HomeMy WebLinkAboutNCC230921_ESC Approval Submitted_20230403ROY COOPER
Governor
ELIZABETH S. BISER
Secretary
DOUGLAS R. ANSEL
Interim Director
NORTH CAROL.INA
Environmental Quality
February 2, 2023
LETTER OF APPROVAL WITH MODIFICATIONS
City of Charlotte- Charlotte Water
Attention: Joseph Wilson, Chief Engineer
5100 Brookshire Blvd
Charlotte, North Carolina 28216
RE: Project Name: Stowe Regional WRRF Access Roads
Project ID: MECKL,-2021-050
Acres Approved: 16.1
County: Mecklenburg
City: Charlotte
Location: Belmeade Drive
River Basin: Catawba
Stream Classification: Other
Submitted By: HDR Engineering, Inc.
Date Received by LQS: January 24, 2023
Plan Type: Revised
Dear Mr. Wilson:
This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be
acceptable with modifications and hereby issue this letter of Approval with Modifications. The
Modifications Required for Approval are listed on the attached page. This plan approval shall expire three
(3) years following the date of approval, if no land -disturbing activity has been undertaken, as is required
by Title 15A NCAC 4B .0129.
As of April 1, 2019, all new construction activities are required to complete and submit an electronic
Notice of Intent (eNOI) form requesting a Certificate of Coverage (COC) under the NCGO10000
Construction General Permit. After the form is reviewed and found to be complete, you will receive a
link with payment instructions for the $100 annual permit fee. After the fee is processed, you will receive
the COC via email. As the Financially Responsible Party shown on the FRO form submitted for this
project, you MUST obtain the COC prior to commencement of any land disturbing
activity. The eNOI form may be accessed at deq.nc.uov/NCG01. Direct questions about the eNOI form
to the Stormwater Program staff in the Raleigh central office. If the owner/operator of this project
changes in the future, the new responsible parry must obtain a new COC.
Title 15A NCAC 4B .0118(a) and the NCGO1 permit require that the following documentation be kept on
file at the job site:
The approved E&SC plan as well as any approved deviation.
North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources
Mooresville Regional office ( 610 East Center Avenue, Suite 301 1 Mooresville, North Carolina 2811.5
nni+M L"A4?OtNA
�.nh_ q Envky -W Q.111 4Mw""'+
704-663,1699
Letter of Approval with Modifications
City of Charlotte- Charlotte Water
February
Page 2 of 3
2. The NCGO1 permit and the COC, once it is received.
3. Records of inspections made during the previous 30 days.
Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to ensure
compliance with the approved plan.
North Carolina's Sedimentation Pollution Control Act is performance -oriented, requiring protection of
existing natural resources and adjoining properties. If, following the commencement of this project, it is
determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the
Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this
office may require revisions to the plan and implementation of the revisions to ensure compliance with
the Act.
Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water
quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to
this land -disturbing activity. This approval does not supersede any other permit or approval.
Note that this approval is based in part on the accuracy of the information provided in the Financial
Responsibility Form, which you provided. You are requested to file an amended form if there is any
change in the information included on the form. In addition, it would be helpful if you notify this office
of the proposed starting date for this project. Your cooperation is appreciated.
Enclosures: Certificate of Approval
Modifications Required for Approval
NCGO1 Fact Sheet
c: HDR Engineering, Inc.
Attn: James Rice
440 South Church Street, Suite 1200
Charlotte, NC 28202
Depar5�aeirrx�menh�l �1u,tTb�
North Carolina Department of Environmental Quality I Division of Energy, Mineral and Resources
Mooresville Reginal Office 1 610 East Center Avenue, Suite 301 1 Mooresville, North Carolina 28115
704.663,1699
Letter of Approval with Modifications
City of Charlotte- Charlotte Water
February
Page 3 of 3
MODIFICATIONS REQUIRED FOR APPROVAL
Project Name: Stowe Regional WRRF Access Roads
Project ID: MECKL-2021-050
County: Mecklenburg
Reviewed by: Kenny S. Llywelyn
Cleanwater bypasses are to be separated from site construction flows. There are areas throughout the
plans where cleanwater bypass channels are discharging into construction stormwater feature. This is
not the intent of a cleanwater bypass. Also, clean water bypasses are to be permanently stabilized once
they are constructed. Permanent stabilization can be achieved by using sod, lined rip rap channels, or
pipe network.
North Carolina Department of Environmental Quality I Division of Energy, Mineral and Resources
Mooresville Reginal Office 1 610 East Center Avenue, Suite 301 1 Mooresville, North Carolina 28115
704.663.1699