HomeMy WebLinkAboutNCC230922_Site Plan or Location Map_20230404 ci
E
EROSION CONTROL CONSTRUCTION SEQUENCE(PHASE 1): a Ave m m m z N"
L? 1. OBTAIN GRADING/EROSION CONTROL PLAN APPROVAL FROM West CataW: / V
p m z E N
2Q c MECKLENBURG COUNTY LUESA. C\ d s- c
LEGEND „z cc OBTAIN CERTIFICATION OF COVERAGE(COO)FROM NCDEQ. CO Q w N u/
__ PROPERTY BOUNDARY ¢a 0_ a r
__ z�H 2. SET UP AN ON-SITE PRE-CONSTRUCTION CONFERENCE WITH THE S`o f 3 W U 'g 2
^'154 / i C¢ FOLLOWING DEPARTMENTS:LUESA EROSION CONTROL INSPECTOR, P t0�7 r
752 / 4.Q LAND DEVELOPMENT INSPECTOR AND ZONING INSPECTOR.FAILURE TO R ark 4� Chartwell
�® �® �® PROPOSED DIVERSION DITCH -/553 'SS 757 759 T58- '� -_ 0 SCHEDULE SUCH CONFERENCE 48 HOURS PRIOR TO ANY LAND C \
s5 a Center
////// -�•__ 1 y6 55 DISTURBING ACTIVITY IS SUBJECT TO FINE. `
776 EXISTING CONTOUR
T �n 753 3. INSTALL SILT FENCE,SKIMMER BASIN,DIVERSION DITCHES,TREE lQ Dr o
0• E
776 PROPOSED CONTOUR CONSTRUCT % --- PROTECTION,AND OTHER MEASURES AS SHOWN ON PLANS, ,y C
IOM4 • / CLEARING ONLY AS NECESSARY TO INSTALL THESE DEVICES. - 3
0
LIMIT OF DISTURBANCE 757 35z
4. CALL FOR ON SITE INSPECTION BY INSPECTOR.WHEN APPROVED,
a D a D a D D TREE PROTECTION FENCE ®®♦®♦ '%� 1 'ROP.TREE INSPECTOR ISSUES THE GRADING PERMIT AND CLEARING AND GRUBBING 0
PROTECTION FENCE MAY BEGIN U
PMTMM1
PROPOSED SILT FENCE(HIGH HAZARD)(STD 30.06B) ;�� / VAN ZEN,LI, ITYP.)
PID:00541107 5. THE CONTRACTOR SHALL DILIGENTLY AND CONTINUOUSLY MAINTAIN ALL
® PROPOSED SILT FENCE STONE OUTLET(STD 30.06C) •. DB 35369 PG 41 EROSION CONTROL DEVICES AND STRUCTURES. 7.socip71,,,,,,,
r� PROPOSED WATTLE(STD 30.10C) 6. STABILIZE SITE AS AREAS ARE BROUGHT TO FINISHED GRADE. -� IN 4
0 PROPOSED INLET PROTECTION(STD.30.07) � ®e / � / 7. COORDINATE WITH EROSION CONTROL INSPECTOR PRIOR TO REMOVAL SITE� )
POROUS BAFFLE(STD 30.19) 748 OF EROSION CONTROL MEASURE. -S
SK-U SB-H SKIMMER/SEDIMENT BASIN(STD 30.02A,STD 30.026) ♦ h A
8. ALLEROSIONCONTROL MEASURES SHALL BE CONSTRUCTED IN
♦ ; ACCORDANCE DESIGN MNACE,U.S.DAND SEOF AGRNTLTURE.LICIA MECKLNBUR DESIGNMANUALU IONAN OF AGRICULTURE, VICINITY "P "TS /7Z7j'TEMPORARY STONE RING BOUN ^ MECKLENBURG COUNTY EROSION CONTROL ORDINANCE,AND THE O�j��O/S7URBEO BUFFER Al�y ^ TEMPORARY DITCHES TO �_ CHARLOTTE-MECKLENBURG LAND DEVELOPMENT STANDARDS. 7'9�i=iBE LINED WITK C125 4' 9 MMEN IN WITH = ND i80'UNDISTURBED BUFFER ERosION CQNTRQLi c G = 07FORPHASEDEROSION CONTROL PLANS,CONTRACTOR SHALL MEET' * * �' �' �4 MATTING PER ENHANCED WITHEROSIONCONTROLINSPECTORPRIORTOCO 1 `-I EACH PHASE OF EROSION CONTROL MEASURES. ff�- j- •• 11 EROSION CONTROL(TYP.) p EROSIONCONTROL&WATER QUALITY � �```�.��0.� INSPECTORCONCRETE SIDEWALK ®�� �i �� COR721-058 Y 91i,,,,,O
980 72
ii
/ LAND DEVELOPMENT INSPECTOR:
��� /1`'U� //� 1
TOTAL DISTURBED AREA: HEATHER DAVIS
/ , • I` 208826 SF-4.79 AC (980)721-3571
� ZONING INSPECTOR:
6 BRIAN SIFFORD
S6 (980)721-0924
LL5 � ���� % NARRATIVE:
TD-1(PHASE 1): THE PROPOSED CONSTRUCTION IS FOR THE CONSTRUCTION OF CORNELIUS
•
vw+eo ew. ♦♦�♦ I STD 3D 05(TYP.) I' Cr CAR CONDO&STORAGE THE SITE TO BE DEVELOPED IS APPROXIMATELY 6.74
IHI.me zI ACRES WITH A PROPOSED DISTURBED AREA OF 4 79 ACRES
♦ �/ TD-2(PHASE 1):�su rrra ' ��.♦® (TYP.)0.05 Q THE SITE IS LEVEL TOPOGRAPHY WITH SOILS ON SITE BEING CLASSIFIED AS:
/ / Z SYMBOL NAME HYDROLOGIC GROUP m
..�� 2. HBB2 ENON 8AE SANDY
LOAM B
ATTENTION! �oM wo "'^++a .�s' �Sa He8 ENON FINE SANDY LOAM C
DITCH TO BE ,a aE o� �♦♦♦♦♦.♦♦♦ 0
x wc.eu Ise..I
CONSTRUCTED WITH ANY SOILS LEAVING OR ENTERING THE SITE WILL NEED TO BE DELIVERED TO
BOTTOM WIDTH AS NOD ♦♦♦♦♦♦..♦♦♦♦ `, /y OR RECEIVED FROM A SITE WITH AN APPROVED EROSION AND SEDIMENT
REQUIRED IN TABLE 1(TYP.)
�L CONTROL PLAN
BELOW i.ona ...E zz,".,: or�..
�� .� aaw� . A., Q
TEMPORARY WATTLE CHECK THE SCOPE OF WORK WILL INCLUDE INSTALLATION OF EROSION CONTROL
DAM(SEE SPACING CHART ON44
j I G �II)I MEASURES,CLEARING AND GRUBBING,AND FINE GRADING.
pPPRDVEO II/GE Ozreao] NOT To SCALE STD.30.10C �I I /I
NRCRLENBORG COUNTYMAI
.♦♦♦ ` I IMIT OF
IAND DEVELOPMENT TEMPORARY SILT DITCH /...♦♦♦♦♦® ALL AREAS DETERMINED BY AUTOCAD.
STANDARDSwri O.Os iI/ �♦..♦ �/ DISTURBANCE(TYP.)
ewxoncxrceLC PRASE lnxD Zl /.' 4444 r DOWNSTREAM RECEIVING WATERS ARE MOUNTAIN ISLAND LAKE
,♦♦.♦♦ ' ) ) ^� THIS SITE IS IN ZONE X PER FEMA FLOOD MAP COMMUNITY PANEL NUMBER:
.�♦♦♦♦♦..♦♦♦� PROP.INLET
COPNELMISCM % / 3710464300K,DATED 9/02/2015.
Dan. c A O=" a N z . ..x �,♦♦♦♦. . J ' 1 I 9 STD.30.07 N:
< '.♦�♦:♦:♦♦ �/ / I 1 1 / /I STD.30.07
rosw�a x® NO 7m ,. x� x, x, ,x x ,s L,n x� � -/I �� EROSION CONTROL NOTES
1. ALL'STD."NUMBERS REFER TO THE MECKLENBURG COUNTY LAND
�♦♦ / % PROP.TEMP 24"HOPE CULVERT DEVELOPMENT STANDARDS MANUAL(MOLDS)
INV IN:741.01
PROP.HIGH HAZARD SILT ---I/ INV OUT:740.43 2. ON-SITE BURIAL PITS REQUIRE AN ON-SITE DEMOLITION LANDFILL
FENCE STD.30.OBB(TYP.) ) �p� PERMIT FROM THE ZONING ADMINISTRATOR.
a ILT
FENCE AROUND
�' I ' 3. ANVGRADINGBEYONDTHEDENUDEDLIMITSSHOWNONTHEPLAN
:X2T0T:STD
30.06A(TYP.)
IS A VIOLATION OF THE COUNTY EROSION CONTROL ORDINANCE AND
O IS SUBJECT TO A FINE
o
TEMPORARY ' TEMPORARY 4. GRADING MORE THAN ONE ACRE WITHOUT AN APPROVED EROSION �+
•
STOCKPILE 0 CONSTRUCTION cc
CONTROL PLAN IS A VIOLATION OF THE COUNTY EROSION CONTROL 750 LOCATIONENTRANCE: ORDINANCE AND IS SUBJECT TO A FINE.
3.1 / \747 ^ STD.30.11A5. STA BERME WIT IN 7 S AND GLOUN GREATER TITHON O1 ALL O HE
PROP 24"HDP 0 k_ __ - STABILIZED WITHIN 7 DAYS.GROUND STABILIZATION ON ALL OTHER a
TEMPORARY �� 746 AREAS MUST BE COMPLETED WITHIN 14 DAYS.REFER TO THE o
SLOPE DRAIN ENSURE MIN 2' EROSION CONTROL ORDINANCE FOR ADDITIONAL REQUIREMENTS.
STD 30.04 ( TqS PIPE COVER' r,
INV.IN:]32.50 /// -} 6. ADDITIONAL MEASURES TO CONTROL EROSION AND SEDIMENT MAY BE z
INV.OUT:732.00 ® STOCKPIL REQUIRED BY A REPRESENTATIVE OF THE COUNTY.
/ ♦•�' ///
_ \ ENTRANCE "ROP.CONCRETE TIREWASH
- 1` (INSPECTOR MAY REQUIRE AT 7. A GRADING PLAN MUST BE SUBMITTED FOR ANY LOT GRADING
SILT FENCE' .! {� I'S 3 A OW.30.11 NTRACTOR EXPENSE) EXCEEDING ONE ACRE THAT WAS NOT PREVIOUSLY APPROVED. ZSTONE OUTLET: X BB sO•9 PG 41 / STD.30.11E
_ EXISTING TREE ySTD 30.O6C(TYP.) PARCEL'C',MB 65 G 327 � �R 8. TEMPORARY DRIVEWAY PERMIT FOR CONSTRUCTION ENTRANCES IN
/ ;I ( ) NCDOT RIGHT OF WAY MUST BE PRESENTED AT PRE-CONSTRUCTION w m
'�•� 7 ♦7I
MEETING. '^ Z
43 NSURE POSITWE V C
{ IS� �. 9. ALL EMBANKMENTS MUST BE CONSTRUCTED PER SECTION 4.0.6
RIP-RAP BAFFLE(PER t .`�I N6URE SLOPE DITCH DRAINAGE Q
ENHANCED EROSION /� / `�- �\DRAIN A FROM EXISTING EMBANKMENT REQUIREMENTS IN THE BMP DESIGN MANUAL. N
CONTROL) / \- ADHERES TO o (/ ,,,,,PIPE OUTLET 10. SLOPES SHALL BE GRADED NO STEEPER THAN 2:1.SLOPES GREATER Li
rp�-��\; TD 30.04(TYP.) - ' THAN 10 VERTICAL FEET REQUIRE ADEQUATE TERRACING(MCLDSM M r O
Y-.g 30.16).SOILS ENGINEER TO VERIFY STABILITY OF SLOPES GREATER = I-
it -ROP. THAN21 II11 CO
$K-1 '�V ' •4 ''„ ONE IARBA` HOPE I..V
TOTAL DRAINAGE AREA=9.81AC E / ��j _ 3 PROVIDED) / TEMPORARY 11. SOIL COMPACTIONTESTSAREREQUIREDONANVBERM>=5'INCo
/'` SLOPE DRAINS HEIGHT FROM THE NATURAL GRADE.SOIL COMPACTION MUST BE O
% ®..BAFFLE:STD 30.19(TYP. +P ^a)!Th3 •'+t}aV'S.S' k A
STD 30.04 AT 95%PROCTOR AND CERTIFIED BYA LICENSED SOIL ENGINEER. OTOTAL DENUDED A® AC /
• INLET ZONE SURFACE AREA k.l INV.IN 732.50 �/ Q
dx4 x6'ANTI / PROVIDED) %4}q+. ,�,I/I c, INV.OUT.732.00 12. TIREWASH MAY BE REQUIRED AT OWNER/CONTRACTOR EXPENSE LF�
w. !11a SEEP COLLA- ... 34 gOtTt + �• zr ,• O
- OrOO P4O4,EU , TD-7(PHASE 1): O
• 46R? R#4 OA ' #"•` ', STD 30.05(TYP.)
AWN.40 ' • �� C-)
�I �� Ce
,:
rc
EXISTING DROP INLET(TYP. ; 739-- "�� �'' I
w
_ �% .. „ / RIP-RAP APR-0
-737--=-- STD 20.23(T'pP) Y- RO CO: ''^^
OUT FALL POINT , \' cc v/
INV:729.79' ' - 'z = Z
SKIMMER
EXISTING FENCE(TP.) STD 30.02B __ erg 8 W W 5
KIMMER BASIN(PHASE i) '1 Z
10'CONSTRUCTION STD 36.62 �� N m
ACCESS BERM:736.00 TEMPORARY 1.1.
SPILLWAY INV:734.00 _ STONE RING 728 O Q
Z
BOTTOM OF POND:732.00 771
LINE INNER SLOPE WITH j ��y 1� v
PROP.HIGH HAZARD SILT C125 EROSION CONTROL
FENCE STD.30.06B(TYP.) MATTING Ei W
SONDERWERKS RE HOLDINGS
PID:00541112
Y1Iina
20'EMERGENCV SPILLWAY DB33888 PG 01 j GRAPHIC SCALE PROJECT INFORMATION
INV:736.00 PARCEL"B",MB 65 G 327 j LOCATED PRIOR W W W DC811.0}9 PROJECT MANAGER: AL
FOR CONTACTING
"MINOR SUBDIVISION OF 15.683 ACRES ON L c MEry RIO AO BEGS NING CONSTRUCTIOrv. BARRICADES USING
CHARTOWN DRIVE" OH9 - OR1v 1� EXISTING UTILITIES ARE
.. ssnar ro wO REL SAFETY
DESIGNED SA
Lg26 11
DRAWN SB
(IN FEET)
1 INCH= 40 FT. 31 A PROJECT NUMBER: KT29.400
REPLACED ACCORDING TO STANDARDS OF THE NORTH CAROLINA
DEPARTMENT Or TRANSPORTATION AND LOCAL MUNICIPALITIES_ ORIGINAL DATE: 11/18/2022
1,6, A) HORING WILL BE ACCORDING TO OS
PART 1928 SUBPARTP,OR AS AMENDED. RA TRENCHING STANDARDS SHEET: //�
O C6.2
E
EROSION CONTROL CONSTRUCTION SEQUENCE(PHASE 2):
ANeir m m z N.
1. THE CONTRACTOR SHALL DILIGENTLY AND CONTINUOUSLY MAINTAIN ALL West CataW: / I
p m z E 4 N
2e c PHASE 1 EROSION CONTROL DEVICES AND STRUCTURES. a s- c a
N� a aW qY 15
LEGEND •
'ROPERTY BOUNDARY , '�' 2. COORDINATE WITH EROSION CONTROL INSPECTOR PRIOR TO REMOVAL OF d o o
L// PHASE 1 EROSION CONTROL MEASURES. 41 ft1. -2•� W U S r
--Ili'
10'CONSTRUCTION ACCESS C¢ p O/) S
--_-- 11
3. FOR PHASED EROSION CONTROL PLANS,CONTRACTOR SHALL MEET WITH R°rk 4� Ch°rtwe
Ill'
EROSIONCONTROL NCON ROTOR A COMMENCING WITH d
�® �® �® �® PROPOSED DIVERSION DITCHCeF1teE
_ EACH PHASE OF EROSION CONTROL MEASURES. pIMMMI
-776- EXISTING CONTOUR O Dr o
j 1- 4. INSTALL OUTLET SILT FENCE,TEMPORARY DITCHES,SLOPE DRAINS, lQ
776 PROPOSED CONTOUR - _-_ RIPRAP APRONS,BAFFLES,SKIMMER BASIN,AND OTHER MEASURES ,y C
% SHOWN ON PLANS. 3
LIMIT OF DISTURBANCE ...--.1. O
e� .:::NV:rllr::4-
=UILD SITE UP TO FUTURE 5. THE CONTRACTOR SHALL DILIGENTLY AND CONTINUOUSLY MAINTAIN ALL 0
a D a D a D D EE:RE:ENG:: :z:: PMTMM1
PTD30.O6B) 'CONS1 7R -•19] •® TD 30.06C) /A. DB 5369 PG 41 n SOUTH. DRAINAGE,SIDEWALKS,DRIVE WAY IMPROVEMENTS,AND ALL ASPECTS OF
V.1 �� ^q ROAD CONSTRUCTION um ^ 2 JT
404,4 PROPOSED WATTLE(STD 30.10C) ♦ �' SITE
�`r 6. STABILIZE SITE AS AREAS ARE BROUGHT TO FINISHED GRADE n ��
pPROPOSED INLET PROTECTION(STD.30.07) ' / y Jiri/ n . 7. COORDINATE WITH EROSION CONTROL INSPECTOR PRIOR TO REMOVAL I
POROUS BAFFLE(STD 30.19) • i
/• OF ANV EROSION CONTROL MEASURES \/
SK-tt SB4i SKIMMER/SEDIMENT BASIN(STD 30.02A,STD 30.026) ���♦♦, 8. ALL EROSION CONTROL MEASURES SHALL BE CONSTRUCTED IN y N TY MAP N TS
ci
'OOP.TREE ACCORDANCE WITH THEN C.EROSION AND SEDIMENT CONTROL ��,�(N�CgRO,�
TEMPORARY STONE RING Bo.
0 UND ® PROTECTION FENCE PLANNING AND DESIGN MANUAL,U.S.DEPT.OF AGRICULTURE, ..• �/
80'UNDISTURBED BUFFER FO BUF ,➢ (TVP) CHARLOTTE M CKLENBU G LAND DEVEL O MEET STANDARD THE ���� �'•.7'9♦i♦
STURB 3�� FFR I CHARLOTTE-MECKLENBURG LAND DEVELOPMENT STANDARDS.
G
1. k
/: EROSION CONTROL&WATER QUALITY 3) $\ � `
INSPECTOR ..•'�
CONCRETE SIDEWALK I
n- - I 980)]21-OISB V ♦♦♦"00011111M �LAND DVELENTINSPECTORHEATHR DALo
(980)]2-3571TEMPORARY DITCHES TO ZONING INSPOR// BELINEDWITHC125 BRIAN SIFFORD
��y EROSION CONTROLV (980)721-0924
�j' MATTING PER ENHANCED
,/I/� EROSION CONTROL(TYP.)
♦ $ a TRAWWATTLE(SEESPACINGCHARTSTD.30.10C)(TVP.)
TEMPORARY WATTLE CHECK / "DAM(SEE SPACING CHART ONSTD.30.10C)(TVP.) TD-1(PHASE2):N STD 30.05(TYP.)• Oi
,iI STD 30,BGC(TVP.)\ /(-------X /i'♦� s1.
LLB
di
I
TEMPORARY DITCHES TO �BE LINED WITH RC125
OLEROSION CONTROLMATTING PER ENHANCED ]EROSION CONTROL(TYP.)
L� / �i / PROP.TEMP 24.HDPE CULVERT
ILT FENCE AROUND INV N:]41.01
PROP.HIGH HAZARD SILT STOCKPILE:STD 30.06A / INV OUT:740.43
FENCE STD.30.06B(TYP.)4
(I (TYP.)
//I
.YSLOCAT TEMPORARY
Lo
VP-. ( ILE
® ®_. ION / p
z
y
LAKE PATH DR. \> p I TEMPORARY
CONSTRUCTION
® x
® ♦. � _74, -- - ^ ENTRANCE:
� '� ,�pQ'/ f(11 STD.30.71A
ENSUR
♦♦ �, MIPIPE EXISTING TREE
♦♦♦ �j• y STOCKPIL COVER (TVP.�I
�♦ ® // / ENTRANCE Jys \/`C/ 1
O
-II
TEMPORARY STONE RIN ' 1 C PROP.CONCRETE TIREWASH z
"J 1•/ (INSPECTOR MAY REQUIRE AT
n \{ yA .. 3 / 1 OWNER/CONTRACTOR EXPENSE) Z
-OOP.L"HDPE Bo.s4•9 PG 41 d / STD.30.11B
/�®® /• TEMPORARY P•-CEL"C",MB 65G 327 � � CO-
,
♦ SLOPE DRAIN NSURE POSITIVE LLJ _
• ♦S♦♦ // STD 30.04 /, DITCH DRAINAGE
INV.IN:732.50 743� FROM EXISTING PIPE CD Z
.,
// f. - ,INV.OUT:732.00-73g NSU76.110SADTRADDHIE3NOR.E04S
RE SLOPE ^p^ OUTLETCe
RIP-RAP BAFFLE PER ENHANCE. � TOIINU
( ��- (TYP.) ),I KIMMER BASIN(PHABE 2) NlOiEROSION CONTROL) �/ STD 30.02+� BERM:736.00
AYINTj ... SPILLWAY INV:734.00 2
'�I F vir
BOTTOM OF POND:732.00 (n
/ / it / LINE INNER SLOPE WITH �(
BAFFLE:STD 30.19(TYP. i A ' I • C125 EROSION CONTROL OV
//// /Hi •/ w.44!•.r.t.'3 '1lf.J. .% ROE 2 2A• MATTING
4z4.66"ANTI-SEEP COLL'- • I ar, �, HDPE • O
• SURFACE AREA �v TEMPORARY O
Ig SK-1 PROVIDED) f°1. �' I SLOPE DRAINSill
s`H q�A . N$ STD 30.04 TD-1(PHASE 2):
TOTAL DRAINAGE AREA=9.81 AC / o� � ! INV.IN:]32.50 Z
�� W''hT OBRVp S g .A-�� STD 30.05ITYP.) 0
TOTAL DENUDED AREA=4.79 AC - ,` ,,� �+o�oF/ • 1y ; INV.our:73z.00 O
\\� '�,s Z Q
OUT INV:POINT= Ce
♦ . - "-Q=.RAP APRO �a 1� O ♦1t
INV-729.79' /// _ -STD 20.2317YP.) �1 '^ v/
rc v!
w
s
EXISTING DROP INLET(TOP. SKIMMER:STD 30.02B(TVP.--� �' iiIIIMININIMMar STONE TEMPORARY
` �� O Z
Cn
EXISTING FENCE(TYPci
.)---- !'C•NSTRUCTION ES W Jet
20'EMERGENCY SPILLWAY �. W W
INV:736.00 -� �Z//
-� Lf� OD
O a
z
PROP.HIGH HAZARD SILT D_
FENCE STD.30.O661TVP.) ly~j
SONDERWERKS RE HOLDINGS,LLC
PID:00541112 Y0 I n a$1
DB 33688 PG Ot GRAPHIC SCALE `�& PROJECT INFORMATION
LOCATED PRIOR www DC811.Or9
PARCEL ION MB 65 G 327 / To BEG corvsr6ucrlorv. PROJECT MANAGER: AL
CONTRACTOR IS FULLY RESPONSIBLE FOR CONTACTING
"MINOR SUBDIVISION OF 15.683 ACRES ON 11
P c NEry RIO As BED/ wcnoEs USING CHARTOWN DRIVE" O.
- d 2` 1v 1AP EXISTING UTILITIES ARE
.. ssnar ro wsu6E SAEErv. DESIGNED
RAWN BY: SAB
Lg DRAWN BY: SB
(IN FEET)
1 INCH= 40 FT. 31 A PROJECT NUMBER: KT29.400
DEPARTMENT OF TRANSPORTATION AND LOCAL MUNICIPALITIES_ ORIGINAL DATE 11/18/2022
raR.iEzs SUBPART P,ONASAmOBBOB HORING WILL BE ACCORDING TO NA TRENCHING STANDARDSSHEET:
C6.3