Loading...
HomeMy WebLinkAbout20150378 Ver 1_Stormwater Approval_20150420Engineering and Environmental Services December 5, 2014 Oliver Sherrill ARE — NC Region No. 14, LLC 7020 Kit Creek Road Suite 100 Research Triangle Park, NC 27709 Re: Stormwater Collection Systems Plan Approval 6 Davis Drive — Hamner Institutes DRB Number D1400055 Durham County Stormwater Project #SW -1408 Dear Mr. Sherrill: On October 27, 2014, we received a stormwater construction drawing package submittal package for the 6 Davis Drive project located at 6 Davis Dr, Durham, NC. This construction drawing set is approved by this office on December 3, 2014. Enclosed is a copy of the plans and calculations, stamped approved by this office. The approved stormwater collection system consists of: 1. Installation of a wet detention facility with a design permanent pool volume of 13,589 CF. 2. Installation of a bio-retention facility with a design volume of 7,603 CF. 3. Installation of a bio-retention facility with a design volume of 1,928 CF. 4. Installation of a bio-retention facility with a design volume of 6,165 CF. Our office will issue a Stormwater Operation and Maintenance Permit for the stormwater control measures after the following are completed: 1. The stormwater system is constructed and final construction inspected by a registered professional engineer, a registered land surveyor, or a registered landscape architect. A signed and sealed copy of the inspection report must be submitted to this office. 2. The final As -Built Plans sealed and signed by a registered professional engineer, a registered land surveyor, or a registered landscape architect must be submitted. 3. An operation and maintenance plan sealed and signed by a registered professional engineer, a registered land surveyor, or a registered landscape architect must be submitted. 4. An operation and maintenance agreement signed and notarized by the property owner. This will be drafted near the end of the project. 5. An improvement security must be provided to our office in accordance with Ordinance Section 14- 155(e). Our calculations indicate a performance bond in the amount of $56,106.64 is necessary to ensure construction, and continuing operation, maintenance and inspection of the facilities. Performance bond forms and information can be found on the Durham County Engineering / S &E Webpage. If you believe this bond amount is incorrect please contact me. See Attached. Please feel free to contact me if you have any questions pertaining to this approval at (919) 560 -7992. Sincerely, - —rc::� D� Ryan D. Eaves Stormwater Manager cc: Curtis M. Blazier, PE McKim & Creed, INC BMP Performance Bond Calculations BMP: Wet Detention Pond Performance Bond Calculations Project Name: 6 Davis Dr - Hamner Facility Name Wet Detention 1 Bio- Retention 3 Bio- Retention 3A Bio- Retention 4 Facility Drainage Area AC 5.10 3.08 0.77 2.77 Facility Volume CF 39,220 7,603 1,928 6,165 Capital Costs' ($) $ 30,382.75 $ 9,635.21 $ 3,687.62 $ 8,320.03 $ $ O &M Costs 2 ($) $ 1,215.31 $ 385.41 $ 147.50 $ 332.80 $ $ Inspection Costs s ($) $ 500.00 $ 500.00 $ 500.00 $ 500.00 $ $ Total ($) $ 32,098.06 $ 10,520.62 $ 4,335.13 $ 9,152.83 $ $ Total Bond Date Notes: $ 56,106.64 121512014 13:54 1) Capital Costs = 18.5 * Volume 2) O &M Costs = 4% Capital Costs 3) Inspection Costs = By Durham County Source: NCDENR Stormwater BMP Manual