HomeMy WebLinkAboutNCC230949_ESC Approval Submitted_20230405 of wAN
• 2G�Salisbury
N*[
916Ril IZ ♦113
March 14"', 2023
Send To:
CT Corporation System
160 Mine Lake Ct., Suite 200
Raleigh,NC 27615
Attn: Mr. Chris Davis
Utah Development, LLC
25000 Assembly Park
Wixom,MI 48393-0019
RE: APPROVAL LETTER w/MODIFICATIONS—EROSION CONTROL PLAN(EC23.001)
PROJECT NAME: Rowan County RV Dealership—EC23.001
LOCATION: East Ritchie Rd.
TOTAL DISTURBED ACRES: 33.5
LATITUDE: 35°37' 35"N
LONGITUDE: -80°29'38"W
Dear Mr. Chris Davis:
This office has reviewed the subject erosion and sedimentation control plan. We find the revised
plans submitted on March 9`h, 2023 to be acceptable with the following modifications:
1. Construction shall not begin before ownership of property has been transferred to the FRO.
Copy of new deed should be presented to this office at that time.
2. Provide a copy of the 401 and 404 permits for the stream impacts.
3. Provide additional EC measures to protect stream from slope build-up at crossings. EC
measures should extend to the crossing culvert and wrap back to the slope.
We hereby issue this Letter of Approval w/Modifications and the following comments:
1. A pre-construction conference is required for this project. Contact this office at least
48 hours in advance.
2. This approval does not authorize off-site land-disturbing activity (borrow or spoil)
associated with this project.
3. This approval does not supercede nor negate the need for any applicable development
permits or approvals including (ie: planning, subdivision, floodplain, DOT, etc.).
Letter of Approval
Mr. Chris Davis
March 14'h, 2023
Page 2
Please be advised that Section 18-52 b. of the Rowan County Soil Erosion & Sedimentation
Ordinance (RCSESO) states that a copy of the approved Erosion Control Plan be on file at the job site.
Also, you should consider this letter as giving the Notice required by G.S. 113A-61(d) & Section 18.53 a.
of that same ordinance specifying our right of periodic inspection to ensure compliance with the approved
plan. This plan approval shall expire three (3) years following the date of approval if no land-disturbing
activity has been undertaken,as is required by Title 15A NCAC 4B.0129.
Based on rules established by the North Carolina Department of Environmental Management
Land Resources (DEMLR) as of April 1, 2019, all new construction activities are required to complete
and submit an electronic Notice of Intent (NOI) form requesting a Certificate of Coverage (COC) under
the NCG010000 Construction Stormwater General Permit. This form MUST be submitted prior to the
commencement of any land disturbing activity on the above mentioned project. The NOI form may be
accessed at deq.nc.gov/NCG01. Please direct questions about the NOI form to Paul Clark at
Paul.clarkgncdenr.gov. After you submit a complete and correct NOI form, a COC will be emailed to
you within three business days. A $100 fee will be charged annually. This fee is to be sent to the
DEMLR Stormwater Central Office staff in Raleigh.
Rowan County's Sedimentation Pollution Control Program is performance oriented, requiring
protection of the natural resources and adjoining properties. If, following the commencement of this
project, it is determined that the erosion and sedimentation control plan is inadequate to meet the
requirements of the Sedimentation Pollution Act of 1973 (North Carolina General Statute 113A-51 thru
66), which are set forth in the local ordinance, this office may require revisions to the plan and
implementation of the revisions to ensure compliance with the Act.
Acceptance and approval of this plan is conditioned upon your compliance with Federal and State
water quality laws, regulations,and rules pursuant to G.S. 113A-61(bl).
Please note that this approval is based in part on the accuracy of the information provided in the
Financial Responsibility Form which you have provided. You are requested to file an amended form if
there is any change in the information included on the form.
Your cooperation is appreciated,and we look forward to working with you on this project.
Sincerely,
Josh Canup, CPESC
Environmental Compliance Specialist
ec: Shane Stewart, Alan Moseley- PE