HomeMy WebLinkAbout20071553 Ver 1_Triage Check List_20070924Triage Check List
/I 1~,,,~t1 c
Date: ~ `7 ~ Project Name: ~lG~ W ~I. f0 ~~
FILE CQPY ~°°nTy: J
To: ^ ARO Kevin Barnett
^ FRO Ken Averitte
MRO Alan Johnson/Barry Love
^ RRO Eric Kulz
From:
^ WaRO Kyle Barnes
^ WiRO Noelle Lutheran/Joanne Steenhuis
^ WSRO Daryl Lamb
Tele hone : 919 ~ ~~
P ~ )
The file attached is being forwarded to your for your evaluation.
Please call if you need. assistance.
^ Stream length impacted
^ Stream determination
^ Wetland determination and distance to blue-line surface waters on USFW topo maps
^ Minimization/avoidance issues
^ Buffer Rules (Meuse, Tar-Pamlico, Catawba, Randleman)
^ Pond fill
^ Mitigation Ratios
^ Ditching
^ Are the stream and or wetland mitigation sites available and viable?
^ Check drawings for accuracy
^ Is the application consistent with pre-application meetings?
^ Cumulative impact concern
Comments: