Loading...
HomeMy WebLinkAbout20150378 Ver 1_SW Impact Analysis_20150420STORMWATER IMPACT ANALYSIS/ STORMWATER NARRATIVE AND CALCULATIONS FOR 6 Davis Drive Durham County, North Carolina (AMENDMENT TO APPROVED PHASE SITE PLAN) Prepared for: - A: AL E X A N D RIAs ARE - NC Region No. 14, LLC 6 Davis Drive, P.O. Box 12137 Research Triangle Park, North Carolina 27709 Date: March 3, 2014 Revised: August 29, 2014 Prepared by: v v N ! f. ,,, O,f1I A(9 5E L - 033840 _ 1730 Varsity Drive, Suite 500 Raleigh, NC 27606 Phone: 919.233.8091 Fax: 919.233.8031 F -1222 6 DAVIS DRIVE STORMWATER IMPACT ANALYSIS / STORMWATER NARRATIVE AND CALCULATIONS TABLE OF CONTENTS Stormwater Narrative Maps Drainage Area Point of Analysis Pre- and Post - Development Time of Concentration and Routing Calculations Upstream Drainage Area Runoff Calculations Downstream Culvert Analysis Wet Detention Storage Volume and Pond Sizing Wet Detention Pond Time of Concentration and Routing Calculations BMP #2 Detention and Stormfilter Sizing Calculations Bioretention Sizing Calculations Bioretention Time of Concentration and Routing Calculations Seasonal High Water Table Report - ECS Carolinas, LLP Erosion Control Outlet Protection Calculations Permanent Grassed Swale Calculations Hydraulic Grade Line Profiles - Stormwater Conveyance Gutter Spread Calculations Anti - Floatation Calculations BMP Design Summary Worksheets Storm Drainage Specifications Erosion Control Specifications - Riprap PROJECT DESCRIPTION This project involves the construction of a two new buildings for the Hamner Institutes campus in Research Triangle Park, North Carolina. This project is the first step to a long- term masterplanned campus. Building B1 will be a 5- story, flexible, multi- tenant shell laboratory. The footprint for the new building will be approximately 41,000 square feet which will contain around 165,000 total square feet. Building 2 will be a greenhouse which will contain 53,000 square feet. These buildings will be devoted towards the combined uses of research /laboratory /office /conference. Along with the buildings, 2 new parking lots will provide approximately 523 parking spaces to serve the new tenants. The entrance to the site is located on the west side of Davis Drive, approximately 0.5 miles north of the interchange where Davis Drive crosses 1 -40. SITE DESCRIPTION The existing site is approximately 56.2 acres of mixed hardwood forest which also accommodates one building that is currently the corporate home for the Hamner Institutes and is approximately 115,000 square feet. It is currently served by 194 total parking spaces. The site lies within the Burden's Creek sub - watershed of the Cape Fear River Basin and does not lie within any of Durham County's Water Supply Watersheds. Two jurisdictional perennial streams are found on the site. Both streams are unnamed tributaries to Burden's Creek. One stream (stream A) flows from north to south the western property line of the site. Once it exits the site, Stream A flows under 1 -40. The other stream (Stream B) flows from northeast to southwest and crosses the southeastern corner of the site. Stream B flows into the adjacent property to the south and eventually under 1 -40. The two streams eventually converge approximately 0.25 miles downstream from where stream A crosses 1 -40. Both streams have a 100 -year flood plain that encroaches onto the site. Beyond the 100 -year flood area, portions of the site are located in Zone "X," a 500 year flood area (see FEMA FIRM Panel 0748 located in the "MAPS" section of this document.) A ridgeline running from the northeast property corner towards the southwest generally divides the drainage for the site. The western side of the side drains towards the existing perennial stream flowing along the western property line. The eastern side of the site drains towards the stream flowing across the southeastern portion of the site. SOILS According to the Durham County Generalized Soil Survey, the majority of uplands within the site are classified as White Store sandy loam, ranging from 2% to 25% slopes (WsB, 2 of 10 WsC, WsE). Along the banks of the stream, soils are classified as Cartecay and Chewacla soils, 0% to 2% slopes, frequently flooded (Cc). The following soil descriptions are associated with the soils found on the site: Ws(X) - White Store sandy loam soils are often found in piedmont uplands, along rounded divides and steep side slopes. These soils were created from weathered Triassic Mudstone. Permeability is very slow and the soils are moderately well drained. Soils have a high shrink /swell potential. The seasonal high water is generally about 1.5 feet below the surface. These soils are in the Hydrologic Soil Group (HSG) D in the City of Durham Public Works Reference Guide for Development. Cc - Cartecay and Chewacla soils are a mixture of approximately 60% Cartecay and 30% Chewacla. These soils are often found along floodplains at slopes of 0% to 2 %. Permeability is moderately rapid and the soils are poorly drained. Soils have a low shrink /swell potential. The seasonal high water is perched and generally 1.5 feet below the ground surface in the late winter and early spring. These soils are in the HSG C. EXISTING POINTS OF ANALYSIS The existing site can be broken into 8 points of analysis where most of the runoff will cross the property line. Each point of analysis has a contributing drainage area which was delineated and broken into areas of impervious, and various levels of vegetated cover. The times of concentration for each basin were calculated based on the ground cover and type of flow based on that ground cover. 3 of 10 Existing Time Pre -Dev. Pre -Dev. Pre -Dev. Pre -Dev. Point of Drainage of 1- Yr /24 -Hr 2- Yr /24 -Hr 10- Yr /24 -Hr 100- Yr /24 -Hr Analysis Area (ac) Conc. Peak Runoff Peak Runoff Peak Runoff Peak Runoff min. ) (cfs) (cfs) (cfs) (cfs A 6.27 47.8 3.78 5.57 10.60 18.67 B 11.10 66.6 5.95 8.56 15.78 27.21 C 2.51 6.5 4.90 6.89 12.28 20.64 D 1 5.28 51.4 3.33 4.91 9.33 16.46 E 10.28 19.5 18.5 24.60 40.45 64.22 F 3.02 36.6 2.35 3.41 6.37 11.08 G 1.32 32.6 1.41 1.95 3.42 5.67 H 16.42 19.5 21.85 30.80 55.27 92.38 3 of 10 POST - DEVELOPMENT POINTS OF ANALYSIS The developed site was analyzed at the previously defined 8 points of analysis. Each point of analysis has a contributing drainage basin that was delineated and broken into areas of impervious, and various levels of vegetated cover. Several basins remain untouched with the proposed development, therefore the post development runoff remains unchanged from the existing runoff. The drainage areas for points of analysis B,C, D, E and H were affected by the new development. The times of concentration for each basin were calculated based on the ground cover and type of flow based on that ground cover. 4 of 10 New Time Post -Dev. Post -Dev. Post -Dev. Post -Dev. Point of Drainage of 1- Yr /24 -Hr 2- Yr /24 -Hr 10- Yr /24 -Hr 100- Yr /24 -Hr Analysis Area (ac) Conc. Peak Runoff Peak Runoff Peak Runoff Peak Runoff min. ) (cfs) (cfs) (cfs A 6.27 47.8 3.78 5.57 10.60 18.67 B 10.05 37.6 9.19 12.89 22.93 38.52 C 2.36 4.1 5.04 7.08 12.58 21.11 D 6.47 8.4 19.49 25.12 39.48 60.67 E 9.41 19.5 16.94 22.52 37.03 58.78 F 3.02 36.6 2.35 3.41 6.37 11.08 G 1.32 32.6 1.41 1.95 3.42 5.67 H 16.49 19.5 27.08 36.67 61.96 100.27 4 of 10 RESULTS Point of Analysis PRE -DEV. 1 -YR DIS. cfs ) POST -DEV. 1 -YR DIS. (cfs) % INC. PRE -DEV. 2 -YR DIS. cfs) POST -DEV. 2 -YR DIS. cfs % INC. PRE -DEV. 10 -YR DIS. cfs POST -DEV. 10 -YR DIS. cfs % INC. DET. REQ (Y /N A 3.78 3.78 0 5.57 5.57 0 10.60 10.60 0 N B 5.95 9.19 54.4 8.56 12.89 50.5 15.78 22.93 45.3 Y C 4.90 5.04 2.8 6.89 7.08 2.7 12.28 12.58 2.4 N D 3.33 19.49 485.2 4.91 25.12 411.6 9.33 39.48 323.1 Y E 18.50 16.94 -8.4 24.60 22.52 -8.5 40.45 37.03 -8.5 N F 2.35 2.35 0 3.41 3.41 0 6.37 6.37 0 N G 1.41 1.41 0 1.95 1.95 0 3.42 3.42 0 N H 21.85 27.08 23.9 30.80 36.67 19.0 55.27 61.96 12.1 Y 5 of 10 SUMMARY OF RESULTS Point of Analysis A Based on the above results, this basin will not require any measure to reduce the runoff as no new improvements occur in this basin. The post - development runoff remains unchanged from the pre - development runoff. Point of Analysis B Based on the above results, the drainage area contributing to Point of Analysis B will require some measure to attenuate the peak flow from the addition of the parking areas since the post - development runoff is more than 10% greater than the pre - development runoff. Point of Analysis C Based on the above results, this basin will not require any measure to reduce runoff as the runoff is decreased due to a realignment of the drainage basin contributing to this point of analysis. Point of Analysis D Based on the above results, the drainage area contributing to Point of Analysis B will require some measure to attenuate the peak flow from the addition of the parking areas since the post - development runoff is more than 10% greater than the pre - development runoff. Point of Analysis E Based on the above results, this basin will not require any measure to reduce runoff as the runoff is decreased due to a realignment of the drainage basin contributing to this point of analysis. Point of Analysis F Based on the above results, this basin will not require any measure to reduce the runoff as no new improvements occur in this basin. The post - development runoff remains unchanged from the pre - development runoff. Point of Analysis G Based on the above results, this basin will not require any measure to reduce the runoff as no new improvements occur in this basin. The post - development runoff remains unchanged from the pre - development runoff. 6 of 10 Point of Analysis H Based on the above results, a measure would need to be installed in the drainage basin to attenuate the post - development peak runoff. CONCLUSIONS Based on Durham County's requirements set forth in the Durham County Stormwater Ordinance, section 14- 153.c, all high density developments with greater than 240 impervious area and located outside the Neuse River Basin are required to control and treat runoff from the first one inch of rainfall and remove 850 of the total suspended solids, as well as show no net increase in peak flow leaving the site from pre - development conditions for the one -year, 24 -hour storm event. Consideration was given to each BMP as to location, drainage area size and need to determine the most appropriate BMP for each given application. POINT OF ANALYSIS B The drainage area for the regional BMP in the drainage area contributing to Point of Analysis B is 2.77 acres. Due to the amount of the volume attenuation that needs to be achieved by this device and considering future buildout of the site, a bioretention area seemed to be the best BMP for this application. Based on the amount of runoff a volume analysis concludes that approximately 6,165 cubic feet of storage will be required to treat the 1.00 -inch storm for 85% TSS removal and properly attenuate the post development runoff to below pre - development conditions. The surface area calculation determined that approximately 6,165 square feet of pond surface area would be required for 12 in ponding depth. The bioretention area has been oversized to account for additional runoff volume by a future building to the north and future roadway. As seen in the results table below, the proposed bioretention area (BMP #4) will reduce the 1 -year post - development runoff flow to below pre - development levels, and keep the 2 -year and 10 -year post - development flows from increasing more than 10% from their pre - development values. Storm Event cfs Site Condition 1 -year (cfs) 2 -year (cfs) 10 -year (cfs) 100 -year (cfs) Pre - Development 5.95 8.56 15.78 27.21 Post - Development without Detention 9.19 12.89 22.93 38.52 Post - Development 1.76 2.24 3.34 10.13 with Detention 7 of 10 POINT OF ANALYSIS D The drainage area for the regional BMP in the drainage area contributing to Point of Analysis D is 5.10 acres. Due to the nature of the volume attenuation that needs to be achieved by this device, a wet detention pond seemed to be the best BMP for this application. Based on the amount of runoff a volume analysis concludes that approximately 1.88 acre -feet, or 82,180 cubic feet of storage will be required to properly attenuate the post development runoff to below pre - development conditions. The surface area calculation determined that approximately 8,690 square feet of pond surface area would achieve 90% TSS removal, therefore requiring no level spreader or vegetated filter before entering the existing stream buffer. The detention pond will be oversized to account for the additional runoff volume contributed by future roadway and a future building to the south. As seen in the results table below, the proposed wet detention pond (BMP #1) will reduce the 1 -year post - development runoff flow to below pre - development levels, and keep the 2 -year and 10 -year post - development flows from increasing more than 10% from their pre - development values. Storm Event (cfs) Site Condition 1 -year (cfs) 2 -year (cfs) 10 -year (cfs) 100 -year (cfs) Pre - Development 3.33 4.91 9.33 16.46 Post - Development 19.49 25.12 39.48 60.67 without Detention 27.08 48.29 75.37 2- year /24 -hour Post - Development 1.21 1.61 10.08 35.54 with Detention 174.45 hour POINT OF ANALYSIS H Research into the downstream system has shown that an existing 72" CMP culvert exists on the adjacent site to the south. Because of the proximity Point of Analysis H and the headwall of the 72" CMP pipe, very little additional runoff is received by Stream B beyond this project's property line. Therefore, an analysis of the upstream runoff combined with the onsite runoff should give a very close approximation of the runoff that would be seen by the 72" CMP. This analysis yields the following results: On -site Post- Offsite Total Storm Event Development Drainage Drainage to Runoff (cfs) Through Site Point of cfs Analysis H 1- year /24 -hour 27.08 48.29 75.37 2- year /24 -hour 36.67 65.86 102.53 10- year /24- 61.96 112.49 174.45 hour An analysis of the downstream culvert would tell if the new development would have any negative impacts on the existing structure. Tailwater depth was assumed to be 0.8 times the diameter of the pipe. For the following design storms, the results are: Based on these results, it is apparent that the new development on the project site will have very little impact on the existing structures downstream from the project. The drainage area for the stormwater BMPs behind Building B1 is relatively small, below 5 acres total and the available footprint is also very limited due to the plans for site infrastructure. Due to its proximity to the main entrance of the building and the more appealing nature of a planted area, this seemed to lend itself to two bioretention areas. The goal of these bioretention areas will be to both remove 85% of the total suspended solids entering from the surrounding impervious drainage area before discharging into the adjacent stream, as well as to attenuate peak flows from the 2 -year and 10 -year storms below the 10% threshold. To obtain the goal of keeping the footprint as small as possible the temporary ponding depth for the design is 12 ", which is the maximum desired as stated in the BMP Manual. Any runoff exceeding the ponding depth will be discharged directly into the adjacent stream buffer with non - erosive velocities. There is additional impervious drainage area contributing to Point of Analysis H that is not treated in the bioretention area due to the proposed site grading. Due to the proximity of this impervious surface to the main entrance of the site and the minimal amount of available open space, this seemed to lend itself to subsurface water quality treatment (BMP #2). Subsurface piping will store the water quality volume from the sub - drainage area and slowly discharge it to a StormFilter vault (manufactured by Contech Engineered Systems) to remove 850 of the total suspended solids. Treated runoff from the subsurface vault will be discharged directly into the adjacent stream buffer with non - erosive velocities. As seen in the results table below, the proposed bioretention areas (BMPs #3 and #3a) and BMP #2 (detention and Stormfilter water quality) will reduce the 1 -year post - development runoff flow to below pre - development levels, and keep the 2 -year and 10 -year post - development flows from increasing more than 10% from their pre - development values. 9 of 10 Ex. Total Ex. Ex. Culvert New Total New New Runoff to Headwater Exit Runoff to Headwater Culvert Exit Storm Event Culvert Elevation Velocity Culvert Elevation Velocity cfs fps ) (cfs) (fps 1- year /24 -hour 69.79 296.02' 2.88 75.37 296.17' 3.11 2- year /24 -hour 96.14 296.69' 3.96 102.53 296.85' 4.23 10- year /24- 166.86 298.25' 6.88 174.45 298.40' 7.19 hour 25- year /24- 209.25 299.06' 8.63 217.31 299.21' 8.96 hour Based on these results, it is apparent that the new development on the project site will have very little impact on the existing structures downstream from the project. The drainage area for the stormwater BMPs behind Building B1 is relatively small, below 5 acres total and the available footprint is also very limited due to the plans for site infrastructure. Due to its proximity to the main entrance of the building and the more appealing nature of a planted area, this seemed to lend itself to two bioretention areas. The goal of these bioretention areas will be to both remove 85% of the total suspended solids entering from the surrounding impervious drainage area before discharging into the adjacent stream, as well as to attenuate peak flows from the 2 -year and 10 -year storms below the 10% threshold. To obtain the goal of keeping the footprint as small as possible the temporary ponding depth for the design is 12 ", which is the maximum desired as stated in the BMP Manual. Any runoff exceeding the ponding depth will be discharged directly into the adjacent stream buffer with non - erosive velocities. There is additional impervious drainage area contributing to Point of Analysis H that is not treated in the bioretention area due to the proposed site grading. Due to the proximity of this impervious surface to the main entrance of the site and the minimal amount of available open space, this seemed to lend itself to subsurface water quality treatment (BMP #2). Subsurface piping will store the water quality volume from the sub - drainage area and slowly discharge it to a StormFilter vault (manufactured by Contech Engineered Systems) to remove 850 of the total suspended solids. Treated runoff from the subsurface vault will be discharged directly into the adjacent stream buffer with non - erosive velocities. As seen in the results table below, the proposed bioretention areas (BMPs #3 and #3a) and BMP #2 (detention and Stormfilter water quality) will reduce the 1 -year post - development runoff flow to below pre - development levels, and keep the 2 -year and 10 -year post - development flows from increasing more than 10% from their pre - development values. 9 of 10 Storm Event cfs Site Condition 1 -year cfs 2 -year cfs 10 -year cfs 100 -year cfs Pre - Development 21.85 30.80 55.27 92.38 Post - Development 27.08 36.67 61.96 100.27 without Detention Post - Development with Detention 14.75 18.85 36.48 65.80 METHODOLOGIES AND PROCEDURES These stormwater analyses were based on the guidelines set forth by the City of Durham's Public Works "Reference Guide for Development." All time of concentration calculations were made using the TR -55 Segmented Approach, which is outlined in chapter 3 of "USDA NRCS Hydrologic Urban Hydrology for Small Watersheds." See appendix for time of concentration calculations. All runoff calculations are based on the Time of Concentration for a 2 -year, 24 -hour storm. Runoff calculations were made using Bentley HydroCAD 10.00, which utilizes the NRCS Peak Discharge method. The storage volume requirement for the wet detention basin was determined using the TR -55 method, found in Chapter 6 of "USDA NRCS Hydrologic Urban Hydrology for Small Watersheds." The downstream culvert was analyzed using Bentley CulvertMaster v3.3. All soils were assumed to have a HSG D for simplicity of the calculation and as is appropriate based on the majority of the soils found on the site as stated above. CALCULATIONS All stormwater calculations were based on the City of Durham Public Works Reference Guide for Development and the NCDENR Stormwater BMP Manual. All calculations are included in the appendix. 10 of 10 MAPS U f/J 1� F P- 0; Bu C% N q:w INS R W -R� RhK DR LA _ �J 0 Refer to USGS Southeast Durham Quadrangle Map U1 , Lpk 0 I Project Area L Q� �l fy 35° 54' 13" N 0 0 N m M 8 N n M O O O n O T d' n O O n M S n a M O O n M O O N a M O n M S M 35° 53'37'N 692600 692700 692800 692900 693000 693100 3 Map Scale: 1:5,380 if printed on A portrait (8.5" x 11 ") sheet Meters N 0 50 100 200 300 Feet 0 250 500 1000 1500 Map projection: Web Mercator Comer coordinates: WGS84 Edge tics: UTM Zone 17N WGS84 C1 }DA Natural Resources Web Soil Survey Conservation Service National Cooperative Soil Survey 3 Soil Map— Durham County, North Carolina (Hamner Institutes) mN n 692600 692700 692800 692900 693000 693100 693200 693300 3 N N m 693200 693300 35° 54' 17N 8 n g N N n M O O n M O O O M O d n U O O m M 8 a n O M V n U M O M M n � 35° 53'37'N 693400 3 R 3/4/2014 Page 1 of 3 DRAINAGE AREA POINT OF ANALYSIS PRE- AND POST - DEVELOPMENT TIME OF CONCENTRATION AND ROUTING CALCULATIONS (1S (7S) (2S (3S (8S (4S (5S (6S Point of Analysis A Point of Analysis B Point of Analysis C Point of Analysis D Point of Analysis E Point of Analysis F Point of Analysis G Point of Analysis H (Pre - Development) (Pre - Development) (Pre - Development) (Pre - Development) (Pre - Development) (Pre-Development) P ) (Pre - Development) (Pre - Development) 9S 15S 10S 11S 16S 12S 13S 14S Point of Analysis A Point of Analysis B Point of Analysis C Point of Analysis D Point of Analysis E Point of Analysis F Point of Analysis G Point of Analysis H (Post - Development) (Post- Development) (Post - Development) (Post- Development) (Post - Development) (Post- Development) (Post - Development) (Post- Development) SubCat Reach on Link Routing Diagram for 2014.08.29.Pre -Post Calculations Prepared by McKim & Creed, Printed 12/9/2014 HydroCAD® 10.00 s/n 04927 © 2011 HydroCAD Software Solutions LLC 6 Davis Drive 2014.08.29.Pre -Post Calculations Type 1124 -hr 1 -year Rainfall= 2.93" Prepared by McKim & Creed Printed 12/9/2014 HvdroCADO 10.00 s/n 04927 © 2011 HvdroCAD Software Solutions LLC Paae 3 Summary for Subcatchment 1S: Point of Analysis A (Pre - Development) Runoff = 3.78 cfs @ 12.50 hrs, Volume= 0.474 af, Depth> 0.91" Runoff by SCS TR -20 method, UH =SCS, Time Span= 5.00 -20.00 hrs, dt= 0.05 hrs Type II 24 -hr 1 -year Rainfall= 2.93" Area (ac) CN Description 6.270 77 Woods, Good, HSG D 6.270 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft /ft) (ft /sec) (cfs) 33.2 75 0.0133 0.04 Sheet Flow, Woods: Dense underbrush n= 0.800 P2= 3.54" 14.6 875 0.0400 1.00 Shallow Concentrated Flow, Woodland Kv= 5.0 fps 47.8 950 Total Subcatchment 1S: Point of Analysis A (Pre - Development) Hydrograph ❑ Runoff 3.78 cfs N o 2- t I - LL 1 I Tye Ii 24�hr I1 -year Itainfall�=2.0" Runbff Area =6.270 ac Rumoff Volume =0.474 of _ Runoff Depth >4.91" Glow Length =960' Tc =47.8 min CN =77 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) 6 Davis Drive 2014.08.29.Pre -Post Calculations Type 1124 -hr 1 -year Rainfall= 2.93" Prepared by McKim & Creed Printed 12/9/2014 HvdroCADO 10.00 s/n 04927 © 2011 HvdroCAD Software Solutions LLC Paae 4 Summary for Subcatchment 2S: Point of Analysis C (Pre - Development) Runoff = 4.90 cfs @ 11.98 hrs, Volume= 0.216 af, Depth> 1.03" Runoff by SCS TR -20 method, UH =SCS, Time Span= 5.00 -20.00 hrs, dt= 0.05 hrs Type II 24 -hr 1 -year Rainfall= 2.93" Area (ac) CN Description 2.510 79 Woods /grass comb., Good, HSG D 2.510 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft /ft) (ft /sec) (cfs) 6.5 532 0.0750 1.37 Shallow Concentrated Flow, Woodland Kv= 5.0 fps Subcatchment 2S: Point of Analysis C (Pre - Development) Hydrograph ❑ Runoff 4.90 cfs 5 Type II 24 -hr 11 -year Raidfall:�:2.93" 4 Runoff Area =2.510 ac �Rup noff Volume = 0.1216 of 3 3 Runoff Depth >1.03" U. Flow Length =532 2 Slope L0.o750 7' T6=6�5 niin 1 I I 4•`R =I7J 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) 6 Davis Drive 2014.08.29.Pre -Post Calculations Type 1124 -hr 1 -year Rainfall= 2.93" Prepared by McKim & Creed Printed 12/9/2014 HvdroCADO 10.00 s/n 04927 © 2011 HvdroCAD Software Solutions LLC Paae 5 Summary for Subcatchment 3S: Point of Analysis D (Pre - Development) Runoff = 3.33 cfs @ 12.46 hrs, Volume= 0.400 af, Depth> 0.91" Runoff by SCS TR -20 method, UH =SCS, Time Span= 5.00 -20.00 hrs, dt= 0.05 hrs Type II 24 -hr 1 -year Rainfall= 2.93" Area (ac) CN Description 0.220 83 Brush, Poor, HSG D 5.060 77 Woods, Good, HSG D 5.280 77 Weighted Average 5.280 0.03 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft /ft) (ft /sec) (cfs) 37.3 75 0.0100 0.03 Sheet Flow, Woods: Dense underbrush n= 0.800 P2= 3.54" 7.6 630 0.0770 1.39 Shallow Concentrated Flow, Woodland Kv= 5.0 fps 44.9 705 Total Subcatchment 3S: Point of Analysis D (Pre - Development) Hydrograph ■ Runoff 3.33 cfs Tye Ii 241hr 3 11 -year Rainfall= 2.93" Runbff Areai=5.280 ac LRunof�Vollum I = 001 of 0 2 Runoff Depth >0.9;1" U_ Flow Length =705 T&44.9 min 1 V t _t CN =77 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) 6 Davis Drive 2014.08.29.Pre -Post Calculations Type 1124 -hr 1 -year Rainfall= 2.93" Prepared by McKim & Creed Printed 12/9/2014 HvdroCADO 10.00 s/n 04927 © 2011 HvdroCAD Software Solutions LLC Paae 6 Summary for Subcatchment 4S: Point of Analysis F (Pre - Development) Runoff = 2.35 cfs @ 12.35 hrs, Volume= 0.243 af, Depth> 0.97" Runoff by SCS TR -20 method, UH =SCS, Time Span= 5.00 -20.00 hrs, dt= 0.05 hrs Type II 24 -hr 1 -year Rainfall= 2.93" Area (ac) CN Description 0.120 98 Paved parking & roofs 0.090 83 Brush, Poor, HSG D 2.810 77 Woods, Good, HSG D 3.020 78 Weighted Average 2.900 96.03% Pervious Area 0.120 Woods: Dense underbrush n= 0.800 P2= 3.54" 3.97% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft /ft) (ft /sec) (cfs) 28.2 75 0.0200 0.04 Sheet Flow, Woods: Dense underbrush n= 0.800 P2= 3.54" 8.4 655 0.0670 1.29 Shallow Concentrated Flow, Woodland Kv= 5.0 fDs 36.6 730 Total 3 0 LL 2 11 Subcatchment 4S: Point of Analysis F (Pre - Development) Hydrograph 2.35 cfs Tye 11 24-hr 9 -year Rairifall- 2.93" Runoff Area =3.020 ac Runoff lVolume =0.243 of Runoff Depth >0.97" Flow Length =730' Tc =36.6 min CN =78 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) ❑ Runoff 6 Davis Drive 2014.08.29.Pre -Post Calculations Type 1124 -hr 1 -year Rainfall= 2.93" Prepared by McKim & Creed Printed 12/9/2014 HvdroCADO 10.00 s/n 04927 © 2011 HvdroCAD Software Solutions LLC Paae 7 Summary for Subcatchment 5S: Point of Analysis G (Pre - Development) Runoff = 1.41 cfs @ 12.29 hrs, Volume= 0.132 af, Depth> 1.20" Runoff by SCS TR -20 method, UH =SCS, Time Span= 5.00 -20.00 hrs, dt= 0.05 hrs Type II 24 -hr 1 -year Rainfall= 2.93" Area (ac) CN Description 0.220 98 Paved parking & roofs 0.230 84 Pasture /grassland /range, Fair, HSG D 0.870 77 Woods, Good, HSG D 1.320 82 Weighted Average 1.100 83.33% Pervious Area 0.220 Woods: Dense underbrush n= 0.800 P2= 3.54" 16.67% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft /ft) (ft /sec) (cfs) 25.2 75 0.0267 0.05 Sheet Flow, Woods: Dense underbrush n= 0.800 P2= 3.54" 7.4 492 0.0490 1.11 Shallow Concentrated Flow, Woodland Kv= 5.0 fDs 32.6 567 Total 3 0 LL 11 Subcatchment 5S: Point of Analysis G (Pre - Development) Hydrograph 1.41 cfs Tye II 24 -hr 11 -year Rainfall= 2.93" Runoff Area =1.320 ac Rumoffl Volume =0.132 of Runoff Depth >1.20" Flow Length =567' Tc =32.6 min CN =82 o 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) ❑ Runoff 6 Davis Drive 2014.08.29.Pre -Post Calculations Type ll 24 -hr 1 -year Rainfall= 2.93" Prepared by McKim & Creed Printed 12/9/2014 HydroCADO 10.00 s/n 04927 © 2011 HydroCAD Software Solutions LLC Page 8 Summary for Subcatchment 6S: Point of Analysis H (Pre - Development) Runoff = 21.65 cfs @ 12.13 hrs, Volume= 1.487 af, Depth> 1.09" Runoff by SCS TR -20 method, UH =SCS, Time Span= 5.00 -20.00 hrs, dt= 0.05 hrs Type II 24 -hr 1 -year Rainfall= 2.93" Area (ac) CN Description 2.080 98 Paved parking & roofs 1.830 83 Brush, Poor, HSG D 0.160 79 Woods, Fair, HSG D 12.350 77 Woods, Good, HSG D 16.420 80 Weighted Average 14.340 87.33% Pervious Area 2.080 12.67% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft /ft) (ft /sec) (cfs) 11.7 50 0.0200 0.07 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.54" 1.9 150 0.0700 1.32 Shallow Concentrated Flow, Woodland Kv= 5.0 fps 0.2 113 0.0290 7.73 6.07 Pipe Channel, 12.0" Round Area= 0.8 sf Perim= 3.1' r= 0.25' n= 0.013 1.0 516 0.0290 8.96 11.00 Pipe Channel, 15.0" Round Area= 1.2 sf Perim= 3.9' r= 0.31' n= 0.013 0.1 77 0.0290 12.26 38.52 Pipe Channel, 24.0" Round Area= 3.1 sf Perim= 6.3' r= 0.50' n= 0.013 0.7 204 0.0400 4.55 3.42 Trap/Vee /Rect Channel Flow, Bot.W =0.00' D =0.50' Z= 3.0'/' Top.W =3.00' n= 0.025 Earth, grassed & winding 3.9 606 0.0080 2.56 17.95 Trap/Vee /Rect Channel Flow, Bot.W =4.00' D =1.00' Z= 3.0'/' Top.W= 10.00' n= 0.040 Windinq stream, pools & shoals 19.5 1,716 Total 6 Davis Drive 2014.08.29.Pre -Post Calculations Type 1124 -hr 1 -year Rainfall= 2.93" Prepared by McKim & Creed Printed 12/9/2014 HvdroCADO 10.00 s/n 04927 © 2011 HydroCAD Software Solutions LLC Paae 9 21 2C 1£ 1E 17 1E 1E a 14 12 12 ° 11 LL 1C Subcatchment 6S: Point of Analysis H (Pre - Development) Hydrograph i I - 4 1 Type Ii�24 -hr �- 1 -y�a� Ida- Infa-11�2.63 �- Itnoff Ate—a=46.420 -lac _LRupo#f V$ju+»g=-1.1487�af %nr D_ epth1 -w -L en th= 7 6 Tc =191.5 min Time (hours) ■ Runoff 21.65 cfS � 4 —� - � 4 1 1 1 i I - 4 1 Type Ii�24 -hr �- 1 -y�a� Ida- Infa-11�2.63 �- Itnoff Ate—a=46.420 -lac _LRupo#f V$ju+»g=-1.1487�af %nr D_ epth1 -w -L en th= 7 6 Tc =191.5 min Time (hours) ■ Runoff 6 Davis Drive 2014.08.29.Pre -Post Calculations Type 1124 -hr 1 -year Rainfall= 2.93" Prepared by McKim & Creed Printed 12/9/2014 HvdroCADO 10.00 s/n 04927 © 2011 HvdroCAD Software Solutions LLC Paae 10 Summary for Subcatchment 7S: Point of Analysis B (Pre - Development) Runoff = 5.95 cfs @ 12.75 hrs, Volume= 0.931 af, Depth> 1.01" Runoff by SCS TR -20 method, UH =SCS, Time Span= 5.00 -20.00 hrs, dt= 0.05 hrs Type II 24 -hr 1 -year Rainfall= 2.93" Area (ac) CN Description 11.100 79 Woods, Fair, HSG D 11.100 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft /ft) (ft /sec) (cfs) 43.7 75 0.0067 0.03 Sheet Flow, Woods: Dense underbrush n= 0.800 P2= 3.54" 22.9 1,286 0.0350 0.94 Shallow Concentrated Flow, Woodland Kv= 5.0 fps 66.6 1,361 Total N 0 LL Subcatchment 7S: Point of Analysis B (Pre - Development) Hydrograph 5.95 cfs Type II 24' -hr 1 -dear- Rainfall = 2.93" Runoff Area = 11.100 ac Runoff Volurme =9.931 of Runoff Depth >1.01" Flow Len Zn th=1,361' Tc =66.6 CN =7J 11i -4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) ❑ Runoff 6 Davis Drive 2014.08.29.Pre -Post Calculations Type ll 24 -hr 1 -year Rainfall= 2.93" Prepared by McKim & Creed Printed 12/9/2014 HydroCADO 10.00 s/n 04927 © 2011 HydroCAD Software Solutions LLC Page 11 Summary for Subcatchment 8S: Point of Analysis E (Pre - Development) Runoff = 18.50 cfs @ 12.12 hrs, Volume= 1.263 af, Depth> 1.47" Runoff by SCS TR -20 method, UH =SCS, Time Span= 5.00 -20.00 hrs, dt= 0.05 hrs Type II 24 -hr 1 -year Rainfall= 2.93" Area (ac) CN Description 3.750 98 Paved parking & roofs 1.650 84 Pasture /grassland /range, Fair, HSG D 0.870 79 Woods, Fair, HSG D 4.010 77 Woods, Good, HSG D 10.280 86 Weighted Average 6.530 63.52% Pervious Area 3.750 36.48% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft /ft) (ft /sec) (cfs) 11.7 50 0.0200 0.07 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.54" 2.6 200 0.0650 1.27 Shallow Concentrated Flow, Woodland Kv= 5.0 fps 0.4 94 0.0200 4.17 3.28 Pipe Channel, 12.0" Round Area= 0.8 sf Perim= 3.1' r= 0.25' n= 0.020 Corrugated PE, corrugated interior 0.3 122 0.0200 7.44 9.14 Pipe Channel, 15.0" Round Area= 1.2 sf Perim= 3.9' r= 0.31' n= 0.013 0.3 155 0.0200 8.41 14.86 Pipe Channel, 18.0" Round Area= 1.8 sf Perim= 4.7' r= 0.38' n= 0.013 0.4 280 0.0200 11.82 58.01 Pipe Channel, 30.0" Round Area= 4.9 sf Perim= 7.9' r= 0.63' n= 0.013 3.4 255 0.0630 1.25 Shallow Concentrated Flow, Woodland Kv= 5.0 fps 0.4 180 0.0560 8.28 83.83 Trap /Vee /Rect Channel Flow, Bot.W =3.00' D =1.50' Z= 2.5'/' Top.W= 10.50' n= 0.040 Windinq stream, pools & shoals 19.5 1,336 Total 6 Davis Drive 2014.08.29.Pre -Post Calculations Type 1124 -hr 1 -year Rainfall= 2.93" Prepared by McKim & Creed Printed 12/9/2014 HvdroCADO 10.00 s/n 04927 © 2011 HvdroCAD Software Solutions LLC Paae 12 Subcatchment 8S: Point of Analysis E (Pre - Development) Hydrograph I — — 20 18.50 cfs 19 18 - - ITy 11:24-: -kar 17 16 -- I -�ar kainfa11i-2.9F3" 15 fi - Runoff Area #tO.2801ac 14 13 -rRupof� V$ urn 126 f 10 L Z-7 1 1 1- Z nA �I Imo' LL _ - 3 7 1 7-49.5 — 6 lb-N=" 5 — — — 4 4- 1 -- 3 2 1 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) ■Runoff 6 Davis Drive 2014.08.29.Pre -Post Calculations Type 1124 -hr 1 -year Rainfall= 2.93" Prepared by McKim & Creed Printed 12/9/2014 HvdroCADO 10.00 s/n 04927 © 2011 HvdroCAD Software Solutions LLC Paae 13 Summary for Subcatchment 9S: Point of Analysis A (Post - Development) Runoff = 3.78 cfs @ 12.50 hrs, Volume= 0.474 af, Depth> 0.91" Runoff by SCS TR -20 method, UH =SCS, Time Span= 5.00 -20.00 hrs, dt= 0.05 hrs Type II 24 -hr 1 -year Rainfall= 2.93" Area (ac) CN Description 6.270 77 Woods, Good, HSG D 6.270 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft /ft) (ft /sec) (cfs) 33.2 75 0.0133 0.04 Sheet Flow, Woods: Dense underbrush n= 0.800 P2= 3.54" 14.6 875 0.0400 1.00 Shallow Concentrated Flow, Woodland Kv= 5.0 fps 47.8 950 Total Subcatchment 9S: Point of Analysis A (Post - Development) Hydrograph ❑ Runoff 3.78 cfs N o 2- t I - LL 1 I Tye Ii 24�hr I1 -year Itainfall�=2.0" Runbff Area =6.270 ac Rumoff Volume =0.474 of _ Runoff Depth >4.91" Glow Length =960' Tc =47.8 min CN =77 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) 6 Davis Drive 2014.08.29.Pre -Post Calculations Type 1124 -hr 1 -year Rainfall= 2.93" Prepared by McKim & Creed Printed 12/9/2014 HvdroCADO 10.00 s/n 04927 © 2011 HvdroCAD Software Solutions LLC Paae 14 Summary for Subcatchment 10S: Point of Analysis C (Post - Development) Runoff = 5.04 cfs @ 11.95 hrs, Volume= 0.204 af, Depth> 1.04" Runoff by SCS TR -20 method, UH =SCS, Time Span= 5.00 -20.00 hrs, dt= 0.05 hrs Type II 24 -hr 1 -year Rainfall= 2.93" Area (ac) CN Description 2.360 79 Woods /grass comb., Good, HSG D 2.360 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft /ft) (ft /sec) (cfs) 4.1 370 0.0890 1.49 Shallow Concentrated Flow, Woodland Kv= 5.0 fps Subcatchment 10S: Point of Analysis C (Post - Development) Hydrograph ❑ Runoff 5.04 cfs 5 Type II 24 -hr 11 -yaar Rainfall= 2.93" 4 Runbff Area =2.360 ac Runoff Volpmg= O.i204, of 0 3 Runoff Depth >1.04" U. Flow Length =370 2 SlbpeL0.6890 7' I TI6=4A min 1 CN =79 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) 6 Davis Drive 2014.08.29.Pre -Post Calculations Type 1124 -hr 1 -year Rainfall= 2.93" Prepared by McKim & Creed Printed 12/9/2014 HydroCADO 10.00 s/n 04927 © 2011 HydroCAD Software Solutions LLC Page 15 Summary for Subcatchment 11S: Point of Analysis D (Post - Development) Runoff = 19.49 cfs @ 12.00 hrs, Volume= 0.964 af, Depth> 1.71" Runoff by SCS TR -20 method, UH =SCS, Time Span= 5.00 -20.00 hrs, dt= 0.05 hrs Type II 24 -hr 1 -year Rainfall= 2.93" Area (ac) CN Description 3.480 98 Paved parking, HSG D 1.460 77 Woods, Good, HSG D 0.220 83 Brush, Poor, HSG D 1.620 80 >75% Grass cover, Good, HSG D 6.780 89 Weighted Average 3.300 48.67% Pervious Area 3.480 51.33% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft /ft) (ft /sec) (cfs) 2.0 290 0.0250 2.37 Shallow Concentrated Flow, Grassed Waterway Kv= 15.0 fps 2.0 628 0.0100 5.26 6.46 Pipe Channel, 15.0" Round Area= 1.2 sf Perim= 3.9' r= 0.31' n= 0.013 4.8 376 0.0680 1.30 Shallow Concentrated Flow, Woodland Kv= 5.0 fps 8.8 1,294 Total 6 Davis Drive 2014.08.29.Pre -Post Calculations Type 1124 -hr 1 -year Rainfall= 2.93" Prepared by McKim & Creed Printed 12/9/2014 HydroCADO 10.00 s/n 04927 © 2011 HydroCAD Software Solutions LLC Page 16 Subcatchment 11 S: Point of Analysis D (Post - Development) Hydrograph 21 2C 1£ 1E 17 1E 1E 14 12 12 � 11 1C LL _ 11 0 5 fi fi � F : :I 4 1 L I � � � ■Runoff 19.49 cfs — - - I —I TYp Ii241fil-r fi t -y airifal 1�2. " :E 1RunnbfffAi*zi:6.780 :b_-c 7�Rupof� Volume--0.964F& %nW-L r7=th = 2` 48. 9 I i n 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) 6 Davis Drive 2014.08.29.Pre -Post Calculations Type 1124 -hr 1 -year Rainfall= 2.93" Prepared by McKim & Creed Printed 12/9/2014 HvdroCADO 10.00 s/n 04927 © 2011 HvdroCAD Software Solutions LLC Paae 17 Summary for Subcatchment 12S: Point of Analysis F (Post - Development) Runoff = 2.35 cfs @ 12.35 hrs, Volume= 0.243 af, Depth> 0.97" Runoff by SCS TR -20 method, UH =SCS, Time Span= 5.00 -20.00 hrs, dt= 0.05 hrs Type II 24 -hr 1 -year Rainfall= 2.93" Area (ac) CN Description 0.120 98 Paved parking & roofs 0.090 83 Brush, Poor, HSG D 2.810 77 Woods, Good, HSG D 3.020 78 Weighted Average 2.900 96.03% Pervious Area 0.120 Woods: Dense underbrush n= 0.800 P2= 3.54" 3.97% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft /ft) (ft /sec) (cfs) 28.2 75 0.0200 0.04 Sheet Flow, Woods: Dense underbrush n= 0.800 P2= 3.54" 8.4 655 0.0670 1.29 Shallow Concentrated Flow, Woodland Kv= 5.0 fDs 36.6 730 Total 3 0 LL 2 11 Subcatchment 12S: Point of Analysis F (Post - Development) Hydrograph 2.35 cfs Tye 11 24-hr 1 -year Rainfalls 2.93" Runoff Area =3.020 ac Runoff lVolume =0.243 of Runoff Depth >0.97" Flow Length =730' Tc =36.6 min CN =78 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) ❑ Runoff 6 Davis Drive 2014.08.29.Pre -Post Calculations Type 1124 -hr 1 -year Rainfall= 2.93" Prepared by McKim & Creed Printed 12/9/2014 HvdroCADO 10.00 s/n 04927 © 2011 HvdroCAD Software Solutions LLC Paae 18 Summary for Subcatchment 13S: Point of Analysis G (Post - Development) Runoff = 1.41 cfs @ 12.29 hrs, Volume= 0.132 af, Depth> 1.20" Runoff by SCS TR -20 method, UH =SCS, Time Span= 5.00 -20.00 hrs, dt= 0.05 hrs Type II 24 -hr 1 -year Rainfall= 2.93" Area (ac) CN Description 0.220 98 Paved parking & roofs 0.230 84 Pasture /grassland /range, Fair, HSG D 0.870 77 Woods, Good, HSG D 1.320 82 Weighted Average 1.100 83.33% Pervious Area 0.220 Woods: Dense underbrush n= 0.800 P2= 3.54" 16.67% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft /ft) (ft /sec) (cfs) 25.2 75 0.0267 0.05 Sheet Flow, Woods: Dense underbrush n= 0.800 P2= 3.54" 7.4 492 0.0490 1.11 Shallow Concentrated Flow, Woodland Kv= 5.0 fDs 32.6 567 Total 3 0 LL Subcatchment 13S: Point of Analysis G (Post - Development) Hydrograph 1 1.41 cfs 11 TyOe II 24 -hr 11 -year Rainfall= 2.93" Runoff Area =1.320 ac Rumoffl Volume =0.132 of Runoff Depth >1.20" Flow Length =567' Tc =32.6 min CN =82 o 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) ❑ Runoff 6 Davis Drive 2014.08.29.Pre -Post Calculations Type ll 24 -hr 1 -year Rainfall= 2.93" Prepared by McKim & Creed Printed 12/9/2014 HydroCADO 10.00 s/n 04927 © 2011 HydroCAD Software Solutions LLC Page 19 Summary for Subcatchment 14S: Point of Analysis H (Post - Development) Runoff = 27.08 cfs @ 12.12 hrs, Volume= 1.845 af, Depth> 1.34" Runoff by SCS TR -20 method, UH =SCS, Time Span= 5.00 -20.00 hrs, dt= 0.05 hrs Type II 24 -hr 1 -year Rainfall= 2.93" Area (ac) CN Description 5.180 98 Paved parking & roofs 1.750 83 Brush, Poor, HSG D 0.160 79 Woods, Fair, HSG D 9.480 77 Woods, Good, HSG D 16.570 84 Weighted Average 11.390 68.74% Pervious Area 5.180 31.26% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft /ft) (ft /sec) (cfs) 11.7 50 0.0200 0.07 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.54" 1.9 150 0.0700 1.32 Shallow Concentrated Flow, Woodland Kv= 5.0 fps 0.2 113 0.0290 7.73 6.07 Pipe Channel, 12.0" Round Area= 0.8 sf Perim= 3.1' r= 0.25' n= 0.013 1.0 516 0.0290 8.96 11.00 Pipe Channel, 15.0" Round Area= 1.2 sf Perim= 3.9' r= 0.31' n= 0.013 0.1 77 0.0290 12.26 38.52 Pipe Channel, 24.0" Round Area= 3.1 sf Perim= 6.3' r= 0.50' n= 0.013 0.7 204 0.0400 4.55 3.42 Trap/Vee /Rect Channel Flow, Bot.W =0.00' D =0.50' Z= 3.0'/' Top.W =3.00' n= 0.025 Earth, grassed & winding 3.9 606 0.0080 2.56 17.95 Trap/Vee /Rect Channel Flow, Bot.W =4.00' D =1.00' Z= 3.0'/' Top.W= 10.00' n= 0.040 Windinq stream, pools & shoals 19.5 1,716 Total 6 Davis Drive 2014.08.29.Pre -Post Calculations Type 1124 -hr 1 -year Rainfall= 2.93" Prepared by McKim & Creed Printed 12/9/2014 HydroCADO 10.00 s/n 04927 © 2011 HydroCAD Software Solutions LLC Page 20 Subcatchment 14S: Point of Analysis H (Post - Development) Hydrograph 30 ■Runoff 28 27.08 cfs 26 - Type 1i -24 -'ir 24 T - - T 1 -j�ar kainfall�=2.93" 22 - Runoff Area #'I -6.570 -�ac 20 � o r- 18 ff V� u m —1.645 of 16 R_ nof� De�pth�1. 4' ° 14-/_ 4 _ F V1-Len th= ; %' LL 9 12 —I Tc =19.5 min 6 -I L 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) 6 Davis Drive 2014.08.29.Pre -Post Calculations Type 1124 -hr 1 -year Rainfall= 2.93" Prepared by McKim & Creed Printed 12/9/2014 HvdroCADO 10.00 s/n 04927 © 2011 HvdroCAD Software Solutions LLC Paae 21 Summary for Subcatchment 15S: Point of Analysis B (Post - Development) Runoff = 9.19 cfs @ 12.35 hrs, Volume= 0.952 af, Depth> 1.14" Runoff by SCS TR -20 method, UH =SCS, Time Span= 5.00 -20.00 hrs, dt= 0.05 hrs Type II 24 -hr 1 -year Rainfall= 2.93" Area (ac) CN Description 0.720 98 Paved parking & roofs 2.050 84 50 -75% Grass cover, Fair, HSG D 7.280 79 Woods, Fair, HSG D 10.050 81 Weighted Average 9.330 92.84% Pervious Area 0.720 Grass: Bermuda n= 0.410 P2= 3.54" 7.16% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft /ft) (ft /sec) (cfs) 23.9 170 0.0410 0.12 Sheet Flow, _t - '1 -year kalnl fa11�=243" Grass: Bermuda n= 0.410 P2= 3.54" 13.7 841 0.0420 1.02 Shallow Concentrated Flow, 7 _T 7 Woodland Kv= 5.0 fDs 37.6 1,011 Total Subcatchment 15S: Point of Analysis B (Post - Development) Hydrograph 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) ■Runoff / j- 4 I- - 10 9 ' 9.19 cfs Ty a Ii 24h r 8 x t _t - '1 -year kalnl fa11�=243" z -- -t -1 Runoff Area = x10.050 ac ^ 6' 7 _T 7 Runoffs Volump=0.1952 -af % T _T T R�noff Be�pfh�1.'�4" 3 5 LL ' Flow-Lengfh =1,011' 4 T Tc -37.6 in 3 1 tN =81 2' 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) ■Runoff 6 Davis Drive 2014.08.29.Pre -Post Calculations Type ll 24 -hr 1 -year Rainfall= 2.93" Prepared by McKim & Creed Printed 12/9/2014 HydroCADO 10.00 s/n 04927 © 2011 HydroCAD Software Solutions LLC Page 22 Summary for Subcatchment 16S: Point of Analysis E (Post - Development) Runoff = 16.94 cfs @ 12.12 hrs, Volume= 1.156 af, Depth> 1.47" Runoff by SCS TR -20 method, UH =SCS, Time Span= 5.00 -20.00 hrs, dt= 0.05 hrs Type II 24 -hr 1 -year Rainfall= 2.93" Area (ac) CN Description 3.250 98 Paved parking & roofs 1.570 84 Pasture /grassland /range, Fair, HSG D 0.870 79 Woods, Fair, HSG D 3.720 77 Woods, Good, HSG D 9.410 86 Weighted Average 6.160 65.46% Pervious Area 3.250 34.54% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft /ft) (ft /sec) (cfs) 11.7 50 0.0200 0.07 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.54" 2.6 200 0.0650 1.27 Shallow Concentrated Flow, Woodland Kv= 5.0 fps 0.4 94 0.0200 4.17 3.28 Pipe Channel, 12.0" Round Area= 0.8 sf Perim= 3.1' r= 0.25' n= 0.020 Corrugated PE, corrugated interior 0.3 122 0.0200 7.44 9.14 Pipe Channel, 15.0" Round Area= 1.2 sf Perim= 3.9' r= 0.31' n= 0.013 0.3 155 0.0200 8.41 14.86 Pipe Channel, 18.0" Round Area= 1.8 sf Perim= 4.7' r= 0.38' n= 0.013 0.4 280 0.0200 11.82 58.01 Pipe Channel, 30.0" Round Area= 4.9 sf Perim= 7.9' r= 0.63' n= 0.013 3.4 255 0.0630 1.25 Shallow Concentrated Flow, Woodland Kv= 5.0 fps 0.4 180 0.0560 8.28 83.83 Trap /Vee /Rect Channel Flow, Bot.W =3.00' D =1.50' Z= 2.5'/' Top.W= 10.50' n= 0.040 Windinq stream, pools & shoals 19.5 1,336 Total 6 Davis Drive 2014.08.29.Pre -Post Calculations Type 1124 -hr 1 -year Rainfall= 2.93" Prepared by McKim & Creed Printed 12/9/2014 HydroCADO 10.00 s/n 04927 © 2011 HydroCAD Software Solutions LLC Page 23 Subcatchment 16S: Point of Analysis E (Post - Development) Hydrograph 1E 17 1E 1E 14 12 1'e — 11 1C 3 c 0 LL c 11 0 5 L ■Runoff 16.94 cfs I��� -1 T-y� Ii 24-'�r !1 -0a�- Ida -infa Ii2.�3.. T - - Run-Off A eai=9.410 tac 1 rt I I- - -tRup°ff VMump =- 1.11-- 56t-af n Q plh 3 q� -11 rt� � el � . Ftow Lenggth ='x336 1 1-1 -1 1 1_ rt -1 TM 4Z min tN 186 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) 6 Davis Drive 2014.08.29.Pre -Post Calculations Type 1124 -hr 2 -year Rainfall= 3.54" Prepared by McKim & Creed Printed 12/9/2014 HvdroCADO 10.00 s/n 04927 © 2011 HvdroCAD Software Solutions LLC Paae 24 Summary for Subcatchment 1S: Point of Analysis A (Pre - Development) Runoff = 5.57 cfs @ 12.49 hrs, Volume= 0.684 af, Depth> 1.31" Runoff by SCS TR -20 method, UH =SCS, Time Span= 5.00 -20.00 hrs, dt= 0.05 hrs Type II 24 -hr 2 -year Rainfall= 3.54" Area (ac) CN Description 6.270 77 Woods, Good, HSG D 6.270 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft /ft) (ft /sec) (cfs) 33.2 75 0.0133 0.04 Sheet Flow, Woods: Dense underbrush n= 0.800 P2= 3.54" 14.6 875 0.0400 1.00 Shallow Concentrated Flow, Woodland Kv= 5.0 fps 47.8 950 Total Subcatchment 1S: Point of Analysis A (Pre - Development) Hydrograph s 5.57 Cfs ❑Runoff kR _ _ Tye Ii 24�hr 5 far kai4allL=1�4" y n -Off Areal =6.270 ac 4 ff Volume= 0.16841 of unoff Delpth�4 17 3- Length =9 0' LL Tc�71.8 -rr m 2 dN =177 1 I I � — I 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) 6 Davis Drive 2014.08.29.Pre -Post Calculations Type 1124 -hr 2 -year Rainfall= 3.54" Prepared by McKim & Creed Printed 12/9/2014 HvdroCADO 10.00 s/n 04927 © 2011 HvdroCAD Software Solutions LLC Paae 25 Summary for Subcatchment 2S: Point of Analysis C (Pre - Development) Runoff = 6.89 cfs @ 11.98 hrs, Volume= 0.306 af, Depth> 1.46" Runoff by SCS TR -20 method, UH =SCS, Time Span= 5.00 -20.00 hrs, dt= 0.05 hrs Type II 24 -hr 2 -year Rainfall= 3.54" Area (ac) CN Description 2.510 79 Woods /grass comb., Good, HSG D 2.510 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft /ft) (ft /sec) (cfs) 6.5 532 0.0750 1.37 Shallow Concentrated Flow, Woodland Kv= 5.0 fps 7 4 3 0 LL 3 2 0 Subcatchment 2S: Point of Analysis C (Pre - Development) Hydrograph 6.89 cfs Type II 24 -hr 2 -year Rainfall =_3.54" Runoff Area =2.510 ac Runoff Vollume =0.306 of Runoj DelpTh� -T.46" -Flow Len-gth =532' SlbpeL0.6750 '/' + F 1 - T6= 61.5-min CN =,79 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) 8 Runoff 6 Davis Drive 2014.08.29.Pre -Post Calculations Type 1124 -hr 2 -year Rainfall= 3.54" Prepared by McKim & Creed Printed 12/9/2014 HvdroCADO 10.00 s/n 04927 © 2011 HvdroCAD Software Solutions LLC Paae 26 Summary for Subcatchment 3S: Point of Analysis D (Pre - Development) Runoff = 4.91 cfs @ 12.45 hrs, Volume= 0.577 af, Depth> 1.31" Runoff by SCS TR -20 method, UH =SCS, Time Span= 5.00 -20.00 hrs, dt= 0.05 hrs Type II 24 -hr 2 -year Rainfall= 3.54" Area (ac) CN Description 0.220 83 Brush, Poor, HSG D 5.060 77 Woods, Good, HSG D 5.280 77 Weighted Average 5.280 0.03 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft /ft) (ft /sec) (cfs) 37.3 75 0.0100 0.03 Sheet Flow, Woods: Dense underbrush n= 0.800 P2= 3.54" 7.6 630 0.0770 1.39 Shallow Concentrated Flow, Woodland Kv= 5.0 fps 44.9 705 Total Subcatchment 3S: Point of Analysis D (Pre - Development) Hydrograph 5- 4.91 cfs Type II 24 -hr 2 -year Rainfall =3.54" 4- Runbff Areai=5.280 lac _Runof Vollume= 0.577 of 3- Runoff Depth >1.31" LL Flow Length =705' 2 i- TcL44�.9 rri i n tN =177 0 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) ❑ Runoff 6 Davis Drive 2014.08.29.Pre -Post Calculations Type 1124 -hr 2 -year Rainfall= 3.54" Prepared by McKim & Creed Printed 12/9/2014 HvdroCADO 10.00 s/n 04927 © 2011 HvdroCAD Software Solutions LLC Paae 27 Summary for Subcatchment 4S: Point of Analysis F (Pre - Development) Runoff = 3.41 cfs @ 12.34 hrs, Volume= 0.347 af, Depth> 1.38" Runoff by SCS TR -20 method, UH =SCS, Time Span= 5.00 -20.00 hrs, dt= 0.05 hrs Type II 24 -hr 2 -year Rainfall= 3.54" Area (ac) CN Description 0.120 98 Paved parking & roofs 0.090 83 Brush, Poor, HSG D 2.810 77 Woods, Good, HSG D 3.020 78 Weighted Average 2.900 96.03% Pervious Area 0.120 Woods: Dense underbrush n= 0.800 P2= 3.54" 3.97% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft /ft) (ft /sec) (cfs) 28.2 75 0.0200 0.04 Sheet Flow, Woods: Dense underbrush n= 0.800 P2= 3.54" 8.4 655 0.0670 1.29 Shallow Concentrated Flow, Woodland Kv= 5.0 fDs 36.6 730 Total Subcatchment 4S: Point of Analysis F (Pre - Development) Hydrograph ❑ Runoff 3.41 cfs Tye II 24 -hr 3 +2 -year Rainfall 3.54" Runoff Area =3.020 ac Runoff) Vo1lume =0.347 of 2 Rulnof Delpth >1.38" U_ Flow Length =730 Tc =36.6 min 1 t _� - CN =78 o 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) 6 Davis Drive 2014.08.29.Pre -Post Calculations Type 1124 -hr 2 -year Rainfall= 3.54" Prepared by McKim & Creed Printed 12/9/2014 HvdroCADO 10.00 s/n 04927 © 2011 HvdroCAD Software Solutions LLC Paae 28 Summary for Subcatchment 5S: Point of Analysis G (Pre - Development) Runoff = 1.95 cfs @ 12.28 hrs, Volume= 0.182 af, Depth> 1.66" Runoff by SCS TR -20 method, UH =SCS, Time Span= 5.00 -20.00 hrs, dt= 0.05 hrs Type II 24 -hr 2 -year Rainfall= 3.54" Area (ac) CN Description 0.220 98 Paved parking & roofs 0.230 84 Pasture /grassland /range, Fair, HSG D 0.870 77 Woods, Good, HSG D 1.320 82 Weighted Average 1.100 83.33% Pervious Area 0.220 Woods: Dense underbrush n= 0.800 P2= 3.54" 16.67% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft /ft) (ft /sec) (cfs) 25.2 75 0.0267 0.05 Sheet Flow, Woods: Dense underbrush n= 0.800 P2= 3.54" 7.4 492 0.0490 1.11 Shallow Concentrated Flow, Woodland Kv= 5.0 fDs 32.6 567 Total 2 0 1 LL Subcatchment 5S: Point of Analysis G (Pre - Development) Hydrograph 1 1.95 cfs I TyOe II 24 -hr 2 -year Rainfall= 3.54" Runoff Area =1.320 ac Runoff lVolume =0.182 of Runoff Depth >1.66" �Io—w Length =567' Tc =32.6 min CN =82 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) ❑ Runoff 6 Davis Drive 2014.08.29.Pre -Post Calculations Type 11 24 -hr 2 -year Rainfall = 3.54" Prepared by McKim & Creed Printed 12/9/2014 HydroCADO 10.00 s/n 04927 © 2011 HydroCAD Software Solutions LLC Page 29 Summary for Subcatchment 6S: Point of Analysis H (Pre - Development) Runoff = 30.53 cfs @ 12.13 hrs, Volume= 2.085 af, Depth> 1.52" Runoff by SCS TR -20 method, UH =SCS, Time Span= 5.00 -20.00 hrs, dt= 0.05 hrs Type II 24 -hr 2 -year Rainfall= 3.54" Area (ac) CN Description 2.080 98 Paved parking & roofs 1.830 83 Brush, Poor, HSG D 0.160 79 Woods, Fair, HSG D 12.350 77 Woods, Good, HSG D 16.420 80 Weighted Average 14.340 87.33% Pervious Area 2.080 12.67% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft /ft) (ft /sec) (cfs) 11.7 50 0.0200 0.07 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.54" 1.9 150 0.0700 1.32 Shallow Concentrated Flow, Woodland Kv= 5.0 fps 0.2 113 0.0290 7.73 6.07 Pipe Channel, 12.0" Round Area= 0.8 sf Perim= 3.1' r= 0.25' n= 0.013 1.0 516 0.0290 8.96 11.00 Pipe Channel, 15.0" Round Area= 1.2 sf Perim= 3.9' r= 0.31' n= 0.013 0.1 77 0.0290 12.26 38.52 Pipe Channel, 24.0" Round Area= 3.1 sf Perim= 6.3' r= 0.50' n= 0.013 0.7 204 0.0400 4.55 3.42 Trap/Vee /Rect Channel Flow, Bot.W =0.00' D =0.50' Z= 3.0'/' Top.W =3.00' n= 0.025 Earth, grassed & winding 3.9 606 0.0080 2.56 17.95 Trap/Vee /Rect Channel Flow, Bot.W =4.00' D =1.00' Z= 3.0'/' Top.W= 10.00' n= 0.040 Windinq stream, pools & shoals 19.5 1,716 Total 6 Davis Drive 2014.08.29.Pre -Post Calculations Type 1124 -hr 2 -year Rainfall= 3.54" Prepared by McKim & Creed Printed 12/9/2014 HydroCADO 10.00 s/n 04927 © 2011 HydroCAD Software Solutions LLC Page 30 Subcatchment 6S: Point of Analysis H (Pre - Development) Hydrograph 34 Runoff 32 � � � 30.53 cfs 30 - - Ty�1i�4-hr 28.//- -I-2- year- kai4allL-3.54" 26 24 _ _L R -anoff 8tea=�15.420 _6c 20 _ TRupoff Vournpm 2.10- 85T-af 18 R no D pth 1. 2" 016 �� el , Flow -Lets th =IJ " 14 4- 4 -4 1 1 1- � I �cT _44 -_ rain 12 — — 10 tN=" 8 6 T_ 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) 6 Davis Drive 2014.08.29.Pre -Post Calculations Type 1124 -hr 2 -year Rainfall= 3.54" Prepared by McKim & Creed Printed 12/9/2014 HvdroCADO 10.00 s/n 04927 © 2011 HvdroCAD Software Solutions LLC Paae 31 Summary for Subcatchment 7S: Point of Analysis B (Pre - Development) Runoff = 8.56 cfs @ 12.73 hrs, Volume= 1.319 af, Depth> 1.43" Runoff by SCS TR -20 method, UH =SCS, Time Span= 5.00 -20.00 hrs, dt= 0.05 hrs Type II 24 -hr 2 -year Rainfall= 3.54" Area (ac) CN Description 11.100 79 Woods, Fair, HSG D 11.100 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft /ft) (ft /sec) (cfs) 43.7 75 0.0067 0.03 Sheet Flow, Woods: Dense underbrush n= 0.800 P2= 3.54" 22.9 1,286 0.0350 0.94 Shallow Concentrated Flow, Woodland Kv= 5.0 fps 66.6 1,361 Total Subcatchment 7S: Point of Analysis B (Pre - Development) Hydrograph ❑ Runoff 9 8.56 cfs T�pe it 24-hr' - - �eaiRainfall X150 7 Runoff Area= 111.10_0 ;blc 6 Runoff Volume = 1.319 of 3 5- noff Depth >1. 3" EL 4 1 owten�th 1-33: 1, Tom=_ N,v.-6 n i n 3 1 CN =7J V 1 vzl^_ I 1 11 _J ` 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) 6 Davis Drive 2014.08.29.Pre -Post Calculations Type 11 24 -hr 2 -year Rainfall = 3.54" Prepared by McKim & Creed Printed 12/9/2014 HydroCADO 10.00 s/n 04927 © 2011 HydroCAD Software Solutions LLC Page 32 Summary for Subcatchment 8S: Point of Analysis E (Pre - Development) Runoff = 24.60 cfs @ 12.12 hrs, Volume= 1.690 af, Depth> 1.97" Runoff by SCS TR -20 method, UH =SCS, Time Span= 5.00 -20.00 hrs, dt= 0.05 hrs Type II 24 -hr 2 -year Rainfall= 3.54" Area (ac) CN Description 3.750 98 Paved parking & roofs 1.650 84 Pasture /grassland /range, Fair, HSG D 0.870 79 Woods, Fair, HSG D 4.010 77 Woods, Good, HSG D 10.280 86 Weighted Average 6.530 63.52% Pervious Area 3.750 36.48% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft /ft) (ft /sec) (cfs) 11.7 50 0.0200 0.07 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.54" 2.6 200 0.0650 1.27 Shallow Concentrated Flow, Woodland Kv= 5.0 fps 0.4 94 0.0200 4.17 3.28 Pipe Channel, 12.0" Round Area= 0.8 sf Perim= 3.1' r= 0.25' n= 0.020 Corrugated PE, corrugated interior 0.3 122 0.0200 7.44 9.14 Pipe Channel, 15.0" Round Area= 1.2 sf Perim= 3.9' r= 0.31' n= 0.013 0.3 155 0.0200 8.41 14.86 Pipe Channel, 18.0" Round Area= 1.8 sf Perim= 4.7' r= 0.38' n= 0.013 0.4 280 0.0200 11.82 58.01 Pipe Channel, 30.0" Round Area= 4.9 sf Perim= 7.9' r= 0.63' n= 0.013 3.4 255 0.0630 1.25 Shallow Concentrated Flow, Woodland Kv= 5.0 fps 0.4 180 0.0560 8.28 83.83 Trap /Vee /Rect Channel Flow, Bot.W =3.00' D =1.50' Z= 2.5'/' Top.W= 10.50' n= 0.040 Windinq stream, pools & shoals 19.5 1,336 Total 6 Davis Drive 2014.08.29.Pre -Post Calculations Type 1124 -hr 2 -year Rainfall= 3.54" Prepared by McKim & Creed Printed 12/9/2014 HydroCADO 10.00 s/n 04927 © 2011 HydroCAD Software Solutions LLC Page 33 Subcatchment 8S: Point of Analysis E (Pre - Development) Hydrograph ■Runoff 26 24.60 cfs 4 24 Tye 11_24 - hr 22 !2 -year kadnfzll:1�4" 20 4 -4 I I 1 I Runoff Area #1 -0.280 is 18- Volume= -1.69 of - 16 1- rt°1 14 Ranoff Depth�1.97" 12 Flow Length= 1,336' 10 Tc' =19.5 min 1 1 tN =$6 4 2 T_ 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) 6 Davis Drive 2014.08.29.Pre -Post Calculations Type 1124 -hr 2 -year Rainfall= 3.54" Prepared by McKim & Creed Printed 12/9/2014 HvdroCADO 10.00 s/n 04927 © 2011 HvdroCAD Software Solutions LLC Paae 34 Summary for Subcatchment 9S: Point of Analysis A (Post - Development) Runoff = 5.57 cfs @ 12.49 hrs, Volume= 0.684 af, Depth> 1.31" Runoff by SCS TR -20 method, UH =SCS, Time Span= 5.00 -20.00 hrs, dt= 0.05 hrs Type II 24 -hr 2 -year Rainfall= 3.54" Area (ac) CN Description 6.270 77 Woods, Good, HSG D 6.270 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft /ft) (ft /sec) (cfs) 33.2 75 0.0133 0.04 Sheet Flow, Woods: Dense underbrush n= 0.800 P2= 3.54" 14.6 875 0.0400 1.00 Shallow Concentrated Flow, Woodland Kv= 5.0 fps 47.8 950 Total Subcatchment 9S: Point of Analysis A (Post - Development) Hydrograph s 5.57 Cfs ❑Runoff kR _ _ Tye Ii 24�hr 5 far kai4allL=1�4" y n-Off Areal =6.270 ac 4 ff Volume= 0.16841 of unoff Delpth�4 17 3- Length =9 0' LL Tc�71.8 -rr m 2 dN =177 1 I I � — I 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) 6 Davis Drive 2014.08.29.Pre -Post Calculations Type 1124 -hr 2 -year Rainfall= 3.54" Prepared by McKim & Creed Printed 12/9/2014 HvdroCADO 10.00 s/n 04927 © 2011 HvdroCAD Software Solutions LLC Paae 35 Summary for Subcatchment 10S: Point of Analysis C (Post - Development) Runoff = 7.08 cfs @ 11.95 hrs, Volume= 0.288 af, Depth> 1.46" Runoff by SCS TR -20 method, UH =SCS, Time Span= 5.00 -20.00 hrs, dt= 0.05 hrs Type II 24 -hr 2 -year Rainfall= 3.54" Area (ac) CN Description 2.360 79 Woods /grass comb., Good, HSG D 2.360 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft /ft) (ft /sec) (cfs) 4.1 370 0.0890 1.49 Shallow Concentrated Flow, Woodland Kv= 5.0 fps 3 4.. O LL 0 Subcatchment 10S: Point of Analysis C (Post - Development) Hydrograph 7.08 cfs Type II 24 -hr -I- -� -year Rainfall= 3.54" Runbff Area =2.360 6c Rumoffl Vollump= 0.12881 of 1 Runol Belpth fi4.4V' _Flow Length =370' * 1 S16eLO.6890 '/' * -4 1 -T6=4.1-min L _t 1 CN =79 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) ❑ Runoff 6 Davis Drive 2014.08.29.Pre -Post Calculations Type 1124 -hr 2 -year Rainfall= 3.54" Prepared by McKim & Creed Printed 12/9/2014 HydroCADO 10.00 s/n 04927 © 2011 HydroCAD Software Solutions LLC Page 36 Summary for Subcatchment 11S: Point of Analysis D (Post - Development) Runoff = 25.12 cfs @ 12.00 hrs, Volume= 1.261 af, Depth> 2.23" Runoff by SCS TR -20 method, UH =SCS, Time Span= 5.00 -20.00 hrs, dt= 0.05 hrs Type II 24 -hr 2 -year Rainfall= 3.54" Area (ac) CN Description 3.480 98 Paved parking, HSG D 1.460 77 Woods, Good, HSG D 0.220 83 Brush, Poor, HSG D 1.620 80 >75% Grass cover, Good, HSG D 6.780 89 Weighted Average 3.300 48.67% Pervious Area 3.480 51.33% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft /ft) (ft /sec) (cfs) 2.0 290 0.0250 2.37 Shallow Concentrated Flow, Grassed Waterway Kv= 15.0 fps 2.0 628 0.0100 5.26 6.46 Pipe Channel, 15.0" Round Area= 1.2 sf Perim= 3.9' r= 0.31' n= 0.013 4.8 376 0.0680 1.30 Shallow Concentrated Flow, Woodland Kv= 5.0 fps 8.8 1,294 Total 6 Davis Drive 2014.08.29.Pre -Post Calculations Type 1124 -hr 2 -year Rainfall= 3.54" Prepared by McKim & Creed Printed 12/9/2014 HydroCADO 10.00 s/n 04927 © 2011 HydroCAD Software Solutions LLC Page 37 Subcatchment 11 S: Point of Analysis D (Post - Development) Hydrograph 22 20 18 a 16 14 3 O LL 12 � I I 10 8 6 5 6 7 8 9 I � Runoff 25.12 cfs Ty e li -24-�r rt2 -year Rainfall -3.54" _L -Run e 80 lac +Rupo"nr #1 V - 2 Oump= 1.1261 -af Fttow Lem th �'r294 T_ c =8.8 min &N =189 10 11 12 13 14 15 16 17 18 19 20 Time (hours) 6 Davis Drive 2014.08.29.Pre -Post Calculations Type 1124 -hr 2 -year Rainfall= 3.54" Prepared by McKim & Creed Printed 12/9/2014 HvdroCADO 10.00 s/n 04927 © 2011 HvdroCAD Software Solutions LLC Paae 38 Summary for Subcatchment 12S: Point of Analysis F (Post - Development) Runoff = 3.41 cfs @ 12.34 hrs, Volume= 0.347 af, Depth> 1.38" Runoff by SCS TR -20 method, UH =SCS, Time Span= 5.00 -20.00 hrs, dt= 0.05 hrs Type II 24 -hr 2 -year Rainfall= 3.54" Area (ac) CN Description 0.120 98 Paved parking & roofs 0.090 83 Brush, Poor, HSG D 2.810 77 Woods, Good, HSG D 3.020 78 Weighted Average 2.900 96.03% Pervious Area 0.120 Woods: Dense underbrush n= 0.800 P2= 3.54" 3.97% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft /ft) (ft /sec) (cfs) 28.2 75 0.0200 0.04 Sheet Flow, Woods: Dense underbrush n= 0.800 P2= 3.54" 8.4 655 0.0670 1.29 Shallow Concentrated Flow, Woodland Kv= 5.0 fDs 36.6 730 Total Subcatchment 12S: Point of Analysis F (Post - Development) Hydrograph ❑ Runoff 3.41 cfs Tye II 24 -hr 3 +2 -year Rainfall 3.54" Runoff Area =3.020 ac Runoff) Vo1lume =0.347 of 2 Rulnof Delpth >1.38" U_ Flow Length =730 Tc =36.6 min 1 t _� - CN =78 o 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) 6 Davis Drive 2014.08.29.Pre -Post Calculations Type 1124 -hr 2 -year Rainfall= 3.54" Prepared by McKim & Creed Printed 12/9/2014 HvdroCADO 10.00 s/n 04927 © 2011 HvdroCAD Software Solutions LLC Paae 39 Summary for Subcatchment 13S: Point of Analysis G (Post - Development) Runoff = 1.95 cfs @ 12.28 hrs, Volume= 0.182 af, Depth> 1.66" Runoff by SCS TR -20 method, UH =SCS, Time Span= 5.00 -20.00 hrs, dt= 0.05 hrs Type II 24 -hr 2 -year Rainfall= 3.54" Area (ac) CN Description 0.220 98 Paved parking & roofs 0.230 84 Pasture /grassland /range, Fair, HSG D 0.870 77 Woods, Good, HSG D 1.320 82 Weighted Average 1.100 83.33% Pervious Area 0.220 Woods: Dense underbrush n= 0.800 P2= 3.54" 16.67% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft /ft) (ft /sec) (cfs) 25.2 75 0.0267 0.05 Sheet Flow, Woods: Dense underbrush n= 0.800 P2= 3.54" 7.4 492 0.0490 1.11 Shallow Concentrated Flow, Woodland Kv= 5.0 fDs 32.6 567 Total Subcatchment 13S: Point of Analysis G (Post - Development) Hydrograph ❑ Runoff 2 1.95 cfs I Tye II 24 -hr 2 -year Rainfall= 3.54" Runoff Area =1.320 ac Runoff lVolume =0.182 of Runoff Depth >1.66" 1 'A �Io—w Leingth =567' LL Tc =32.6 min CN =82 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) 6 Davis Drive 2014.08.29.Pre -Post Calculations Type 11 24 -hr 2 -year Rainfall = 3.54" Prepared by McKim & Creed Printed 12/9/2014 HydroCADO 10.00 s/n 04927 © 2011 HydroCAD Software Solutions LLC Page 40 Summary for Subcatchment 14S: Point of Analysis H (Post - Development) Runoff = 36.67 cfs @ 12.12 hrs, Volume= 2.506 af, Depth> 1.81" Runoff by SCS TR -20 method, UH =SCS, Time Span= 5.00 -20.00 hrs, dt= 0.05 hrs Type II 24 -hr 2 -year Rainfall= 3.54" Area (ac) CN Description 5.180 98 Paved parking & roofs 1.750 83 Brush, Poor, HSG D 0.160 79 Woods, Fair, HSG D 9.480 77 Woods, Good, HSG D 16.570 84 Weighted Average 11.390 68.74% Pervious Area 5.180 31.26% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft /ft) (ft /sec) (cfs) 11.7 50 0.0200 0.07 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.54" 1.9 150 0.0700 1.32 Shallow Concentrated Flow, Woodland Kv= 5.0 fps 0.2 113 0.0290 7.73 6.07 Pipe Channel, 12.0" Round Area= 0.8 sf Perim= 3.1' r= 0.25' n= 0.013 1.0 516 0.0290 8.96 11.00 Pipe Channel, 15.0" Round Area= 1.2 sf Perim= 3.9' r= 0.31' n= 0.013 0.1 77 0.0290 12.26 38.52 Pipe Channel, 24.0" Round Area= 3.1 sf Perim= 6.3' r= 0.50' n= 0.013 0.7 204 0.0400 4.55 3.42 Trap/Vee /Rect Channel Flow, Bot.W =0.00' D =0.50' Z= 3.0'/' Top.W =3.00' n= 0.025 Earth, grassed & winding 3.9 606 0.0080 2.56 17.95 Trap/Vee /Rect Channel Flow, Bot.W =4.00' D =1.00' Z= 3.0'/' Top.W= 10.00' n= 0.040 Windinq stream, pools & shoals 19.5 1,716 Total 6 Davis Drive 2014.08.29.Pre -Post Calculations Type 1124 -hr 2 -year Rainfall= 3.54" Prepared by McKim & Creed Printed 12/9/2014 HydroCADO 10.00 s/n 04927 © 2011 HydroCAD Software Solutions LLC Page 41 Subcatchment 14S: Point of Analysis H (Post - Development) Hydrograph 40 36 34 32 —� 30 28 26 a 24 22 L 0 20 18 16 14 12 10 I i I I 36.67 cfs - _ ■Ruoff Type li 24 -hr - 2 -year Rainfa110.54" fi Runoff Atea=�1-6.5-70 �c - TRupo f Volump 2.506Lf - nr Depthh_l �vZ = 7 c 95 1L� IY =IN - — —I —I —I— I— - - 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) 6 Davis Drive 2014.08.29.Pre -Post Calculations Type 1124 -hr 2 -year Rainfall= 3.54" Prepared by McKim & Creed Printed 12/9/2014 HvdroCADO 10.00 s/n 04927 © 2011 HvdroCAD Software Solutions LLC Paae 42 Summary for Subcatchment 15S: Point of Analysis B (Post - Development) Runoff = 12.89 cfs @ 12.34 hrs, Volume= 1.325 af, Depth> 1.58" Runoff by SCS TR -20 method, UH =SCS, Time Span= 5.00 -20.00 hrs, dt= 0.05 hrs Type II 24 -hr 2 -year Rainfall= 3.54" Area (ac) CN Description 0.720 98 Paved parking & roofs 2.050 84 50 -75% Grass cover, Fair, HSG D 7.280 79 Woods, Fair, HSG D 10.050 81 Weighted Average 9.330 A 92.84% Pervious Area 0.720 Grass: Bermuda n= 0.410 P2= 3.54" 7.16% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft /ft) (ft /sec) (cfs) 23.9 170 0.0410 0.12 Sheet Flow, 4 A 4- -2 -year kaTr x6:3.54" 11 10 Grass: Bermuda n= 0.410 P2= 3.54" 13.7 841 0.0420 1.02 Shallow Concentrated Flow, 4 _4 Woodland Kv= 5.0 fDs 37.6 1,011 Total Subcatchment 15S: Point of Analysis B (Post - Development) Hydrograph 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) ■Runoff 4 14 13 'I 12.89 cfs Ii -2hr Tye4- 12 ,/ - 4 A 4- -2 -year kaTr x6:3.54" 11 10 T _T 7 Wino AteaO1�.�O �C 9- 4 _4 -I Rulpoffl Volume = 1.1325 of T_T 7 T R�noff De�p#h�1.58�, 3 7 6 �w_Len� � 10" Ci 7.V nl in 5- I 4 T 7 7 1 1— 1— _I —— 6N=T8-1 2 1 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) ■Runoff 6 Davis Drive 2014.08.29.Pre -Post Calculations Type 11 24 -hr 2 -year Rainfall = 3.54" Prepared by McKim & Creed Printed 12/9/2014 HydroCADO 10.00 s/n 04927 © 2011 HydroCAD Software Solutions LLC Page 43 Summary for Subcatchment 16S: Point of Analysis E (Post - Development) Runoff = 22.52 cfs @ 12.12 hrs, Volume= 1.547 af, Depth> 1.97" Runoff by SCS TR -20 method, UH =SCS, Time Span= 5.00 -20.00 hrs, dt= 0.05 hrs Type II 24 -hr 2 -year Rainfall= 3.54" Area (ac) CN Description 3.250 98 Paved parking & roofs 1.570 84 Pasture /grassland /range, Fair, HSG D 0.870 79 Woods, Fair, HSG D 3.720 77 Woods, Good, HSG D 9.410 86 Weighted Average 6.160 65.46% Pervious Area 3.250 34.54% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft /ft) (ft /sec) (cfs) 11.7 50 0.0200 0.07 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.54" 2.6 200 0.0650 1.27 Shallow Concentrated Flow, Woodland Kv= 5.0 fps 0.4 94 0.0200 4.17 3.28 Pipe Channel, 12.0" Round Area= 0.8 sf Perim= 3.1' r= 0.25' n= 0.020 Corrugated PE, corrugated interior 0.3 122 0.0200 7.44 9.14 Pipe Channel, 15.0" Round Area= 1.2 sf Perim= 3.9' r= 0.31' n= 0.013 0.3 155 0.0200 8.41 14.86 Pipe Channel, 18.0" Round Area= 1.8 sf Perim= 4.7' r= 0.38' n= 0.013 0.4 280 0.0200 11.82 58.01 Pipe Channel, 30.0" Round Area= 4.9 sf Perim= 7.9' r= 0.63' n= 0.013 3.4 255 0.0630 1.25 Shallow Concentrated Flow, Woodland Kv= 5.0 fps 0.4 180 0.0560 8.28 83.83 Trap /Vee /Rect Channel Flow, Bot.W =3.00' D =1.50' Z= 2.5'/' Top.W= 10.50' n= 0.040 Windinq stream, pools & shoals 19.5 1,336 Total 6 Davis Drive 2014.08.29.Pre -Post Calculations Type 1124 -hr 2 -year Rainfall= 3.54" Prepared by McKim & Creed Printed 12/9/2014 HvdroCADO 10.00 s/n 04927 © 2011 HvdroCAD Software Solutions LLC Paae 44 Subcatchment 16S: Point of Analysis E (Post - Development) 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) Hydrograph 25 23 22 22.52 cfs I� � Type I -24-Ifir 20 :F: -L2- y�aukainfall�:3.54" 19 18 17 t 1 I _ t - Run6ff Area =9.410 -ac 15 j - I- �- — — — — TRuo f V -OIIul p=l .1W4 f - U 13 — RIl no [Y�I1�� • n LL 19 . T c .�1.n 9 8 T — -5 - 6 5 1 - -- 1 I I 2 - 1 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) 2014.08.29.Pre -Post Calculations Prepared by McKim & Creed 6 Davis Drive Type 1124 -hr 10 -year Rainfall= 5.09" Printed 12/9/2014 HvdroCADO 10.00 s/n 04927 © 2011 HvdroCAD Software Solutions LLC Paae 45 Summary for Subcatchment 1S: Point of Analysis A (Pre - Development) Runoff = 10.60 cfs @ 12.47 hrs, Volume= 1.281 af, Depth> 2.45" Runoff by SCS TR -20 method, UH =SCS, Time Span= 5.00 -20.00 hrs, dt= 0.05 hrs Type II 24 -hr 10 -year Rainfall = 5.09" Area (ac) CN Description 6.270 77 Woods, Good, HSG D 6.270 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft /ft) (ft /sec) (cfs) 33.2 75 0.0133 0.04 Sheet Flow, 9 Woods: Dense underbrush n= 0.800 P2= 3.54" 14.6 875 0.0400 1.00 Shallow Concentrated Flow, Woodland Kv= 5.0 fps 47.8 950 Total N 3 0 LL Subcatchment 1S: Point of Analysis A (Pre - Development) Hydrograph 0 10.60 cfs I - I TYpe 11-24-" h r 10 -yr ar Rai6fall =5.69" Runoff Area =6.270 ac Runoff) Volume = 1.1281 of RTnoff Depth >2.45" low, Lertgth =950' TC=4i.8 min CN =77 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) 8 Runoff 9 0 10.60 cfs I - I TYpe 11-24-" h r 10 -yr ar Rai6fall =5.69" Runoff Area =6.270 ac Runoff) Volume = 1.1281 of RTnoff Depth >2.45" low, Lertgth =950' TC=4i.8 min CN =77 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) 8 Runoff 2014.08.29.Pre -Post Calculations Prepared by McKim & Creed 6 Davis Drive Type 1124 -hr 10 -year Rainfall= 5.09" Printed 12/9/2014 HvdroCADO 10.00 s/n 04927 © 2011 HvdroCAD Software Solutions LLC Paae 46 Summary for Subcatchment 2S: Point of Analysis C (Pre - Development) Runoff = 12.28 cfs @ 11.98 hrs, Volume= 0.557 af, Depth> 2.66" Runoff by SCS TR -20 method, UH =SCS, Time Span= 5.00 -20.00 hrs, dt= 0.05 hrs Type II 24 -hr 10 -year Rainfall = 5.09" Area (ac) CN Description 2.510 79 Woods /grass comb., Good, HSG D 2.510 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft /ft) (ft /sec) (cfs) 6.5 532 0.0750 1.37 Shallow Concentrated Flow, Woodland Kv= 5.0 fps 12 1c 11 1C 7 3 U. 6 Subcatchment 2S: Point of Analysis C (Pre - Development) Hydrograph J - ■Runoff 12.28 cfs 3 I I I I I 1 L -i --I t- _- -I 3 2 1 -F _ yjeIi24 'hr -k Runbff -Area =2.510 ac -- Runoff Volume= 0,,557 of R not Depth 2.6-6" _l 9 ow Len t� =532' -6- L0.d750 T tc7-6I 5 rr in 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) 2014.08.29.Pre -Post Calculations Prepared by McKim & Creed 6 Davis Drive Type 1124 -hr 10 -year Rainfall= 5.09" Printed 12/9/2014 HvdroCADO 10.00 s/n 04927 © 2011 HvdroCAD Software Solutions LLC Paae 47 Summary for Subcatchment 3S: Point of Analysis D (Pre - Development) Runoff = 9.33 cfs @ 12.43 hrs, Volume= 1.080 af, Depth> 2.45" Runoff by SCS TR -20 method, UH =SCS, Time Span= 5.00 -20.00 hrs, dt= 0.05 hrs Type II 24 -hr 10 -year Rainfall = 5.09" Area (ac) CN Description 0.220 83 Brush, Poor, HSG D 5.060 77 Woods, Good, HSG D 5.280 77 Weighted Average 5.280 0.03 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft /ft) (ft /sec) (cfs) 37.3 75 0.0100 0.03 Sheet Flow, Woods: Dense underbrush n= 0.800 P2= 3.54" 7.6 630 0.0770 1.39 Shallow Concentrated Flow, Woodland Kv= 5.0 fps 44.9 705 Total Subcatchment 3S: Point of Analysis D (Pre - Development) Hydrograph 0 7% - 6 U / 5 LL 0 9.33 cfs Type II 24 -hr O- yiar-Rainfal1 =5.09" ' i- -Runbff -Arezi -5.280 ac tRunofli V-allu p=- 1.1080 of nr Depth -2.45" FI w L n h =7 Flow el �t b5 ' TC =44I .9 n�in IbN =177 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) ❑ Runoff 2014.08.29.Pre -Post Calculations Prepared by McKim & Creed 6 Davis Drive Type 1124 -hr 10 -year Rainfall= 5.09" Printed 12/9/2014 HvdroCADO 10.00 s/n 04927 © 2011 HvdroCAD Software Solutions LLC Paae 48 Summary for Subcatchment 4S: Point of Analysis F (Pre - Development) Runoff = 6.37 cfs @ 12.32 hrs, Volume= 0.642 af, Depth> 2.55" Runoff by SCS TR -20 method, UH =SCS, Time Span= 5.00 -20.00 hrs, dt= 0.05 hrs Type II 24 -hr 10 -year Rainfall = 5.09" Area (ac) CN Description 0.120 98 Paved parking & roofs 0.090 83 Brush, Poor, HSG D 2.810 77 Woods, Good, HSG D 3.020 78 Weighted Average 2.900 96.03% Pervious Area 0.120 Woods: Dense underbrush n= 0.800 P2= 3.54" 3.97% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft /ft) (ft /sec) (cfs) 28.2 75 0.0200 0.04 Sheet Flow, Woods: Dense underbrush n= 0.800 P2= 3.54" 8.4 655 0.0670 1.29 Shallow Concentrated Flow, Woodland Kv= 5.0 fDs 36.6 730 Total Subcatchment 4S: Point of Analysis F (Pre - Development) Hydrograph 7 6.37 cfs 6 , Tye I i 24-hr 1 b -y6ar kainfa11�5.09" 5 1 Runoff Area =3.020 ac RunogVolume -00.642 of 4 Runoff Depth >2.55" LL 3 - Flow t�ength =730' TcLk6 irnin 2 1 IC N 78 1 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) ❑Runoff 2014.08.29.Pre -Post Calculations Prepared by McKim & Creed 6 Davis Drive Type 1124 -hr 10 -year Rainfall= 5.09" Printed 12/9/2014 HvdroCADO 10.00 s/n 04927 © 2011 HvdroCAD Software Solutions LLC Paae 49 Summary for Subcatchment 5S: Point of Analysis G (Pre - Development) Runoff = 3.42 cfs @ 12.27 hrs, Volume= 0.320 af, Depth> 2.91" Runoff by SCS TR -20 method, UH =SCS, Time Span= 5.00 -20.00 hrs, dt= 0.05 hrs Type II 24 -hr 10 -year Rainfall = 5.09" Area (ac) CN Description 0.220 98 Paved parking & roofs 0.230 84 Pasture /grassland /range, Fair, HSG D 0.870 77 Woods, Good, HSG D 1.320 82 Weighted Average 1.100 83.33% Pervious Area 0.220 Woods: Dense underbrush n= 0.800 P2= 3.54" 16.67% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft /ft) (ft /sec) (cfs) 25.2 75 0.0267 0.05 Sheet Flow, Woods: Dense underbrush n= 0.800 P2= 3.54" 7.4 492 0.0490 1.11 Shallow Concentrated Flow, Woodland Kv= 5.0 fDs 32.6 567 Total Subcatchment 5S: Point of Analysis G (Pre - Development) Hydrograph ❑ Runoff 3.42 cfs Tye 11 24-hr 3 10 -year Rainfall 5.09" Runoff Area =1.320 ac Runoffl Vol ume =0.320 of 2 Runoj Delp�h >�.9T" 3 LL low Length =567' Tc =32.6 min 1 - - - CN =82 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) 6 Davis Drive 2014.08.29.Pre -Post Calculations Type 1124 -hr 10 -year Rainfall= 5.09" Prepared by McKim & Creed Printed 12/9/2014 HydroCADO 10.00 s/n 04927 © 2011 HydroCAD Software Solutions LLC Page 50 Summary for Subcatchment 6S: Point of Analysis H (Pre - Development) Runoff = 54.77 cfs @ 12.12 hrs, Volume= 3.752 af, Depth> 2.74" Runoff by SCS TR -20 method, UH =SCS, Time Span= 5.00 -20.00 hrs, dt= 0.05 hrs Type II 24 -hr 10 -year Rainfall = 5.09" Area (ac) CN Descriotion 2.080 98 Paved parking & roofs 1.830 83 Brush, Poor, HSG D 0.160 79 Woods, Fair, HSG D 12.350 77 Woods, Good, HSG D 16.420 80 Weighted Average 14.340 87.33% Pervious Area 2.080 12.67% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft /ft) (ft /sec) (cfs) 11.7 50 0.0200 0.07 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.54" 1.9 150 0.0700 1.32 Shallow Concentrated Flow, Woodland Kv= 5.0 fps 0.2 113 0.0290 7.73 6.07 Pipe Channel, 12.0" Round Area= 0.8 sf Perim= 3.1' r= 0.25' n= 0.013 1.0 516 0.0290 8.96 11.00 Pipe Channel, 15.0" Round Area= 1.2 sf Perim= 3.9' r= 0.31' n= 0.013 0.1 77 0.0290 12.26 38.52 Pipe Channel, 24.0" Round Area= 3.1 sf Perim= 6.3' r= 0.50' n= 0.013 0.7 204 0.0400 4.55 3.42 Trap/Vee /Rect Channel Flow, Bot.W =0.00' D =0.50' Z= 3.0'/' Top.W =3.00' n= 0.025 Earth, grassed & winding 3.9 606 0.0080 2.56 17.95 Trap/Vee /Rect Channel Flow, Bot.W =4.00' D =1.00' Z= 3.0'/' Top.W= 10.00' n= 0.040 Windinq stream, pools & shoals 19.5 1,716 Total 6 Davis Drive 2014.08.29.Pre -Post Calculations Type 1124 -hr 10 -year Rainfall= 5.09" Prepared by McKim & Creed Printed 12/9/2014 HydroCADO 10.00 s/n 04927 © 2011 HydroCAD Software Solutions LLC Page 51 Subcatchment 6S: Point of Analysis H (Pre - Development) Hydrograph so 54.77 Cfs – — ❑Runoff 55 LyRe 1i _24 -r 50 I 0- y�ar_Raikal l�5.09" 45 Runoff Area #1.6.420 -ac 40 - T un Vol u m - 3.7521 of 35 „ -F I R�n&l D�plh 7-4 Fbw Lang#�i =746 U. 25 IT91� rain 20 dN =$0 15 10 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) 2014.08.29.Pre -Post Calculations Prepared by McKim & Creed 6 Davis Drive Type 1124 -hr 10 -year Rainfall= 5.09" Printed 12/9/2014 HvdroCADO 10.00 s/n 04927 © 2011 HvdroCAD Software Solutions LLC Paae 52 Summary for Subcatchment 7S: Point of Analysis B (Pre - Development) Runoff = 15.78 cfs @ 12.70 hrs, Volume= 2.410 af, Depth> 2.61" Runoff by SCS TR -20 method, UH =SCS, Time Span= 5.00 -20.00 hrs, dt= 0.05 hrs Type II 24 -hr 10 -year Rainfall = 5.09" Area (ac) CN Description 11.100 79 Woods, Fair, HSG D 11.100 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft /ft) (ft /sec) (cfs) 43.7 75 0.0067 0.03 Sheet Flow, Woods: Dense underbrush n= 0.800 P2= 3.54" 22.9 1,286 0.0350 0.94 Shallow Concentrated Flow, Woodland Kv= 5.0 fps 66.6 1,361 Total Subcatchment 7S: Point of Analysis B (Pre - Development) Hydrograph / 17 15.78 cfs 15 16- T�pe i � h>r� 1 - - - 14 ; 10�feir R n#all= 5 -r09 "- 3 �I Unoff "ea =111X100 tic 10 �I 4noff V-glume= ;.4I"f 9 noff D�pth >2. 1 LL $ ' Inw�e th=' 1 3 1' 7 Tc.- -66 6 in-I 6 5 C14=74 4-- T 3 — — — L —1 —I _I_ I_ T_ I I I 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) ■ Runoff 6 Davis Drive 2014.08.29.Pre -Post Calculations Type 1124 -hr 10 -year Rainfall= 5.09" Prepared by McKim & Creed Printed 12/9/2014 HydroCADO 10.00 s/n 04927 © 2011 HydroCAD Software Solutions LLC Page 53 Summary for Subcatchment 8S: Point of Analysis E (Pre - Development) Runoff = 40.45 cfs @ 12.12 hrs, Volume= 2.832 af, Depth> 3.31" Runoff by SCS TR -20 method, UH =SCS, Time Span= 5.00 -20.00 hrs, dt= 0.05 hrs Type II 24 -hr 10 -year Rainfall = 5.09" Area (ac) CN Descriotion 3.750 98 Paved parking & roofs 1.650 84 Pasture /grassland /range, Fair, HSG D 0.870 79 Woods, Fair, HSG D 4.010 77 Woods, Good, HSG D 10.280 86 Weighted Average 6.530 63.52% Pervious Area 3.750 36.48% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft /ft) (ft /sec) (cfs) 11.7 50 0.0200 0.07 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.54" 2.6 200 0.0650 1.27 Shallow Concentrated Flow, Woodland Kv= 5.0 fps 0.4 94 0.0200 4.17 3.28 Pipe Channel, 12.0" Round Area= 0.8 sf Perim= 3.1' r= 0.25' n= 0.020 Corrugated PE, corrugated interior 0.3 122 0.0200 7.44 9.14 Pipe Channel, 15.0" Round Area= 1.2 sf Perim= 3.9' r= 0.31' n= 0.013 0.3 155 0.0200 8.41 14.86 Pipe Channel, 18.0" Round Area= 1.8 sf Perim= 4.7' r= 0.38' n= 0.013 0.4 280 0.0200 11.82 58.01 Pipe Channel, 30.0" Round Area= 4.9 sf Perim= 7.9' r= 0.63' n= 0.013 3.4 255 0.0630 1.25 Shallow Concentrated Flow, Woodland Kv= 5.0 fps 0.4 180 0.0560 8.28 83.83 Trap /Vee /Rect Channel Flow, Bot.W =3.00' D =1.50' Z= 2.5'/' Top.W= 10.50' n= 0.040 Windinq stream, pools & shoals 19.5 1,336 Total 2014.08.29.Pre -Post Calculations Prepared by McKim & Creed 6 Davis Drive Type 1124 -hr 10 -year Rainfall= 5.09" Printed 12/9/2014 HvdroCADO 10.00 s/n 04927 © 2011 HvdroCAD Software Solutions LLC Paae 54 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) ■ Runoff Subcatchment 8S: Point of Analysis E (Pre - Development) Hydrograph 42 40 40.45 cfs 1- I� � fi Ty% 1i_4-_1h_r 38 36 4- 4-0-year Rainfall--5.09" 34 32 — p —y /� y. .� �. �neff Y"'II ea =40.280 Ac 30 28 — fi — — — — — — I — -_ � "°##1 Vo um p=2.1932taf 26 0 22 R�nof Belph�3.3'�, LL 20 — — Flow-Len h =1336 18 � 4 -� 4 - min 16 14 12 fi fi — fi - -1 &4#96 18 6 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) ■ Runoff 2014.08.29.Pre -Post Calculations Prepared by McKim & Creed 6 Davis Drive Type 1124 -hr 10 -year Rainfall= 5.09" Printed 12/9/2014 HvdroCADO 10.00 s/n 04927 © 2011 HvdroCAD Software Solutions LLC Paae 55 Summary for Subcatchment 9S: Point of Analysis A (Post - Development) Runoff = 10.60 cfs @ 12.47 hrs, Volume= 1.281 af, Depth> 2.45" Runoff by SCS TR -20 method, UH =SCS, Time Span= 5.00 -20.00 hrs, dt= 0.05 hrs Type II 24 -hr 10 -year Rainfall = 5.09" Area (ac) CN Description 6.270 77 Woods, Good, HSG D 6.270 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft /ft) (ft /sec) (cfs) 33.2 75 0.0133 0.04 Sheet Flow, 9 Woods: Dense underbrush n= 0.800 P2= 3.54" 14.6 875 0.0400 1.00 Shallow Concentrated Flow, Woodland Kv= 5.0 fps 47.8 950 Total N 3 0 LL Subcatchment 9S: Point of Analysis A (Post - Development) Hydrograph 0 10.60 cfs - I Ty% 11-24-" h r 10 -yr ar Rai6fall =5.69" Runoff Area =6.270 ac Runoff) Volume = 1.1281 of RTnoff Depth >2.45" low, Lertgth =950' TC=4i.8 min CN =77 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) 8 Runoff 9 0 10.60 cfs - I Ty% 11-24-" h r 10 -yr ar Rai6fall =5.69" Runoff Area =6.270 ac Runoff) Volume = 1.1281 of RTnoff Depth >2.45" low, Lertgth =950' TC=4i.8 min CN =77 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) 8 Runoff 2014.08.29.Pre -Post Calculations Prepared by McKim & Creed 6 Davis Drive Type 1124 -hr 10 -year Rainfall= 5.09" Printed 12/9/2014 HvdroCADO 10.00 s/n 04927 © 2011 HvdroCAD Software Solutions LLC Paae 56 Summary for Subcatchment 10S: Point of Analysis C (Post - Development) Runoff = 12.58 cfs @ 11.95 hrs, Volume= 0.525 af, Depth> 2.67" Runoff by SCS TR -20 method, UH =SCS, Time Span= 5.00 -20.00 hrs, dt= 0.05 hrs Type II 24 -hr 10 -year Rainfall = 5.09" Area (ac) CN Description 2.360 79 Woods /grass comb., Good, HSG D 2.360 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft /ft) (ft /sec) (cfs) 4.1 370 0.0890 1.49 Shallow Concentrated Flow, Woodland Kv= 5.0 fps 3 0 LL 14 12 11 1C Subcatchment 10S: Point of Analysis C (Post - Development) Hydrograph _ T1 2.58 cfs 5 4 i 3 � 2 1 T _L -1 I Types 1i -24 -hr 110 -year kair fa_l 5.09" RunOff Areal =2.360 6c +Rugo- #I Vo�ump_=0.1525taf n 67" low Length =370' 4 � SlbpeL06890 '/' T1c= 4..1A'rr i n 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) L 5 4 i 3 � 2 1 T _L -1 I Types 1i -24 -hr 110 -year kair fa_l 5.09" RunOff Areal =2.360 6c +Rugo- #I Vo�ump_=0.1525taf n 67" low Length =370' 4 � SlbpeL06890 '/' T1c= 4..1A'rr i n 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) 6 Davis Drive 2014.08.29.Pre -Post Calculations Type 1124 -hr 10 -year Rainfall= 5.09" Prepared by McKim & Creed Printed 12/9/2014 HvdroCADO 10.00 s/n 04927 © 2011 HvdroCAD Software Solutions LLC Paae 57 Summary for Subcatchment 11S: Point of Analysis D (Post - Development) Runoff = 39.48 cfs @ 12.00 hrs, Volume= 2.042 af, Depth> 3.61" Runoff by SCS TR -20 method, UH =SCS, Time Span= 5.00 -20.00 hrs, dt= 0.05 hrs Type II 24 -hr 10 -year Rainfall = 5.09" Area (ac) CN Description 3.480 98 Paved parking, HSG D 1.460 77 Woods, Good, HSG D 0.220 83 Brush, Poor, HSG D 1.620 80 >75% Grass cover, Good, HSG D 6.780 89 Weighted Average 3.300 48.67% Pervious Area 3.480 51.33% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft /ft) (ft /sec) (cfs) 2.0 290 0.0250 2.37 Shallow Concentrated Flow, Grassed Waterway Kv= 15.0 fps 2.0 628 0.0100 5.26 6.46 Pipe Channel, 15.0" Round Area= 1.2 sf Perim= 3.9' r= 0.31' n= 0.013 4.8 376 0.0680 1.30 Shallow Concentrated Flow, Woodland Kv= 5.0 fps 8.8 1,294 Total 2014.08.29.Pre -Post Calculations Prepared by McKim & Creed 6 Davis Drive Type 1124 -hr 10 -year Rainfall= 5.09" Printed 12/9/2014 HvdroCADO 10.00 s/n 04927 © 2011 HvdroCAD Software Solutions LLC Paae 58 Subcatchment 11 S: Point of Analysis D (Post - Development) Hydrograph 44 _L - _I I L 42 40 39.48 cfs 4- 4 � I� � T_y� 1134 -�r -- 34 32 .- yar- /kairifall��$.n -Ru� b Areai�.I X70 lac 30- 26 - _ LR"offf Volurnp= 2.042-af U 24nr = _.6V� 0 20 LL 16 fi Flow -Lei tai -294 Flow-Le n 12 - c_ 8� A rrain 1 7 1V-N=1&9 18 �- 6 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) ■Runoff 2014.08.29.Pre -Post Calculations Prepared by McKim & Creed 6 Davis Drive Type 1124 -hr 10 -year Rainfall= 5.09" Printed 12/9/2014 HvdroCADO 10.00 s/n 04927 © 2011 HvdroCAD Software Solutions LLC Paae 59 Summary for Subcatchment 12S: Point of Analysis F (Post - Development) Runoff = 6.37 cfs @ 12.32 hrs, Volume= 0.642 af, Depth> 2.55" Runoff by SCS TR -20 method, UH =SCS, Time Span= 5.00 -20.00 hrs, dt= 0.05 hrs Type II 24 -hr 10 -year Rainfall = 5.09" Area (ac) CN Description 0.120 98 Paved parking & roofs 0.090 83 Brush, Poor, HSG D 2.810 77 Woods, Good, HSG D 3.020 78 Weighted Average 2.900 96.03% Pervious Area 0.120 Woods: Dense underbrush n= 0.800 P2= 3.54" 3.97% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft /ft) (ft /sec) (cfs) 28.2 75 0.0200 0.04 Sheet Flow, Woods: Dense underbrush n= 0.800 P2= 3.54" 8.4 655 0.0670 1.29 Shallow Concentrated Flow, Woodland Kv= 5.0 fDs 36.6 730 Total Subcatchment 12S: Point of Analysis F (Post - Development) Hydrograph 7 6.37 cfs 6 , Tye I i 24-hr 1 b -y6ar kainfa11�5.09" 5 1 Runoff Area =3.020 ac RunogVolume -00.642 of 4 Runoff Depth >2.55" LL 3 - Flow t�ength =730' t I TcLk6 irnin 2-/ 1 IC N 78 1 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) ❑Runoff 2014.08.29.Pre -Post Calculations Prepared by McKim & Creed 6 Davis Drive Type 1124 -hr 10 -year Rainfall= 5.09" Printed 12/9/2014 HvdroCADO 10.00 s/n 04927 © 2011 HvdroCAD Software Solutions LLC Paae 60 Summary for Subcatchment 13S: Point of Analysis G (Post - Development) Runoff = 3.42 cfs @ 12.27 hrs, Volume= 0.320 af, Depth> 2.91" Runoff by SCS TR -20 method, UH =SCS, Time Span= 5.00 -20.00 hrs, dt= 0.05 hrs Type II 24 -hr 10 -year Rainfall = 5.09" Area (ac) CN Description 0.220 98 Paved parking & roofs 0.230 84 Pasture /grassland /range, Fair, HSG D 0.870 77 Woods, Good, HSG D 1.320 82 Weighted Average 1.100 83.33% Pervious Area 0.220 Woods: Dense underbrush n= 0.800 P2= 3.54" 16.67% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft /ft) (ft /sec) (cfs) 25.2 75 0.0267 0.05 Sheet Flow, Woods: Dense underbrush n= 0.800 P2= 3.54" 7.4 492 0.0490 1.11 Shallow Concentrated Flow, Woodland Kv= 5.0 fDs 32.6 567 Total Subcatchment 13S: Point of Analysis G (Post - Development) Hydrograph ❑ Runoff 3.42 cfs Tye 11 24-hr 3 10 -year Rainfall 5.09" Runoff Area =1.320 ac Runoffl Vol ume =0.320 of 2 Runoj Delp�h >�.9T" 3 LL low Length =567' Tc =32.6 min 1 - - - CN =82 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) 6 Davis Drive 2014.08.29.Pre -Post Calculations Type 1124 -hr 10 -year Rainfall= 5.09" Prepared by McKim & Creed Printed 12/9/2014 HydroCADO 10.00 s/n 04927 © 2011 HydroCAD Software Solutions LLC Page 61 Summary for Subcatchment 14S: Point of Analysis H (Post - Development) Runoff = 61.96 cfs @ 12.12 hrs, Volume= 4.298 af, Depth> 3.11" Runoff by SCS TR -20 method, UH =SCS, Time Span= 5.00 -20.00 hrs, dt= 0.05 hrs Type II 24 -hr 10 -year Rainfall = 5.09" Area (ac) CN Description 5.180 98 Paved parking & roofs 1.750 83 Brush, Poor, HSG D 0.160 79 Woods, Fair, HSG D 9.480 77 Woods, Good, HSG D 16.570 84 Weighted Average 11.390 68.74% Pervious Area 5.180 31.26% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft /ft) (ft /sec) (cfs) 11.7 50 0.0200 0.07 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.54" 1.9 150 0.0700 1.32 Shallow Concentrated Flow, Woodland Kv= 5.0 fps 0.2 113 0.0290 7.73 6.07 Pipe Channel, 12.0" Round Area= 0.8 sf Perim= 3.1' r= 0.25' n= 0.013 1.0 516 0.0290 8.96 11.00 Pipe Channel, 15.0" Round Area= 1.2 sf Perim= 3.9' r= 0.31' n= 0.013 0.1 77 0.0290 12.26 38.52 Pipe Channel, 24.0" Round Area= 3.1 sf Perim= 6.3' r= 0.50' n= 0.013 0.7 204 0.0400 4.55 3.42 Trap/Vee /Rect Channel Flow, Bot.W =0.00' D =0.50' Z= 3.0'/' Top.W =3.00' n= 0.025 Earth, grassed & winding 3.9 606 0.0080 2.56 17.95 Trap/Vee /Rect Channel Flow, Bot.W =4.00' D =1.00' Z= 3.0'/' Top.W= 10.00' n= 0.040 Windinq stream, pools & shoals 19.5 1,716 Total 6 Davis Drive 2014.08.29.Pre -Post Calculations Type 1124 -hr 10 -year Rainfall= 5.09" Prepared by McKim & Creed Printed 12/9/2014 HydroCADO 10.00 s/n 04927 © 2011 HydroCAD Software Solutions LLC Page 62 Subcatchment 14S: Point of Analysis H (Post - Development) Hydrograph ■Runoff 657 61.96 cfs 60 Ty a Ii 24 -hr Vw 557 T T T I I F T _1TO -j�ar Oainfalli5.0 _ 50 �- Runoff Atea# 1-6.570 aC 45 u n V$ urn -4 29"I f 40 N T1 •I _�l n° B ., 3 35 _I # el pth �3.1I1 E 30 Flow-Lenggffii =1,7fi6 25 - Tc =-I 9 rr� -in 207 tN =$4 15 J 10 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) 2014.08.29.Pre -Post Calculations Prepared by McKim & Creed 6 Davis Drive Type 1124 -hr 10 -year Rainfall= 5.09" Printed 12/9/2014 HvdroCADO 10.00 s/n 04927 © 2011 HvdroCAD Software Solutions LLC Paae 63 Summary for Subcatchment 15S: Point of Analysis B (Post - Development) Runoff = 22.93 cfs @ 12.33 hrs, Volume= 2.358 af, Depth> 2.81" Runoff by SCS TR -20 method, UH =SCS, Time Span= 5.00 -20.00 hrs, dt= 0.05 hrs Type II 24 -hr 10 -year Rainfall = 5.09" Area (ac) CN Description 0.720 98 Paved parking & roofs 2.050 84 50 -75% Grass cover, Fair, HSG D 7.280 79 Woods, Fair, HSG D 10.050 81 Weighted Average 9.330 92.84% Pervious Area 0.720 Grass: Bermuda n= 0.410 P2= 3.54" 7.16% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft /ft) (ft /sec) (cfs) 23.9 170 0.0410 0.12 Sheet Flow, fi 4b- y_�arkaHrifalI� *.69 18 Grass: Bermuda n= 0.410 P2= 3.54" 13.7 841 0.0420 1.02 Shallow Concentrated Flow, ' - Woodland Kv= 5.0 fDs 37.6 1,011 Total Subcatchment 15S: Point of Analysis B (Post - Development) Hydrograph ■ Runoff 23 22.93 cfs _�-e li�4�r 22 20 fi fi 4b- y_�arkaHrifalI� *.69 18 ; Runoff AteaO1-0.050 Ac 17 ' - Runoff V-o1=p 2.3r58 f — 15 12 % — — — �nr D�pth 0 " 10 F� venT71� 9 �- I -� - — — — Tc min 7 4�1 -�� -II �-I �- 3 2 1 0- � � 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) ■ Runoff 6 Davis Drive 2014.08.29.Pre -Post Calculations Type 1124 -hr 10 -year Rainfall= 5.09" Prepared by McKim & Creed Printed 12/9/2014 HydroCADO 10.00 s/n 04927 © 2011 HydroCAD Software Solutions LLC Page 64 Summary for Subcatchment 16S: Point of Analysis E (Post - Development) Runoff = 37.03 cfs @ 12.12 hrs, Volume= 2.592 af, Depth> 3.31" Runoff by SCS TR -20 method, UH =SCS, Time Span= 5.00 -20.00 hrs, dt= 0.05 hrs Type II 24 -hr 10 -year Rainfall = 5.09" Area (ac) CN Description 3.250 98 Paved parking & roofs 1.570 84 Pasture /grassland /range, Fair, HSG D 0.870 79 Woods, Fair, HSG D 3.720 77 Woods, Good, HSG D 9.410 86 Weighted Average 6.160 65.46% Pervious Area 3.250 34.54% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft /ft) (ft /sec) (cfs) 11.7 50 0.0200 0.07 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.54" 2.6 200 0.0650 1.27 Shallow Concentrated Flow, Woodland Kv= 5.0 fps 0.4 94 0.0200 4.17 3.28 Pipe Channel, 12.0" Round Area= 0.8 sf Perim= 3.1' r= 0.25' n= 0.020 Corrugated PE, corrugated interior 0.3 122 0.0200 7.44 9.14 Pipe Channel, 15.0" Round Area= 1.2 sf Perim= 3.9' r= 0.31' n= 0.013 0.3 155 0.0200 8.41 14.86 Pipe Channel, 18.0" Round Area= 1.8 sf Perim= 4.7' r= 0.38' n= 0.013 0.4 280 0.0200 11.82 58.01 Pipe Channel, 30.0" Round Area= 4.9 sf Perim= 7.9' r= 0.63' n= 0.013 3.4 255 0.0630 1.25 Shallow Concentrated Flow, Woodland Kv= 5.0 fps 0.4 180 0.0560 8.28 83.83 Trap /Vee /Rect Channel Flow, Bot.W =3.00' D =1.50' Z= 2.5'/' Top.W= 10.50' n= 0.040 Windinq stream, pools & shoals 19.5 1,336 Total 6 Davis Drive 2014.08.29.Pre -Post Calculations Type 1124 -hr 10 -year Rainfall= 5.09" Prepared by McKim & Creed Printed 12/9/2014 HydroCADO 10.00 s/n 04927 © 2011 HydroCAD Software Solutions LLC Page 65 Subcatchment 16S: Point of Analysis E (Post - Development) Hydrograph 40 38 37.03 cfs I 36 -I �Yp� li 24r 32 - *O -y� r kai4a- 11��5.0" 28 fi 1 — t 1Ru "ff Areal= 9.4101ac N 24 fi rt I_ � -R��o— V$jump=2.1592- 20 � 1 � 1 1 1 � no# Depth _ �w n - LL 16 L A —o � fi T=' f �3min 14 - C �-5 12 —I lb -1=86 10 — — — — — — 6 - 4 - 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) 2014.08.29.Pre -Post Calculations Prepared by McKim & Creed 6 Davis Drive Type 1124 -hr 100 -year Rainfall= 7.40" Printed 12/9/2014 HvdroCADO 10.00 s/n 04927 © 2011 HvdroCAD Software Solutions LLC Paae 66 Summary for Subcatchment 1S: Point of Analysis A (Pre - Development) Runoff = 18.67 cfs @ 12.46 hrs, Volume= 2.267 af, Depth> 4.34" Runoff by SCS TR -20 method, UH =SCS, Time Span= 5.00 -20.00 hrs, dt= 0.05 hrs Type II 24 -hr 100 -year Rainfall= 7.40" Area (ac) CN Description 6.270 77 Woods, Good, HSG D 6.270 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft /ft) (ft /sec) (cfs) 33.2 75 0.0133 0.04 Sheet Flow, H 12 Woods: Dense underbrush n= 0.800 P2= 3.54" 14.6 875 0.0400 1.00 Shallow Concentrated Flow, 8 7 Woodland Kv= 5.0 fps 47.8 950 Total Subcatchment 1S: Point of Analysis A (Pre - Development) Hydrograph ■ Runoff 19 ' 4 18 — — 17 4 16 15 14 H 12 / 11 0 10 LL 9 8 7 — 6 5 4 3 — 2,I � 4 - 18.67 cfs 1 4 I — — — Tye 1i _24-�Ihr -� 100- / arkaiWa11L-7.40" I- -Ru nbf - Area =- 6i.2 -70 c Runoff] VGIl u me=2.1267taf -t R nr Qepth 4. " 7loW Len th =9 ' —_1= _471.-8- rrrm —I d-N47 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) 2014.08.29.Pre -Post Calculations Prepared by McKim & Creed 6 Davis Drive Type 1124 -hr 100 -year Rainfall= 7.40" Printed 12/9/2014 HvdroCADO 10.00 s/n 04927 © 2011 HvdroCAD Software Solutions LLC Paae 67 Summary for Subcatchment 2S: Point of Analysis C (Pre - Development) Runoff = 20.64 cfs @ 11.98 hrs, Volume= 0.966 af, Depth> 4.62" Runoff by SCS TR -20 method, UH =SCS, Time Span= 5.00 -20.00 hrs, dt= 0.05 hrs Type II 24 -hr 100 -year Rainfall= 7.40" Area (ac) CN Description 2.510 79 Woods /grass comb., Good, HSG D 2.510 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft /ft) (ft /sec) (cfs) 6.5 532 0.0750 1.37 Shallow Concentrated Flow, Woodland Kv= 5.0 fps 21 1� 1E 17 1E 1E 14 w 1'- = 12 0 11 LL 1C I Subcatchment 2S: Point of Analysis C (Pre - Development) Hydrograph L _I - 20.64 cfs ■Runoff I Type II 24 -hr fi 10 -yAai ka_j_6faa1 =7.40_" - I: :RunbfU_ArecI x.510 :tu_c +Ruipof Vd�uxnp--iO.1966 of r RiiJlnr Delpth �.C2" low Ce t= 532' i.67-50 -P i - -Tc7-6I5 nihn �1V T79 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) 4 --t 7 Type II 24 -hr fi 10 -yAai ka_j_6faa1 =7.40_" - I: :RunbfU_ArecI x.510 :tu_c +Ruipof Vd�uxnp--iO.1966 of r RiiJlnr Delpth �.C2" low Ce t= 532' i.67-50 -P i - -Tc7-6I5 nihn �1V T79 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) 2014.08.29.Pre -Post Calculations Prepared by McKim & Creed 6 Davis Drive Type 1124 -hr 100 -year Rainfall= 7.40" Printed 12/9/2014 HvdroCADO 10.00 s/n 04927 © 2011 HvdroCAD Software Solutions LLC Paae 68 Summary for Subcatchment 3S: Point of Analysis D (Pre - Development) Runoff = 16.46 cfs @ 12.42 hrs, Volume= 1.911 af, Depth> 4.34" Runoff by SCS TR -20 method, UH =SCS, Time Span= 5.00 -20.00 hrs, dt= 0.05 hrs Type II 24 -hr 100 -year Rainfall= 7.40" Area (ac) CN Description 0.220 83 Brush, Poor, HSG D 5.060 77 Woods, Good, HSG D 5.280 77 Weighted Average 5.280 0.03 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft /ft) (ft /sec) (cfs) 37.3 75 0.0100 0.03 Sheet Flow, L � � � no#� D� , ' ,° 7 � - low Cen =7 Tc� =44�. a rr m Woods: Dense underbrush n= 0.800 P2= 3.54" 7.6 630 0.0770 1.39 Shallow Concentrated Flow, 2- 1 F Woodland Kv= 5.0 fps 44.9 705 Total Subcatchment 3S: Point of Analysis D (Pre - Development) Hydrograph 18 17 16 16.46 cfs I y�e I� 24 =hr 15 - 100- y�arkairifa11�=7.4$" 14 13 Runbff- Ar-ea1 =5.280 Ac 12 _ -Runoff Vzsllump=1.I911Lf U ,a $ L � � � no#� D� , ' ,° 7 � - low Cen =7 Tc� =44�. a rr m 5 5 - — — �L1_�1 17 4 3 — 2- 1 F 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) ■Runoff 2014.08.29.Pre -Post Calculations Prepared by McKim & Creed 6 Davis Drive Type 1124 -hr 100 -year Rainfall= 7.40" Printed 12/9/2014 HvdroCADO 10.00 s/n 04927 © 2011 HvdroCAD Software Solutions LLC Paae 69 Summary for Subcatchment 4S: Point of Analysis F (Pre - Development) Runoff = 11.08 cfs @ 12.32 hrs, Volume= 1.124 af, Depth> 4.47" Runoff by SCS TR -20 method, UH =SCS, Time Span= 5.00 -20.00 hrs, dt= 0.05 hrs Type II 24 -hr 100 -year Rainfall= 7.40" Area (ac) CN Description 0.120 98 Paved parking & roofs 0.090 83 Brush, Poor, HSG D 2.810 77 Woods, Good, HSG D 3.020 78 Weighted Average 2.900 0.04 96.03% Pervious Area 0.120 3.97% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft /ft) (ft /sec) (cfs) 28.2 75 0.0200 0.04 Sheet Flow, Woods: Dense underbrush n= 0.800 P2= 3.54" 8.4 655 0.0670 1.29 Shallow Concentrated Flow, Woodland Kv= 5.0 fDs 36.6 730 Total Subcatchment 4S: Point of Analysis F (Pre - Development) Hydrograph 12 /I 11.08 cfs 11 / I TyJoie li 24hr 10:/ I 1010 -year kainfa11�7.410" 9 L _ Runoff Areal =3.020 -ac 8 Runoff Volume =1.124 of ,I 4 7 - noff De pfh .4711 ° 6 low Lengt - O' LL 5 k1 =3616 min 4-X I dN =78 3 2 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) ■ Runoff 2014.08.29.Pre -Post Calculations Prepared by McKim & Creed 6 Davis Drive Type 1124 -hr 100 -year Rainfall= 7.40" Printed 12/9/2014 HvdroCADO 10.00 s/n 04927 © 2011 HvdroCAD Software Solutions LLC Paae 70 Summary for Subcatchment 5S: Point of Analysis G (Pre - Development) Runoff = 5.67 cfs @ 12.27 hrs, Volume= 0.540 af, Depth> 4.91" Runoff by SCS TR -20 method, UH =SCS, Time Span= 5.00 -20.00 hrs, dt= 0.05 hrs Type II 24 -hr 100 -year Rainfall= 7.40" Area (ac) CN Description 0.220 98 Paved parking & roofs 0.230 84 Pasture /grassland /range, Fair, HSG D 0.870 77 Woods, Good, HSG D 1.320 82 Weighted Average 1.100 83.33% Pervious Area 0.220 Woods: Dense underbrush n= 0.800 P2= 3.54" 16.67% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft /ft) (ft /sec) (cfs) 25.2 75 0.0267 0.05 Sheet Flow, Woods: Dense underbrush n= 0.800 P2= 3.54" 7.4 492 0.0490 1.11 Shallow Concentrated Flow, Woodland Kv= 5.0 fDs 32.6 567 Total Subcatchment 5S: Point of Analysis G (Pre - Development) Hydrograph 6 5.67 cfs Tye II 24 -hr 5 100 -year Rainfall 7.40" Runoff Area =1.320 ac 4 Rupoffl Volume =0.540 of 3 Runoff Depfh>4.9V' 3 t t I t �Iovv Length =567' - J Tc =32.6 min 2 CN =82 fl 0 " 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) ❑ Runoff 6 Davis Drive 2014.08.29.Pre -Post Calculations Type 1124 -hr 100 -year Rainfall= 7.40" Prepared by McKim & Creed Printed 12/9/2014 HydroCADO 10.00 s/n 04927 © 2011 HydroCAD Software Solutions LLC Page 71 Summary for Subcatchment 6S: Point of Analysis H (Pre - Development) Runoff = 92.38 cfs @ 12.12 hrs, Volume= 6.445 af, Depth> 4.71" Runoff by SCS TR -20 method, UH =SCS, Time Span= 5.00 -20.00 hrs, dt= 0.05 hrs Type II 24 -hr 100 -year Rainfall= 7.40" Area (ac) CN Description 2.080 98 Paved parking & roofs 1.830 83 Brush, Poor, HSG D 0.160 79 Woods, Fair, HSG D 12.350 77 Woods, Good, HSG D 16.420 80 Weighted Average 14.340 87.33% Pervious Area 2.080 12.67% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft /ft) (ft /sec) (cfs) 11.7 50 0.0200 0.07 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.54" 1.9 150 0.0700 1.32 Shallow Concentrated Flow, Woodland Kv= 5.0 fps 0.2 113 0.0290 7.73 6.07 Pipe Channel, 12.0" Round Area= 0.8 sf Perim= 3.1' r= 0.25' n= 0.013 1.0 516 0.0290 8.96 11.00 Pipe Channel, 15.0" Round Area= 1.2 sf Perim= 3.9' r= 0.31' n= 0.013 0.1 77 0.0290 12.26 38.52 Pipe Channel, 24.0" Round Area= 3.1 sf Perim= 6.3' r= 0.50' n= 0.013 0.7 204 0.0400 4.55 3.42 Trap/Vee /Rect Channel Flow, Bot.W =0.00' D =0.50' Z= 3.0'/' Top.W =3.00' n= 0.025 Earth, grassed & winding 3.9 606 0.0080 2.56 17.95 Trap/Vee /Rect Channel Flow, Bot.W =4.00' D =1.00' Z= 3.0'/' Top.W= 10.00' n= 0.040 Windinq stream, pools & shoals 19.5 1,716 Total 6 Davis Drive 2014.08.29.Pre -Post Calculations Type 1124 -hr 100 -year Rainfall= 7.40" Prepared by McKim & Creed Printed 12/9/2014 HvdroCADO 10.00 s/n 04927 © 2011 HvdroCAD Software Solutions LLC Paae 72 Subcatchment 6S: Point of Analysis H (Pre - Development) Hydrograph + 4 —I T-y�eA i 24 4tr H16d -y4ar ka _4611�=T.40" t- ftn off Area# 1.420 arc jfti toTVofp"."51of TR Delpfb�4,7II1" Flw en Lt � 1 1W rc-4i-r in --I —CN=180 4-4__1 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) ❑Runoff 100 95 — +_ + -4 - 92.38 cfs 90 — 85_! — 80 , 75_ � — 70 - - 65 — - - 60 a 55 T 0 50 a 45 — 40 = — — 35 30 25- - 20 _ j 4- 15: + 4 —I T-y�eA i 24 4tr H16d -y4ar ka _4611�=T.40" t- ftn off Area# 1.420 arc jfti toTVofp"."51of TR Delpfb�4,7II1" Flw en Lt � 1 1W rc-4i-r in --I —CN=180 4-4__1 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) ❑Runoff 2014.08.29.Pre -Post Calculations Prepared by McKim & Creed 6 Davis Drive Type 1124 -hr 100 -year Rainfall= 7.40" Printed 12/9/2014 HvdroCADO 10.00 s/n 04927 © 2011 HvdroCAD Software Solutions LLC Paae 73 Summary for Subcatchment 7S: Point of Analysis B (Pre - Development) Runoff = 27.21 cfs @ 12.69 hrs, Volume= 4.187 af, Depth> 4.53" Runoff by SCS TR -20 method, UH =SCS, Time Span= 5.00 -20.00 hrs, dt= 0.05 hrs Type II 24 -hr 100 -year Rainfall= 7.40" Area (ac) CN Description 11.100 79 Woods, Fair, HSG D 11.100 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft /ft) (ft /sec) (cfs) 43.7 75 0.0067 0.03 Sheet Flow, 0 14 LL 12 _3:1 IOW Le th =1 �J � 10 8 Woods: Dense underbrush n= 0.800 P2= 3.54" 22.9 1,286 0.0350 0.94 Shallow Concentrated Flow, Woodland Kv= 5.0 fps 66.6 1,361 Total Subcatchment 7S: Point of Analysis B (Pre - Development) Hydrograph 26 27.21 cfs T�P_ e� 24hr 1 24-/ 10— -r- - yiar-kai4a11�=7.40" 22 zI unoff Mea= 111:100 ac 20 Runoff VgIume =4.187 of 16-z 3 . Runoff D�pth 4 3 0 14 LL 12 _3:1 IOW Le th =1 �J � 10 8 Te= .6 i n W=79 PC 6 / �I I 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) ■ Runoff 6 Davis Drive 2014.08.29.Pre -Post Calculations Type 1124 -hr 100 -year Rainfall= 7.40" Prepared by McKim & Creed Printed 12/9/2014 HydroCADO 10.00 s/n 04927 © 2011 HydroCAD Software Solutions LLC Page 74 Summary for Subcatchment 8S: Point of Analysis E (Pre - Development) Runoff = 64.22 cfs @ 12.11 hrs, Volume= 4.606 af, Depth> 5.38" Runoff by SCS TR -20 method, UH =SCS, Time Span= 5.00 -20.00 hrs, dt= 0.05 hrs Type II 24 -hr 100 -year Rainfall= 7.40" Area (ac) CN Description 3.750 98 Paved parking & roofs 1.650 84 Pasture /grassland /range, Fair, HSG D 0.870 79 Woods, Fair, HSG D 4.010 77 Woods, Good, HSG D 10.280 86 Weighted Average 6.530 63.52% Pervious Area 3.750 36.48% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft /ft) (ft /sec) (cfs) 11.7 50 0.0200 0.07 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.54" 2.6 200 0.0650 1.27 Shallow Concentrated Flow, Woodland Kv= 5.0 fps 0.4 94 0.0200 4.17 3.28 Pipe Channel, 12.0" Round Area= 0.8 sf Perim= 3.1' r= 0.25' n= 0.020 Corrugated PE, corrugated interior 0.3 122 0.0200 7.44 9.14 Pipe Channel, 15.0" Round Area= 1.2 sf Perim= 3.9' r= 0.31' n= 0.013 0.3 155 0.0200 8.41 14.86 Pipe Channel, 18.0" Round Area= 1.8 sf Perim= 4.7' r= 0.38' n= 0.013 0.4 280 0.0200 11.82 58.01 Pipe Channel, 30.0" Round Area= 4.9 sf Perim= 7.9' r= 0.63' n= 0.013 3.4 255 0.0630 1.25 Shallow Concentrated Flow, Woodland Kv= 5.0 fps 0.4 180 0.0560 8.28 83.83 Trap /Vee /Rect Channel Flow, Bot.W =3.00' D =1.50' Z= 2.5'/' Top.W= 10.50' n= 0.040 Windinq stream, pools & shoals 19.5 1,336 Total 6 Davis Drive 2014.08.29.Pre -Post Calculations Type 1124 -hr 100 -year Rainfall= 7.40" Prepared by McKim & Creed Printed 12/9/2014 HydroCADO 10.00 s/n 04927 © 2011 HydroCAD Software Solutions LLC Page 75 Subcatchment 8S: Point of Analysis E (Pre - Development) Hydrograph 70- 64.22 cfs 65 I■Runoff — TyPe l i -24 -#h r 55 160- y�avkainfa11L7.40 50 T Runoff Atea #10.280 lac 45 4 - 4-RuPofff VQ1u- mP= 4.6Waf c 35 T 7 -�ln 9epfh�5'3;�, LL Flow -- 336' 25' Tc =1913 min 20 Ib N F6 10 T- 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) 2014.08.29.Pre -Post Calculations Prepared by McKim & Creed 6 Davis Drive Type 1124 -hr 100 -year Rainfall= 7.40" Printed 12/9/2014 HvdroCADO 10.00 s/n 04927 © 2011 HvdroCAD Software Solutions LLC Paae 76 Summary for Subcatchment 9S: Point of Analysis A (Post - Development) Runoff = 18.67 cfs @ 12.46 hrs, Volume= 2.267 af, Depth> 4.34" Runoff by SCS TR -20 method, UH =SCS, Time Span= 5.00 -20.00 hrs, dt= 0.05 hrs Type II 24 -hr 100 -year Rainfall= 7.40" Area (ac) CN Description 6.270 77 Woods, Good, HSG D 6.270 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft /ft) (ft /sec) (cfs) 33.2 75 0.0133 0.04 Sheet Flow, H 12 Woods: Dense underbrush n= 0.800 P2= 3.54" 14.6 875 0.0400 1.00 Shallow Concentrated Flow, 8 7 Woodland Kv= 5.0 fps 47.8 950 Total Subcatchment 9S: Point of Analysis A (Post - Development) Hydrograph ■ Runoff 19 ' 4 18 — — 17 4 16 15 14 H 12 / 11 0 10 LL 9 8 7 — 6 5 4 3 — 2,I � 4 - 18.67 cfs 1 4 I — — — Tye 1i _24-�Ihr -� 100- / arkaiWa11L-7.40" I- -Ru nbf - Area =- 6i.2 -70 c Runoff] VGIl u me=2.1267taf -t R nr Qepth 4. " 7loW Len th =9 ' —_1= _471.-8- rrrm —I d-N47 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) 2014.08.29.Pre -Post Calculations Prepared by McKim & Creed 6 Davis Drive Type 1124 -hr 100 -year Rainfall= 7.40" Printed 12/9/2014 HvdroCADO 10.00 s/n 04927 © 2011 HvdroCAD Software Solutions LLC Paae 77 Summary for Subcatchment 10S: Point of Analysis C (Post - Development) Runoff = 21.11 cfs @ 11.94 hrs, Volume= 0.909 af, Depth> 4.62" Runoff by SCS TR -20 method, UH =SCS, Time Span= 5.00 -20.00 hrs, dt= 0.05 hrs Type II 24 -hr 100 -year Rainfall= 7.40" Area (ac) CN Description 2.360 79 Woods /grass comb., Good, HSG D 2.360 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft /ft) (ft /sec) (cfs) 4.1 370 0.0890 1.49 Shallow Concentrated Flow, Woodland Kv= 5.0 fps Subcatchment 10S: Point of Analysis C (Post - Development) Hydrograph 21.11 cfs _ 21 20 % fi Oe 11-24 I,- 19 18 - 4- 100- y�avkai4a11L7.44" 16 �I — — - l fi Ru - - iq�r�al =2. — arc 14 luoff Vz��umg= 0.19fl9f � ,V .2 LL 19 ! I OW L e�t - 3 - 6 ;I tc--4I 1- niinQ 4 L 2 1 0 5 „ 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) 6 Davis Drive 2014.08.29.Pre -Post Calculations Type 1124 -hr 100 -year Rainfall= 7.40" Prepared by McKim & Creed Printed 12/9/2014 HvdroCADO 10.00 s/n 04927 © 2011 HvdroCAD Software Solutions LLC Paae 78 Summary for Subcatchment 11S: Point of Analysis D (Post - Development) Runoff = 60.67 cfs @ 12.00 hrs, Volume= 3.228 af, Depth> 5.71" Runoff by SCS TR -20 method, UH =SCS, Time Span= 5.00 -20.00 hrs, dt= 0.05 hrs Type II 24 -hr 100 -year Rainfall= 7.40" Area (ac) CN Description 3.480 98 Paved parking, HSG D 1.460 77 Woods, Good, HSG D 0.220 83 Brush, Poor, HSG D 1.620 80 >75% Grass cover, Good, HSG D 6.780 89 Weighted Average 3.300 48.67% Pervious Area 3.480 51.33% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft /ft) (ft /sec) (cfs) 2.0 290 0.0250 2.37 Shallow Concentrated Flow, Grassed Waterway Kv= 15.0 fps 2.0 628 0.0100 5.26 6.46 Pipe Channel, 15.0" Round Area= 1.2 sf Perim= 3.9' r= 0.31' n= 0.013 4.8 376 0.0680 1.30 Shallow Concentrated Flow, Woodland Kv= 5.0 fps 8.8 1,294 Total 6 Davis Drive 2014.08.29.Pre -Post Calculations Type 1124 -hr 100 -year Rainfall= 7.40" Prepared by McKim & Creed Printed 12/9/2014 HydroCADO 10.00 s/n 04927 © 2011 HydroCAD Software Solutions LLC Page 79 Subcatchment 11 S: Point of Analysis D (Post - Development) Hydrograph - -- Runoff 657 60.67 cfs 60 I �e Ii 24 hr 55 100- y�ar_kair faal:�7.40" 50 �— - Ru"f -Ar- eat =6.780 ac - 45 TRulpoq "Lj-mp= 3.12 -28-j of 40 0 35 �u noo Rep�h��. /1 1'� LL 25 F� w Len th 112n94' _ _ _c_ =8.8 20 t N =$9 15 10 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) 2014.08.29.Pre -Post Calculations Prepared by McKim & Creed 6 Davis Drive Type 1124 -hr 100 -year Rainfall= 7.40" Printed 12/9/2014 HvdroCADO 10.00 s/n 04927 © 2011 HvdroCAD Software Solutions LLC Paae 80 Summary for Subcatchment 12S: Point of Analysis F (Post - Development) Runoff = 11.08 cfs @ 12.32 hrs, Volume= 1.124 af, Depth> 4.47" Runoff by SCS TR -20 method, UH =SCS, Time Span= 5.00 -20.00 hrs, dt= 0.05 hrs Type II 24 -hr 100 -year Rainfall= 7.40" Area (ac) CN Description 0.120 98 Paved parking & roofs 0.090 83 Brush, Poor, HSG D 2.810 77 Woods, Good, HSG D 3.020 78 Weighted Average 2.900 0.04 96.03% Pervious Area 0.120 3.97% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft /ft) (ft /sec) (cfs) 28.2 75 0.0200 0.04 Sheet Flow, Woods: Dense underbrush n= 0.800 P2= 3.54" 8.4 655 0.0670 1.29 Shallow Concentrated Flow, Woodland Kv= 5.0 fDs 36.6 730 Total Subcatchment 12S: Point of Analysis F (Post - Development) Hydrograph 12 /I 11.08 cfs 11:/ fi rt 1 TyJoie li 24hr 10:/ 1 1010 -year Ikainfall�=7.410" 9 /I Runoff Areal =3.020 -ac 8 /I Runoff) Volume= 1.1124 of noff De pfh .4711 ° 6 low Lengt -7�0' LL 5 k1 =361:6 min 4-X I dN =78 3 2 fi 1 I I 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) ■ Runoff 2014.08.29.Pre -Post Calculations Prepared by McKim & Creed 6 Davis Drive Type 1124 -hr 100 -year Rainfall= 7.40" Printed 12/9/2014 HvdroCADO 10.00 s/n 04927 © 2011 HvdroCAD Software Solutions LLC Paae 81 Summary for Subcatchment 13S: Point of Analysis G (Post - Development) Runoff = 5.67 cfs @ 12.27 hrs, Volume= 0.540 af, Depth> 4.91" Runoff by SCS TR -20 method, UH =SCS, Time Span= 5.00 -20.00 hrs, dt= 0.05 hrs Type II 24 -hr 100 -year Rainfall= 7.40" Area (ac) CN Description 0.220 98 Paved parking & roofs 0.230 84 Pasture /grassland /range, Fair, HSG D 0.870 77 Woods, Good, HSG D 1.320 82 Weighted Average 1.100 83.33% Pervious Area 0.220 Woods: Dense underbrush n= 0.800 P2= 3.54" 16.67% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft /ft) (ft /sec) (cfs) 25.2 75 0.0267 0.05 Sheet Flow, Woods: Dense underbrush n= 0.800 P2= 3.54" 7.4 492 0.0490 1.11 Shallow Concentrated Flow, Woodland Kv= 5.0 fDs 32.6 567 Total Subcatchment 13S: Point of Analysis G (Post - Development) Hydrograph ❑ Runoff 6 5.67 cfs Tye II 24 -hr 5 100 -year Rainfall 7.40" Runoff Area =1.320 ac 4 Rupoffl Volume =0.540 of 3 � Runoff Depth >4.9V' 3 �Iovv Length =567' Tc =32.6 min 2 CN =82 fl 0 " 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) 6 Davis Drive 2014.08.29.Pre -Post Calculations Type 1124 -hr 100 -year Rainfall= 7.40" Prepared by McKim & Creed Printed 12/9/2014 HydroCADO 10.00 s/n 04927 © 2011 HydroCAD Software Solutions LLC Page 82 Summary for Subcatchment 14S: Point of Analysis H (Post - Development) Runoff = 100.27 cfs @ 12.11 hrs, Volume= 7.118 af, Depth> 5.16" Runoff by SCS TR -20 method, UH =SCS, Time Span= 5.00 -20.00 hrs, dt= 0.05 hrs Type II 24 -hr 100 -year Rainfall= 7.40" Area (ac) CN Description 5.180 98 Paved parking & roofs 1.750 83 Brush, Poor, HSG D 0.160 79 Woods, Fair, HSG D 9.480 77 Woods, Good, HSG D 16.570 84 Weighted Average 11.390 68.74% Pervious Area 5.180 31.26% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft /ft) (ft /sec) (cfs) 11.7 50 0.0200 0.07 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.54" 1.9 150 0.0700 1.32 Shallow Concentrated Flow, Woodland Kv= 5.0 fps 0.2 113 0.0290 7.73 6.07 Pipe Channel, 12.0" Round Area= 0.8 sf Perim= 3.1' r= 0.25' n= 0.013 1.0 516 0.0290 8.96 11.00 Pipe Channel, 15.0" Round Area= 1.2 sf Perim= 3.9' r= 0.31' n= 0.013 0.1 77 0.0290 12.26 38.52 Pipe Channel, 24.0" Round Area= 3.1 sf Perim= 6.3' r= 0.50' n= 0.013 0.7 204 0.0400 4.55 3.42 Trap/Vee /Rect Channel Flow, Bot.W =0.00' D =0.50' Z= 3.0'/' Top.W =3.00' n= 0.025 Earth, grassed & winding 3.9 606 0.0080 2.56 17.95 Trap/Vee /Rect Channel Flow, Bot.W =4.00' D =1.00' Z= 3.0'/' Top.W= 10.00' n= 0.040 Windinq stream, pools & shoals 19.5 1,716 Total 6 Davis Drive 2014.08.29.Pre -Post Calculations Type 1124 -hr 100 -year Rainfall= 7.40" Prepared by McKim & Creed Printed 12/9/2014 HydroCADO 10.00 s/n 04927 © 2011 HydroCAD Software Solutions LLC Page 83 Subcatchment 14S: Point of Analysis H (Post - Development) Hydrograph 110 105 100 100.27 cfs — 1 T ❑Runoff 95 90 :Y � 10b -year kair�faH =�4�G' 85 80 F I � -Wmoff Mea01$570 Inc 75 - _ _ u- OTV_ _I__� .11 jaf 65 60 0 55 �R o Delpthh 51 IV' LL —Flow-Le tai -1 71_' IT 40 T�9.5 rri�u 30 t —t fi __T tN =184 25= 20 - 15 10 - - - - 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) 2014.08.29.Pre -Post Calculations Prepared by McKim & Creed 6 Davis Drive Type 1124 -hr 100 -year Rainfall= 7.40" Printed 12/9/2014 HvdroCADO 10.00 s/n 04927 © 2011 HvdroCAD Software Solutions LLC Paae 84 Summary for Subcatchment 15S: Point of Analysis B (Post - Development) Runoff = 38.52 cfs @ 12.33 hrs, Volume= 4.015 af, Depth> 4.79" Runoff by SCS TR -20 method, UH =SCS, Time Span= 5.00 -20.00 hrs, dt= 0.05 hrs Type II 24 -hr 100 -year Rainfall= 7.40" Area (ac) CN Description 0.720 98 Paved parking & roofs 2.050 84 50 -75% Grass cover, Fair, HSG D 7.280 79 Woods, Fair, HSG D 10.050 81 Weighted Average 9.330 92.84% Pervious Area 0.720 Grass: Bermuda n= 0.410 P2= 3.54" 7.16% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft /ft) (ft /sec) (cfs) 23.9 170 0.0410 0.12 Sheet Flow, Grass: Bermuda n= 0.410 P2= 3.54" 13.7 841 0.0420 1.02 Shallow Concentrated Flow, Woodland Kv= 5.0 fDs 37.6 1,011 Total Subcatchment 15S: Point of Analysis B (Post - Development) Hydrograph ■Runoff 40 38.52 cfs 38- - - _ Ty l i_24-'h r 34- 1ADO -yea ainfall .4 " 32- 30- - ftno#' Item W.050 `a! 26 -RU fff Volump=4.1� 5Faf 3 22 R9noff Depth�4.7`9" LL 18 { - - Flow -Len th- �0 ' 16 7V 14 12- dN41 10-11/ - 8! 6 4 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) 6 Davis Drive 2014.08.29.Pre -Post Calculations Type 1124 -hr 100 -year Rainfall= 7.40" Prepared by McKim & Creed Printed 12/9/2014 HydroCADO 10.00 s/n 04927 © 2011 HydroCAD Software Solutions LLC Page 85 Summary for Subcatchment 16S: Point of Analysis E (Post - Development) Runoff = 58.78 cfs @ 12.11 hrs, Volume= 4.216 af, Depth> 5.38" Runoff by SCS TR -20 method, UH =SCS, Time Span= 5.00 -20.00 hrs, dt= 0.05 hrs Type II 24 -hr 100 -year Rainfall= 7.40" Area (ac) CN Description 3.250 98 Paved parking & roofs 1.570 84 Pasture /grassland /range, Fair, HSG D 0.870 79 Woods, Fair, HSG D 3.720 77 Woods, Good, HSG D 9.410 86 Weighted Average 6.160 65.46% Pervious Area 3.250 34.54% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft /ft) (ft /sec) (cfs) 11.7 50 0.0200 0.07 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.54" 2.6 200 0.0650 1.27 Shallow Concentrated Flow, Woodland Kv= 5.0 fps 0.4 94 0.0200 4.17 3.28 Pipe Channel, 12.0" Round Area= 0.8 sf Perim= 3.1' r= 0.25' n= 0.020 Corrugated PE, corrugated interior 0.3 122 0.0200 7.44 9.14 Pipe Channel, 15.0" Round Area= 1.2 sf Perim= 3.9' r= 0.31' n= 0.013 0.3 155 0.0200 8.41 14.86 Pipe Channel, 18.0" Round Area= 1.8 sf Perim= 4.7' r= 0.38' n= 0.013 0.4 280 0.0200 11.82 58.01 Pipe Channel, 30.0" Round Area= 4.9 sf Perim= 7.9' r= 0.63' n= 0.013 3.4 255 0.0630 1.25 Shallow Concentrated Flow, Woodland Kv= 5.0 fps 0.4 180 0.0560 8.28 83.83 Trap /Vee /Rect Channel Flow, Bot.W =3.00' D =1.50' Z= 2.5'/' Top.W= 10.50' n= 0.040 Windinq stream, pools & shoals 19.5 1,336 Total 6 Davis Drive 2014.08.29.Pre -Post Calculations Type 1124 -hr 100 -year Rainfall= 7.40" Prepared by McKim & Creed Printed 12/9/2014 HydroCADO 10.00 s/n 04927 © 2011 HydroCAD Software Solutions LLC Page 86 Subcatchment 16S: Point of Analysis E (Post - Development) Hydrograph 65 ■Runoff 60 58.78 cfs 55 , - Type li -241hr 50 � 100 -y6ar -Rai nfal lL7.40" 45 �_ Run- Of-A rea1=9.410 mac 40 1 _Rugoffl WIlump 4.12161 of 35- 1 R�_ noj Delpth�5. 8' � LL 30 Flow Len th =1 336' 25 — Ic , 91.5. min 20 J — — — tN =86 15 — 10 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) UPSTREAM DRAINAGE AREA RUNOFF CALCULATIONS 6 Davis Drive 2014.08.29.Pre -Post Calculations Type 11 24 -hr 1 -year Rainfall= 2.93" Prepared by McKim & Creed Printed 12/9/2014 HvdroCADO 10.00 s/n 04927 © 2011 HvdroCAD Software Solutions LLC Paae 1 Summary for Subcatchment 17S: Offsite - Upstream Runoff = 48.29 cfs @ 12.89 hrs, Volume= 8.350 af, Depth> 1.30" Runoff by SCS TR -20 method, UH =SCS, Time Span= 5.00 -20.00 hrs, dt= 0.05 hrs Type II 24 -hr 1 -year Rainfall= 2.93" Area (ac) CN Description 14.710 98 Paved parking & roofs 31.090 84 Pasture /grassland /range, Fair, HSG D 31.090 77 Woods, Good, HSG D 76.890 84 Weighted Average 62.180 80.87% Pervious Area 14.710 Woods: Dense underbrush n= 0.800 P2= 3.54" 19.13% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft /ft) (ft /sec) (cfs) 37.3 75 0.0100 0.03 Sheet Flow, Woods: Dense underbrush n= 0.800 P2= 3.54" 32.3 1,336 0.0190 0.69 Shallow Concentrated Flow, Woodland Kv= 5.0 fps 9.4 1,476 0.0190 2.62 5.89 Trap /Vee /Rect Channel Flow, Bot.W =3.00' D =0.50' Z= 3.07' Top.W =6.00' n= 0.040 Windinq stream, pools & shoals 79.0 2,887 Total Subcatchment 17S: Offsite - Upstream Hydrograph ❑ Runoff 50 48.29 cfs ,I Typed 24-hir 45 1 -year Rainfall= 2.93" - 40 �tnoff Arlea= 76.890 ac l 35 ! RLfnoff Vplume =8.350 of 30 Rno�ff D_epth�1. 0" 25 Flow ,Len th 12'1 17' .2 20 /I T+c�79.0 in 151//, 5 / VI= 84 � T 10 / 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) L 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) 6 Davis Drive 2014.08.29.Pre -Post Calculations Type// 24 -hr 2 -year Rainfall= 3.54" Prepared by McKim & Creed Printed 12/9/2014 HvdroCADO 10.00 s/n 04927 © 2011 HvdroCAD Software Solutions LLC Paae 2 Summary for Subcatchment 17S: Offsite - Upstream Runoff = 65.86 cfs @ 12.88 hrs, Volume= 11.357 af, Depth> 1.77" Runoff by SCS TR -20 method, UH =SCS, Time Span= 5.00 -20.00 hrs, dt= 0.05 hrs Type II 24 -hr 2 -year Rainfall= 3.54" Area (ac) CN Description 14.710 98 Paved parking & roofs 31.090 84 Pasture /grassland /range, Fair, HSG D 31.090 77 Woods, Good, HSG D 76.890 84 Weighted Average 62.180 40 80.87% Pervious Area 14.710 Woods: Dense underbrush n= 0.800 P2= 3.54" 19.13% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft /ft) (ft /sec) (cfs) 37.3 75 0.0100 0.03 Sheet Flow, unoff o um�e= 11 r357af 40 Runoff De th >1.77,' Woods: Dense underbrush n= 0.800 P2= 3.54" 32.3 1,336 0.0190 0.69 Shallow Concentrated Flow, 25 CW =84 t- 20 Woodland Kv= 5.0 fps 9.4 1,476 0.0190 2.62 5.89 Trap /Vee /Rect Channel Flow, Bot.W =3.00' D =0.50' Z= 3.07' Top.W =6.00' n= 0.040 Windinq stream, pools & shoals 79.0 2,887 Total Subcatchment 17S: Offsite - Upstream Hydrograph 70 65 65.86 cfs T�pe 1� 24 -hr 60 - Oa-rRafnfall 3.te L i runoff A"a =7"q (YaP-- 50 45 �1 unoff o um�e= 11 r357af 40 Runoff De th >1.77,' 0 35 —I Ivv Len th-�� ,$817 30 T6=79.0 meinI- 25 CW =84 t- 20 15 10 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) ■Runoff 2014.08.29.Pre -Post Calculations Prepared by McKim & Creed 6 Davis Drive Type 1124 -hr 10 -year Rainfall= 5.09" Printed 12/9/2014 HvdroCADO 10.00 s/n 04927 © 2011 HvdroCAD Software Solutions LLC Paae 3 Summary for Subcatchment 17S: Offsite - Upstream Runoff = 112.49 cfs @ 12.88 hrs, Volume= 19.526 af, Depth> 3.05" Runoff by SCS TR -20 method, UH =SCS, Time Span= 5.00 -20.00 hrs, dt= 0.05 hrs Type II 24 -hr 10 -year Rainfall = 5.09" Area (ac) CN Description 14.710 98 Paved parking & roofs 31.090 84 Pasture /grassland /range, Fair, HSG D 31.090 77 Woods, Good, HSG D 76.890 84 Weighted Average 62.180 R nof� V�lu -1e=11 -5? afl 80.87% Pervious Area 14.710 Woods: Dense underbrush n= 0.800 P2= 3.54" 19.13% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft /ft) (ft /sec) (cfs) 37.3 75 0.0100 0.03 Sheet Flow, —I R nof� V�lu -1e=11 -5? afl Woods: Dense underbrush n= 0.800 P2= 3.54" 32.3 1,336 0.0190 0.69 Shallow Concentrated Flow, —I Woodland Kv= 5.0 fps 9.4 1,476 0.0190 2.62 5.89 Trap /Vee /Rect Channel Flow, Bot.W =3.00' D =0.50' Z= 3.07' Top.W =6.00' n= 0.040 Windinq stream, pools & shoals 79.0 2,887 Total 125 120 115 110 90 85 80 75 w 70 65 c 60 LL 55 30 25 20 15 10 5 0 5 Subcatchment 17S: Offsite - Upstream Hydrograph 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) ❑Runoff - � � — — — 112.49 cfs Type 24-hr � -+ � _ 1&yez�r R_ainf 111 =5.09'h T- 7T :71 1 -R4noff Arrea= 7fr.890-oc t —I R nof� V�lu -1e=11 -5? afl _ -Ru -noff Depth>3-.05 - f I" t�err�th =1,187' � 1 � T6 --7910 rriin I —I 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) ❑Runoff 2014.08.29.Pre -Post Calculations Prepared by McKim & Creed 6 Davis Drive Type 1124 -hr 100 -year Rainfall= 7.40" Printed 12/9/2014 HvdroCADO 10.00 s/n 04927 © 2011 HvdroCAD Software Solutions LLC Paae 4 Summary for Subcatchment 17S: Offsite - Upstream Runoff = 183.50 cfs @ 12.86 hrs, Volume= 32.407 af, Depth> 5.06" Runoff by SCS TR -20 method, UH =SCS, Time Span= 5.00 -20.00 hrs, dt= 0.05 hrs Type II 24 -hr 100 -year Rainfall= 7.40" Area (ac) CN Description 14.710 98 Paved parking & roofs 31.090 84 Pasture /grassland /range, Fair, HSG D 31.090 77 Woods, Good, HSG D 76.890 84 Weighted Average 62.180 80.87% Pervious Area 14.710 Woods: Dense underbrush n= 0.800 P2= 3.54" 19.13% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft /ft) (ft /sec) (cfs) 37.3 75 0.0100 0.03 Sheet Flow, Woods: Dense underbrush n= 0.800 P2= 3.54" 32.3 1,336 0.0190 0.69 Shallow Concentrated Flow, Woodland Kv= 5.0 fps 9.4 1,476 0.0190 2.62 5.89 Trap /Vee /Rect Channel Flow, Bot.W =3.00' D =0.50' Z= 3.07' Top.W =6.00' n= 0.040 Windinq stream, pools & shoals 79.0 2,887 Total 1 170 160 150 140 130 120 N 110 c 100 LL 90 50 40 Subcatchment 17S: Offsite - Upstream Hydrograph 183.50 cis Tipe 1f24-hr- 1 60-y4ar-Raffitalfit7 40- - Rpnoff Area = -7"90 -arc- -R�-no Vo�!Iurnle= 32.407 of R no D tai >5�06" f I t Zp t h= 1,87' T6 --7910 kin —I I- -4 Time (hours) ❑Runoff DOWNSTREAM CULVERT IMPACT ANALYSIS Solve For: Headwater Elevation Culvert Summary Allowable HW Elevation 500.00 ft Computed Headwater Elew 296.17 ft Inlet Control HW Elev. 295.75 ft Outlet Control HW Elev. 296.17 ft Culvert Calculator Report 72" CMP Headwater Depth /Height 0.60 Discharge 75.37 cfs Tailwater Elevation 292.29 ft Control Type Entrance Control Title: The Hamner Institutes Project Engineer: gavant s: \... \2014.08.29.ex. 72 -inch cmp.cvm McKim & Creed Raleigh CulvertMaster v3.3 [03.03.00.04] 09/01/14 05:20:41 PW Bentley Systems, Inc. Haestad Methods Solution Center Watertown, CT 06795 USA +1- 203 - 755 -1666 Page 1 of 1 Grades Upstream Invert Length 292.55 ft 400.00 ft Downstream Invert Constructed Slope 287.49 ft 0.012650 ft/ft Hydraulic Profile Profile CompositeS1S2 Slope Type Steep Flow Regime N/A Velocity Downstream 3.11 ft/s Depth, Downstream Normal Depth Critical Depth Critical Slope 4.80 ft 2.22 ft 2.32 ft 0.010730 ft/ft Section Section Shape Section Material Section Size Number Sections Circular CMP 72 inch 1 Mannings Coefficient Span Rise 0.024 6.00 ft 6.00 ft Outlet Control Properties Outlet Control HW Elev. Ke 296.17 ft 0.50 Upstream Velocity Head Entrance Loss 0.86 ft 0.43 ft Inlet Control Properties Inlet Control HW Elev. Inlet Type K M C Y 295.75 ft Headwall 0.00780 2.00000 0.03790 0.69000 Flow Control Area Full HDS 5 Chart HDS 5 Scale Equation Form N/A 28.3 ft2 2 1 1 Title: The Hamner Institutes Project Engineer: gavant s: \... \2014.08.29.ex. 72 -inch cmp.cvm McKim & Creed Raleigh CulvertMaster v3.3 [03.03.00.04] 09/01/14 05:20:41 PW Bentley Systems, Inc. Haestad Methods Solution Center Watertown, CT 06795 USA +1- 203 - 755 -1666 Page 1 of 1 Culvert Calculator Report 72" CMP Solve For: Headwater Elevation Culvert Summary Allowable HW Elevation 500.00 ft Headwater Depth /Height 0.72 Computed Headwater Elew 296.85 ft Discharge 102.53 cfs Inlet Control HW Elev. 296.39 ft Tailwater Elevation 292.29 ft Outlet Control HW Elev. 296.85 ft Control Type Entrance Control Title: The Hamner Institutes Project Engineer: gavant s: \... \2014.08.29.ex. 72 -inch cmp.cvm McKim & Creed Raleigh CulvertMaster v3.3 [03.03.00.04] 09/01/14 05:23:00 PMJ Bentley Systems, Inc. Haestad Methods Solution Center Watertown, CT 06795 USA +1- 203 - 755 -1666 Page 1 of 1 Grades Upstream Invert Length 292.55 ft 400.00 ft Downstream Invert Constructed Slope 287.49 ft 0.012650 ft/ft Hydraulic Profile Profile CompositeS1S2 Slope Type Steep Flow Regime N/A Velocity Downstream 4.23 ft/s Depth, Downstream Normal Depth Critical Depth Critical Slope 4.80 ft 2.63 ft 2.73 ft 0.011126 ft/ft Section Section Shape Section Material Section Size Number Sections Circular CMP 72 inch 1 Mannings Coefficient Span Rise 0.024 6.00 ft 6.00 ft Outlet Control Properties Outlet Control HW Elev. Ke 296.85 ft 0.50 Upstream Velocity Head Entrance Loss 1.05 ft 0.52 ft Inlet Control Properties Inlet Control HW Elev. Inlet Type K M C Y 296.39 ft Headwall 0.00780 2.00000 0.03790 0.69000 Flow Control Area Full HDS 5 Chart HDS 5 Scale Equation Form Unsubmerged 28.3 ft2 2 1 1 Title: The Hamner Institutes Project Engineer: gavant s: \... \2014.08.29.ex. 72 -inch cmp.cvm McKim & Creed Raleigh CulvertMaster v3.3 [03.03.00.04] 09/01/14 05:23:00 PMJ Bentley Systems, Inc. Haestad Methods Solution Center Watertown, CT 06795 USA +1- 203 - 755 -1666 Page 1 of 1 Culvert Calculator Report 72" CMP Solve For: Headwater Elevation Culvert Summary Allowable HW Elevation 500.00 ft Headwater Depth /Height 0.98 Computed Headwater Elew 298.40 ft Discharge 174.45 cfs Inlet Control HW Elev. 297.92 ft Tailwater Elevation 292.29 ft Outlet Control HW Elev. 298.40 ft Control Type Outlet Control Title: The Hamner Institutes Project Engineer: gavant s: \... \2014.08.29.ex. 72 -inch cmp.cvm McKim & Creed Raleigh CulvertMaster v3.3 [03.03.00.04] 09/01/14 05:24:00 PMD Bentley Systems, Inc. Haestad Methods Solution Center Watertown, CT 06795 USA +1- 203 - 755 -1666 Page 1 of 1 Grades Upstream Invert Length 292.55 ft 400.00 ft Downstream Invert Constructed Slope 287.49 ft 0.012650 ft/ft Hydraulic Profile Profile Slope Type Flow Regime Velocity Downstream M1 Mild Subcritical 7.19 ft/s Depth, Downstream Normal Depth Critical Depth Critical Slope 4.80 ft 3.62 ft 3.60 ft 0.012808 ft/ft Section Section Shape Section Material Section Size Number Sections Circular CMP 72 inch 1 Mannings Coefficient Span Rise 0.024 6.00 ft 6.00 ft Outlet Control Properties Outlet Control HW Elev. Ke 298.40 ft 0.50 Upstream Velocity Head Entrance Loss 1.49 ft 0.75 ft Inlet Control Properties Inlet Control HW Elev. Inlet Type K M C Y 297.92 ft Headwall 0.00780 2.00000 0.03790 0.69000 Flow Control Area Full HDS 5 Chart HDS 5 Scale Equation Form Unsubmerged 28.3 ft2 2 1 1 Title: The Hamner Institutes Project Engineer: gavant s: \... \2014.08.29.ex. 72 -inch cmp.cvm McKim & Creed Raleigh CulvertMaster v3.3 [03.03.00.04] 09/01/14 05:24:00 PMD Bentley Systems, Inc. Haestad Methods Solution Center Watertown, CT 06795 USA +1- 203 - 755 -1666 Page 1 of 1 Culvert Calculator Report 72" CMP Solve For: Headwater Elevation Culvert Summary Allowable HW Elevation 500.00 ft Headwater Depth /Height 1.11 Computed Headwater Elew 299.21 ft Discharge 217.31 cfs Inlet Control HW Elev. 298.80 ft Tailwater Elevation 292.29 ft Outlet Control HW Elev. 299.21 ft Control Type Outlet Control Title: The Hamner Institutes Project Engineer: gavant s: \... \2014.08.29.ex. 72 -inch cmp.cvm McKim & Creed Raleigh CulvertMaster v3.3 [03.03.00.04] 09/01/14 05:25:00 PW Bentley Systems, Inc. Haestad Methods Solution Center Watertown, CT 06795 USA +1- 203 - 755 -1666 Page 1 of 1 Grades Upstream Invert Length 292.55 ft 400.00 ft Downstream Invert Constructed Slope 287.49 ft 0.012650 ft/ft Hydraulic Profile Profile Slope Type Flow Regime Velocity Downstream M1 Mild Subcritical 8.96 ft/s Depth, Downstream Normal Depth Critical Depth Critical Slope 4.80 ft 4.22 ft 4.03 ft 0.014262 ft/ft Section Section Shape Section Material Section Size Number Sections Circular CMP 72 inch 1 Mannings Coefficient Span Rise 0.024 6.00 ft 6.00 ft Outlet Control Properties Outlet Control HW Elev. Ke 29921 ft 0.50 Upstream Velocity Head Entrance Loss 1.63 ft 0.81 ft Inlet Control Properties Inlet Control HW Elev. Inlet Type K M C Y 298.80 ft Headwall 0.00780 2.00000 0.03790 0.69000 Flow Control Area Full HDS 5 Chart HDS 5 Scale Equation Form Unsubmerged 28.3 ft2 2 1 1 Title: The Hamner Institutes Project Engineer: gavant s: \... \2014.08.29.ex. 72 -inch cmp.cvm McKim & Creed Raleigh CulvertMaster v3.3 [03.03.00.04] 09/01/14 05:25:00 PW Bentley Systems, Inc. Haestad Methods Solution Center Watertown, CT 06795 USA +1- 203 - 755 -1666 Page 1 of 1 WET DETENTION STORAGE VOLUME & POND SIZING WATER QUALITY POND #1 CALCULATIONS Project Name 6 Davis Drive Project Number 01517 -0236 Date February 26, 2014 3rd revision 2nd revision 1 st revision 10.10.14 8.29.14 Water Quality Pond Drainage Area Data Project Project No. Date Total site area 6 Davis Drive 01517 -0236 February 26, 2014 222,075 square feet = acres Impervious areas Drainage area to pond Other Drai Existing [sf] Proposed [sf] Change [sf] Existing [sf] On -site buildings 0 15,740 15,740 0 On -site streets 0 0 0 0 On -site parking 0 135,839 135,839 0 On -site sidewalks 0 0 0 0 Other on -site 0 0 0 0 Total off -site impervious 0 0 0 0 Total Impervious 151,579 151,579 0 Non - impervious areas Drainage area to pond Other Drai Existing [sf] Proposed [sf] Change [sf] Existing [sf] On -site grass /landscape 0 68,496 68,496 0 On -site woods 187,343 2,000 - 185,343 0 Other undeveloped 0 0 0 0 Total off -site non - impervious 0 0 0 0 Total non - impervious 187,343 70,496 - 116,847 0 Total Drainage Area 1 222,075 1 222,075 1 0 3,167,850 Percent Impervious 1 0.0 1 68.3 1 68.3 1 0.0 Notes: 2014.10.10.Wet Detention Pond #1 a_Rev2.xls Site Drainage Area Data Page 2 of 18 Printed 12/9/2014 4:38 PM nage Area Proposed nage Area Proposed 0 0 0 0 0 3,167,850 0.0 2014.10.10.Wet Detention Pond #1 a_Rev2.xls Site Drainage Area Data Page 3 of 18 Printed 12/9/2014 4:38 PM Water Quality Pond Surface Area Calculations Project Project No. 6 Davis Drive 01517 -0236 Date February 26, 2014 Total on -site drainage area to pond 222,075 square feet Total impervious area in drainage area 151,579 square feet Average water depth of basin at normal pool 3.0 feet Location of site Durham County Site region Piedmont % Impervious cover 68.3 percent If the site is in a coastal area, will a vegetative filter be used? n/a Surface Area /Drainage Area Ratios: For a site in the Piedmont (85 %) 2.8 percent For a site in the Piedmont (90 %) 3.9 percent For a site in a Coastal County w/ Vegetative Filter 5.8 percent For a site in a Coastal County w /out Vegetative Filter 7.9 percent Required surface area of pond: For a site in the Piedmont (85 %) 6,210.0 square feet For a site in the Piedmont (90 %) 8,690.0 square feet For a site in a Coastal County w/ Vegetative Filter 12,940.0 square feet For a site in a Coastal County w /out Vegetative Filter 17,570.0 square feet Notes: 2014.10.10.Wet Detention Pond #1 a_Rev2.xls Pond Surface Area Calcs Page 4 of 18 Printed 12/9/2014 4:38 PM Water Quality Pond Stormwater Runoff Volume Calculations Project Project No. Date Drainage area Impervious area Rainfall depth Percent Impervious 6 Davis Drive 01517 -0236 February 26, 2014 222,075 square feet 151,579 square feet 1.00 inches 68.3 percent R(v)= 0.05 +0.009 *(Percent impervious) Runoff coefficient - R(v) 0,66 in /in Runoff volume = (Design rainfall) *(R(v)) *(Drainage area) Runoff volume 12,293.7 cubic feet Notes: 2014.10.10.Wet Detention Pond #1a_Rev2.xls Runoff Volume Calcs Page 5 of 18 Printed 12/9/2014 4:38 PM Water Quality Pond Volume Calculations Stage- Storage Data for Pond - Temporary Pool Project 6 Davis Drive Project No. 01517 -0236 Date February 26, 2014 Contour ID Stage Area [sq. ft.] Area [acres] Incremental Area [sq. ft.] Incremental Area [acres] Incremental volume [cu. ft] Incremental volume [acre -ft] Cumulative volume [cu. ft] Cumulative volume [acre -ft] 307 0 12,092.0 0.278 12,092.0 0.3 0.0 0.0 0.0 0.0 308 1 15,086.0 0.346 2,994.0 0.1 13,589.0 0.3 13,589.0 0.3 309 2 16,558.0 0.380 1,472.0 0.0 15,822.0 0.4 29,411.0 0.7 309.5 2.5 17,315.0 0.397 757.0 0.0 8,468.3 0.2 37,879.3 0.6 310 3 18,072.0 0.415 757.0 0.0 8,846.8 0.2 46,726.0 0.4 311 4 19,651.0 0.451 1,579.0 0.0 18,861.5 0.4 65,587.5 0.6 312 5 20,392.0 0.468 741.0 0.0 20,021.5 0.5 85,609.0 0.9 2014.10.10.Wet Detention Pond #1a_Rev2.xls Stage Storage (Temp Pool) Page 6 of 18 Printed 12/9/2014 4:38 PM Water Quality Pond Volume Calculations Stage- Storage Data for Pond - Permanent Pool Project 6 Davis Drive Project No. 01517 -0236 Date February 26, 2014 Contour ID Stage Area [sq. ft.] Area [acres] Incremental Area [sq. ft.] Incremental Area [acres] Incremental volume [cu. ft] Incremental volume [acre -ft] Cumulative volume [cu. ft] Cumulative volume [acre -ft] 302 0 5,023.0 0.115 5,023.0 0.1 0.0 0.0 0.0 0.0 303 1 6,024.0 0.138 1,001.0 0.0 5,523.5 0.1 5,523.5 0.1 304 2 7,080.0 0.163 1,056.0 0.0 6,552.0 0.2 12,075.5 0.3 305 3 8,194.0 0.188 1,114.0 0.0 7,637.0 0.2 19,712.5 0.3 306 4 9,364.0 0.215 1,170.0 0.0 8,779.0 0.2 28,491.5 0.4 307 5 12,092.0 0.278 2,728.0 0.1 10,728.0 0.2 39,219.5 0.4 2014.10.10.Wet Detention Pond #1a_Rev2.xls Stage Storage (Perm Pool) Page 7 of 18 Printed 12/9/2014 4:38 PM Water Quality Pond Volume Calculations Stage- Storage Data for Pond - Forebays Project 6 Davis Drive Project No. 01517 -0236 Date February 26, 2014 Contour ID Stage Area [sq. ft.] Area [acres] Incremental Area [sq. ft.] Incremental Area [acres] Incremental volume [cu. ft] Incremental volume [acre -ft] Cumulative volume [cu. ft] Cumulative volume [acre -ft] 302 0 775.0 0.018 775.0 0.0 0.0 0.0 0.0 0.0 303 1 1,026.0 0.024 251.0 0.0 900.5 0.0 900.5 0.0 304 2 1,305.0 0.030 279.0 0.0 1,165.5 0.0 2,066.0 0.0 305 3 1,610.0 0.037 305.0 0.0 1,457.5 0.0 3,523.5 0.1 306 4 1,938.0 0.044 328.0 0.0 1,774.0 0.0 5,297.5 0.1 307 5 2,826.0 0.065 888.0 0.0 2,382.0 0.1 7,679.5 0.1 2014.10.10.Wet Detention Pond #1a_Rev2.xls Stage Storage (Forebays) Page 8 of 18 Printed 12/9/2014 4:38 PM Water Quality Basin Dewatering Time Calculations Project 6 Davis Drive Project No. 01517 -0236 Date February 26, 2014 Maximum surface area of basin Maximum head of water above dewatering hole Orifice coefficient Diameter of each hole Number of holes Cross sectional area of each hole = Cross sectional area of each hole = Cross sectional area of dewatering hole(s) _ Cross sectional area of dewatering hole(s) _ Dewatering time for basin = Dewatering time for basin = Notes: 17,315 square feet 2.50 feet 0.60 2.5 inches 1 0.034 square feet 4.9 square inches 0.034 square feet 4.9 square inches 92.7 hours 3.86 days WET DETENTION POND TIME OF CONCENTRATION AND ROUTING CALCULATIONS 6S 1S 2S Pre - Development to Pre - Development to Post -Dev lopment rj$ POA D Pond Only Und veloped 3P Wet Pond #1 7 4R (new Reach) SubCat Reach on Link Routing Diagram for 2014.10.13.POA D Prepared by McKim & Creed, Printed 12/10/2014 E HydroC AD® ® 10.00 s/n 04927 © 2011 HydroCAD Software Solutions LLC 6 Davis Drive 2014.10.13.POA D Type 1124 -hr 1 -year Rainfall= 3.00" Prepared by McKim & Creed Printed 12/10/2014 HvdroCADO 10.00 s/n 04927 © 2011 HvdroCAD Software Solutions LLC Paae 3 Summary for Subcatchment 1 S: Pre - Development to Pond Only Runoff = 4.50 cfs @ 12.26 hrs, Volume= 0.455 af, Depth= 1.07" Runoff by SCS TR -20 method, UH =SCS, Time Span= 5.00 -40.00 hrs, dt= 0.05 hrs Type II 24 -hr 1 -year Rainfall= 3.00" Area (sf) CN Description 222,075 77 Woods, Good, HSG D 222,075 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft /ft) (ft /sec) (cfs) 30.0 Direct Entry, Subcatchment 1S: Pre - Development to Pond Only Hydrograph 5- 7 I i I I I I i I I I I I I I I I I I I I I I 4.50 cfs iy�e II 24 -hrs 4 III l 17 1 1 17 17 T 1y _6�TkaTir f�11 =3 b& V H W II Rulnbff iAtOa�=2221,075 �sf 3 Runoff ?e,pth=l .0 JI�I LL SUM -min � �� � 111111111111111 11111 III 1111111111 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 Time (hours) ❑Runoff 6 Davis Drive 2014.10.13.POA D Type 1124 -hr 1 -year Rainfall= 3.00" Prepared by McKim & Creed Printed 12/10/2014 HvdroCADO 10.00 s/n 04927 © 2011 HvdroCAD Software Solutions LLC Paae 4 Summary for Subcatchment 2S: Post - Development Runoff = 16.13 cfs @ 12.01 hrs, Volume= 0.918 af, Depth> 2.16" Runoff by SCS TR -20 method, UH =SCS, Time Span= 5.00 -40.00 hrs, dt= 0.05 hrs Type II 24 -hr 1 -year Rainfall= 3.00" Area (sf) CN DescriDtion 151,579 98 Paved parking, HSG D 68,496 80 >75% Grass cover, Good, HSG D 2,000 77 Woods, Good, HSG D 222,075 92 Weighted Average 70,496 31.74% Pervious Area 151,579 68.26% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft /ft) (ft /sec) (cfs) 10.0 Direct Entry, 18-- I-i 1 1 1 17 I-t 16.13 cf 16 H 14 15 I4Rtinbff IArOA=22ZG75-�sf H T 14 1 1 T 13 Yg1y_me =0i.9�1 "f T 12 11 I T T 10 / IT 9 I T T T 3 0 8 LL TTTTTTTTTTITTM 7 I IT T 6 / I� I� IT T T 5 Irt Irt IT ITITITITI /- 3 / 1 Subcatchment 2S: Post - Development Hydrograph JITTi I IT �t in in in in in in in in iTy�� h 2d�� I-t I-i I_f I_f IT I-t H H 14 14 IT I4Rtinbff IArOA=22ZG75-�sf 4 1 1 1 T TRIIu q# Yg1y_me =0i.9�1 "f TTTTTTTI I n pth 'I 7C=10. Jmin IT IT IT IT T I T T T I T I T I T IC-4 TTTTTTTTTTITTM I� I� IT IT IT Irt Irt Irt IT ITITITITI 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 Time (hours) ❑Runoff 6 Davis Drive 2014.10.13.POA D Type 1124 -hr 1 -year Rainfall= 3.00" Prepared by McKim & Creed Printed 12/10/2014 HvdroCADO 10.00 s/n 04927 © 2011 HvdroCAD Software Solutions LLC Paae 5 Summary for Subcatchment 5S: Undeveloped Runoff = 1.00 cfs @ 12.46 hrs, Volume= 0.135 af, Depth= 1.07" Runoff by SCS TR -20 method, UH =SCS, Time Span= 5.00 -40.00 hrs, dt= 0.05 hrs Type II 24 -hr 1 -year Rainfall= 3.00" Area (sf) CN Description 65,969 77 Woods, Good, HSG D 65,969 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft /ft) (ft /sec) (cfs) 44.9 Direct Entry, 1 w 3 0 LL Subcatchment 5S: Undeveloped Hydrograph IlHIIH M 111111 (IIIIIIIIII 1.00 cfs rt rt T I rt l T Tye II 24 -hrs III 111y6e rl kalirifall =3 0& IIII 11 1 1 1 1 1 IRlunoff Atela$651,9I69 �sf IIII IIII IIII Ryggff Vglym� i.113� p# IIII IIII Runoff, Zpth=l .O T =44. min 9 IIIIII 111111111 ����� IIII " 1111111 � 1111111 Iliilll 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 . 26 27 . 28 29 . 30 31 . 32 33 . 34 35 . 36 37 38 39 40 Time (hours) ❑Runoff 6 Davis Drive 2014.10.13.POA D Type 1124 -hr 1 -year Rainfall= 3.00" Prepared by McKim & Creed Printed 12/10/2014 HvdroCADO 10.00 s/n 04927 © 2011 HvdroCAD Software Solutions LLC Paae 6 Summary for Subcatchment 6S: Pre - Development to POA D Runoff = 3.50 cfs @ 12.46 hrs, Volume= 0.471 af, Depth= 1.07" Runoff by SCS TR -20 method, UH =SCS, Time Span= 5.00 -40.00 hrs, dt= 0.05 hrs Type II 24 -hr 1 -year Rainfall= 3.00" Area (ac) CN Description 5.280 77 Woods, Good, HSG D 5.280 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft /ft) (ft /sec) (cfs) 44.9 Direct Entry, Subcatchment 6S: Pre - Development to POA D Hydrograph I � � ❑Runoff 3.50 cfs iy�e II 24 -hrs 4 4 4 14 4 4 1y+Es�r�k"f�j1= 3.lob -� - 3 III I I RUnloff Airdal= 5.280 Ad l Ity9Qf# )/glympp 0.471 p# 3 2- "�I OTI U. C =44. min +I +I +I +I�I�I�I 1 IIII Ililllllliilll 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 Time (hours) 6 Davis Drive 2014.10.13.POA D Type 1124 -hr 1 -year Rainfall= 3.00" Prepared by McKim & Creed Printed 12/10/2014 HvdroCAD® 10.00 s/n 04927 © 2011 HvdroCAD Software Solutions LLC Paae 7 Summary for Reach 4R: (new Reach) Inflow Area = 6.613 ac, 52.62% Impervious, Inflow Depth > 1.16" for 1 -year event Inflow = 1.21 cfs @ 12.46 hrs, Volume= 0.641 of Outflow = 1.21 cfs @ 12.49 hrs, Volume= 0.640 af, Atten= 0 %, Lag= 1.6 min Routing by Stor- Ind +Trans method, Time Span= 5.00 -40.00 hrs, dt= 0.05 hrs Max. Velocity= 0.93 fps, Min. Travel Time= 0.9 min Avg. Velocity = 0.65 fps, Avg. Travel Time= 1.3 min Peak Storage= 65 cf @ 12.47 hrs Average Depth at Peak Storage= 0.03' Bank -Full Depth= 2.00' Flow Area= 666.7 sf, Capacity= 9,231.33 cfs 500.00' x 2.00' deep Parabolic Channel, n= 0.013 Length= 50.0' Slope= 0.0100 T Inlet Invert= 100.00', Outlet Invert= 99.50' t Reach 4R: (new Reach) Hydrograph IIIIIIIIIIIIIIIIIIIII 1.21 cfs IiI� n�I I flb� Max I ► rV elII 6aII 11'I I �0I� ..�9=13 �13 QfI 0a•ip cs l n =0.013 LL ' CIapa�ity= I9,2I31.I3� ICIS 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 Time (hours) ❑Inflow ❑ Outflow 6 Davis Drive 2014.10.13.POA D Type 1124 -hr 1- year Rainfall= 3.00" Prepared by McKim & Creed Printed 12/10/2014 HydroCADO 10.00 s/n 04927 © 2011 HydroCAD Software Solutions LLC Page 8 Summary for Pond 3P: Wet Pond #1 Inflow Area = 5.098 ac, 68.26% Impervious, Inflow Depth > 2.16" for 1 -year event Inflow = 16.13 cfs @ 12.01 hrs, Volume= 0.918 of Outflow = 0.23 cfs @ 19.01 hrs, Volume= 0.506 af, Atten= 99 %, Lag= 420.0 min Primary = 0.23 cfs @ 19.01 hrs, Volume= 0.506 of Secondary = 0.00 cfs @ 5.00 hrs, Volume= 0.000 of Routing by Stor -Ind method, Time Span= 5.00 -40.00 hrs, dt= 0.05 hrs Peak Elev= 309.06' @ 19.01 hrs Surf.Area= 16,603 sf Storage= 30,395 cf Plug -Flow detention time= 815.5 min calculated for 0.506 of (55% of inflow) Center -of -Mass det. time= 705.9 min ( 1,506.6 - 800.7 ) Volume Invert Avail.Storage Storage Description #1 307.00' 84,852 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq -ft) (cubic -feet) (cubic -feet) 307.00 12,092 0 0 308.00 15,086 13,589 13,589 309.00 16,558 15,822 29,411 310.00 17,315 16,937 46,348 311.00 19,651 18,483 64,831 312.00 20,392 20,022 84,852 Device Routing Invert Outlet Devices #1 Primary 302.00' 18.0" Round Culvert L= 74.0' RCP, square edge headwall, Ke= 0.500 Inlet / Outlet Invert= 302.00' / 296.00' S= 0.0811 T Cc= 0.900 n= 0.013, Flow Area= 1.77 sf #2 Device 1 307.00' 2.5" Vert. Orifice /Grate C= 0.600 #3 Device 1 309.50' 36.0" x 36.0" Horiz. Orifice /Grate C= 0.600 Limited to weir flow at low heads #4 Secondary 310.00' 20.0' long x 10.0' breadth Broad - Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Primary OutFlow Max =0.23 cfs @ 19.01 hrs HW= 309.06' (Free Discharge) L1= Culvert (Passes 0.23 cfs of 21.37 cfs potential flow) �2=Orifice/G rate (Orifice Controls 0.23 cfs @ 6.73 fps) 3= Orifice /Grate ( Controls 0.00 cfs) e Scondary OutFlow Max =0.00 cfs @ 5.00 hrs HW= 307.00' (Free Discharge) 4= Broad - Crested Rectangular Weir( Controls 0.00 cfs) 6 Davis Drive 2014.10.13.POA D Type 1124 -hr 1 -year Rainfall= 3.00" Prepared by McKim & Creed Printed 12/10/2014 HvdroCADO 10.00 s/n 04927 © 2011 HvdroCAD Software Solutions LLC Paae 9 5 6 7 8 9 1011 12 1314 15 1617 18 19 20 21 22 23 24 25 26 27 28 29 30 3132 33 34 35 36 37 38 39 40 Time (hours) LInflow ary Pond 3P: Wet Pond #1 Hydrograph 16.13 cfs �-I H H [�Jj LAr 1� 1049 1 1 18 17 16 / — — 15 / 1-- 4- I4 14-1 H 14 I -I-1 StIOI" "30,395r-t-fl 14 / 13 12 / 14II I41�-IH14II1HHI4 1H141 U) 11 10 10 / / -I — H 1+ 1 — H — 1-t- I H I H H I H I� I H I H I — — 9 , 8 / 1t I I� I t H H I t I H H t H H I 7 1_- H-- -fitH- 5 4 / _71 T 1 7 7 71 3 2 0.23 cfs 0.00 cfs 5 6 7 8 9 1011 12 1314 15 1617 18 19 20 21 22 23 24 25 26 27 28 29 30 3132 33 34 35 36 37 38 39 40 Time (hours) LInflow ary 6 Davis Drive 2014.10.13.POA D Type 1124 -hr 2 -year Rainfall= 3.50" Prepared by McKim & Creed Printed 12/10/2014 HvdroCADO 10.00 s/n 04927 © 2011 HvdroCAD Software Solutions LLC Paae 11 Summary for Subcatchment 1 S: Pre - Development to Pond Only Runoff = 6.14 cfs @ 12.26 hrs, Volume= 0.608 af, Depth= 1.43" Runoff by SCS TR -20 method, UH =SCS, Time Span= 5.00 -40.00 hrs, dt= 0.05 hrs Type II 24 -hr 2 -year Rainfall= 3.50" Area (sf) CN Description 222,075 77 Woods, Good, HSG D 222,075 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft /ft) (ft /sec) (cfs) 30.0 Direct Entry, Subcatchment 1S: Pre - Development to Pond Only Hydrograph I III 6.14 cfs _4 4 14 I -I- 14 1 +'+4_ e 11 24 -hrs III ililililil�ly��l��fau�l5�'t 5- 1 1 1 1 1 1 1 Rulnbff AtOa�=2221,075 �sf Runoff ep =1.4 " LL 3 C 0 min Illi 111111111111111111111��L�� 2'I� - Illllllllllllllllll +I -41 41- 141-�1-�1�-1 +14-14-14-1 1 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 Time (hours) ❑Runoff 6 Davis Drive 2014.10.13.POA D Type 1124 -hr 2 -year Rainfall= 3.50" Prepared by McKim & Creed Printed 12/10/2014 HvdroCADO 10.00 s/n 04927 © 2011 HvdroCAD Software Solutions LLC Paae 12 Summary for Subcatchment 2S: Post - Development Runoff = 19.48 cfs @ 12.01 hrs, Volume= 1.120 af, Depth> 2.64" Runoff by SCS TR -20 method, UH =SCS, Time Span= 5.00 -40.00 hrs, dt= 0.05 hrs Type II 24 -hr 2 -year Rainfall= 3.50" Area (sf) CN DescriDtion 151,579 98 Paved parking, HSG D 68,496 80 >75% Grass cover, Good, HSG D 2,000 77 Woods, Good, HSG D 222,075 92 Weighted Average 70,496 31.74% Pervious Area 151,579 68.26% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft /ft) (ft /sec) (cfs) 10.0 Direct Entry, ❑Runoff Subcatchment 2S: Post - Development Hydrograph — - 14 1- 1-- 14 14 14 -t- 21- 19 - 19.48 cfs - 19.48 - - F I- I�- I�- I- I-� I- 1 4 1 4 - Ify il���r� 17 I- II I_ I_t 7 171 1 �! �F�tt6f�li � I5b'f 15 I:1 E - I- 1- 11 I- -R:U:nd f IArOa --MR5:0 13 1-I 1-I 1- 1- 1- 14 I- I- 4Ipgff "I�tTe= 1.12Q_�af 11 ' 1� I� H I� 14 14 I4 14 14 I� � f _0 10 // I-f - I� I� 1- I� I- I I fi I I - t 1 rt0m G42� 7 6 - - ---------- 1 - -1 -I 5 4 1-1 1 - 1- 1-� 1-- I I I I I -I- I -� 3 2 , 4 1 0 " 5 6 7 8 9 10 11 12 13 14"15 16 17 18 19 20 21 22 23 Time (hours) 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 ❑Runoff 6 Davis Drive 2014.10.13.POA D Type 1124 -hr 2 -year Rainfall= 3.50" Prepared by McKim & Creed Printed 12/10/2014 HvdroCADO 10.00 s/n 04927 © 2011 HvdroCAD Software Solutions LLC Paae 13 Summary for Subcatchment 5S: Undeveloped Runoff = 1.38 cfs @ 12.45 hrs, Volume= 0.181 af, Depth= 1.43" Runoff by SCS TR -20 method, UH =SCS, Time Span= 5.00 -40.00 hrs, dt= 0.05 hrs Type II 24 -hr 2 -year Rainfall= 3.50" Area (sf) CN Description 65,969 77 Woods, Good, HSG D 65,969 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft /ft) (ft /sec) (cfs) 44.9 Direct Entry, w 3 0 LL 1 0 Subcatchment 5S: Undeveloped Hydrograph 1.38—c f-S iy�e II 24 -hrs I I11yie�rl F�alirifall= �3l5b'� —� �- -- I IRu h6ff - Atela$651,9169 -sf RYq(?ff Vglym� 01.1181 p# Runoff, Zpth=l . 4�3'j min =44. 1 111 111111111111 ����� 111111 " 1111111 11 1111111 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 Time (hours) ❑Runoff 6 Davis Drive 2014.10.13.POA D Type 1124 -hr 2 -year Rainfall= 3.50" Prepared by McKim & Creed Printed 12/10/2014 HvdroCADO 10.00 s/n 04927 © 2011 HvdroCAD Software Solutions LLC Paae 14 Summary for Subcatchment 6S: Pre - Development to POA D Runoff = 4.80 cfs @ 12.45 hrs, Volume= 0.629 af, Depth= 1.43" Runoff by SCS TR -20 method, UH =SCS, Time Span= 5.00 -40.00 hrs, dt= 0.05 hrs Type II 24 -hr 2 -year Rainfall= 3.50" Area (ac) CN Description 5.280 77 Woods, Good, HSG D 5.280 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft /ft) (ft /sec) (cfs) 44.9 Direct Entry, Subcatchment 6S: Pre - Development to POA D Hydrograph I I " I I I I I I I I I I I I I 4.80 cf s 3 3 0 LL ■■EI tk IIII iy�e II 24 -hr I_ !- - J - I- ly ArLkainfall=3.5b- Runloff AirOA= 5.280 Ad 4 I4 14 4 _RNnoff Vglym� .629_# 1 1 1 1 1 1 III Runoff, Zpth=l . 4�3'j m i n =44. 1 � ''lllllllllllllllllllllll 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 Time (hours) ❑Runoff ■■EI tk IIII iy�e II 24 -hr I_ !- - J - I- ly ArLkainfall=3.5b- Runloff AirOA= 5.280 Ad 4 I4 14 4 _RNnoff Vglym� .629_# 1 1 1 1 1 1 III Runoff, Zpth=l . 4�3'j m i n =44. 1 � ''lllllllllllllllllllllll 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 Time (hours) ❑Runoff 6 Davis Drive 2014.10.13.POA D Type 1124 -hr 2 -year Rainfall= 3.50" Prepared by McKim & Creed Printed 12/10/2014 HvdroCAD® 10.00 s/n 04927 © 2011 HvdroCAD Software Solutions LLC Paae 15 Summary for Reach 4R: (new Reach) Inflow Area = 6.613 ac, 52.62% Impervious, Inflow Depth > 1.36" for 2 -year event Inflow = 1.60 cfs @ 12.45 hrs, Volume= 0.750 of Outflow = 1.60 cfs @ 12.47 hrs, Volume= 0.749 af, Atten= 0 %, Lag= 1.5 min Routing by Stor- Ind +Trans method, Time Span= 5.00 -40.00 hrs, dt= 0.05 hrs Max. Velocity= 0.99 fps, Min. Travel Time= 0.8 min Avg. Velocity = 0.65 fps, Avg. Travel Time= 1.3 min Peak Storage= 81 cf @ 12.46 hrs Average Depth at Peak Storage= 0.04' Bank -Full Depth= 2.00' Flow Area= 666.7 sf, Capacity= 9,231.33 cfs 500.00' x 2.00' deep Parabolic Channel, n= 0.013 Length= 50.0' Slope= 0.0100 T Inlet Invert= 100.00', Outlet Invert= 99.50' t Reach 4R: (new Reach) Hydrograph 1 1 159-P �o • 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 Time (hours) ❑ Inflow ❑ Outflow 6 Davis Drive 2014.10.13.POA D Type// 24 -hr 2 -year Rainfall = 3.50" Prepared by McKim & Creed Printed 12/10/2014 HydroCADO 10.00 s/n 04927 © 2011 HydroCAD Software Solutions LLC Page 16 Summary for Pond 3P: Wet Pond #1 Inflow Area = 5.098 ac, 68.26% Impervious, Inflow Depth > 2.64" for 2 -year event Inflow = 19.48 cfs @ 12.01 hrs, Volume= 1.120 of Outflow = 0.25 cfs @ 19.43 hrs, Volume= 0.569 af, Atten= 99 %, Lag= 445.1 min Primary = 0.25 cfs @ 19.43 hrs, Volume= 0.569 of Secondary = 0.00 cfs @ 5.00 hrs, Volume= 0.000 of Routing by Stor -Ind method, Time Span= 5.00 -40.00 hrs, dt= 0.05 hrs Peak Elev= 309.50' @ 19.43 hrs Surf.Area= 16,935 sf Storage= 37,750 cf Plug -Flow detention time= 822.1 min calculated for 0.568 of (51 % of inflow) Center -of -Mass det. time= 710.7 min ( 1,506.1 - 795.4 ) Volume Invert Avail.Storage Storage Description #1 307.00' 84,852 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq -ft) (cubic -feet) (cubic -feet) 307.00 12,092 0 0 308.00 15,086 13,589 13,589 309.00 16,558 15,822 29,411 310.00 17,315 16,937 46,348 311.00 19,651 18,483 64,831 312.00 20,392 20,022 84,852 Device Routing Invert Outlet Devices #1 Primary 302.00' 18.0" Round Culvert L= 74.0' RCP, square edge headwall, Ke= 0.500 Inlet / Outlet Invert= 302.00' / 296.00' S= 0.0811 T Cc= 0.900 n= 0.013, Flow Area= 1.77 sf #2 Device 1 307.00' 2.5" Vert. Orifice /Grate C= 0.600 #3 Device 1 309.50' 36.0" x 36.0" Horiz. Orifice /Grate C= 0.600 Limited to weir flow at low heads #4 Secondary 310.00' 20.0' long x 10.0' breadth Broad - Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Primary OutFlow Max =0.25 cfs @ 19.43 hrs HW= 309.50' (Free Discharge) 't--1 =Culvert (Passes 0.25 cfs of 22.10 cfs potential flow) �2=Orifice/G rate (Orifice Controls 0.25 cfs @ 7.45 fps) 3= Orifice /Grate ( Controls 0.00 cfs) e Scondary OutFlow Max =0.00 cfs @ 5.00 hrs HW= 307.00' (Free Discharge) 4= Broad - Crested Rectangular Weir( Controls 0.00 cfs) 6 Davis Drive 2014.10.13.POA D Type 1124 -hr 2 -year Rainfall= 3.50" Prepared by McKim & Creed Printed 12/10/2014 HvdroCADO 10.00 s/n 04927 © 2011 HvdroCAD Software Solutions LLC Pace 17 5 6 7 8 9 1011 12 1314 15 1617 18 19 20 21 22 23 24 25 26 27 28 29 30 3132 33 34 35 36 37 38 39 40 Time (hours) ■ Inflow © Outflow E Primary ■ Secondary Pond 3P: Wet Pond #1 Hydrograph 1 H H HIHiH H HIH H HI / / 19.48 cfs H H H I- 1�_i l v1_ rert_a��B l� e� 20 / 141+- I4 14- -1 H IH _�0__ I H I P-6ak E-telv�30.SW 19 18 / ; H I a I H H j — — H I sto"g0 =w,75O :fl 7 14 -� �- I H 1 H 1 -H H I H 1 H H H -� H 1-+ 1 11 o 19 / �- -I - 1-1- - -H H I- -I - I- 8 / 14-1 H H H 1 H H 4I HI H 141 6 5 / — -i 1 4 3 0.25 cfs „ 0.00 cfs 5 6 7 8 9 1011 12 1314 15 1617 18 19 20 21 22 23 24 25 26 27 28 29 30 3132 33 34 35 36 37 38 39 40 Time (hours) ■ Inflow © Outflow E Primary ■ Secondary 6 Davis Drive 2014.10.13.POA D Type 1124 -hr 10 -year Rainfall= 5.10" Prepared by McKim & Creed Printed 12/10/2014 HvdroCADO 10.00 s/n 04927 © 2011 HvdroCAD Software Solutions LLC Paae 19 Summary for Subcatchment 1 S: Pre - Development to Pond Only Runoff = 11.92 cfs @ 12.25 hrs, Volume= 1.150 af, Depth= 2.71" Runoff by SCS TR -20 method, UH =SCS, Time Span= 5.00 -40.00 hrs, dt= 0.05 hrs Type II 24 -hr 10 -year Rainfall = 5.10" Area (sf) CN Description 222,075 77 Woods, Good, HSG D 222,075 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft /ft) (ft /sec) (cfs) 30.0 Direct Entry, N 3 0 LL 12 12 11 1C 1 1' Subcatchment 1S: Pre - Development to Pond Only Hydrograph '-4 '—i 14 '4 '4 '—+i— +'4'+'- 11.92 cfs I� I I I " IIIIII IIIIIIII I_ I_4 I- I_4 VIII -I_T III 'Type IIr� _'I!0-year kainfall= I'I-& - - tRtInoff IArOa1 =2 — 2,075 -f �u�Qf� �14����1•�I`�Q �� R�Y n f e1p I c= min '-T Irt Irt I -T ' -'rt I -r Ic -VLj7 1.-1.- I4 I4 I4 14 14 I4 '4' -I 1 +I+I V'�, -�' Iiiilji — ' -7 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 Time (hours) ❑Runoff 6 Davis Drive 2014.10.13.POA D Type 1124 -hr 10 -year Rainfall= 5.10" Prepared by McKim & Creed Printed 12/10/2014 HvdroCADO 10.00 s/n 04927 © 2011 HvdroCAD Software Solutions LLC Paae 20 Summary for Subcatchment 2S: Post - Development Runoff = 30.10 cfs @ 12.01 hrs, Volume= 1.771 af, Depth> 4.17" Runoff by SCS TR -20 method, UH =SCS, Time Span= 5.00 -40.00 hrs, dt= 0.05 hrs Type II 24 -hr 10 -year Rainfall = 5.10" Area (sf) CN DescriDtion 151,579 98 Paved parking, HSG D 68,496 80 >75% Grass cover, Good, HSG D 2,000 77 Woods, Good, HSG D 222,075 92 Weighted Average 70,496 31.74% Pervious Area 151,579 68.26% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft /ft) (ft /sec) (cfs) 10.0 Direct Entry, ❑Runoff Subcatchment 2S: Post - Development Hydrograph 32:/ 30 / 30.10 cfs Ty� 28 26-// / — I—F H ye�r�F�a�'i rifa��. rV 24-- ki 14 1-4 I- I4 I41111t.inloff IArOa�= 222,0175-�Sf 20 1 1 1 1 1 1 —RjupQff qTe =1.77jj -p# Run ff epth> " �;=l O E: - - 04 MM I—E I—F I—I 1—� 14 I —I- 14 14 14 1 T I T 1 IC -NL­� 12 10 8 / 6/I IT T IT IT IT IT IT 17 17 IT IT ITITITITI / iTITITITI 2 0 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Time (hours) 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 ❑Runoff 6 Davis Drive 2014.10.13.POA D Type 1124 -hr 10 -year Rainfall= 5.10" Prepared by McKim & Creed Printed 12/10/2014 HvdroCADO 10.00 s/n 04927 © 2011 HvdroCAD Software Solutions LLC Paae 21 Summary for Subcatchment 5S: Undeveloped Runoff = 2.69 cfs @ 12.43 hrs, Volume= 0.342 af, Depth= 2.71" Runoff by SCS TR -20 method, UH =SCS, Time Span= 5.00 -40.00 hrs, dt= 0.05 hrs Type II 24 -hr 10 -year Rainfall = 5.10" Area (sf) CN Description 65,969 77 Woods, Good, HSG D 65,969 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft /ft) (ft /sec) (cfs) 44.9 Direct Entry, Subcatchment 5S: Undeveloped Hydrograph 3 F-IhiTI—�IJI - 7 I I 2.69cfs 11111111111 l�y�e II 24 -hrs 1 1 1 1 1 1 1 III 1 bly6e rl kalirifal l =5!1 & 2 I -+ 1-+ IRunoff Ate6$651,969 -f l Ryggff Vglym� i.34? p# Runoff) elpth= 2.171'1 LL c =44.9 min L-1 I L 1 III IIIIIIIIIIIIIIIIIIIII III ki M I I I I I I I I I I I I I I I I I I I I 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 Time (hours) ❑Runoff 6 Davis Drive 2014.10.13.POA D Type 1124 -hr 10 -year Rainfall= 5.10" Prepared by McKim & Creed Printed 12/10/2014 HvdroCADO 10.00 s/n 04927 © 2011 HvdroCAD Software Solutions LLC Paae 22 Summary for Subcatchment 6S: Pre - Development to POA D Runoff = 9.36 cfs @ 12.43 hrs, Volume= 1.191 af, Depth= 2.71" Runoff by SCS TR -20 method, UH =SCS, Time Span= 5.00 -40.00 hrs, dt= 0.05 hrs Type II 24 -hr 10 -year Rainfall = 5.10" Area (ac) CN Description 5.280 77 Woods, Good, HSG D 5.280 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft /ft) (ft /sec) (cfs) 44.9 Direct Entry, Subcatchment 6S: Pre - Development to POA D Hydrograph 10 9.36 cfs 9 8 T I4 I4 1 o I y ;Jjr ;ajnf�l 7 1 -Runoff 'Areal= 51.280 Ad 6 I� oR­u ff Vglyme�1.191 a c 5 T n _I-f U. c =44. min 4- 1 T T 17 IT T T 3 IIII IIIIIIIIIIIIIIIIIII 2'Illlll 1111111 l 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 Time (hours) ❑Runoff 6 Davis Drive 2014.10.13.POA D Type 1124 -hr 10 -year Rainfall= 5.10" Prepared by McKim & Creed Printed 12/10/2014 HvdroCAD® 10.00 s/n 04927 © 2011 HvdroCAD Software Solutions LLC Paae 23 Summary for Reach 4R: (new Reach) Inflow Area = 6.613 ac, 52.62% Impervious, Inflow Depth > 2.81" for 10 -year event Inflow = 8.98 cfs @ 12.27 hrs, Volume= 1.547 of Outflow = 8.92 cfs @ 12.29 hrs, Volume= 1.547 af, Atten= 1 %, Lag= 1.3 min Routing by Stor- Ind +Trans method, Time Span= 5.00 -40.00 hrs, dt= 0.05 hrs Max. Velocity= 1.64 fps, Min. Travel Time= 0.5 min Avg. Velocity = 0.71 fps, Avg. Travel Time= 1.2 min Peak Storage= 273 cf @ 12.28 hrs Average Depth at Peak Storage= 0.08' Bank -Full Depth= 2.00' Flow Area= 666.7 sf, Capacity= 9,231.33 cfs 500.00' x 2.00' deep Parabolic Channel, n= 0.013 Length= 50.0' Slope= 0.0100 T Inlet Invert= 100.00', Outlet Invert= 99.50' 0 on 0 5 " 4t t I 3 1l 11 1 Reach 4R: (new Reach) Hydrograph 1 1 1 1 1 1 1 1 1 1 inlfllo� drlea1�.�1131 �� L Aq 6.1016v r Ibe�th1 =b 0Oi III 1 1 1 1 1 11 III 116)k V61"11.64 fps! IIIIIIIII III I I I I I I 117Q•Q'� 3i I I I I I I I I I I I �=�Q•p 1 11 H II I I �701•Q1IOQ ICI � L1 �ana�y9� 7313 Icfs ✓/�������:![��1� , i '6 a iTi�iTi�iT a iT��Ti u .iii ,.�rirt�� 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 3"3­3''4­3'57 3 34 35 36 37 38 39 40 Time (hours) ❑Inflow ❑ Outflow 6 Davis Drive 2014.10.13.POA D Type 1124 -hr 10 -year Rainfall= 5.10" Prepared by McKim & Creed Printed 12/10/2014 HydroCADO 10.00 s/n 04927 © 2011 HydroCAD Software Solutions LLC Page 24 Summary for Pond 3P: Wet Pond #1 Inflow Area = 5.098 ac, 68.26% Impervious, Inflow Depth > 4.17" for 10 -year event Inflow = 30.10 cfs @ 12.01 hrs, Volume= 1.771 of Outflow = 6.78 cfs @ 12.25 hrs, Volume= 1.206 af, Atten= 77 %, Lag= 14.2 min Primary = 6.78 cfs @ 12.25 hrs, Volume= 1.206 of Secondary = 0.00 cfs @ 5.00 hrs, Volume= 0.000 of Routing by Stor -Ind method, Time Span= 5.00 -40.00 hrs, dt= 0.05 hrs Peak Elev= 309.80' @ 12.24 hrs Surf.Area= 17,165 sf Storage= 42,933 cf Plug -Flow detention time= 469.4 min calculated for 1.205 of (68% of inflow) Center -of -Mass det. time= 372.3 min ( 1,156.9 - 784.6 ) Volume Invert Avail.Storage Storage Description #1 307.00' 84,852 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq -ft) (cubic -feet) (cubic -feet) 307.00 12,092 0 0 308.00 15,086 13,589 13,589 309.00 16,558 15,822 29,411 310.00 17,315 16,937 46,348 311.00 19,651 18,483 64,831 312.00 20,392 20,022 84,852 Device Routing Invert Outlet Devices #1 Primary 302.00' 18.0" Round Culvert L= 74.0' RCP, square edge headwall, Ke= 0.500 Inlet / Outlet Invert= 302.00' / 296.00' S= 0.0811 T Cc= 0.900 n= 0.013, Flow Area= 1.77 sf #2 Device 1 307.00' 2.5" Vert. Orifice /Grate C= 0.600 #3 Device 1 309.50' 36.0" x 36.0" Horiz. Orifice /Grate C= 0.600 Limited to weir flow at low heads #4 Secondary 310.00' 20.0' long x 10.0' breadth Broad - Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Primary OutFlow Max =6.76 cfs @ 12.25 hrs HW= 309.80' (Free Discharge) L1= Culvert (Passes 6.76 cfs of 22.59 cfs potential flow) �2=Orifice/G rate (Orifice Controls 0.27 cfs @ 7.91 fps) 3= Orifice /Grate (Weir Controls 6.49 cfs @ 1.79 fps) e Scondary OutFlow Max =0.00 cfs @ 5.00 hrs HW= 307.00' (Free Discharge) 4= Broad - Crested Rectangular Weir( Controls 0.00 cfs) 6 Davis Drive 2014.10.13.POA D Type 1124 -hr 10 -year Rainfall= 5.10" Prepared by McKim & Creed Printed 12/10/2014 HvdroCADO 10.00 s/n 04927 © 2011 HvdroCAD Software Solutions LLC Pace 25 5 6 7 8 9 1011 12 1314 15 1617 18 19 20 21 22 23 24 25 26 27 28 29 30 3132 33 34 35 36 37 38 39 40 Time (hours) Pond 3P: Wet Pond #1 Hydrograph ❑ I ❑ ■Inflow / 30.10 cfs ❑ — ❑ ❑ I ❑ 1 ❑I7�ri /� El Outflow DIg ❑ Primary / ❑ Secondary 32 / ❑ ❑ I ❑ I ❑ I ❑ —1 ❑ 1 � cik EUVv - -30.SW 30 / 2 I❑ I ❑ I❑ 111 ❑ I❑ ❑ I St"rr �Q,�37df 26 6 / 2 / I❑ I❑ 111 L 11-1 I ❑I ❑ 1❑ I ❑I 1❑ Li 22 2 / —L / I❑ I❑ ❑I ❑ �❑ I T I 71 ❑ M 771 El 17F 18 /❑ ❑ I ❑ I ❑I ❑1❑ ❑ II ❑ 1 ❑1 L°14 10 / 6.78 cfs 17 1 ❑ 1 1❑ 11 I T I ❑ I IF ❑ I ❑ 71 F-1 I ❑ I 8 / '�� -T I 1 6 4 0.00 cfs 5 6 7 8 9 1011 12 1314 15 1617 18 19 20 21 22 23 24 25 26 27 28 29 30 3132 33 34 35 36 37 38 39 40 Time (hours) 6 Davis Drive 2014.10.13.POA D Type 1124 -hr 100 -year Rainfall= 7.40" Prepared by McKim & Creed Printed 12/10/2014 HvdroCADO 10.00 s/n 04927 © 2011 HvdroCAD Software Solutions LLC Paae 27 Summary for Subcatchment 1 S: Pre - Development to Pond Only Runoff = 20.84 cfs @ 12.24 hrs, Volume= 2.008 af, Depth= 4.73" Runoff by SCS TR -20 method, UH =SCS, Time Span= 5.00 -40.00 hrs, dt= 0.05 hrs Type II 24 -hr 100 -year Rainfall= 7.40" Area (sf) CN Description 222,075 77 Woods, Good, HSG D 222,075 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft /ft) (ft /sec) (cfs) 30.0 Direct Entry, ❑Runoff Subcatchment 1S: Pre - Development to Pond Only Hydrograph _T 1 ++ 1 T l ++ 23 22 / 1� 20.84 cfs I� I _- I__ I _� I _ - I -- I -I- I —Y 18 I-F H H H I-+ 1001y--64�ainfa1I1 J.4& 16 1 11 IJ 11 :1 1 ::[I$:U:nloff ArO=222,US:�sf 14 'I N N H 14 14 I4 I4 I4ungff )I_q1yMe= 2.008 _p# o „ I_ Irt 1_t Irt Irt Irt I _ � Z-30. �th .I CI - u 19 1I 1- � � 1� I� _T - min I j I J I j 4 T 1CN= 8 — 6/I H H �� I-f H I� I- -+ I -+ I -+ I�-1�1 +1 I � I +I 4/ i I _1 IlI1I _T I _T I _T I_I_ITITITII 3 2 / / 1 0 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 Time (hours) ❑Runoff 6 Davis Drive 2014.10.13.POA D Type 1124 -hr 100 -year Rainfall= 7.40" Prepared by McKim & Creed Printed 12/10/2014 HvdroCADO 10.00 s/n 04927 © 2011 HvdroCAD Software Solutions LLC Paae 28 Summary for Subcatchment 2S: Post - Development Runoff = 45.17 cfs @ 12.01 hrs, Volume= 2.713 af, Depth> 6.39" Runoff by SCS TR -20 method, UH =SCS, Time Span= 5.00 -40.00 hrs, dt= 0.05 hrs Type II 24 -hr 100 -year Rainfall= 7.40" Area (sf) CN DescriDtion 151,579 98 Paved parking, HSG D 68,496 80 >75% Grass cover, Good, HSG D 2,000 77 Woods, Good, HSG D 222,075 92 Weighted Average 70,496 31.74% Pervious Area 151,579 68.26% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft /ft) (ft /sec) (cfs) 10.0 Direct Entry, ❑Runoff Subcatchment 2S: Post - Development Hydrograph 50 Z 48 / H 45.17 cfs I- 4 I- 4 I- 4 IH I- I- I- I- 44 40 7 0701y_e rFka_ _i1k4.4& 38 34 / — H IH H H H IH I- +ROnloff IArOe- 22-?,U5 -�f 30 H H 14 14 1-4 14 14 14I � � 4 "�?1 26 '' ��f �I 'I CI 0 24 - 22 20 I-E I� I-F 1-� 14 14 I4 ��� 14 14 14 14 I -I- 1 IC�L�� 18 16 14 H I� I7 I7 7 7 7 7 7 71111 12 10 H H IH IH IH IH H I I I I HIHIHIH 8 4 -� �- 14 14 14 1 _ I_ 14- 14 2 0 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Time (hours) 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 ❑Runoff 6 Davis Drive 2014.10.13.POA D Type 1124 -hr 100 -year Rainfall= 7.40" Prepared by McKim & Creed Printed 12/10/2014 HvdroCADO 10.00 s/n 04927 © 2011 HvdroCAD Software Solutions LLC Paae 29 Summary for Subcatchment 5S: Undeveloped Runoff = 4.72 cfs @ 12.42 hrs, Volume= 0.597 af, Depth= 4.73" Runoff by SCS TR -20 method, UH =SCS, Time Span= 5.00 -40.00 hrs, dt= 0.05 hrs Type II 24 -hr 100 -year Rainfall= 7.40" Area (sf) CN Description 65,969 77 Woods, Good, HSG D 65,969 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft /ft) (ft /sec) (cfs) 44.9 Direct Entry, Subcatchment 5S: Undeveloped Hydrograph 5 4.72 cfs T VI ype II 24 -hrs I--4 1-1 ! - I- I-t 14 T 440 y6e rkkalinfall= 7.40' 4 III I I IRunoff Atela$65,969 sf F 3 iI III Runoff, elpth= 4.173'1 LL c =44.9 min T 1 -11717 7 1 T I ITTT� L 1111111111111111111111111 11111 IIIIII17I I11111111IHI111 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 Time (hours) ❑Runoff 6 Davis Drive 2014.10.13.POA D Type 1124 -hr 100 -year Rainfall= 7.40" Prepared by McKim & Creed Printed 12/10/2014 HvdroCADO 10.00 s/n 04927 © 2011 HvdroCAD Software Solutions LLC Paae 30 Summary for Subcatchment 6S: Pre - Development to POA D Runoff = 16.46 cfs @ 12.42 hrs, Volume= 2.080 af, Depth= 4.73" Runoff by SCS TR -20 method, UH =SCS, Time Span= 5.00 -40.00 hrs, dt= 0.05 hrs Type II 24 -hr 100 -year Rainfall= 7.40" Area (ac) CN Description 5.280 77 Woods, Good, HSG D 5.280 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft /ft) (ft /sec) (cfs) 44.9 Direct Entry, ❑ Runoff Subcatchment 6S: Pre - Development to POA D Hydrograph 1 18 16 i -16.46 cfs 1­4 I-4 1-4 1-4 1-4 I4 14 J 601y� J- kalnf�jJ= _.�4�'� 13 / I—t 1-4 1—� 1� 1 � I -RLJr Off IAlr" -5x280 12 11 Reno )tgIy ,e= 2.0so:pf 10 9 / / I� I� I� I� IZ IZ I� 1nf pth= 4.17'j 0 LL S c =44.3 min 7� I�I� -------IC- - - - IT 5 I— I- I— I— I— I— I— I rt l /I H I--t t I-t — — — 1-t 1-t I_t It ItItItIt 3 2 / _ �-4 1 0 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 Time (hours) ❑ Runoff 6 Davis Drive 2014.10.13.POA D Type 1124 -hr 100 -year Rainfall= 7.40" Prepared by McKim & Creed Printed 12/10/2014 HvdroCAD® 10.00 s/n 04927 © 2011 HvdroCAD Software Solutions LLC Paae 31 Summary for Reach 4R: (new Reach) Inflow Area = 6.613 ac, 52.62% Impervious, Inflow Depth > 4.97" for 100 -year event Inflow = 33.71 cfs @ 12.10 hrs, Volume= 2.740 of Outflow = 33.78 cfs @ 12.11 hrs, Volume= 2.740 af, Atten= 0 %, Lag= 0.6 min Routing by Stor- Ind +Trans method, Time Span= 5.00 -40.00 hrs, dt= 0.05 hrs Max. Velocity= 2.47 fps, Min. Travel Time= 0.3 min Avg. Velocity = 0.75 fps, Avg. Travel Time= 1.1 min Peak Storage= 687 cf @ 12.11 hrs Average Depth at Peak Storage= 0.15' Bank -Full Depth= 2.00' Flow Area= 666.7 sf, Capacity= 9,231.33 cfs 500.00' x 2.00' deep Parabolic Channel, n= 0.013 Length= 50.0' Slope= 0.0100 T Inlet Invert= 100.00', Outlet Invert= 99.50' 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 Time (hours) Reach 4R: (new Reach) Hydrograph L _L I LI L I--I I--i — I _L I I ❑Inflow 33.78 cfs � l '. �, - �,I ~I nifo' k6"r 64 i� &- ❑ Outflow 34 32 —6 30 28 1� I- � I� I a-I 11 u M- 6kV61*2_4710s�- 26:'/'/ 24 / I� �- �- a-I N I� -�Q •'� 20 " 16 / I� 1 14-1 4- 1 4- � I I S=01. 12 14 I4- 1 4- �I I I Capacity ,231����s 10 _ � �-4I 4- ��I4 Ii� � II�I�III14- N � � 1! 6 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 Time (hours) 6 Davis Drive 2014.10.13.POA D Type 1124 -hr 100 -year Rainfall= 7.40" Prepared by McKim & Creed Printed 12/10/2014 HydroCADO 10.00 s/n 04927 © 2011 HydroCAD Software Solutions LLC Page 32 Summary for Pond 3P: Wet Pond #1 Inflow Area = 5.098 ac, 68.26% Impervious, Inflow Depth > 6.39" for 100 -year event Inflow = 45.17 cfs @ 12.01 hrs, Volume= 2.713 of Outflow = 31.43 cfs @ 12.10 hrs, Volume= 2.144 af, Atten= 30 %, Lag= 5.5 min Primary = 23.37 cfs @ 12.10 hrs, Volume= 2.049 of Secondary = 8.06 cfs @ 12.10 hrs, Volume= 0.095 of Routing by Stor -Ind method, Time Span= 5.00 -40.00 hrs, dt= 0.05 hrs Peak Elev= 310.29' @ 12.10 hrs Surf.Area= 18,002 sf Storage= 51,543 cf Plug -Flow detention time= 307.6 min calculated for 2.143 of (79% of inflow) Center -of -Mass det. time= 226.3 min ( 1,003.0 - 776.7 ) Volume Invert Avail.Storage Storage Description #1 307.00' 84,852 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq -ft) (cubic -feet) (cubic -feet) 307.00 12,092 0 0 308.00 15,086 13,589 13,589 309.00 16,558 15,822 29,411 310.00 17,315 16,937 46,348 311.00 19,651 18,483 64,831 312.00 20,392 20,022 84,852 Device Routing Invert Outlet Devices #1 Primary 302.00' 18.0" Round Culvert L= 74.0' RCP, square edge headwall, Ke= 0.500 Inlet / Outlet Invert= 302.00' / 296.00' S= 0.0811 T Cc= 0.900 n= 0.013, Flow Area= 1.77 sf #2 Device 1 307.00' 2.5" Vert. Orifice /Grate C= 0.600 #3 Device 1 309.50' 36.0" x 36.0" Horiz. Orifice /Grate C= 0.600 Limited to weir flow at low heads #4 Secondary 310.00' 20.0' long x 10.0' breadth Broad - Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Primary OutFlow Max =23.37 cfs @ 12.10 hrs HW= 310.29' (Free Discharge) 't--1 =Culvert (Inlet Controls 23.37 cfs @ 13.22 fps) �2=Orifice/G rate (Passes < 0.29 cfs potential flow) 3= Orifice /Grate (Passes < 27.70 cfs potential flow) e Scondary OutFlow Max =8.00 cfs @ 12.10 hrs HW= 310.29' (Free Discharge) 4= Broad - Crested Rectangular Weir (Weir Controls 8.00 cfs @ 1.37 fps) 6 Davis Drive 2014.10.13.POA D Type 1124 -hr 100 -year Rainfall= 7.40" Prepared by McKim & Creed Printed 12/10/2014 HvdroCADO 10.00 s/n 04927 © 2011 HvdroCAD Software Solutions LLC Pace 33 Pond 3P: Wet Pond #1 Hydrograph ill J45.cfs El Inflow II ■ LJ Pnmlary 50 / 141bw Area x.0966 ac I ■ Secondary 45 40 / 1 31.43 cfs IT �ol_r_S�11,�fl 35 / 14 1TT TITITI 30 / 137CfS 1- T T T T fit T T I 3 25 / T I T l l l l l T T 1 1-1 171- 0 u. 20 / 15 10 5 6 7 8 9 1011 12 1314 15 1617 18 19 20 21 22 23 24 25 26 27 28 29 30 3132 33 34 35 36 37 38 39 40 Time (hours) laylymal"Imms DETENTION AND STORMFILTER SIZING CALCULATIONS ® Determining Number of Cartridges for Volume -Based C"40NTECHDesign in NC ENGINEERED SOLUTIONS Design Engineer: JDP Blue Cells = Input Date 9/4/2014 Black Cells = Calculation Site Information Project Name Project State Project Location Drainage Area, Ad Impervious Area, Ai Pervious Area, Ap % Impervious Runoff Coefficient, Rv Water Quality Volume Calculations Design storm rainfall depth, Rd Water quality volume, WQV Storage Component Calculations Capture 75% of WQV Pretreatment credit (estimated or calculated), %pre Mass loading calculations Mean Annual Rainfall, P Agency required % removal Percent Runoff Capture (% capture) Mean Annual Runoff,Vt Event Mean Concentration of Pollutant, EMC Annual Mass Load, Mtotal Filter System Filtration brand Cartridge height Cartridge Quantity Calculation Mass removed by pretreatment system, Mpre Mass load to filters after pretreatment, Mpassl Estimate the required filter efficiency, Efilter Mass to be captured by filters, Mflter Maximum Cartridge Flow rate, Qoart Mass load per cartridge, Mcart (Ibs) Number of Cartridges required, Nasss Maximum Treatment Capacity Hamner North Carolina Durham 1.98 ac 1.39 ac 0.60 70% 0.68 1.0 in 4884.9 ft3 3663.7 ft3 30% = 0.05 +0.9 *(Ai /Ad) =Ad * Rv * Rd `(43560/ 12 ) = 0.75 *WQV 45 in 85% 90% 197,838 ft3 = P *Ad *Rv *(43560/12)* %capture 70.0 mg /I (Typically 60 - Residential /Office, 70 - Commercial, 100 - Industrial) 864.02 Ibs = EMC *Vt *(28.3) *(0.000001) *(2.2046) StormFilter 18 in 259 Ibs = Mtotal * %removal 605 Ibs = Mtotal - Mpre 79% =1 +(%removal - 1)/(1 - %pre) 475 Ibs = Mpassl * Efilter 7.5 gpm =q * (7.5 ft2 /cartridge) 36 Ibs = lookup mass load per cartridge 14 = ROUNDUP(Mfilter /Mcart,0) 0.23 = Nmass *(Qcart /449) SUMMARY Maximum Treatment Flow Rate, cfs 0.23 Cartridge Flow Rate, gpm 7.5 Number of Cartridges 14 BIORETENTION SIZING CALCULATIONS BIO- RETENTION AREA DESIGN 6 Davis Drive Bioretention Pond #3 Project: 01517 -0236 Prepared by: CMB Date: 8/29/2014 Drainage area: 134,137 sf Impervious area: 93,925 sf Volume to Catch The First 1.0 Inch of Runoff: Runoff : Rv = 0.05 + 0.9 * la Simple Method, Schueler la (ac /ac)= 0.700 Rv = 0.680 Volume: V = 3630 * P * Rv * A P = 1.00 in Rv = 0.680 A = 3.08 ac V = 7,603 Cf Surface Area: SA = Volume / Depth Depth = 12 in SA = 7,603 sf Select Fill Soil: Soil Conductivity (k) (in / hr) Sand 6 Loamy Sand 2 Sandy Loam 0.5 - 1 Clay Soils: Use Sandy Loam or Loamy Sand Fill Soil= Sandy Loam k= 2 6 Davis Drive Page 2 of 2 Find Time Drawdown of Water Throuah Bio- Retention Soil Laver A. Rate of Drawdown: Qd = (2.3e -5) * k * SA * H / L H / L Approximatley = 1 Qd= 0.3498 cfs B. Find Time to Drawdown Water from Inundation to Saturation at Surface: Volume to Drawdown: Vi -s = SA *Depth Vi -s = 7,603 cf Time to Remove Volume of Water at Flowrate Qd: Ti -s = Vi -s / Qd = 21,739 sec. = 6 hr. C. Find Time to Drawdown Water from Saturation at Surface to 2 feet Below Surface: Porosity (n) = 0.45 Volume to Drawdown: Vi -s = 2 feet * SA * n Vs -2 = 6,843 cf Time to Remove Volume of Water at Flowrate Qd: Ts -2 = Vs -2 / Qd = 19,565 sec. 5 hrs D. Total Time to Draw Water Through Soil: T= 11 hrs BIO- RETENTION AREA DESIGN 6 Davis Drive Bioretention Pond #3A Project: 01517 -0236 Prepared by: CMB Date: 8/29/2014 Drainage area: 33,537 sf Impervious area: 23,848 sf Volume to Catch The First 1.0 Inch of Runoff: Runoff : Rv = 0.05 + 0.9 * la Simple Method, Schueler la (ac /ac)= 0.711 Rv = 0.690 Volume: V = 3630 * P * Rv * A P = 1.00 in Rv = 0.690 A = 0.77 ac V = 1,928 cf Surface Area: SA = Volume / Depth Depth = 12 in SA = 1,928 sf Select Fill Soil: Soil Conductivity (k) (in / hr) Sand 6 Loamy Sand 2 Sandy Loam 0.5 - 1 Clay Soils: Use Sandy Loam or Loamy Sand Fill Soil= Sandy Loam k= 2 6 Davis Drive Page 2 of 2 Find Time Drawdown of Water Throuah Bio- Retention Soil Laver A. Rate of Drawdown: Qd = (2.3e -5) * k * SA * H / L H / L Approximatley = 1 Qd= 0.0887 cfs B. Find Time to Drawdown Water from Inundation to Saturation at Surface: Volume to Drawdown: Vi -s = SA *Depth Vi -s = 1,928 cf Time to Remove Volume of Water at Flowrate Qd: Ti -s = Vi -s / Qd = 21,739 sec. = 6 hr. C. Find Time to Drawdown Water from Saturation at Surface to 2 feet Below Surface: Porosity (n) = 0.45 Volume to Drawdown: Vi -s = 2 feet * SA * n Vs -2 = 1,736 cf Time to Remove Volume of Water at Flowrate Qd: Ts -2 = Vs -2 / Qd = 19,565 sec. 5 hrs D. Total Time to Draw Water Through Soil: T= 11 hrs BIO- RETENTION AREA DESIGN 6 Davis Drive Bioretention Pond #4 Project: 01517 -0236 Prepared by: CMB Date: 8/29/2014 Drainage area: 120,570 sf Impervious area: 75,500 sf Volume to Catch The First 1.0 Inch of Runoff: Runoff : Rv = 0.05 + 0.9 * la Simple Method, Schueler la (ac /ac)= 0.626 Rv = 0.614 Volume: V = 3630 * P * Rv * A P = 1.00 in Rv = 0.614 A = 2.77 ac V = 6,165 Cf Surface Area: SA = Volume / Depth Depth = 12 in SA = 6,165 sf Select Fill Soil: Soil Conductivity (k) (in / hr) Sand 6 Loamy Sand 2 Sandy Loam 0.5 - 1 Clay Soils: Use Sandy Loam or Loamy Sand Fill Soil= Sandy Loam k= 2 6 Davis Drive Page 2 of 2 Find Time Drawdown of Water Throuah Bio- Retention Soil Laver A. Rate of Drawdown: Qd = (2.3e -5) * k * SA * H / L H / L Approximatley = 1 Qd= 0.2836 cfs B. Find Time to Drawdown Water from Inundation to Saturation at Surface: Volume to Drawdown: Vi -s = SA *Depth Vi -s = 6,165 cf Time to Remove Volume of Water at Flowrate Qd: Ti -s = Vi -s / Qd = 21,739 sec. = 6 hr. C. Find Time to Drawdown Water from Saturation at Surface to 2 feet Below Surface: Porosity (n) = 0.45 Volume to Drawdown: Vi -s = 2 feet * SA * n Vs -2 = 5,548 cf Time to Remove Volume of Water at Flowrate Qd: Ts -2 = Vs -2 / Qd = 19,565 sec. 5 hrs D. Total Time to Draw Water Through Soil: T= 11 hrs BIORETENTION TIME OF CONCENTRATION Milum ROUTING CALCULATIONS 1S 2S { Existing Conditions Post-Development Z3P Bio Area #3 Subcat Re Pon Link Routing Diagram for Bioretention Pond #3.rev 2 Prepared by McKim & Creed, Printed 12/10/2014 WvA— rOrVal 40 00 c/n 0AQ97 G] 0011 u ... Ir rnn cnl.ifin I 6 Davis Drive Bioretention Pond #3.rev 2 Type 1124 -hr 1 Rainfall = 3.00" Prepared by McKim & Creed Printed 12/10/2014 HvdroCADO 10.00 s/n 04927 © 2011 HvdroCAD Software Solutions LLC Paae 3 Summary for Subcatchment 1S: Existing Conditions Runoff = 6.02 cfs @ 11.97 hrs, Volume= 0.263 af, Depth> 1.08" Runoff by SCS TR -20 method, UH =SCS, Time Span= 5.00 -20.00 hrs, dt= 0.05 hrs Type II 24 -hr 1 Rainfall= 3.00" Area (sf) CN Description 127,148 79 Woods, Fair, HSG D 127,148 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft /ft) (ft /sec) (cfs) 5.8 318 0.0330 0.91 Shallow Concentrated Flow, Woodland Kv= 5.0 fps 3 0 LL 3 0 Subcatchment 1S: Existing Conditions Hydrograph 6.02 cfs � � � Type II 24 -hr 1 Rainfall= 3.00" Runoff Area = 127,148 sf Runoff) Vol umg=- 0.263 -af Runoff Deipth�1.08" Flow Length =318' SlopeL0.0330 '/' T6=5.8 min CN =;79 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) ❑ Runoff 6 Davis Drive Bioretention Pond #3.rev 2 Type 1124 -hr 1 Rainfall = 3.00" Prepared by McKim & Creed Printed 12/10/2014 HvdroCADO 10.00 s/n 04927 © 2011 HvdroCAD Software Solutions LLC Paae 4 Summary for Subcatchment 2S: Post - Development Runoff = 11.78 cfs @ 11.95 hrs, Volume= 0.542 af, Depth> 2.11" Runoff by SCS TR -20 method, UH =SCS, Time Span= 5.00 -20.00 hrs, dt= 0.05 hrs Type II 24 -hr 1 Rainfall= 3.00" Area (sf) CN Description 93,925 98 Paved parking, HSG D 40,222 80 >75% Grass cover, Good, HSG D 134,147 93 Weighted Average 40,222 29.98% Pervious Area 93,925 70.02% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft /ft) (ft /sec) (cfs) 5.0 Direct Entry, Subcatchment 2S: Post - Development Hydrograph I a I _I— — I— I— —1 13 ,2 11.78 cfs - Ty�e li -24-hr ■Runoff 4 -4 - - 1 Rainfalk3.00" - 10'/ 9 /I fi -' - Runoff Area = 134,147 sf 8 /I — Rugoffl Vollumg=0.1542i of 7 / R nol 7=5.0 th 2.11" LL m i n 5/ T _T 7 _F _T &N =43 4 L —1 —1 L 1 —1 L 2 1 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) 6 Davis Drive Bioretention Pond #3.rev 2 Type 11 24 -hr 1 Rainfall = 3.00" Prepared by McKim & Creed Printed 12/10/2014 HydroCADO 10.00 s/n 04927 © 2011 HydroCAD Software Solutions LLC Page 5 Summary for Pond 3P: Bio Area #3 Inflow Area = 3.080 ac, 70.02% Impervious, Inflow Depth > 2.11" for 1 event Inflow = 11.78 cfs @ 11.95 hrs, Volume= 0.542 of Outflow = 3.33 cfs @ 12.09 hrs, Volume= 0.361 af, Atten= 72 %, Lag= 8.5 min Primary = 3.33 cfs @ 12.09 hrs, Volume= 0.361 of Routing by Stor -Ind method, Time Span= 5.00 -20.00 hrs, dt= 0.05 hrs Peak Elev= 310.91' @ 12.09 hrs Surf.Area= 8,877 sf Storage= 12,882 cf Plug -Flow detention time= 142.5 min calculated for 0.359 of (66% of inflow) Center -of -Mass det. time= 74.9 min ( 831.2 - 756.3 ) Volume Invert Avail.Storage Storage Description #1 309.25' 23,225 cf Custom Stage Data (Irregular)Listed below (Recalc) Elevation Surf.Area Perim. Inc.Store Cum.Store Wet.Area (feet) (sq -ft) (feet) (cubic -feet) (cubic -feet) (sq -ft) 309.25 6,740 324.0 0 0 6,740 310.25 7,897 351.0 7,311 7,311 8,229 311.00 9,007 377.0 6,334 13,645 9,760 312.00 10,165 396.0 9,580 23,225 10,991 Device Routing Invert Outlet Devices #1 Primary 304.62' 30.0" Round Culvert L= 121.0' RCP, square edge headwall, Ke= 0.500 Inlet / Outlet Invert= 304.62'/ 304.00' S= 0.0051 T Cc= 0.900 n= 0.024, Flow Area= 4.91 sf #2 Device 1 310.25' 24.0" W x 3.0" H Vert. Orifice /Grate C= 0.600 #3 Device 1 310.50' 24.0" W x 4.0" H Vert. Orifice /Grate C= 0.600 #4 Device 1 311.50' 48.0" x 48.0" Horiz. Orifice /Grate C= 0.600 Limited to weir flow at low heads Primary OutFlow Max =3.32 cfs @ 12.09 hrs HW= 310.91' (Free Discharge) L1= Culvert (Passes 3.32 cfs of 35.89 cfs potential flow) 12= Orifice /Grate (Orifice Controls 1.76 cfs @ 3.52 fps) 3= Orifice /Grate (Orifice Controls 1.56 cfs @ 2.34 fps) 4=Orifice/G rate ( Controls 0.00 cfs) 6 Davis Drive Bioretention Pond #3.rev 2 Type 1124 -hr 1 Rainfall = 3.00" Prepared by McKim & Creed Printed 12/10/2014 HydroCADO 10.00 s/n 04927 © 2011 HydroCAD Software Solutions LLC Page 6 Pond 3P: Bio Area #3 Hydrograph ■ Inflow 13 11.78 cfs ■Primary V I I I 12 — 1f-f16w�4r�a= 3.O�"c -- 11 10 g N 7 3 LL L L I A 5 -L 4 + 3.33 cfs 3 E Irea�k 6ev=340.41 kto�ag�= 12,$82 6f- J- � - -r T -T I I L L I -L � LI 1 1 1 1 1 1 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) 6 Davis Drive Bioretention Pond #3.rev 2 Type 1124 -hr 2 Rainfall = 3.50" Prepared by McKim & Creed Printed 12/10/2014 HvdroCADO 10.00 s/n 04927 © 2011 HvdroCAD Software Solutions LLC Paae 8 Summary for Subcatchment 1S: Existing Conditions Runoff = 7.95 cfs @ 11.97 hrs, Volume= 0.349 af, Depth> 1.43" Runoff by SCS TR -20 method, UH =SCS, Time Span= 5.00 -20.00 hrs, dt= 0.05 hrs Type II 24 -hr 2 Rainfall= 3.50" Area (sf) CN Description 127,148 79 Woods, Fair, HSG D 127,148 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft /ft) (ft /sec) (cfs) 5.8 318 0.0330 0.91 Shallow Concentrated Flow, Woodland Kv= 5.0 fps Subcatchment 1S: Existing Conditions Hydrograph i 7 7.95 cfs Type II 24 -hr 7 2 Ra i nfa I l= 3.50" 6 t t I Runoff Area =1 i7,1't48 sf Runoff Vojumg -O.1349 -af 5 Runoff De�pth�1.4i3': 4 Flow Length =318 3 SlopeL�0330 '/' T"= L8 min 2 CN =,79 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) ❑ Runoff 6 Davis Drive Bioretention Pond #3.rev 2 Type 1124 -hr 2 Rainfall = 3.50" Prepared by McKim & Creed Printed 12/10/2014 HvdroCADO 10.00 s/n 04927 © 2011 HvdroCAD Software Solutions LLC Paae 9 Summary for Subcatchment 2S: Post - Development Runoff = 14.12 cfs @ 11.95 hrs, Volume= 0.658 af, Depth> 2.57" Runoff by SCS TR -20 method, UH =SCS, Time Span= 5.00 -20.00 hrs, dt= 0.05 hrs Type II 24 -hr 2 Rainfall= 3.50" Area (sf) CN Description 93,925 98 Paved parking, HSG D 40,222 80 >75% Grass cover, Good, HSG D 134,147 93 Weighted Average 40,222 29.98% Pervious Area 93,925 70.02% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft /ft) (ft /sec) (cfs) 5.0 Direct Entry, Subcatchment 2S: Post - Development Hydrograph 15- — 14.12 cfs � 14 Types li 24ir 12 4- 4 2- kairifallL3.�O" 11 % Runoff ArOa= 1134 1471 sf 10 +Runoffl V- IIump--O.1658 of —I �- R�n&I pth�2.W ° 7 _ 5 min LL 6� —Ic N= 93 4 3 — _ fi rt i � I I I 1 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) ■Runoff 6 Davis Drive Bioretention Pond #3.rev 2 Type 11 24 -hr 2 Rainfall = 3.50" Prepared by McKim & Creed Printed 12/10/2014 HydroCADO 10.00 s/n 04927 © 2011 HydroCAD Software Solutions LLC Page 10 Summary for Pond 3P: Bio Area #3 Inflow Area = 3.080 ac, 70.02% Impervious, Inflow Depth > 2.57" for 2 event Inflow = 14.12 cfs @ 11.95 hrs, Volume= 0.658 of Outflow = 4.39 cfs @ 12.08 hrs, Volume= 0.475 af, Atten= 69 %, Lag= 7.9 min Primary = 4.39 cfs @ 12.08 hrs, Volume= 0.475 of Routing by Stor -Ind method, Time Span= 5.00 -20.00 hrs, dt= 0.05 hrs Peak Elev= 311.16' @ 12.08 hrs Surf.Area= 9,192 sf Storage= 15,133 cf Plug -Flow detention time= 132.5 min calculated for 0.475 of (72% of inflow) Center -of -Mass det. time= 68.7 min ( 820.9 - 752.2 ) Volume Invert Avail.Storage Storage Description #1 309.25' 23,225 cf Custom Stage Data (Irregular)Listed below (Recalc) Elevation Surf.Area Perim. Inc.Store Cum.Store Wet.Area (feet) (sq -ft) (feet) (cubic -feet) (cubic -feet) (sq -ft) 309.25 6,740 324.0 0 0 6,740 310.25 7,897 351.0 7,311 7,311 8,229 311.00 9,007 377.0 6,334 13,645 9,760 312.00 10,165 396.0 9,580 23,225 10,991 Device Routing Invert Outlet Devices #1 Primary 304.62' 30.0" Round Culvert L= 121.0' RCP, square edge headwall, Ke= 0.500 Inlet / Outlet Invert= 304.62'/ 304.00' S= 0.0051 T Cc= 0.900 n= 0.024, Flow Area= 4.91 sf #2 Device 1 310.25' 24.0" W x 3.0" H Vert. Orifice /Grate C= 0.600 #3 Device 1 310.50' 24.0" W x 4.0" H Vert. Orifice /Grate C= 0.600 #4 Device 1 311.50' 48.0" x 48.0" Horiz. Orifice /Grate C= 0.600 Limited to weir flow at low heads Primary OutFlow Max =4.37 cfs @ 12.08 hrs HW= 311.16' (Free Discharge) 't-1 =Culvert (Passes 4.37 cfs of 36.87 cfs potential flow) 12= Orifice /Grate (Orifice Controls 2.13 cfs @ 4.26 fps) 3= Orifice /Grate (Orifice Controls 2.24 cfs @ 3.36 fps) 4=Orifice/G rate ( Controls 0.00 cfs) 6 Davis Drive Bioretention Pond #3.rev 2 Type 1124 -hr 2 Rainfall = 3.50" Prepared by McKim & Creed Printed 12/10/2014 HvdroCADO 10.00 s/n 04927 © 2011 HvdroCAD Software Solutions LLC Paae 11 1E 14 12 1'e 11 1C N � w 3 E o LL I Pond 3P: Bio Area #3 Hydrograph iieatk EITev_=34_1.Au-- Iko%acj' =f 5,fn -d- T T TI T T I T T T T T T 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) _ � � � � ■Inflow T - 14.12 cfs `nfi"rA rya --3�- .0 30 C- 0 Primary iieatk EITev_=34_1.Au-- Iko%acj' =f 5,fn -d- T T TI T T I T T T T T T 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) T IT 4.39 efs iieatk EITev_=34_1.Au-- Iko%acj' =f 5,fn -d- T T TI T T I T T T T T T 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) 6 Davis Drive Bioretention Pond #3.rev 2 Type 1124 -hr 10 Rainfall = 5.10" Prepared by McKim & Creed Printed 12/10/2014 HvdroCADO 10.00 s/n 04927 © 2011 HvdroCAD Software Solutions LLC Paae 13 Summary for Subcatchment 1S: Existing Conditions Runoff = 14.52 cfs @ 11.97 hrs, Volume= 0.650 af, Depth> 2.67" Runoff by SCS TR -20 method, UH =SCS, Time Span= 5.00 -20.00 hrs, dt= 0.05 hrs Type II 24 -hr 10 Rainfall = 5.10" Area (sf) CN Description 127,148 79 Woods, Fair, HSG D 127,148 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft /ft) (ft /sec) (cfs) 5.8 318 0.0330 0.91 Shallow Concentrated Flow, Woodland Kv= 5.0 fps 1E 1E 14 12 12 11 1C w c 3 E 0 LL No Subcatchment 1S: Existing Conditions Hydrograph ■Runoff 14.52 cfs 4- -+ ---� _ I Tye li 24 -hr 10-ka 4alI6iS 0" tR><inoff Arda=1127J-48fisf �Rul o� Volume= 0.1650�- n pth " low Lengt �m34 —I SabpEL-o fi fi 4- 4 1�c =51$ rrhn CN =179 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) i 1 I 4- -+ ---� _ I Tye li 24 -hr 10-ka 4alI6iS 0" tR><inoff Arda=1127J-48fisf �Rul o� Volume= 0.1650�- n pth " low Lengt �m34 —I SabpEL-o fi fi 4- 4 1�c =51$ rrhn CN =179 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) 6 Davis Drive Bioretention Pond #3.rev 2 Type 1124 -hr 10 Rainfall = 5.10" Prepared by McKim & Creed Printed 12/10/2014 HvdroCADO 10.00 s/n 04927 © 2011 HvdroCAD Software Solutions LLC Paae 14 Summary for Subcatchment 2S: Post - Development Runoff = 21.53 cfs @ 11.95 hrs, Volume= 1.033 af, Depth> 4.02" Runoff by SCS TR -20 method, UH =SCS, Time Span= 5.00 -20.00 hrs, dt= 0.05 hrs Type II 24 -hr 10 Rainfall = 5.10" Area (sf) CN Description 93,925 98 Paved parking, HSG D 40,222 80 >75% Grass cover, Good, HSG D 134,147 93 Weighted Average 40,222 29.98% Pervious Area 93,925 70.02% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft /ft) (ft /sec) (cfs) 5.0 Direct Entry, Subcatchment 2S: Post - Development Hydrograph 24 — 23- 22: – - 21 — — — - 20 19 :E I 18 16 15 / w 14 13 12 / 3 O 11 LL 10 9 8 / 6 5 4 3 9 / 21.53 cfs 4- 4__ Ty e 1 i -241fi r a!r fall�5.fn — I — I -- Rtinoff Ar6a =1 34 j47 -{-sf - - LRunofff V$Ilu p=- 1.103Laf n° pt 4.�2 IV T 5$ rain . = _ I- 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) ■Runoff 6 Davis Drive Bioretention Pond #3.rev 2 Type 11 24 -hr 10 Rainfall = 5.10" Prepared by McKim & Creed Printed 12/10/2014 HydroCADO 10.00 s/n 04927 © 2011 HydroCAD Software Solutions LLC Page 15 Summary for Pond 3P: Bio Area #3 Inflow Area = 3.080 ac, 70.02% Impervious, Inflow Depth > 4.02" for 10 event Inflow = 21.53 cfs @ 11.95 hrs, Volume= 1.033 of Outflow = 12.52 cfs @ 12.04 hrs, Volume= 0.845 af, Atten= 42 %, Lag= 5.5 min Primary = 12.52 cfs @ 12.04 hrs, Volume= 0.845 of Routing by Stor -Ind method, Time Span= 5.00 -20.00 hrs, dt= 0.05 hrs Peak Elev= 311.75' @ 12.04 hrs Surf.Area= 9,864 sf Storage= 20,680 cf Plug -Flow detention time= 111.0 min calculated for 0.842 of (82% of inflow) Center -of -Mass det. time= 60.1 min ( 804.0 - 744.0 ) Volume Invert Avail.Storage Storage Description #1 309.25' 23,225 cf Custom Stage Data (Irregular)Listed below (Recalc) Elevation Surf.Area Perim. Inc.Store Cum.Store Wet.Area (feet) (sq -ft) (feet) (cubic -feet) (cubic -feet) (sq -ft) 309.25 6,740 324.0 0 0 6,740 310.25 7,897 351.0 7,311 7,311 8,229 311.00 9,007 377.0 6,334 13,645 9,760 312.00 10,165 396.0 9,580 23,225 10,991 Device Routing Invert Outlet Devices #1 Primary 304.62' 30.0" Round Culvert L= 121.0' RCP, square edge headwall, Ke= 0.500 Inlet / Outlet Invert= 304.62'/ 304.00' S= 0.0051 T Cc= 0.900 n= 0.024, Flow Area= 4.91 sf #2 Device 1 310.25' 24.0" W x 3.0" H Vert. Orifice /Grate C= 0.600 #3 Device 1 310.50' 24.0" W x 4.0" H Vert. Orifice /Grate C= 0.600 #4 Device 1 311.50' 48.0" x 48.0" Horiz. Orifice /Grate C= 0.600 Limited to weir flow at low heads Primary OutFlow Max =12.25 cfs @ 12.04 hrs HW= 311.74' (Free Discharge) 't-1 =Culvert (Passes 12.25 cfs of 39.10 cfs potential flow) 12= Orifice /Grate (Orifice Controls 2.81 cfs @ 5.62 fps) 3= Orifice /Grate (Orifice Controls 3.32 cfs @ 4.98 fps) 4=Orifice/G rate (Weir Controls 6.12 cfs @ 1.60 fps) 6 Davis Drive Bioretention Pond #3.rev 2 Type 1124 -hr 10 Rainfall = 5.10" Prepared by McKim & Creed Printed 12/10/2014 HvdroCADO 10.00 s/n 04927 © 2011 HvdroCAD Software Solutions LLC Paae 16 Pond 3P: Bio Area #3 I 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) Hydrograph 24 —� —� �:: -E I a 21.53 cfS Inflow O Primary 23 1 � `rtfl�ew- 22 — — — — Ar�a�.0- 0 c_ _ 1 _ 1 �a�k Efev�=3�1 J5� 19 _ 17 tt0�ag-�=io, 'Q0--cf- 1 15 5 4 A I 4- + 4 14 12.52 cfs u 13 3 12 — — 0 11 " 10 — + -T �- I- -I -F -I 9 — — — 7 T + 6 - 5 t t t 4 — — I 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) 6 Davis Drive Bioretention Pond #3.rev 2 Type 1124 -hr 100 Rainfall = 7.40" Prepared by McKim & Creed Printed 12/10/2014 HvdroCADO 10.00 s/n 04927 © 2011 HvdroCAD Software Solutions LLC Paae 18 Summary for Subcatchment 1S: Existing Conditions Runoff = 24.38 cfs @ 11.96 hrs, Volume= 1.124 af, Depth> 4.62" Runoff by SCS TR -20 method, UH =SCS, Time Span= 5.00 -20.00 hrs, dt= 0.05 hrs Type II 24 -hr 100 Rainfall= 7.40" Area (sf) CN Description 127,148 79 Woods, Fair, HSG D 127,148 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft /ft) (ft /sec) (cfs) 5.8 318 0.0330 0.91 Shallow Concentrated Flow, Woodland Kv= 5.0 fps Subcatchment 1S: Existing Conditions Hydrograph ■Runoff 24.38 cfs 24 ��e Ii 24 -hr 22.' ' -100 kainlfall��7.40' 20 4-Runoff Ar6a= 12-TUB sf 18' 16 ! T- -T 7 -- Runoffs VoIumg= 1.1124 of 14 3 L not Dep- tb >4.62" .° 12 1a �I _ Flow L_en t�i_ =31_8' S pe-0 33d T 8 tc7-54 n" 4 -F -1 7- - 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) 6 Davis Drive Bioretention Pond #3.rev 2 Type 1124 -hr 100 Rainfall = 7.40" Prepared by McKim & Creed Printed 12/10/2014 HvdroCADO 10.00 s/n 04927 © 2011 HvdroCAD Software Solutions LLC Paae 19 Summary for Subcatchment 2S: Post - Development Runoff = 32.04 cfs @ 11.95 hrs, Volume= 1.571 af, Depth> 6.12" Runoff by SCS TR -20 method, UH =SCS, Time Span= 5.00 -20.00 hrs, dt= 0.05 hrs Type II 24 -hr 100 Rainfall= 7.40" Area (sf) CN Description 93,925 98 Paved parking, HSG D 40,222 80 >75% Grass cover, Good, HSG D 134,147 93 Weighted Average 40,222 29.98% Pervious Area 93,925 70.02% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft /ft) (ft /sec) (cfs) 5.0 Direct Entry, Subcatchment 2S: Post - Development Hydrograph 32.04 cfs I� � TYp� 1 i�4 r fi _i00 ka 4a11�=7.40" i-Rtinoff ArOa= 1134j4TO 32 nO �pth` � �6 .'F39V = min 6 -"93 / 30 28 / 26 1 24 22 / --t 1 20 U 18 ' � U° 16 14 / L 12 / 10 / 6 4-/ / 32.04 cfs I� � TYp� 1 i�4 r fi _i00 ka 4a11�=7.40" i-Rtinoff ArOa= 1134j4TO _�R nom VQllump= 1.1571, nO �pth` � �6 .'F39V = min 6 -"93 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) ■ Runoff 6 Davis Drive Bioretention Pond #3.rev 2 Type 1124 -hr 100 Rainfall = 7.40" Prepared by McKim & Creed Printed 12/10/2014 HydroCADO 10.00 s/n 04927 © 2011 HydroCAD Software Solutions LLC Page 20 Summary for Pond 3P: Bio Area #3 Inflow Area = 3.080 ac, 70.02% Impervious, Inflow Depth > 6.12" for 100 event Inflow = 32.04 cfs @ 11.95 hrs, Volume= 1.571 of Outflow = 29.92 cfs @ 12.00 hrs, Volume= 1.378 af, Atten= 7 %, Lag= 2.9 min Primary = 29.92 cfs @ 12.00 hrs, Volume= 1.378 of Routing by Stor -Ind method, Time Span= 5.00 -20.00 hrs, dt= 0.05 hrs Peak Elev= 312.08' @ 12.00 hrs Surf.Area= 10,165 sf Storage= 23,225 cf Plug -Flow detention time= 91.5 min calculated for 1.378 of (88% of inflow) Center -of -Mass det. time= 50.6 min ( 788.4 - 737.8 ) Volume Invert Avail.Storage Storage Description #1 309.25' 23,225 cf Custom Stage Data (Irregular)Listed below (Recalc) Elevation Surf.Area Perim. Inc.Store Cum.Store Wet.Area (feet) (sq -ft) (feet) (cubic -feet) (cubic -feet) (sq -ft) 309.25 6,740 324.0 0 0 6,740 310.25 7,897 351.0 7,311 7,311 8,229 311.00 9,007 377.0 6,334 13,645 9,760 312.00 10,165 396.0 9,580 23,225 10,991 Device Routing Invert Outlet Devices #1 Primary 304.62' 30.0" Round Culvert L= 121.0' RCP, square edge headwall, Ke= 0.500 Inlet / Outlet Invert= 304.62'/ 304.00' S= 0.0051 T Cc= 0.900 n= 0.024, Flow Area= 4.91 sf #2 Device 1 310.25' 24.0" W x 3.0" H Vert. Orifice /Grate C= 0.600 #3 Device 1 310.50' 24.0" W x 4.0" H Vert. Orifice /Grate C= 0.600 #4 Device 1 311.50' 48.0" x 48.0" Horiz. Orifice /Grate C= 0.600 Limited to weir flow at low heads Primary OutFlow Max =29.64 cfs @ 12.00 hrs HW= 312.07' (Free Discharge) L1= Culvert (Passes 29.64 cfs of 40.33 cfs potential flow) 12= Orifice /Grate (Orifice Controls 3.14 cfs @ 6.27 fps) 3= Orifice /Grate (Orifice Controls 3.80 cfs @ 5.71 fps) 4=Orifice/G rate (Weir Controls 22.70 cfs @ 2.48 fps) 6 Davis Drive Bioretention Pond #3.rev 2 Type 1124 -hr 100 Rainfall = 7.40" Prepared by McKim & Creed Printed 12/10/2014 HydroCAD® 10.00 s/n 04927 © 2011 HydroCAD Software Solutions LLC Page 21 Pond 3P: Bio Area #3 Hydrograph L I J _ L L -L � J ■Inflow T 32.04 cfs — T O Primary — 29.92 cfs `fl�w�►r�a= �3.(80� fi T 7 - r H I I eak Elfe =3-IT2 68' zo 26 24 + 22 20 t — 3 18 LL 16 14 12 10 8 I a#oiagi =i3,2� 5-Jcf- I t t -t -1 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) 1S 2S Existing Conditions Post -Dev lopment 43P Bio Area #3A Subcat Reach Pon Link Routing Diagram for Bioretention Pond #3A Prepared by McKim & Creed, Printed 12/10/2014 E Hyd,oCAD® 10.00 s/n 04927 © 2011 HydroCAD Software Solutions LLC 6 Davis Drive Bioretention Pond #3A Type 1124 -hr 1 Rainfall = 3.00" Prepared by McKim & Creed Printed 12/10/2014 HvdroCADO 10.00 s/n 04927 © 2011 HvdroCAD Software Solutions LLC Paae 3 Summary for Subcatchment 1S: Existing Conditions Runoff = 1.32 cfs @ 12.00 hrs, Volume= 0.062 af, Depth> 1.08" Runoff by SCS TR -20 method, UH =SCS, Time Span= 5.00 -20.00 hrs, dt= 0.05 hrs Type II 24 -hr 1 Rainfall= 3.00" Area (sf) CN Description 30,020 79 Woods, Fair, HSG D 30,020 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft /ft) (ft /sec) (cfs) 8.4 465 0.0344 0.93 Shallow Concentrated Flow, Woodland Kv= 5.0 fps Subcatchment 1S: Existing Conditions Hydrograph ❑ Runoff 1.32 cfs Type II 24 -hr 1 Rainfall= 3.00" 1 R'unb- f- 'rea:*0,020'sf Runoff) Volume= 0.062 of Runoff Depth >1.08" LL Flow Length =465' SlopeL0.0344 '/' T6=8.4 min I11-A I CN =79 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) 6 Davis Drive Bioretention Pond #3A Type 1124 -hr 1 Rainfall = 3.00" Prepared by McKim & Creed Printed 12/10/2014 HvdroCADO 10.00 s/n 04927 © 2011 HvdroCAD Software Solutions LLC Paae 4 Summary for Subcatchment 2S: Post - Development Runoff = 2.95 cfs @ 11.95 hrs, Volume= 0.136 af, Depth> 2.11" Runoff by SCS TR -20 method, UH =SCS, Time Span= 5.00 -20.00 hrs, dt= 0.05 hrs Type II 24 -hr 1 Rainfall= 3.00" Area (sf) CN Description 23,848 98 Paved parking, HSG D 9,689 80 >75% Grass cover, Good, HSG D 33,537 93 Weighted Average 9,689 28.89% Pervious Area 23,848 71.11% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft /ft) (ft /sec) (cfs) 5.0 Direct Entry, Subcatchment 2S: Post - Development Hydrograph ❑Runoff 2.95 cfs 3 Tybe II 24 -hr 1 Rainfall= 3.00" Runoff Area,-733,537. sf 2 Rumoff Votum� _O.136jof Rulnoff Delpth >2.11" o LL Tc =5.0 min CN 93 _ 1 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) 6 Davis Drive Bioretention Pond #3A Type 1l 24 -hr 1 Rainfall = 3.00" Prepared by McKim & Creed Printed 12/10/2014 HydroCADO 10.00 s/n 04927 © 2011 HydroCAD Software Solutions LLC Page 5 Summary for Pond 3P: Bio Area #3A Inflow Area = 0.770 ac, 71.11 % Impervious, Inflow Depth > 2.11" for 1 event Inflow = 2.95 cfs @ 11.95 hrs, Volume= 0.136 of Outflow = 1.10 cfs @ 12.07 hrs, Volume= 0.091 af, Atten= 63 %, Lag= 7.1 min Primary = 1.10 cfs @ 12.07 hrs, Volume= 0.091 of Routing by Stor -Ind method, Time Span= 5.00 -20.00 hrs, dt= 0.05 hrs Peak Elev= 313.50' @ 12.07 hrs Surf.Area= 2,513 sf Storage= 3,043 cf Plug -Flow detention time= 131.0 min calculated for 0.090 of (67% of inflow) Center -of -Mass det. time= 63.8 min ( 820.0 - 756.3 ) Volume Invert Avail.Storage Storage Description #1 312.00' 5,915 cf Custom Stage Data (Irregular)Listed below (Recalc) Elevation Surf.Area Perim. Inc.Store Cum.Store Wet.Area (feet) (sq -ft) (feet) (cubic -feet) (cubic -feet) (sq -ft) 312.00 1,578 191.0 0 0 1,578 313.00 2,192 213.0 1,877 1,877 2,314 314.00 2,862 233.0 2,520 4,396 3,058 314.50 3,218 242.0 1,519 5,915 3,418 Device Routing Invert Outlet Devices #1 Primary 307.67' 24.0" Round Culvert L= 55.0' RCP, square edge headwall, Ke= 0.500 Inlet/ Outlet Invert= 307.67'/ 307.00' S=0.0122'/' Cc= 0.900 n= 0.024, Flow Area= 3.14 sf #2 Device 1 313.00' 18.0" W x 3.0" H Vert. Orifice /Grate C= 0.600 #3 Device 1 313.50' 18.0" W x 3.0" H Vert. Orifice /Grate C= 0.600 #4 Device 1 313.75' 48.0" x 48.0" Horiz. Orifice /Grate C= 0.600 Limited to weir flow at low heads Primary OutFlow Max =1.08 cfs @ 12.07 hrs HW= 313.49' (Free Discharge) L1= Culvert (Passes 1.08 cfs of 27.27 cfs potential flow) 12= Orifice /Grate (Orifice Controls 1.08 cfs @ 2.89 fps) 3= Orifice /Grate ( Controls 0.00 cfs) 4=Orifice/G rate ( Controls 0.00 cfs) 6 Davis Drive Bioretention Pond #3A Type 1124 -hr 1 Rainfall = 3.00" Prepared by McKim & Creed Printed 12/10/2014 HvdroCADO 10.00 s/n 04927 © 2011 HvdroCAD Software Solutions LLC Paae 6 N w V 3 O LL Pond 3P: Bio Area #3A Hydrograph 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) FE-1 nflow O Primary 6 Davis Drive Bioretention Pond #3A Type 1124 -hr 2 Rainfall = 3.50" Prepared by McKim & Creed Printed 12/10/2014 HvdroCADO 10.00 s/n 04927 © 2011 HvdroCAD Software Solutions LLC Paae 8 Summary for Subcatchment 1S: Existing Conditions Runoff = 1.74 cfs @ 12.00 hrs, Volume= 0.082 af, Depth> 1.43" Runoff by SCS TR -20 method, UH =SCS, Time Span= 5.00 -20.00 hrs, dt= 0.05 hrs Type II 24 -hr 2 Rainfall= 3.50" Area (sf) CN Description 30,020 79 Woods, Fair, HSG D 30,020 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft /ft) (ft /sec) (cfs) 8.4 465 0.0344 0.93 Shallow Concentrated Flow, Woodland Kv= 5.0 fps Subcatchment 1S: Existing Conditions Hydrograph ❑ Runoff 1.74 cfs Type II 24 -hr 2 Rainfall= 3.50" R'unciff Areat30,020 sf Runoff) Volume= 0.082 of - Ru,noff Depth >1.43" LL Flow Length =465' SlopeL0.0344 '/' T6=8.4 min Al CN =79 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) 6 Davis Drive Bioretention Pond #3A Type 1124 -hr 2 Rainfall = 3.50" Prepared by McKim & Creed Printed 12/10/2014 HvdroCADO 10.00 s/n 04927 © 2011 HvdroCAD Software Solutions LLC Paae 9 Summary for Subcatchment 2S: Post - Development Runoff = 3.53 cfs @ 11.95 hrs, Volume= 0.165 af, Depth> 2.57" Runoff by SCS TR -20 method, UH =SCS, Time Span= 5.00 -20.00 hrs, dt= 0.05 hrs Type II 24 -hr 2 Rainfall= 3.50" Area (sf) CN Description 23,848 98 Paved parking, HSG D 9,689 80 >75% Grass cover, Good, HSG D 33,537 93 Weighted Average 9,689 28.89% Pervious Area 23,848 71.11% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft /ft) (ft /sec) (cfs) 5.0 Direct Entry, Subcatchment 2S: Post - Development Hydrograph 3.53 cfs ❑Runoff Tye Ii 24 �hr 3 2 Rainfall 3.50" Runoff Area7= 33,537 sf IRumofflVolume= 0.1165 of 2 Ru-noff Qelpth>2.57" Tc =5.0 min CN =93 0 0 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) 6 Davis Drive Bioretention Pond #3A Type 1l 24 -hr 2 Rainfall = 3.50" Prepared by McKim & Creed Printed 12/10/2014 HydroCADO 10.00 s/n 04927 © 2011 HydroCAD Software Solutions LLC Page 10 Summary for Pond 3P: Bio Area #3A Inflow Area = 0.770 ac, 71.11 % Impervious, Inflow Depth > 2.57" for 2 event Inflow = 3.53 cfs @ 11.95 hrs, Volume= 0.165 of Outflow = 1.66 cfs @ 12.06 hrs, Volume= 0.120 af, Atten= 53 %, Lag= 6.3 min Primary = 1.66 cfs @ 12.06 hrs, Volume= 0.120 of Routing by Stor -Ind method, Time Span= 5.00 -20.00 hrs, dt= 0.05 hrs Peak Elev= 313.67' @ 12.06 hrs Surf.Area= 2,630 sf Storage= 3,485 cf Plug -Flow detention time= 121.3 min calculated for 0.120 of (73% of inflow) Center -of -Mass det. time= 58.0 min ( 810.2 - 752.2 ) Volume Invert Avail.Storage Storage Description #1 312.00' 5,915 cf Custom Stage Data (Irregular)Listed below (Recalc) Elevation Surf.Area Perim. Inc.Store Cum.Store Wet.Area (feet) (sq -ft) (feet) (cubic -feet) (cubic -feet) (sq -ft) 312.00 1,578 191.0 0 0 1,578 313.00 2,192 213.0 1,877 1,877 2,314 314.00 2,862 233.0 2,520 4,396 3,058 314.50 3,218 242.0 1,519 5,915 3,418 Device Routing Invert Outlet Devices #1 Primary 307.67' 24.0" Round Culvert L= 55.0' RCP, square edge headwall, Ke= 0.500 Inlet/ Outlet Invert= 307.67'/ 307.00' S=0.0122'/' Cc= 0.900 n= 0.024, Flow Area= 3.14 sf #2 Device 1 313.00' 18.0" W x 3.0" H Vert. Orifice /Grate C= 0.600 #3 Device 1 313.50' 18.0" W x 3.0" H Vert. Orifice /Grate C= 0.600 #4 Device 1 313.75' 48.0" x 48.0" Horiz. Orifice /Grate C= 0.600 Limited to weir flow at low heads Primary OutFlow Max =1.64 cfs @ 12.06 hrs HW= 313.66' (Free Discharge) L1= Culvert (Passes 1.64 cfs of 27.80 cfs potential flow) 12= Orifice /Grate (Orifice Controls 1.32 cfs @ 3.53 fps) 3= Orifice /Grate (Orifice Controls 0.32 cfs @ 1.30 fps) 4=Orifice/G rate ( Controls 0.00 cfs) 6 Davis Drive Bioretention Pond #3A Type 1124 -hr 2 Rainfall = 3.50" Prepared by McKim & Creed Printed 12/10/2014 HvdroCADO 10.00 s/n 04927 © 2011 HvdroCAD Software Solutions LLC Paae 11 N V 3 0 LL Pond 3P: Bio Area #3A Hydrograph 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) ❑ Inflow ❑ Primary 6 Davis Drive Bioretention Pond #3A Type 1124 -hr 10 Rainfall = 5.10" Prepared by McKim & Creed Printed 12/10/2014 HvdroCADO 10.00 s/n 04927 © 2011 HvdroCAD Software Solutions LLC Paae 13 Summary for Subcatchment 1S: Existing Conditions Runoff = 3.19 cfs @ 12.00 hrs, Volume= 0.153 af, Depth> 2.67" Runoff by SCS TR -20 method, UH =SCS, Time Span= 5.00 -20.00 hrs, dt= 0.05 hrs Type II 24 -hr 10 Rainfall = 5.10" Area (sf) CN Description 30,020 79 Woods, Fair, HSG D 30,020 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft /ft) (ft /sec) (cfs) 8.4 465 0.0344 0.93 Shallow Concentrated Flow, Woodland Kv= 5.0 fps Subcatchment 1S: Existing Conditions Hydrograph i 3.19 cfs Type II 24 -err 3 I10 Rainfall = 5.110" R'unciff Areat30,020 sf Ru noff l Vol u me �.'L53 _af 2 Runoff Depth >2.67" LL Flow Length =465' Slop_eL0.03_44 '/' 1 T64.4 min CN =79 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) 8 Runoff 6 Davis Drive Bioretention Pond #3A Type 11 24 -hr 10 Rainfall = 5.10" Prepared by McKim & Creed Printed 12/10/2014 HvdroCADO 10.00 s/n 04927 © 2011 HvdroCAD Software Solutions LLC Paae 14 Summary for Subcatchment 2S: Post - Development Runoff = 5.38 cfs @ 11.95 hrs, Volume= 0.258 af, Depth> 4.02" Runoff by SCS TR -20 method, UH =SCS, Time Span= 5.00 -20.00 hrs, dt= 0.05 hrs Type II 24 -hr 10 Rainfall = 5.10" Area (sf) CN Description 23,848 98 Paved parking, HSG D 9,689 80 >75% Grass cover, Good, HSG D 33,537 93 Weighted Average 9,689 28.89% Pervious Area 23,848 71.11 % Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft /ft) (ft /sec) (cfs) 5.0 Direct Entry, N 3 0 LL Subcatchment 2S: Post - Development Hydrograph 5.38 cfs Type II 24 -hr 10 Rainfall = 5.10" Runoff Area = 33,537 sf Runoff Volume =0.258 of Runoff Depth >4.02" Tc =5.0 min CN =93 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) ❑ Runoff 6 Davis Drive Bioretention Pond #3A Type 11 24 -hr 10 Rainfall = 5.10" Prepared by McKim & Creed Printed 12/10/2014 HydroCADO 10.00 s/n 04927 © 2011 HydroCAD Software Solutions LLC Page 15 Summary for Pond 3P: Bio Area #3A Inflow Area = 0.770 ac, 71.11 % Impervious, Inflow Depth > 4.02" for 10 event Inflow = 5.38 cfs @ 11.95 hrs, Volume= 0.258 of Outflow = 4.92 cfs @ 12.00 hrs, Volume= 0.213 af, Atten= 9 %, Lag= 2.8 min Primary = 4.92 cfs @ 12.00 hrs, Volume= 0.213 of Routing by Stor -Ind method, Time Span= 5.00 -20.00 hrs, dt= 0.05 hrs Peak Elev= 313.88' @ 12.00 hrs Surf.Area= 2,777 sf Storage= 4,057 cf Plug -Flow detention time= 99.6 min calculated for 0.212 of (82% of inflow) Center -of -Mass det. time= 48.6 min ( 792.6 - 744.0 ) Volume Invert Avail.Storage Storage Description #1 312.00' 5,915 cf Custom Stage Data (Irregular)Listed below (Recalc) Elevation Surf.Area Perim. Inc.Store Cum.Store Wet.Area (feet) (sq -ft) (feet) (cubic -feet) (cubic -feet) (sq -ft) 312.00 1,578 191.0 0 0 1,578 313.00 2,192 213.0 1,877 1,877 2,314 314.00 2,862 233.0 2,520 4,396 3,058 314.50 3,218 242.0 1,519 5,915 3,418 Device Routing Invert Outlet Devices #1 Primary 307.67' 24.0" Round Culvert L= 55.0' RCP, square edge headwall, Ke= 0.500 Inlet/ Outlet Invert= 307.67'/ 307.00' S=0.0122'/' Cc= 0.900 n= 0.024, Flow Area= 3.14 sf #2 Device 1 313.00' 18.0" W x 3.0" H Vert. Orifice /Grate C= 0.600 #3 Device 1 313.50' 18.0" W x 3.0" H Vert. Orifice /Grate C= 0.600 #4 Device 1 313.75' 48.0" x 48.0" Horiz. Orifice /Grate C= 0.600 Limited to weir flow at low heads Primary OutFlow Max =4.85 cfs @ 12.00 hrs HW= 313.88' (Free Discharge) 't-1 =Culvert (Passes 4.85 cfs of 28.43 cfs potential flow) 12= Orifice /Grate (Orifice Controls 1.56 cfs @ 4.17 fps) 3= Orifice /Grate (Orifice Controls 0.90 cfs @ 2.39 fps) 4=Orifice/G rate (Weir Controls 2.38 cfs @ 1.17 fps) Bioretention Pond #3A Prepared by McKim & Creed HvdroCADO 10.00 s/n 04927 © 2011 N w V 3 O LL roCAD Software Solutions LLC Pond 3P: Bio Area #3A Hydrograph 6 Davis Drive Type 1124 -hr 10 Rainfall = 5.10" Printed 12/10/2014 Paae 16 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) FE-1 nflow O Primary 6 Davis Drive Bioretention Pond #3A Type 1124 -hr 100 Rainfall = 7.40" Prepared by McKim & Creed Printed 12/10/2014 HvdroCADO 10.00 s/n 04927 © 2011 HvdroCAD Software Solutions LLC Paae 18 Summary for Subcatchment 1S: Existing Conditions Runoff = 5.36 cfs @ 12.00 hrs, Volume= 0.265 af, Depth> 4.62" Runoff by SCS TR -20 method, UH =SCS, Time Span= 5.00 -20.00 hrs, dt= 0.05 hrs Type II 24 -hr 100 Rainfall= 7.40" Area (sf) CN Description 30,020 79 Woods, Fair, HSG D 30,020 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft /ft) (ft /sec) (cfs) 8.4 465 0.0344 0.93 Shallow Concentrated Flow, Woodland Kv= 5.0 fps Subcatchment 1S: Existing Conditions Hydrograph e 6 5.36 cfs Type -Ii 34-hr 5 400 Rai4a11�=7.40" R'un�ff Area #30,020 sf 4 Runoff) Volume= 0.265 of 3 3 R- ulnoff Depth�4.63 U. Flow Length =465' 2 SlopeL�0344 '/' T6=8.4 min 1 — CN =79 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) ❑ Runoff 6 Davis Drive Bioretention Pond #3A Type 1124 -hr 100 Rainfall = 7.40" Prepared by McKim & Creed Printed 12/10/2014 HvdroCADO 10.00 s/n 04927 © 2011 HvdroCAD Software Solutions LLC Paae 19 Summary for Subcatchment 2S: Post - Development Runoff = 8.01 cfs @ 11.95 hrs, Volume= 0.393 af, Depth> 6.12" Runoff by SCS TR -20 method, UH =SCS, Time Span= 5.00 -20.00 hrs, dt= 0.05 hrs Type II 24 -hr 100 Rainfall= 7.40" Area (sf) CN Description 23,848 98 Paved parking, HSG D 9,689 80 >75% Grass cover, Good, HSG D 33,537 93 Weighted Average 9,689 28.89% Pervious Area 23,848 71.11% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft /ft) (ft /sec) (cfs) 5.0 Direct Entry, Subcatchment 2S: Post - Development Hydrograph d 8.01 cfs T —t Tye Ii 24 =hr t t It00 Rainfall 7.40" � Rtm6ff -Area,= 33,1537 -sf _Ru _noff4Vo1u mp _O.391_af Runoff Delpth >6.12" Tc =5.0 m i n L -L -t &N =�3 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) ❑ Runoff 8 t t 6 5 �° 't [_ L 1 - d 8.01 cfs T —t Tye Ii 24 =hr t t It00 Rainfall 7.40" � Rtm6ff -Area,= 33,1537 -sf _Ru _noff4Vo1u mp _O.391_af Runoff Delpth >6.12" Tc =5.0 m i n L -L -t &N =�3 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) ❑ Runoff 6 Davis Drive Bioretention Pond #3A Type 11 24 -hr 100 Rainfall = 7.40" Prepared by McKim & Creed Printed 12/10/2014 HydroCADO 10.00 s/n 04927 © 2011 HydroCAD Software Solutions LLC Page 20 Summary for Pond 3P: Bio Area #3A Inflow Area = 0.770 ac, 71.11 % Impervious, Inflow Depth > 6.12" for 100 event Inflow = 8.01 cfs @ 11.95 hrs, Volume= 0.393 of Outflow = 7.65 cfs @ 11.97 hrs, Volume= 0.347 af, Atten= 5 %, Lag= 1.3 min Primary = 7.65 cfs @ 11.97 hrs, Volume= 0.347 of Routing by Stor -Ind method, Time Span= 5.00 -20.00 hrs, dt= 0.05 hrs Peak Elev= 313.96' @ 11.97 hrs Surf.Area= 2,832 sf Storage= 4,278 cf Plug -Flow detention time= 81.0 min calculated for 0.346 of (88% of inflow) Center -of -Mass det. time= 41.3 min ( 779.1 - 737.8 ) Volume Invert Avail.Storage Storage Description #1 312.00' 5,915 cf Custom Stage Data (Irregular)Listed below (Recalc) Elevation Surf.Area Perim. Inc.Store Cum.Store Wet.Area (feet) (sq -ft) (feet) (cubic -feet) (cubic -feet) (sq -ft) 312.00 1,578 191.0 0 0 1,578 313.00 2,192 213.0 1,877 1,877 2,314 314.00 2,862 233.0 2,520 4,396 3,058 314.50 3,218 242.0 1,519 5,915 3,418 Device Routing Invert Outlet Devices #1 Primary 307.67' 24.0" Round Culvert L= 55.0' RCP, square edge headwall, Ke= 0.500 Inlet/ Outlet Invert= 307.67'/ 307.00' S=0.0122'/' Cc= 0.900 n= 0.024, Flow Area= 3.14 sf #2 Device 1 313.00' 18.0" W x 3.0" H Vert. Orifice /Grate C= 0.600 #3 Device 1 313.50' 18.0" W x 3.0" H Vert. Orifice /Grate C= 0.600 #4 Device 1 313.75' 48.0" x 48.0" Horiz. Orifice /Grate C= 0.600 Limited to weir flow at low heads Primary OutFlow Max =7.40 cfs @ 11.97 hrs HW= 313.95' (Free Discharge) L1= Culvert (Passes 7.40 cfs of 28.64 cfs potential flow) 12= Orifice /Grate (Orifice Controls 1.64 cfs @ 4.37 fps) 3= Orifice /Grate (Orifice Controls 1.03 cfs @ 2.73 fps) 4=Orifice/G rate (Weir Controls 4.73 cfs @ 1.47 fps) Bioretention Pond #3A Prepared by McKim & Creed HvdroCADO 10.00 s/n 04927 © 2011 7 t t w 5 3 4 u 'I 3 11 6 Davis Drive Type 1124 -hr 100 Rainfall = 7.40" Printed 12/10/2014 roCAD Software Solutions LLC Page 21 Pond 3P: Bio Area #3A Hydrograph I I FE-1 nflow 8.01 cfs � , O Primary 7.65 cfs jnfl6w Area �.7�16 C 1 0eaFk E- Fle v-L-31�3.946' St6ra6e=-4,t78 -Cf fi t -1 I t t � 1111 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) F � 1 Y , 1S 2S ; Existing Conditions Post-De v lopment 43P Bio Area #4 Subcat R Pon [Link Routing Diagram for Bioretention Pond #4 rev Prepared by McKim & Creed, Printed 12/10/2014 E Hyd, 10.00 s/n 04927 © 2011 HydroCAD Software Solutions LLC 6 Davis Drive Bioretention Pond #4 rev Type// 24 -hr 1 -Yr Rainfall= 3.00" Prepared by McKim & Creed Printed 12/10/2014 HvdroCADO 10.00 s/n 04927 © 2011 HvdroCAD Software Solutions LLC Paae 3 Summary for Subcatchment 1S: Existing Conditions Runoff = 7.64 cfs @ 11.98 hrs, Volume= 0.337 af, Depth> 1.08" Runoff by SCS TR -20 method, UH =SCS, Time Span= 5.00 -20.00 hrs, dt= 0.05 hrs Type II 24 -hr 1 -Yr Rainfall= 3.00" Area (sf) CN Description 162,558 79 Woods, Fair, HSG D 162,558 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft /ft) (ft /sec) (cfs) 6.4 413 0.0460 1.07 Shallow Concentrated Flow, Woodland Kv= 5.0 fps Subcatchment 1S: Existing Conditions Hydrograph 6- 5 w 0 4 LL 3 2 1- 7.64 cfs Tye II 24 -hx _ 1!Yr Rai4all= 3.00" Runoff Arba =1162,15581 sf Runoff Volumg4l.1337 [af - Ruinoff Deipth�1.08" Flow Length =413' Slbpe =�6460 7' -1 - T6=6�4 -m i n DN =,79 i 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) 6 Davis Drive Bioretention Pond #4 rev Type// 24 -hr 1 -Yr Rainfall= 3.00" Prepared by McKim & Creed Printed 12/10/2014 HvdroCADO 10.00 s/n 04927 © 2011 HvdroCAD Software Solutions LLC Paae 4 Summary for Subcatchment 2S: Post - Development Runoff = 9.94 cfs @ 11.95 hrs, Volume= 0.446 af, Depth> 1.94" Runoff by SCS TR -20 method, UH =SCS, Time Span= 5.00 -20.00 hrs, dt= 0.05 hrs Type II 24 -hr 1 -Yr Rainfall= 3.00" Area (sf) CN Description 75,500 98 Paved parking, HSG D 45,070 80 >75% Grass cover, Good, HSG D 120,570 91 Weighted Average 45,070 37.38% Pervious Area 75,500 62.62% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft /ft) (ft /sec) (cfs) 5.0 Direct Entry, Subcatchment 2S: Post - Development Hydrograph i 11 9.94 cfs 10 T ��e li 24�r 9 _ 11Yr kainfall�=_3.d0" 8 Runoff ArOa= 1120 57010 7-,/ LRuno ff Volump= 0.1446Lf 0 6- j1 R�u nol D jpth�1.9'4" LL 5 Tc =5.0 min n 4 6N =91 3/1 1-T TTT 2 /I T T T T 1 �I I I I I 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) ■Runoff 6 Davis Drive Bioretention Pond #4-rev Type 1124 -hr 1 -Yr Rainfall = 3.00" Prepared by McKim & Creed Printed 12/10/2014 HvdroCAD® 10.00 s/n 04927 © 2011 HvdroCAD Software Solutions LLC Paae 5 Summary for Pond 3P: Bio Area #4 Inflow Area = 2.768 ac, 62.62% Impervious, Inflow Depth > 1.94" for 1 -Yr event Inflow = 9.94 cfs @ 11.95 hrs, Volume= 0.446 of Outflow = 1.76 cfs @ 12.14 hrs, Volume= 0.297 af, Atten= 82 %, Lag= 11.0 min Primary = 1.76 cfs @ 12.14 hrs, Volume= 0.297 of Routing by Stor -Ind method, Time Span= 5.00 -20.00 hrs, dt= 0.05 hrs Peak Elev= 308.71' @ 12.14 hrs Surf.Area= 7,083 sf Storage= 10,722 cf Plug -Flow detention time= 144.0 min calculated for 0.296 of (66% of inflow) Center -of -Mass det. time= 76.8 min ( 841.3 - 764.5 ) Volume Invert Avail.Storage Storage Description #1 307.00' 39,653 cf Custom Stage Data (Irregular)Listed below (Recalc) Elevation Surf.Area Perim. Inc.Store Cum.Store Wet.Area (feet) (sq -ft) (feet) (cubic -feet) (cubic -feet) (sq -ft) 307.00 5,510 291.0 0 0 5,510 308.00 6,412 310.0 5,955 5,955 6,467 309.00 7,372 329.0 6,886 12,842 7,485 310.00 8,387 348.0 7,874 20,716 8,563 311.00 9,460 367.0 8,918 29,634 9,701 312.00 10,588 387.0 10,019 39,653 10,959 Device Routing Invert Outlet Devices #1 Primary 302.37' 15.0" Round Culvert L= 100.0' RCP, square edge headwall, Ke= 0.500 Inlet/ Outlet Invert= 302.37'/ 299.50' S=0.0287'/' Cc= 0.900 n= 0.024, Flow Area= 1.23 sf #2 Device 1 308.00' 18.0" W x 4.0" H Vert. Orifice /Grate C= 0.600 #3 Device 1 310.00' 36.0" x 36.0" Horiz. Orifice /Grate C= 0.600 Limited to weir flow at low heads Primary OutFlow Max =1.76 cfs @ 12.14 hrs HW= 308.71' (Free Discharge) L1= Culvert (Passes 1.76 cfs of 9.04 cfs potential flow) �2=0rifice/G rate (Orifice Controls 1.76 cfs @ 3.52 fps) 3= Orifice /Grate ( Controls 0.00 cfs) Bioretention Pond #4 rev Prepared by McKim & Creed HvdroCADO 10.00 s/n 04927 © 2011 N 3 0 LL 11 1C I roCAD Software Solutions LLC Pond 3P: Bio Area #4 Hydrograph I 9 94 -F cs + 4 - t 6 Davis Drive Type// 24 -hr 1 -Yr Rainfall =3.00" Printed 12/10/2014 Pace 6 infk nrAr"=2i7�8-�c - I?ea-k E-1evL-3b8J1' ttoi a- ge =1 '0,722 -ACV 1.76cfs L L 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) IN Inflow ■ Primary 6 Davis Drive Bioretention Pond #4 rev Type 11 24 -hr 2 -Yr Rainfall= 3.50" Prepared by McKim & Creed Printed 12/10/2014 HvdroCADO 10.00 s/n 04927 © 2011 HvdroCAD Software Solutions LLC Paae 8 Summary for Subcatchment 1S: Existing Conditions Runoff = 10.07 cfs @ 11.98 hrs, Volume= 0.446 af, Depth> 1.43" Runoff by SCS TR -20 method, UH =SCS, Time Span= 5.00 -20.00 hrs, dt= 0.05 hrs Type II 24 -hr 2 -Yr Rainfall= 3.50" Area (sf) CN Description 162,558 79 Woods, Fair, HSG D 162,558 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft /ft) (ft /sec) (cfs) 6.4 413 0.0460 1.07 Shallow Concentrated Flow, Woodland Kv= 5.0 fps Subcatchment 1S: Existing Conditions Hydrograph 11 10.07 cfs 10 1 -r Tye Ii 24 -hr 9- 2-Yr Rain' fall =3.50" 8 RUnoff Arba= 1625581 sf 7 �I Rugoffl Volume= 0.14461 of 6 Ryno7 Depth >1.43" LL 5 ! Flow Length =413' 4 1 ,I 1 SlbpeL0.6460 T 3- —1 —tc =614 m i n 2 " =79 1- 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) ■Runoff 6 Davis Drive Bioretention Pond #4 rev Type 11 24 -hr 2 -Yr Rainfall= 3.50" Prepared by McKim & Creed Printed 12/10/2014 HvdroCADO 10.00 s/n 04927 © 2011 HvdroCAD Software Solutions LLC Paae 9 Summary for Subcatchment 2S: Post - Development Runoff = 12.05 cfs @ 11.95 hrs, Volume= 0.549 af, Depth> 2.38" Runoff by SCS TR -20 method, UH =SCS, Time Span= 5.00 -20.00 hrs, dt= 0.05 hrs Type II 24 -hr 2 -Yr Rainfall= 3.50" Area (sf) CN Description 75,500 98 Paved parking, HSG D 45,070 80 >75% Grass cover, Good, HSG D 120,570 91 Weighted Average 45,070 37.38% Pervious Area 75,500 62.62% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft /ft) (ft /sec) (cfs) 5.0 Direct Entry, Subcatchment 2S: Post - Development Hydrograph ■ Runoff 12.05 cfs 12 T — TY% 1i _24�hhr 11 L A 2�YukainfallL3.50if 10 9 +-Runoff Area = 120,570 sf 8 Runoff) Volume= 0.1549 of � nr D p�h� ?.38, 6 C =5.0 min 5 fi rt 6N=il 1�II I I 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) 6 Davis Drive Bioretention Pond #4-rev Type 1124 -hr 2 -Yr Rainfall = 3.50" Prepared by McKim & Creed Printed 12/10/2014 HydroCADO 10.00 s/n 04927 © 2011 HydroCAD Software Solutions LLC Page 10 Summary for Pond 3P: Bio Area #4 Inflow Area = 2.768 ac, 62.62% Impervious, Inflow Depth > 2.38" for 2 -Yr event Inflow = 12.05 cfs @ 11.95 hrs, Volume= 0.549 of Outflow = 2.24 cfs @ 12.13 hrs, Volume= 0.398 af, Atten= 81 %, Lag= 10.3 min Primary = 2.24 cfs @ 12.13 hrs, Volume= 0.398 of Routing by Stor -Ind method, Time Span= 5.00 -20.00 hrs, dt= 0.05 hrs Peak Elev= 309.04' @ 12.13 hrs Surf.Area= 7,407 sf Storage= 13,101 cf Plug -Flow detention time= 136.8 min calculated for 0.397 of (72% of inflow) Center -of -Mass det. time= 74.1 min ( 833.8 - 759.7 ) Volume Invert Avail.Storage Storage Description #1 307.00' 39,653 cf Custom Stage Data (Irregular)Listed below (Recalc) Elevation Surf.Area Perim. Inc.Store Cum.Store Wet.Area (feet) (sq -ft) (feet) (cubic -feet) (cubic -feet) (sq -ft) 307.00 5,510 291.0 0 0 5,510 308.00 6,412 310.0 5,955 5,955 6,467 309.00 7,372 329.0 6,886 12,842 7,485 310.00 8,387 348.0 7,874 20,716 8,563 311.00 9,460 367.0 8,918 29,634 9,701 312.00 10,588 387.0 10,019 39,653 10,959 Device Routing Invert Outlet Devices #1 Primary 302.37' 15.0" Round Culvert L= 100.0' RCP, square edge headwall, Ke= 0.500 Inlet/ Outlet Invert= 302.37'/ 299.50' S=0.0287'/' Cc= 0.900 n= 0.024, Flow Area= 1.23 sf #2 Device 1 308.00' 18.0" W x 4.0" H Vert. Orifice /Grate C= 0.600 #3 Device 1 310.00' 36.0" x 36.0" Horiz. Orifice /Grate C= 0.600 Limited to weir flow at low heads Primary OutFlow Max =2.24 cfs @ 12.13 hrs HW= 309.03' (Free Discharge) L1= Culvert (Passes 2.24 cfs of 9.22 cfs potential flow) �2=Orifice/G rate (Orifice Controls 2.24 cfs @ 4.48 fps) 3= Orifice /Grate ( Controls 0.00 cfs) 6 Davis Drive Bioretention Pond #4_rev Type 11 24 -hr 2 -Yr Rainfall= 3.50" Prepared by McKim & Creed Printed 12/10/2014 HydroCAD® 10.00 s/n 04927 © 2011 HydroCAD Software Solutions LLC Page 11 Pond 3P: Bio Area #4 Hydrograph 1— - — — — I I -�— -4— Inflow 9 ns rfs O Primary 13 T T 12 10 9 LI -L N `r 7 3 6 E I 5 4 I 2.24 cfs `nfl�ow�Ar"=T2.A"C -- - - I ea�k Elev= 3-69.b4'- I �to�age= 1r3,1�011111111�cf I L L I -i 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) 6 Davis Drive Bioretention Pond #4 rev Type 1124 -hr 10 -Yr Rainfall= 5.10" Prepared by McKim & Creed Printed 12/10/2014 HvdroCADO 10.00 s/n 04927 © 2011 HvdroCAD Software Solutions LLC Paae 13 Summary for Subcatchment 1S: Existing Conditions Runoff = 18.36 cfs @ 11.98 hrs, Volume= 0.831 af, Depth> 2.67" Runoff by SCS TR -20 method, UH =SCS, Time Span= 5.00 -20.00 hrs, dt= 0.05 hrs Type II 24 -hr 10 -Yr Rainfall = 5.10" Area (sf) CN Description 162,558 79 Woods, Fair, HSG D 162,558 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft /ft) (ft /sec) (cfs) 6.4 413 0.0460 1.07 Shallow Concentrated Flow, Woodland Kv= 5.0 fps 19 18 17 16 15 14 13 12 �+ 11 0 10 LL 9 0 Subcatchment 1S: Existing Conditions Hydrograph —F � — _ I � ■Runoff 18.36 cfs 1 —1 I Type 11 -24 -fir fi 1�Yr-kaiffalk5A" fi Runoff A&Oa =162�558tsf TRuipoffj V$lump=0.1831Taf R-9 n al D .% 19 � � oyv Lee rLgt 4- ' 516pe�--0.646O -/' _ C QI --179 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) Z 1:1 1 1 1 -� 4�II � 4 1 —1 I Type 11 -24 -fir fi 1�Yr-kaiffalk5A" fi Runoff A&Oa =162�558tsf TRuipoffj V$lump=0.1831Taf R-9 n al D .% 19 � � oyv Lee rLgt 4- ' 516pe�--0.646O -/' _ C QI --179 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) 6 Davis Drive Bioretention Pond #4 rev Type 1124 -hr 10 -Yr Rainfall= 5.10" Prepared by McKim & Creed Printed 12/10/2014 HvdroCADO 10.00 s/n 04927 © 2011 HvdroCAD Software Solutions LLC Paae 14 Summary for Subcatchment 2S: Post - Development Runoff = 18.77 cfs @ 11.95 hrs, Volume= 0.883 af, Depth> 3.83" Runoff by SCS TR -20 method, UH =SCS, Time Span= 5.00 -20.00 hrs, dt= 0.05 hrs Type II 24 -hr 10 -Yr Rainfall = 5.10" Area (sf) CN Description 75,500 98 Paved parking, HSG D 45,070 80 >75% Grass cover, Good, HSG D 120,570 91 Weighted Average 45,070 37.38% Pervious Area 75,500 62.62% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft /ft) (ft /sec) (cfs) 5.0 Direct Entry, Subcatchment 2S: Post - Development Hydrograph 21 L 20 19 � 18 — 17 16 / 15 —+ 14 / — 12 11 0 10 .2 9 / / 21 18.77 cfs 4- j Tyje li -24-1ir - 1 0�Yr-ka nfal1— .10" Runoff Area = 120,!570 -0 - -I Runoff) Vollume= 0.1883 of F no D pffi ?Xzvv �fc =5�0 min �N --491 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) ■Runoff 6 Davis Drive Bioretention Pond #4-rev Type 1124 -hr 10 -Yr Rainfall = 5.10" Prepared by McKim & Creed Printed 12/10/2014 HydroCADO 10.00 s/n 04927 © 2011 HydroCAD Software Solutions LLC Page 15 Summary for Pond 3P: Bio Area #4 Inflow Area = 2.768 ac, 62.62% Impervious, Inflow Depth > 3.83" for 10 -Yr event Inflow = 18.77 cfs @ 11.95 hrs, Volume= 0.883 of Outflow = 3.34 cfs @ 12.13 hrs, Volume= 0.728 af, Atten= 82 %, Lag= 11.0 min Primary = 3.34 cfs @ 12.13 hrs, Volume= 0.728 of Routing by Stor -Ind method, Time Span= 5.00 -20.00 hrs, dt= 0.05 hrs Peak Elev= 310.01' @ 12.13 hrs Surf.Area= 8,397 sf Storage= 20,795 cf Plug -Flow detention time= 130.1 min calculated for 0.728 of (82% of inflow) Center -of -Mass det. time= 79.4 min ( 829.1 - 749.7 ) Volume Invert Avail.Storage Storage Description #1 307.00' 39,653 cf Custom Stage Data (Irregular)Listed below (Recalc) Elevation Surf.Area Perim. Inc.Store Cum.Store Wet.Area (feet) (sq -ft) (feet) (cubic -feet) (cubic -feet) (sq -ft) 307.00 5,510 291.0 0 0 5,510 308.00 6,412 310.0 5,955 5,955 6,467 309.00 7,372 329.0 6,886 12,842 7,485 310.00 8,387 348.0 7,874 20,716 8,563 311.00 9,460 367.0 8,918 29,634 9,701 312.00 10,588 387.0 10,019 39,653 10,959 Device Routing Invert Outlet Devices #1 Primary 302.37' 15.0" Round Culvert L= 100.0' RCP, square edge headwall, Ke= 0.500 Inlet/ Outlet Invert= 302.37'/ 299.50' S=0.0287'/' Cc= 0.900 n= 0.024, Flow Area= 1.23 sf #2 Device 1 308.00' 18.0" W x 4.0" H Vert. Orifice /Grate C= 0.600 #3 Device 1 310.00' 36.0" x 36.0" Horiz. Orifice /Grate C= 0.600 Limited to weir flow at low heads Primary OutFlow Max =3.29 cfs @ 12.13 hrs HW= 310.01' (Free Discharge) L1= Culvert (Passes 3.29 cfs of 9.75 cfs potential flow) �2=Orifice/G rate (Orifice Controls 3.27 cfs @ 6.53 fps) 3= Orifice /Grate (Weir Controls 0.03 cfs @ 0.29 fps) 6 Davis Drive Bioretention Pond #4 rev Type 1124 -hr 10 -Yr Rainfall= 5.10" Prepared by McKim & Creed Printed 12/10/2014 HvdroCADO 10.00 s/n 04927 © 2011 HvdroCAD Software Solutions LLC Paae 16 21 2C 1E 1E 17 1E 1E 14 12 w 12 11 c 1C LL i Pond 3P: Bio Area #4 Hydrograph L L 1 -1 —I 18.77 cfs `riflbwJ r6a -2.76" ak E - ev'= 340�61'- kk01 -Q I r7 �LV� �- E: L I a ::1 I 1 L 1 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) ■Inflow D Primary I L I -L ::I I I 3.34 cfs `riflbwJ r6a -2.76" ak E - ev'= 340�61'- kk01 -Q I r7 �LV� �- E: L I a ::1 I 1 L 1 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) ■Inflow D Primary 6 Davis Drive Bioretention Pond #4 rev Type 1124 -hr 100 -Yr Rainfall= 7.40" Prepared by McKim & Creed Printed 12/10/2014 HydroCADO 10.00 s/n 04927 © 2011 HydroCAD Software Solutions LLC Page 18 Summary for Subcatchment 1S: Existing Conditions Runoff = 30.46 cfs @ 11.97 hrs, Volume= 1.436 af, Depth> 4.62" Runoff by SCS TR -20 method, UH =SCS, Time Span= 5.00 -20.00 hrs, dt= 0.05 hrs Type II 24 -hr 100 -Yr Rainfall= 7.40" Area (sf) CN Description 162,558 79 Woods, Fair, HSG D 162,558 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft /ft) (ft /sec) (cfs) 6.4 413 0.0460 1.07 Shallow Concentrated Flow, Woodland Kv= 5.0 fps Subcatchment 1S: Existing Conditions Hydrograph 34 32 / 30 28 26 _ 24 L I 22-/// 20 w 318 / 0 16 FL 14 _ 4 12 / _ 10 8 � 6 30.46 cfs _ Type 1124 -hr 11 00�Yr-Rai nfaI I L7.40" _LRUnoff Ar6a=t1-62�55&sf TRunoff Volu -mp I.1436Taf R not Deplh�4. 2' — 71ow Length =4 ' -� 4 —I S1bpeL -0.6V6—/' "=179 -I 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) ■ Runoff 6 Davis Drive Bioretention Pond #4 rev Type 1124 -hr 100 -Yr Rainfall= 7.40" Prepared by McKim & Creed Printed 12/10/2014 HydroCADO 10.00 s/n 04927 © 2011 HydroCAD Software Solutions LLC Page 19 Summary for Subcatchment 2S: Post - Development Runoff = 28.31 cfs @ 11.95 hrs, Volume= 1.367 af, Depth> 5.93" Runoff by SCS TR -20 method, UH =SCS, Time Span= 5.00 -20.00 hrs, dt= 0.05 hrs Type II 24 -hr 100 -Yr Rainfall= 7.40" Area (sf) CN Description 75,500 98 Paved parking, HSG D 45,070 80 >75% Grass cover, Good, HSG D 120,570 91 Weighted Average 45,070 37.38% Pervious Area 75,500 62.62% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft /ft) (ft /sec) (cfs) 5.0 Direct Entry, Subcatchment 2S: Post - Development Hydrograph _ _ ■Runoff 30 28 28.31 cfs fi fi I� � I Ty l i 24 r Z -k- 4 - - 4- _10(�Yir- kai4all�=7.40" 24 22 TRifndff Ar6a= 1120 5701 sf 20 �I +Runoffl Vrc lump= 1.367 of - 16 ' I I -1 - I- R _tl not pth �M. —° 14 LL/ c=5.0 min 12 T - 6N=41 8 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) 6 Davis Drive Bioretention Pond #4-rev Type 1124 -hr 100 -Yr Rainfall= 7.40" Prepared by McKim & Creed Printed 12/10/2014 HydroCADO 10.00 s/n 04927 © 2011 HydroCAD Software Solutions LLC Page 20 Summary for Pond 3P: Bio Area #4 Inflow Area = 2.768 ac, 62.62% Impervious, Inflow Depth > 5.93" for 100 -Yr event Inflow = 28.31 cfs @ 11.95 hrs, Volume= 1.367 of Outflow = 10.13 cfs @ 12.05 hrs, Volume= 1.207 af, Atten= 64 %, Lag= 5.9 min Primary = 10.13 cfs @ 12.05 hrs, Volume= 1.207 of Routing by Stor -Ind method, Time Span= 5.00 -20.00 hrs, dt= 0.05 hrs Peak Elev= 310.75' @ 12.07 hrs Surf.Area= 9,191 sf Storage= 27,346 cf Plug -Flow detention time= 106.5 min calculated for 1.202 of (88% of inflow) Center -of -Mass det. time= 67.9 min ( 810.0 - 742.1 ) Volume Invert Avail.Storage Storage Description #1 307.00' 39,653 cf Custom Stage Data (Irregular)Listed below (Recalc) Elevation Surf.Area Perim. Inc.Store Cum.Store Wet.Area (feet) (sq -ft) (feet) (cubic -feet) (cubic -feet) (sq -ft) 307.00 5,510 291.0 0 0 5,510 308.00 6,412 310.0 5,955 5,955 6,467 309.00 7,372 329.0 6,886 12,842 7,485 310.00 8,387 348.0 7,874 20,716 8,563 311.00 9,460 367.0 8,918 29,634 9,701 312.00 10,588 387.0 10,019 39,653 10,959 Device Routing Invert Outlet Devices #1 Primary 302.37' 15.0" Round Culvert L= 100.0' RCP, square edge headwall, Ke= 0.500 Inlet/ Outlet Invert= 302.37'/ 299.50' S=0.0287'/' Cc= 0.900 n= 0.024, Flow Area= 1.23 sf #2 Device 1 308.00' 18.0" W x 4.0" H Vert. Orifice /Grate C= 0.600 #3 Device 1 310.00' 36.0" x 36.0" Horiz. Orifice /Grate C= 0.600 Limited to weir flow at low heads Primary OutFlow Max =10.13 cfs @ 12.05 hrs HW= 310.74' (Free Discharge) L1 = Culvert (Barrel Controls 10.13 cfs @ 8.25 fps) �2=Orifice/G rate (Passes < 3.86 cfs potential flow) 3= Orifice /Grate (Passes < 24.96 cfs potential flow) Bioretention Pond #4 rev Prepared by McKim & Creed HvdroCADO 10.00 s/n 04927 © 2011 30 28 26 + � 24 I —L A 22 20 T T w 18 — 3 16 �° 14 L 12 10 8 6 6 Davis Drive Type 1124 -hr 100 -Yr Rainfall= 7.40" Printed 12/10/2014 roCAD Software Solutions LLC Page 21 Pond 3P: Bio Area #4 Hydrograph ■Inflow 28.31 cfs 10 Primary 6fI",rA r"--�' .A"C- _ I�_ea C EITev_ =3_0J_5r_ - poi age =J7,4A - 6f- T T T 1 T T i— 10.13 cfs 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) SEASONAL HIGH WATER TABLE REPORT ECS Carolinas LLP 9001 Glenwood Avenue Raleigh, NC 27617 (919) 861 -9910 [Phone] LETTER OF TRANSMITTAL (919) 861 -9911 [Fax] NC Registered Engineering Firm # F -1078 October 21, 2014 O'Brien Atkins Associates PO Box 12037 Research Triangle Park, NC 27709 ATTN: Mr. Jay W. Smith, RLA, LEED AP We are enclosing: X Materials Engineering Division Reports X For your use X As requested ENCL: Field Report # 2 10/20/2014 V\ CjARC °�Q� FSS►c7 �17 SEAL Peter J. Domenico, P.E. o���i 2U�4 Branch NFtt'r V. I N?�G ,•4 1J- I1)()0�y��e� RE: Hamner Institute For Health Sciences -geo ECS Job # 06:22070 Permits: Location: 6 Davis Drive - Research Triangle Park Durham, NC I' Christina N. Warr, P.E. Project Engineer This report (and any included attachments) shall not be reproduced, except in full, without the prior written approval of ECS. 1000.1 ECS Carolinas, LLP 9001 Glenwood Avenue Raleigh, NC 27617 FIELD REPORT (919) 861 -9910 [Phone] 444 ° (919) 861 -9911 [Fax] Project No. 06:22070 Report No. 2 Project Hamner Institute For Health Sciences -geo Day & Date Monday 10/20/2014 Location Durham, NC Weather 600/ Sunny Client O'Brien Atkins Associates - Jay W. Smith, RLA, LEED On -Site Time 5.75 Lab Time 0.25 Travel Time* 0.00 Total 6.00 Re Obs.Time 0.00 Remarks Trip Charges* Tolls /Parking* Mileage* Time of Arrival Departure 08:45A 02:30P Chargeable Items * Travel time and mileage will be billed in accordance with the contract Summary of Services Performed (field test data, locations, elevations & depths are estimates) & Individuals Contacted. I The undersigned arrived on site to conduct a Seasonal High Water Table (SHWT) Study. The locations of the tests relative to the proposed stormwater ponds are shown on the attached sketch. ECS conducted an evaluation of the soils to identify the elevation of the seasonal high water table located on the property. The investigation included drilling two borings in pond site one and one boring in the other pond sites. The properties and characteristics of the soils retrieved from the borings were observed and recorded in field notes. The properties include texture, depth, the presence of restrictive horizons, depth to seasonal high water table, coarse fragments, etc. The assessment was conducted in accordance with current soil science practices and technology and the North Carolina Division of Water Quality Stormwater Best Management Manual (BMP), dated July 2007. The site was evaluated and report was prepared by Scott Sanders- N.C. Soil Science License # 1209. Site IA Pond 1: 0 to 24 inches dark red weathered rock that crushes to silt loam. 24 to 48 inches pinkish red weathered rock that crushes to silt loam 4 to 6 feet dark red weathered rock that crushes to silt loam Drilling stopped at 72 inches because drill could not penetrate material. No seasonal high water table within the top 72 inches from existing grade. Site 1 B Pond 1: By Scott P. Sanders, — Field Technician 1700 1035555 ECS Carolinas, LLP 9001 Glenwood Avenue Raleigh, NC 27617 (919) 861 -9910 [Phone] (919) 861 -9911 [Fax] Project Hamner Institute For Health Sciences -geo FIELD REPORT Project No. 06:22070 Report No. 2 Day & Date Monday 10/20/2014 The surface layer to a depth of 44 inches is dark red clay and structureless. The subsurface layer from 44 to 48 inches is dark red weathered rock that crushes to fine sandy loam. The subsurface layer from 44 to 74 inches is dark red clay and structureless. The subsurface layer from 74 to 90 inches is dark red weathered rock that crushes to silt loam. The subsurface layer from 90 to 120 inches is dark red clay and structureless. This site was fill material and there is no seasonal high water table within the top 120 inches from existing grade. Site 2 Pond 4: The surface layer to depth of 20 inches is dark red clay and structureless. The subsurface layer from 20 to 28 inches is brown and gray clay and structureless. The subsurface layer from 28 to 40 inches dark red clay silty clay and structureless. The subsurface layer from 40 to 48 inches is pinkish gray weathered rock that crushes to very fine sandy loam. The subsurface layer from 48 to 72 inches pinkish brown weathered rock that crushes to fine sandy loam. The subsurface layer from 72 to 96 inches is dark red weathered rock that crushes to fine sandy loam. There is no seasonal high water table within the top 96 of existing grade. Site 3 Pond 3A: The surface layer to a depth of 20 inches is orange clay. The structure is moderate medium subangular blocky with very sticky and very plastic consistence.The subsurface layer from 20 to 36 inches is orange clay and structureless. The subsurface layer from 36 to 50 inches dark red clay and structureless. The subsurface layer from 50 to 60 inches is dark red weathered rock that crushes to silt loam. The subsurface layer from 60 to 66 inches is dark brownish red weathered rock that crushes to silt loam. There is no seasonal high water table within the top 66 inches of existing grade. This site is natural soil with the original surface removed. Site 4 Pond : The surface layer to a depth of 15 inches is brown clay and structureless. The subsurface layer from 15 to 24 inches is dark red weathered rock that crushes to silt loam. The subsurface layer from 24 to 45 inches is red silty clay and structureless. The subsurface layer from 45 to 48 inches is dark weathered rock that crushes to silt loam. The subsurface layer from 48 to 90 inches is dark red clay with gray mottles and structureless. The subsurface layer from 90 to 94 inches is gray and red clay and stuctureless. The gray colors are caused by a root channel. The subsurface layer from94 to 100 inches is red silty clay and with gray mottles and structureless. By Scott P. Sanders, — Field Technician Page 2 1700 1035555 A� ECS Carolinas, LLP 9001 Glenwood Avenue o Raleigh, NC 27617 " (919) 861 -9910 [Phone] - (919)861 -9911 [Fax] Project Hamner Institute For Health Sciences -geo FIELD REPORT Project No. 06:22070 Report No. 2 Day & Date Monday 10/20/2014 The subsurface layer from 100 to 110 inches is dark red weathered rock that crushes to silt loam. The subsurface layer from 110 to 115 inches is gray weathered rock that crushes to fine sandy loam. The subsurface layer from 115 to 120 inches is dark red weathered rock that crushes to silt loam. This site is fill material and no seasonal high water table is within the top 120 inches from existing grade. By Scott P. Sanders, — Field Technician 1700 Page 3 1035555 �eOf A i / L� � io /1c /i4 Cr �-2c�G sflc C/ Wr, s rr[ EROSION CONTROL OUTLET PROTECTION CALCULATIONS DATE: 8/29/14 DESIGNED BY: CMB ME: Hamner Institute 7PROJECT PROJECT NO: CHECKED BY CATION: Durham, NC 01517 -0236 GML -1 A Structure= FES -1A Q10 /Qfull = 0.24 Size= 24 in V /Vfull = 0.807 Q25 = 9.57 cfs V = 10.4 fps Qfull = 40.66 cfs Vfull = 12.94 fps From Fig. 8.06.b.1: Zone = 2 From Fig. 8.06.b.2: D50 = 8 in DMAX = 12 in Riprap Class = B Apron Thickness = 22 in 3 Apron Length = 12.0 ft Length Apron Width = 3 x Dia = 6.0 ft FES -1 B Structure= FES -1B Q10 /Qfull = 0.38 Size= 24 in V /Vfull = 0.929 Q25 = 12.33 cfs V = 9.6 fps Qfull = 32.62 cfs Vfull = 10.38 fps From Fig. 8.06.b.1: Zone = 2 From Fig. 8.06.b.2: D50 = 8 in DMAX = 12 in Riprap Class = B s Apron Thickness = 22 in 3 Apron Length = 12.0 ft Length Apron Width = 3 x Dia = 6.0 ft - • • DATE: 8/29/14 DE SIGNED BY: 7ROJECT CMB ME: Hamner Institute PROJECT NO: CHECKED BY CATION: Durham, NC 101517-0236 GML FES -1 C Structure= FES -1C Quo / Qfull = 0.57 Size= 18 in V /Vfull = 1.024 Q25 = 16.95 cfs V = 17.3 fps Qfull = 29.91 cfs Vfull = 16.93 fps From Fig. 8.06.b.1: Zone = 3 From Fig. 8.06.b.2: D50 = 10 in DMAx = 15 in Riprap Class = 1 Apron Thickness = 24 in 3 Apron Length = 12.0 ft Length Apron Width = 3 x Dia = 5.0 ft FES -2 Structure= FES -2 Q10 /Qfull = 0.97 Size= 24 in V /Vfull = 1.139 Q25 = 18.37 cfs V = 6.9 fps Qfull = 18.93 cfs Vfull = 6.03 fps From Fig. 8.06.b.1: Zone = 2 From Fig. 8.06.b.2: D50 = 8 in DMAx = 12 in Riprap Class = B s Apron Thickness = 22 in 3 Apron Length = 12.0 ft Length Apron Width = 3 x Dia = 6.0 ft DATE: 8/29/14 DESIGN ED BY: CMB ME: Hamner Institute 7RO=JECT PROJECT NO: CHECKED BY CATION:Durham, NC 01517 -0236 GML FES -3A Structure= FES -3A Q10 /Qfull = 0.83 Size= 15 in V /Vfull = 1.117 Q25 = 3.85 cfs V = 4.2 fps Qfull = 4.66 cfs Vfull = 3.80 fps From Fig. 8.06.b.1: Zone = 1 From Fig. 8.06.b.2: D50 = 4 in DMAX = 6 in Riprap Class = A s Apron Thickness = 12 in Apron Length = 5.0 ft Length Apron Width = 3 x Dia = 4.0 ft FES -3B Structure= FES -313 Q10 /Qfull = 0.40 Size= 15 in V /Vfull = 0.944 Q25 = 2.38 cfs V = 4.6 fps Qfull = 5.96 cfs Vfull = 4.86 fps From Fig. 8.06.b.1: Zone = 1 From Fig. 8.06.b.2: D50 = 4 in DMAX = 6 in Riprap Class = A Apron Thickness = 12 in 3 Apron Length = 5.0 ft Length Apron Width = 3 x Dia = 4.0 ft FLUME - 3D Structure= Size= Q25 = Qfull = Vfull = From Fig. 8.06.b.1: From Fig. 8.06.b.2: FLUME -3D 15 in 2.42 cfs 28.89 cfs 23.55 fps Quo / Qfull = 0.08 V /Vfull = 0.588 V = 13.8 fps Zone = 2 D5o = 4 in DMAx DATE: 8/29/14 Riprap Class DESIGNED BY: Apron Thickness = 22 in Apron Length = 7.5 ft Apron Width = 3 x Dia = 4.0 ft 7PPOJECT NAME: Hamner Institute PROJECT NO: CHECKED BY JECT LOCATION: Durham, NC 101517-0236 GML FLUME - 3C Structure= FLUME -3C Quo /Qfull = 0.08 Size= 15 in V /Vfull = 0.588 Q25 = 2.90 cfs V = 17.8 fps Qfull = 37.11 cfs Vfull = 30.24 fps From Fig. 8.06.b.1: Zone = 2 From Fig. 8.06.b.2: D50 = 8 in DMAx = 12 in Riprap Class = B Apron Thickness = 22 in 3 Apron Length = 7.5 ft Length Apron Width = 3 x Dia = 4.0 ft FLUME - 3D Structure= Size= Q25 = Qfull = Vfull = From Fig. 8.06.b.1: From Fig. 8.06.b.2: FLUME -3D 15 in 2.42 cfs 28.89 cfs 23.55 fps Quo / Qfull = 0.08 V /Vfull = 0.588 V = 13.8 fps Zone = 2 D5o = 4 in DMAx = 6 in Riprap Class = A Apron Thickness = 22 in Apron Length = 7.5 ft Apron Width = 3 x Dia = 4.0 ft - • • DATE: 8/29/14 DE SIGNED BY: 7ROJECT CMB ME: Hamner Institute PROJECT NO: CHECKED BY CATION: Durham, NC 101517-0236 GML FLUME - 3E Structure= FLUME -3E Quo /Qfull = 0.04 Size= 15 in V /Vfull = 0.423 Q25 = 1.06 cfs V = 10.0 fps Qfull = 28.89 cfs Vfull = 23.55 fps From Fig. 8.06.b.1: Zone = 1 From Fig. 8.06.b.2: D50 = 4 in DMAx = 6 in Riprap Class = A Apron Thickness = 12 in 3 Apron Length = 5.0 ft Length Apron Width = 3 x Dia = 4.0 ft FES -4A Structure= FES -4A Q10 /Qfull = 0.24 Size= 18 in V /Vfull = 0.807 Q25 = 5.65 cfs V = 10.6 fps Qfull = 23.11 cfs Vfull = 13.08 fps From Fig. 8.06.b.1: Zone = 2 From Fig. 8.06.b.2: D50 = 8 in DMAx = 12 in Riprap Class = B s Apron Thickness = 22 in 3 Apron Length = 9.0 ft Length Apron Width = 3 x Dia = 5.0 ft - • • DATE: 8/29/14 DE SIGNED BY: 7ROJECT CMB ME: Hamner Institute PROJECT NO: CHECKED BY CATION: Durham, NC 101517-0236 GML FES -4B Structure= FES -413 Quo /Qfull = 0.84 Size= 15 in V /Vfull = 1.117 Q25 = 9.21 cfs V = 10.0 fps Qfull = 10.94 cfs Vfull = 8.92 fps From Fig. 8.06.b.1: Zone = 2 From Fig. 8.06.b.2: D50 = 8 in DMAx = 12 in Riprap Class = B Apron Thickness = 22 in 3 Apron Length = 7.5 ft Length Apron Width = 3 x Dia = 4.0 ft FES -3A1 Structure= FES -3A1 Q10 /Qfull = 0.37 Size= 15 in V /Vfull = 0.912 Q25 = 3.73 cfs V = 7.6 fps Qfull = 10.21 cfs Vfull = 8.32 fps From Fig. 8.06.b.1: Zone = 2 From Fig. 8.06.b.2: D50 = 8 in DMAx = 12 in Riprap Class = B s Apron Thickness = 22 in 3 IM Apron Length = 7.5 ft Length Apron Width = 3 x Dia = 4.0 ft DATE: 8/29/14 DESIGN ED BY: CMB ME: Hamner Institute 7RO=JECT PROJECT NO: CHECKED BY CATION:Durham, NC 01517 -0236 GML FES -3A2 Structure= FES -3A2 Q10 /Qfull = 0.23 Size= 24 in V /Vfull = 0.807 Q25 = 5.83 cfs V = 6.4 fps Qfull = 24.99 cfs Vfull = 7.95 fps From Fig. 8.06.b.1: Zone = 2 From Fig. 8.06.b.2: D50 = 8 in DMAX = 12 in Riprap Class = B s Apron Thickness = 22 in Apron Length = 12.0 ft Length Apron Width = 3 x Dia = 6.0 ft FES -3F Structure= FES -3F Q10 /Qfull = 0.61 Size= 30 in V /Vfull = 1.045 Q25 = 18.00 cfs V = 6.2 fps Qfull = 29.29 cfs Vfull = 5.97 fps From Fig. 8.06.b.1: Zone = 2 From Fig. 8.06.b.2: D50 = 8 in DMAX = 12 in Riprap Class = B Apron Thickness = 22 in 3 Apron Length = 15.0 ft Length Apron Width = 3 x Dia = 8.0 ft PERMANENT GRASSED SWALE CALCULATIONS Permanent Grassed Swale GS -1 Project Description Friction Method Manning Formula Solve For Normal Depth Input Data Roughness Coefficient 0.030 ft Channel Slope 0.02222 ft/ft Left Side Slope 10.00 ft/ft (H:V) Right Side Slope 10.00 ft/ft (H:V) Bottom Width 2.00 ft Discharge 2.22 ft3 /s Results Normal Depth 0.24 ft Flow Area 1.05 ftz Wetted Perimeter 6.80 ft Hydraulic Radius 0.15 ft Top Width 6.77 ft Critical Depth 0.23 ft Critical Slope 0.02473 ft/ft Velocity 2.12 ft/s Velocity Head 0.07 ft Specific Energy 0.31 ft Froude Number 0.95 Flow Type Subcritical GVF Input Data Downstream Depth 0.00 ft Length 0.00 ft Number Of Steps 0 GVF Output Data Upstream Depth 0.00 ft Profile Description Profile Headloss 0.00 ft Downstream Velocity Infinity ft/s Upstream Velocity Infinity ft/s Normal Depth 0.24 ft Critical Depth 0.23 ft Channel Slope 0.02222 ft/ft Bentley Systems, Inc. Haestad Methods Sdiiakibi ohteMaster V81 (SELECTseries 1) [08.11.01.03] 914/2014 5:30:02 PM 27 Siemons Company Drive Suite 200 W Watertown, CT 06795 USA +1- 203 - 755 -1666 Page 1 of 2 Permanent Grassed Swale GS -2 Project Description Friction Method Manning Formula Solve For Normal Depth Input Data Roughness Coefficient 0.030 ft Channel Slope 0.02050 ft/ft Left Side Slope 6.00 ft/ft (H:V) Right Side Slope 10.00 ft/ft (H:V) Bottom Width 2.00 ft Discharge 0.95 ft3 /s Results Normal Depth 0.17 ft Flow Area 0.56 ftz Wetted Perimeter 4.69 ft Hydraulic Radius 0.12 ft Top Width 4.67 ft Critical Depth 0.15 ft Critical Slope 0.02737 ft/ft Velocity 1.71 ft/s Velocity Head 0.05 ft Specific Energy 0.21 ft Froude Number 0.87 Flow Type Subcritical GVF Input Data Downstream Depth 0.00 ft Length 0.00 ft Number Of Steps 0 GVF Output Data Upstream Depth 0.00 ft Profile Description Profile Headloss 0.00 ft Downstream Velocity Infinity ft/s Upstream Velocity Infinity ft/s Normal Depth 0.17 ft Critical Depth 0.15 ft Channel Slope 0.02050 ft/ft Bentley Systems, Inc. Haestad Methods Sdiiakibi ohteMaster V81 (SELECTseries 1) [08.11.01.03] 914/2014 5:31:04 PM 27 Siemons Company Drive Suite 200 W Watertown, CT 06795 USA +1- 203 - 755 -1666 Page 1 of 2 Permanent Grassed Swale GS -3 Project Description Friction Method Manning Formula Solve For Normal Depth Input Data Roughness Coefficient 0.030 ft Channel Slope 0.03450 ft/ft Left Side Slope 8.00 ft/ft (H:V) Right Side Slope 8.00 ft/ft (H:V) Bottom Width 2.00 ft Discharge 0.08 ft3 /s Results Normal Depth 0.04 ft Flow Area 0.09 ftz Wetted Perimeter 2.60 ft Hydraulic Radius 0.03 ft Top Width 2.59 ft Critical Depth 0.04 ft Critical Slope 0.04170 ft/ft Velocity 0.94 ft/s Velocity Head 0.01 ft Specific Energy 0.05 ft Froude Number 0.92 Flow Type Subcritical GVF Input Data Downstream Depth 0.00 ft Length 0.00 ft Number Of Steps 0 GVF Output Data Upstream Depth 0.00 ft Profile Description Profile Headloss 0.00 ft Downstream Velocity Infinity ft/s Upstream Velocity Infinity ft/s Normal Depth 0.04 ft Critical Depth 0.04 ft Channel Slope 0.03450 ft/ft Bentley Systems, Inc. Haestad Methods Sdiiakibi ohteMaster V81 (SELECTseries 1) [08.11.01.03] 914/2014 5:32:10 PM 27 Siemons Company Drive Suite 200 W Watertown, CT 06795 USA +1- 203 - 755 -1666 Page 1 of 2 Permanent Grassed Swale GS -4 Project Description Friction Method Manning Formula Solve For Normal Depth Input Data Roughness Coefficient 0.030 ft Channel Slope 0.02300 ft/ft Left Side Slope 6.00 ft/ft (H:V) Right Side Slope 10.00 ft/ft (H:V) Bottom Width 2.00 ft Discharge 0.96 ft3 /s Results Normal Depth 0.16 ft Flow Area 0.54 ftz Wetted Perimeter 4.62 ft Hydraulic Radius 0.12 ft Top Width 4.60 ft Critical Depth 0.16 ft Critical Slope 0.02733 ft/ft Velocity 1.79 ft/s Velocity Head 0.05 ft Specific Energy 0.21 ft Froude Number 0.92 Flow Type Subcritical GVF Input Data Downstream Depth 0.00 ft Length 0.00 ft Number Of Steps 0 GVF Output Data Upstream Depth 0.00 ft Profile Description Profile Headloss 0.00 ft Downstream Velocity Infinity ft/s Upstream Velocity Infinity ft/s Normal Depth 0.16 ft Critical Depth 0.16 ft Channel Slope 0.02300 ft/ft Bentley Systems, Inc. Haestad Methods Sdiiakibi ohteMaster V81 (SELECTseries 1) [08.11.01.03] 914/2014 5:35:30 PM 27 Siemons Company Drive Suite 200 W Watertown, CT 06795 USA +1- 203 - 755 -1666 Page 1 of 2 HGL PROFILES STORMWATER CONVEYANCE a 311 311 311 311 3 31! 31! 31! 31! 3 31, 31, 31, 31, 3 31: 31; 31; 31; 3 C 31: r 31: 31: W 31; 3 31] 31] 31] 31] 3 31C 31C 31C 31C 3 305 305 305 305 3 30E 30E 30E 30E Label: CI -1 Type: Catch Basin Label: CI -3 ID: 15 CI -1 to FES -4A - 10 -Year Storm Type: Catch Basin ID: 1,7 � I 8 hr� 1—T - q - - .2 L6 .8 - - -- - 6 .4 2 - - I - 1 _ if Tv r s hel. ID: 1 1 - ° — - _ - - - Label j Type: Cn C .8 .6 L8= .z L3 j -- I g . _ _ _., _ — — —� —_ I: CO -2 M I rt Type: n onduit .2 L2 - — — .8 .6 — I -- ° ¢ --- — — — — .s- .4 —�— — — r �,.. _ �, ,,tip a.j}/� n' A — _.. be$ - .6 - Imo _ _ .6 — — — — 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 125 130 135 140 145 Station (ft) HGL Line EGL 316.8 316.7 316.6 316.5 316.4 316.3 316.2 316.1 316 315.9 315.8 315.7 315.6 315.5 315.4 315.3 315.2 315.1 O 315 314.9 d �y 314.8 314.7 314.6 314.5 314.4 314.3 314.2 314.1 314 313.9 313.8 313.7 313.6 313.5 313.4 313.3 313.2 -2 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 Station (ft) HGL Line EGL C I -2 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 Station (ft) HGL Line EGL 319.8 319.6 319.4 319.2 319 318.8 318.6 318.4 318,2 318 317.8 317.6 317.4 317.2 317 316.8 316.6 316.4 316.2 316 315.8 315.6 315.4 C 315.2 ++ 315 N 314.8 Ey 314.6 314.4 314.2 314 313.8 313.6 313.4 313.2 313 312.8 312.6 312.4 312.2 312 311.8 311.6 311.4 311.2 311 310.8 310.6 310.4 Label: DI -6 Type: Catch Basin ID: 29 DI -6 to FES -3A - 10 -Year Storm 0 20 40 60 80 100 120 140 160 180 200 220 240 260 280 300 Station (ft) :tfall -3A HGL Line EG L Label: DI -9 pe: Catch Basin - -- Type: Catch Baild ID: 30 oe: Catch Basin ID. 51 _ { - - - - -- - -, - Label: iype: O -7 nd`. ._ I-LJ7 v r Label: CO -76 Type: Conduit I - --- ji, - - •-- - _ r� r .__ n. ID h4 - p - - - 1 - -I ID, ay? Ekbe9rCO y �..Ct[rfduult ID: 37 _ - rn. 36 r ° --- - _..__ j ��... -6 _�� .. �.�.. -- - - i -.� Lab l -�� - - -- TYbbl-.- t Labe -Labs -C,0-1& ID: 52 -- 0 20 40 60 80 100 120 140 160 180 200 220 240 260 280 300 Station (ft) :tfall -3A HGL Line EG L Label: DI -13 Type: Catch Basin ID: 44 319.6 319.4 319.2 319 318.8 318.6 318.4 318.2 318 317.8 317.6 317.4 317.2 317 316.8 316.6 316.4 316.2 316 315.8 315.6 315.4 C 315.2 315 .2 314.8 314.6 W 314.4 314.2 314 313.8 313.6 313.4 313.2 313 312.8 312.6 312.4 312.2 312 311.8 311.6 311.4 311.2 311 310.8 310.6 310.4 DI -13 to FES -3A - 10 -Year Storm 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 190 200 210 220 230 240 Station (ft) FES -3A Outfall 40 HGL Line FGL I TypeI Catch - - -•1 l - 4 Bas rp -- A- - - - -t C - - --•-•- - -. Tv - -- cin ,. ..._ �TV fil 778 -- . L .bet MI}f � fRh R ID: 43 ._•_ .-Labs T e�_8uit yP10 1.4- $5 �- _ bel L10. Type. �_____.!. - ..-.._ � -f=ond i4 -- - - - - -- 7 - IC -YAtZe e l Cy On} l ui t � - --- �`""_• - -- - -t 9 tabs!_ Tx D - -- 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 190 200 210 220 230 240 Station (ft) FES -3A Outfall 40 HGL Line FGL 315.8 315.7 315.6 315.5 315,4 315.3 315.2 315.1 315 314.9 314.8 314.7 314.6 314.5 314.4 314.3 314.2 314.1 O 314 313.9 W 313.8 313.7 313.6 313.5 313.4 313.3 313.2 313.1 313 312.9 312.8 312,7 312.6 312.5 312.4 312.3 312.2 312.1 DI -14 to DI -15 - 10 -Year Storm Label: DI -14 Label: DI -15 Type: Catch Basin ID: 224 Type: Catch Basin a �Q _- I.Abe) -M-7.7 Type Cd)nduit ? I I _ _1 i -•- _ - -- ! {] 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 Station (ft) HGL Line EGL 313.6 313.5 313.4 313.3 313.2 313.1 313 312.9 312.8 312.7 312.6 312.5 312.4 312.3 312.2 C 312.1 O ,0 312 a► 311.9 W 311.8 311.7 311.6 311.5 311.4 311.3 311.2 311.1 311 310.9 310.8 310.7 310.6 310.5 Label: DI -16 Type: Catch Basin ID: 56 DI -16 to FES -3B - 10 -Year Storm -1 0 t 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 Station (ft) HGL Line EGL S -1 0 t 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 Station (ft) HGL Line EGL Label: CI -26 Type: Catch Basin ID: 98 323 322.5 322 321.5 321 320.5 320 319.5 319 318.5 318 317.5 317 316.5 316 C 315.5 O '0 315 a 41 314.5 W 314 313.5 313 312.5 312 311.5 311 310.5 310 309.5 309 308.5 308 307.5 CI -26 to HW -1B - 10 -Year Storm w w vu ou wu icu 14u lbu lbu tuu ttu L4u [bu Mu 3uu 3YU 340 360 380 400 420 440 460 480 500 520 540 560 580 Station (ft) _ I 7 ' Typ Catch asin 1 1 i i EGL Line Label: CI-27 T Basra Type Catch B Basing °- — ° Ty e 1'.- Basin Type: o onduit a r„- — C - 8 8 � 1 \ _ Typ ; -- r r�.... T LatieE; C -_�,�_ I - - . — T p Label: C - -32 -> abe' C Cr 33-- 11 Type. C d - 1T1 S Si3"" -- I III- — C Esbef C CO -43 ape : . 4 L : CO -44 . r L vu ou wu icu 14u lbu lbu tuu ttu L4u [bu Mu 3uu 3YU 340 360 380 400 420 440 460 480 500 520 540 560 580 Station (ft) 321.3 32 .2 321.1 321 320.9 320.8 320.7 320.6 320.5 320.4 320.3 320.2 320.1 320 319.9 319.8 319.7 319.6 319.5 319.4 319.3 319.2 C 319.1 319 318.9 W 318.8 318.7 318.6 318.5 318.4 318.3 318.2 318.1 318 317.9 317.8 317.7 317.6 317.5 317.4 317.3 317.2 317.1 317 316.9 316.8 316.7 DI -27A to CI -27 - 10 -Year Storm Label; CI -27 Type: Catch Basin ID* 93 -1 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Station (ft) HGL Line E MINIM ME MINIM MINIM OEM MININI I Al -1 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Station (ft) HGL Line E 321.6 321.4 321.2 321 320.8 320.6 320.4 320.2 320 319.8 319.6 319.4 319.2 319 318.8 318.6 C 'a0-+ 318.4 318.2 W 318 317.8 317.6 317.4 317.2 317 316.8 316.6 316.4 316.2 316 315.8 315.6 315.4 315.2 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 Station (ft) sin — HGL Line FGI_ DI -37A to CI -28 — - 10 -Year Storm Label: CI Type: Catch ID: 100 -28 Ba k Label: CI -37 Tyoe: Catch Bac,ni ID: 88 - 3 I Typ Catch Basin - ILI: 86- 1- _.— ..._�- I! L- �._- _- ..��... Label CO -35 Tyx�- rn_nrliifr ID: 89 . p _ (Label: CO -36 ID: 91 f. 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 Station (ft) sin — HGL Line FGI_ 321.4 321.2 321 320.8 320.6 320.4 320.2 320 319.8 319.6 319.4 319.2 319 318.8 c +p+ 318.6 m y 318.4 W 318.2 318 317.8 317.6 317.4 317.2 317 316.8 316.6 316.4 316.2 316 315.8 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 125 130 135 140 145 150 155 Station (ft) HGL Line EGL 318 317.8 317.6 317.4 317.2 317 316.8 316.6 316.4 316.2 316 315.8 315.6 315.4 315.2 315 C 314.8 O 314.6 W 314.4 314.2 314 313.8 313.6 313.4 313.2 313 312.8 312.6 312.4 312.2 312 311.8 311.6 311.4 CI -36 to CI -30 - 10 -Year Storm Label: CI -30 Type: Catch Basin 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 Station (ft) — HGL Line — EGL bef: CI 35 f LaIJ 11 C1 35 Type: Catch Basin Tl ID: 115 I n - - A. - f Type: C nduit 1 .4d -rr mil Type: Conduit �� ava- [I _ - .._ ---- - - 4 .- ...__ I 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 Station (ft) — HGL Line — EGL 317.6 317.4 317.2 317 316.8 316.6 316.4 316.2 316 315.8 315.6 315.4 315.2 315 c O 314.8 y 314.6 W 314.4 314.2 314 313.8 313.6 313.4 313.2 313 312.8 312.6 312.4 312.2 312 CI -34 to CI -35 - 10 -Year Storm Label: CI -35 Type: Catch Basin ID: 103 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 Station (ft) HGL Line EGL - Catch Basin i -4wQ2— _ -- —• - -- _ _— - °-L Type ---- Label: 1): CO-41 104- �I 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 Station (ft) HGL Line EGL 317. 317. 317. 317. 31 316. 316. 316. 316. 31 315. 315. 315. 315. 31 314. 314. 314. 314. 31 313. 313. 313. 313. 31 C 312. Q 312. A 312. y 312. W 31 311. 311. 311. 311. 31' 310. 310. 310. 310. 31 309. 309. 309. 309. 30 308. 308. 308. 308. 30 307. 307. 307. 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 Station (ft) HGL Line EGL e . m SWISS-- i _ _ 1r'_ ZONES.: MINES.- _ 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 Station (ft) HGL Line EGL 316.8 316.6 316.4 316.2 316 315.8 315.6 315.4 315.2 315 314.8 314.6 314.4 314.2 314 313.8 313.6 313.4 313.2 313 312.8 312.6 > 312.4 Ej 312.2 312 311.8 311.6 311.4 311.2 311 310.8 310.6 310.4 310.2 310 309.8 309.6 309.4 309.2 309 308.8 308.6 308.4 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 41 Station (ft) HGL Line EGL mom Now=- unman - i woman 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 41 Station (ft) HGL Line EGL 316 315.8 315.6 315.4 315.2 315 314.8 314.6 314.4 314.2 314 313.8 313.6 313.4 313.2 313 312.8 312.6 312.4 ^, 312.2 312 C 311.8 311.6 W 311.4 311.2 311 310.8 310.6 310.4 310.2 310 309.8 309.6 309.4 309.2 309 308.8 308.6 308.4 308.2 308 307.8 307.6 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 190 200 210 220 230 240 250 260 270 Station (ft) HGL Line EGL 312.2 312.1 312 311.9 311.8 311.7 311.6 311.5 311.4 311.3 311.2 311.1 311 310.9 310.8 310.7 310.6 310.5 310.4 C 310.3 O 310.2 310.1 W 310 309.9 309.8 309.7 309.6 309.5 309.4 309.3 309.2 309.1 309 308.9 308.8 308.7 308.6 308.5 308.4 308.3 308.2 308.1 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 Station (ft) HGL Line EGL Label: Type: Catch ID: CI -18 Basin 69 CI -18 to CI -19 - 10 -Year Storm Label: CI -19 ID 63 3-L. - ' Label: CO -26 � i - •-- •_- - -� 6 R II °� 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 Station (ft) HGL Line EGL 314.2 314 313.8 313.6 313.4 313.2 313 312.8 312.6 312.4 312.2 312 311.8 311.6 311.4 311.2 C 311 > 310.8 d w 310.6 310.4 310.2 310 309.8 309.6 309.4 309.2 309 308.8 308.6 308.4 308.2 308 307.8 307.6 CI -21 to FS -1 - 10 -Year Storm Label: FS -1 Type: Manhole ID: 210 1 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 Station (ft) HGL Line EGL I i r I _ I - _ I I —T- - s - duik - Labe Type: C �i6 kch Basin `71 - — -- TXPe Co - _ —� 1 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 Station (ft) HGL Line EGL Label: CI -4 Type: Catch Basin ID: 22 317.3 317.2 317.1 317 316.9 316.8 316.7 316.6 316.5 316.4 316.3 316.2 316.1 316 315.9 315.8 315.7 315.6 315.5 315.4 C 315.3 O 315.2 M 315.1 N 315 W 314.9 314.8 314.7 314.6 314.5 314.4 314.3 314.2- 314.1 314 313.9 313.8 313.7 313.6 313.5- 313.4- 313.3 313.2 313.1 - 313 CI -4 to FES -3A1 - 10 -Year Storm 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 Station (ft) FES -3A1 z: Outfall D : 26 HGL Line FGL ■ I 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 Station (ft) FES -3A1 z: Outfall D : 26 HGL Line FGL 3 316 316 316 316 3: 315 315 315 315 3: 314 314 314 314 3: 313 313 313 313 3] C 312 312 312 312 W 31 311. 311, 311, 311 31 310. 310. 310. 310. 31 309. 309. 309. 309. 3C 308. 308. 308. 308. 0 Ll 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 125 130 135 140 145 Station (ft) HGL Line EGL 317.: 317. 317.1 317 316.5 316.E 316.7 316.E 316.5 316.4 316.3 316.2 316.1 316 315.9 315.8 315.7 315.6 315.5 315.4 315.3 0 315.2 315.1 47 315 W 314.9 314.8 314.7 314.6 314.5 314.4 314.3 314.2 314.1 314 313.9 313.8 313.7 313.6 313.5 313.4 313.3 313.2 313.1 313 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 Station (ft) 3111 71 HGL Line EGL Type: Label: Catch I0: CI -4 Basin 22 CI -4 to FES -3A1 - 25 -Year Storm F"-r-- Ty-p-. - C - age � Eas:7f LL -r -Ty 1 IFE Ccl -4 24 1. _.- __ - .._- _ . - _- - -_._ Tvpe: Conduit 1. lU: - _ -__ -- • - -- I. Label: F 5 m Type: :n _- _.�-- -- --f -i•°� d .� ��6__;__TV,� 9 _- - _- ,�..�__. -...- ,___�..__ ' - 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 Station (ft) 3111 71 HGL Line EGL Label: CI -4A Type: Catch Basin ID: 25 316.8 316.7 316.6 316.5 316.4 316.3 316.2 316.1 316 315.9 315.8 315.7 315.6 315.5 315.4 315.3 .� 315.2 315.1 O 315 314.9 w 314.8 314.7 314.6 314.5 314.4 314.3 314.2 314.1 314 313.9 - 313.8 313.7- 313.6 313.5 313.4 313.3 313.2 CI -4A to CI -5 - 25 -Year Storm -2 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 Station (ft) HGL Line EGL I _ p -I- Type: Catch Basin Label: CO -5 1 - ID: 27____ t _ 77= _.__ _s.__ _ t - - -2 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 Station (ft) HGL Line EGL 319.8 319.6 319.4 319.2 319 318.8 318.6 318.4 318.2 318 317.8 317.6 317.4 317.2 317 316.8 316.6 316.4 316.2 316 315.8 315.6 315.4 0 315.2 .P 315 M 314.8 y� 314.6 314.4 314.2 314 313.8 313.6 313.4 313.2 313 312.8 312.6 312.4 312.2 312 311.8 311.6 311.4 311.2 311 310.8 310.6 310.4 Label: DI.6 Type: Catch Basin ID: 29 DI -6 to FES -3A - 25 -Year Storm !k- - - - Catch Ba in • e: Catch Basin Lt�f'ype: Label: DI -9 - ype: Catch Basin I I - - � - - ri �.� I L&btd-.- CG-7& Type. r�nfi,ik ID 228 Cun�4uit I FES 3R Outfall 40 Type: C o dull - - �- - Label: CI-11 ype• atch Base tD^- -- - -- \VE CO-13 C� Lt�be4` Type: ondi ,k' T., 1U 41 ID l� �. �_ e - j 0 20 40 60 S0 100 120 140 160 180 200 220 240 260 280 300 Station (ft) -�IEGL 313.6 313.5 313.4 313.3 313.2 313.1 313 312.9 312.8 312.7 312.6 312.5 312.4 312.3 312.2 C 312.1 O 312 311.9 W 311.8 311.7 311.6 311.5 311.4 311.3 311.2 311.1 311 310.9 310.8 310.7 310.6 310.5 Label: DI -16 Type: Catch Basin ID: 56 DI -16 to FES -3B - 25 -Year Storm -1 0 1 2 3 4 S 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 Station (ft) HGL Line E L 1 Q ■ -1 0 1 2 3 4 S 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 Station (ft) HGL Line E L Label: DI -13 Type: Catch Basin ID: 44 319.6 319.4 319.2 319 318.8 318.6 318.4 318.2 - 318 317.8 317.6 317.4 317.2 317 316.8 316.6 316.4 - 316.2 316 315.8 - 315.6 - 315.4 C 315.2 315 314.8 41 314.6 W 314.4 314.2 314 313.8 313.6 313.4 313.2 313 312.8 - 312.6 - 312.4 312.2 312 311.8 311.6 311.4- 311.2 311 310.8 310.6 310.4 DI -13 to FES -3A - 25 -Year Storm 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 190 200 210 220 230 240 Station (ft) Outfall 40 HGL Line EGL _� ... .. - i - -. - -- L DI -9 _hel: Typej Catch fi - '0 Bas n 1, - k - abeP..-U - fi' Type: EEFT Catch Bd in s _,� __@ �0 j Et-p bel: 1 -10 Labei: CI-11 TYW [Purr - • �s,1 -TY40m Cwdijit e ... ID: _ Ta_beL•CCO Tv1Xe�nri�� --�.. ID: 5 �.. v 225 - {� - poi• Tyre rn -74 _ - s�. Candui _ I ����� - #I --- -- 13 - - -_ -- � I 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 190 200 210 220 230 240 Station (ft) Outfall 40 HGL Line EGL 315.8 315.7 315.6 315.5 315.4 315.3 315.2 315.1 315 314.9 314.8 314.7 314.6 314.5 314.4 314.3 314.2 314.1 O 314 313.9 w 313.8 313.7 313.6 313.5 313.4 313.3 313.2 313.1 313 312.9 312.8 312.7 312.6 312,S 312.4 312.3 312.2 312.1 t 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 Station (ft) HGL Line EGL DI -14 to DI -15 - 25 -Year - CO -77 57cf it Storm Label: Type: Catch ID: DI -15 Basin 224 Label: l: Type: _ _-To. D I -14 D Basin Sri. - _ _ 4 - °• - - - I -77 Label: TYpe: 1 �� k , t-7, I - i t 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 Station (ft) HGL Line EGL 323 322.5 322 321.5 321 320.5 320 319.5 319 318.5 318 317.5 317 316.5 .. 316 C 315.5 O l7 315 �o d 314.5 W 314 313.5 313 312.5 312 311.5 311 310.5 310 309.5 309 308.5 308 307.5 0 20 40 60 80 100 120 140 160 180 200 220 240 260 280 300 320 340 360 380 400 420 440 460 480 500 520 540 560 580 Station (ft) HGL Line EGL 321.3 321.2 321.1 321 320.9 320.8 320.7 320.6 320.5 320.4 320.3 320.2 320.1 320 319.9 319.8 319.7 319.6 319.5 319.4 319.3 $ 319.2 C 319.1 319 318.9 w 318.8 318.7 318.6 318.5 318.4 318.3 318.2 318.1 318 317.9 317.8 317.7 317.6 317.5 317.4 317.3 317.2 317.1 317 316.9 316.8 316.7 DI -27A to CI -27 - 25 -Year Storm Label: CI -27 Type: Catch Basin ID: 93 -1 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Station (ft) HGL Line EGL Di 27A Bash'- ! ��_....__ EL ID: 9 �.�._ -_-. - --- -•° --- - - - Label Z pe: Catch - 1 -1 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Station (ft) HGL Line EGL 321.6 321.4 321.2 321 320.8 320.6 320.4 320.2 320 319.8 319.6 319.4 319.2 319 _ 318.8 318.6 318.4 d 318.2 W 318 317.8 317.6 317.4 317.2 317 316.8 316.6 316.4 316.2 316 315.8 315.6 315.4 315.2 DI -37A to CI -28 - 25 -Year Storm Label: CI 28 Type: Catch Basin ID: 100 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 Station (ft) HGL Line EGL Label: CI 3 i -- - - -�— — Labe : CO -36 �- `hype Condwft — Catch Basin ID: 88 t—T Type: M: 86 . — 9 Label: CO-35 ID: 89 _ -- 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 Station (ft) HGL Line EGL 321.4 321.2 321 320.8 320.6 320.4 320.2 320 319.8 319.6 319.4 319.2 319 318.8 C r 318.6 M y 318.4 W 318.2 318 317.8 317.6 317.4 317.2 317 316.8 316.6 316.4 316.2 316 315.8 DI -37B to CI -37 - 25 -Year Storm Label: CI -37 Type: Catch Basin ID: 88 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 125 130 135 140 145 150 155 Station (ft) HGL Line EGL C 111111 t r ~I -T _ Label �D. ! Laid: DI -3 I D: 22t D: 220 -1 Tvpe: .df3ei Ca Basin] Labels TYPp:dui[ CO -72 22 i I� CO -11 221 I 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 125 130 135 140 145 150 155 Station (ft) HGL Line EGL Label: CI -30 CI -36 to CI -30 - 25 -Year Storm Type: Catch Basin Label: CI -36 Label: CI -35 - - ID: 105 318 Yp�:_Ca�rb_iiasi� i -. _ _ -- r ID: 1115 I },�' ET;ch 13a3Srr 317.8 • -.. - °� E - - - -- - �.° ID: 317.6 -. T.. -- . - ' � HGL Line 317.4 ' - ..,_ - �_, ,_ -..�. ....._•' -._V. . - -.. -. - - -- �.� � -.�. _.__. � � EGL 317.2 _,...._ -- .___. -_. ...- ,.�.�_.� --- • -- � � ._ .'_- ___ -,__ � --- G - -._.. 317 316.6._ 316.4 316.2 ...... 316 - - - - _.- ._ -___- - --- --_ _ .... -° ��..- _ -- - °--• -• -' - - -- - -- -- - - -- � �-° �� -- - - . 315.8 --- �..,.._.a.,.��- ._____. — - �._ ._._..� T�,_.....,.._.�- .��.___.,. - .... _._..__ ,- - e_ =- .- •--- •- `--�•- -�.�i. :__ 315.6 I- 315.4 315 I- C 314.8 314.6 314.4 Label: (0-47 -- - f 314.2 �. _.___ - - - ;x i 6- - f -_ - -_ � � - - .._.- .--� - -- -- -- - -• -� - � - - 313.8 313.6 -- + Labe CO 42 313.4 T C orrdtsst• � - R• � y^ •-- 313.2 Whim, - - -_ _ �� _.. [[A106 312.8 312.6 jE -v - - - -- 312.4 ---} -r - - -- 312,2 d- �- • ---- -� °- ° --•- -4 312 - 0 311.8 - 311.6 -- 311.4 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 Station (ft) 317.6 317.4 317.2 317 316.8 316.6 316.4 316.2 316 315.8 315.6 315.4 315.2 * 315 C 4.2 + 314.8 10 y 314.6 W 314.4 314.2 314 313.8 313.6 313.4 313.2 313 312.8 312.6 312.4 312.2 312 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 Station (ft) HGL Line EGL �;P9T 317.8 317.6 317.4 317.2 317 316.8 316.6 316.4 316.2 316 315.8 315.6 315.4 315.2 315 314.8 314.6 314.4 314.2 314 313.8 313,6 313.4 313.2 313 C 312.8 312.6 A 312.4 y 312.2 W 312 311.8 311.6 311.4 311.2 311 310.8 310.6 310.4 310.2 310 309.8 309.6 309.4 309.2 309 308.8 308.6 308.4 308.2 308 307.8 307.6 307.4 CI -38 to HW -lA - 25 -Year Storm 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 Station (ft) HGL Line EGL zz • _ _ _ Label-40-39 Typi: Calkli Basin I _ _ - d Type: onduitl i SDI ID: 122 I 12.1 i 771-1 'Ype`�rmriu 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 Station (ft) HGL Line EGL 316.8 316.6 316.4 316.2 316 315.8 315.6 315.4 315.2 315 314.8 314.6 314.4 314.2 314 313.8 313.6 313.4 313.2 313 c 312.8 Y 312.6 312.4 Ey 312.2 312 311.8 311.6 311.4 311.2 311 310.8 310.6 310.4 310.2 310 309.8 309.6 309.4 309.2 309 308.8 308.6 308.4 0 L 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 Station (ft) HGL Line EGL CI -40 to CI -39 - 25 Label: pe.. TyPe: -Year Storm "CO -49 on g duiE Label: Type: Catch ID. C:1 -j9 Basin 119 Label: YPe el ID CI -40 tsia -basin 118 - -- R 0 L 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 Station (ft) HGL Line EGL 316 315.8 315.6 315.4 315.2 315 314.8 314.6 314.4 314.2 314 313.8 313.6 313.4 313.2 313 312.8 312.6 312.4 312.2 312 c 0 311.8 M 311.6 W 311.4 311.2 311 310.8 310.6 310.4 310.2 310 309.8 309.6 309.4 309.2 309 308.8 308.6 308.4 308.2 308 307.8 307.6 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 190 200 210 220 230 240 250 260 270 Station (ft) HGL Line FGI Label: CI -17A Type: Catch Basin ID: 60 Label: CI -17 Type: Catch Basin ID: 61 CI -17A to FS -1 - 25 -Year Storm ° I I be�: g_i FS -1 , anhole - ° -- _ _ . {•-_- atrel -e -ID: 6- - --•- - --- - -- -•� -�R .____,., - - -rte- .._�l_..- _._...{ V { i _uP { � �1 Label: 4 `type: I---------•--I � I Label PI -20 E ype:`CaI h Basrn G .L�beII..CF -19 Catch Basin E �..�.r �I {- ....._._..^ Label• CO -24 ape: oriduiF .. . =66 -TY• ^� dolt ID: 2 1_ _ - - - ` L ID 210 - - -23 n u •�- - _ 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 190 200 210 220 230 240 250 260 270 Station (ft) HGL Line FGI 312.2 312.1 312 311.9 311.8 311.7 311.6 311.5 311.4 311.3 311.2 311.1 311 310.9 310.8 310.7 310.6 310.5 310.4 " 310.3 0 310.2 310.1 47 310 W 309.9 309.8 309.7 309.6 309.5 309.4 309.3 309.2 309.1 309 308.9 308.8 308.7 308.6 308.5 308.4 308.3 308.2 308.1 I Label: CI -18 Type: Catch Basin rT_10 i-- rT_1A _ 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 Station (ft) HGL Line EGL +V. V� - � •---- i Label: CI -19 vpe: Catcl1 Basin ID: 63 I ____�• � - _--�_ Toe Condui t � .�. . - - III ! II I�I f I ..� � A..� �. _ �... _ »..� _ . � y _'a`_`- - - - �'� - � »---- �- -°-• -• � - - C - - .. � _ -�� .� --�-'" =pis +_ . - - - - - 1 i -7777.. 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 Station (ft) HGL Line EGL 314.2 314 313.8 313.6 313.4 313.2 313 312.8 312.6 312.4 312.2 int.21— Type: Catch Basin 312 -71D 311.8 311.6 311.4 311.2 .2 311 310.8 LLJ 310.6 310.4 310.2 310 309.8 309.6 309.4 is EF 309.2 - — 3091- 308.8 308.6 308.4 308.2 308 307.8 307.6 0 2 3 CI-21 to FS-1 - 25-Year Storm 4 5 6 7 8 9 10 11 Station (ft) 12 13 14 15 16 17 1s 19 20 21 �HGL Line �:_- EGL� GUTTER SPREAD CALCULATIONS 6 Davis Drive - Buildings #1 and #2 Gutter Spread Calculations 8/29/2014 Intensity Gutter n Pavement cross slope, ST Gutter long. slope, SL B -B Width, ft Curb and Gutter, in Allowable Gutter Spread, T Gutter Spread = ((�� Z= Qgrate Inlet CI -17 CI -17A CI -18 CI -19 CI -21 CI -28 CI -29 CI -35 CI -36 CI -37 Storm I 2 -Year 5.53 0.013 0.0208 varies 26 30 7.25 T = [Qn(Zl.b7) /0.56(S,o.5))os75 1 /ST K* D1.67 Bypass C I A O-rf Si. Z T K Qiniet 0.35 PASS (in /hr) (ac) (cfs) (ft /ft) (ft) (cfs) CI -19 0.93 5.53 0.25 1.29 0.020 48.08 6.31 27 0.91 CI -18 0.93 5.53 0.26 1.34 0.020 48.08 6.40 27 0.94 CI -21 0.93 5.53 0.18 1.33 0.020 48.08 6.38 27 0.93 CI -21 0.93 5.53 0.17 1.25 0.020 48.08 6.23 27 0.90 0.85 5.53 0.52 2.44 0.008 48.08 9.53 20 1.35 0.87 5.53 0.04 0.19 0.012 48.08 3.43 23 0.28 CI -35 0.90 5.53 0.07 0.35 0.028 48.08 3.63 31 0.42 0.95 5.53 0.06 0.32 0.023 48.08 3.63 29 0.39 0.93 5.53 0.18 0.93 0.023 48.08 5.43 29 0.77 0.89 5.53 0.05 0.25 0.012 48.08 3.76 23 0.33 Qbyp- Check Notes (cfs) 0.37 PASS 0.40 PASS 0.39 PASS 0.35 PASS FAIL Functions more as sag inlet PASS PASS PASS PASS PASS ANTI - FLOATATION CALCULATIONS • ' • DATE: 8/29/2014 DESIGNED BY: CMB PROJECT NAME: 6 Davis Drive PROJECT NO: CHECKED BY: GML PROJECT LOCATION: RTP, NC 01517 -0236 Pond Name= BMP #1 Riser Outer Width = 4 ft Riser Resisting Force = 8,400 lb Riser Outer Length = 4 ft Base Resisting Force = 3,750 lb Riser Inner Width = 3 ft Total Resisting Force = 12,150 lb Riser Inner Length = 3 ft Riser Height = 8 ft Riser Buoyant Force = 7,987 lb Base Buoyant Force = 1,560 lb Concrete Base Length = 5 ft Total Buoyant Force = 9,547 lb Concrete Base Width = 5 ft Concrete Base Depth = 12 in Factor of Safety 1.27 Design Acceptable LOCATION: RTP, NC DATE: 8/29/2014 1517 -0236 DESIGNED BY: CMB Pond Name= BMP #3 Riser Outer Width = 5 ft Riser Resisting Force = 7,905 lb Riser Outer Length = 5 ft Base Resisting Force = 5,400 lb Riser Inner Width = 4 ft Total Resisting Force = 13,305 lb Riser Inner Length = 4 ft Riser Height = 5.92 ft Riser Buoyant Force = 9,235 lb Base Buoyant Force = 2,246 lb Concrete Base Length = 6 ft Total Buoyant Force = 11,482 lb Concrete Base Width = 6 ft Concrete Base Depth = 12 in Factor of Safety 1.16 Design Acceptable Notch Weir #1 Height= 3 in Notch Weir #1 Length= 24 in Notch Weir #2 Height = 4 in Notch Weir #2 Length = 24 in LOCATION: RTP, NC DATE: 8/29/2014 1517 -0236 DESIGNED BY: CMB Pond Name= BMP #3A Riser Outer Width = 5 ft Riser Resisting Force = 7,261 lb Riser Outer Length = 5 ft Base Resisting Force = 5,400 lb Riser Inner Width = 4 ft Total Resisting Force = 12,661 lb Riser Inner Length = 4 ft Riser Height = 5.42 ft Riser Buoyant Force = 8,455 lb Base Buoyant Force = 2,246 lb Concrete Base Length = 6 ft Total Buoyant Force = 10,702 lb Concrete Base Width = 6 ft Concrete Base Depth = 12 in Factor of Safety 1.18 Design Acceptable Notch Weir #1 Height= 3 in Notch Weir #1 Length= 18 in Notch Weir #2 Height = 3 in Notch Weir #2 Length = 18 in LOCATION: RTP, NC DATE: 8/29/2014 1517 -0236 DESIGNED BY: CMB Pond Name= BMP #4 Riser Outer Width = 4 ft Riser Resisting Force = 6,966 lb Riser Outer Length = 4 ft Base Resisting Force = 3,750 lb Riser Inner Width = 3 ft Total Resisting Force = 10,716 lb Riser Inner Length = 3 ft Riser Height = 6.67 ft Riser Buoyant Force = 6,659 lb Base Buoyant Force = 1,560 lb Concrete Base Length = 5 ft Total Buoyant Force = 8,219 lb Concrete Base Width = 5 ft Concrete Base Depth = 12 in Factor of Safety 1.30 Design Acceptable Notch Weir #1 Height= 4 in Notch Weir #1 Length= 18 in Notch Weir #2 Height = in Notch Weir #2 Length = in BMP DESIGN SUMMARY WORKSHEETS M• Coq DURHAM COUNTY q ;• Engineering Departm en t Storm water Division ��; ••..• ' ���� 120 East Parrish Street, Durham, NC 27701 CAR Telephone 919 560 -0739 FAX 919 560 -0740 Wet Detention Pond Design Summary Stormwater Management Construction Plan Review: A complete stormwater management construction plan submittal includes a design summary for each stormwater BMP, design calculations, plans and specifications showing BMP, inlet and outlet structure details. L PROJECT INFORMATION Project Name: Phase PIN: Case #: Design Contact Person: Phone #: () - Legal Name of Owner: Owner Contact: Phone #: Owner Address: Deed Book Page # or Plat Book Page# for BMP Property For projects with multiple basins, specify which pond this worksheet applies to: Does the proposed pond also incorporate stormwater detention? Yes No Detention provided for: 1 -year 2 -year 10 -year other Dam Height: (feet) Dam Classification: Elevations Pond bottom elevation ft. (1loor of the pond) Permanent pool elevation ft. (invert elevation of the orifice) Temporary pool elevation ft. (elevation of the structure overflow) 1 -year storm orifice /weir elevation ft. (invert elevation) 1 -year storm water surface elevation ft. 2 -year storm orifice /weir elevation ft. (invert elevation) 2 -year storm water surface elevation ft. 10 -year storm orifice /weir elevation ft. (invert elevation) 10 -year storm water surface elev. ft. Emergency spillway elevation ft. (invert of emergency spillway) Top of embankment /dam ft. (elevation) Maximum water surface elevation ft. (max. storm pond can safely pass) Areas Permanent pool area provided Minimum required permanent pool area Design storm surface area Drainage area (10 -acres min) ft2 (water surface area at orifice invert elevation) ft2 (calculated surface area required) ft2 (Specify frequency event: year) ac. (total drainage to the pond Discharges (Specify only applicable frequency events) At BMP Volumes Permanent pool volume Water quality pool storage volume Design storm storage volume Total Storage volume provided at design storm Total Storage volume provided at top of dam Forebay volume ft3 (volume of main pond and forebay) ft3 (volume above permanent pool) ft3 (volume above permanent pool) W W ft3 ( 20% of permanent pool volume) Hydraulic Depths Volume of normal pool divided by surface area of normal pool ft. Volumes at temporary pool plus normal pool divided by surface area of temporary pool ft. Other Parameters SA/DA' Diameter of orifice Draw -down time (from DWQ table) in. (must provide draw down over 2 to S day period) hrs ' When using the SA/DA tables from the Stormwater Best Management Practices Manual, linear interpolation may be used for values between table entries. Riser /Principal and Emergency Spillway Information 1 -year storm orifice /weir 1 -year 2 -year 10 -year in. length ft. -year Inflow cfs cfs cfs cfs Routed outflow cfs cfs cfs cfs Principal spillway At Analysis Point(s) that BMP Contributes to in. Emergency spillway width 1 -year 2 -year 10 -year -year Pre - development cfs cfs cfs cfs Post - development w/o detention cfs cfs cfs cfs With detention cfs cfs cfs cfs Volumes Permanent pool volume Water quality pool storage volume Design storm storage volume Total Storage volume provided at design storm Total Storage volume provided at top of dam Forebay volume ft3 (volume of main pond and forebay) ft3 (volume above permanent pool) ft3 (volume above permanent pool) W W ft3 ( 20% of permanent pool volume) Hydraulic Depths Volume of normal pool divided by surface area of normal pool ft. Volumes at temporary pool plus normal pool divided by surface area of temporary pool ft. Other Parameters SA/DA' Diameter of orifice Draw -down time (from DWQ table) in. (must provide draw down over 2 to S day period) hrs ' When using the SA/DA tables from the Stormwater Best Management Practices Manual, linear interpolation may be used for values between table entries. Riser /Principal and Emergency Spillway Information 1 -year storm orifice /weir diameter in. length ft. 2 -year storm orifice /weir diameter in. length ft. 10 -year storm orifice /weir diameter in. length ft. - year storm orifice /weir diameter in. length ft. Principal spillway diameter in. Emergency spillway width ft. side slopes :1 slope % II. REQUIRED ITEMS CHECKLIST The following checklist outlines design requirements. Initial in the space provided to indicate the following design requirements have been met and supporting documentation is attached. ADnlicant's initials a. The permanent pool depth is between 3- and 6 -feet (required minimum hydraulic depth of 3- feet). b. The forebay volume is approximately equal to 20% of the pond volume. c. The temporary pool controls runoff for water quality design storm. d. The temporary pool draws down in 2- to 5 -days. e. The drainage area to the facility is at least 10- acres. f. Riprap outlet protection, if provided, reduces flow to non - erosive velocities (provide calculations). g. The pond length to width ratio is greater than or equal to 3:1. h. The pond side slopes above the permanent pool area are no steeper than 3:1. i. A submerged and vegetated shelf with a slope no greater than 6:1 is provided around the perimeter of the pond (show on plan and profile and provide a vegetation plan). j. Vegetative cover above the permanent pool elevation is specified. No woody vegetation is permitted on the embankment. k. A surface baffle, trash rack or similar device is provided for both the overflow and orifice. Flat top trash racks are not acceptable. Access hatch has been provided. 1. A recorded drainage easement is provided for each pond including access to the nearest right -of -way and is graded per Section 8.3, Stormwater Control Facilities (BMPs). m. If the basin is used for sediment and erosion control during construction, a note requiring clean out and vegetative cover being established prior to use as a wet detention basin shall be provided on the construction plan. n. A mechanism is specified which will drain the pond for maintenance and emergencies. Valves used shall be plug valves. o. Anti - floatation calculations are provided for riser structure. p. A plan view of the pond with grading shown is provided. q. A profile through the forebay, main pond and spillway is provided. Water surface elevations are shown on the profile. r. Riser structure details are provided. s. Dam designed to account for a 5.00% settlement factor. t. Compaction specifications for the embankment are shown on the plan. u. The minimum top of dam width has been provided for the pond embankment top width per Section 8.3, Stormwater Control Facilities (BMPs). Note: Executed Stormwater Facility Operation and Maintenance Permit Agreement and payment of surety are required prior to Stormwater Permit issuance. �,M•,C•p:�� DURHAM COUNTY (Max slope of 4:1 and minimum width of 10 feet or a forebay) Engineering Departm en t • ••'••. Stormwater Division --J.•� ti��� � ;�o .,,,,,.. 2 CARO�'� 120 East Parrish Street, Durham, NC 27701 (6- inches max) Telephone (919) 560 -0739 FAX (919) 560 -0740 Bio- Retention Area Design Summary Stormwater Management Construction Plan Review: A complete stormwater management construction plan submittal includes a design summary for each stormwater BMP, design calculations, plans and specifications showing BMP, inlet and outlet structure details. L PROJECT INFORMATION Project Name: Phase PIN: Case #: Design Contact Person: Phone #: () - Legal name of Owner: Owner Contact: Phone #: Owner Address: Deed Book Page # or Plat Book Page# for BMP Property For projects with multiple basins, specify which pond this worksheet applies to: Drainage area ac (on -site drainage to the area, 1 -acre max,) Impervious area ac (on -site impervious area draining to facility) Design runoff cfs Design treatment volume W 1 Assumes 100% impervious, larger areas may be considered if maximum sheet flow velocity is not exceeded Bioretention Design Grass buffer strip width ft (Max slope of 4:1 and minimum width of 10 feet or a forebay) Size of cell area ft2 (Min 5% of drainage area with sand bed, 7% without bed) Depth of ponding area ft (6- inches max) Width of cell ft (Minimum width of 25 feW) Length of cell ft (Minimum length of 2 times the width) Inflow sheet flow velocity ft /s (Maximum of 1-foot/second) Mulch layer elevation ft (Elevation of top of layer) Planting soil top elevation ft (Elevation of top of soil) Depth of planting soil ft (Minimum depth of 4-fee?) Top of sand if applicable ft (Elevation of top of sand) Bottom elevation ft (Elevation of bottom of cell) Perforated pipe length ft (Length of perforated pipe provided under cell layers) Space between pipe runs ft (Spacing between perforated pipe runs, max of 10 feet) 2 Smaller widths may be accepted in urbanized areas or in retrofit situations. These designs will be evaluated on a case -by -case basis. 3 Smaller depths may be accepted in urbanized areas or in retrofit situations. These designs will be evaluated on a case -by -case basis. Longitudinal slope Diameter of pipe Emergency outlet elev. Emergency spillway ft (I% minimum longitudinal slope) in (Pipe diameter of perforated pipe, min of 6- inches) Emergency Spillway Information ft (invert of emergency overflow weir) width ft. side slopes _1 slope_ II. REQUIRED ITEMS CHECKLIST The following checklist outlines design requirements. Initial in the space provided to indicate the following design requirements have been met and supporting documentation is attached. Applicant's initials a. Runoff from landscaped areas and other non - impervious areas has been directed away from the bioretention area to the maximum extent practical. b. Drainage area for bioretention area is less than 1 -acre. c. Plan specifies how all slopes draining to the bioretention area will be stabilized, note that the slopes must be stabilized before installation of the under drain system. d. Construction sequencing shall be considered and a note added to the plan that states: "All sediment and erosion control practices shall be in place and the slopes draining to the bioretention area shall be stabilized before construction of the bioretention area begins." e. No side slopes draining to bioretention area greater than 3:1, promote sheet flow through the grass filter strip. f. Riprap outlet protection, if provided, reduces flow to non - erosive velocities (provide calculations). g. A recorded drainage easement is provided for each cell including access to the nearest right - of -way and is graded per Section 8.3, Stormwater Control Facilities (BMPs). h. A plan view of the bioretention area with grading shown is provided. i. A profile through the bioretention area and emergency spillway is provided. j. Geotextile fabric is placed at the bottom of the excavated cell to prevent soil from getting into the underdrain system. k. The underdrain system is wrapped in a gravel jacket and a geotextile fabric is placed between the bottom of the sand bed or planting soil and the top of the gravel jacket. 1. The pipe for the underdrain system shall be perforated Schedule 40 PVC. m. The underdrain system shall connect to the outflow system at a point at least 1 foot inside the bioretention cell wall. n. A non - perforated piping system is connected to the underdrain piping and extends to the surface of the planting soil for cleanouts. o. Cleanouts are to be provided at the beginning of each pipe run and at all intersections. p. A planting soil mixture specification and a soil characteristics table are provided. Maximum clay content in the soil mixture is 8.00 %. q. The hydraulic conductivity for the planting mixture is to be 1 -inch to 2- inches per hour. r. Mulch layer specification is provided; mulch is to be a 4 -inch layer of coarse hardwood mulch with re- application rate specified. s. Soil with a P index of less than or equal to 25 specified on plan. t. A bioretention area landscape plan is provided including the transport of plant material, preparation of the planting pit, fertilization, installation of the plant material, type and number of plantings (note that there shall be a minimum of three species of trees and three species of shrubs selected to insure diversity, their planting locations, post - installation inspection and maintenance guidelines. Note: Executed Stormwater Facility Operation and Maintenance Permit Agreement and payment of surety are required prior to Stormwater Permit issuance. �,M•,C•p:�� DURHAM COUNTY (Max slope of 4:1 and minimum width of 10 feet or a forebay) Engineering Departm en t • ••'••. Stormwater Division --J.•� ti��� � ;�o .,,,,,.. 2 CARO�'� 120 East Parrish Street, Durham, NC 27701 (6- inches max) Telephone (919) 560 -0739 FAX (919) 560 -0740 Bio- Retention Area Design Summary Stormwater Management Construction Plan Review: A complete stormwater management construction plan submittal includes a design summary for each stormwater BMP, design calculations, plans and specifications showing BMP, inlet and outlet structure details. L PROJECT INFORMATION Project Name: Phase PIN: Case #: Design Contact Person: Phone #: () - Legal name of Owner: Owner Contact: Phone #: Owner Address: Deed Book Page # or Plat Book Page# for BMP Property For projects with multiple basins, specify which pond this worksheet applies to: Drainage area ac (on -site drainage to the area, 1 -acre max,) Impervious area ac (on -site impervious area draining to facility) Design runoff cfs Design treatment volume W 1 Assumes 100% impervious, larger areas may be considered if maximum sheet flow velocity is not exceeded Bioretention Design Grass buffer strip width ft (Max slope of 4:1 and minimum width of 10 feet or a forebay) Size of cell area ft2 (Min 5% of drainage area with sand bed, 7% without bed) Depth of ponding area ft (6- inches max) Width of cell ft (Minimum width of 25 feW) Length of cell ft (Minimum length of 2 times the width) Inflow sheet flow velocity ft /s (Maximum of 1-foot/second) Mulch layer elevation ft (Elevation of top of layer) Planting soil top elevation ft (Elevation of top of soil) Depth of planting soil ft (Minimum depth of 4-fee?) Top of sand if applicable ft (Elevation of top of sand) Bottom elevation ft (Elevation of bottom of cell) Perforated pipe length ft (Length of perforated pipe provided under cell layers) Space between pipe runs ft (Spacing between perforated pipe runs, max of 10 feet) 2 Smaller widths may be accepted in urbanized areas or in retrofit situations. These designs will be evaluated on a case -by -case basis. 3 Smaller depths may be accepted in urbanized areas or in retrofit situations. These designs will be evaluated on a case -by -case basis. Longitudinal slope Diameter of pipe Emergency outlet elev. Emergency spillway ft (I% minimum longitudinal slope) in (Pipe diameter of perforated pipe, min of 6- inches) Emergency Spillway Information ft (invert of emergency overflow weir) width ft. side slopes _1 slope_ II. REQUIRED ITEMS CHECKLIST The following checklist outlines design requirements. Initial in the space provided to indicate the following design requirements have been met and supporting documentation is attached. Applicant's initials a. Runoff from landscaped areas and other non - impervious areas has been directed away from the bioretention area to the maximum extent practical. b. Drainage area for bioretention area is less than 1 -acre. c. Plan specifies how all slopes draining to the bioretention area will be stabilized, note that the slopes must be stabilized before installation of the under drain system. d. Construction sequencing shall be considered and a note added to the plan that states: "All sediment and erosion control practices shall be in place and the slopes draining to the bioretention area shall be stabilized before construction of the bioretention area begins." e. No side slopes draining to bioretention area greater than 3:1, promote sheet flow through the grass filter strip. f. Riprap outlet protection, if provided, reduces flow to non - erosive velocities (provide calculations). g. A recorded drainage easement is provided for each cell including access to the nearest right - of -way and is graded per Section 8.3, Stormwater Control Facilities (BMPs). h. A plan view of the bioretention area with grading shown is provided. i. A profile through the bioretention area and emergency spillway is provided. j. Geotextile fabric is placed at the bottom of the excavated cell to prevent soil from getting into the underdrain system. k. The underdrain system is wrapped in a gravel jacket and a geotextile fabric is placed between the bottom of the sand bed or planting soil and the top of the gravel jacket. 1. The pipe for the underdrain system shall be perforated Schedule 40 PVC. m. The underdrain system shall connect to the outflow system at a point at least 1 foot inside the bioretention cell wall. n. A non - perforated piping system is connected to the underdrain piping and extends to the surface of the planting soil for cleanouts. o. Cleanouts are to be provided at the beginning of each pipe run and at all intersections. p. A planting soil mixture specification and a soil characteristics table are provided. Maximum clay content in the soil mixture is 8.00 %. q. The hydraulic conductivity for the planting mixture is to be 1 -inch to 2- inches per hour. r. Mulch layer specification is provided; mulch is to be a 4 -inch layer of coarse hardwood mulch with re- application rate specified. s. Soil with a P index of less than or equal to 25 specified on plan. t. A bioretention area landscape plan is provided including the transport of plant material, preparation of the planting pit, fertilization, installation of the plant material, type and number of plantings (note that there shall be a minimum of three species of trees and three species of shrubs selected to insure diversity, their planting locations, post - installation inspection and maintenance guidelines. Note: Executed Stormwater Facility Operation and Maintenance Permit Agreement and payment of surety are required prior to Stormwater Permit issuance. �,M•,C•p:�� DURHAM COUNTY (Max slope of 4:1 and minimum width of 10 feet or a forebay) Engineering Departm en t • ••'••. Stormwater Division --J.•� ti��� � ;�o .,,,,,.. 2 CARO�'� 120 East Parrish Street, Durham, NC 27701 (6- inches max) Telephone (919) 560 -0739 FAX (919) 560 -0740 Bio- Retention Area Design Summary Stormwater Management Construction Plan Review: A complete stormwater management construction plan submittal includes a design summary for each stormwater BMP, design calculations, plans and specifications showing BMP, inlet and outlet structure details. L PROJECT INFORMATION Project Name: Phase PIN: Case #: Design Contact Person: Phone #: () - Legal name of Owner: Owner Contact: Phone #: Owner Address: Deed Book Page # or Plat Book Page# for BMP Property For projects with multiple basins, specify which pond this worksheet applies to: Drainage area ac (on -site drainage to the area, 1 -acre max,) Impervious area ac (on -site impervious area draining to facility) Design runoff cfs Design treatment volume W 1 Assumes 100% impervious, larger areas may be considered if maximum sheet flow velocity is not exceeded Bioretention Design Grass buffer strip width ft (Max slope of 4:1 and minimum width of 10 feet or a forebay) Size of cell area ft2 (Min 5% of drainage area with sand bed, 7% without bed) Depth of ponding area ft (6- inches max) Width of cell ft (Minimum width of 25 feW) Length of cell ft (Minimum length of 2 times the width) Inflow sheet flow velocity ft /s (Maximum of 1-foot/second) Mulch layer elevation ft (Elevation of top of layer) Planting soil top elevation ft (Elevation of top of soil) Depth of planting soil ft (Minimum depth of 4-fee?) Top of sand if applicable ft (Elevation of top of sand) Bottom elevation ft (Elevation of bottom of cell) Perforated pipe length ft (Length of perforated pipe provided under cell layers) Space between pipe runs ft (Spacing between perforated pipe runs, max of 10 feet) 2 Smaller widths may be accepted in urbanized areas or in retrofit situations. These designs will be evaluated on a case -by -case basis. 3 Smaller depths may be accepted in urbanized areas or in retrofit situations. These designs will be evaluated on a case -by -case basis. Longitudinal slope Diameter of pipe Emergency outlet elev. Emergency spillway ft (I% minimum longitudinal slope) in (Pipe diameter of perforated pipe, min of 6- inches) Emergency Spillway Information ft (invert of emergency overflow weir) width ft. side slopes _1 slope_ II. REQUIRED ITEMS CHECKLIST The following checklist outlines design requirements. Initial in the space provided to indicate the following design requirements have been met and supporting documentation is attached. Applicant's initials a. Runoff from landscaped areas and other non - impervious areas has been directed away from the bioretention area to the maximum extent practical. b. Drainage area for bioretention area is less than 1 -acre. c. Plan specifies how all slopes draining to the bioretention area will be stabilized, note that the slopes must be stabilized before installation of the under drain system. d. Construction sequencing shall be considered and a note added to the plan that states: "All sediment and erosion control practices shall be in place and the slopes draining to the bioretention area shall be stabilized before construction of the bioretention area begins." e. No side slopes draining to bioretention area greater than 3:1, promote sheet flow through the grass filter strip. f. Riprap outlet protection, if provided, reduces flow to non - erosive velocities (provide calculations). g. A recorded drainage easement is provided for each cell including access to the nearest right - of -way and is graded per Section 8.3, Stormwater Control Facilities (BMPs). h. A plan view of the bioretention area with grading shown is provided. i. A profile through the bioretention area and emergency spillway is provided. j. Geotextile fabric is placed at the bottom of the excavated cell to prevent soil from getting into the underdrain system. k. The underdrain system is wrapped in a gravel jacket and a geotextile fabric is placed between the bottom of the sand bed or planting soil and the top of the gravel jacket. 1. The pipe for the underdrain system shall be perforated Schedule 40 PVC. m. The underdrain system shall connect to the outflow system at a point at least 1 foot inside the bioretention cell wall. n. A non - perforated piping system is connected to the underdrain piping and extends to the surface of the planting soil for cleanouts. o. Cleanouts are to be provided at the beginning of each pipe run and at all intersections. p. A planting soil mixture specification and a soil characteristics table are provided. Maximum clay content in the soil mixture is 8.00 %. q. The hydraulic conductivity for the planting mixture is to be 1 -inch to 2- inches per hour. r. Mulch layer specification is provided; mulch is to be a 4 -inch layer of coarse hardwood mulch with re- application rate specified. s. Soil with a P index of less than or equal to 25 specified on plan. t. A bioretention area landscape plan is provided including the transport of plant material, preparation of the planting pit, fertilization, installation of the plant material, type and number of plantings (note that there shall be a minimum of three species of trees and three species of shrubs selected to insure diversity, their planting locations, post - installation inspection and maintenance guidelines. Note: Executed Stormwater Facility Operation and Maintenance Permit Agreement and payment of surety are required prior to Stormwater Permit issuance. STORM DRAINAGE SPECIFICATIONS 6 Davis Drive, Building 1 26June2014 PERMIT SET SECTION 334100 - STORM UTILITY DRAINAGE PART 1 - GENERAL 1.1 SUMMARY: A. Work under this section consists of furnishing all plant, labor, materials and equipment for the installation of storm drain pipelines, pipe fittings, catch basins, inlets, junction boxes, interference boxes, structures, manholes, and headwalls. 1.2 RELATED WORK IN OTHER SECTIONS: A. Site Clearing: Section 311000 B. Soil Erosion and Sediment Control Section 312500 C. Turf and Grasses: Section 329200 1.3 QUALITY ASSURANCE: A. Standards: American Society for Testing and Materials • ASTM A185 Reinforcing Steel • ASTM A252 Encasement Pipe • ASTM A305 Reinforcing Steel • ASTM A444 Corrugated Steel Pipe Connecting Bands • ASTM B308 Aluminum Alloy Standard Structural Shapes • ASTM C33 Crushed Stone • ASTM C55 Concrete Brick • ASTM C76 Reinforced Concrete Pipe • ASTM C91 Masonry Cement • ASTM C443 Reinforced Concrete Pipe Joints • ASTM C478 Precast Catch Basins and Manholes • ASTM D1784 Rigid Poly(Vinyl Chloride) (PVC) Compounds and Chlorinated Poly(Vinyl Chloride) (CPVC) Compounds • ASTM D2729 Poly(Vinyl Chloride) (PVC) Sewer Pipe and Fittings • ASTM D3212 Joints for Drain and Sewer Plastic Pipes Using Flexible Elastomeric Seals • ASTM D3350 Polyethylene Plastic Pipe and Fittings Materials • ASTM F405 Subsurface Drain Lines American Association of State Highway Transportation Officials • AASHTO M36 Corrugated Steel Pipe • AASHTO M170 -81 -1 Reinforced Concrete Pipe • AASHTO M196 Corrugated Aluminum Pipe STORM UTILITY DRAINAGE 334100-1 6 Davis Drive, Building 1 26June2014 PERMIT SET AASHTO M219 Aluminum Alloy Structural Plate Pipe, Pipe Arches, and Arches AASHTO M274 -791 Corrugated Steel Pipe AASHTO T180 Compaction of Backfill Federal Specifications Federal Specifications SS -S -00210 - Sealing Compound for Pipe Joints Federal Specifications WW -P -00402 - Corrugated Aluminum Pipe B. All defective work or material shall be repaired and/or replaced by the Contractor at no cost to the Owner. Areas in which testing indicates compaction below the specified density shall be reworked, or removed and replaced by the Contractor, at no expense to the Owner, until specified compaction is obtained. C. Siltation, sedimentation, and erosion shall be kept to a minimum at all times during construction. Sedimentation and erosion control methods shall be employed by the Contractor during construction in order to comply with the requirements of the N.C. Sedimentation Pollution Control Act of 1973, and to Durham County requirements. 1.4 SUBMITTALS A. Product Data: For each type of product indicated. B. Shop Drawings: I. Manholes: Include plans, elevations, sections, details, frames, and covers. 2. Catch basins and stormwater inlets. Include plans, elevations, sections, details, frames, covers, and grates. 3. Storm pipe and pipe joint material. Include plans, sections and details. 4. Duckbill check valve C. Coordination Drawings: Show pipe sizes, locations, and elevations. Show other piping in same trench and clearances from storm drainage system piping. Indicate interface and spatial relationship between manholes, piping, and proximate structures. D. Field quality - control reports. E. Contech Engineered Solutions, or authorized supplier, to submit shop drawings for StormFilter stormwater treatment system with underground detention pipe, fittings, vault, filters cartridges and accessory equipment. Drawings shall include principal dimensions, filter placement, location of piping and unit foundation. F. Contech Engineered Solutions, or authorized supplier, shall submit an Operation and Maintenance Manual. PART 2 - PRODUCTS STORM UTILITY DRAINAGE 334100-2 6 Davis Drive, Building 1 26June2014 PERMIT SET 2.1 REINFORCED CONCRETE PIPE: A. Reinforced concrete pipe used for the storm drainage system shall conform to AASHTO Specification M- 170 -81 -1 and ASTM C76 (latest edition). Pipe shall have circular reinforcement. Joints shall be tongue and groove with preformed plastic gasket sealant or bell and spigot with rubber O -ring in accordance with ASTM C -443. Joint lengths shall be 4', 8', or 12' as desired by the Contractor, except minimum 8' joint lengths shall be employed for pipe segments within street limits. For "closures" and segment length adjustments, 4' joint lengths may be used within street limits. When a strength class is not specified, indicated in the Bid, or shown on the Plans, Class III, Wall B pipe shall be used. B. Reinforced concrete pipe fittings shall be fabricated from 8' joint straight pipe sections. For bends and tees both longitudinal and circumferential reinforcing steel shall be welded from section to section and additional steel added in order to provide for continuous, suitable reinforcement. Grout employed in fitting fabrication shall be high strength with properties compatible with the concrete of the pipe segment. The load carrying capacity of fittings shall be equal to that for straight pipe joints. C. Joint material for concrete pipe shall be the preformed plastic, rope type as manufactured by Ram -Nek, or equal, and which meets or exceeds all requirements of Federal Specification SS -S -00210 "Sealing Compound, Preformed Plastic for Pipe Joints, Type I, Rope Form." 2.2 POLYVINYL CHLORIDE (PVC) STORM SEWER PIPE (6" THROUGH 15 "): A. Material Standard: ASTM D1784, Cell Classification 12454 -B or 12454 -C. B. Pipe and Fitting Standard: ASTM D3034. C. Minimum Wall Thickness: SDR 35. D. Maximum Pipe Section Length: 12' - 6 ". E. Joints 1. Type: Bell and spigot with rubber gaskets. 2. Joint Standard: ASTM D3212. 3. Gasket Standard: ASTM F477. 2.3 POLYVINYL CHLORIDE (PVC) PERFORATED DRAIN PIPE: A. Material Standard: ASTM D1784, Cell Classification 12454 -B. B. Pipe and Fitting Standard: ASTM D2729 C. Joints 1. Type: Bell and spigot with rubber gaskets. 2. Joint Standard: ASTM D3212. 3. Gasket Standard: ASTM F477. STORM UTILITY DRAINAGE 334100-3 6 Davis Drive, Building 1 26June2014 PERMIT SET 2.4 REINFORCED POLYETHYLENE PIPE: A. DuroMaxx is a reinforced polyethylene pipe with a smooth waterway wall and exterior profile that is reinforced with high strength galvanized steel ribs. The continuous reinforcing ribs are completely encased within the polyethylene profile. DuroMaxx is manufactured using a helical winding process that results in a continuously fusion welded lap seam. The pipe profile is manufactured using a high quality stress -rated thermoplastic meeting the requirements of ASTM F2562 "Standard Specification for Steel Reinforced Thermoplastic Ribbed Pipe and Fittings for Non - Pressure Drainage and Sewerage" or AASHTO Designation MP -20, Bridge Construction Section 26 & Design Section 12. For the purpose of hydraulic design, the recommended Manning's "n" value shall be 0.012 for pipe diameters included within this specification. B. Virgin high density polyethylene stress -rated resins are used to manufacture DuroMaxx pipe and complimentary fabricated fittings. Resins shall conform to the minimum requirements of cell classification 345464C as defined and described in the latest version of ASTM D3350 "Standard Specification for Polyethylene Plastics Pipe and Fittings Materials ". C. Pipe lengths shall be joined on site using welded couplers especially designed for DuroMaxx pipe that meet the following specification: Welded Coupler (WC) Joints (36" — 120 ") shall utilize plain ended DuroMaxx pipe welded together with a polyethylene coupler by way of electrofusion welding or extrusion welding technology. The welded connections provide a true, infield watertight system. The field installed welded coupler joints shall remain watertight and can achieve zero leakage rates on appropriate applications. The welded coupler joints have been laboratory tested to 30 psi in accordance with ASTM D3212. D. All fabricated fittings and couplings supplied by the manufacturer shall be constructed to ensure no loss of structural integrity or joint tightness at welded seams and joints. Only those fittings supplied by or recommended by the manufacturer shall be used. 2.5 CASTINGS AND STEPS: A. Castings and steps shall be provided for each catch basin, junction box and manhole. Frames, covers, grates, and steps shall be of cast iron of superior quality, tough and even texture, and of not less than 40% pig. They shall be clear of blow holes, and holes, cracks, or other defects, properly finished and bituminous coated while hot. Catch basins and manhole covers, frames, grates, and steps shall conform to the details for each type on the plans, or to similar plans differing in detail but of equally good design, provided such castings are approved by the Engineer prior to use. Covers and frames shall be machined to provide plane, smooth surfaces for uniform seating and interchangeability of covers. Rings and covers that provide imperfect seating will be rejected. 2.6 MASONRY CEMENT: STORM UTILITY DRAINAGE 334100-4 6 Davis Drive, Building 1 26June2014 PERMIT SET A. Masonry cement shall be of best grade, conforming to ASTM Specification C91, Type II, of a brand approved by the Engineer. It shall be newly manufactured, well housed and kept dry and protected at all times. 2.7 CONCRETE: A. General: Cast -in -place concrete according to ACI318, ACI350 /350R, and the following: 1. Cement: ASTM C 150, Type II. 2. Fine Aggregate: ASTM C 33, sand. 3. Coarse Aggregate: ASTM C 33, crushed gravel. 4. Water: Potable. B. Portland Cement Design Mix: 4000 psi minimum, with 0.45 maximum water /cementitious materials ratio. 1. Reinforcing Fabric: ASTM A 185/A 185M, steel, welded wire fabric, plain. 2. Reinforcing Bars: ASTM A 615/A 615M, Grade 60 (420 MPa) deformed steel. C. Manhole Channels and Benches: Factory or field formed from concrete. Portland cement design mix, 4000 psi minimum, with 0.45 maximum water /cementitious materials ratio. Include channels and benches in manholes. 1. Channels: Concrete invert, formed to same width as connected piping, with height of vertical sides to three- fourths of pipe diameter. Form curved channels with smooth, uniform radius and slope. 2. Benches: Concrete, sloped to drain into channel. D. Ballast and Pipe Supports: Portland cement design mix, 3000 psi minimum, with 0.58 maximum water / cementitious materials ratio. 2.8 CRUSHED STONE: A. Crushed stone for pipe and drainage structure foundation shall be washed stone graded 11 /z" to 1" and down with a minimum of fine material, conforming to ASTM C33, Size No. 67, or Size No. 57, as directed by the Engineer. 2.9 RIP -RAP: A. Rip Rap shall be as shown on plans and as defined by the N.C. Department of Transportation. 2.10 STORM FILTER INTERNAL COMPONENTS: STORM UTILITY DRAINAGE 334100-5 6 Davis Drive, Building 1 26June2014 PERMIT SET All internal components including ABS and PVC manifold piping, filter cartridge(s), filter media (as specified on the plans in the StormFilter data block or by the Engineer), sump covers, flow spreaders, and energy dissipaters shall be provided by Contech Engineered Solutions LLC. Filter media shall be provided by CONTECH Construction Products Inc. or approved alternate source. Filter media shall consist of one or more of the following, as specified in the StormFilter data block, or by the Engineer: Perlite Media: Perlite media shall be made of natural siliceous volcanic rock free of any debris or foreign matter. The perlite media shall have a bulkdensity ranging from 6.5 to 8.5 lb /ft3 and particle sizes ranging from that passing through a 0.50 inch screen and retained on a U.S. Standard #8 sieve. 2.11 PRECAST CONCRETE VAULT COMPONENTS: 1. Precast concrete vault shall be provided according to ASTM C857 and C858. 2. Vault joint sealant shall be Conseal CS -101 or approved equal. If interior concrete baffle walls are provided, baffle walls shall be sealed to the interior vault walls and floor with a polyurethane construction sealant rated for use below the waterline, SikaFlex la or equal. Contractor to provide sealant material and installation unless completed prior to shipment. 4. Frames and covers shall be gray cast iron and shall meet AASHTO H -20 loading requirements, and shall be provided according to ASTM A48. Doors shall have hot - dipped galvanized frame and covers. Covers shall have diamond plate finish. Each door to be equipped with a recessed lift handle. Doors shall meet H -20 loading requirements for incidental traffic, at a minimum. 6. Steps shall be constructed of copolymer polypropylene conforming to ASTM D- 4101. Steps shall be driven into preformed or drilled holes once concrete is cured. Steps shall meet the requirements of ASTM C -478 and AASHTO M -199. The '/2" Grade 60 deformed reinforcing bar shall meet ASTM A -615. 7. Ladders shall be constructed of aluminum and steel reinforced copolymer polypropylene conforming to ASTM D -4101. Ladder shall bolt in place. Ladder shall meet all ASTM C -497 load requirements. Ladders provided upon request or where required. 8. Duckbill check valves shall be Series 35 -1 as manufactured by Tideflex or approved equal. 2.12 STORM FILTER CONTRACTOR PROVIDED COMPONENTS: A. All contractor - provided components shall meet the requirements of this section, the plans specifications and contract documents. In the case of conflict, the more stringent specification shall apply. STORM UTILITY DRAINAGE 334100-6 6 Davis Drive, Building 1 26June2014 PERMIT SET B. Crushed rock base material shall be six -inch minimum layer of 3/4 -inch minus rock. Compact undisturbed sub -grade materials to 95% of maximum density at +/ -2% of optimum moisture content. Unsuitable material below sub -grade shall be replaced to engineer's approval. C. Backfill material shall be 3/4 -inch minus crushed rock, or approved equal. 2.13 FILTER CARTRIDGES: A. Filter cartridges shall be delivered with the vault. Contractor shall take appropriate action to protect the cartridges from sediment and other debris during construction. Methods for protecting the cartridges include but are not limited to: Leave cartridges in the vault and plug inlet and outlet pipe to prevent stormwater from entering the vault. The method ultimately selected shall be at Contractor's discretion and Contractor's risk. B. Filter cartridges shall not be placed in operation until the vault is clean and the project site is clean and stabilized (construction erosion control measures no longer required). The project site includes any surface that contributes storm drainage to the StormFilter. All impermeable surfaces shall be clean and free of dirt and debris. All catch basins, manholes and pipes shall be free of dirt and sediments. Contact Contech Engineered Solutions to assist with system activation and/or inspect the system for proper installation once site is clean and stabilized. PART 3 - EXECUTION 3.1 LOCATIONS: A. Pipework shall be installed at the locations shown on the plans and to the position, alignment and grade shown thereon. Prior to beginning work at any location, the Contractor shall consult with the Engineer and Owner to determine that all rights -of -way, permits, or other legalities are in order. He shall familiarize himself with all conditions and/or limitations of such rights -of -way or permits and shall fully comply with all such requirements. All work shall be confined to rights -of -way or permit limits and any encroachment beyond such limits shall be the Contractor's liability. 3.2 CLEARING AND GRUBBING: A. Clearing and grubbing, where required, shall be done prior to beginning pipe installation. B. The Contractor shall consult with the Owner and Engineer prior to starting clearing and a full understanding is to be reached as to procedure. The Contractor shall then conduct clearing and grubbing operations in strict accordance with these agreements. STORM UTILITY DRAINAGE 334100-7 6 Davis Drive, Building 1 26June2014 PERMIT SET C. Clearing of trees and brush along the pipeline shall be carefully done so that no damage will occur outside of the limits of the rights -of -way. Trees and brush must be cut by hand and trees felled within the rights -of -way limits. Only trees that would seriously interfere with the construction shall be cut down and all others shall be saved and protected. Trees 6" or more in diameter shall be trimmed, cut into usable lengths of 3' or as directed by the Owner, and the logs neatly stacked on the edge of the right -of -way or disposed in a manner approved by the Engineer. Brush, laps, roots, etc., shall be disposed off site in a manner approved by the Engineer. D. Grubbing of stumps that are in the way of construction shall be done in any convenient manner which will not cause damage to remaining trees or adjacent property. Stumps shall be disposed as for brush and laps above. 3.3 TRENCH EXCAVATION: A. Trenches for pipe shall be excavated true to line and grade. Where paving is to be cut, it shall be cut in advance of trenching P wider than the specified width of the trench. Pavement shall be carefully cut by approved means ahead of removal. Where soil conditions prevent ditch excavation without excessive widths, or where directed by the Engineer, wood or steel sheeting, as hereinafter specified, shall be driven to support the trench walls, or a suitably reinforced steel trench box shall be employed. B. Trench bottoms shall be hand graded to provide uniform and continuous bearing for the pipe along its entire length, with bell holes being dug for pipe bells, where applicable. No ridges, sags or undercutting will be allowed. C. If approved by the Engineer and subject to suitable soil conditions, the trench may be excavated a few inches below the established subgrade and backfilled with selected material (from the excavation, if available) well compacted and so shaped as to give the pipes uniform bearing throughout their lengths at the established grade. Bell holes shall be dug to relieve the bells of load and to provide for completing the joints. D. Where the material at grade is unstable, soft, and incapable of supporting the pipe, the trench shall be excavated below grade, as directed by the Engineer, and refilled to grade with stone or gravel so as to form a firm foundation for the pipe. Stone shall be compacted and graded so as to provide stable foundation and uniform bearing for the pipe. Bell holes shall be provided as in other types of foundations. A minimum stone depth of 4" is required. E. Where the material excavated from the trench is unsuitable for backfill material, it shall be hauled off and disposed of and selected material hauled in for backfilling the trench. F. Should ground water be encountered in the bottom of the trench, causing the trench bottom to be unstable, the material, as directed by the Engineer, shall be excavated below grade sufficiently to allow a bed of crushed rock or gravel to be placed in which to bed the pipe. The work shall be done as for unstable foundations. The depth of cut below grade shall be only the minimum amount to accomplish the purpose, and shall be as directed by the Engineer. STORM UTILITY DRAINAGE 334100-8 6 Davis Drive, Building 1 26June2014 PERMIT SET G. The Contractor shall furnish all machinery for pumping, bailing, and /or well pointing and shall pump, bail, or otherwise remove any water which may be found or shall accumulate in the trenches, and shall perform all work necessary to keep them clear of water while the pipe is being laid. The disposal of water after removal shall be satisfactory to the Engineer. H. Whenever necessary, the side of the trench shall be braced and rendered secure and either open or closed sheeting used to the satisfaction of the Engineer; such sheeting and bracing to be left in place until the trench is refilled to a safe limit, not less than 2' above the top of the pipe. The top portion may then be cut off, but the lower portion shall remain undisturbed. In lieu of sheeting, suitable trench boxes may be employed. All sheeting, bracing, trench boxes, and trench construction methods shall conform to the latest Department of Labor Safety and Health Regulations for construction promulgated under the Occupational Safety and Health Act of 1970. No extra payment will be made for sheeting and bracing. Such cost shall be included in the cost of installing the pipe. I. In rock or other unyielding material, the excavation shall be made at least 6" below subgrade elevation. The trench shall be refilled with select material compacted in place as specified for ordinary excavation. Suitable material from excavation may be used, if available. If not, it shall be hauled in. Trench Rock (Disposal Off -Site) This item includes all costs associated with excavating and disposal off -site of Trench Rock as further defined below. The Contractor shall include in the unit price all costs associated with providing the equipment listed below whenever he encounters any subsurface material for which he intends to claim as trench rock. If said equipment can successfully remove the material in question, material shall not be classified as Trench Rock. 2. Rock excavation for trenches and pits includes removal and disposal of materials and obstructions encountered that cannot be excavated with a track - mounted power excavator, equivalent to Caterpillar Model 235D or equivalent, with a break out force of at least 44,000 pounds. Rock shall have an original volume of at least 2 cubic yards. Trenches in excess of ten (10) feet in width and pits in excess of thirty (30) feet in either length or width are classified as general rock excavation. Rock payment lines are limited to the following: A. Two (2) feet outside of concrete work for which forms are required, except foundations. B. One (1) foot outside perimeter of foundations. C. In pipe trenches, six (6) inches below invert elevation of pipe and two (2) feet wider than inside diameter of pipe, but not less than three (3) feet minimum trench width. D. Outside dimensions of concrete work where no forms are required. E. Under slabs on grade, six (6) inches below bottom of concrete slab. STORM UTILITY DRAINAGE 334100-9 6 Davis Drive, Building 1 26June2014 PERMIT SET F. Do not perform rock excavation work until material to be excavated has been cross - sectioned and classified by the Contractor, and such information provided to the Engineer for approval. Such excavation will be paid on basis of Contract Conditions relative to changes in work. 4. The payment for this classification shall be on a cubic yard basis determined from in- place, surveyed measurements of the associated undercut area conducted by the Contractor and verified by the ITL. No costs associated with backfilling the excavation shall be included in this unit price item. Backfilling of the excavation will be paid in accordance with the unit price items "ON -SITE BORROW (Associated With Undercutting and Rock Excavation Only)" or "OFF -SITE BORROW (Associated With Undercutting and Rock Excavation Only) ". 6. Unauthorized excavation consists of removal of materials beyond indicated subgrade elevations or dimensions without specific direction by the Designer. Unauthorized excavation, as well as remedial work directed by Designer, shall be a Contractor's expense. Providing additional backfill and compacting unauthorized excavations and no additional cost to the Owner. K. All existing water and sewer lines, buried electrical and telephone cable, and other known utilities intersecting the lines of construction, if requested by the Engineer, shall be uncovered by the Contractor at his expense and exposed to the Engineer at least 200' ahead of pipe laying operations to insure the correctness of grades. Existing utilities shown on the plans are as accurately located as existing records and field surveys allow; however, the Contractor shall verify with the various utility companies before excavating and shall save harmless the Owner from any claims for damages as a result of his work. L. The Contractor shall at all times take necessary precautions in preventing gutters, catch basins, ditches and other drainage facilities from being clogged that might cause flooding conditions and damage to public or private properties. M. During the course of pipeline construction, benching, early seeding of grass cover, and whatever means necessary shall be carried out to prevent siltation and bank erosion. 3.4 PIPE INSTALLATION: A. Pipe shall be protected during handling against impact shocks and free fall. On the subgrade prepared as above described, the pipe shall be laid so as to produce a straight line of pipe on a uniform grade, each pipe laid to form a close joint with the preceding pipe and so as to form a smooth inside flow line. Pipe jointing shall be in strict accordance with the manufacturer's written recommendations. B. Concrete pipe shall be laid with preformed plastic gasket joints, or gaskets, as specified in paragraph B.I.C. C. Installation DuroMaxx Pipe shall be in accordance with ASTM D2321 "Practice for Underground Installation of Thermoplastic Pipe for Sewers and Other Gravity -Flow Applications" along with product- specific recommendations contained in Contech STORM UTILITY DRAINAGE 334100-10 6 Davis Drive, Building 1 26June2014 PERMIT SET Installation Guidelines for DuroMaxx pipe, available from local Contech representatives or from www.conteches.com. 3.1 CATCH BASIN AND MANHOLE INSTALLATION: A. Brick catch basins, junction boxes, and manholes shall be constructed by experienced manhole masons. Brick shall be laid in level courses in mortar, as specified below, with mortar joints approximately '/2" thick. The joints shall be completely filled with mortar and inside joints struck flush. Cast iron steps shall be placed in each catch basin or manhole at 12" intervals. They shall be properly aligned and set level. B. Precast catch basins, junction boxes, and manholes shall be installed as follows: Precast base sections shall be installed on a firm stabilized foundation so prepared to prevent settlement and misalignment. Pipe openings shall be exactly aligned to that of the pipe entering and leaving the manhole. Cement mortar joints shall be carefully made to the manufacturer's requirements. Grout shall be as stiff as possible to be consistent with good practice and all joints shall be well filled. Pipes shall be placed in the openings provided in the base section and properly aligned and set to grade. They shall be firmly held in place and the opening around the exterior diameter of the pipe and the base opening shall be filled with an expanding -type grout, well rammed into place. C. Pipe connections shall be cut off flush with the inside wall of the drainage structure and grouted as necessary to make smooth and uniform surfaces on the inside of the structure. D. Cast iron frames, grates, and covers shall be properly set in a bed of mortar and aligned to fit the top section of the manhole. Brick set in mortar shall be used to adjust the top of finished grade. No more than four courses of brick will be used for adjustments on precast units. Steps shall be properly placed at 12" intervals. 3.2 BACKFILLING OF TRENCHES: A. Backfilling of trenches shall be completed after the installation of each section of pipe laying to the satisfaction of the Engineer. B. Backfilling around the pipe and to a depth of at least 1' above the top of pipe shall be placed by hand in layers of not over 6 ". Only select material containing no rock or other objectionable material shall be used for this portion of the backfill. As fast as the material is place, it shall be cut under the haunches of the pipe with a shovel and thoroughly compacted with mechanical tamps for the full width of the trench to provide support for the bottom and sides of the pipe. Filling shall be carried up evenly on both sides. Compaction of backfill to a depth of at least F above the top of pipe for all pipe within street limits shall be 95% of maximum as established by AASHTO Specification T99, Method A. For reinforced concrete pipe outside street limits compaction shall be at least 90% of maximum. For some pipe segments, backfilling up to the "spring line" of the pipe shall be with crushed rock or gravel, as indicated on the Plans. C. For the remainder of the backfill, no frozen earth, debris, or rocks measuring more than 6" in size shall be used. In streets, roads, and shoulders, the backfill shall be placed in layers of not over 8" and thoroughly compacted with mechanical tampers, so as to avoid STORM UTILITY DRAINAGE 334100-11 6 Davis Drive, Building 1 26June2014 PERMIT SET future settlement. In paved highways and streets, the compaction shall be acceptable to the Department of Transportation or Owner whichever has jurisdiction. Excess material shall be promptly removed from the site and the pavement or road surface cleaned of objectionable material. The Contractor shall correct any future settlement within the guarantee period. D. In shoulder of roads, the top 6" of trench shall be filled with well compacted topsoil. In unpaved streets, the top 6" of trench shall be filled with crushed aggregate base course, well compacted. The paved areas, the top of the trench shall be filled with the specified base for pavement, well mixed and compacted. Any settlement of backfill below finish grade shall be promptly corrected. E. On outfall lines and at other points where damage to the system or property will not occur, the backfill material more than F above the top of the pipe may be placed in 12" to 18" layers. The upper portion of the backfill, more than 5' above the pipe may be compacted by rolling with wheeled equipment. The Contractor will be responsible for all final subsidence of all trenches and shall have the same flush with the original ground after all settlement has taken place. Trenches must be protected against scour and erosion due to surface drainage. 3.3 FIELD HYDROSTATIC TESTING: A. As determined appropriate by the civil engineer of record, field hydrostatic pressure testing of the Duromaxx piping shall be conducted in accordance with ATSM F2487 -06 Infiltration and Exfiltration Acceptance Testing of Installed High Density Polyethylene Pipelines to verify water- tightness of the system. The following adjustments to ASTM F2487 -06 will be considered as part of the testing process: • A minimum conditioning period of 12 hours will be observed to enable stabilization of water temperature within the cistern. Following this conditioning period, the cistern will be refilled to appropriate level prior to beginning test period. • Water levels shall be measured from within the riser at a point 12" from the crown of the cistern. • The cistern test period will be a minimum of 12 hours, rather than the 15 minute test period identified in ASTM 2487. • Upon completion of the testing period, there shall be no more than 6" observable drop from initial water level within the riser. 3.8 REPAIRS TO DAMAGED SERVICES AND UTILITIES: A. Repairs to damaged services and utilities shall be promptly made at the Contractor's expense. The Contractor shall use every effort to avoid damaging or breaking water, sewer, gas, power, telephone or other utility services. Utility lines shall be properly supported across the pipe trench until backfilling is completed. Should damage occur, immediate action shall be initiated to effect satisfactory repairs. All repair work shall be satisfactory to the Engineer and the Owner of the damaged utility. 3.9 MISCELLANEOUS ITEMS: STORM UTILITY DRAINAGE 334100-12 6 Davis Drive, Building 1 26June2014 PERMIT SET A. The Contractor shall be responsible for removing and replacing miscellaneous items in conflict with the storm drainage work such as mail boxes, signs, fences, walls, shrubbery, private ornamental items, etc. Shrubbery and plantings shall be preserved by proper root protection and watering until replanted; however, the Contractor will not be required to guarantee replanted items. No additional payment will be made for removing and replacing miscellaneous items. 3.10 SEEDING AND MULCHING: A. The work of seeding and mulching shall be performed on a section by section basis immediately upon completion of storm drainage improvements. The Contractor shall adapt his operations to variations in weather or soil conditions as necessary for the establishment and growth of the grasses or legumes. In all operations, care shall be taken to preserve the required line, grade, and cross - section of the area. All disturbed pipeline areas shall be seeded in accordance with Section 02480. 3.11 FINAL CLEAN -UP: A. Final clean -up will meet the approval of the Engineer, the Owner, and the property owner, where applicable, with all defects in ditch settlement, seeding, pavement patches or other deficiencies being promptly corrected. B. Clean -up of work along highways or roads shall be performed immediately upon completion of the backfill operation. Pipe laying shall be stopped at any time that clean- up work lags and shall not be resumed until clean -up progress is satisfactory to the Engineer. END OF SECTION 334100 STORM UTILITY DRAINAGE 334100-13 EROSION CONTROL SPECIFICATIONS 6 Davis Drive, Building 1 26June2014 PERMIT SET SECTION 312500 — SOIL EROSION AND SEDIMENT CONTROL PART 1 — GENERAL 1.1 RELATED DOCUMENTS Drawings and general provisions of the Contract, including General and Supplemental Conditions and Special Project Sections, apply to this Section. 1.2 SUMMARY A. This Section includes the following: Soil erosion and sedimentation control for all areas of the site that are graded or disturbed by any construction operations and elsewhere as indicated on the Drawings or specified herein. Erosion control shall be as specified herein and as may be required by actual conditions and governing authorities. B. The Contractor is fully responsible for all applicable permits and approvals for off -site borrow and waste areas. C. The Contractor shall have full responsibility for the construction and maintenance of erosion control and sedimentation control facilities as shown on the Drawings and as specified herein. The Contractor shall at all times provide the operation and maintenance necessary to operate the permitted sediment and erosion controls at optimum efficiency. D. The Contractor shall provide permanent or temporary ground cover as soon as possible over disturbed areas of the site, and shall provide permanent or temporary ground cover in no more than 14 days after construction activities have permanently or temporarily ceased over the disturbed area. Temporary or permanent ground cover shall be provided on swales, ditches or slopes within 7 days after construction activities have permanently or temporarily ceased. E. Failure on the part of the Contractor to perform the necessary measures to control erosion, siltation, and pollution will result in the Engineer notifying the Contractor to take such measures. In the event that the Contractor fails to perform such measures within 24 hours after receipt of such notice, the Engineer may suspend the work with no extension of contract time, or may proceed to have such measures performed by others at the Contractor's expense, or both. F. Related Work in Other Sections: Earth Moving: Section 312000 Turf and Grasses: Section 329200 1.3 PRODUCT HANDLING A. Deliver seed, fertilizer and other packaged material in unopened original packages with labels legible and intact. Seed packages shall bear a guaranteed analysis by a recognized authority. SOIL EROSION AND SEDIMENT CONTROL 312500- 1 6 Davis Drive, Building 1 26June2014 PERMIT SET B. On -site storage of materials shall be kept to a minimum. Wet or damaged seed or other material shall be removed from the project immediately. 1.4 MONITORING AND RECORD KEEPING A. All sediment and erosion control devices and facilities shall be inspected at least once every seven (7) calendar days or within 24 hours after any storm event of greater than 0.5 inches of rain per 24 hour period. A written record of the daily rainfall amounts shall be retained and all records shall be made available to Durham County Environmental Services or others upon request. B. Stormwater discharges shall be inspected by observation for stormwater discharge characteristics (as listed below) at the above frequency to evaluate the effectiveness of the sediment control facilities, devices or practices. Observations shall be made at all stormwater discharge outfalls and other locations were concentrated stormwater discharges from the site. Observations shall be qualitative, no analytical testing or sampling is required. If any visible sedimentation is leaving the site, corrective action shall be taken to reduce the discharge of sediments. 1. Color 2. Odor 3. Clarity 4. Floating solids 5. Suspended solids 6. Foam 7. Oil sheen 8. Other obvious indicators of stormwater pollution B. A rain gauge shall be maintained in good working order on the site. The contractor shall perform and keep written records of the above inspections using the Inspection form provided as part of the general permit NCGO10000 for the project. Visible sedimentation found off the site shall be recorded with an explanation of the measures taken to prevent future release as well as any measures taken to clean up the sediment that has left the site. This record shall be made available to the Owner, Designer, and governmental authorities. 1.5 QUALITY ASSURANCE A. Quality Assurance: Erosion and sedimentation control shall conform to the requirements of the North Carolina Sedimentation Pollution Control Act of 1973 and Durham County Sedimentation and Erosion Control. PART 2 — PRODUCTS 2.1 SOIL AMENDMENTS AND SEEDING A. Refer to Construction Drawings SOIL EROSION AND SEDIMENT CONTROL 312500-2 6 Davis Drive, Building 1 26June2014 PERMIT SET 2.2 MISCELLANEOUS A. Gravel for stone filters: Washed No. 57 stone or as indicated on the drawings. B. Silt Fabric: A synthetic filter fabric or a pervious sheet of polypropylene, nylon, polyester, or polyethylene yarn, which is certified by the manufacturer or supplier as conforming to the following requirements. 1. Filtering efficiency: 85% min. 2. Tensile Strength at 20% (max.) elongation: 301b. /lin in (min.) 3. Slurry Flow Rate: 0.3 gal/sq -ft /min. (min.) 4. Fabric shall contain ultraviolet ray inhibitors and stabilizers to provide a minimum of six months of expected useable construction life. C. Filter Fabric (for installation under riprap): non -woven geotextile fabric, apparent opening size no larger than US Standard Sieve No. 70, min. grab strength of 120 lbs. 2.3 CHANNEL AND SLOPE PROTECTION A. Jute Netting: Provide heavy, uniform; woven of single jute yarn. Install netting over straw mulch and anchor according to manufacturer's recommendations. B. Manufactured Mats and Blankets: Erosion Control Blankets shall be a machine - produced mat of agricultural straw, a straw and coconut fiber combination, or curled wood fiber (excelsior) as specified below or on the drawings. The blanket shall be of consistent thickness with the fiber evenly distributed over the entire area of the mat. The blanket shall be covered with a photo degradable plastic netting secured to the fiber mat. Erosion control blanket shall have the following properties: Straw Mat: a. Straw: 100% (.50lb /sq. yd.). b. Netting: Top side only, photo degradable, approx. '' /z" x '/2" mesh (1.64lb/1000 sq. ft.). C. Thread: Cotton. 2. Excelsior Mat: a. Fiber: Curled wood excelsior of 80% six inch or longer fiber length with a consistent width of fibers evenly distributed throughout the mat. Mat shall be smolder resistant with no chemical additives. b. Top and Bottom Netting: Photo degradable extruded plastic netting with maximum mesh size of 3/4 ' x 3/4". 3. Synthetic Mat: a. Fiber: W stabilized polypropylene fiber matrix (0.7lbs. /sq. yd.). b. Top Netting: Extra heavyweight UV stabilized polypropylene (5lbs /1000 sq. ft. approx. weight). SOIL EROSION AND SEDIMENT CONTROL 312500-3 6 Davis Drive, Building 1 26June2014 PERMIT SET C. Bottom Netting: Heavyweight UV stabilized polypropylene (3lbs /1000 sq. ft. approx. weight). 4. Wire Staples: 16 gauge steel wire, with minimum of 3" top and 6" long legs. 1.75 staples per square yard of matting minimum. 2.4 RIPRAP A. Riprap: Provide riprap of the class and quantity indicated on the Drawings. While no specific gradation is required, the various sizes of the stone shall be equally distributed within the required size range. The size of an individual stone shall be determined by measuring its long dimension. Stone shall meet the requirement of the following table for class and size distribution. No more than 5% of the material furnished can be less than the minimum size specified nor no more than 10% of the material can exceed the maximum size specified. REQUIRED STONE SIZES — INCHES CLASS MINIMUM MIDRANGE MAXIMUM A 2 4 6 B 5 8 12 1 5 10 17 2 9 14 23 PART 3 — EXECUTION 3.1 GENERAL A. Existing Structures and Facilities 1. Existing structures, facilities, and water courses shall be protected from sedimentation. 2. The Contractor shall be responsible for the construction of necessary measures, and all costs shall be at the expense of the Contractor. 3. Items to be protected from sedimentation deposits shall include, but are not limited to, all down stream property, natural waterways, streams, lakes and ponds, catch basins, drainage ditches, road gutters, and natural buffer zones. 4. Control measures such as the erection of silt fences, barriers, dams, or other structures shall begin prior to any land disturbing activity. Additional measures shall be constructed as required during construction. 5. All facilities installed shall be maintained continuously during construction until the disturbed areas are stabilized. Contractor shall remove all erosion control measures at the end of the project at his expense unless otherwise directed by the Owner or his representative. 6. Perform monitoring and record keeping as specified in Section 1. 7. Construction operations in rivers, streams, ditches, and water impoundments shall be restricted to those areas which must be entered for the performance of SOIL EROSION AND SEDIMENT CONTROL 312500-4 6 Davis Drive, Building 1 26June2014 PERMIT SET work shown on the plans. Excavated materials shall not be deposited in rivers, streams, ditches, or impoundments except that temporary earth dikes may be used when approved by the Engineer, but such dikes shall be completely removed in such manner as to prevent siltation. Frequent fording of flowing streams with equipment will not be permitted. Temporary bridges or other structures shall be used wherever frequent stream crossings are necessary. 8. The Engineer may limit the area over which excavation, embankment, and grading operations are performed whenever the Contractor's operations are not effectively minimizing erosion and/or siltation. 9. The Contractor shall take every precaution throughout the life of the project to prevent the pollution of rivers, streams, and water impoundments. Pollutants such as chemicals, fuels, lubricants, bitumens, sewage, and other harmful waste shall not be discharged into or alongside rivers, streams, or impoundments, or into natural or manmade channels leading thereto. The Contractor shall also comply with all Federal, State, and local water and air pollution laws. 3.2 PROTECTIVE MEASURES A. Protective measures shall conform to all State and Local requirements. B. Construction and maintenance of sediment and erosion control measures shall be in accordance with all applicable laws, codes, ordinances, rules and regulations. 1. Silt Fence: 12 gauge 4 "x4" or 2 "x4" welded wire fastened to posts as recommended by the Manufacturer, and covered with silt fabric. 2. Berms and Diversion Ditches: These shall be graded channels with a supporting ridge on the lower side constructed across a sloping land surface. Diversion ditches and berms shall be planted in vegetative cover as soon as completed. 3. Mulching: Mulching shall be used to prevent erosion and to hold soil and seed in place during establishment of vegetation. 4. Matting: Temporary matting shall be used for temporary stabilization during the establishment of seeded cover in all grassed ditches, channels, long slopes, and steep banks (3:1 or greater) as indicated on plans. Matting shall be installed on any area on site as needed to provide temporary stabilization whether or not matting is indicated on the plan. 5. Construction Entrances: Construct all entrances in accordance with plans. Maintain all ingress /egress points to prevent tracking of soil onto public or private roads. Any soil that is tracked onto the roads shall be removed immediately. 6. Riprap: Stone shall be graded so that the smaller stones are uniformly distributed throughout the mass. Stone may be placed by mechanical methods, augmented by hand placing where necessary, provided that when the riprap is completed it forms a properly graded, dense, neat layer of stone. 7. Other Measures: Other methods of protecting existing structures and facilities, such as vegetative filter strips, diversions, riprap, baffle boards, and ditch checks used for reduction of sediment movement and erosion, may be used at the option of the Contractor when approved by the appropriate State or Local authorities. SOIL EROSION AND SEDIMENT CONTROL 312500-5 6 Davis Drive, Building 1 26June2014 PERMIT SET 3.3 STABILIZATION A. Permanently protect stabilized areas prior to the removal of protective devices. B. After the final establishment of permanent stabilization, remove temporary sediment control measures. Respread accumulated sediments as specified. C. Permanently stabilize all areas disturbed by the removal and re- spreading operations immediately. 3.4 TEMPORARY SEEDING A. In accordance with the schedule as detailed on the drawings. 3.5 PERMANENT SEEDING A. In accordance with the schedule as detailed on the drawings. 3.6 MULCHING AND MATTING A. Apply mulch or matting to retain soil and grass. B. Mulch areas with slope greater than 5% by spreading a light cover of mulch over seeded area at the rate of not less than 85lbs. per 1000 sq. ft. C. Install temporary matting in all grassed ditches, channels, long slopes, and steep banks (3:1 or greater) and other areas indicated on plans or where extra protection from erosion is needed. Ia►106] WWo M[63'ZG1f►•T.�III1 SOIL EROSION AND SEDIMENT CONTROL 312500-6