Loading...
HomeMy WebLinkAboutNC0024210_Approval_19990503�ICQD 2y2C RVEN AND SAWYER Environmental Engineers & Scientists May 3, 1999 Ms. Coleen Sullins Water Quality Section Chief Division of Water Quality State of North Carolina Department of Environment and Natural Resources Post Office Box 29535 Raleigh, North Carolina 27626-0535 Re: Schedule for Permit Issuance/AtoC Eastside WWTP High Point, North Carolina Dear Ms. Sullins: ,TDAye- a�i Hazen and Sawyer, P.C. � 4011 WesiChase Blvd. Raleigh, NC 27607 919 833-7152 Fax: 919 833-1828 This is to confirm the schedule for issuance of the NPDES permit and Authorization to Construct (AtoC) associated with the upgrade and expansion of the Eastside Plant based on recent conversations with Jay Lucas with Construction Grants and Dave Goodrich with the NPDES Unit. The City of High Point is requesting that drafting of the permit and internal DWQ reviews be expedited to reduce the time required for issuance of the NPDES permit and AtoC. Based on a recent conversation with Jay Lucas, we are anticipating that the FONSI will be issued on May 28. On May 28, Hazen and Sawyer intends to hand -deliver the NPDES permit application for 26 mgd capacity to Dave Goodrich. We understand that the turnaround from issuance of the FONSI to advertising a notice of intent to issue a revised NPDES permit an be 75 to 120 days depending on backlog. Due to staff shortages in the NPDES Unit, Dave anticipates no less than 60 days after receipt of the FONSI for drafting the permit, completing internal reviews, and completing review by the Regional Office. We are requesting that the Eastside project be moved ahead in the queue based on the work done over the past 2 years relating to the Eastside discharge permit. This needed project has already been delayed by issues related to the Randleman Reservoir. The proposed project includes facilities for BNR and other improvements that will result in improved effluent quality and improved water quality in the Deep River. The sooner these facilities are constructed, the sooner that improvements in performance and water quality will be achieved. The schedule for issuance of a NPDES permit for expanded flow for the Eastside Plant includes 7 days for preparing the public notice and 7 days lead time for the advertisement. There is limited opportunity to reduce these times according to DavEP Goodrich based on the work required. Z IAAY - 6 1999 CCRRESICRAMER1SWIins0427981_tr. d. Nex York, NV •Armonk, NY • WOOtlWry, NY • UPI1e<$aOUI¢ Hirer, NJ • 0¢Uoq MI • Raleigh. NC • CnatlWle. NC • FaiNax. VA • HollVxrooE. FL • 9oq Halan, FL • Full Pierce, FL • G ,gilliL • r ota. FL •Miami. FL HUENAND SAWYER Ms. Coleen Sullins May 3, 1999 Page 2 The schedule also includes a statutory 45 day period after advertisement before the permit may be signed and issued by the NPDES Unit. A summary of the most optimistic schedule as discussed with Jay Lucas and Dave Goodrich is as follows: Date Critical Schedule Item May 28, 1999 FONSI due out. NPDES permit application hand -delivered by Hazen and Sawyer to Permits and Engineering. July 27, 1999 End of 60-day period for drafting permit, internal review, review by Regional Office. August 3, 1999 Advertisement prepared and submitted. August 10, 1999 Public Notice/Advertisement September 20, 1999 Permit and AtoC issued (construction contract may be awarded). Dave Goodrich noted that an additional 90 to 120 days could be required if there is a public hearing held due to significant public comment during the notice of intent to issue the permit. Please let us know if the above schedule is not correct or if portions of the schedule may be expedited to provide an earlier award of the construction of improvements to the Eastside Plant. Very truly yours, HAZEN AND SAWYER, P.C. (/per")+nnxn 13..11'u� dames A. Cramer, P.E. Vice President JAC/bpr cc: Perry Kairis Dave Goodrich Ed Powell Bob DiFiore Bob Berndt Alan Stone CORRMCRAMEMSuIl mW2]98UT tl