Loading...
HomeMy WebLinkAbout20191299 Ver 2_ePCN Application_20230330DWR Division of Water Resources Pre -Construction Notification (PCN) Form For Nationwide Permits and Regional General Permits (along with corresponding Water Quality Certifications) April 13, 2022 Ver 4.3 Initial Review Has this project met the requirements for acceptance in to the review process? Yes No Is this project a public transportation project?* Yes No Change only If needed. Pre -Filing Meeting Date Request was submitted on: 3/30/2023 BIMS # Assigned 20191299 Is a payment required for this project?* No payment required Fee received Fee needed - send electronic notification Select Project Reviewer* Zachary Thomas:zachary.thomas@ncdenr.gov Information for Initial Review la. Name of project: Stone Landfill Stormwater Basin Improvement 1a. Who is the Primary Contact?* Alan Stone 1b. Primary Contact Email: * alanrocs@gmail.com Date Submitted 3/30/2023 Nearest Body of Water Overcup Creek (LISGS) New Hope Arm of B. Everett Jordan Lake (DWR) Basin Cape Fear Water Classification WS-IV,B; NSW, CA Site Coordinates Latitude: Longitude: 35.8025121-79.0296110 A. Processing Information Is this project connected with ARPA funding? Yes No County (or Counties) where the project is located: Chatham Is this a NCDMS Project Yes No Version#* 2 Reviewing Office` Raleigh Regional Office - (919) 791-4200 1c. Primary Contact Phone: * (919)971-0918 a Is this project a public transportation project?* Yes No 1a.Type(s)of approval sought from the Corps: Section 404 Permit (wetlands, streams and waters, Clean Water Act) Section 10 Permit (navigable waters, tidal waters, Rivers and Harbors Act) Has this PCN previously been submitted?* Yes No 1b. What type(s) of permit(s) do you wish to seek authorization? Nationwide Permit (NWP) Regional General Permit (RGP) Standard (IP) 1c. Has the NWP or GP number been verified by the Corps? Yes No Nationwide Permit (NWP) Number: 03 - Maintenance NWP Numbers (for multiple NWPS): 1d. Type(s) of approval sought from the DWR: 401 Water Quality Certification - Regular 401 Water Quality Certification - Express Non-404 Jurisdictional General Permit Riparian Buffer Authorization Individual 401 Water Quality Certification le. Is this notification solely for the record because written approval is not required? " For the record only for DWR 401 Certification: Yes No For the record only for Corps Permit: Yes No 1f. Is this an after -the -fact permit application? * Yes No 1g. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? Yes No 1g. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? Yes No 1h. Is the project located in any of NC's twenty coastal counties? Yes No 1j. Is the project located in a designated trout watershed? Yes No B. Applicant Information 1d. Who is applying forthe permit? Owner Applicant (other than owner) le. Is there an Agent/Consultant for this project? Yes No 2. Owner Information 2a. Name(s) on recorded deed: ARBD LLC 2b. Deed book and page no.: 1828 0533 2c. Contact Person: Alan H Stone 2d.Address Street Address 5180A Big Woods Drive Address Line 2 City State / Province / Region Chapel Hill NC Postal / Zip Code Country 27517 USA 2e. Telephone Number: (919)971-0918 2g. Email Address:* alanrocs@gmail.com 4. Agent/Consultant (if applicable) 4a. Name: Philip May 4b. Business Name: Inver Environmental Consulting, LLC 4c.Address Street Address 105 West 4th St Address Line 2 Suite 700 city Winston-Salem Postal / Zip Code 27101 4d. Telephone Number: (919)606-1065 4f. Email Address:* philm@inverenv.com C. Project Information and Prior Project History 1. Project Information 1b. Subdivision name: (if appropriate) 1c. Nearest municipality / town: Chapel Hill NC 2. Project Identification 2a. Property Identification Number: 0087334 2c. Project Address Street Address 5180A Big Woods Drive Address Line 2 City Chapel Hill Postal / Zip Code 27517 3. Surface Waters 3a. Name of the nearest body of water to proposed project: * Overcup Creek (USGS) New Hope Arm of B. Everett Jordan Lake (DWR) 3b. Water Resources Classification of nearest receiving water: WS-IV,B; NSW, CA 3c. What river basin(s) is your project located in?* Cape Fear 3d. Please provide the 12-digit HUC in which the project is located. 030300020610 4. Project Description and History 2f. Fax Number: State / Province / Region NC Country USA 4e. Fax Number: 2b. Property size: 2.13 State / Province / Region NC Country USA 4a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: * The site is an existing Land Clearing & Inert Debris (LCID) landfill. Adjacent areas are a mix of dispersed residences, forested areas, and US Army Corps of Engineers land around Lake Jordan. 4b. Have Corps permits or DWR certifications been obtained for this project (including all prior phases) in the past? Yes No Unknown If yes, please give the DWR Certification number or the Corps Action ID (exp. SAW-0000-00000). Action ID SAW-2019-01857 No corresponding DWR number (courtesy copied on PCN) 4f. List the total estimated acreage of all existing wetlands on the property: 0.41 (entire landfill property) 4g. List the total estimated linear feet of all existing streams on the property: 1570 (entire landfill property) 4h. Explain the purpose of the proposed project:* The purpose of the project is to improve stormwater management on the east side of the existing LCID landfill by enlarging an existing basin (see attached plans). No increase in landfill footprint is associated with the project as it will remain within the existing permitted area. 4i. Describe the overall project in detail, including indirect impacts and the type of equipment to be used: * The existing basin on the east side of the landfill will be improved through volume and area expansion to better manage stormwater on the site. The new basin will be graded and an outlet structure and emergency spillway provided to discharge stormwater in a controlled manner. Construction will be performed using standard equipment likely including bulldozers, graders, and excavators. No specialized equipment is anticipated. 5. Jurisdictional Determinations 5a. Have the wetlands or streams been delineated on the property or proposed impact areas? Yes No Comments: Prior delineation was reviewed on 2/6/23 5b. If the Corps made a jurisdictional determination, what type of determination was made? Preliminary Approved Not Verified Unknown N/A Corps AID Number: SAW-2019-01857 5c. If 5a is yes, who delineated the jurisdictional areas? Name (if known): Rob Crowther Agency/Consultant Company: Carolina Ecosystems, Inc. Other: C3 Unknown 5d. List the dates of the Corp jurisdiction determination or State determination if a determination was made by the Corps or DWR USACE PJD Issued in conjunction with NWP on 11/7/19. 6. Future Project Plans 6a. Is this a phased project?* Yes No Are any other NWP(s), regional general permit(s), or individual permits(s) used, or intended to be used, to authorize any part of the proposed project or related activity? No additional impacts are anticipated for the landfill to continue operation. The 2019 NWP was issued for basin A improvements associated with continued landfill construction. This basin (D - see attached plans) is on the Phase 1 side of the landfill and was an existing sediment trap that requires improvements as the site continues to operate and fill the permitted cells. D. Proposed Impacts Inventory 1. Impacts Summary 1a. Where are the impacts associated with your project? (check all that apply): Wetlands Streams -tributaries O Buffers Open Waters Pond Construction 2. Wetland Impacts O 2a1 Reason (?) Grading 1p 2b. Impact type* (?) 2c. Type of W.* Headwater Forest 2d. W. name WB 2e. Forested* Yes 2f. Type of Jurisdicition * ?) Both 2g. Impact area * 0(ac. (acres) Clearing T Headwater Forest WB f=][B.th 0.060 (acres) 2g. Total Temporary Wetland Impact 2g. Total Permanent Wetland Impact 0.060 0.027 2g. Total Wetland Impact 0.087 2i. Comments: Temporary impacts associated with clearing for construction access on the east side of the existing basin, in order for the basin to remain in operation while the new berm is graded. E. Impact Justification and Mitigation 1. Avoidance and Minimization 1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project: The basin location cannot avoid the wetlands, which begin at the foot of the existing basin and may have been created or enlarged by the long-term seepage from the existing basin. The configuration of the basin has been altered to minimize wetland impacts while controlling stormwater prior to discharge. Enlarging the basin in other directions is not practicable to maintain drainage/flow or it would require removal of significant amount of waste material to the west. Primary discharge will be to an upland area with secondary discharge to the stream below the wetland. 1b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques: Sediment and erosion control measures including silt fence and check dams will be installed and maintained throughout construction. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? Yes No 2b. If this project DOES NOT require Compensatory Mitigation, explain why: Total impacts for this site, including the prior 2019 Nationwide Permit, are below typical thresholds (0.1 acre) for wetland mitigation. F. Stormwater Management and Diffuse Flow Plan (required by DWR) 1. Diffuse Flow Plan 1a. Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules? Yes No If no, explain why: The stream channel shown on the attached plans is not shown on USGS or NRCS mapping (maps from prior permit are attached), and therefore not under the jurisdiction of the Jordan Lake Buffer Rules. A 50-foot buffer is being retained for the purposes of other local approvals. 2. Stormwater Management Plan 2a. Is this a NCDOT project subject to compliance with NCDOT's Individual NPDES permit NCS000250? Yes No 2b. Does this project meet the requirements for low density projects as defined in 15A NCAC 02H .1003(2)? Yes No Comments: The LCID landfill will be primarily a vegetated cap with little impervious area. The discharge from the basin will be to an existing low area which will allow overland flow back toward the short stream segment west of Big Woods Drive. The basin will have minimal flow during the design storm, and likely reduced flow compared to the existing basin discharge. G. Supplementary Information 1. Environmental Documentation 1a. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land? Yes No 2. Violations (DWR Requirement) 2a. Is the site in violation of DWR Water Quality Certification Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), or DWR Surface Water or Wetland Standards or Riparian Buffer Rules (15A NCAC 2B .0200)? * Yes No 3. Cumulative Impacts (DWR Requirement) 3a. Will this project result in additional development, which could impact nearby downstream water quality? * Yes No 3b. If you answered "no," provide a short narrative description. No road or sewer improvements, which typically are required to increase development, are associated with the project. There is no additional landfill capacity associated with this project, and no increase in landfill traffic. O O O 4. Sewage Disposal (DWR Requirement) 4a. Is sewage disposal required by DWR for this project? Yes No N/A 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or habitat?* Yes No 5b. Have you checked with the USFWS concerning Endangered Species Act impacts? Yes No 5c. If yes, indicate the USFWS Field Office you have contacted. Raleigh 5d. Is another Federal agency involved?* Yes No 5e. Is this a DOT project located within Division's 1-8? Yes No 5f. Will you cut any trees in order to conduct the work in waters of the U.S.? Yes No 5g. Does this project involve bridge maintenance or removal? Yes No 5h. Does this project involve the construction/installation of a wind turbine(s)?' Yes No Unknown 5i. Does this project involve (1) blasting, and/or (2) other percussive activities that will be conducted by machines, such as jackhammers, mechanized pile drivers, etc.? Yes No 5j. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? IPaC database (03/30/23), NCNHP Data Explorer (03/30/23) and on -site review of habitats (02/06/23). No habitat is present for IPaC species (red - cockaded woodpecker, Atlantic pigtoe, Harparella). Vegetation has been cleared from the project area but were not significant size or composition to provide RCW habitat (previously disturbed area on the perimeter of existing landfill). 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as an Essential Fish Habitat?* Yes No 6b. What data sources did you use to determine whether your site would impact an Essential Fish Habitat? NOAA EFH Mapper 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation status? Yes No 7b. What data sources did you use to determine whether your site would impact historic or archeological resources? NC SHPO HPOWeb Map Service. No historic resources present in the vicinity of the project. The area has been previously disturbed for landfill construction, stormwater management, and power line clearing. 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA-designated 100-year floodplain? Yes No 8c. What source(s) did you use to make the floodplain determination?* NC DEM Flood Mapping Program. FEMA zones are on the east side of Big Woods Drive. Miscellaneous O Please use the space below to attach all required documentation or any additional information you feel is helpful for application review. Documents should be combined into one file when possible, with a Cover Letter, Table of Contents, and a Cover Sheet for each Section preferred. Click the upload button or dreg and drop files here to attach document StoneLCID_PCNAttachments_033023.pdf 3AMB File must be PDF or KMZ Comments While initial clearing has been performed within the limits of the proposed basin, no construction/permanent fill or grading has taken place, therefore no violation of wetland standards or unauthorized fill has occurred. Based on review of the current Nationwide Permit 3 and Regional Conditions, and General Certification 4239, written authorization is not required. Please contact me at your earliest convenience if you have any questions regarding this project. Thanks Phil Signature p By checking the box and signing below, I certify that: • The project proponent hereby certifies that all information contained herein is true, accurate, and complete to the best of my knowledge and belief; and • The project proponent hereby requests that the certifying authority review and take action on this CWA 401 certification request within the applicable reasonable period of time. • I have given true, accurate, and complete information on this form; • I agree that submission of this PCN form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act"); • I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act"); • I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND • I intend to electronically sign and submit the PCN form. Full Name: Philip May Signature Date 3/30/2023