HomeMy WebLinkAbout20140513 Ver 2_Modified_Permit_Drawings_20150427WETLAND AND SURFACE WATER IMPACTS PERMIT
�-t, S�ol1.'�P C ��nai'�z r��iay�
, /
�' SITE 4 �
i �
� �
�
UNITm STATES OF AMEfUCA
___ DB 2 PG 265
ABANDON EXISTING COPPER -� �
AND FIBER CABLES :
DEEP CFEEK RNER
/`
TO LONG SH�� �
� CONCRETE FLUME WITH/
— bl LF SHEET PILE CLA55 B RIPRAP OUTLET WETLANDS DELWEATED BY CLAY WILLIS
DIVISION I ENVIRONMENTAL OFFICER
' �'1:3a:i7
�l����.t�y�>'
�`
5'?i::��:::i�i::_..� . . . _
� f ••,���
c.wat
US 264 225'BA o
— CO�ICRETE FLUM TH �3 F
CLASS B RIPRAP LET —
° ExisT ftiw
END OF SHEET
PILE
—�
..�_.. .,_ -.- F
caxac
_ �.. _
PLOW COPPER & FIBER CABLES
TO NEXT PED, 262 LF AT
18' L OF GL
BORE PIT, 17' L OF
GL, STA 20+28
F �
_ �ontuR� T ro _ _ _ _ _ �a— r--r _,.
` 'DATUR) i�FO i�FO
N 5J'l0'2QTW --- —�
i0 ENGLEHARD ---
! — F — —� —�a--T—? —1--r—?--x�a----T—?—
PROJECT REFERENCE NO. SHEEf NO.
17BP.1.R.50 — �
DARE COUNTY BRIDGE #270003
',OADWAY DESIGN HYDRAULICS
ENGINEER ENGINEER
� r{-� . 1-, ' UNITFD STATES OF AMFRICA
�I ��"IY• �� `((,1! S�OV�(J��`r __ 5���.�i,`�.,C�IOYV D6735PG13
_--�-_ __.. -__ _ -_. SITE 5
�
m
�
I o � DIRECTIONAL BORE 825' AT A MINIMUM
�, DEPTH OF 53' BELOW GRADE, 20' GL, TO
I � .� or� aaro� ew�,vice AVOID VERTICAL SHEET PILING. PULL IN
�� — a 825' OF 4" PIPE WITH 1 Y25° SUBDUCT.
, ; PULL COPPER AND FIBER CABLES THRU.
�
a
a
� METHOD II MODIFIED CLEARING
N
/
CAASTAL WETLAND IMPACTS SURFACE WATER IMPACTS
n�'i F DENOTES FILL IN FILLINWETLAND iEMP.IMPACTS lEMP.IMPACTS PERM.IMPACTS
e � WETLAND - -
, � SITE 4 1870 SF 23 SF
', v SI7E 5 436 SF ' ' '
�� q � DENOTES HAND
� CLEARING 60' 0' 60'
� m
a
�
m � DENOTES IMPACTS IN
Y
SURFACE WATER SCALE = I" = 60'
O �
i N i
I �3
�/
I ••
REVISED PROPOSED LOWEST
LOW STEEL = 2.42'
PREVIOUS PROPOSED LOWEST -
LOW STEEL = 1.72'
SHEET PILING
-5. _._ _
r�
_ -l5_ �o
-6Q
14+00
100 YEAR ELEV. = 0.04' �
25 YEAR ELEV. =-0.1'�
O �� N �p �
� � V� �"� �`'� 11j �"�
�l'
BRIDGE HYDRAULIC DATA
DESIGN DISCHARGE = 950 CFS
DESIGN FREQUENCY = 50 YRS
DESIGN HW ELEVATION = 0.0 fT
BASE DISCHARGE _ 1200 CFS
BASE FREQUENCY = l00 YRS
BASE HW ELEVATION = 0.04 fT
OVERTOPPING DISCHARGE = 6755 CFS
OVERTOPPlN6 FREQUENCY= 500+ YRS
OVERTOPPING ELEVATION = 2.3 FT
= Fr
DATE OF SURVEY = 9-28-1/
WS. ELEVATION
AT DATE OF SURVEY = -0J �
15+00
tCpo, r� j
�"� lCj
CL STA. 16 + 06.16 -L-, EL. 5.40'
SKEW = 75 DEGREES
1 @45', 1 @50', 1 @55',
21" CORED SLAB BRIDGE
VERTICAL ABUTMENTS
�
0
�
�
II" 1'� C�> I�� I I. I�:
�
�
O�
� �;
�16
16+00
7N �
I Lry �'j
EXIST. BRIDGE
TO BE REMOVED
REVISED PROPOSED ROADWAY
GRADE AT CENTERLINE
PREVIOUS PROPOSED ROADWAY
GRADE AT CENTERLINE
�— EXISTING LOWEST
�LOW STEEL = 1.67'
SHEET PILING
FEMA 100 YEAR COASTAL
STILL WATER ELEVATION = 4.0'
WSEL=-0.1'
�DATE: 9-28-11 (NWL)
N� o �� � �:
� �y- � N � N N r�j
17+00
10' w
DIRECTIONAL BORE 825' AT A MINIMUM DEPTH OF Q
53' BELOW GRADE9 20' C/L9 TO AVOID VERTICAL �
SHEET PILINGa PULL IN 825' OF 4" PIPE WITH J
I-I/25" SUBDUCTe PULL COPPER AND FIBER a
CABLES THRUe U
F-
4 0' 0' 0' W
>
HORIZONTAL SCALE
18+00
I\( �II>C�)"I�
�
N
I)IVISI�N �F HIGHW�YS
I)ARE COUN�Y
PR�J]ECT: 270003
�IaII)GE 270003
US 2�i�1 �VEI� I)EEF CI�EE�
SHE]ET 1 �F i
o� % 1� %
s�e�� 3