Loading...
HomeMy WebLinkAbout20230479 Ver 1_prefile_soa_resourcemaps_202303293/29/23, 2:38 PM wetlands-waters.com Mail - 401 Pre -file Notification - Duke Energy / Beatty's Ford Recreation Area WLANDS Chris Huysman <chrishuysman@wetlands-waters.com> r4fTxTERS, INC. 401 Pre -file Notification - Duke Energy / Beatty's Ford Recreation Area Chris Huysman <chrishuysman@wetlands-waters.com> To: michael.burkhard@ncdenr.gov Wed, Feb 22, 2023 at 11:24 AM Michael - We will be filing a 401 application for the development of a recreational beach per the requirements of the FERC license for Lake Norman. The project is located in Lincoln County off of Unity Church Road at approximately 35.482036,-80.958015. Please confirm receipt of this email. Chris Huysman 336.406.0906 170 Dew Drop Road Sparta, NC 28675 chrishuysman@wetlands-waters.com chris.huysman@gmail.com wetlands-waters.com TWETLANDS „" a WATERS, INC. The information contained in this email message is confidential and may be legally privileged and is intended only for the use of the individual or entity named above. If you are not an intended recipient or if you have received this message in error, you are hereby notified that any dissemination, distribution or copy of this email is strictly prohibited. If you have received this email in error, please immediately notify us by return email or telephone if the sender's phone number is listed above, then promptly and permanently delete this message. Thank you for your cooperation and consideration. https://mail.google.com/mail/u/0/?ik=bd5c9ecf64&view=pt&search=all&permmsgid=msg-a: r-1954033130997944394&simpl=msg-a:r-19540331309979... 1 /1 W10.* WILDLANDS E N G I N E E R I N G Catawba 01 Riparian Buffer Credits Statement of Availability March 29, 2023 Duke Power Company Attn: Ryan Snitkar 257 Duke Lane Stanley, NC 28164 RE: Availability of Riparian Buffer Credits for the "Beatty's Ford Recreation/Access Area" project Permittee: Duke Power Company Riparian Buffer Credits Needed: 8,166.00 sq. ft. Riparian Buffer Credits Available: 189,170.00 sq. ft. Future Riparian Buffer Credits: Catawba River Basin (03050101) BANK NAME BANK SPONSOR DWR PROJECT NUMBER Firestone Bank Parcel Wildlands Holdings VI, LLC 2020-1096v1 Double Rock Bank Parcel Wildlands Holdings VI, LLC 2020-1095v1 Dear Mr. Snitkar, Wildlands Holdings VI, LLC owned and operated by Wildlands Engineering, Inc., currently have sufficient riparian buffer credits from the above -mentioned banks to satisfy the riparian buffer mitigation requirements related to your project. The project is located within the service area (HUC 03050101), of the Banks. This letter is simply a statement of availability of credits as of the date written. It is neither a guarantee of future credit availability, nor a guarantee of credit pricing. Credits are sold on a first come, first serve basis at the Bank's price at the time an invoice is requested. Invoices reserve both the credits and the price for a period of 30 days. Credits and associated pricing may be reserved for up to 6 months with a signed reservation agreement and a 10% deposit. Final transfer of the credits will be made upon receipt of a copy of the 401 Water Quality Certification and Authorization Certificate from the NC Department of Environmental Quality -Division of Water Resources approving the Riparian Buffer mitigation purchase from the Bank and upon receipt of your payment to Wildlands Holdings VI, LLC (depending on availability at the time of permit issuance). We will then issue a credit transfer certificate verifying your credit purchase to the North Carolina Division of Water Resources and to you for your records. We appreciate the opportunity to assist you with your mitigation requirements. Please contact me at (704) 332- 7754 x114 or cbrunick@wildlandseng.com if you have any questions or need any additional information. Wildlands Holdings VI, LLC • Wildlands Engineering, Inc • 1430 South Mint Street, Suite 104, Charlotte, NC 28203 w1p.* WILDLANDS E N G I N E E R I N G Sincerely, Camden M. Brunick Wildlands Engineering, Inc. Mitigation Credit Sales cbrunick@wildlandseng.com 0: (704) 332-7754 ext. 114 M: (919) 219-6162 Cc: Ms. Katie Merritt, Nutrient Offset & Buffer Banking Coordinator I NC Division of Water Resources Mr. Chris Huysman, Project Manager I Wetlands & Waters Inc. Wildlands Holdings VI, LLC • Wildlands Engineering, Inc • 1430 South Mint Street, Suite 104, Charlotte, NC 28203 webbs Rd ebbs Sara/, I r 2 to S o£i 61 61 1 Triangle le F Of est Rd era 2 0 0 0 6 II. Westport t aKe Rd .mac Q Unity Chnreh Rd c^ vham Rd Hagers P erry Rq 0 1,500 3,000 6,000 Feet I I I I I I I Cowans For Country Club I c+ 1 a \ p01 0. Gr \I gCOW1 a/ aioia / \ Lake Norman, / 1 1 i I / Jetton Rd 1 I Peninsula Club l 1 I I j ts\eof / Lake Norma►/ n Labe Norman City,of Charlotte, NC, County of Lincoln, State of North Carolina DOT, Esri, HERE, Garmin, SafeGraph, GeoTechnologies, Inc, METI/NASA, USGS, EPA, NPS, USDA Project Name: J� W—L—IIS Owner/Devel WATERS, INC. City/County: Tax PIN(s): Site Vicinity Coordinates: Beattys Ford Access N Duke Power Company w�E Denver/Lincoln V 4613750794 4613766519 S Lat: 35.4823462°N Long:-80.9572671°W Date: 10-10-2022 Project Name: Owner / Developer WETLANDS City/County: N4JW,(WATERS} INC. TaxPIN(s): Coordinates: Figure 1: Approximate Delineation of Surface Waters and Wetlands Lat: 35.482346 *Wetland Sketch provided for illustrative purposes for preliminary planning use only. Not intended to be relied upon for exact location, dimensions, or orientation. All findings and assessments made by wetland consultants regarding limits ofjurisdiction or permitting requirements are subject to verification by the US Army Corps of Engineers and other appropriate state and local authorities. Beattvs Ford Access Duke Power Company Denver/Lincoln 4613750794,4613766519 Scale: Date: -80.957267 graphic 10-10-2022 a� 79931 7 .79928 79932' 79925 ' 7992 i �•. r{ 799216t . 79933 ai-;i79924 79934 79923 x ; u79936 w _ 9935'i fff is . 79922 5 6217 k FX `r . 33532 ' 110286i1 k85 790 ' 3016779921 79938 31481 - ` 0i1 88425 r71§ a �! r';: �70355 t. y5221 $'5$ 71197. 89388 a �•T � 1 }: 'dal v -' }".:'fll 79940 79939i4 57957f, 31337 `89389'}' 33 i193 t r � 57923 71291 70101 . ` <2 70709 30963 if - f 701033..... '�82258582 45 .': 52333_ 2.5`" r. 8356 702 82246i 51 } 51888 129670 32433 i �' 31167 104161 ; f' �� 31Q64 --T3�6 73732 ,. 4~ 32332 1♦ 99i 1 50 October 10, 2022 Lincoln County, NC 0 100 200 Feet Office of the Tax Administrator, GIS Mapping Division U ncoln County and its mapp irrg contractors a=_s4me r>c lesaI responsibility far the information contained on this map. This map is not to be used far land conveyance. The map is based on NC State Plane Coordinate System 1983 NAD, 1 inch = 369 feet Project Name: Beattys Ford Access Owner/ Developer: Duke Power Company City/County: Denver/Lincoln WETLANDS & WATERS, 1Nr- TaxPIN(s): 4613750794,4613766519 Figure 2: County GIS Coordinates: Lat: 35.482346 Long:-80.957267 Scale: graphic Date: 10-10-2022 • L rI� KI 0 455 910 1,820 Feet - -a Project Name: W ETLA N o s Owner / Developer. & WATERS, NC_ City/County: Tax PIN(s): Figure 3: USGS Topo Quad Coordinates. K a o�Man Estates Beattys Ford _ Access + d \Ramp In$ Mai *�9) Source: Historical Topographic Map Collection co rtesy of the U.S. Geological Survey, Esri, Maxar, Esri Community Maps Cont�butors, City of Charlotte, NC, County of Lincoln, State of North Carolina DOT,#,sri, HERE, Garmin, SafeGraph, GeoTechnologies, Inc, METI/NASA, USGS, ERAJNPS, US Census Bureau, USDA Beattys Ford Access Duke Power Company Denver/Lincoln N W+E S Date: 10-10-2022 Soil Map —Lincoln County, North Carolina 3 (Review Area) _ 503660 503740 T3820 50 00 503380 5.060 5.1. - Mup` 1e: 1:3,34o ff pinied an Apor t(8.3'x 11")4—t - N Mfrs m 0 41 11 180 270 At 0 150 300 600 900 MaP prof yion:N bMa-mr C'ama orordi.a W684 Erg, tics:U Zane 17N W684 WETLANDS &r WATERS, INC. Figure 4: NRCS Soil Survey Map Unit Legend Map Unit Symbol Map Unit Name Acres in AOI Percent of AOI LdB2 Lloyd sandy clay loam, 2 to 8 percent slopes, moderately eroded 19.6 89.3 Ur Urban land 2.3 10.5 W Water 0.0 0.2 Totals for Area of Interest 22.0 100.0% Project Name: Beattys Ford Access Owner/ Developer: Duke Power Company City/County: Denver/Lincoln Tax PIN(s): 4613750794, 4613766519 Coordinates: Scale: Lat: 35.482346 Long: -80.957267 graphic Date: 10-10-2022 Wq /P 2 a ring .!Jr 'eC2. - 4% MES k y s 1 � 444 r - i y - t} - t 3T 1 I+• • ., CDOT Project ATLAS SWEEP rs ity of Charlotte, NC, County 0 455 910 1,820 Feet ''sri, HERE, Garmin, SafeGraph, NPS, US Census Bureau, USDA Project Name: Beattys Ford Access N WETLAN �S Owner/Developer: Duke Power Company W�E WATERS, 1NC. City/County: Denver/Lincoln V Tax PIN(s): 4613750794 4613766519 5 Figure 4A: NRCS Paper Soil Survey Coordinates: Lat: 35.4823462°N Long:-80.9572671°W Date: 10-10-2022 r CY 66 r 0 455 910 1,820 Feet i i i I iI l ill Project Name: WEOwner/Developer. V-e- V--, INc. City/County: Figure 5: National Wetlands Inventory Tax PIN(s):Coordinates: Legend USA Wetlands Marine Estuarine Palustrine Riverine Lacustrine Beattys Ford Access Duke Power Company Denver/Lincoln N W+E S Date: 10-10-2022 M. 0 455 910 1,820 Feet / / J / ♦ M U VMki'm-mA, Ssr Curnmul-L[ty Ntp—"-OnnfAbl 'u tonm' C[f:y on 1r{on V L, Coui-Lily of U oIi-L, Si its U, f Mi U, rt Va S�ro[ [vn 007a Ls roa H ERE, C,nmlI[1a S 6c, ph, C�7c-h'nalu'J51C5, 0m—' V�]�7[Ju J,°151 JScSo IEIP4INIPS, US C-aalo Olurvilu, UJSLA A