Loading...
HomeMy WebLinkAboutNCC230921_ESC Approval Submitted_20230403ROY COOPER Governor ELIZABETH S. BISER Secretary DOUGLAS R. ANSEL Interim Director NORTH CAROL.INA Environmental Quality February 2, 2023 LETTER OF APPROVAL WITH MODIFICATIONS City of Charlotte- Charlotte Water Attention: Joseph Wilson, Chief Engineer 5100 Brookshire Blvd Charlotte, North Carolina 28216 RE: Project Name: Stowe Regional WRRF Access Roads Project ID: MECKL,-2021-050 Acres Approved: 16.1 County: Mecklenburg City: Charlotte Location: Belmeade Drive River Basin: Catawba Stream Classification: Other Submitted By: HDR Engineering, Inc. Date Received by LQS: January 24, 2023 Plan Type: Revised Dear Mr. Wilson: This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable with modifications and hereby issue this letter of Approval with Modifications. The Modifications Required for Approval are listed on the attached page. This plan approval shall expire three (3) years following the date of approval, if no land -disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129. As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (eNOI) form requesting a Certificate of Coverage (COC) under the NCGO10000 Construction General Permit. After the form is reviewed and found to be complete, you will receive a link with payment instructions for the $100 annual permit fee. After the fee is processed, you will receive the COC via email. As the Financially Responsible Party shown on the FRO form submitted for this project, you MUST obtain the COC prior to commencement of any land disturbing activity. The eNOI form may be accessed at deq.nc.uov/NCG01. Direct questions about the eNOI form to the Stormwater Program staff in the Raleigh central office. If the owner/operator of this project changes in the future, the new responsible parry must obtain a new COC. Title 15A NCAC 4B .0118(a) and the NCGO1 permit require that the following documentation be kept on file at the job site: The approved E&SC plan as well as any approved deviation. North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources Mooresville Regional office ( 610 East Center Avenue, Suite 301 1 Mooresville, North Carolina 2811.5 nni+M L"A4?OtNA �.nh_ q Envky -W Q.111 4Mw""'+ 704-663,1699 Letter of Approval with Modifications City of Charlotte- Charlotte Water February Page 2 of 3 2. The NCGO1 permit and the COC, once it is received. 3. Records of inspections made during the previous 30 days. Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to ensure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Act is performance -oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, it is determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions to the plan and implementation of the revisions to ensure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land -disturbing activity. This approval does not supersede any other permit or approval. Note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. You are requested to file an amended form if there is any change in the information included on the form. In addition, it would be helpful if you notify this office of the proposed starting date for this project. Your cooperation is appreciated. Enclosures: Certificate of Approval Modifications Required for Approval NCGO1 Fact Sheet c: HDR Engineering, Inc. Attn: James Rice 440 South Church Street, Suite 1200 Charlotte, NC 28202 Depar5�aeirrx�menh�l �1u,tTb� North Carolina Department of Environmental Quality I Division of Energy, Mineral and Resources Mooresville Reginal Office 1 610 East Center Avenue, Suite 301 1 Mooresville, North Carolina 28115 704.663,1699 Letter of Approval with Modifications City of Charlotte- Charlotte Water February Page 3 of 3 MODIFICATIONS REQUIRED FOR APPROVAL Project Name: Stowe Regional WRRF Access Roads Project ID: MECKL-2021-050 County: Mecklenburg Reviewed by: Kenny S. Llywelyn Cleanwater bypasses are to be separated from site construction flows. There are areas throughout the plans where cleanwater bypass channels are discharging into construction stormwater feature. This is not the intent of a cleanwater bypass. Also, clean water bypasses are to be permanently stabilized once they are constructed. Permanent stabilization can be achieved by using sod, lined rip rap channels, or pipe network. North Carolina Department of Environmental Quality I Division of Energy, Mineral and Resources Mooresville Reginal Office 1 610 East Center Avenue, Suite 301 1 Mooresville, North Carolina 28115 704.663.1699