HomeMy WebLinkAboutNC0057703_Authorization to Construct_20160629,. *
Wai er- P esourc es
ENWRONVEN?AL QUALITY
June 29, 2016
Mr. Thomas Roberts
President and Chief Operating Officer
Aqua North Carolina, Inc.
202 Mackenan Court
Cary, North Carolina 27511
SUBJECT:
Dear Mr. Roberts:
PAT MCCRORY
(;orernur
DONALD R. VAN DER VAART
Secrelarr
S. JAY ZIMMERMAN
Authorization to Construct
A to C No. 057703A05
Aqua North Carolina, Im
The Cape WWTP
Direclor
A letter of request for an Authorization to Construct was received November 12, 2015, by
the Division of Water Resources (Division), and final plans and specifications for the subject
project have been reviewed and found to be satisfactory. Authorization is hereby granted for the
construction of modifications to the existing 0.26 MGD The Cape WWTP, with discharge of
treated wastewater into the Cape Fear River in the Cape Fear River Basin.
This authorization results in no increase in design or permitted capacity and is awarded for
the construction of the following specific modifications:
Installation of new headworks consisting of a single unit for peak flow 700 GPM with
combined operations of mechanical screening, grit removal, and FOG removal with,
piping, auxiliary conveyors, blowers, wash systems, and other controls; installation of
a new flow splitter box with mechanical bar screen, piping, and controls; installation
of a new 100,000 gallon EQ basin with coarse air diffuser system, two (2) 140 SCFM
blower, piping, and controls; installation of three (3) new 325 GPM at 12.6 ft TDH
EQ submersible pumps; in conformity with the project plans, specifications, and other
supporting data subsequently filed and approved by the Department of Enviromnental
Quality.
This Authorization to Construct is issued in accordance with Part III, Paragraph A of
NPDES Permit No. NCO057703 issued January 1, 2012, and shall be subject to revocation unless
the wastewater treatment facilities are constructed in accordance with the conditions and
limitations specified in Permit No. NC0057703.
The sludge generated from these treatment facilities must be disposed of in accordance
with G.S. 143-215.1 and in a manner approved by the Division.
State of North Carolina I Environmental Quality I Water Resources
1617 Mail service Center I Raleigh, North Carolina 27699-1617
Location: 512 N. Salisbury St. Raleigh, North Carolina 27604, Archdale Building 9th Floor
Phone: 919 807 6300 / Fax: 919 807 9489
Mr. Thomas Roberts, President Aqua North Carolina, Inc.
June 29, 2016
Page 2 of 3
In the event that the facilities fail to perform satisfactorily, including the creation of
nuisance conditions, the Permittee shall take immediate corrective action, including those as may
be required by the Division, such as the construction of additional or replacement wastewater
treatment or disposal facilities.
The Wilmington Regional Office, telephone number (910) 796 - 7215, shall be notified at
least forty-eight (48) hours in advance of operation of the installed facilities so that an on site
inspection can be made. Such notification to the regional supervisor shall be made during the
normal office hours from 8:00 a.m. until 5:00 p.m. on Monday through Friday, excluding State
Holidays.
Upon completion of construction and prior to operation of this permitted facility, a
certification must be received from a professional engineer certifying that the permitted facility
has been installed in accordance with the NPDES Permit, this Authorization to Construct and the
approved plans and specifications. Mail the Certification to: Division of Water Resources, WQ
Permitting Section — NPDES, 1617 Mail Service Center, Raleigh, NC 27699-1617.
Upon classification of the facility by the Certification Commission, the Permittee shall
employ a certified wastewater treatment plant operator to be in responsible charge (ORC) of the
wastewater treatment facilities. The operator must hold a certificate of the type and grade at least
equivalent to or greater than the classification assigned to the wastewater treatment facilities by
the Certification Commission.
The Permittee must also employ a certified back-up operator of the appropriate type and
=r grade to comply with the conditions of T15A:8G.0202. The ORC of the facility must visit each
Class I facility at least weekly and each Class II, III and IV facility at least daily, excluding
weekends and holidays, must properly manage the facility, must document daily operation and
maintenance of the facility, and must comply with all other conditions of T15A:8G.0202.
A copy of the approved plans and specifications shall be maintained on file by the Permittee
for the life of the facility.
During the construction of the proposed additions/modifications, the permittee shall continue to
properly maintain and operate the existing wastewater treatment facilities at all times, and in such
a manner, as necessary to comply with the effluent limits specified in the NPDES Permit.
You are reminded that it is mandatory for the project to be constructed in accordance with
the North Carolina Sedimentation Pollution Control Act, and when applicable, the North Carolina
Dam Safety Act. In addition, the specifications must clearly state what the contractor's
responsibilities shall be in complying with these Acts.
Prior to entering into any contract(s) for construction, the recipient must have obtained all
applicable permits from the State.
%
'" Mr. Thomas Roberts, President Aqua North Carolina, Inc.
June 29, 2016
Page 3 of 3
Failure to abide by the requirements contained in this Authorization to Construct may
subject the Permittee to an enforcement action by the Division in accordance with North Carolina
General Statute 1437215.6A to 143-215.6C.
The issuance of this Authorization to Construct does not preclude the Permittee from
complying with any and all statutes, rules, regulations, or ordinances which may be imposed by
other government agencies (local, state, and federal) which have jurisdiction.
If you have any questions or need additional information, please contact Ron Berry at
telephone number (919) 807-6396.
Sincerely,
r4i� ot -
S. Jay Zimmerman
Director, Division of Water Resources
cc: Michael Wicker, P.E.
WithersRavenel, Inc
115 MacKenan Drive
Cary, NC 27511
DWR/Wilmington Regional Office, Water Quality Programs
Central Files
NPDES File
Without Engineer's Certificate attached:
New Hanover County Health Department
Y ..
Aqua North Carolina, Inc.
The Cape WWTP
Authorization to Construct No. 057703A05
Issued June 29, 2016
Engineer's Certification
I, , as a duly registered Professional Engineer in
the State of North Carolina, having been authorized to observe (periodically/weekly/full time)
the construction of the modifications and improvements to The Cape Wastewater Treatment
Plant, located in New Hanover County, hereby state that, to the best of my abilities, due care and
diligence was used in the observation of the following construction:
Installation of new headworks consisting of a single unit for peak flow 700 GPM with
combined operations of mechanical screening, grit removal, and FOG removal with,
piping, auxiliary conveyors, blowers, wash systems, and other controls; installation
of a new flow splitter box with mechanical bar screen, piping, and controls;
installation of a new 100,000 gallon EQ basin with coarse air diffuser system, two
(2) 140 SCFM blower, piping, and controls; installation of three (3) new 325 GPM
at 12.6 ft TDH EQ submersible pumps; in conformity with the project plans,
specifications, and other supporting data subsequently filed and approved by the
Department of Environmental Quality.
I certify that the construction of the above referenced project was observed to be built within
substantial compliance, intent and in conformity with all applicable regulations and statutes and
the project plans, specifications, and other supporting documentation comprising the
Authorization to Construct Permit Application package.
Signature
Date
Registration No.
Mail this Certification to: Attn: Ron Berry SEAL
Complex Permitting Unit
DEQ/DWR/Water Quality Programs �•.
1617 Mail Service Center `.
Raleigh, NC 27699-1617