Loading...
HomeMy WebLinkAbout20140957 Ver 2_Attch2_WetlandTable_2_HUC8_20190711TABLE 2 (REVISED JULY 2019) Atlantic Coast Pipeline Project - U.S. Army Corps of Engineers Wilmington District HUC 8 Wetland Impacts Table Cowardin Pipeline Centerline Temporary Impacts Conversion Impacts Permanent Loss HUC 8 Watershed Classification a Crossing Length (feet) (acre) (acre) b (acre) 03010107 PEM 100 0.318 0.000 0.000 PFO 4,478 8.441 3.103 0.000 PSS 182 0.387 0.042 0.000 Total 4,760 9.146 3.145 0.000 03010204 PEM 957 1.931 0.000 0.000 PFO 14,249 24.240 9.711 0.007 PSS 218 0.638 0.051 0.000 Total 159424 26.809 9.761 0.007 03020101 PEM 780 1.604 0.000 0.000 PFO 23,701 42.438 16.440 0.000 PSS 119 0.277 0.040 0.000 Total 249600 44.320 16.480 0.000 03020102 PEM 1,856 3.189 0.000 0.002 PFO 19,626 34.022 13.572 0.129 PSS 3,542 6.359 0.815 0.000 Total 259024 43.569 14.388 0.131 03020201 PEM 692 1.212 0.000 0.000 PFO 43,144 76.847 29.522 0.171 PSS 2,376 4.186 0.604 0.000 Total 469213 82.245 30.127 0.171 03020203 PEM 139 0.183 0.000 0.000 PFO 26,134 45.107 18.013 0.000 PSS 360 0.648 0.083 0.000 Total 269633 45.937 18.096 0.000 03030004 PEM 91 0.158 0.000 0.000 PFO 5,102 9.074 3.513 0.000 PSS 257 0.398 0.059 0.000 Total 59450 9.630 3.571 0.000 03030005 PEM 0 0.359 0.000 0.000 PFO 17,538 28.772 11.098 0.000 PSS 2,286 3.132 0.533 0.000 Total 199824 32.263 11.631 0.000 03030006 PEM 1,540 7.902 0.000 0.000 PFO 34,461 57.545 23.547 0.000 PSS 10,337 17.844 2.373 0.000 Total 46,338 83.291 25.921 0.000 03040203 PEM 1,563 2.583 0.000 0.000 PFO 30,925 53.707 21.309 0.000 PSS 10,873 18.678 2.498 0.000 Total 43,361 74.968 23.807 0.000 Project Total 2579627 452.178 156.927 0.310 a Indicates Cowardin classification. PEM - emergent, PSS - scrub -shrub, PFO - forested. b Conversion of PFO and PSS wetlands consists of acreage that will be maintained as herbaceous/scrub-shrub wetlands following construction to facilitate inspection and maintenance of the pipeline. Note: The totals shown in this table may not equal the sum of addends due to rounding