Loading...
HomeMy WebLinkAbout20150070 Ver 1_Site Plan_20150423 (2)Strickland, Bev From: Montalvo, Sheri A Sent: Wednesday, April 22, 2015 3:25 PM To: Strickland, Bev Subject: FW: Willowcroft digital files From: Reddick, Rob [! ailto:ir _ .idk: @«�.j od. l 5Lpo_ q!M] Sent: Wednesday, April 22, 2015 3:19 PM To: Montalvo, Sheri A Subject: Willowcroft digital files Sheri The link below will allow you to download the entire pdf set. If you have any issues with the link please let me know and we can try something else. Thanks Rob f Robert M. Reddick Jr, P.E. Director, Charlotte Region Office: 704 - 527 -0800 ext. 321 Mobile: 704 - 361 -6889 McAdamsCo.com Designing Tomorrow's Infrastructure & Communities 1 N jlli CHESTNUT LANE TOWN OF STALLINGS, NORTH CAROLINA PROJECT NUMBER: MRH- 13040 DATE: JULY 25, 2014 REVISED: AUGUST 8, 2014 REVISED: SEPTEMBER 22, 2014 REVISED: OCTOBER 13, 2014 REVISED: OCTOBER 28, 2014 REVISED: JANUARY 8, 2015 REVISED: JANUARY 22, 2015 REVISED: JANUARY 27, 2015 REVISED: APRIL 17, 2015 OWNER: MERITAGE HOMES 11605 NORTH COMMUNHY HOUSE ROAD SUITE 250 CHARWITE, N.C. 28277 (704) 944 -8906 mark.serpent @merita ehomesecom APPLICANT: MERITAGE HOMES 11605 NORTH COMMUNITY HOUSE ROAD SUITE 250 CHARLOTrE. N.C. 28277 (704) 944 -8906 � 11 CONTRACTOR SHALL NOTIFY "NORTH CAROLINA ONE CALL" (811) OR (1- 800 - 632 -4949) AT LEAST 48 HOURS PRIOR TO BEGINNING CONSTRUCTION OR EXCAVATION TO HAVE EXISTING UTILITIES LOCATED. CONTRACTOR SHALL CONTACT ANY LOCAL UTILITIES THAT PROVIDE THEIR OWN LOCATOR SERVICES INDEPENDENT OF "NORTH CAROLINA ONE CALL ". REPORT ANY DISCREPANCIES TO THE ENGINEER IMMEDIATELY. LAND SURVEYOR: MCADAMS COMPANY 11301 CARMEL COMMONS BLVD. SUITE 111 SUITE 111 CHARLOTTE, N.C. 28277 (704) 527 -0800 ENGINEER: MCADAMS COMPANY 11301 CARMEL COMMONS BLVD. SUITE 111 SUITE 111 CHARLOTTE, N.C. 28277 (704) 527 -0800 REDDICKOMCADAMSCO . COM M, R SHEET INDEX P -2 P -3 XS-1 XS-2 XS-3 XS-4 XS-5 XS-6 XS-7 XS-8 D�-19 D -2 D -3 D5 D-6 D -7 PAPA i Q L~ZO ooary Of U) z 0 U I I I, II II .. 0 WiF 11 PLAN & PROPUZ -SEWER LINE "A" PLAN & PROF Z -SEWER LINE 'S" PLAN & PROFILE -SEWER LINE "C" PLAN & PROFILE -SEWER LINE "E" PLAN & PROFILE -SEWER IAVE "D" PLAN & PROFILE -ROAD "A" PLAN & PROFLLE- YARROW STREET EXTENSION PLAN & PROFILE -ROAD "B" PLAN & PROFILE - CHESTNUT LANE LOS PLAN & PROFLILZ- CULVERT STORMWATER MANAGEMENT FACILITY PLAN STORMWATER MANAGEMENT FACILITY DEMW STORMWATER MANAGEMENT FACLIM DEMM STORMWATER MANAGEMENT FACHXrY DEMW HYDRODYNAMIC SEPARATOR DETAIW HYDRODYNAAHC SEPARATOR DETAILS CHESTNUT LANE CROSS SECTION STA 1+00 - 2+00 CHESTNUT LANE CROSS SECTION STA 2+50 - 3+50 CHESTNUT LANE CROSS SECTION STA 4+00 - 5+00 CHESTNUT LANE CROSS SECTION STA 5+50 - 6+50 CHESTNUT LANE CROSS SECTION STA 7+00 - 8 +00 CHESTNUT LANE CROSS SECTION STA 8+50 - 9+50 CHESTNUT LANE CROSS SECTION STA 10+00 - 11+00 CHESTNUT LANE CROSS SECTION STA 11 +50 - 12+50 CHESTNUT LANE CROSS SECTION STA 13+00 -UAL JLJMf - WATER - WATER & SEWER - EROSION CONTROL - EROSION CONTROL - EROSION CONTROL !!Jj MCADAMS TFIE JOHN R MCADAMS COMPANY, INC. 11301 Carmel Commons Blvd. Suite 111 Charlotte, North Carolina 28226 License No.: C -0293 (800) 733 -5646 ■ McAdamsCo.com FINAL DRAWING — NOT RELEASED FOR CONSTRUCTION VICINITY MAP N TS MCKEE SITE RD YARROW ST. 1 -485 CHESTNUT LANE MATTHEWS z WEDDINGTON RED j ROAD BARN 0 TRAIL n. N jlli CHESTNUT LANE TOWN OF STALLINGS, NORTH CAROLINA PROJECT NUMBER: MRH- 13040 DATE: JULY 25, 2014 REVISED: AUGUST 8, 2014 REVISED: SEPTEMBER 22, 2014 REVISED: OCTOBER 13, 2014 REVISED: OCTOBER 28, 2014 REVISED: JANUARY 8, 2015 REVISED: JANUARY 22, 2015 REVISED: JANUARY 27, 2015 REVISED: APRIL 17, 2015 OWNER: MERITAGE HOMES 11605 NORTH COMMUNHY HOUSE ROAD SUITE 250 CHARWITE, N.C. 28277 (704) 944 -8906 mark.serpent @merita ehomesecom APPLICANT: MERITAGE HOMES 11605 NORTH COMMUNITY HOUSE ROAD SUITE 250 CHARLOTrE. N.C. 28277 (704) 944 -8906 � 11 CONTRACTOR SHALL NOTIFY "NORTH CAROLINA ONE CALL" (811) OR (1- 800 - 632 -4949) AT LEAST 48 HOURS PRIOR TO BEGINNING CONSTRUCTION OR EXCAVATION TO HAVE EXISTING UTILITIES LOCATED. CONTRACTOR SHALL CONTACT ANY LOCAL UTILITIES THAT PROVIDE THEIR OWN LOCATOR SERVICES INDEPENDENT OF "NORTH CAROLINA ONE CALL ". REPORT ANY DISCREPANCIES TO THE ENGINEER IMMEDIATELY. LAND SURVEYOR: MCADAMS COMPANY 11301 CARMEL COMMONS BLVD. SUITE 111 SUITE 111 CHARLOTTE, N.C. 28277 (704) 527 -0800 ENGINEER: MCADAMS COMPANY 11301 CARMEL COMMONS BLVD. SUITE 111 SUITE 111 CHARLOTTE, N.C. 28277 (704) 527 -0800 REDDICKOMCADAMSCO . COM M, R SHEET INDEX P -2 P -3 XS-1 XS-2 XS-3 XS-4 XS-5 XS-6 XS-7 XS-8 D�-19 D -2 D -3 D5 D-6 D -7 PAPA i Q L~ZO ooary Of U) z 0 U I I I, II II .. 0 WiF 11 PLAN & PROPUZ -SEWER LINE "A" PLAN & PROF Z -SEWER LINE 'S" PLAN & PROFILE -SEWER LINE "C" PLAN & PROFILE -SEWER LINE "E" PLAN & PROFILE -SEWER IAVE "D" PLAN & PROFILE -ROAD "A" PLAN & PROFLLE- YARROW STREET EXTENSION PLAN & PROFILE -ROAD "B" PLAN & PROFILE - CHESTNUT LANE LOS PLAN & PROFLILZ- CULVERT STORMWATER MANAGEMENT FACILITY PLAN STORMWATER MANAGEMENT FACILITY DEMW STORMWATER MANAGEMENT FACLIM DEMM STORMWATER MANAGEMENT FACHXrY DEMW HYDRODYNAMIC SEPARATOR DETAIW HYDRODYNAAHC SEPARATOR DETAILS CHESTNUT LANE CROSS SECTION STA 1+00 - 2+00 CHESTNUT LANE CROSS SECTION STA 2+50 - 3+50 CHESTNUT LANE CROSS SECTION STA 4+00 - 5+00 CHESTNUT LANE CROSS SECTION STA 5+50 - 6+50 CHESTNUT LANE CROSS SECTION STA 7+00 - 8 +00 CHESTNUT LANE CROSS SECTION STA 8+50 - 9+50 CHESTNUT LANE CROSS SECTION STA 10+00 - 11+00 CHESTNUT LANE CROSS SECTION STA 11 +50 - 12+50 CHESTNUT LANE CROSS SECTION STA 13+00 -UAL JLJMf - WATER - WATER & SEWER - EROSION CONTROL - EROSION CONTROL - EROSION CONTROL !!Jj MCADAMS TFIE JOHN R MCADAMS COMPANY, INC. 11301 Carmel Commons Blvd. Suite 111 Charlotte, North Carolina 28226 License No.: C -0293 (800) 733 -5646 ■ McAdamsCo.com FINAL DRAWING — NOT RELEASED FOR CONSTRUCTION LEGA D L s I nl - .LEGEND: V! C! N I,TY MAP �P° : Being, that certain parcel of land located in Vance Township in Union County, NTS North; Carolina alon the north side of Chestnut Lane and bein more articular) O EXISTING REBAR UNLESS NOTED OTHERWISE 9 9 particularly described as follows: c3` i NOTED OTHERWISE O, IRON PIPE SET, UNLESS fl Beginning CALCULATED POINT gi gat an iron pipe... located an the northern right a# way lane of Chestnut °!� e .: Lan a - e, 60 foot public right of way, said oint bein . the southeast corner of; da . P 9 Y P 9 <' EIP EXISTING IRON PIPE. .John Howard Faison, ` IV, recorded in Deed Book 11$2, Page 684, said point` having � , � , MCKEE :O. /% North Carolina State Plane Coordinates NAD83 2011 of N 4$2,294.35 feet LOT 50 PK PK NAIL RD (. ( » and E .1 485 535.29 feet said point bein the POINT OF BEGINNING thence SITE ,•, P g, �. UTILITY POLE: leaving he right o 9 gh f way of Chestnut Lane and following the line.. of said Faison - Narth 02 00 00 Wet 454.25 feet: to an new iron pipe; thence . out 89 5335 _ %.: -O - OVERHEAD UTILITY YARROW s. P P, S h U E t Wes 434.96 feet to an iron i . e at the northeast corner_ of Lot. 58 of ` Chestnut ST,. �/ �� Subdivision, recorded in Plot Cabinet H, Slide 251; thence following the eastern 0;. ; o # LIGHT POLE : . 485 CHESTNUT' . line of Lots 5 � . S SANITARY .SEWER MANHOLE L 8 and 57 of said Chestnut Subdivision North 34 49 26 West 247.99 � Q w LANE % . � L feet to rebar. at the southeastern corner 'of Lot 51 of sad Chestnut 0 MATTHEWS . Subdivision;. thence with the eastern line of Lot 51, the eastern terminus. of Z , ,,. D EIP�FOU � WEDDINGTON / � WATER. VALVE RED Yorrow Street and Lot 50 of said Chestnut Subdivision North 34'49 26 West / T TELEPHONE PEDESTAL 0 �0 PROPERTY UNE cr ROAD 450.18 feet to a reb r on the southern line. of Chestnut Homeowners. Association BARN a s / ) Wil CATCH BASIN CHESTNUT` SUBDIVISION PHASE 20 TRAIL recorded in Deed Book 20 9 3, P ag e 6 55, thence along the sou t hen of said . - g PS. H. PG.:' 251 ? Chestnut Homeowners Association and .Duke Energy Corporation PIN 07141007A o [E ELECTRIC BOX CL 9Y P ( i ak5 Pti North 58 09 39 E t. 7 c to Energy � X as 690. 9 feet to a rebar, thence along said Duke ne gy 680.0 SPOT ELEVATION Corporation. and- the southern line of Lennor Carolinas, LLC, recorded in Deed. Book Nbo LOT 5 1 ::: WETLAND HATCH � W E 4305, Page 730 North 20 06 58 . East 260.10, feet to a rebar located at the 9 westernmost . corner of Lot 9 of Farrforest Subdivision, recorded in Plat Cabinet A, - •.,.,. ;.., / DUKE POWER / .DUKE SURVEYED LINE Slide 86A, thence with the western line of Lots 9, 8, 5, 4 and 3 of said. `. ENERGY CORPORATIO N - - -- -LINE NOT SURVEYED Fairfo est ,kph r Subdivision South 24 53 39 East 1024.52 -feet to a rebar located at ' - ' •' • �' ..GENERAL DOTES 5719.. - ::= FENCE the northwestern corner of 13yard Gordan. Clemmons, recorded in Deed Book • , , • . • . �: I Page 6� 1.. THIS IS A. SURVEY OF AN EXISTING PARCEL OF LAND. THIS IS. AN g thence. along the western Tine' of said Clemmons South 02. 00 07 East ` ` � � - • 659.47 feet to a point on the northern -ri ht of via line of the aforementioned P 9 Y \ ALTA /AGSM LAND TITLE SURVEY. AREA WAS CALCULATED BY THE � _ ,. • .: ..:, .. , • : • . , . Chestnut Lane; thence South 02 0007 East 3,75 feet to a rebar located inside COORDINATE METHOD. , � �. y , SHED IS 3.3 OUTSIDE MH the right .of way. of said Chestnut Lane, thence South Q2 00 07- East 27.52 feet � _ , : :�. ; .: � . . THE PROPERTY. LINE : :9? .. = 7 .1 2.). THE to a k nail set in the centerline of Chestnut Lane; thence foflowin the STREAM. 8.. RIM 02 2 g STATE ,PLANE COORDINATES (SPC)' 'FOR .THIS. PROJECT WERE PRODUCED P , g � . , : . • .. . • . • . • �. WITH RTK -VRS GPS OBSERVATIONS USING A EPOCH 50 GNSS SYSTEM . centerline of Chestnut Lane the. following hree 3 calls. 1 along a curve to the .� _ IN = S 3.3 / 9 {) O 9 0 LOT 57 RECEIVER AND PROCESSED USING- GPS CONTINUOUSLY OPERATING i O• : ; : - .::::: 1 right having a ,radius. of :422:55 feet, an arc Length of :155.16 feet and a chord REFERENCE STATIONS, DATE OF OBSERVATIONS WAS AUGUST 28, 2013. THE ; bearin .:and distance of South 76'1626 West 154.29 feet 2 South. 86 08. 10 g :' AND • . RELATIVE POSITIONAL ACCURACY OF THE GPS NETWORK IS <0.06. , (.� . •.. ,' ``'�; West 76.60 'feet; and 3 South. 87 44 49 West 54.94 feet to a k' nail set in S - THE FOLLOWING COBS WAS THE BASE STATION USED. DF6318 177 the centerline of said Chestnut Lane, thence North 02 00.00 West 30.00 feet to ... • , . , . - .. WELCOME CENTER CORS ARP NG77 the POINT OF BEGINNING con:tainin 19.90 'acres more or less. ''•' ' HORIZONTAL POSITIONS ARE REFERENCED TO NAD 2011 . `i.6 co THE COMBINED SCALE FACTOR IS 0.999$479.$. rk R FOU D. 0.210 9 R B N ,�� OUTSIDE PROPERTY 3.) ALL DISTANCES ARE HORIZONTAL. GROUND .DISTANCES. LINE'" LOT 58? 4.) FLOOD NOTE, THIS PROPERTY IS NOT LOCATED .IN A SPECIAL.. FLOOD HAZARD ZONE. R IS LOCATED IN ZONE "X AS DEFINED .BY FEMA F.f.R.M, COMMUNITY NO. 370234 'PANEL 4488) MA MAP NO. 371 OOJ , (� oaas8 ), DATED OCTOBER 16, 2008. X15 MH x RIM- 701.62 5: , PAGE REFERENCES: DEED BOOK '6017 712 �. - E. OF THE .UNION COUNTY REGISTRY INV 691.5 PIN 07141001 G N s 6. NO .GRID GR {D MONUMENTS FOUND WITHIN 000 OF SITE. . ) N 2 7.) BOUNDARY SURVEY OF. 19.90 ACRE TRACT. FOR DR. PATRICK M. REAMES BY REGISTERED. SURVEYOR WM. -.J.. ALEXANDER DATED DECEMBER 31 1973. 20 PR AN NT '69.4 E RESEE ��� .B 3 31 P 40 E S R AME HOLDING LP DB 6017 PG 712 10 TE O R NOTES PERTAINING TO E PIN 71 '_ o s TI 10 41001 G �•:: • °. G G N CHICAGO TITLE INSURANCE COMPANY _ ; .:: ::•:•�: .. •:.. : '•. '•• E SEM Ts 867,046 SQ..FT. TOTAL / COMMITMENT NO. 13- 18754CH . 19.90 ACRES TOTAL B. 31, G. 0 f • .EFFECTIVE: SEPTEMBER 4_2013 " A T 8. 00 AM 0 R a SCHEDULE B SECTION. it (EXCEPTIONS) 0.20 �W ACRES •. ' � n S H . REBAR FOUND O 19.70 NET ACRES > 3 - ITEM 3 - SANITARY SEWER LINE EASEMENT TO UNION COUNTY RECORDED IN ::.: RIM= 703.95 0.29• INSIDE N ` / " , PROPERTY UNE = BOOK 3733,. PAGE 440 AFFECTS' SUBJECT PROPERTY AS SHOWN ., .... .. , : : •. =::. - ". : •. :'. ; �, � `• INV 690..4 h 0. HEREON. p , -:'' S, ..��, � f LENNAR CAROLINA LLC !� / N DB 4305 PG 730 PIN' 4100 8 71 .r. o; • ,., 0 JOHN HOWARD FAISON IV DB -1182 PG 684 � n w 2' PIN 07141001 0 2 s 2. o o •1 4S '• s� • ' a ° , (TQ Lj ry . u { , : N." CURVE TABLE CURVE: RADIUS LENGTH TANGENT 'CHORD CHORD .DIRECTION .j` C1 422,55 1 155.16 78.46 154.29 S 76'16'26" W C2. 392.551 156.66 79.39 1155.63 1 S' 75-23#05* W LINE TABLE. - LINE LENGTH BEARING L11 76:60 S 86'08'1o" W L2 54.94 - S 8T '49" W. L3 76.35 S 86'08'10" :W L4 54.38 87.44'4 " 6(a), 7(o). 7(6)(1). 7(c), 8, 9, and 11(a) of Tdbie A thereof. �,.- � � r The flefd work was complete d on' FlwBRUARY 15, 2Q14. ��� • ---.�. ..,, N 3: BPS.. e ,► y in S. Bauco , 'LS L- �4275 Date nurnm ®iithnr _niinma :cnm . J WADAMS GENERAL NOTES 1. ALL EXISTING UTILITIES ARE SHOWN AT APPROXIMATE LOCATIONS. ACTUAL LOCATION AND DEPTH TO BE CONFIRMED IN FIELD BEFORE CONSTRUCTION. 2. EXISTING IMPROVEMENTS DAMAGED DURING CONSTRUCTION SHALL BE REPLACED /RESTORED TO THEIR ORIGINAL CONDITION OR TO THE SATISFACTION OF THE OWNER BY THE CONTRACTOR RESPONSIBLE FOR DAMAGE. 3. CONTRACTOR IS RESPONSIBLE FOR COORDINATING CONSTRUCTION ACTIVITIES WITH THE APPROPRIATE UTILITY COMPANIES FOR ANY REQUIRED RELOCATION (I.E. POWER POLES, TELEPHONE PEDESTALS, WATER METERS, ETC.). 4. PRIOR TO STARTING CONSTRUCTION, THE GENERAL CONTRACTOR SHALL HOLD A PRE - CONSTRUCTION CONFERENCE. 5. ALL DIMENSIONS AND GRADES SHOWN ON THE PLANS SHALL BE FIELD VERIFIED BY THE CONTRACTOR PRIOR TO CONSTRUCTION. CONTRACTOR SHALL NOTIFY THE OWNER IF ANY DISCREPANCIES EXIST PRIOR TO PROCEEDING WITH CONSTRUCTION FOR NECESSARY PLAN OR GRADE CHANGES. NO EXTRA COMPENSATION SHALL BE PAID TO THE CONTRACTOR FOR ANY WORK DONE DUE TO DIMENSIONS OR GRADES SHOWN INCORRECTLY ON THESE PLANS IF SUCH NOTIFICATION HAS NOT BEEN GIVEN. 6. ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH TOWN OF STALLINGS NORTH CAROLINA UNIFIED DEVELOPMENT ORDINANCE. 7. CONSTRUCTION, MAINTENANCE AND REMOVAL OF ALL EROSION CONTROL DEVICES ARE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. 8. EXISTING UTILITIES AND STRUCTURES SHOWN, BOTH UNDERGROUND AND ABOVE GROUND, ARE BASED ON A FIELD SURVEY AND THE BEST AVAILABLE RECORD DRAWINGS. THE CONTRACTOR SHALL VERIFY FIELD CONDITIONS PRIOR TO BEGINNING RELATED CONSTRUCTION. ANY DISCREPANCIES SHALL BE REPORTED TO THE OWNER IMMEDIATELY. 9. UTILITIES THAT WERE VISIBLE HAVE BEEN LOCATED TO THE BEST OF OUR KNOWLEDGE. HOWEVER, NEITHER THE OWNER, THE DEVELOPER, NCDOT, THE ENGINEER, NOR UNION COUNTY PUBLIC WORKS WILL BE RESPONSIBLE FOR ANY DAMAGE TO UTILITIES, STORM DRAINS, DRIVEWAYS, OR ROADS. 10. THE CONTRACTOR WILL BE RESPONSIBLE FOR LOCATING, PROTECTING, AND REPAIRING (IF DAMAGED) ALL UTILITIES, STORM DRAINS, DRIVEWAYS AND ROADS. 11. TOPOGRAPHIC AND WETLANDS BOUNDARY INFORMATION SHOWN IS AS PROVIDED BY THE MCADAMS COMPANY. 12. THE INTERNAL STREETS SHALL BE PUBLIC ROADS MAINTAINED BY NCDOT. 13. THE ENTRANCE MONUMENTS LOCATED AT THE ENTRANCE TO THE SITE WILL BE LOCATED IN THE BUFFER ALONG CHESTNUT LANE. 14. SIDEWALK WIDTHS SHALL BE A MINIMUM OF 4' WIDE UNLESS OTHERWISE SPECIFIED. A 5' X 5' SIDEWALK IS REQUIRED AT LEAST EVERY 200' AS REQUIRED BY ADA FOR A PASSING ZONE UNLESS OTHERWISE PROVIDED BY RESIDENTIAL DRIVEWAYS OR INTERSECTING SIDEWALKS. 1 � # i) I I I i HENRY 0. AND 1 I ELSIE G. EUBANKS 1 PIN 07141001D I I EXISTING EDGE OF PAVEMENT y i 1 # I � I I PK I I I j J 1 I ELAINE A. NICHOLS PIN 07141001F 30° STANDARD CURB I -~4 I AND GUTTER I Ijl d 1 1 DONALD E. AND KATHLEEN F. GOESSEL PIN 07141001J SITE TRIANGLE t (TYP.) EX. RED BARN r I TRAIL (VARIABLE PUBLIC R /W) � \ POSSIBLE LOCATION OF ENTRANCE SIGN t S= DATA TOTAL SITE ACREAGE: +/ -19.90 ACRES TAX PARCEL NUMSER: 07141001G \ (Singe Family) EX. YARROW STREET \ CHESTNUT SUBDIVISION, PHASE 2 \ E2[IS1IIdG ZONING: CZ13.09.01 H PG. 251 50' PUBLIC R/W \ PB. LOT 50 PROPOSED ZONING: SINGLE FAMILY DETACHED \ PIN 07141106 RESIDENTIAL ACREAGE: +/ -19.9 ACRES \ \ TOTAL No. OF LOTS /UNITS: + / -54 UNITS \ TEMPORARY BARRIER WILL BE PLACED AT THE END OF \ � TOTAL SITE DENSITY: +/ -2.71 UNIT /AC. YARROW STREET AND THE CONNECTION WILL NOT BE \ \ MINflam LOT SIZE: 7,300 SF OPENED UNTIL FINAL CERTIFICATE OF OCCUPANCY FOR THE PROPOSED DEVELOPMENT HAS BEEN ISSUED. PER MN. BUII.DING SETBACKS STALLINGS UDO ARTICLE 5 FRONTSETBAM' 20 CHESTNUT SUBDIVISION, PHASE 2 ' SIDE SETBACK T PB. H PG. 251 p `0 k5 REARSETBACM 80' \ PIN LOT 11107 MIN. LOT WIDnk wv�1 \ '0 PUBLIC OPEN SPACE (PARISH \ � STORM IN MUIRED OPEN SPACE: 1596 OF SIZE (2.98 AC.) \ �P�l ' / EASEMENT ; TOTAL IMPERVIOUS: 6.98 AC. \ ,6 `qp / / Cos TREE SAVE AREA REgUIRED TREE SAVE: 5% (0.99 AC.) CHESTNUT SUBDIVISION, PHASE 2 \ / \ 8,614 SF e � PROVIDED TREE SAVE 8% (1.60 AC.) PB. LOT 57 251 (1.27 AC. + 0.33 AC.) PIN 07141113 0p' 8,373 SF _____ _ - Pl/ � ROAD DATA ACCESSIBLE RAMP ' RED BARN TRAIL 1,647 LF ✓ g9 � 8,135 SF �` ��'• Wnl.OWCROFTDRIVE 1,700 IF �g0 \ YARROW ST 2,127 LF CHESTNUT SUBDIVISION, PHASE 2 �0 PB. H PG. 251 / LOT 58 O TOTAL 5,474 LF PIN 07141114 ^' / / 11,935 SF \` TYPICAL CUL- DE-SAC I 'I SCALE: 'N.T.S. I 15.419 SF 1 2' VALLEY 1 5' UCPW UTILITY C &G --- �45 R i EASEMENT / 36' R I I 42 1 1 1 1 I 9,655 SF it 1 1 I jl 1 / I 9,425 SF I 20.0 R PROPERTY LINE 1 "T I i 5' SIDEWALK 35.0' R (TYP.) --- -- - - -- - - -- I CA I I P rn 1 I 4' PLANTING I I 1 I STRIP 44 I 1 TEMPORARY �EASEMENTDON I 1 I 9,425 SF i 1 0 ROW 1 I I II JOHN HOWARD FAISON IV I 45 I I 1 860' LINE OF SIGHT DB 1162 PG 684 10' WIDE NO CLEAR (SEE SHEETS P -8 AND C -5) PIN 07141001 BUFFER ALONG 1 I 9,425 SF j i I PROPERTY LINE I I I I 20' TEMPORARY I CONSTRUCTION I j I EASEMENT 48 I 1 I N: 482748.26 1 If 001 E: 1485519.44 1 I 9,425 SF 1 1 (SEE NOTE 2) it I I 20' LANDSCAPE j 1 BUFFER 484.26 (TOTAL), I - NO2.00'00 °W _ - - A5425- -= = _--T -- - - - - -� - - - - - -r --- 20' FUTURE PERMANENT i S.S. EASEMENT 47 I r r O I 7,641 SF I 7,641 SF O 80 I 11 O 10,301 SF I 54 53 52 I 51 i , 49 i 8,839 SF P 1 i 7,641 SF i O ' i 7,641 SF I 7,641 SF I 7,640 SF I / 1 r 1 20' PUBLIC I i 20' PUBLIC I ; STORM DRAIN r I 5' UCPW UTILITY( (STORM DRAIN r iEASEMENT iEASEMENT 30 -X30" STOP SIGN (TYP.) (CONTRACTOR TO I STALL) 0 PUBLIC 10 /w-- _� -Z - -- - -_�_ - --- ___ -___ -} __ -- L- -- -- - -- -'- _---- __� - -- - " -'- -- LIGHT POLE (TYP. �j W O �� o (SEE DETAIL) 10' CURB TRANSITION m m -� ACCESSIBLE RAMP \ 1 I 20' LANDSCAP4 f (TYP') I I BUFFER I I i I O O 8 �1\ 1 O I O O O I 6 I 7.360 SF I 8,000 O 1 SF it 1 I 7,360 SF I 7.360 SF I 7,360 SF I 7,360 SF i 7,360 SF i 7,360 SF CHESTNUT LANE TO HAVE 7 \ } ` I .52' _ 1.5" OVERLAY ACROSS � \\ \ I � i � JIr�-- ----•- ' ALONG ENTIRE FRONTAGE ROAD \ \ �5 S0200'07 °E 660.82 -y - - -- �_ 30° STANDARD CURB l \ L- _.. AND GUTTER \ \\ PK <\ \ t CHANG YUNG KI AND SOON SUN PIN 07141016A \ \ BYARD GORDON CLEMMONS DB 5719 PG 006 PIN 07141001E �/ SITE TRIANGLE Y\ 20 �� ` (TYP. SF 19 \ 7,872 SF ,8 RETAINING WALL (DESIGNED BY 8,843 SF OTHERS) ij 10 1 7,552 SF I 11 II (I O 8,422 SF I II 20' MANAGEMENT FACILITY EIP 36 III I I 9,953 SF II 20' PUBLIC STORM DRAT 11 1 16 I 8,067 SF I RETAINING WALL (DESIGNED BY �T - / OTHERS) I i I 8,065 SF I � 14 ' ITiro IC I {�J 8,442 SF rt`�------ - - ---- 8,442 SF I11 1 7,552 SF � 5' UCPW UTILITY EASEMENT II I 7,552 SF II II 1 ij 10 1 7,552 SF I 11 II (I O 8,422 SF I II 20' MANAGEMENT FACILITY EIP REVOCABLE LIVING TRUST DB 4680 PG 414 PIN 07141020 HANDRAIL EXISTING POND 20' UTILITY EASEMENT DUKE POWER / DUKE ENERGY CORPORATION PIN 07141007A 32 \ ,450 SF CONDITIONAL REZONING NOTES 1. THE APPLICANT OR RESPONSIBLE PARTY SHALL OBTAIN ALL PERMITS REQUIRED FOR DEVELOPMENT WITHIN THE TOWN AND OUTSIDE AGENCIES IN COMPLIANCE WITH ACCEPTABLE REGULATIONS. THE SUBMITTED SKETCH PLAN MUST MEET ALL REQUIREMENTS AS ESTABLISHED BY PERMITTING AGENCIES. IF MEETING PERMITTING REQUIREMENTS REQUIRES SIGNIFICANT CHANGES TO THE PLAN AS DEFINED BY UDO ARTICLE 10.10.7, THE PLAN WILL REQUIRE APPROVAL OF THE PLANNING BOARD AND TOWN COUNCIL. 2. USE OF PROPERTY WILL BE LIMITED TO A MAXIMUM DENSITY OF 2.76 UNITS AN ACRE NOT TO EXCEED 55 LOTS. 3. INTERIOR LOT SETBACKS FOR THE PROJECT WILL BE 20'- FRONT; 7' SIDE, 15' ON CORNER LOTS; 20' REAR. THE MINIMUM LOT WIDTH WILL BE 64'. 4. THE MINIMUM SQUARE FOOTAGE FOR HOMES WITHIN THE DEVELOPMENT WLL BE 2,400 SQUARE FEET FOR A TWO STORY HOUSE, AND 2,000 SQUARE FEET FOR A ONE STORY HOUSE. 5. ALL STREETS WITHIN THE DEVELOPMENT WILL BE BUILT TO TOWN OF STALLINGS MINIMUM DESIGN STANDARDS. 6. A MINIMUM 15% OPEN SPACE WILL BE PROVIDED ON SITE. OPEN SPACE CALCULATIONS MUST BE PROVIDED AS A PART OF THE PLAN REVIEW PERMITTING PROCESS. 7. PROVIDE A CONNECTION TO THE EXISTING STUB ON YARROW STREET TO PROVIDE CONNECTIVITY BETWEEN THE DEVELOPMENTS AS REQUIRED BY THE STALLINGS LIDO ARTICLE 5. A TEMPORARY BARRIER WILL BE PLACED AT THE END OF YARROW STREET AND THE CONNECTION WILL NOT BE OPENED UNTIL FINAL CERTIFICATE OF OCCUPANCY FOR THE PROPOSED DEVELOPMENT HAS BEEN ISSUED. 8. DUE TO THE LACK OF ACCESSIBILITY TO THE COMMON OPEN SPACE AREA; STAFF WOULD RECOMMEND THE FEE IN LIEU OF PARK LAND BE ACCEPTED FOR THE PROJECT AS DEFINED IN ARTICLE 10 OF THE STALLINGS UDO. 9. ALL FOUNDATIONS WILL HAVE A MINIMUM 18 INCHES EXPOSED BRICK. ALL FRONT ELEVATIONS OF THE HOMES WILL BE COMPROMISED OF 75% BRICK AND /OR STONE AND WITH NO MORE THAN 25% FIBER CEMENT BOARD. THERE WILL BE 0% VINYL ON THE EXTERIOR. THE OTHER THREE SIDES OF THE HOMES WILL BE COMPRISED OF FIBER CEMENT BOARD, BRICK OR STONE. A 24 INCH RETURN OF BRICK WLL BE USED WHERE APPLICABLE. 10. A PROJECT BOUNDARY BUFFER OF 0.2 CAPACITY WILL BE REQUIRED WHERE ADJACENT TO EXISTING SINGLE FAMILY RESIDENTIAL PROPERTY AS PER THE STALLINGS UDO ARTICLE 7.79. EXISTING VEGETATION WILL BE MAINTAINED IN THIS AREA. CLEARING TO THE PROPERTY LINE WILL NOT BE PERMITTED. 11. TWO (2) SPEED BUMPS WILL BE ADDED TO YARROW STREET AT THE EXPENSE OF THE DEVELOPER. THE SPEED BUMPS WILL BE BUILT TO TOWN STANDARDS; AND WITH THE AGREEMENT OF THE RESIDENTS OF YARROW STREET AND THE CHESTNUT HOA. 12. THE TOWN COUNCIL MAY ACT TO REVOKE THE CONDITIONAL ZONING DISTRICT APPROVAL IF THE APPLICANT FAILS TO MEET THE TERMS OF THE DISTRICT. VICINITY MAP MATTHEWS NTS WEDDINGTON ROAD MCKEE zz RD w U Z wo 0 0 0 Of cr a 26 7,987 SF DONNELLY CARLTON CAMERON DB 3634 PG 699 PIN 07141022 CHRISTOPHER G. MOWBRAY PIN 07141026 I � .ARTHUR P. AND MARTHA A. HEIN JR. DB 3493 PG 310 PIN 07141025 I MATTHEWS WEDDINGTON AD ROAD GRAPHIC SCALE 60 0 30 60 120 1 inch = 60 ft. FINAL DRAWING - NOT RELEASED FOR CONSTRUCTION z VJ A � V .`` �. 0 57 z? a © <1 © ® ® ®® t` �i W � d' Ox o > = w Z to W�FF _ell o E__j L) M z 1-. = F F W C F F z a in 0 U� m U .y d O O U O a z O � O PBOIECT NO. MRH -13040 FILENAME: MRH13040 -S1 CHECKED BY: RMR DEAwN BY: CM /JL /RMR scACE: 1 " =50' DATE: 07 -25 -2014 SHEET N0. C -2 M MCADAMS 36 \ 12,483 SF \ \ 20' PUBLIC STORM DRAT � EASEMENT/ 1 I � REVOCABLE LIVING TRUST DB 4680 PG 414 PIN 07141020 HANDRAIL EXISTING POND 20' UTILITY EASEMENT DUKE POWER / DUKE ENERGY CORPORATION PIN 07141007A 32 \ ,450 SF CONDITIONAL REZONING NOTES 1. THE APPLICANT OR RESPONSIBLE PARTY SHALL OBTAIN ALL PERMITS REQUIRED FOR DEVELOPMENT WITHIN THE TOWN AND OUTSIDE AGENCIES IN COMPLIANCE WITH ACCEPTABLE REGULATIONS. THE SUBMITTED SKETCH PLAN MUST MEET ALL REQUIREMENTS AS ESTABLISHED BY PERMITTING AGENCIES. IF MEETING PERMITTING REQUIREMENTS REQUIRES SIGNIFICANT CHANGES TO THE PLAN AS DEFINED BY UDO ARTICLE 10.10.7, THE PLAN WILL REQUIRE APPROVAL OF THE PLANNING BOARD AND TOWN COUNCIL. 2. USE OF PROPERTY WILL BE LIMITED TO A MAXIMUM DENSITY OF 2.76 UNITS AN ACRE NOT TO EXCEED 55 LOTS. 3. INTERIOR LOT SETBACKS FOR THE PROJECT WILL BE 20'- FRONT; 7' SIDE, 15' ON CORNER LOTS; 20' REAR. THE MINIMUM LOT WIDTH WILL BE 64'. 4. THE MINIMUM SQUARE FOOTAGE FOR HOMES WITHIN THE DEVELOPMENT WLL BE 2,400 SQUARE FEET FOR A TWO STORY HOUSE, AND 2,000 SQUARE FEET FOR A ONE STORY HOUSE. 5. ALL STREETS WITHIN THE DEVELOPMENT WILL BE BUILT TO TOWN OF STALLINGS MINIMUM DESIGN STANDARDS. 6. A MINIMUM 15% OPEN SPACE WILL BE PROVIDED ON SITE. OPEN SPACE CALCULATIONS MUST BE PROVIDED AS A PART OF THE PLAN REVIEW PERMITTING PROCESS. 7. PROVIDE A CONNECTION TO THE EXISTING STUB ON YARROW STREET TO PROVIDE CONNECTIVITY BETWEEN THE DEVELOPMENTS AS REQUIRED BY THE STALLINGS LIDO ARTICLE 5. A TEMPORARY BARRIER WILL BE PLACED AT THE END OF YARROW STREET AND THE CONNECTION WILL NOT BE OPENED UNTIL FINAL CERTIFICATE OF OCCUPANCY FOR THE PROPOSED DEVELOPMENT HAS BEEN ISSUED. 8. DUE TO THE LACK OF ACCESSIBILITY TO THE COMMON OPEN SPACE AREA; STAFF WOULD RECOMMEND THE FEE IN LIEU OF PARK LAND BE ACCEPTED FOR THE PROJECT AS DEFINED IN ARTICLE 10 OF THE STALLINGS UDO. 9. ALL FOUNDATIONS WILL HAVE A MINIMUM 18 INCHES EXPOSED BRICK. ALL FRONT ELEVATIONS OF THE HOMES WILL BE COMPROMISED OF 75% BRICK AND /OR STONE AND WITH NO MORE THAN 25% FIBER CEMENT BOARD. THERE WILL BE 0% VINYL ON THE EXTERIOR. THE OTHER THREE SIDES OF THE HOMES WILL BE COMPRISED OF FIBER CEMENT BOARD, BRICK OR STONE. A 24 INCH RETURN OF BRICK WLL BE USED WHERE APPLICABLE. 10. A PROJECT BOUNDARY BUFFER OF 0.2 CAPACITY WILL BE REQUIRED WHERE ADJACENT TO EXISTING SINGLE FAMILY RESIDENTIAL PROPERTY AS PER THE STALLINGS UDO ARTICLE 7.79. EXISTING VEGETATION WILL BE MAINTAINED IN THIS AREA. CLEARING TO THE PROPERTY LINE WILL NOT BE PERMITTED. 11. TWO (2) SPEED BUMPS WILL BE ADDED TO YARROW STREET AT THE EXPENSE OF THE DEVELOPER. THE SPEED BUMPS WILL BE BUILT TO TOWN STANDARDS; AND WITH THE AGREEMENT OF THE RESIDENTS OF YARROW STREET AND THE CHESTNUT HOA. 12. THE TOWN COUNCIL MAY ACT TO REVOKE THE CONDITIONAL ZONING DISTRICT APPROVAL IF THE APPLICANT FAILS TO MEET THE TERMS OF THE DISTRICT. VICINITY MAP MATTHEWS NTS WEDDINGTON ROAD MCKEE zz RD w U Z wo 0 0 0 Of cr a 26 7,987 SF DONNELLY CARLTON CAMERON DB 3634 PG 699 PIN 07141022 CHRISTOPHER G. MOWBRAY PIN 07141026 I � .ARTHUR P. AND MARTHA A. HEIN JR. DB 3493 PG 310 PIN 07141025 I MATTHEWS WEDDINGTON AD ROAD GRAPHIC SCALE 60 0 30 60 120 1 inch = 60 ft. FINAL DRAWING - NOT RELEASED FOR CONSTRUCTION z VJ A � V .`` �. 0 57 z? a © <1 © ® ® ®® t` �i W � d' Ox o > = w Z to W�FF _ell o E__j L) M z 1-. = F F W C F F z a in 0 U� m U .y d O O U O a z O � O PBOIECT NO. MRH -13040 FILENAME: MRH13040 -S1 CHECKED BY: RMR DEAwN BY: CM /JL /RMR scACE: 1 " =50' DATE: 07 -25 -2014 SHEET N0. C -2 M MCADAMS GENERAL NOTES: COORDINATE ALL CURB AND STREET GRADES IN INTERSECTION WITH INSPECTOR. ALL ROAD IMPROVEMENTS ON CHESTNUT ARE TO BE COORDINATED WITH THE TOWN OF STALLINGS ENGINEERING DEPARTMENT PRIOR TO CONSTRUCTION. DEVELOPER WILL PROVIDE STREET SIGNS. SIGHT TRIANGLES SHOWN ARE THE MINIMUM REQUIRED. IN ROLLING AND HILLY TERRAINS, SWEEPING OF THE STONE BASE AND /OR APPLICATION OF A TACK COAT MAY BE REQUIRED NEAR INTERSECTION. THESE REQUIREMENTS WILL BE ESTABLISHED BY THE INSPECTOR AND BASED ON FIELD CONDITIONS. APPROVAL OF THIS PLAN IS NOT AN AUTHORIZATION TO GRADE ADJACENT PROPERTIES. WHEN FIELD CONDITIONS WARRANT OFF-SITE GRADING, PERMISSION MUST BE OBTAINED FROM THE AFFECTED PROPERTY OWNERS. IN ORDER TO ENSURE DRAINAGE, KEEP A MINIMUM OF 0.5% SLOPE ON THE CURB. SUBSURFACE DRAINAGE FACILITIES MAY BE REQUIRED IN THE STREET RIGHT OF WAY IF DEEMED NECESSARY BY THE INSPECTOR. CURB AND GUTTER SHOWN ON PLANS ALONG CHESTNUT LANE MAY BE ADJUSTED BASED UPON FIELD STAKING BY CITY ENGINEERING. ASSOCIATED STORM DRAINAGE MAY ALSO REQUIRE MODIFICATION BASED UPON FIELD CONDITIONS. THE PURPOSE OF THE STORM DRAINAGE EASEMENT (SDE) IS TO PROVIDE STORM WATER CONVEYANCE AND ANY STRUCTURES AND /OR OBSTRUCTION TO STORM WATER IS PROHIBITED. THE DEVELOPER SHALL MAINTAIN EACH STREAM, CREEK, OR BACKWASH CHANNEL IN AN UNOBSTRUCTED STATE AND SHALL REMOVE FROM THE CHANNEL AND BANKS OF THE STREAM ALL DEBRIS, LOGS, TIMBER, JUNK AND OTHER ACCUMULATIONS. HIGH- DENSITY POLYETHYLENE (HDPE) STORM DRAINAGE PIPE INSTALLED WITHIN EXISTING OR PROPOSED PUBLIC STREET RIGHT -OF -WAY MUST BE APPROVED BY THE CITYS INSPECTOR PRIOR TO ANY BACKFILL BEING PLACED. BACKFILL MATERIAL MUST BE APPROVED BY THE CITY INSPECTOR PRIOR TO PLACEMENT OF THE MATERIAL WITHIN THE PUBLIC RIGHT -OF -WAY. GENERAL NOTES: ALL OPENINGS (e.g., DOORS, WINDOWS, VENTS) IN STRUCTURES BUILT SHOULD BE LOCATED A MINIMUM OF ONE FOOT ABOVE THE ADJACENT FINISHED GROUND SURFACE. "AS- BUILT" DRAWINGS AND PLANS OF THE STORM DRAINAGE SYSTEM, INCLUDING DESIGNED DITCHES AND BMP'S, MUST BE SUBMITTED PRIOR TO SUBDIVISION FINAL INSPECTION TO THE CITY /COUNTY ENGINEERING DEPARTMENT IN ACCORDANCE WITH THE CITY /COUNTY SUBDIVISION ORDINANCE. NON- STANDARD ITEMS (ie: PAVERS, IRRIGATION SYSTEMS, ETC.) IN THE RIGHT -OF -WAY REQUIRE A RIGHT -OF -WAY ENCROACHMENT AGREEMENT WITH THE (NORTH CAROLINA DEPARTMENT OF TRANSPORTATION) BEFORE INSTALLATION. PRIOR TO PLAT RECORDATION, OFFSITE R/W AND /OR CONSTRUCTION EASEMENTS ARE REQUIRED TO BE OBTAINED ACCORDING TO THE GUIDELINES OF THE "OFFSITE R/W ACQUISITION PROCESS ". THESE NEEDED R/W AND CONSTRUCTION LIMITS ARE CLEARLY SHOWN ON THE ROADWAY IMPROVEMENT PLAN. CERTIFICATION AND STREET CUT PERMITS MAY BE REQUIRED FOR UTILITY CUTS ON CITY STREETS. FOR INFORMATION CONTACT LYNNE HAIR AT THE TOWN OF STALLINGS PLANNING DEPARTMENT (704) 821 -0315 NOTES:. 1. CONTACT THE UTILITY COMPANY TO RELOCATE ANY EXISTING UTILITY POLES. ALL EXISTING FACILITIES WHICH CONFLICT WITH THE IMPROVEMENTS UNDER THE SCOPE OF THIS PROJECT MUST BE RELOCATED AT THE EXPENSE OF THE APPLICANT. 2. ALL DEVELOPMENT CREATING A TOTAL OF 20,000 SQUARE FEET OF IMPERVIOUS AREA SINCE SEPTEMBER 1978 WALL REQUIRE STORM DRAINAGE DETENTION. 3. BEFORE YOU DIG STOP. CALL THE NC ONE -CALL CENTER AT 1- 800 - 632 -4949. IT'S THE LAW. 4. ALL ACCESS DRIVEWAYS WILL BE DESIGNED TO SUPPORT 80,000 LB LOADS CHESTNUT SUBDIVISION, PHASE 2 PB. H PG. 251 LOT 57 / PIN 07141113 � 39 CHESTNUT SUBDIVISION, PHASE 2 // \ \�� 50'x65' PB. H PG. 251 \ \ LOT 58 PIN 07141114 i 8 50'x68 ^� \\ ' / n x1 HI z m ° I � I i I I I I HENRY 0. AND I I ELSIE G. EUBANK I I PIN 07141001D I I I I I PAVEMENT Zl.Zl. 30" STANDARD CURB I I TRANSITION AND GUTTER ' I I- - TAPER 717TLANDSCAP I I I I EXISTING EDGE I I I BUFFER I I I I I I OF PAVEMENT I I I I I I I I I I I I I I I I I I I I I I I I I 51 I I 50 I I I I O I I 50'x75' I I i-- ELAINE A. NICHOLS 54 I I 49 I I O 50'x75' PIN 07141001F 53 50x67 50'x67' I 50'x67' 50'x67' 50'x67' I I I I 20' PUBLI 50'x67' I I I I UCPW UT STORM DRC A IN D 4" PLANTING 5" SIDEWALK E ASEMENT EASEMENT STRIP I/ _u o° I 0' PUBLIC I I I I (TYP,) I I I IGt PER TOSLDS I I STORM DRAIN I I I I I I 50.05A(CONTRACTOR TO Z m D EASEMENT I I # .°i Z o C I I I I I J- NSTALL) - -- - ?gym 30 "X30 TOP SIN TYP.) -- - oon �CONTR - -- i I - -- m I I 30L0'R nm w EL - 35'x35' SITE _ - N r _ RED BB" N AIL m m 7RIAN( I 1 I ' - - - o m w 10' x70' SITE j ( - - - TRIANGLE / I 10' CURB TRANSITION - - s 30.0' - - - - -__ - - - - - -- -- -- - - -- B R ST�EET SIGN PER TOSCD - LIGHT T • 'RED #50.05A(CONTRACTOR TO I i LIGHT TYP i I I AYCESSIBLE RAM pubUc Rt I INSTALL I I I I I P) I DRI VEWA I I ��ARIABLE (TYP) I I I I 20' LANDSCAPE I I I I O I 10' x70' SITE 1 1 I BUFFER I I I 7 8 TRIANGLE , 1 `� I I I O O O I O I 5' I 50x65' I 50'x65' 1 1 I I O I 50'x65' I 50'x65' I 50'x65' i 50'x65' i 50'x65' 1 50'x65' CHANG YUNG KI AND SOON SUN I I I I I I PIN 07141016A \ \ I I I I I — � 30" STANDARD CURB - - - - END OF ROADWAY enin ci irrro \ � �" — MARKER .,.� GREGORY SETH LEONARD DB 6234 PG 721 PIN 07141001E DEAD END BARRICADE 12 50'x76' 5" SIDEWALK 4" PLANTING STRIP 11 50'x76' EXISTING POND a GRAPHIC SCALE 40 0 20 40 80 I inch = 40 ft. FINAL DRAWING - NOT RELEASED FOR CONSTRUCTION g N 0 0 ol 00 pill � g VJ A � V R , s 8p, � z C o rc a 3 z b i 5 s s s s s N N N N N N N P4 ol co �� N o z x a O o z�U W F E- Hzz �x F E W O Iz a 44 00 2, P-4 O o �y PROJECT NO- MRH -13040 PDENaeE: MRH13040 —S1 CHECKED BY. RMR DRANN BY: CM /JL /RMR SCALE: 1"=40' DATE: 07 -25 -2014 SHEET N0. C -3 �J MCADAMS I (DESIGNED BY W 1 I 45 I I I I OTHERS) x I I I Ov m JOHN HOWARD FAISON IV 50'x75' I I 14 O DB 1162 PG 684 I I O PIN 07141001 I- I I O loorak EXISTING CHESTNUT LANE TO HAVE I N 50'x76' 1.5" OVERLAY ACROSS n CHESTN LANE UT ENTIRE WIDTH OF ROAD I 1 I (60' PUBLIC R /W) ALONG FRONTAGE rT ° I � I i I I I I HENRY 0. AND I I ELSIE G. EUBANK I I PIN 07141001D I I I I I PAVEMENT Zl.Zl. 30" STANDARD CURB I I TRANSITION AND GUTTER ' I I- - TAPER 717TLANDSCAP I I I I EXISTING EDGE I I I BUFFER I I I I I I OF PAVEMENT I I I I I I I I I I I I I I I I I I I I I I I I I 51 I I 50 I I I I O I I 50'x75' I I i-- ELAINE A. NICHOLS 54 I I 49 I I O 50'x75' PIN 07141001F 53 50x67 50'x67' I 50'x67' 50'x67' 50'x67' I I I I 20' PUBLI 50'x67' I I I I UCPW UT STORM DRC A IN D 4" PLANTING 5" SIDEWALK E ASEMENT EASEMENT STRIP I/ _u o° I 0' PUBLIC I I I I (TYP,) I I I IGt PER TOSLDS I I STORM DRAIN I I I I I I 50.05A(CONTRACTOR TO Z m D EASEMENT I I # .°i Z o C I I I I I J- NSTALL) - -- - ?gym 30 "X30 TOP SIN TYP.) -- - oon �CONTR - -- i I - -- m I I 30L0'R nm w EL - 35'x35' SITE _ - N r _ RED BB" N AIL m m 7RIAN( I 1 I ' - - - o m w 10' x70' SITE j ( - - - TRIANGLE / I 10' CURB TRANSITION - - s 30.0' - - - - -__ - - - - - -- -- -- - - -- B R ST�EET SIGN PER TOSCD - LIGHT T • 'RED #50.05A(CONTRACTOR TO I i LIGHT TYP i I I AYCESSIBLE RAM pubUc Rt I INSTALL I I I I I P) I DRI VEWA I I ��ARIABLE (TYP) I I I I 20' LANDSCAPE I I I I O I 10' x70' SITE 1 1 I BUFFER I I I 7 8 TRIANGLE , 1 `� I I I O O O I O I 5' I 50x65' I 50'x65' 1 1 I I O I 50'x65' I 50'x65' I 50'x65' i 50'x65' i 50'x65' 1 50'x65' CHANG YUNG KI AND SOON SUN I I I I I I PIN 07141016A \ \ I I I I I — � 30" STANDARD CURB - - - - END OF ROADWAY enin ci irrro \ � �" — MARKER .,.� GREGORY SETH LEONARD DB 6234 PG 721 PIN 07141001E DEAD END BARRICADE 12 50'x76' 5" SIDEWALK 4" PLANTING STRIP 11 50'x76' EXISTING POND a GRAPHIC SCALE 40 0 20 40 80 I inch = 40 ft. FINAL DRAWING - NOT RELEASED FOR CONSTRUCTION g N 0 0 ol 00 pill � g VJ A � V R , s 8p, � z C o rc a 3 z b i 5 s s s s s N N N N N N N P4 ol co �� N o z x a O o z�U W F E- Hzz �x F E W O Iz a 44 00 2, P-4 O o �y PROJECT NO- MRH -13040 PDENaeE: MRH13040 —S1 CHECKED BY. RMR DRANN BY: CM /JL /RMR SCALE: 1"=40' DATE: 07 -25 -2014 SHEET N0. C -3 �J MCADAMS EXISTING YARROW STREET 50' PUBLIC R/W TEMPORARY BARRIER WILL BE PLACED AT THE END OF YARROW STREET AND THE CONNECTION WILL NOT BE OPENED UNTIL FINAL CERTIFICATE OF OCCUPANCY FOR THE PROPOSED DEVELOPMENT HAS BEEN ISSUED. PER STALLINGS LIDO ARTICLE 5 NOTES: 1. CONTACT THE UTILITY COMPANY TO RELOCATE ANY EXISTING UTILITY POLES. ALL EXISTING FACILITIES WHICH CONFLICT WITH THE IMPROVEMENTS UNDER THE SCOPE OF THIS PROJECT MUST BE RELOCATED AT THE EXPENSE OF THE APPLICANT. 2. ALL DEVELOPMENT CREATING A TOTAL OF 20,000 SQUARE FEET OF IMPERVIOUS AREA SINCE SEPTEMBER 1978 WALL REQUIRE STORM DRAINAGE DETENTION. 3. BEFORE YOU DIG STOP. CALL THE NC ONE -CALL CENTER AT 1 -800- 632 -4949. IT'S THE LAW. 4. ALL ACCESS DRIVEWAYS WILL BE DESIGNED TO SUPPORT 80,000 LB LOADS CHESTNUT SUBDIVISION, PHASE 2 PB. H PG. 251 LOT 51 PIN 07141107 10' WIDE NO CLEAR - BUFFER ALONG PROPERTY LINE � 38 \� 50'x67' \ YARROW STREET EXT. 50' PUBLIC R/W GENERAL NOTES, COORDINATE ALL CURB AND STREET GRADES IN INTERSECTION WITH INSPECTOR. ALL ROAD IMPROVEMENTS ON CHESTNUT ARE TO BE COORDINATED WITH THE TOWN OF STALLINGS ENGINEERING DEPARTMENT PRIOR TO CONSTRUCTION. DEVELOPER WILL PROVIDE STREET SIGNS SIGHT TRIANGLES SHOWN ARE THE MINIMUM REQUIRED. IN ROWING AND HILLY TERRAINS, SWEEPING OF THE STONE BASE AND /OR APPLICATION OF A TACK COAT MAY BE REQUIRED NEAR INTERSECTION. THESE REQUIREMENTS WILL BE ESTABLISHED BY THE INSPECTOR AND BASED ON FIELD CONDITIONS. APPROVAL OF THIS PLAN IS NOT AN AUTHORIZATION TO GRADE ADJACENT PROPERTIES. WHEN FIELD CONDITIONS WARRANT OFF -SITE GRADING, PERMISSION MUST BE OBTAINED FROM THE AFFECTED PROPERTY OWNERS. IN ORDER TO ENSURE DRAINAGE, KEEP A MINIMUM OF 0,5% SLOPE ON THE CURB. SUBSURFACE DRAINAGE FACILITIES MAY BE REQUIRED IN THE STREET RIGHT OF WAY IF DEEMED NECESSARY BY THE INSPECTOR. CURB AND GUTTER SHOWN ON PLANS ALONG CHESTNUT LANE MAY BE ADJUSTED BASED UPON FIELD STAKING BY CITY ENGINEERING. ASSOCIATED STORM DRAINAGE MAY ALSO REQUIRE MODIFICATION BASED UPON FIELD CONDITIONS. THE PURPOSE OF THE STORM DRAINAGE EASEMENT (SIDE) IS TO PROVIDE STORM WATER CONVEYANCE AND ANY STRUCTURES AND /OR OBSTRUCTION TO STORM WATER IS PROHIBITED. THE DEVELOPER SHALL MAINTAIN EACH STREAM, CREEK, OR BACKWASH CHANNEL IN AN UNOBSTRUCTED STATE AND SHALL REMOVE FROM THE CHANNEL AND BANKS OF THE STREAM ALL DEBRIS, LOGS, TIMBER, JUNK AND OTHER ACCUMULATIONS. HIGH - DENSITY POLYETHYLENE (HDPE) STORM DRAINAGE PIPE INSTALLED WITHIN EXISTING OR PROPOSED PUBLIC STREET RIGHT -OF -WAY MUST BE APPROVED BY THE CITYS INSPECTOR PRIOR TO ANY BACKFILL BEING PLACED. BACKFILL MATERIAL MUST BE APPROVED BY THE CITY INSPECTOR PRIOR TO PLACEMENT OF THE MATERIAL WITHIN THE PUBLIC RIGHT -OF -WAY. GENERAL NOTES: ALL OPENINGS (e.g., DOORS, WINDOWS, VENTS) IN STRUCTURES BUILT SHOULD BE LOCATED A MINIMUM OF ONE FOOT ABOVE THE ADJACENT FINISHED GROUND SURFACE. "AS- BUILT" DRAWINGS AND PLANS OF THE STORM DRAINAGE SYSTEM, INCLUDING DESIGNED DITCHES AND BMP'S, MUST BE SUBMITTED PRIOR TO SUBDIVISION FINAL INSPECTION TO THE CITY /COUNTY ENGINEERING DEPARTMENT IN ACCORDANCE WITH THE CITY /COUNTY SUBDIVISION ORDINANCE. NON- STANDARD ITEMS (ie: PAVERS, IRRIGATION SYSTEMS, ETC.) IN THE RIGHT -OF -WAY REQUIRE A RIGHT -OF -WAY ENCROACHMENT AGREEMENT WITH THE (NORTH CAROLINA DEPARTMENT OF TRANSPORTATION) BEFORE INSTALLATION. PRIOR TO PLAT RECORDATION, OFFSITE R/W AND /OR CONSTRUCTION EASEMENTS ARE REQUIRED TO BE OBTAINED ACCORDING TO THE GUIDELINES OF THE " OFFSITE R/W ACQUISITION PROCESS ". THESE NEEDED R/W AND CONSTRUCTION LIMITS ARE CLEARLY SHOWN ON THE ROADWAY IMPROVEMENT PLAN. CERTIFICATION AND STREET CUT PERMITS MAY BE REQUIRED FOR UTILITY CUTS ON CITY STREETS. FOR INFORMATION CONTACT LYNNE HAIR AT THE TOWN OF STALLINGS PLANNING DEPARTMENT (704) 821 -0315 i i 1 ,'PROPOSED 20''- UTILITY EASEMENT \� COs I 24" VALLEY CURB & GUTTER \\ ;T1 \\ \ 35'x35' SITE / 1 \ \TRIANGLE 7 0 DRIVEWAY \ D I ) i> \� � REET SIGN '�EIT nM ' z� tzi' I� M W ' n ' I DUKE POWER / DUKE ENERGY CORPORATION PIN 07141007A J '\ r i 32 05' / /SF,�PG \ (TYP.) 10' WIDE NO CLEAR BUFFER ALONG PROPERTY LINE 10' WIDE NO CLEAR \ BUFFER ALONG PROPERTY LINE CHRISTOPHER G. MOWBRAY PIN 07141026 LENNAR CAROLINAS, LLC DB 4305 PG 730 PIN 07141008 GRAPHIC SCALE "" ""`""4z 1 inch = 40 ft„ FINAL DRAWING — NOT RELEASED FOR CONSTRUCTION N O 4 w � V zo 00§ z .38 M t` VJ t•1 � V /9 Af. RE 0 . i 61 o o rc V] � � ry S ♦ � n z o a m o° 5 d d a a s Nry N N N N N i` 19 cv o W CQ �o z Ox o y' o x Z.- F F Um 0­4x F F W 0O F F �y z o U /1 c d 00 0 P"'J"T 140. MRH -13040 FMNAMR: MRH13040 -S1 CHECKED BY: RMR BRAWN BY: CM /JL /RMR scA1z: 07 -25 -2014 NO. F C -4 M WADAMS GENERAL NOTES: COORDINATE ALL CURB AND STREET GRADES IN INTERSECTION WITH INSPECTOR. ALL ROAD IMPROVEMENTS ON CHESTNUT ARE TO BE COORDINATED WITH THE TOWN OF STALLINGS ENGINEERING DEPARTMENT PRIOR TO CONSTRUCTION. DEVELOPER WILL PROVIDE STREET SIGNS SIGHT TRIANGLES SHOWN ARE THE MINIMUM REQUIRED. IN ROLLING AND HILLY TERRAINS, SWEEPING OF THE STONE BASE AND /OR APPLICATION OF A TACK COAT MAY BE REQUIRED NEAR INTERSECTION. THESE REQUIREMENTS WILL BE ESTABLISHED BY THE INSPECTOR AND BASED ON FIELD CONDITIONS. APPROVAL OF THIS PLAN IS NOT AN AUTHORIZATION TO GRADE ADJACENT PROPERTIES. WHEN FIELD CONDITIONS WARRANT OFF -SITE GRADING, PERMISSION MUST BE OBTAINED FROM THE AFFECTED PROPERTY OWNERS. IN ORDER TO ENSURE DRAINAGE, KEEP A MINIMUM OF 0.5% SLOPE ON THE CURB. SUBSURFACE DRAINAGE FACILITIES MAY REQUIRED IN THE STREET RIGHT OF WAY IF DEEMED NECESSARY BY THE INSPECTOR. CURB AND GUTTER SHOWN ON PLANS ALONG CHESTNUT LANE MAY BE ADJUSTED BASED UPON FIELD STAKING BY CITY ENGINEERING. ASSOCIATED STORM DRAINAGE MAY ALSO REQUIRE MODIFICATION BASED UPON FIELD CONDITIONS. THE PURPOSE OF THE STORM DRAINAGE EASEMENT (SIDE) IS TO PROVIDE STORM WATER CONVEYANCE AND ANY STRUCTURES AND /OR OBSTRUCTION TO STORM WATER IS PROHIBITED. THE DEVELOPER SHALL MAINTAIN EACH STREAM, CREEK, OR BACKWASH CHANNEL IN AN UNOBSTRUCTED STATE AND SHALL REMOVE FROM THE CHANNEL AND BANKS OF THE STREAM ALL DEBRIS, LOGS, TIMBER, JUNK AND OTHER ACCUMULATIONS. HIGH - DENSITY POLYETHYLENE (HOPE) STORM DRAINAGE PIPE INSTALLED WITHIN EXISTING OR PROPOSED PUBLIC STREET RIGHT -OF -WAY MUST BE APPROVED BY THE CITY'S INSPECTOR PRIOR TO ANY BACKFILL BEING PLACED. BACKFILL MATERIAL MUST BE APPROVED BY THE CITY INSPECTOR PRIOR TO PLACEMENT OF THE MATERIAL WITHIN THE PUBLIC RIGHT -OF -WAY. GENERAL NOTES ALL OPENINGS (e.g., DOORS, WINDOWS, VENTS) IN STRUCTURES BUILT SHOULD BE LOCATED A MINIMUM OF ONE FOOT ABOVE THE ADJACENT FINISHED GROUND SURFACE. "AS- BUILT" DRAWINGS AND PLANS OF THE STORM DRAINAGE SYSTEM, INCLUDING DESIGNED DITCHES AND BMP'S, MUST BE SUBMITTED PRIOR TO SUBDIVISION FINAL INSPECTION TO THE CITY /COUNTY ENGINEERING DEPARTMENT IN ACCORDANCE WITH THE CITY /COUNTY SUBDIVISION ORDINANCE. NON- STANDARD ITEMS (ie: PAVERS, IRRIGATION SYSTEMS, ETC.) IN THE RIGHT -OF -WAY REQUIRE A RIGHT -OF -WAY ENCROACHMENT AGREEMENT WITH THE (NORTH CAROLINA DEPARTMENT OF TRANSPORTATION) BEFORE INSTALLATION. PRIOR TO PLAT RECORDATION, OFFSITE R/W AND /OR CONSTRUCTION EASEMENTS ARE REQUIRED TO BE OBTAINED ACCORDING TO THE GUIDELINES OF THE "OFFSITE R/W ACQUISITION PROCESS ". THESE NEEDED R/W AND CONSTRUCTION LIMITS ARE CLEARLY SHOWN ON THE ROADWAY IMPROVEMENT PLAN. CERTIFICATION AND STREET CUT PERMITS MAY BE REQUIRED FOR UTILITY CUTS ON CITY STREETS. FOR INFORMATION CONTACT LYNNE HAIR AT THE TOWN OF STALLINGS PLANNING DEPARTMENT (704).821 -0315 NOTES, 1. CONTACT THE UTILITY COMPANY TO RELOCATE ANY EXISTING UTILITY POLES. ALL EXISTING FACILITIES WHICH CONFLICT WITH THE IMPROVEMENTS UNDER THE SCOPE OF THIS PROJECT MUST BE RELOCATED AT THE EXPENSE OF THE APPLICANT. 2. ALL DEVELOPMENT CREATING A TOTAL OF 20,000 SQUARE FEET OF IMPERVIOUS AREA SINCE SEPTEMBER 1978 WILL REQUIRE STORM DRAINAGE DETENTION. 3. BEFORE YOU DIG STOP. CALL THE NC ONE -CALL CENTER AT 1 -800- 632 -4949. IT'S THE LAW. 4. ALL ACCESS DRIVEWAYS WALL BE DESIGNED TO SUPPORT 80,000 LB LOADS TEMPORARY JOHN HOWARD FAISON IV CONSTRUCTION DB 1162 PG 684 EASEMENT PIN 07141001 PROPOSED EDGE OF PAVEMENT A- EXISTING CHESTNUT LANE (60' PUBLIC R /W) 10' WIDE NO Cl BUFFER ALONG PROPERTY LINE LINE OF (SEE SHEETS P-8 8 AND C -5) RED BARN IW (50' PUBLIC R /W) 30 "X30 STOP SIGN (TYP.) (CONTRACTOR TO INSTALL) 20' PUBLIC STORM DRAIN EASEMENT J 7" �M III SITE LEGEND - - PROPERTY LINE v SIGNAGE RIGHT -OF -WAY LINE YARD LIGHTS — - - — - - — LOT LINE LIGHT POLE — EASEMENT LINE CENTERLINE Cab POWER POLE — X— X —X —X— FENCE TRAFFIC DIRECTIONAL ARROW HANDICAP PARKING STALL HANDICAP RAMPS TOWNSHIP BORDER POSSIBLE LOCATION OF ENTRANCE SIGN /® r C ♦ -- 0710' R CHESTNUT LANE TO HAVE J 1 ~ 1.5" OVERLAY ACROSS - ENTIRE WIDTH OF ROAD 30" STANDARD CURB -�. ALONG FRONTAGE AND GUTTER T - HENRY 0. AND ELSIE G. EUBANKS PIN 07141001D / I 20' LANDSCAPE BUFFER (TYP.) J TRANSITION JAPER r / / CHANG YUNG KI AND SOON SUN PIN 07141016A 10' X 70' SITE TRIANGLE (TYP.) ' DONALD E. AND EX. RED BARN KATHLEEN F. GOESSEL TRAM PIN 07141001J ELAINE A. NICHOLS (VARIABLE PUBLIC R /W) PIN 07141001F GRAPHIC SCALE 40 0 20 40 80 FINAL DRAWING - NOT RELEASjMhF`DRIOC4NSTRUCTION N N NM too G -8n .fir p V,^ VJ A � V R 9 ' i 0 7 �, °BF FN �m un�• i w a N i 0 2 F Z a 3 a Ly � Li a o a S z 5 N N N N N N N t` 0. N co rA N o z Ox o zNU W F F z �y x F+-1 E" E- 0 O E ' a r0 U p(•L ~ d o° °z U O O PROJECT NO. MRH -13040 FILENAME: MRH13040 -S1 CHECKED Hr: RMR DRAIN BY. CM /JL/RMR SCALE: 1"=40' DATE: 07 -25 -2014 SHEET NO. C -5 HU MCADAMS GREGORY SETH LEONARD / DB 6234 PG 721 PIN 07141001E EXISTING RIGHT OF WAY PROPOSED EDGE OF PAVEMENT 1 ' POSSIBLE LOCATION OF ENTRANCE SIGN /® r C ♦ -- 0710' R CHESTNUT LANE TO HAVE J 1 ~ 1.5" OVERLAY ACROSS - ENTIRE WIDTH OF ROAD 30" STANDARD CURB -�. ALONG FRONTAGE AND GUTTER T - HENRY 0. AND ELSIE G. EUBANKS PIN 07141001D / I 20' LANDSCAPE BUFFER (TYP.) J TRANSITION JAPER r / / CHANG YUNG KI AND SOON SUN PIN 07141016A 10' X 70' SITE TRIANGLE (TYP.) ' DONALD E. AND EX. RED BARN KATHLEEN F. GOESSEL TRAM PIN 07141001J ELAINE A. NICHOLS (VARIABLE PUBLIC R /W) PIN 07141001F GRAPHIC SCALE 40 0 20 40 80 FINAL DRAWING - NOT RELEASjMhF`DRIOC4NSTRUCTION N N NM too G -8n .fir p V,^ VJ A � V R 9 ' i 0 7 �, °BF FN �m un�• i w a N i 0 2 F Z a 3 a Ly � Li a o a S z 5 N N N N N N N t` 0. N co rA N o z Ox o zNU W F F z �y x F+-1 E" E- 0 O E ' a r0 U p(•L ~ d o° °z U O O PROJECT NO. MRH -13040 FILENAME: MRH13040 -S1 CHECKED Hr: RMR DRAIN BY. CM /JL/RMR SCALE: 1"=40' DATE: 07 -25 -2014 SHEET NO. C -5 HU MCADAMS EROSION CONTROL NOTES: CONSTRUCTION SE UENCE: 1. SOIL STABILIZATION SHALL BE ACHIEVED ON ANY AREA OF A SITE WHERE 1. OBTAIN GRADING EROSION CONTROL PLAN APPROVAL FROM NORTH NOTE: LAND- DISTURBING ACTIVITIES HAVE TEMPORARILY OR PERMANENTLY CEASED CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES. THE PHASE I MEASURES SHOWN ON THE PLANS REFLECT THE IN CHESTNUT HOMEOWNERS ACCORDING TO THE FOLLOWING SCHEDULE: 2. SET UP AN ON -SITE PRE - CONSTRUCTION CONFERENCE WITH NC DENR PLACE EROSION CONTROL NECESSARY TO ALLOW THE SITE TO BE ASSOCIATION, INC a. ALL PERIMETER DIKES, SWALES, DITCHES, PERIMETER SLOPES AND ALL (704- 663 - 1699), THE BUILDING OFFICIAL AND LYNNE HAIR AT THE TOWN CLEARED AND GRUBBED IN PREPARATION FOR THE INITIAL STAGE OF PIN 07141006 SLOPES GREATER THAN 3 HORIZONTAL TO 1 VERTICAL (3:1) SHALL BE OF STALLINGS PLANNING DEPARTMENT (704- 821 -0315) TO DISCUSS THE GRADING WORK. THE PHASE II MEASURES DEPICTED ON THE PROVIDED TEMPORARY OR PERMANENT STABILIZATION WITH GROUND COVER EROSION CONTROL MEASURES. PLANS SHOW THE IN PLACE EROSION CONTROLS THAT WILL REMAIN / AS SOON AS PRACTICAL BUT IN ANY EVENT WITHIN 7 CALENDAR DAYS 3. APPLY FOR AND OBTAIN DRIVEWAY PERMITS. UPON OBTAINING DRIVEWAY PERMITS, INSTALL GRAVEL CONSTRUCTION ENTRANCE IN ACCORDANCE WITH AT THE COMPLETION OF THE FINAL STAGE IN THE GRADING WORK EX. YARROW STREET CHESTNUT SUBDIVISION, PHASE / //, I FROM THE LAST LAND- DISTURBING ACTIVITY. REQUIRED BY TH PROJECT. CHI ER STAGE OF PB. H PG. 25 DETAILS PROVIDED. E PRO E R EA NT IM AL • i U b. ALL OTHER DISTURBED AREAS SHALL BE PROVIDED TEMPORARY OR GRADING WORK, THE CONTRACTOR SHALL BE REQUIRED TO INSTALL 5O PUBLIC R/1P LOT 50 c / T ALEN D COVER AS SON AS PRACTICAL 4. PRIOR TO THE START OF CONSTRUCTION, ADJOINING PROPERTY OWNERS s � � I )) PERMANENT STABILIZATION WITH N 0 CAL ANY ADDITIONAL TEMPORARY MEASURES THAT MAY BE NECESSARY TO BUT IN ANY EVENT WITHIN 14 CALENDAR DAYS FROM THE LAST MUST BE NOTIFIED. \ PIN 071411 / �� � ' 5. PRIOR TO CONSTRUCTION OF SEDIMENT BASIN #2, THE EXISTING SEWER CONTROL SEDIMENT AND EROSION THAT OCCURS AS A RESULT OF \ / f / LAND- DISTURBING ACTIVITY. CHANGES TO THE EXISTING GROUND ELEVATION CONTOURS. AS / / / 2. BETWEEN (AND INCLUDING) EX. MH -14 THROUGH EX. MH -16 MUST BE � \ " � � / SEEDING OF AREAS GRADED SHALL BE IN ACCORDANCE WITH NORTH REMOVED /RELOCATED AND ACCEPTED BY THE UNION COUNTY PUBLIC DIRECTED BY THE TOWN OF STALLINGS OR STATE INSPECTORS. \ / /�$ / / / \ \ a CAROLINA EROSION AND SEDIMENT CONTROL DESIGN MANUAL. WORKS. EROSION CONTROL INSPECTION SCHEDULE / 3. REPRESENTATIVES OF THE NC DENR OR THE TOWN OF STALLINGS 6. INSTALL DITCHES, SILT FENCE, INLET PROTECTION, STREAM CROSSINGS VERSIOOTHER % / \ \ / I i / / ENGINEERING DEPARTMENT MAY REVIEW AND EVALUATE THE METHODS USED THE PERSON RESPONSIBLE FOR LAND DISTURBING ACTIVITIES MUST \ SILT FENC \> F /� AND THE OVERALL EFFECTIVENESS OF THE EROSION CONTROL PROGRAM. MEASURES AS SHOWN ON PHASE 1 PLANS, CLEARING ONLY AS NECESSARY INSPECT THE SEDIMENT AND EROSION CONTROL MEASURES ON A \ ( )\ 1_ d TO INSTALL THESE DEVICES. THIS IS TO INCLUDE THE EROSION CONTROL PROJECT AFTER EACH PHASE TO ENSURE THE APPROVED PLAN IS r OWTL T�'P. r /` THE APPROVED EROSION AND SEDIMENT CONTROL PLAN MAY BE AMENDED BEING FOLLOWED. AT A MINIMUM, THE INSPECTIONS SHALL BE r /• � SEE SHEET D -4 \ / I / BY THE APPROVING AUTHORITY IF AN ON SITE INSPECTION INDICATED THAT MEASURES ALONG CHESTNUT LANE FOR THE CONSTRUCTION OF THE TURN / LANE AND ROAD IMPROVEMENTS. PERFORMED AFTER EACH OF THE FOLLOWING PHASES OF A PLAN: CHESTNUT SUBDIVISION, PHASE 2 /'`.. ' %r / 1 { / THE APPROVED CONTROL MEASURES ARE NOT EFFECTIVE IN CONTROLLING a. INSTALLATION OF PERIMETER EROSION AND SEDIMENT CONTROL PB. H PG. 251 / ii -' / i' I i..:I: EROSION AND SEDIMENTATION OR IF BECAUSE OF CHANGED CIRCUMSTANCES 7. CLEAN WATER DIVERSION DITCHES MUST BE MATTED AND STABILIZED /i i r- f/ j.. ! I / \ IMMEDIATELY AFTER CONSTRUCTION. MEASURES. LOT 51 / / ,> / ! / THE APPROVED PLAN CANNOT BE CARRIED OUT. 8. IN CONJUNCTION WITH THE EXTERNAL WIRE AND GRAVEL INLET PROTECTION, b. INSTALLATION OF SEDIMENT TRAPS BASINS. PIN 07141107 4. CONTRACTOR SHALL LOCATE AND VERIFY THE LOCATION OF ALL UTILITIES / / PRIOR TO BEGINNING CONSTRUCTION. SILT SACKS, OR SIMILAR INLET PROTECTION MEASURES, SHALL BE a CLEARING AND GRUBBING OF EXISTING GROUND COVERS. , r `EMPORARY \ / {j PROVIDED IN ALL STORM INLETS NOT DISCHARGING TO A SEDIMENT BASIN. d. COMPLETION OF ANY PHASE OF GRADING THAT REQUIRES \ ,1 Dlt(ERSION DITCIi \ -.� 9. CALL FOR ON -SITE INSPECTION BY INSPECTOR. UPON APPROVAL BY PROVISION OF STABILIZATION. T!(ti \ \ / / ^) \) j XISTI4G ?/6' UTILITY EASEMENT 5. THE CONTRACTOR SHALL NOTIFY NORTH CAROLINA ONE CALL CENTER (811) / ) :': / / % I OR 1- 800 - 632 -4949 BEFORE BEGINNING ANY EXCAVATION OR UTILITY INSPECTOR CLEARING & GRUBBING MAY BEING. e. INSTALLATION OF MEASURES DURING ANY PHASE OF THE = r \ \ \ MILT /FRIDGE / l / 11 WORK. CONTACT UNION COUNTY FOR LOCATING EXISTING WATER AND 10. LIMIT CLEARING AND GRUBBING OF SITE TO AREAS THAT WILL BE MASS PROJECT. TEMPORARY CLEAN y' \ \ \ \ (TSP/.) I / / ss :: /' / / %/ SEWER LINES. GRADED IN PHASE 1. WHENEVER POSSIBLE, EXISTING VEGETATION SHALL WATER DIVERSION \ M \' f. COMPLETION OF CONSTRUCTION OR DEVELOPMENT. DITCH \ \ � I L � / 1 / � / ' � I� I/ / LIMITS OF 6. EROSION AND SEDIMENT CONTROL PRACTICES SHALL BE MAINTAINED, SO REMAIN IN PLACE TO PREVENT EROSION E SITE. - \ \ \ / / \ 11. ANY OFF -SITE BORROW AND/OR WASTE REQUIRED FOR THIS PROJECT 9• INSTALLATION OF STORMWATER RETENTION MEASURES. � �� /,• �, \ \ \ \ I / / /�/ /� II/ f � I' I ( / s�' ? /\ DISTURBANCE THAT SEDIMENT CARRYING RUNOFF FROM THE SITE WILL NOT ENTER STORM MUST COME FROM AN APPROVED EROSION CONTROL PLAN SITE, A SITE h. QUARTERLY UNTIL THE ESTABLISHMENT OF PERMANENT GROUND CHESTNUT SUBDIVISION, PHASE 2 / / \ \ ,.%( / / 1.. l / (TYp,) DRAINAGE FACILITIES. PB. H PG. 251 \ REGULATED UNDER THE MINING ACT OF 1971, OR A LANDFILL REGULATED COVER IS FULLY ESTABLISHED. CHECK DAM ` / / r �I l ;/ is ' I / / 7. PROPERTIES AND RIGHT -OF -WAY ADJOINING THE SITE SHALL BE KEPT LOT 57 r / / l / l' / / i :':' I BY THE DIVISION OF SOLID WASTE MANAGEMENT. DEBRIS FROM DEMOLITION *CONTACT NCDENR AT (704)663 -1699 FOR ADDITIONAL INFORMATION (TYP•) i / / i . / / ` / / / / i CLEAN OF MUD OR SILT CARRIED FROM THE SITE BY VEHICULAR TRAFFIC PIN 07141113 � �I' /�/ � � .�; ACTIVITIES SHOULD BE DISPOSED OF AT AN APPROVED FACILITY. /I\ \ �' TEMPORAFj��r' (/ i f ? h I I / / / / OR RUNOFF. 12. BEGIN GRADING ACTIVITIES AS SHOWN IN PHASE 1. AS SITE IS GRADED, NOTE: s / / / / DUKE POWER / DUKE ENERGY CONTRACTOR SHALL MINIMIZE THE AMOUNT OF STORM WATER FLOWING ANY EXISTING EASEMENTS TO BE / I \ i\ \ DIVE I�SIO�NJ BEM I \\ 1j.... 11\ / I / / / / \ / // CORPORATION 8. ALL CONSTRUCTION TRAFFIC SHALL ENTER AND EXIT THE SITE VIA THE OVER FILL SLOPES BY USING DIVERSION DITCHES AND SLOPE DRAINS. ABANDONED MUST BE APPROVED BY / i\ \\\ \ AND DITCLi I II , PIN 07141007A CONSTRUCTION ENTRANCES. DITCHES AND SLOPE DRAINS SHOWN ON PLANS DEPICT REQUIRED THE BOARD OF COUNTY COMMISSIONERS, �� \. \! // /1 \ �� \ Ck{ECK D \ \\ \ l II `..W9?yAND l j \\ ILy FENCE / // r // / 9. EXCAVATED MATERIAL FROM TRENCHES SHALL BE PLACED ON THE UPGRADE DIVERSION DITCHES AND SLOPE DRAINS AT FINAL PAD GRADE. ADDITIONAL UNION COUNTY DOES NOT HAVE THE - - - - _ - r \ \ \ \ \\ !? /: OUTLET /(TYPJ/ / \ / / SIDE OF THE TRENCH TO ALLOW MATERIAL TO ERODE INTO THE TRENCH. AUTHORITY TO DO S0. - - - - - '` I \ I�. ( � \ � `(T,YP.� \ � / S E /D 4 / / / / CONSTRUCTION MAINTENANCE AND REMOVAL OF ALL EROSION CONTROL MEASURES MAY BE NEEDED AS GRADING PROGRESSES. - r/ / \� \\ \ ENV INt700 5 \ \ E DEVICES ARE THE RESPONSIBILITY OF GRADING CONTRACTOR UNLESS 13. MAINTAIN AND ADJUST E &SC MEASURES AS MASS GRADING PROGRESSES TO / �11 \I( \ \ \ 'I 'I /D UBLE ROW RY TEMP C VERT 1 SIT / OTHERWISE NOTED. MAINTAIN PROPER E &SC CONTROL \ STOCK PILE `j - ,, � \ \ \ \ \ ' :: `j 11 '1 I / / \e ` / 14. INSTALL STORM WATER COLLECTION SYSTEM, VELOCITY DISSIPATERS AND `i',• 1 40 LF 15" \\ \ \ \ \ (TPI) 1 10. NO OFF -SITE BORROW AREAS SHALL BE UTILIZED DURING GRADING OF THE PROTECT INLETS WITH SILT FENCE, GRAVEL FILTERS, SILT TRAPS OR OTHER " ' \ \ / RCO, ® 1 {00% \ \ \ \ TOP O y' I I 4 I , I I \� SITE. ALL FILL SHALL BE OBTAINED WITHIN LIMITS OF DISTURBANCE SHOWN APPROVED MEASURES AS SHOWN ON THE PLANS. CHESTNUT SUBDIVISION, PHASE 2 \ \\ \Y MPO Rll \ \\ \ BANK \ a I EM� 1 ( ON PLANS. \ \ RA -}�� \ \ STR M CRbS IN 15. THE CONTRACTOR SHALL DILIGENTLY AND CONTINUOUSLY MAINTAIN ALL PB. H PG. 251 \ 1 - - C�LVE C OS 13 Ntl 1 \ \ 1 I p f \ \ \ ' I \ 1 ` ` I I I I 11. SITE BURIAL PITS REQUIRE AN ON -SITE DEMOLITION LANDFILL PERMIT EROSION CONTROL DEVICES AND STRUCTURES. INSPECT ONCE PER WEEK LOT 58 FROM THE SOLID WASTE SECTION OF NC DENR. AND AFTER EACH RAINFALL PIN 07141114 I \I I 12. NO OPEN BURNING ALLOWED. 16. STABILIZE SITE AS AREAS ARE BROUGHT TO GRADE. SEDIMENT BASIN #1 i ) i P4 / / ) / \ l 1 � �,�► `IMV.I OUT: 17d0.?5 � - 1 \ \ 1 \ 1 �, AND SEDIMENT BASIN #2 SHALL BE CONVERTED OVER TO PERMANENT / / i 1 I / I 1 I I j I Ill lk 021.00\ \ ` \ 13. ALL TREES & BRUSH REMOVED DURING CLEARING & GRUBBING OF SITE WATER QUALITY FACILITY AFTER THE ENTIRE SITE HAS BEEN STABILIZED. I / /� [ _\ / \ \ J SHALL BE CHIPPED ON SITE AND HAULED OFF SITE FOR DISPOSAL. FAILURE TO DO SO COULD CAUSE THE PLANTED PLANTS IN POND TO DIE - - - ' \ \ / \ \ \ 1� \ \ \ \ \ \ i� 1 I / I it / r� -� \ I 1 TEM \CULVERT\ 2 \ I 1 1 14. ANY GRADING BEYOND THE DENUDED LIMITS SHOWN ON THE PLAN IS IN WHEN INUNDATED WITH SILT. 1 \ / r / \ f r / VIOLATION OF THE CITY/COUNTY EROSION CONTROL ORDINANCE AND IS 17. SEDIMENT BASIN 1 AND SEDIMENT BASIN 2 ARE TO BE INCREASED IN / � / r _ - I \45�L )F \15" DEPTH TO THE DESIGNED ELEVATIONS SHOWN IN THE STORMWATER / ' \ \ \� / rr / / \ RCP \1.p1$ \ \ SUBJECT TO A FINE. \ i / / / / . 1 \ MANAGEMENT FACILITY PLANS. \ / %/ �: i I 15. MAINTAIN MINIMUM 10' CLEAR ZONE FROM TOP OF CHANNEL BANK TO 18. SEDIMENT BASINS SHALL NOT BE REMOVED OR CONVERTED TO i / / r r r // .; i..:: ; e :: ::::.. I l / / tNY. OU��01� 5 1 \ \ \\ DENUDED LIMITS. POST - CONSTRUCTION STORM WATER PONDS UNTIL AFTER ROADS HAVE 1 ( ,�EbIME�NT BAS/N # 1 % / r / / ' , / / / 11 D AINAGE AREA = 11.75 ACRE / / i // E r : /� / / / / / 16. GRADING MORE THAN ONE ACRE WITHOUT AN APPROVED EROSION CONTROL SECTION INSPECTOR. AND UNTIL APPROVED BY THE LAND QUALITY J 25' (L) X \121' (W) ^ I v d� ' c / ;:::'i::. i / / j// / I i I \ �I PLAN IS A VIOLATION OF THE DENR EROSION CONTROL ORDINANCE AND IS / I \ SUBJECT TO A FINE. 19. INLET PROTECTION MUST REMAIN IN PLACE WITHIN WORK AREA UNTIL ALL TMAL \ \ \\ // / // R5� / /t / / .......... J l/ �'•1 � /J 2CI' gER�ANEN l ' \ \\ 17. ADDITIONAL MEASURES TO CONTROL EROSION AND SEDIMENT MAY BE AREAS OF THE PROJECT ARE STABILIZED. \ \ / I' SEW R EM NT \ \ \ \ REQUIRED BY A REPRESENTATIVE OF THE TOWN OF STALLINGS OR NC 20. COORDINATE WITH EROSION CONTROL INSPECTOR FROM THE LAND QUALITY DISTURBED /DENUDED \ / / /� / /r%� / / /j/ I //A / /' � / I D B �7 1 \PG. 44� \ \ \ \\ \\ \ � \ \ \ DENR LAND QUALITY SECTION. SECTION OF NCDENR AND LYNNE HAIR AT THE TOWN OF STALLINGS \ (BASIN 0 BE STaL�ILIZED / / �� /. // ; ;:; / :~::.... /, 11/ l / / / (TO E EMVVE) \ \ \ \ \ \ PLANNING DEPARTMENT (704- 821 -0315) PRIOR TO REMOVAL OF EROSION AREA = 17.45* AC. IMMEDIA Y AFTER \ / / / // // i ° // 1: ' /l.` / f �` @ \ Q \ \ \ \ \ \ 18. SLOPES SHALL BE GRADED NO STEEPER THAN 2:1. FILL SLOPES GREATER 0 / / / / i :;:;:;:;:;:::.:.:::..: I //I 1l�' MPORARY\� \ \\ \\ \ \\ \ THAN 10' REQUIRE ADEQUATE TERRACING. CONTROL MEASURES. \ IN\STALLATI \ / / 2 / / / / 1 21. ALL EROSION CONTROL MEASURES SHALL BE CONSTRUCTED IN € \ \ \ r / / / / 1 : y' l 1 f l \CO%ST �JCTION EASEMENT \ \ \ i \ \ 19. A GRADING PLAN MUST BE SUBMITTED FOR ANY LOT GRADING EXCEEDING \ r / / ACCORDANCE WITH THE N.C. EROSION AND SEDIMENT CONTROL PLANNING i l \\ \ \\ // / j; ; ; ; ; ; ; ; ; ; ; ;:;(:: ' } /�A .1 \ R.B731k PG. 1440 \ \ \\ \ �\ \ ONE ACRE THAT WAS NOT PREVIOUSLY APPROVED. AND DESIGN MANUAL. \:: 22. WHEN VEGETATION IS ESTABLISHED, CALL FOR FINAL SITE INSPECTION. IF \ \ \ \ BAFFLES 20. TEMPORARY DRIVEWAY PERMIT FOR CONSTRUCTION ENTRANCES IN NCDOT THE SITE IS APPROVED BY THE INSPECTOR, THE PERFORMANCE BOND, IF \ \ ( ) l / / / / / :::::: ( •Ir I \\ \ \i \ \ RIGHT OF WAY MUST BE PRESENTED AT PRE - CONSTRUCTION MEETING. REQUIRED, WILL BE RELEASED. \ \ \ x/ ✓ / 1 ::::::::::::::i : c : i:::::i:::::::::1 iI I ( it I�► I II:� \ \ \ \ L \ 21. THE APPROXIMATE AREA OF THE LIMITS OF CLEARING, GRADING, AND CLASS e' t E &MENT BAS /N \ 2\ \ \ CONSTRUCTION IS 17.45 ACRES. RISER \& SKIMMER / / _ 2' RAP ;:;:: I \ IDRAI AGE AREA I [ 2'x6'x22 "c: ) \ LENNAR CAROLINAS, LLC { a II ! ( SKIMMR TO \HAVE POSITIVE RAINAdE ?/ / // J /r . . I I �\ / / 114' ) X 80' W / SEDIMENT BASIN �\ [ r \ .E: I: \ / I DB 4305 PG 730 TO ENSURE Fl7LLEWA(ERING) / // / / \ E :..: J t� \ / \ PIN 07141008 gyp? 1 I . ly DRAINAGE AREA \ 1 1 �S)CIMMER\ INV. EL 698.00( / / / / /i / ®1i 5 �.` . . :. ::: :::::: I \ (`!! \ I \ i / `: \\ \ / / I I BAA IN FLOOR LEV: 694.00 // / / // / i . :' : ):; E ; I; ; \ PROPERTY LINE \ E / / // / :::Y::; 4 \ V / SKS�IMER PIPEI INTAKE/ ELEV 6946 / / l:: isc ::......:::::::::::::::::::::' 8 / II I II J (TYP•) \ SKIMMER PIP DISCHARGE LEV: 613.83 � /� / / / / 1 \ \t l \ \\ FILTER FiR / / / /1/ X::: \ R r J SER MER . . . . .' .. . . ...1/ : : : : : : \ D KATE Y \ (SKIMM R TO HAVE POSITIVE DRAINAGE \1� SICOPk Al t� / / / �' / / I : � � \ ` \ I I °?, 1 � \ \TO ENS E FULL DEWATERING) \ TO ,BFI ALL / p / / / I . \. \ \ \ \ \ SKIMMER Ill ELEV: 701.00 \ R 3 • P i I 1 �l l l // b $j 7 / / / :::::fc':':::':'i ' i ::.::.. i.:.; C171S9 B...: I I \ ✓ \ \ fVE(fa E / / / 0 / / I1 :;::. r RIP: \RAC:::':. , 1 t �' \ \ BA§I FLOOR ELEV 700.00 1 JOHN HOWARD FAISON IV I I I l / l / / /// ! / / /Tp� �IN�W1y/%*ERE / / / // / / h: :�: ':'''' ,' ` ` ``` '�'t0'x6'x9�: \ \ \ \ 1 1 \ \ \ \ \ \ SKIM�R PIPE\INTAKS ELEV: 700.00 -_ DB 1162 PG 684 /I I l $$LOPEXCE D$ 7 / / / / _ \ '. i.. . ... '.':':'.'. . I I \ \ \ \ \ \ SKIMMER PIPE DISCHARGE- ELEV: 699.64 PIN 07141001 / II / / 1 I II I I / / / 1 F.E 1It� HEI HIi. / / / / / I :.:(: :\: : ..... . . . ` \:': :'�� \c i:a:: :�.I \\'� \ \� J i .....::...... \ ..... 71 LF 241 I \ \ \ \ k rf \ \! \ \\ \ \ \ oS. NN is \:.' %::. _ HENRY 0. AND kO OSEI) X10 1ft \ : Q ;T _ . . . : . .. . .. .. . :: : . . .. J. / ` // \ \ \\ \ \ CHE�GK DAM II I' TEMPORARY / / I ( \ \ \ \ - _ . . l 1 �.l / l 1 ?. 1 I ELSIE G EUBANKS I V� / / \ _ _' r / /! 1 \` VI r / / I 1 V LOO uN V V A \ V= x (TYP.) . PIN 07141001D { I CONSTRUCTION \I EASEMENT / / / / V A A V A V A \ \ :!_ _ _ - - �l \ TEM RARY _ STOCK ILE TREE SAVE J r I / CHRISTOPHER G. MOWBRAY PIN 07141026 ? - �.g OP F 1 3E1M€NT BASIN D P GE AREA � 1 I ARTHUR P. AND R. 1,J / ,) MARTHA A. REIN J e�° y � � DB 3493 PG 310 PIN 07141025 ELAINE A- . N ICHOLS- I I r'7I r r ! / L r . DO\ NZ CARLTON C AM ERON CONC2L LDB3634 PG 699 L PIN 07141001F W UT STAT40N PIN 07141022 / SILT F RO fI - /// / / / ' ✓ \ / / 1 `� \\ Jr`� / // / (Ty k) N¢E FNCEEEK DIC TED \ \ \ \ I \\ I( A E\ I �AF� _ TREE SAVE H)iA1 y31�ERS10� I I� DONALD E. AND 1 4 r/ // fir/ // / Jp d0 I YC III IIIII AV SILT IEN�E KATHLEEN F. GOESSEL ( 1 / / / / ' ( I / A 1 \ \ \ \ I / / d / ��� I S EL�E� q A A t I PIN 07141001) l l_ I / I // l �� Jf /� \ \ / / 1 IIIIIII�� ^ \\ EXISTING v \ \\ \VA \� ��\ \\ 1 EASEMENTY I ( ICON �� TEEM�PORARY EN N0 t LF \ \ r \ \ �_ \ \ \ EX. RED BARN v v vv �CQN�RA �q S `') \ \ \\ '\ \ �NSIE SL�IVE TRAIL �\ 1 \ \ \ \\ - -_ \ DRAINAGE /�CONCZ` \ EXISTING (VARIABLE PUBLIC R /W)\ \ \ \ \\ \ \ \ _ _ --TEMPORA Y \\ \ \ \ \ \\ . ; POND e 4\ \ \ \ \ \\ DITCBERM \\ \ �.. e REVOCABLE LIVING TRUST DB 4680 PG 414 PIN 07141020 \ I TEMPORARY CLEAN LIMITS OF WATER DIVERSION DISTURBANCE DITCH CHANG YUNG KI \ �\ ;\ \ 9 (TYP•) I AND SOON SUN A \ \ \ BYARD GORDON CLEMMONS PIN 07141016A \1 �\ DB 5719 PG 006 \\ \\ \ PIN 07141001E \ 0 \� \\\ NOTE: \ �\ DO NOT BUILD SEDIMENT BASIN //2 `' UNTIL EXISTING SEWER IS RELOCATED \� `A\ AND ACCEPTED BY UCPW Sediment Basin 1 Data Block Basin Volume Basin Surface Area Cleanout Skimmer Skimmer Basin Drainage Denuded Area Depth H (Feet) Z (Feet) L (Feet) T (Feet) W (Feet) Pipe Dia. Orifice Required Provded (Cubic Required Provided Area (Acres) (Acres) 010 (Cubic FT.) FT.) (SQ FT.) (SQ FT.) (FT.) H/2 (in.) Dia. (in.) Basin #1 11.75 1 11.75 1 49.56 1 21150 97179 1 21558 1 24454 1.28 1 6.0 5.5 1 N/A WA N/A 6.00 5.80 Sediment Basin 2 Data Block Basin Volume Basin Surface Area Cleanout Skimmer Skimmer Basin Drainage Denuded Area Depth H (Feet) Z (Feet) L (Feet) T (Feet) W (Feet) Pipe Dia. Orifice Required Provided (Cubic Required Provided Area (Acres) (Acres) 010 ( Cubic FT.) FT. ) (SQ FT.) (SO FT.) (FT.) H12 (in:) Dia. (in.) Basin #2 3.65 3.65 15.39 6570 35300 6697 9046 1.30 6.0 5.5 N/A N/A N/A 4.00 3.70 EROSION CONTROL WOODED SILT FENCE OUTLET INLET PROTECTION M JIM %alff FILTER BERM amo CHECK DAM -BERM-BERM- PERIMETER BERM -SF-SF-SF- SILT FENCE _TP_TP_TP_ TREE PROTECTION _LD -LD LIMITS OF DISTURBANCE DIVERSION DITCH CONSTRUCTION ENTRANCE GRAPHIC SCALE 60 0 30 60 120 1 inch = 60 ft. FINAL DRAWING - NOT RELEASED FOR CONSTRUCTION Nj 0 VJ A V a • 8 W U s : r2 w e5 - - 8 8 8 rc a 3 a m m m N m z M o o 5 N N N N N N N a ®© ®©® ®® T- a � W Cvt W-+ o z M a =�Cc = zC1� WxWx C� Q O .7 O EiUrnz �x PIE" F W O E z L0 U� m U .r a '" r-I OQ. 1 U z cw7 0 0 O � U o z O A 0 PROJECT NO. MRH -13040 r''n'El MRH13040 -EC1 CRECEED BY: Rill DRAWN BY: CM /JL /RMR scATE: 1'=60' DATE' 07 -25 -2014 SHEET NO. C -6 1111 MCADAMS EROSION CONTROL NOTES: 1. SOIL STABILIZATION SHALL BE ACHIEVED ON ANY AREA OF A SITE WHERE LAND- DISTURBING ACTIVITIES HAVE TEMPORARILY OR PERMANENTLY CEASED ACCORDING TO THE FOLLOWING SCHEDULE: a. ALL PERIMETER DIKES, SWALES, DITCHES, PERIMETER SLOPES AND ALL SLOPES GREATER THAN 3 HORIZONTAL TO 1 VERTICAL (3:1) SHALL BE PROVIDED TEMPORARY OR PERMANENT STABILIZATION WITH GROUND COVER AS SOON AS PRACTICAL BUT IN ANY EVENT WITHIN 7 CALENDAR DAYS FROM THE LAST LAND- DISTURBING ACTIVITY. b. ALL OTHER DISTURBED AREAS SHALL BE PROVIDED TEMPORARY OR PERMANENT STABILIZATION WITH GROUND COVER AS SOON AS PRACTICAL BUT IN ANY EVENT WITHIN 14 CALENDAR DAYS FROM THE LAST LAND- DISTURBING ACTIVITY. 2. SEEDING OF AREAS GRADED SHALL BE IN ACCORDANCE WITH NORTH CAROLINA EROSION AND SEDIMENT CONTROL DESIGN MANUAL. 3. REPRESENTATIVES OF THE NC DENR OR THE TOWN OF STALLINGS ENGINEERING DEPARTMENT MAY REVIEW AND EVALUATE THE METHODS USED AND TH E OVERALL EFFECTIVENESS OF THE EROSION CONTROL PROGRAM. THE APPROVED EROSION AND SEDIMENT CONTROL PLAN MAY BE AMENDED BY THE APPROVING AUTHORITY IF AN ON SITE INSPECTION INDICATED THAT THE APPROVED CONTROL MEASURES ARE NOT EFFECTIVE IN CONTROLLING EROSION AND SEDIMENTATION OR IF BECAUSE OF CHANGED CIRCUMSTANCES THE APPROVED PLAN CANNOT BE CARRIED OUT. 4. CONTRACTOR SHALL LOCATE AND VERIFY THE LOCATION OF ALL UTILITIES PRIOR TO BEGINNING CONSTRUCTION. 5. THE CONTRACTOR SHALL NOTIFY NORTH CAROLINA ONE CALL CENTER (811) OR 1- 800 - 632 -4949 BEFORE BEGINNING ANY EXCAVATION OR UTILITY WORK. CONTACT UNION COUNTY FOR LOCATING EXISTING WATER AND SEWER LINES. 6. EROSION AND SEDIMENT CONTROL PRACTICES SHALL BE MAINTAINED, SO THAT SEDIMENT CARRYING RUNOFF FROM THE SITE WILL NOT ENTER STORM DRAINAGE FACILITIES. 7. PROPERTIES AND RIGHT -OF -WAY ADJOINING THE SITE SHALL BE KEPT CLEAN OF MUD OR SILT CARRIED FROM THE SITE BY VEHICULAR TRAFFIC OR RUNOFF. 8. ALL CONSTRUCTION TRAFFIC SHALL ENTER AND EXIT THE SITE VIA THE CONSTRUCTION ENTRANCES. 9. EXCAVATED MATERIAL FROM TRENCHES SHALL BE PLACED ON THE UPGRADE SIDE OF THE TRENCH TO ALLOW MATERIAL TO ERODE INTO THE TRENCH. CONSTRUCTION MAINTENANCE AND REMOVAL OF ALL EROSION CONTROL DEVICES ARE THE RESPONSIBILITY OF GRADING CONTRACTOR UNLESS OTHERWISE NOTED. 10. NO OFF -SITE BORROW AREAS SHALL BE UTILIZED DURING GRADING OF THE SITE. ALL FILL SHALL BE OBTAINED WITHIN LIMITS OF DISTURBANCE SHOWN ON PLANS. 11. ON -SITE BURIAL PITS REQUIRE AN ON -SITE DEMOLITION LANDFILL PERMIT FROM THE SOLID WASTE SECTION OF NC DENR. 12. NO OPEN BURNING ALLOWED. 13. ALL TREES & BRUSH REMOVED DURING CLEARING & GRUBBING OF SITE SHALL BE CHIPPED ON SITE AND HAULED OFF SITE FOR DISPOSAL. 14. ANY GRADING BEYOND THE DENUDED LIMITS SHOWN ON THE PLAN IS IN VIOLATION OF THE CITY /COUNTY EROSION CONTROL ORDINANCE AND IS SUBJECT TO A FINE. 15. MAINTAIN MINIMUM 10' CLEAR ZONE FROM TOP OF CHANNEL BANK TO DENUDED LIMITS. 16. GRADING MORE THAN ONE ACRE WITHOUT AN APPROVED EROSION CONTROL PLAN IS A VIOLATION OF THE DENR EROSION CONTROL ORDINANCE AND IS SUBJECT TO A FINE. 17. ADDITIONAL MEASURES TO CONTROL EROSION AND SEDIMENT MAY BE REQUIRED BY A REPRESENTATIVE OF THE TOWN OF STALLINGS OR NC DENR LAND QUALITY SECTION. 18. SLOPES SHALL BE GRADED NO STEEPER THAN 2:1. FILL SLOPES GREATER THAN 10' REQUIRE ADEQUATE TERRACING. 19. A GRADING PLAN MUST BE SUBMITTED FOR ANY LOT GRADING EXCEEDING ONE ACRE THAT WAS NOT PREVIOUSLY APPROVED. 20. TEMPORARY DRIVEWAY PERMIT FOR CONSTRUCTION ENTRANCES IN NCDOT RIGHT OF WAY MUST BE PRESENTED AT PRE - CONSTRUCTION MEETING. 21. THE APPROXIMATE AREA OF THE LIMITS OF CLEARING, GRADING, AND CONSTRUCTION IS 17.45 ACRES. CONSTRUCTION SEQUENCE: 1. OBTAIN GRADING /EROSION CONTROL PLAN APPROVAL FROM NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES. 2. SET UP AN ON -SITE PRE - CONSTRUCTION CONFERENCE WITH NC DENR OFOSTALLINGS9PLANNING DEPARTMENT (704-821-0315) OFFICIAL 21-03 5 TO DISCUSS TOWN EROSION CONTROL MEASURES. 3. APPLY FOR AND OBTAIN DRIVEWAY PERMITS. UPON OBTAINING DRIVEWAY PERMITS, INSTALL GRAVEL CONSTRUCTION ENTRANCE IN ACCORDANCE WITH DETAILS PROVIDED. 4. PRIOR TO THE START OF CONSTRUCTION, ADJOINING PROPERTY OWNERS MUST BE NOTIFIED. 5. PRIOR TO CONSTRUCTION OF SEDIMENT BASIN #2, THE EXISTING SEWER BETWEEN (AND INCLUDING) EX. MH -14 THROUGH EX. MH -16 MUST BE REMOVED /RELOCATED AND ACCEPTED BY THE UNION COUNTY PUBLIC WORKS. 6. INSTALL SILT FENCE, INLET PROTECTION, SEDIMENT BASIN, DIVERSION DITCHES, TREE PROTECTION, TEMPORARY STREAM CROSSINGS AND OTHER MEASURES AS SHOWN ON PHASE 1 PLANS, CLEARING ONLY AS NECESSARY TO INSTALL THESE DEVICES. THIS IS TO INCLUDE THE EROSION CONTROL MEASURES ALONG CHESTNUT LANE FOR THE CONSTRUCTION OF THE TURN LANE AND ROAD IMPROVEMENTS. 7. CLEAN WATER DIVERSION DITCHES MUST BE MATTED AND STABILIZED IMMEDIATELY AFTER CONSTRUCTION. 8. IN CONJUNCTION WITH THE EXTERNAL WIRE AND GRAVEL INLET PROTECTION, SILT SACKS, OR SIMILAR INLET PROTECTION MEASURES, SHALL BE PROVIDED IN ALL STORM INLETS NOT DISCHARGING TO A SEDIMENT BASIN. 9. CALL FOR ON -SITE INSPECTION BY INSPECTOR. UPON APPROVAL BY INSPECTOR CLEARING & GRUBBING MAY BEING. 10. LIMIT CLEARING AND GRUBBING OF SITE TO AREAS THAT WILL BE MASS GRADED IN PHASE 1. WHENEVER POSSIBLE, EXISTING VEGETATION SHALL REMAIN IN PLACE TO PREVENT EROSION OF SITE. 11. ANY OFF -SITE BORROW AND /OR WASTE REQUIRED FOR THIS PROJECT MUST COME FROM AN APPROVED EROSION CONTROL PLAN SITE, A SITE REGULATED UNDER THE MINING ACT OF 1971, OR A LANDFILL REGULATED BY THE DIVISION OF SOLID WASTE MANAGEMENT. DEBRIS FROM DEMOLITION ACTIVITIES SHOULD BE DISPOSED OF AT AN APPROVED FACILITY. 12. BEGIN GRADING ACTIVITIES AS SHOWN IN PHASE 1. AS SITE IS GRADED, CONTRACTOR SHALL MINIMIZE THE AMOUNT OF STORM WATER FLOWING OVER FILL SLOPES BY USING DIVERSION DITCHES AND SLOPE DRAINS. DITCHES AND SLOPE DRAINS SHOWN ON PLANS DEPICT REQUIRED DIVERSION DITCHES AND SLOPE DRAINS AT FINAL PAD GRADE. ADDITIONAL MEASURES MAY BE NEEDED AS GRADING PROGRESSES. 13. MAINTAIN AND ADJUST E &SC MEASURES AS MASS GRADING PROGRESSES TO MAINTAIN PROPER E &SC CONTROL. 14. INSTALL STORM WATER COLLECTION SYSTEM, VELOCITY DISSIPATERS AND PROTECT INLETS WITH SILT FENCE, GRAVEL FILTERS, SILT TRAPS OR OTHER APPROVED MEASURES AS SHOWN ON THE PLANS. 15. THE CONTRACTOR SHALL DILIGENTLY AND CONTINUOUSLY MAINTAIN ALL EROSION CONTROL DEVICES AND STRUCTURES. INSPECT ONCE PER WEEK AND AFTER EACH RAINFALL. 16. STABILIZE SITE AS AREAS ARE BROUGHT TO GRADE. SEDIMENT BASIN #1 AND SEDIMENT BASIN #2 SHALL BE CONVERTED OVER TO PERMANENT WATER QUALITY FACILITY AFTER THE ENTIRE SITE HAS BEEN STABILIZED. FAILURE TO DO SO COULD CAUSE THE PLANTED PLANTS IN POND TO DIE WHEN INUNDATED WITH SILT. 17. SEDIMENT BASIN #1 AND SEDIMENT BASIN #2 ARE TO BE INCREASED IN DEPTH TO THE DESIGNED ELEVATIONS SHOWN IN THE STORMWATER MANAGEMENT FACILITY PLANS. 18. SEDIMENT BASINS SHALL NOT BE REMOVED OR CONVERTED TO POST - CONSTRUCTION STORM WATER PONDS UNTIL AFTER ROADS HAVE BEEN BUILT AND STABILIZED AND UNTIL APPROVED BY THE LAND QUALITY SECTION INSPECTOR. 19. INLET PROTECTION MUST REMAIN IN PLACE WITHIN WORK AREA UNTIL ALL AREAS OF THE PROJECT ARE STABILIZED. 20. COORDINATE WITH EROSION CONTROL INSPECTOR FROM THE LAND QUALITY SECTION OF NCDENR AND LYNNE HAIR AT THE TOWN OF STALLINGS PLANNING DEPARTMENT (704- 821 -0315) PRIOR TO REMOVAL OF EROSION CONTROL MEASURES. 21. ALL EROSION CONTROL MEASURES SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE N.C. EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL. 22. WHEN VEGETATION IS ESTABLISHED, CALL FOR FINAL SITE INSPECTION. IF THE SITE IS APPROVED BY THE INSPECTOR, THE PERFORMANCE BOND, IF REQUIRED, WILL BE RELEASED. /1 \ CHESTNUT SUBDIVISION, PHASE 2 PB. HO PG. 251 L 51 PIN 07141107 �,v CHESTNUT SUBDIVISION, PHASE 2 PB. H PG. 251 LOT 57 PIN 07141113 - TEMPORARY CLEAN WATER DIVERSION / DITCH m \ ECK DAM���v \�A \ \VAAV AAA CONTRACTOR TO� \ \ \ \ \ \ ENSURE POSITIVE I V. �N: \ 70.6 CHESTNUT SUBDIVISION, PHASE 2 \ \ TEMPORARY DRAINAGE ALONG I TEMP. ICUL�/ERT I \ \ PB. H PG. 251 \ STOCK PILE TEMPORARY 40 LF 15" \ - DITCH /BERM RC � ®11 06% 1 1 \ r j , PIN L071411114 \ I /I \ - \\ T�MP RAi2Y � 1 \l C LVE T ICR S IN() 1 I �. /QUTJ 7 0. 5 1 THE PHASE I MEASURES SHOWN ON THE PLANS REFLECT THE IN PLACE EROSION CONTROL NECESSARY TO ALLOW THE SITE TO BE CLEARED AND GRUBBED IN PREPARATION FOR THE INITIAL STAGE OF THE GRADING WORK. THE PHASE II MEASURES DEPICTED ON THE PLANS SHOW THE IN PLACE EROSION CONTROLS THAT WILL REMAIN AT THE COMPLETION OF THE FINAL STAGE OF THE GRADING WORK REQUIRED BY THE PROJECT. DURING EACH INTERIM STAGE OF THE GRADING WORK, THE CONTRACTOR SHALL BE REQUIRED TO INSTALL ANY ADDITIONAL TEMPORARY MEASURES THAT MAY BE NECESSARY TO CONTROL SEDIMENT AND EROSION THAT OCCURS AS A RESULT OF CHANGES TO THE EXISTING GROUND ELEVATION CONTOURS. AS DIRECTED BY THE TOWN OF STALLINGS OR STATE INSPECTORS. THE PERSON RESPONSIBLE FOR LAND DISTURBING ACTIVITIES MUST INSPECT THE SEDIMENT AND EROSION CONTROL MEASURES ON A PROJECT AFTER EACH PHASE TO ENSURE THE APPROVED PLAN IS BEING FOLLOWED. AT A MINIMUM, THE INSPECTIONS SHALL BE PERFORMED AFTER EACH OF THE FOLLOWING PHASES OF A PLAN: a. INSTALLATION OF PERIMETER EROSION AND SEDIMENT CONTROL MEASURES. b. INSTALLATION OF SEDIMENT TRAPS /BASINS. c. CLEARING AND GRUBBING OF EXISTING GROUND COVERS. d. COMPLETION OF ANY PHASE OF GRADING THAT REQUIRES PROVISION OF STABILIZATION. e. INSTALLATION OF MEASURES DURING ANY PHASE OF THE PROJECT. f. COMPLETION OF CONSTRUCTION OR DEVELOPMENT. g. INSTALLATION OF STORMWATER RETENTION MEASURES. h. QUARTERLY UNTIL THE ESTABLISHMENT OF PERMANENT GROUND COVER IS FULLY ESTABLISHED. *CONTACT NCDENR AT (704)663 -1699 FOR ADDITIONAL INFORMATION TMPORARY �� / L DOUBLE ROW E ENCE / / ( SILT F DIVERSION DITC � (TYP.) II ! I I I II I I- 11 I! I e I I 5ED /MNT BASIN� /' i DRAINAGE AREA = 11.75 ACRE I I I I \ \ \ 25, (L) X 1 \Z1, (W) i / ! /; / // % .:. J / / ,I ilk \ \ *BASIN\TO BE STA LIZED / / // / / DOUBLE ROW 1 IMMEDIAT LY AFTER / / / / / / / / : SIC[' FENCE..... I 11 II 1 \ INSTALLATI N \ / I / / / / y.::::..:(TYP);: / BAFFLES SSER &\SKIMME� KIMMER b0 HAVE\ POSITI�E DRAINAG / / / // / I I I \ TO NSURE \FULL OEWATERING) j / SILT: FEtJ. . SKIMER INV ELEV� 695.00 / / / / I I II�III I E BASIN\\ FLOOR OUTLET I' p ° 1 \SKIMMER PIPE( INTAKE EL : 694.00/ / /r CLASS B : I 6 I I TEMPORARY SEr :SH.D =4 I I CONSTRUCTION f \ SEDIMENT BASIN / I DRAINAGE AREA \ \ i )SKIMMER PIPE DISGHARG�ELEV: ���8 // / : j I RIP RAP i 1 I E I9 EASEMENT (TYP.) \ I \ I FILTER BEE2M / / // / / 12x6 x�2 P D Al / /TpPB II�S4TA D \ /�i // / //I /// z y.. Td C N AT / I f II 3 1 I I JOHN HOWARD FAISON IV I // / TO ASYN� HE / / / / // / / P // //I : : : : : : : : ::::... . . . . .... . .:.:.: ( I 1 I d DB 1162 PG 684 b,.� I 1 // / E E/E EEE9 h/ / / / /// // / %:: PIN 07141001 I / / / / G/ _ _ ::: HENRY 0. AND JI I1 I d I I �/ // / / / // / / i / / f..:...:.. . \. .' ELSIE G. EUBANKS J m E \I I /l l l / // / �/ /� / / /Id/ / / ( I PIN 0 71 41 0 01 0 / / P Op�Ep 1 0 R. / 4b rN P r / i oI k I / 119 / / / %..... ; :....... . F L E / II I m I I 10' WIDE NO CLEAR, S I BUFFER ALONG/ I 19 I PROPERTY LINE \ \ 1 ^ 1 LIMITS OF DISTURBANCE �I ,I \ \ -- - - - - -- -- I \10' WIDE NO CLEAR - - -- / I I I 9 PROPERTY LINE BUFFER ALONG V PROPERTY LINE - - - _l_ - - - - - - _ - - - - I - I � -�', -� II i / L-}- / 1 1 I I J 10' x,10 ELAINE A. NICHOLS ii - CONCRETE PIN 07141001E I II I LJ / WASHOUT STATION ATED DEDI ToP of �"l is - �� / / / I TREE SAVE BANK P \ \\ \ 1 AREA PR,0OSED 10 Y FLT kIN if DONALD E. AND AI / \I \IDjEV�RON DITCH (1 WETTILPP) S G KATHLEEN F. GOESSEL PIN 07141001) t �1 / / / / / V / / / �� r1 �� .:.: CENTERLINE OF CREEK ,r I TEMPO RAR I / \ CONSTRUCT N \ ENTRANCE (1 0 LF EPIONpG \ \ \\\► ` EX. RED BARN (VARIABLE PUBLIC R /W) CHECK DA 4�x A v v A (TYP A \\ v v .) J TEMPORARY CLEAN REVOCABLE LIVING TRUST AL CHANG YUNG KI \ 10' WIDE NO CLEAR I DB 4680 PG 414 AND SOON SUN \ \� \ L \ °� BUFFER ALONG LIMITS OF WATER DIVERSION PIN 07141020 PIN 07141016A \ \ \b \ \�� \ \ PROPERTY LINE (�TTURBANCE DITCH I \\ \ I GREGORY SETH LEONARD \ \ h \\ \ DB 6234 PG 721 I \\ \ 9 PIN 07141001E MATCH LINE - SEE SHEET C -6C Sediment Basin 1 Data Block SILT FENCE OUTLET Drainage Denuded Area FILTER BERM Basin Volume Basin Surface Area Cleanout PERIMETER BERM - SF- SF -SF- SILT FENCE - TP- Tp -Tp- TREE PROTECTION Skimmer Skimmer Required Provided (Cubic Required Provided Basin Depth H (Feet) Z (Feet) L (Feet) T (Feet) W (Feet) Pipe Dia. Orifice Area (Acres) (Acres) 010 (Cubic FT.) FT.) (SQ FT.) (SQ FT.) (FT.) H/2 (in.) Dia. (in.) Basin #1 11.75 11.75 49.56 21150 1 97179 21558 24454 1.28 6.0 8.0 N/A N/A N/A 6.00 5.80 NOTE ANY EXISTING EASEMENTS TO BE ABANDONED MUST BE APPROVED BY THE BOARD OF COUNTY COMMISSIONERS, UNION COUNTY DOES NOT HAVE THE AUTHORITY TO DO SO. TOTAL DISTURBED /DENUDED AREA = 17.45t AC. EROSION CONTROL LEGEND IIIIIIIII SILT FENCE OUTLET INLET PROTECTION NFAW FILTER BERM 400 CHECK DAM - BERM -BERM PERIMETER BERM - SF- SF -SF- SILT FENCE - TP- Tp -Tp- TREE PROTECTION -Lp LD- LIMITS OF DISTURBANCE WOODED AREA DIVERSION DITCH CONSTRUCTION ENTRANCE GRAPHIC SCALE 50 0 25 50 100 1 inch = 50 ft. NAL DRAWING - NOT RELEASED FOR CONSTRUCTION 0 OR 4 ,.r oz M O�Q o 0 n 0 VJ A V - 35AL r M. ( ���'��n n n u.n•. 8 3 Z i Lti � w N N Z '6 z o Si o y'3 p � 8 z o q < ®A 1A M 1A P4 CQ � w cv1 o z Ox o wZCU w E- E-4 F urn z x E. F w S F F Z a � x � m U d O 0 (� Z a 0 U O O O PROJECT No. MRH -13040 PD.ENAw: MRH13040 -EC1 CRECEED BY: RMR Dm"N BY: CM /JL /RMR SCALE: 1"=50- DATE: 07 -25 -2014 SHEET N0. C -6A J MCADAMS \CHESTNUT HOMEOWNERS ASSOCIATION, INC f PIN 07141006 CHESTNUT SUBDIVISION, PHASE 2 ,O°• / PB. H PG. 251 EX. YARROW STREET LOT 50 TOP OF PIN 07141106 BANK 50 PUBLIC R/lP Z, i d % i �/ / ( \ ` / / 20' PERMANENT / SE IMEN1\ BASIN 1 � SEWER EASEMENT CHESTNUT SUBDIVISION, PHASE 2 / D NAGE Y1REA' ) f D.B 3731, PG. 440 PB. HO PG51 251 J, Mt.) PIN 07141107 \ I CO TRA TOR I J/ i � Q /� ENEI POSITIV \ / / p(/ a / 10' TEMPORARY / ��- Bft»tCCCII Ed ALON i : :: 1 / \ / Cr�NSTRUCTION EASEMENT TEMPORARY CLEAN TEMPO RY / !! /j /J / / D.8 3731, PG. 440 WATER DIVERSION /j / / TEMPORARY / DIT /BERM DITCH / I ( DIVERSION �E / F�ROPOSFr lOOYR. a \ \ t OD LING `\ G LIMITS OF \ / / :f ,\ DISTURBANCE / "\ i 1 I CONSTRUCTION SEQUENCE: EROSION CONTROL NOTES 1. OBTAIN GRADING EROSION CONTROL PLAN APPROVAL FROM NORTH 1. SOIL STABILIZATION SHALL BE ACHIEVED ON ANY AREA OF A SITE WHERE Basin Surface Area CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES. I LAND- DISTURBING ACTIVITIES HAVE TEMPORARILY OR PERMANENTLY CEASED 2. SET UP AN ON -SITE PRE - CONSTRUCTION CONFERENCE WITH NC DENR ACCORDING TO THE FOLLOWING SCHEDULE: Skimmer (704- 663 - 1699), THE BUILDING OFFICIAL AND LYNNE HAIR AT THE TOWN Provided (Cubic c. ALL PERIMETER DIKES, SWALES, DITCHES, PERIMETER SLOPES AND ALL Provided OF STALLINGS PLANNING DEPARTMENT (704 -821 -0315) TO DISCUSS Area (Acres) SLOPES GREATER THAN 3 HORIZONTAL TO 1 VERTICAL (3:1) SHALL BE EROSION CONTROL MEASURES. H (Feet) PROVIDED TEMPORARY OR PERMANENT STABILIZATION WITH GROUND COVER 3. APPLY FOR AND OBTAIN DRIVEWAY PERMITS. UPON OBTAINING DRIVEWAY W (Feet) I AS SOON AS PRACTICAL BUT IN ANY EVENT WITHIN 7 CALENDAR DAYS Orifice PERMITS, INSTALL GRAVEL CONSTRUCTION ENTRANCE IN ACCORDANCE WITH FROM THE LAST LAND- DISTURBING ACTIVITY. Q10 DETAILS PROVIDED. FT.) (SQ FT.) 4. PRIOR THE START OF CONSTRUCTION, ADJOINING PROPERTY OWNERS b. ALL OTHER DISTURBED AREAS SHALL BE PROVIDED TEMPORARY OR MUST BE E N PERMANENT STABILIZATION WITH GROUND COVER AS SOON AS PRACTICAL 5. PRIOR CONSTRUCTION OF SEDIMENT BASIN #2, THE EXISTING SEWER 3.65 BUT IN ANY EVENT WITHIN 14 CALENDAR DAYS FROM THE LAST 15.39 BETWEEN N (AND INCLUDING) EX. MH -14 THROUGH EX. MH -16 MUST BE 19205 LAND- DISTURBING ACTIVITY. 6932 REMOVED /RELOCATED AND ACCEPTED BY THE UNION COUNTY PUBLIC 2. SEEDING OF AREAS GRADED SHALL BE IN ACCORDANCE WITH NORTH 1 N/A WORKS. I WA CAROLINA EROSION AND SEDIMENT CONTROL DESIGN MANUAL. 6. INSTALL SILT FENCE, INLET PROTECTION, SEDIMENT BASIN, DIVERSION 3. REPRESENTATIVES OF THE NC DENR OR THE TOWN OF STALLINGS DITCHES, TREE PROTECTION, TEMPORARY STREAM CROSSINGS AND OTHER ENGINEERING DEPARTMENT MAY REVIEW AND EVALUATE THE METHODS USED MEASURES AS SHOWN ON PHASE 1 PLANS, CLEARING ONLY AS NECESSARY AND THE OVERALL EFFECTIVENESS OF THE EROSION CONTROL PROGRAM. TO INSTALL THESE DEVICES. THIS IS TO INCLUDE THE EROSION CONTROL THE APPROVED EROSION AND SEDIMENT CONTROL PLAN MAY BE AMENDED MEASURES ALONG CHESTNUT LANE FOR THE CONSTRUCTION OF THE TURN BY THE APPROVING AUTHORITY IF AN ON SITE INSPECTION INDICATED THAT LANE AND ROAD IMPROVEMENTS. THE APPROVED CONTROL MEASURES ARE NOT EFFECTIVE IN CONTROLLING 7. CLEAN WATER DIVERSION DITCHES MUST BE MATTED AND STABILIZED EROSION AND SEDIMENTATION OR IF BECAUSE OF CHANGED CIRCUMSTANCES IMMEDIATELY AFTER CONSTRUCTION. THE APPROVED PLAN CANNOT BE CARRIED OUT. 8. IN CONJUNCTION WITH THE EXTERNAL WIRE AND GRAVEL INLET PROTECTION SILT SACKS, OR SIMILAR INLET PROTECTION MEASURES, SHALL BE 4. CONTRACTOR SHALL LOCATE AND VERIFY THE LOCATION OF ALL UTILITIES PROVIDED IN ALL STORM INLETS NOT DISCHARGING TO A SEDIMENT BASIN. PRIOR TO BEGINNING CONSTRUCTION. 9. CALL FOR ON -SITE INSPECTION BY INSPECTOR. UPON APPROVAL BY 5. THE CONTRACTOR SHALL NOTIFY NORTH CAROLINA ONE CALL CENTER (811) INSPECTOR CLEARING & GRUBBING MAY BEING. OR 1- 800 - 632 -4949 BEFORE BEGINNING ANY EXCAVATION OR UTILITY 10. LIMIT CLEARING AND GRUBBING OF SITE TO AREAS THAT WILL BE MASS WORK. CONTACT UNION COUNTY FOR LOCATING EXISTING WATER AND GRADED IN PHASE 1. WHENEVER POSSIBLE, EXISTING VEGETATION SHALL SEWER LINES. 11. REMAIN IN PLACE TO PREVENT EROSION OF SITE. ANY OFF -SITE BORROW AND /OR WASTE REQUIRED FOR THIS PROJECT 6. EROSION AND SEDIMENT CONTROL PRACTICES SHALL BE MAINTAINED, SO MUST COME FROM AN APPROVED EROSION CONTROL PLAN SITE, A SITE THAT SEDIMENT CARRYING RUNOFF FROM THE SITE WILL NOT ENTER STORM REGULATED UNDER THE MINING ACT OF 1971, OR A LANDFILL REGULATED DRAINAGE FACILITIES. BY THE DIVISION OF SOLID WASTE MANAGEMENT. DEBRIS FROM DEMOLITION 7. PROPERTIES AND RIGHT -OF -WAY ADJOINING THE SITE SHALL BE KEPT ACTIVITIES SHOULD BE DISPOSED OF AT AN APPROVED FACILITY. CLEAN OF MUD OR SILT CARRIED FROM THE SITE BY VEHICULAR TRAFFIC 12. BEGIN GRADING ACTIVITIES AS SHOWN IN PHASE 1. AS SITE IS GRADED, OR RUNOFF. CONTRACTOR SHALL MINIMIZE THE AMOUNT OF STORM WATER FLOWING B. ALL CONSTRUCTION TRAFFIC SHALL ENTER AND EXIT THE SITE VIA THE OVER FILL SLOPES BY USING DIVERSION DITCHES AND SLOPE DRAINS. CONSTRUCTION ENTRANCES. DITCHES AND SLOPE DRAINS SHOWN ON PLANS DEPICT REQUIRED TEMPORARY / / / / / l akll/ l ! // // / i DIVERSION DITCHES AND SLOPE DRAINS AT FINAL PAD GRADE. ADDITIONAL 9• SIDE VOED THE ATRENCH TO ALLOW MATERIAL TOB ERODE CNDTO ON THE HTRENCH. E STOCKPILE / / / / WETLANDS ' /:::: \ / ( / / / MEASURES MAY BE NEEDED AS GRADING PROGRESSES. CONSTRUCTION MAINTENANCE AND REMOVAL OF ALL EROSION CONTROL / / J / / / 13. MAINTAIN AND ADJUST E &SC MEASURES AS MASS GRADING PROGRESSES TO �NP') I g1 II / MAINTAIN PROPER E &SC CONTROL DEVICES ARE THE RESPONSIBILITY OF GRADING CONTRACTOR UNLESS 14. INSTALL STORM WATER COLLECTION SYSTEM, VELOCITY DISSIPATERS AND OTHERWISE NOTED. PROTECT INLETS WITH SILT FENCE, GRAVEL FILTERS, SILT TRAPS OR OTHER 10. NO OFF -SITE BORROW AREAS SHALL BE UTILIZED DURING GRADING OF THE APPROVED MEASURES AS SHOWN ON THE PLANS. SITE. ALL FILL SHALL BE OBTAINED WITHIN LIMITS OF DISTURBANCE SHOWN D'Ol/'BL� GE / � / / 15. THE CONTRACTOR SHALL DILIGENTLY AND CONTINUOUSLY MAINTAIN ALL ON PLANS. \ IL F NCE / / \ EROSION CONTROL DEVICES AND STRUCTURES. INSPECT ONCE PER WEEK {\ .. .. \ T 11. ON -SITE BURIAL PITS REQUIRE AN ON -SITE DEMOLITION LANDFILL PERMIT a\ \ AND AFTER EACH RAINFALL. FROM THE SOLID WASTE SECTION OF NC DENR. DUKE POWER / DUKE ENERGY 16. STABILIZE SITE AS AREAS ARE BROUGHT TO GRADE. SEDIMENT BASIN #1 ies / / / CORPORATION AND SEDIMENT BASIN #2 SHALL BE CONVERTED OVER TO PERMANENT 12. NO OPEN BURNING ALLOWED. \ PIN 07141007A INV. IN: 700.65 : � ` 1 I I �A ' WATER QUALITY FACILITY AFTER THE ENTIRE SITE HAS BEEN STABILIZED. 13. ALL TREES &BRUSH REMOVED DURING CLEARING &GRUBBING OF SITE 1 � �: �•: . _ . `\ . I II ( FAILURE TO DO SO COULD CAUSE THE PLANTED PLANTS IN POND TO DIE SHALL BE CHIPPED ON SITE AND HAULED OFF SITE FOR DISPOSAL. jILIZEq ST�2EAM / /� WHEN INUNDATED WITH SILT. TEMP. CULVERT 1 j I IIWW 14. ANY GRADING BEYOND THE DENUDED LIMITS SHOWN ON THE PLAN IS IN 40 LF 15" \ ,' I� \ R SS GI \ 17. SEDIMENT BASIN #1 AND SEDIMENT BASIN #2 ARE TO BE INCREASED IN VIOLATION OF THE CITY /COUNT( EROSION CONTROL ORDINANCE AND IS :.': I I DEPTH TO THE DESIGNED ELEVATIONS SHOWN IN THE STORMWATER RCP 1.00% \ \ \ \I ' MANAGEMENT FACILITY PLANS. SUBJECT TO A FINE. TEMPORARY \ I I 18. SEDIMENT BASINS SHALL NOT BE REMOVED OR CONVERTED TO 15. MAINTAIN MINIMUM 10' CLEAR ZONE FROM TOP OF CHANNEL BANK TO CULVERT CROSSING SILT FENCE I 1 POST- CONSTRUCTION STORM WATER PONDS UNTIL AFTER ROADS HAVE DENUDED LIMITS. INV. OUT: 700.25 OUTLET (i1 .) 1 I 1 \ BEEN BUILT AND STABILIZED AND UNTIL APPROVED BY THE LAND QUALITY 16. GRADING MORE THAN ONE ACRE WITHOUT AN APPROVED EROSION CONTROL SEE SWEET D -4 \\ INS. IN: �0�.001 ` �� I SECTION INSPECTOR. PLAN IS A VIOLATION OF THE DENR EROSION CONTROL ORDINANCE AND IS I PROPERTY LINE 19. INLET PROTECTION MUST REMAIN IN PLACE WITHIN WORK AREA UNTIL ALL SUBJECT TO A FINE. T P CLL�ERT \2 \\ \ \�� (TYP.) AREAS OF THE PROJECT ARE STABILIZED. 17. ADDITIONAL MEASURES TO CONTROL EROSION AND SEDIMENT MAY BE � 20. COORDINATE WITH EROSION CONTROL INSPECTOR FROM THE LAND QUALITY T5.20 F 15C \ SECTION OF NCDENR AND LYNNE HAIR AT THE TOWN OF STALLINGS REQUIRED BY A REPRESENTATIVE OF THE TOWN OF STALLINGS OR NC RCP 7.1 \1 %\ 1 I \ PLANNING DEPARTMENT (704- 821 -0315) PRIOR TO REMOVAL OF EROSION DENR LAND QUALITY SECTION. ` i \ \ I / \ INV. OUT: 70, I 1 I ��\ CONTROL MEASURES. 18. SLOPES SHALL BE GRADED NO STEEPER THAN 2:1. FILL SLOPES GREATER . :::_ .- . /; /;: :;� l 21. ALL EROSION CONTROL MEASURES SHALL BE CONSTRUCTED IN THAN 10' REQUIRE ADEQUATE TERRACING. l ACCORDANCE WITH THE N.C. EROSION AND SEDIMENT CONTROL PLANNING 19. A GRADING PLAN MUST BE SUBMITTED FOR ANY LOT GRADING EXCEEDING • I f // HECK D�M AND DESIGN MANUAL. ONE ACRE THAT WAS NOT PREVIOUSLY APPROVED. /1P /) / / 1 \ 22. WHEN VEGETATION IS ESTABLISHED, CALL FOR FINAL SITE INSPECTION. IF 20. TEMPORARY DRIVEWAY PERMIT FOR CONSTRUCTION ENTRANCES IN NCDOT / / / \ THE SITE IS APPROVED BY THE INSPECTOR, THE PERFORMANCE BOND, IF / /�/ // AI \ REQUIRED, WILL BE RELEASED. RIGHT OF WAY MUST BE PRESENTED AT PRE - CONSTRUCTION MEETING. 1 I I $0' �EF�MAtyENT / 21. THE APPROXIMATE AREA OF THE LIMITS OF CLEARING, GRADING, AND j j EEAA EE ll l I ' V TEMPORARY CLEAN NOTE: CONSTRUCTION IS 17.45 ACRES. C / / EW R S ME T I ....:: /.:/ / / / D.B137$1, G.�4 \ \ \ \ \ \ \ \ WATER DIVERSION ANY EXISTING EASEMENTS TO BE (T0 BE( REOVED \ \ \ \ \ \ DITCH ABANDONED MUST BE APPROVED BY \ \ \ \ \ \ \ \ \ THE BOARD OF COUNTY COMMISSIONERS, \ \ \ \ \ \ \q \ UNION COUNTY DOES NOT HAVE THE -r10' T MP�ORAL\Y ).:,:I. / % l CON RUCTION EAS ENT \ \ \ \ \ \ 10' WIDE NO CLEAR AUTHORITY TO DO SO. D.B 731, \PG. 40 \ \ \ \ \ \ \ \ \ \ \ \ PROPERTY ALONG .: t l I l \ SCOPE �9RAIN / / / I \TO BE INLSTALLE \ \ \ \ \ A ( 1 I \ 0 C NVEYI WAT R R yi f SLOPE EXC EDS \\ \ \ \ \ \ ♦ \ \ .tW�• C6 ... . ..:.:.:::.:.:.:.:: .......::�.;.I•:I.: �. I I (t 1(I '�►r /� TEEIIIN H IGHT. \ \ \ \ / TOTAL !\ \/ \ \ f BAFFLES \ \ \ \ DISTURBED /DENUDED fiTYP.> V A E . E I \ 1 \ SEDI ENT BA I \ \ / AREA = 17.45± AC. W Ir , ] I %\ l / DRAI AGE AR \ 1 ( I �\ / / (TYP / LENNAR CAROLINAS, LLC \'\ I' 1 \ \ \ ` / / DB 4305 PG 730 I /\ 1 / \\ \ \ / PIN 07141008 `: 7 SEDI ENT BIAS /N I 2 >=1LT}t�R BERM 1 �o ( I DRAIN GE AREA =/3.65 ACR 1 / {TYP. ) \ Ia 1 I \1 114' (1) X 80' (W)/. \ *BASINS TO BE ST BILIZED . . . . . . . . ....: IMMEDIATELY AFTER 1 1 INSTALLATION \ ♦ - - 1::::.:.:: ( \ D DI ATE \: l \ j�ISER &I SKIMMER \ TREE SAVE \ :�:.:.' 11 \" 1 \ \ (SKIMMER\ 0 HAVE POSITIVE DRAINAGE \ REA \ ................. \ 11 \ `. \ \ \ \ TO NSURE ULL D TERING \ \ \' \ SKIM ER INV. ELEV: 701\00 \ \ \ :: ' : ' :\ .. \ \ \ \ \ \ BASIN FLOOR ELEV! 700.09 \ - : { \:::::: \:::. I I \ " \I \ \ 1 TEM ORARY IMMED PIPE INTAKE ELEV 700.00 / \j \\ /: ! \ \ \ IVEION DITC�I S MMER IPE DISCHARGE ELFZV: 699.621- - - _ . ` :` i .:.:.:.:.: ..::::';.:�II: i %. ,I ' -CHRISTOPHER G. MOWBRAY PIN 07141026 CHECK D \(TYP.) IL PORARY STOCK - .ARTHUR P. AND PROPOSED 100YR. \ �. MARTHA A. HEIN JR. FLOOD LINE �\ ' \ \ _ I DB 3493 PG 310 \LUB PIN 07141025 FEN �CI RO \ w� "' MITS OF \ \ 1 (I . 11 I I I I / I \ P• \ i \ DISTURBANCE \ \ \ \ (TYP.) A LA \\ TREE SAVE \ \ \ \ DONNELLY CARLTON CAMERON BANK F ( ) I ' REA \ \ DB 3634 PG 699 TOP 0 \ PIN 07141022 \ \ \ \ 10' WIDE NO CLEAR BUFFER ALONG PROPERTY LINE NOTE CENTERLINE .' {: \ \ 1 OF CREEK XI \ EXISTING t DO NOT BUILD SEDIMENT BASIN #2 0 20' UTILITY UNTIL EXISTING SEWER IS RELOCATED EASEMENT AND ACCEPTED BY UCPW ` REVOCABLE LIVING TRUST ` DB 4680 PG 414 PIN 07141020 NOTE: THE PHASE I MEASURES SHOWN ON THE PLANS REFLECT THE IN PLACE EROSION CONTROL NECESSARY TO ALLOW THE SITE TO BE CLEARED AND GRUBBED IN PREPARATION FOR THE INITIAL STAGE OF THE GRADING WORK. THE PHASE II MEASURES DEPICTED ON THE PLANS SHOW THE IN PLACE EROSION CONTROLS THAT WILL REMAIN AT THE COMPLETION OF THE FINAL STAGE OF THE GRADING WORK REQUIRED BY THE PROJECT. DURING EACH INTERIM STAGE OF THE GRADING WORK, THE CONTRACTOR SHALL BE REQUIRED TO INSTALL ANY ADDITIONAL TEMPORARY MEASURES THAT MAY BE NECESSARY TO CONTROL SEDIMENT AND EROSION THAT OCCURS AS A RESULT OF CHANGES TO THE EXISTING GROUND ELEVATION CONTOURS. AS DIRECTED BY THE TOWN OF STALLINGS OR STATE INSPECTORS. EROSION CONTROL INSPECTION SCHEDULE THE PERSON RESPONSIBLE FOR LAND DISTURBING ACTIVITIES MUST INSPECT THE SEDIMENT AND EROSION CONTROL MEASURES ON A PROJECT AFTER EACH PHASE TO ENSURE THE APPROVED PLAN IS BEING FOLLOWED. AT A MINIMUM, THE INSPECTIONS SHALL BE PERFORMED AFTER EACH OF THE FOLLOWING PHASES OF A PLAN: c. INSTALLATION OF PERIMETER EROSION AND SEDIMENT CONTROL MEASURES. b. INSTALLATION OF SEDIMENT TRAPS /BASINS. c. CLEARING AND GRUBBING OF EXISTING GROUND COVERS. d. COMPLETION OF ANY PHASE OF GRADING THAT REQUIRES PROVISION OF STABILIZATION. e. INSTALLATION OF MEASURES DURING ANY PHASE OF THE PROJECT. f. COMPLETION OF CONSTRUCTION OR DEVELOPMENT. g. INSTALLATION OF STORMWATER RETENTION MEASURES. h. QUARTERLY UNTIL THE ESTABLISHMENT OF PERMANENT GROUND COVER IS FULLY ESTABLISHED. *CONTACT NCDENR AT (704)663 -1699 FOR ADDITIONAL INFORMATION EROSION CONTROL LEGEND SILT FENCE OUTLET INLET PROTECTION R� FILTER BERM CHECK DAM - BERM -BERM PERIMETER BERM - SF- SF -SF- SILT FENCE -TP -TP -TP - TREE PROTECTION -Lp LD UMITS OF DISTURBANCE WOODED AREA DIVERSION DITCH CONSTRUCTION ENTRANCE Sediment Basin 2 Data Block Drainage Denuded Area Basin Volume Basin Surface Area I Cleanout I I Skimmer Skimmer Required Provided (Cubic Required Provided Basin Area (Acres) (Acres) Depth H (Feet) Z (Feet) I L (Feet) I T (Feet) I W (Feet) I Pipe Dia. I Orifice Q10 (Cubic FT.) FT.) (SQ FT.) (SQ FT. (FT.) (in.) Dia. (in.) Basin #2 3.65 3.65 15.39 6570 19205 6697 6932 1.31 4.0 1 6.0 1 N/A I N/A I WA 1 4.00 3.70 GRAPHIC SCALE 0 25 50 100 1 inch = 50 ft. RELEASED FOR CONSTRUCTION rj) xx co wz os� �M C 04 s VJ A � V `y. 9 AL �•° b 9_0r N z i W S 2 o S 2 6i 2 w r n o 5 N N N N H H !�•! t` R'i co U) W N VI o z x a o� O xz�U W EW E- PA HU W Z " x E F W O O E+ Z 7 I U U .-r d O ° w Z o U O O O w rEOrECr No. MRH -13040 mRNAm: MRH13040 -EC1 CHECKED BY: RMR DRAWN BY. CM /JL /RMR SCME: 1"=50' DATE: 07- 257 014 SHE6%' N0. C -6B 'J MCADAMS CONSTRUCTION SEQUENCE: 1. OBTAIN GRADING EROSION CONTROL PLAN APPROVAL FROM NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES. 2. SET UP AN ON -SITE PRE - CONSTRUCTION CONFERENCE WITH NC DENR O704- 663 -1699 THE BUILDING OFFICIAL AND LYNNE HAIR AT THE TOWN F STALLINGS PLANNING DEPARTMENT (704- 821 -0315) TO DISCUSS EROSION CONTROL MEASURES. 3. APPLY FOR AND OBTAIN DRIVEWAY PERMITS. UPON OBTAINING DRIVEWAY PERMITS, INSTALL GRAVEL CONSTRUCTION ENTRANCE 1N ACCORDANCE WITH DETAILS PROVIDED. 4. PRIOR TO THE START OF CONSTRUCTION, ADJOINING PROPERTY OWNERS MUST BE NOTIFIED. 5. PRIOR TO CONSTRUCTION OF SEDIMENT BASIN #2, THE EXISTING SEWER BETWEEN (AND INCLUDING) EX. MH -14 THROUGH EX. MH -16 MUST BE REMOVED /RELOCATED AND ACCEPTED BY THE UNION COUNTY PUBLIC WORKS. 6. INSTALL SILT FENCE, INLET PROTECTION, SEDIMENT BASIN, DIVERSION DITCHES, TREE PROTECTION, TEMPORARY STREAM CROSSINGS AND OTHER MEASURES AS SHOWN ON PHASE 1 PLANS, CLEARING ONLY AS NECESSARY TO INSTALL THESE DEVICES. THIS IS TO INCLUDE THE EROSION CONTROL MEASURES ALONG CHESTNUT LANE FOR THE CONSTRUCTION OF THE TURN LANE AND ROAD IMPROVEMENTS. 7. CLEAN WATER DIVERSION DITCHES MUST BE MATTED AND STABILIZED IMMEDIATELY AFTER CONSTRUCTION. 8. IN CONJUNCTION WITH THE EXTERNAL WIRE AND GRAVEL INLET PROTECTION, SILT SACKS, OR SIMILAR INLET PROTECTION MEASURES, SHALL BE PROVIDED IN ALL STORM INLETS NOT DISCHARGING TO A SEDIMENT BASIN. 9. CALL FOR ON -SITE INSPECTION BY INSPECTOR. UPON APPROVAL BY INSPECTOR CLEARING & GRUBBING MAY BEING. 10. LIMIT CLEARING AND GRUBBING OF SITE TO AREAS THAT WILL BE MASS GRADED IN PHASE 1. WHENEVER POSSIBLE, EXISTING VEGETATION SHALL REMAIN IN PLACE TO PREVENT EROSION OF SITE. 11. ANY OFF -SITE BORROW AND /OR WASTE REQUIRED FOR THIS PROJECT MUST COME FROM AN APPROVED EROSION CONTROL PLAN SITE, A SITE REGULATED UNDER THE MINING ACT OF 1971, OR A LANDFILL REGULATED BY THE DIVISION OF SOLID WASTE MANAGEMENT. DEBRIS FROM DEMOLITION ACTIVITIES SHOULD BE DISPOSED OF AT AN APPROVED FACILITY. 12. BEGIN GRADING ACTIVITIES AS SHOWN IN PHASE 1. AS SITE IS GRADED, CONTRACTOR SHALL MINIMIZE THE AMOUNT OF STORM WATER FLOWING OVER FILL SLOPES BY USING DIVERSION DITCHES AND SLOPE DRAINS. DITCHES AND SLOPE DRAINS SHOWN ON PLANS DEPICT REQUIRED DIVERSION DITCHES AND SLOPE DRAINS AT FINAL PAD GRADE. ADDITIONAL MEASURES MAY BE NEEDED AS GRADING PROGRESSES. 13. MAINTAIN AND ADJUST E &SC MEASURES AS MASS GRADING PROGRESSES TO MAINTAIN PROPER E &SC CONTROL. 14. INSTALL STORM WATER COLLECTION SYSTEM, VELOCITY DISSIPATERS AND PROTECT INLETS WITH SILT FENCE, GRAVEL FILTERS, SILT TRAPS OR OTHER APPROVED MEASURES AS SHOWN ON THE PLANS. 15. THE CONTRACTOR SHALL DILIGENTLY AND CONTINUOUSLY MAINTAIN ALL EROSION CONTROL DEVICES AND STRUCTURES. INSPECT ONCE PER WEEK AND AFTER EACH RAINFALL. 16. STABILIZE SITE AS AREAS ARE BROUGHT TO GRADE. SEDIMENT BASIN #1 AND SEDIMENT BASIN #2 SHALL BE CONVERTED OVER TO PERMANENT WATER QUALITY FACILITY AFTER THE ENTIRE SITE HAS BEEN STABILIZED. FAILURE TO DO SO COULD CAUSE THE PLANTED PLANTS IN POND TO DIE WHEN INUNDATED WITH SILT. 17. SEDIMENT BASIN #1 AND SEDIMENT BASIN #2 ARE TO BE INCREASED IN DEPTH TO THE DESIGNED ELEVATIONS SHOWN IN THE STORMWATER MANAGEMENT FACILITY PLANS. 18. SEDIMENT BASINS SHALL NOT BE REMOVED OR CONVERTED TO POST - CONSTRUCTION STORM WATER PONDS UNTIL AFTER ROADS HAVE BEEN BUILT AND STABILIZED AND UNTIL APPROVED BY THE LAND QUALITY SECTION INSPECTOR. 19. INLET PROTECTION MUST REMAIN IN PLACE WITHIN WORK AREA UNTIL ALL AREAS OF THE PROJECT ARE STABILIZED. 20. COORDINATE WITH EROSION CONTROL INSPECTOR FROM THE LAND QUALITY SECTION OF NCDENR AND LYNNE HAIR AT THE TOWN OF STALLINGS PLANNING DEPARTMENT (704 - 821 -0315) PRIOR TO REMOVAL OF EROSION CONTROL MEASURES. 21. ALL EROSION CONTROL MEASURES SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE N.C. EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL. 22. WHEN VEGETATION IS ESTABLISHED, CALL FOR FINAL SITE INSPECTION. IF THE SITE IS APPROVED BY THE INSPECTOR, THE PERFORMANCE BOND, IF REQUIRED, WILL BE RELEASED. EROSION CONTROL NOTES: 1. SOIL STABILIZATION SHALL BE ACHIEVED ON ANY AREA OF A SITE WHERE LAND- DISTURBING ACTIVITIES HAVE TEMPORARILY OR PERMANENTLY CEASED ACCORDING TO THE FOLLOWING SCHEDULE: c.ALL PERIMETER DIKES SWALES DITCHES PERIMETER SLOPES AND ALL SLOPES GREATER THAN 3 HORIZONTAL TO 1 VERTICAL (3:1) SHALL BE PROVIDED TEMPORARY OR PERMANENT STABILIZATION WITH GROUND COVER AS SOON AS PRACTICAL BUT IN ANY EVENT WITHIN 7 CALENDAR DAYS FROM THE LAST LAND- DISTURBING ACTIVITY. b.ALL OTHER DISTURBED AREAS SHALL BE PROVIDED TEMPORARY OR PERMANENT STABILIZATION WITH GROUND COVER AS SOON AS PRACTICAL BUT IN ANY EVENT WITHIN 14 CALENDAR DAYS FROM THE LAST LAND- DISTURBING ACTIVITY. 2. SEEDING OF AREAS GRADED SHALL BE IN ACCORDANCE WITH NORTH CAROLINA EROSION AND SEDIMENT CONTROL DESIGN MANUAL. 3. REPRESENTATIVES OF THE NC DENR OR THE TOWN OF STALLINGS ENGINEERING DEPARTMENT MAY REVIEW AND EVALUATE THE METHODS USED AND THE OVERALL EFFECTIVENESS OF THE EROSION CONTROL PROGRAM. THE APPROVED EROSION AND SEDIMENT CONTROL PLAN MAY BE AMENDED BY THE APPROVING AUTHORITY IF AN ON SITE INSPECTION INDICATED THAT THE APPROVED CONTROL MEASURES ARE NOT EFFECTIVE IN CONTROLLING EROSION AND SEDIMENTATION OR IF BECAUSE OF CHANGED CIRCUMSTANCES THE APPROVED PLAN CANNOT BE CARRIED OUT. 4. CONTRACTOR SHALL LOCATE AND VERIFY THE LOCATION OF ALL UTILITIES PRIOR TO BEGINNING CONSTRUCTION. 5. THE CONTRACTOR SHALL NOTIFY NORTH CAROLINA ONE CALL CENTER (811) OR 1 -800- 632 -4949 BEFORE BEGINNING ANY EXCAVATION OR UTILITY WORK. CONTACT UNION COUNTY FOR LOCATING EXISTING WATER AND SEWER LINES. 6. EROSION AND SEDIMENT CONTROL PRACTICES SHALL BE MAINTAINED, SO THAT SEDIMENT CARRYING RUNOFF FROM THE SITE WILL NOT ENTER STORM DRAINAGE FACILITIES. 7. PROPERTIES AND RIGHT -OF -WAY ADJOINING THE SITE SHALL BE KEPT CLEAN OF MUD OR SILT CARRIED FROM THE SITE BY VEHICULAR TRAFFIC OR RUNOFF. 8. ALL CONSTRUCTION TRAFFIC SHALL ENTER AND EXIT THE SITE VIA THE CONSTRUCTION ENTRANCES. 9. EXCAVATED MATERIAL FROM TRENCHES SHALL BE PLACED ON THE UPGRADE SIDE OF THE TRENCH TO ALLOW MATERIAL TO ERODE INTO THE TRENCH. CONSTRUCTION MAINTENANCE AND REMOVAL OF ALL EROSION CONTROL DEVICES ARE THE RESPONSIBILITY OF GRADING CONTRACTOR UNLESS OTHERWISE NOTED. 10. NO OFF -SITE BORROW AREAS SHALL BE UTILIZED DURING GRADING OF THE SITE. ALL FILL SHALL BE OBTAINED WITHIN LIMITS OF DISTURBANCE SHOWN ON PLANS. 11. ON -SITE BURIAL PITS REQUIRE AN ON -SITE DEMOLITION LANDFILL PERMIT FROM THE SOLID WASTE SECTION OF NC DENR. 12. NO OPEN BURNING ALLOWED. 13. ALL TREES & BRUSH REMOVED DURING CLEARING & GRUBBING OF SITE SHALL BE CHIPPED ON SITE AND HAULED OFF SITE FOR DISPOSAL.. 14. ANY GRADING BEYOND THE DENUDED LIMITS SHOWN ON THE PLAN IS IN VIOLATION OF THE CITY /COUNTY EROSION CONTROL ORDINANCE AND IS SUBJECT TO A FINE. 15. MAINTAIN MINIMUM 10' CLEAR ZONE FROM TOP OF CHANNEL BANK TO DENUDED LIMITS. 16. GRADING MORE THAN ONE ACRE WITHOUT AN APPROVED EROSION CONTROL PLAN IS A VIOLATION OF THE DENR EROSION CONTROL ORDINANCE AND IS SUBJECT TO A FINE. 17. ADDITIONAL MEASURES TO CONTROL EROSION AND SEDIMENT MAY BE REQUIRED BY A REPRESENTATIVE OF THE TOWN OF STALLINGS OR NC DENR LAND QUALITY SECTION. 18. SLOPES SHALL BE GRADED NO STEEPER THAN 2:1. FILL SLOPES GREATER THAN 10' REQUIRE ADEQUATE TERRACING. 19. A GRADING PLAN MUST BE SUBMITTED FOR ANY LOT GRADING EXCEEDING ONE ACRE THAT WAS NOT PREVIOUSLY APPROVED. 20. TEMPORARY DRIVEWAY PERMIT FOR CONSTRUCTION ENTRANCES IN NCDOT RIGHT OF WAY MUST BE PRESENTED AT PRE - CONSTRUCTION MEETING. 21. THE APPROXIMATE AREA OF THE LIMITS OF CLEARING, GRADING, AND CONSTRUCTION IS 17.45 ACRES. NOTE: THE PHASE I MEASURES SHOWN ON THE PLANS REFLECT THE IN PLACE EROSION CONTROL NECESSARY TO ALLOW THE SITE TO BE PREPARATION FOR HE INITIAL STAGE OF CLEARED AND GRUBBED IN R T THE GRADING WORK. THE PHASE II MEASURES DEPICTED ON THE PLANS SHOW THE IN PLACE EROSION CONTROLS THAT WILL REMAIN AT THE COMPLETION OF THE FINAL STAGE OF THE GRADING WORK REQUIRED BY THE PROJECT. DURING EACH INTERIM STAGE OF THE GRADING WORK, THE CONTRACTOR SHALL BE REQUIRED TO INSTALL ANY ADDITIONAL TEMPORARY MEASURES THAT MAY BE NECESSARY TO CONTROL SEDIMENT AND EROSION THAT OCCURS AS A RESULT OF CHANGES TO THE EXISTING GROUND ELEVATION CONTOURS. AS DIRECTED BY THE TOWN OF STALLINGS OR STATE INSPECTORS. THE PERSON RESPONSIBLE FOR LAND DISTURBING ACTIVITIES MUST INSPECT THE SEDIMENT AND EROSION CONTROL MEASURES ON A PROJECT AFTER EACH PHASE TO ENSURE THE APPROVED PLAN IS BEING FOLLOWED. AT A MINIMUM, THE INSPECTIONS SHALL BE PERFORMED AFTER EACH OF THE FOLLOWING PHASES OF A PLAN: c. INSTALLATION OF PERIMETER EROSION AND SEDIMENT CONTROL MEASURES. b. INSTALLATION OF SEDIMENT TRAPS /BASINS. c. CLEARING AND GRUBBING OF EXISTING GROUND COVERS. d. COMPLETION OF ANY PHASE OF GRADING THAT REQUIRES PROVISION OF STABILIZATION. e. INSTALLATION OF MEASURES DURING ANY PHASE OF THE PROJECT. f. COMPLETION OF CONSTRUCTION OR DEVELOPMENT. g. INSTALLATION OF STORMWATER RETENTION MEASURES. h. QUARTERLY UNTIL THE ESTABLISHMENT OF PERMANENT GROUND COVER IS FULLY ESTABLISHED. *CONTACT NCDENR AT (704)663 -1699 FOR ADDITIONAL INFORMATION NOTE: ANY EXISTING EASEMENTS TO BE ABANDONED MUST BE APPROVED BY THE OARD OF COUNTY COMMISSIONERS, , UNION COUNTY DOES NOT HAVE THE AUTHORITY TO DO SO. SEDIMENT BASIN DRAINAGE AREA MATCH LINE - SEE SHEET C -6A immiam LIMITS OF ° i PROPERTY LINE DISTURBANCE al JACK AND BETTY STAFF (TYp) -" - (TYp') DB 3602 PG 154 I TEMPORARY PIN 07141115 CONSTRUCTION JOHN HOWARD FAISON IV / 10' WIDE NO CLEAR �_ - - EASEMENT DB N 0 41 01 G i BUFFER ALONG PIN 07141001 �. PROPERTY LINE .y.® ��� Ol -31-- =1 j ti- -- - - ?� - - - -- __ � -_ �T 7 �,. /� x.®•l w - w w w _ - � - « ..- .C: T ® ®.- ® ®-. .®.� ®. .�.w.. TOTAL DISTURBED /DENUDED AREA = 17.45* AC. TEMPORARY CONSTRUCTION ENTRANCE (100 LF TYP.) / EXISTING GUSTNUT LANE ®® ..gym - �. _... UBLIC R /W) SILT FENCE (TYP.) HENRY 0. AND ELSIE G. EUBANKS PIN 07141001D U� I I o z:w I ao I w z 7t D_ w DONALD E. AND KATHLEEN F. GOESSEL PIN 07141001) F GREGORY SETH LEONARD DB 6234 PG 721 PIN 07141001E LIMITS OF DISTURBAI (TYP.) CHECK (TYP.) TEMPORARY CLEAN / r I WATER DIVERSION DITCH EX. FAIRFOREST- DRIVE (VARIABLE PUBLIC R /W) FILTER (TYP.) I / a GARY AND LAURA SHEPARD / DB 3633 PG 342 PIN 07141019 t - EX. RED BARN TRAIL (VARIABLE PUBLIC R /W) CHANG YUNG KI AND SOON SUN PIN 07141016A i JAMES AND LYNDA GREENLESS DB N/A PG N/A PIN 07141040 i MARK AND NANCY DECHANT DB N/A PG N/A PIN 07141015 i KHANDAKER T. RAHMAN MIRZA R. ROKSANA DB 6228 PG 711 PIN 07141001L EROSION CONTROL LEGEND �IIIIIIIII� -BERM-BERM -SF-SF-SF- _7p -TP -TP - UD LD SILT FENCE OUTLET INLET PROTECTION FILTER BERM CHECK DAM PERIMETER BERM SILT FENCE TREE PROTECTION LIMITS OF DISTURBANCE GRAPHIC SCALE 50 0 25 50 100 1 inch = 50 ft. FINAL DRAWING - NOT RELEASED FOR CONSTRUCTION �•i N �j c OD N C �.1 w Fi d �g z 08., s VJ A � V A 57 = '•, M. RED .�� 0 U w a y p2 yp� IJ U F 8 Il Z 4 1* 3 n < �w < z 5 N N N N N N N x ® ©� ©Q ©Q t` a cq N U O x o� O zC'jU W WE E �OIza)O E-+Ucn z x E" PP ix W O O F z a m a U py d C+ 00 O z r-i UP W 0 0 F U O 1--1 W W PROJECT 404=E �AMF: CHECKED DRAWN BYSCALE: 1 " =50' DATE: 07 -25 -2014 SHEET NO. C -6C M MCADAMS EROSION CONTROL NOTES: CONSTRUCTION SE UENCE: 1. SOIL STABILIZATION SHALL BE ACHIEVED ON ANY AREA OF A SITE WHERE 1. OBTAIN GRADING EROSION CONTROL PLAN APPROVAL FROM NORTH LAND- DISTURBING ACTIVITIES HAVE TEMPORARILY OR PERMANENTLY CEASED CAROLINA DEPARTMENT ENVIRONMENT AND NATURAL RESOURCES. 2. SET UP AN O99 SITE PRE-CONSTRUCTION CONFERENCE WITH NC DENR ACCORDING TO THE FOLLOWING SCHEDULE: 704- 663 -1699 AND LYNNE HAIR AT THE TOWN OF STALLINGS PLANNING a. ALL PERIMETER DIKES, SWALES, DITCHES, PERIMETER SLOPES AND ALL DEPARTMENT (704-821-0315) TO DISCUSS EROSION CONTROL MEASURES. SLOPES GREATER THAN 3 HORIZONTAL TO 1 VERTICAL (3:1) SHALL BE 3. APPLY FOR AND OBTAIN DRIVEWAY PERMITS. UPON OBTAINING DRIVEWAY PROVIDED TEMPORARY CTIICALL BUT RN ANY EVENT WITHIN 7 CALENDAR DAYS DETAILS PROVIDED INSTALL STABILIZATION WNDOVER PERMITS, ` GRAVEL CONSTRUCTION ENTRANCE IN ACCORDANCE WITH AS SOON AS P I EX. YARROW STREET � FROM THE LAST LAND- DISTURBING ACTIVITY. 4. PRIOR TO CONSTRUCTION OF SEDIMENT BASIN #2, THE EXISTING SEWER 50' PUBLIC R /W b. ALL OTHER DISTURBED AREAS SHALL BE PROVIDED TEMPORARY OR BETWEEN (AND INCLUDING) EX. MH -14 THROUGH EX. MH -16 MUST BE �� PERMANENT STABILIZATION WITH GROUND COVER AS SOON AS PRACTICAL REMOVED /RELOCATED AND ACCEPTED BY THE UNION COUNTY PUBLIC BUT IN ANY EVENT WITHIN 14 CALENDAR DAYS FROM THE LAST WORKS. 5. INSTALL SILT FENCE, INLET PROTECTION, SEDIMENT BASIN, DIVERSION \ LAND- DISTURBING ACTIVITY. DITCHES, TREE PROTECTION, TEMPORARY STREAM CROSSINGS AND OTHER 2. SEEDING OF AREAS GRADED SHALL BE IN ACCORDANCE WITH NORTH MEASURES AS SHOWN ON PHASE 1 PLANS, CLEARING ONLY AS NECESSARY \ CAROLINA EROSION AND SEDIMENT CONTROL DESIGN MANUAL. TO INSTALL THESE DEVICES. THIS IS TO INCLUDE THE EROSION CONTROL 3. REPRESENTATIVES OF THE NC DENR OR THE TOWN OF STALLINGS MEASURES ALONG CHESTNUT LANE FOR THE CONSTRUCTION OF THE TURN \ ENGINEERING DEPARTMENT MAY REVIEW AND EVALUATE THE METHODS USED LANE AND ROAD IMPROVEMENTS. AND THE OVERALL EFFECTIVENESS OF THE EROSION CONTROL PROGRAM. 6. CLEAN WATER DIVERSION DITCHES MUST BE MATTED AND STABILIZED \ SILT FENCE THE APPROVED EROSION AND SEDIMENT CONTROL PLAN MAY BE AMENDED IMMEDIATELY AFTER CONSTRUCTION. BY THE APPROVING AUTHORITY IF AN ON SITE INSPECTION INDICATED THAT 7• IN CONJUNCTION WITH THE EXTERNAL WIRE AND GRAVEL INLET PROTECTION, CHESTNUT SUBDIVISION, PHASE 2 ('') / THE APPROVED CONTROL MEASURES ARE NOT EFFECTIVE IN CONTROLLING SILT SACKS, OR SIMILAR INLET PROTECTION MEASURES, SHALL BE PB, H PG. 251 EROSION AND SEDIMENTATION OR IF BECAUSE OF CHANGED CIRCUMSTANCES PROVIDED IN ALL STORM INLETS NOT DISCHARGING TO A SEDIMENT BASIN. LOT 51 THE APPROVED PLAN CANNOT BE CARRIED OUT. 8. CALL FOR ON -SITE INSPECTION BY INSPECTOR. UPON APPROVAL BY \ PIN 07141107 4. CONTRACTOR SHALL LOCATE AND VERIFY THE LOCATION OF ALL UTILITIES INSPECTOR CLEARING & GRUBBING MAY BEING. \ /1 9. LIMIT CLEARING AND GRUBBING OF SITE TO AREAS THAT WILL BE MASS PRIOR TO BEGINNING CONSTRUCTION. GRADED IN PHASE 1. WHENEVER POSSIBLE, EXISTING VEGETATION SHALL 5. THE CONTRACTOR SHALL NOTIFY NORTH CAROLINA ONE CALL CENTER (811) REMAIN IN PLACE TO PREVENT EROSION OF SITE. \® \ / OR 1 -800- 632 -4949 BEFORE BEGINNING ANY EXCAVATION OR UTILITY 10. ANY OFF -SITE BORROW AND /OR WASTE REQUIRED FOR THIS PROJECT \` \ \ ��\ WORK. CONTACT UNION COUNTY FOR LOCATING EXISTING WATER AND MUST COME FROM AN APPROVED EROSION CONTROL PLAN SITE, A SITE SEWER LINES. REGULATED UNDER THE MINING ACT OF 1971, OR A LANDFILL REGULATED \ - \� \ \\ \ 6. EROSION AND SEDIMENT CONTROL PRACTICES SHALL BE MAINTAINED, SO BY THE DIVISION OF SOLID WASTE MANAGEMENT. DEBRIS FROM DEMOLITION \\ \ THAT SEDIMENT CARRYING RUNOFF FROM THE SITE WILL NOT ENTER STORM ACTIVITIES SHOULD BE DISPOSED OF AT AN APPROVED FACILITY. DRAINAGE FACILITIES. 11. BEGIN GRADING ACTIVITIES AS SHOWN IN PHASE 1. AS SITE IS GRADED, CONTRACTOR SHALL MINIMIZE THE AMOUNT OF STORM WATER FLOWING CHESTNUT SUBDIVISION, PHASE 2 \ y �� / TFPE" 7. PROPERTIES AND RIGHT -OF -WAY ADJOINING THE SITE SHALL BE KEPT OVER FILL SLOPES BY USING DIVERSION DITCHES AND SLOPE DRAINS. PB. H PG. 251 / CLEAN OF MUD OR SILT CARRIED FROM THE SITE BY VEHICULAR TRAFFIC DITCHES AND SLOPE DRAINS SHOWN ON PLANS DEPICT REQUIRED LOT 57 OR RUNOFF. / \ DIVERSION DITCHES AND SLOPE DRAINS AT FINAL PAD GRADE. ADDITIONAL PIN 07141113 8. ALL CONSTRUCTION TRAFFIC SHALL ENTER AND EXIT THE SITE VIA THE MEASURES MAY BE NEEDED AS GRADING PROGRESSES.J° \ CONSTRUCTION ENTRANCES. 12. MAINTAIN AND ADJUST E &SC MEASURES AS MASS GRADING PROGRESSES TO 'Y YPEBk 9. EXCAVATED MATERIAL FROM TRENCHES SHALL BE PLACED ON THE UPGRADE MAINTAIN PROPER E &SC CONTROL. _ _ - - _ SIDE OF THE TRENCH TO ALLOW MATERIAL TO ERODE INTO THE TRENCH. 13. INSTALL STORM WATER COLLECTION SYSTEM, VELOCITY DISSIPATERS -ANB - '-- - - CONSTRUCTION MAINTENANCE AND REMOVAL OF ALL EROSION CONTROL PROTECT INLETS WITH SILT FENCE, GRAVEL FILTERS, SILT TRAPS OR OTHER CHESTNUT SUBDIVISION, PHASE 2 APPROVED MEASURES AS SHOWN ON THE PLANS. DEVICES ARE THE RESPONSIBILITY OF GRADING CONTRACTOR UNLESS PB. H PG. 251 x OTHERWISE NOTED. 14. THE CONTRACTOR SHALL DILIGENTLY AND CONTINUOUSLY MAINTAIN ALL LOT 58 `� I ,� \ \TYpE 10. NO OFF -SITE BORROW AREAS SHALL BE UTILIZED DURING GRADING OF THE AND EROSION EACHLRAINFALL AND STRUCTURES . INSPECT ONCE PER WEEK PIN 07141114, SITE. ALL FILL SHALL BE OBTAINED WITHIN LIMITS OF DISTURBANCE SHOWN 15. STABILIZE SITE AS AREAS ARE BROUGHT TO GRADE. SEDIMENT BASIN #1 ON PLANS. AND SEDIMENT BASIN #2 SHALL BE CONVERTED OVER TO PERMANENT / V\ 11. ON -SITE BURIAL PITS REQUIRE AN ON -SITE DEMOLITION LANDFILL PERMIT WATER QUALITY FACILITY AFTER THE ENTIRE SITE HAS BEEN STABILIZED. 40 FROM THE ZONING ADMINISTRATOR. FAILURE TO DO SO COULD CAUSE THE PLANTED PLANTS IN POND 70 DIE 12. NO OPEN BURNING ALLOWED. WHEN INUNDATED WITH SILT. I x /� HYPE "B° 16. SEDIMENT BASIN #1 AND SEDIMENT BASIN #2 ARE TO BE INCREASED IN I jNL PROTECTION 13. ALL TREES & BRUSH REMOVED DURING CLEARING & GRUBBING OF SITE DEPTH TO THE DESIGNED ELEVATIONS SHOWN IN THE STORMWATEB - - i ( ��� I SHALL BE CHIPPED ON SITE AND HAULED OFF SITE FOR DISPOSAL MANAGEMENT FACILITY PLANS. \ \\ ���W /PSILT SACK 14. ANY GRADING BEYOND THE DENUDED LIMITS SHOWN ON THE PLAN IS IN 17. SEDIMENT BASINS SHALL NOT BE REMOVED OR CONVERTED TO ) VIOLATION OF THE CITY/COUNTY EROSION CONTROL ORDINANCE AND IS POST - CONSTRUCTION STORM WATER PONDS UNTIL AFTER ROADS HAVE SUBJECT TO A FINE. BEEN BUILT AND STABILIZED AND UNTIL APPROVED BY THE LAND QUALITY I 4a" B" � SECTION INSPECTOR. 15. MAINTAIN MINIMUM 10' CLEAR ZONE FROM TOP OF CHANNEL BANK TO TYP 18. INLET PROTECTION MUST REMAIN IN PLACE WITHIN WORK AREA UNTIL ALL I / I ' / \ DENUDED LIMITS. AREAS OF THE PROJECT ARE STABILIZED. 16. GRADING MORE THAN ONE ACRE WITHOUT AN APPROVED EROSION CONTROL 19. COORDINATE WITH EROSION CONTROL INSPECTOR FROM THE LAND QUALITY PLAN IS A VIOLATION OF THE DENR EROSION CONTROL ORDINANCE AND IS SECTION OF NCDENR AND LYNNE HAIR AT THE TOWN OF STALLINGS SUBJECT TO A FINE. PLANNING DEPARTMENT (704- 821 -0315) PRIOR TO REMOVAL OF EROSION 17. ADDITIONAL MEASURES TO CONTROL EROSION AND SEDIMENT MAY BE CONTROL MEASURES. - -�-- - - -- / REQUIRED BY A REPRESENTATIVE OF THE TOWN OF STALLINGS OR NC 20. ALL EROSION CONTROL MEASURES SHALL BE CONSTRUCTED IN DENR ENGINEERING DEPARTMENT. ACCORDANCE WITH THE N.C. EROSION AND SEDIMENT CONTROL PLANNING I / AND DESIGN MANUAL. I 2 18. SLOPES SHALL BE GRADED NO STEEPER THAN 2:1. FILL SLOPES GREATER r 21. WHEN VEGETATION IS ESTABLISHED, CALL FOR FINAL SITE INSPECTION. �F\ THAN 10' REQUIRE ADEQUATE TERRACING. THE SITE IS APPROVED THE PERFORMANCE BOND, IF REQUIRED, WILL BE � � I (\ \ TYPE 19. A GRADING PLAN MUST BE SUBMITTED FOR ANY LOT GRADING EXCEEDING RELEASED. \ ONE ACRE THAT WAS NOT PREVIOUSLY APPROVED. - _ 20. TEMPORARY DRIVEWAY PERMIT FOR CONSTRUCTION ENTRANCES IN NCDOT _ \ - -� RIGHT OF WAY MUST BE PRESENTED AT PRE - CONSTRUCTION MEETING. \ \ I 4 21. THE APPROXIMATE AREA OF THE LIMITS OF CLEARING, GRADING, AND � I \ \ / CONSTRUCTION IS 18.83 ACRES. \ 43 \I r�E i PROPERTY LINE Z (TYP.) I�q^ah� ' I I T PP °Et' / ( s JOHN HOWARD FAISON IV I I DB 1162 PG 684 / I / // *4Ej I PIN 07141001 / T7iB" NIIIi� I I I II A 0.2 OPACITY BUFFER IS /'- ( I REQUIRED WHERE SITE IS / HENRY O. AND I I. a ADJACENT TO EXISTING / I ELSIE G. EUBANKS I I I n SINGLE FAMILY. PIN 07141001D ` \� 10' WIDE I TYPE] 1 UNDERSTORY LIMITS OF \ II g 7 SHRUBS / DISTURBANCE I` (EXISTING VEGETATION TO BE / / // T / USED IN LIEU WHERE / (TYP,) I I 20' LANDSCAPE APPLICABLE. // / _ ' --{./ -H I I I r9 BUFFER \\ / �} / =__L ELI -- I 411 - `c_7 - ELAINE A. NICHOLS T II I 54 i i TYPE TYPE B" v t PE "B" TYPE "B" "� ' I" _ PIN 07141001E TYP�`�` I ill \ E DONALD E. AND KATHLEEN F. GOESSEL n +oo 12 +00 3+ o PIN 07141001J 10 00 �� / I / / -- I �\ - \ I� \$ 11' EX. RED BARN \ " E I , I O TRAM 4 � \ I TYPE (VARIABLE (VARIABLE PUBLIC R /W) TYPE B. � \ f \ 1 I I \. \ y \ CHANG YUNG KI AND SOON SUN PIN 07141016A ` \ CHESTNUT HOMEOWNERS ASSOCIATION, INC PIN 07141006 f I CHESTNUT SUBDIVISION, PHASE 2I PB. H PG. 25) LOT 50 i I PIN 0714116 / 36 _ 4E C1" I /% / I \ / / LIMITS OF DISTURBANCE (TYP.) DOUBLE ROW SILT FENCE / . BANK... !:::. ';' ' ' / DUKE POWER /DUKE ENERGY �. \ / CORPORATION CONTACT NCDENR AT (704)663- /: PIN 07141007A I N/> L*15 N 1 /35 `.:. ... / NOTE: \ . . : . - •' :-: \ / � / I / / ANY EXISTING EASEMENTS TO BE ABANDONED MUST BE APPROVED BY / THE BOARD OF COUNTY COMMISSIONERS, UNION COUNTY DOES NOT HAVE THE AUTHORITY TO DO SO. TIYPE "W 1 i PE/ /\ TYPE \B" I 1 \ Y C" I \ ) \\ \NET PROTE ION iFYP✓C" SILT SACK \ TMAL \ / DISTURBED /DENUDED TY AREA = 17.45* AC. E . ;:;ISILT:FENGE::::::::1: ` i \ . :. . \ \� TIDE LENNAR CAROLINAS, LLC 2g DB 4305 PG 730 PIN 07141008 I i/ .. ...... ............................... . . . . . {{ \ \ \ TYPE �.':/-:POND TYPE \B" TREE SAVE 00 k _:.; _ r -TYPE - -- \ \' F + CHRISTOPHER G. MOWBRAY PIN 07141026 \- ARTHUR P. AND EASEMENT MARTHA A. REIN JR. DB 3493 PG 310 PIN 07141025 \ \ \ DONNELL�CARLTON CAMERON IC A D \ \\ \ DB 3634 PG 699 TREE SAVE \ I \\ \\ PIN 07141022 REA / I (t \; l 10 \ L S I VYF TYEEG ) �i EXISTING \ \ \ POND W REVOCABLE LIVING TRUST -- \ $\ \ \\ DB4680PG414 \ _ � PIN 07141020 A \ ° BUFFER DSCAPE I NOTE: THE PHASE I MEASURES SHOWN ON THE PLANS REFLECT THE IN PLACE EROSION CONTROL NECESSARY TO ALLOW THE SITE TO BE CLEARED AND GRUBBED IN PREPARATION FOR THE INITIAL STAGE OF THE GRADING WORK. THE PHASE II MEASURES DEPICTED ON THE PLANS SHOW THE IN PLACE EROSION CONTROLS THAT WILL REMAIN AT THE COMPLETION OF THE FINAL STAGE OF THE GRADING WORK REQUIRED BY THE PROJECT. DURING EACH INTERIM STAGE OF THE GRADING WORK, THE CONTRACTOR SHALL BE REQUIRED TO INSTALL ANY ADDITIONAL TEMPORARY MEASURES THAT MAY BE NECESSARY TO CONTROL SEDIMENT AND EROSION THAT OCCURS AS A RESULT OF CHANGES TO THE EXISTING GROUND ELEVATION CONTOURS. AS DIRECTED BY THE TOWN OF STALLINGS OR STATE INSPECTORS. EROSION CONTROL INSPECTION SCHEDULE THE PERSON RESPONSIBLE FOR LAND DISTURBING ACTIVITIES MUST INSPECT TH E SEDIMENT AND EROSION CONTROL MEASURES ON A PROJECT AFTER EACH PHASE TO ENSURE THE APPROVED PLAN IS BEING FOLLOWED, AT A MINIMUM, THE INSPECTIONS SHALL BE PERFORMED AFTER EACH OF THE FOLLOWING PHASES OF A PLAN: a. INSTALLATION OF PERIMETER EROSION AND SEDIMENT CONTROL MEASURES. b. INSTALLATION OF SEDIMENT TRAPS /BASINS. c CLEARING AND GRUBBING OF EXISTING GROUND COVERS. d. COMPLETION OF ANY PHASE OF GRADING THAT REQUIRES PROVISION OF STABILIZATION. e. INSTALLATION OF MEASURES DURING ANY PHASE OF THE PROJECT. f. COMPLETION OF CONSTRUCTION OR DEVELOPMENT. g. INSTALLATION OF STORMWATER RETENTION MEASURES. h. QUARTERLY UNTIL THE ESTABLISHMENT OF PERMANENT GROUND COVER IS FULLY ESTABLISHED. * 1699 FOR ADDITIONAL INFORMATION A \0 \ l \ 9 9 \ 9 \ \ 1.11RCP BYARD GORDON CLEMMONS DB 5719 PG 006 PIN 07141001E EROSION CONTROL LEGEND -1111411111 SILT FENCE OUTLET INDIVIDUAL LOT EROSION CONTROL MEASURES LOT# TYPE LOT# TYPE LOT# TYPE INLET PROTECTION 1 B 19 C 37 B 2 B 20 C 38 B 3 B 21 C 39 B FILTER BERM 4 B 22 C 40 B CHECK DAM 5 B 23 C 41 B 6 B 24 C 42 B -BERM -BERM PERIMETER BERM 7 B 25 C 43 B - SF- SF -SF- SILT FENCE 8 B 26 B 44 B -Tp -Tp -Tp - TREE PROTECTION 9 C 27 B 45 B -LD U) - LIMITS OF DISTURBANCE 10 C 28 B 46 B WOODED AREA 11 C 29 B 47 B 12 C 30 8 48 B DIVERSION DITCH 13 C 31 B 49 B 14 C 32 B 50 B CONSTRUCTION ENTRANCE 15 C 33 B 51 B 16 C 34 B 52 B 17 C 35 C 53 B 18 C 36 C 54 B * See sheet D -5 for Individual Lot Erosion Control Measures.Mrm GRAPHIC SCALE 60 0 30 60 120 1 inch = 60 ft. FINAL DRAWING - NOT RELEASED FOR CONSTRUCTION alap� Z t7 N Zli Q Ch � V O• 01 �y% c AL 035 4 0. `e�n�'GL1 .... X�,,: b 3 0 9 ? a z ° iR5 F3~ 6 W 6 = Cl =y N p s Z iy •� g1 b n .°� S i` � W cat W U d Ox o x ;" 0 � z�U r� W x � T.W., E EVIZ �+ x E" E W � E z °a �n 0 � O U ppq . d a 0 'w 1 z 00 U O0 0 � ^ W PROJECT NO- MRH -13040 PR.ERAM MRH13040 -EC2 CRBCEED BY: RMR DRAWN BY: CM /JL /RMR scACE: 07' •256 . DATE: 2014 SUET NO. C -7 'JI MCADAMS EROSION CONTROL NOTES INDIVIDUAL LOT EROSION CONTROL MEASURES 1. SOIL STABILIZATION SHALL BE ACHIEVED ON ANY AREA OF A SITE WHERE LAND- DISTURBING ACTIVITIES HAVE TEMPORARILY OR PERMANENTLY CEASED LOT# TYPE LOT# TYPE LOT# TYPE ACCORDING TO THE FOLLOWING SCHEDULE: 1 B 19 C 37 B a. ALL PERIMETER DIKES, SWALES, DITCHES, PERIMETER SLOPES AND ALL SLOPES GREATER THAN 3 HORIZONTAL TO 1 VERTICAL (3:1) SHALL BE 2 B 20 C 38 B PROVIDED TEMPORARY OR PERMANENT STABILIZATION WITH GROUND COVER 3 B 21 C 39 B AS SOON AS PRACTICAL BUT IN ANY EVENT WITHIN 7 CALENDAR DAYS FROM THE LAST LAND- DISTURBING ACTIVITY. 4 B 22 C 40 B b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ee sheet D -5 for Individual Lot Erosion Control Measures. PIN 07141114 DRAINAGE FACILITIES. 7. PROPERTIES AND RIGHT -OF -WAY ADJOINING THE SITE SHALL BE KEPT CLEAN OF MUD OR SILT CARRIED FROM THE SITE BY VEHICULAR TRAFFIC OR RUNOFF. 8. ALL CONSTRUCTION TRAFFIC SHALL ENTER AND EXIT THE SITE VIA THE I CONSTRUCTION ENTRANCES. til 9. EXCAVATED MATERIAL FROM TRENCHES SHALL BE PLACED ON THE UPGRADE I 9 SIDE OF THE TRENCH TO ALLOW MATERIAL TO ERODE INTO THE TRENCH. \ I - CONSTRUCTION MAINTENANCE AND REMOVAL OF ALL EROSION CONTROL DEVICES ARE THE RESPONSIBILITY OF GRADING CONTRACTOR UNLESS \ \ t I t I OTHERWISE NOTED. n II I ( g 10. NO OFF -SITE BORROW AREAS SHALL BE UTILIZED DURING GRADING OF THE I SITE. ALL FILL SHALL BE OBTAINED WITHIN LIMITS OF DISTURBANCE SHOWN ) ( I I LIMITS OF ON PLANS. I ( i DISTURBANCE y 11. ON -SITE BURIAL PITS REQUIRE AN ON -SITE DEMOLITION LANDFILL PERMIT IJ I I 9 FROM THE ZONING ADMINISTRATOR. I °' 9" I I I (TYP-) 12. NO OPEN BURNING ALLOWED. { I 13. ALL TREES & BRUSH REMOVED DURING CLEARING & GRUBBING OF SITE SHALL BE CHIPPED ON SITE AND HAULED OFF SITE FOR DISPOSAL. I I I I 14. ANY GRADING BEYOND THE DENUDED LIMITS SHOWN ON THE PLAN IS IN VIOLATION OF THE CITY /COUNTY EROSION CONTROL ORDINANCE AND IS SUBJECT TO A FINE. III II I g \ 15. MAINTAIN MINIMUM 10' CLEAR ZONE FROM TOP OF CHANNEL BANK TOI DENUDED LIMITS. 16. GRADING MORE THAN ONE ACRE WITHOUT AN APPROVED EROSION CONTROL I PLAN IS A VIOLATION OF THE DENR EROSION CONTROL ORDINANCE AND IS I I I 9 SUBJECT TO A FINE. III I I I 17. ADDITIONAL MEASURES TO CONTROL EROSION AND SEDIMENT MAY BE I I I CHECK DAM \ REQUIRED BY A REPRESENTATIVE OF THE TOWN OF STALLINGS OR NC I DENR ENGINEERING DEPARTMENT. M 18. SLOPES SHALL BE GRADED NO STEEPER THAN 2:1. FILL SLOPES GREATER I THAN 10' REQUIRE ADEQUATE TERRACING. 19. A GRADING PLAN MUST BE SUBMITTED FOR ANY LOT GRADING EXCEEDING 9 \ ONE ACRE THAT WAS NOT PREVIOUSLY APPROVED. I I \ I JOHN HOWARD FAISON IV 20. TEMPORARY DRIVEWAY PERMIT FOR CONSTRUCTION ENTRANCES IN NCDOT I DB 1162 PG 684 RIGHT OF WAY MUST BE PRESENTED AT PRE - CONSTRUCTION MEETING. I I I I FILTER BERM PIN 07141001 21. THE APPROXIMATE AREA OF THE LIMITS OF CLEARING, GRADING, AND II ^ i i I 9 (NP•) \ \ \ CONSTRUCTION IS 19 ACRES. CONSTRUCTION SEQUENCE: 3I 1 1. OBTAIN GRADING EROSION CONTROL PLAN APPROVAL FROM NORTH N I ( w I \ CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES. 2. SET UP AN ON -SITE PRE - CONSTRUCTION CONFERENCE WITH NC DENR HENRY 0. AND 02 J I Emd DEPARTMENT (704-821 L03I15)HTOR DISCUSS EROSION CONTROLS MEASURES. ELPIN 07141001D S a::) 3. APPLY FOR AND OBTAIN DRIVEWAY PERMITS. UPON OBTAINING DRIVEWAY I I 9 PERMITS, INSTALL GRAVEL CONSTRUCTION ENTRANCE IN ACCORDANCE WITH DETAILS PROVIDED. 4. PRIOR TO CONSTRUCTION OF SEDIMENT BASIN #2, THE EXISTING SEWER I / BETWEEN (AND INCLUDING) EX. MH -14 THROUGH EX. MH -16 MUST BE I 9 / WORKSED /RELOCATED AND ACCEPTED BY THE UNION COUNTY PUBLIC 5. INSTALL SILT FENCE, INLET PROTECTION, SEDIMENT BASIN, DIVERSION 'I I I I LIMITS OF DITCHES, TREE PROTECTION, TEMPORARY STREAM CROSSINGS AND OTHER II I DISTURBANCE / MEASURES AS SHOWN ON PHASE 1 PLANS, CLEARING ONLY AS NECESSARY III I n 9 (TYP) TO INSTALL THESE DEVICES. THIS IS TO INCLUDE THE EROSION CONTROL MEASURES ALONG CHESTNUT LANE FOR THE CONSTRUCTION OF THE TURN (I / LANE AND ROAD IMPROVEMENTS. I 6. CLEAN WATER DIVERSION DITCHES MUST BE MATTED AND STABILIZED , IMMEDIATELY AFTER CONSTRUCTION. 7. IN CONJUNCTION WITH THE EXTERNAL WIRE AND GRAVEL INLET PROTECTION, \ / I 9 / SILT SACKS, OR SIMILAR INLET PROTECTION MEASURES, SHALL BE I S \/ PROPERTY LINE PROVIDED IN ALL STORM INLETS NOT DISCHARGING TO A SEDIMENT BASIN. I i - - - - (TYP.) 8. CALL FOR ON -SITE INSPECTION BY INSPECTOR. UPON APPROVAL BY INSPECTOR CLEARING & GRUBBING MAY BEING. j 9 \ / 9. LIMIT CLEARING AND GRUBBING OF SITE TO AREAS THAT WILL BE MASS I / GRADED IN PHASE 1. WHENEVER POSSIBLE, EXISTING VEGETATION SHALL J REMAIN IN PLACE TO PREVENT EROSION OF SITE. 10. ANY OFF -SITE BORROW AND /OR WASTE REQUIRED FOR THIS PROJECT MUST COME FROM AN APPROVED EROSION CONTROL PLAN SITE, A SITE REGULATED UNDER THE MINING ACT OF 1971, OR A LANDFILL REGULATED BY THE DIVISION OF SOLID WASTE MANAGEMENT. DEBRIS FROM DEMOLITION ACTIVITIES SHOULD BE DISPOSED OF AT AN APPROVED FACILITY. 11. BEGIN GRADING ACTIVITIES AS SHOWN IN PHASE 1. AS SITE IS GRADED, ELAINE A. NICHOLS T I I I I 53 I E9 B" CONTRACTOR SHALL MINIMIZE THE AMOUNT OF STORM WATER FLOWING PIN 07141001E I I i 54 I I TYPE "B" TyP€ B\ TYPEy "6" /T)YP OVER FILL SLOPES BY USING DIVERSION DITCHES AND SLOPE DRAINS. II I I TYPE "B" ' TYPE DITCHES AND SLOPE DRAINS SHOWN ON PLANS DEPICT REQUIRED DIVERSION DITCHES AND SLOPE DRAINS AT FINAL PAD GRADE. ADDITIONAL MEASURES MAY BE NEEDED AS GRADING PROGRESSES. 12. MAINTAIN AND ADJUST E &SC MEASURES AS MASS GRADING PROGRESSES TO MAINTAIN PROPER E &SC CONTROL. 13. INSTALL STORM WATER COLLECTION SYSTEM, VELOCITY DISSIPATERS AND DONALD E. AND - PROTECT INLETS WITH SILT FENCE, GRAVEL FILTERS, SILT TRAPS OR OTHER KATHLEEN F. GOESSEL - APPROVED MEASURES AS SHOWN ON THE PLANS. PIN 07141001J 14. THE CONTRACTOR SHALL DILIGENTLY AND CONTINUOUSLY MAINTAIN ALL EROSION CONTROL DEVICES AND STRUCTURES. INSPECT ONCE PER WEEK I °' - 11 LIC NOTE: THE PHASE I MEASURES SHOWN ON THE PLANS REFLECT THE IN PLACE EROSION CONTROL NECESSARY TO ALLOW THE SITE TO BE CLEARED AND GRUBBED IN PREPARATION FOR THE INITIAL STAGE OF CHESTNUT SUBDIVISION, PHASE 2 THE GRADING WORK. THE PHASE II MEASURES DEPICTED ON THE PB. H PG. 251 ( PLANS SHOW THE IN PLACE EROSION CONTROLS THAT WILL REMAIN LOT 51 ' AT THE COMPLETION OF THE FINAL STAGE OF THE GRADING WORK \ PIN 07141107 REQUIRED BY THE PROJECT. DURING EACH INTERIM STAGE OF THE GRADING WORK, THE CONTRACTOR SHALL BE REQUIRED TO INSTALL \ - \ ANY ADDITIONAL TEMPORARY MEASURES THAT MAY BE NECESSARY TO CONTROL SEDIMENT AND EROSION THAT OCCURS AS A RESULT OF CHANGES TO THE EXISTING GROUND ELEVATION CONTOURS. AS DIRECTED BY THE TOWN OF STALLINGS OR STATE INSPECTORS. / / \ EROSION CONTROL INSPECTION SCHEDULE qUT SUBDIVISION, PHASE 2 THE PERSON RESPONSIBLE FOR LAND DISTURBING ACTIVITIES MUST /I �7 / \ INSPECT THE SEDIMENT AND EROSION CONTROL MEASURES ON A PB. H PG. 251 �' \\ \ PROJECT AFTER EACH PHASE TO ENSURE THE APPROVED PLAN IS LOT 57 // I \ \� \woe \ J BEING FOLLOWED. AT A MINIMUM, THE INSPECTIONS SHALL BE \ / \ \ \ PERFORMED AFTER EACH OF THE FOLLOWING PHASES OF A PLAN: a. INSTALLATION OF PERIMETER EROSION AND SEDIMENT CONTROL MEASURES. b. INSTALLATION OF SEDIMENT TRAPS /BASINS. c. CLEARING AND GRUBBING OF EXISTING GROUND COVERS. d. COMPLETION OF ANY PHASE OF GRADING THAT REQUIRES PROVISION OF STABILIZATION. /'x \ \ e. INSTALLATION OF MEASURES DURING ANY PHASE OF THE ,SE 2 / A 39 f A A PROJECT. TYPE "B , It l' \ f. COMPLETION OF CONSTRUCTION OR DEVELOPMENT. g. INSTALLATION OF STORMWATER RETENTION MEASURES. h. QUARTERLY UNTIL THE ESTABLISHMENT OF PERMANENT GROUND COVER IS FULLY ESTABLISHED. ' 'e / /` / 40 *CONTACT NCDENR AT (704)663 -1699 FOR ADDITIONAL INFORMATION TYPE "B" /> , / \ / ANDY EXISTING EASEMENTS TO BE ABANDONED MUST BE APPROVED BY THE BOARD OF COUNTY COMMISSIONERS, UNION COUNTY DOES NOT HAVE THE AUTHORITY TO DO SO. TYPE "� / / / / / / SILT FENCE OUTLET 4 / / / / / / // .. ROTECTION (TYP.) TYPE �B" / / TYPE ^C% / I I INL PRO'TECTIO '�/ l� \ � / / / \ I ( \ W/ SILT SACK / // / / '\ \/\ / // / �\i% // /// / / /.�.:::f'''a . / \ \. L TYP. TOTAL I 42 oTBFE Row DISTUMEDMENMED TYPf"B" \ ' i / / / / /f :SILT FENCE \ \ / / , / / / / / (TYP.) ... AREA = 17.45* AC. /. . . . . . 7: 7 - / / - - / / / ROSED 100 / ~ /�/ j PO YE I AR F)_QOD PLAIN \ 43 / // / / i/ �/ l' \ TYPE "BI' L / INLET ROTECTION 747 . . . W/ SILT SACK / 49 / / J/ / / / w W pq 7 PE . . . . .. al .. ' � .. j)w / ITYP2 O\EC-� - - - / -� 4 IYY / ROPOSED 100 / B,) 1 !; / d/- - 7-/- J Lr _l I / YEAR FLOOD PLAIN TREE SAVE BANK r EROSION CONTROL LEGEND 0/ETLANDSI' . (TYP.) SILT FENCE OUTLET ti _.__. _ _- -�/ � •. CENTERLINE l OF CREEK I 0 I I �: ' � INLET PROTECTION AND AFTER EACH RAINFALL. 15. STABILIZE SITE AS AREAS ARE BROUGHT TO GRADE. SEDIMENT BASIN #1 / [ / _ _ - - \ \ \ \ AND SEDIMENT BASIN #2 SHALL BE CONVERTED OVER TO PERMANENT e I _ _ _ _ _ - _ - - - - - - - -C - \\ , I \ \ \ \ \ \ \ S . '.:. ' FILTER BERM WATER QUALITY FACILITY AFTER THE ENTIRE SITE HAS BEEN STABILIZED. I _ _ ' - - - - - - NL�T PROTECTIO \ \ I �\ 1 dOL Rd \ FAILURE TO DO SO COULD CAUSE THE PLANTED PLANTS IN POND TO DIE I - \ W/ SILT SACK I \ - - - - ^ \ SILT FENCE CHECK DAM WHEN INUNDATED WITH SILT. S I \ I TYP.) I \ \ \ TYP.) ` 16. SEDIMENT BASIN #1 AND SEDIMENT BASIN #2 ARE TO BE INCREASED IN - I ��- I \ \ \ \ _ DEPTH TO THE DESIGNED ELEVATIONS SHOWN IN THE STORMWATER \ I I I \\ \ - BERM -BERM PERIMETER BERM MANAGEMENT FACILITY PLANS \ EX. RED BARN \ I O I O I 17. SEDIMENT BASINS SHALL NOT BE REMOVED OR CONVERTED TO 1I 1 \ TRAIL \\ \ \ 4 \\ 5 O I \ I TYPE B" ( ^ \ - SF -sF -- SILT FENCE POST - CONSTRUCTION STORM WATER PONDS UNTIL AFTER ROADS HAVE I O TYPE ^g^ TYPE ^B "/ I -- I A \ - .p- Tp -Tp- \ ` 1I j \ (VARIABLE PUBLIC R /W) I �Q 1 \ \ TYPE „B^ ` TREE PROTECTION BEEN BUILT AND STABILIZED AND UNTIL APPROVED BY THE LAND QUALITY \ \ v TYPE „B„ I TC\ „Ba \ \ I I \ \ \ \ SECTION INSPECTOR. I \ 18. INLET PROTECTION MUST REMAIN IN PLACE WITHIN WORK AREA UNTIL ALL \ I AREAS OF THE PROJECT ARE STABILIZED. \ \ TYPE "e^ 19. COORDINATE WITH EROSION CONTROL INSPECTOR FROM THE LAND QUALITY \ I I I _ SECTION OF NCDENR AND LYNNE HAIR AT THE TOWN OF STALLINGS PLANNING DEPARTMENT (704- 821 -0315) PRIOR TO REMOVAL OF EROSION CONTROL MEASURES. 20. ALL EROSION CONTROL MEASURES SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE N.C. EROSION AND SEDIMENT CONTROL PLANNING - - - \ PROPERTY AND DESIGN MANUAL. CHANG YUNG KI \ \ \� 9 LINE (TYP.) 21. WHEN VEGETATION IS ESTABLISHED, CALL FOR FINAL SITE INSPECTION. IF AND SOON SUN LIMITS OF \\ \ \ THE SITE IS APPROVED THE PERFORMANCE BOND, IF REQUIRED, WILL BE PIN 07141016A \\ \ \ \ DISTURBANCE RELEASED. \ \ \ \\ \ \ \ TYP.) I 9 \e GREGORY SETH LEONARD \ \ \ \ DB 6234 PG 721 I \\ \ 9 PIN 07141001E MATCH LINE - SEE SHEET C -7C SILT FENCE OUTLET -LD LD - LIMITS OF DISTURBANCE PROTECTION (TYP.) ` WOODED AREA DIVERSION DITCH REVOCABLE LIVING TRUST ` CONSTRUCTION ENTRANCE DB 4680 PG 414 PIN 07141020 ` GRAPHIC SCALE 50 0 25 50 100 1 inch = 50 ft. FINAL DRAWING - NOT RELEASED FOR CONSTRUCTION OW U rm z °$ gh 0 � V rv^ VJ � V L =,qk .664 . nREVV% U s i5 b a a z i w 3 g wei IN 5 8 y o z p (/j (y K N iV ♦ b z ��aaaai° 5 N N N s s N N i` co W CV Vj o z O x cod E- ° d x z- E�E z x P= E" F W p E- z a k m U d 00 H W 0 W a° W PR07ECT N0. MRH -13040 FftxNA)'E:MRH13040 -EC2 CHECKED BY: RMR DHA11N HY: CM /JL /RMR SCALE: 1 " =50' DATE: 07 -25 -2014 SHEET N0. C -7A M MCADAMS EROSION CONTROL NOTES: 1. SOIL STABILIZATION SHALL BE ACHIEVED ON ANY AREA OF A SITE WHERE LAND- DISTURBING ACTIVITIES HAVE TEMPORARILY OR PERMANENTLY CEASED ACCORDING TO THE FOLLOWING SCHEDULE: a. ALL PERIMETER DIKES, SWALES, DITCHES, PERIMETER SLOPES AND ALL SLOPES GREATER THAN 3 HORIZONTAL TO 1 VERTICAL (3:1) SHALL BE PROVIDED TEMPORARY OR PERMANENT STABILIZATION WITH GROUND COVER AS SOON AS PRACTICAL BUT IN ANY EVENT WITHIN 7 CALENDAR DAYS FROM THE LAST LAND- DISTURBING ACTIVITY. b. ALL OTHER DISTURBED AREAS SHALL BE PROVIDED TEMPORARY OR PERMANENT STABILIZATION WITH GROUND COVER AS SOON AS PRACTICAL BUT IN ANY EVENT WITHIN 14 CALENDAR DAYS FROM THE LAST LAND- DISTURBING ACTIVITY. 2. SEEDING OF AREAS GRADED SHALL BE IN ACCORDANCE WITH NORTH CAROLINA EROSION AND SEDIMENT CONTROL DESIGN MANUAL. 3. REPRESENTATIVES OF THE NC DENR OR THE TOWN OF STALLINGS ENGINEERING DEPARTMENT MAY REVIEW AND EVALUATE THE METHODS USED AND THE OVERALL EFFECTIVENESS OF THE EROSION CONTROL PROGRAM. THE APPROVED EROSION AND SEDIMENT CONTROL PLAN MAY BE AMENDED BY THE APPROVING AUTHORITY IF AN ON SITE INSPECTION INDICATED THAT THE APPROVED CONTROL MEASURES ARE NOT EFFECTIVE IN CONTROLLING EROSION AND SEDIMENTATION OR IF BECAUSE OF CHANGED CIRCUMSTANCES THE APPROVED PLAN CANNOT BE CARRIED OUT. 4. CONTRACTOR SHALL LOCATE AND VERIFY THE LOCATION OF ALL UTILITIES PRIOR TO BEGINNING CONSTRUCTION. 5. THE CONTRACTOR SHALL NOTIFY NORTH CAROLINA ONE CALL CENTER (811) OR 1- 800 -632 -4949 BEFORE BEGINNING ANY EXCAVATION OR UTILITY WORK. CONTACT UNION COUNTY FOR LOCATING EXISTING WATER AND SEWER LINES. 6. EROSION AND SEDIMENT CONTROL PRACTICES SHALL BE MAINTAINED SO THAT SEDIMENT CARRYING RUNOFF FROM THE SITE WILL NOT ENTER STORM DRAINAGE FACILITIES. 7. PROPERTIES AND RIGHT -OF -WAY ADJOINING THE SITE SHALL BE KEPT CLEAN OF MUD OR SILT CARRIED FROM THE SITE BY VEHICULAR TRAFFIC OR RUNOFF. 8. ALL CONSTRUCTION TRAFFIC SHALL ENTER AND EXIT THE SITE VIA THE CONSTRUCTION ENTRANCES. 9. EXCAVATED MATERIAL FROM TRENCHES SHALL BE PLACED ON THE UPGRADE SIDE OF THE TRENCH TO ALLOW MATERIAL TO ERODE INTO THE TRENCH. CONSTRUCTION MAINTENANCE AND REMOVAL OF ALL EROSION CONTROL DEVICES ARE THE RESPONSIBILITY OF GRADING CONTRACTOR UNLESS OTHERWISE NOTED. 10. NO OFF -SITE BORROW AREAS SHALL BE UTILIZED DURING GRADING OF THE SITE. ALL FILL SHALL BE OBTAINED WITHIN LIMITS OF DISTURBANCE SHOWN ON PLANS. 11. ON -SITE BURIAL PITS REQUIRE AN ON -SITE DEMOLITION LANDFILL PERMIT FROM THE ZONING ADMINISTRATOR. 12. NO OPEN BURNING ALLOWED. 13. ALL TREES & BRUSH REMOVED DURING CLEARING & GRUBBING OF SITE SHALL BE CHIPPED ON SITE AND HAULED OFF SITE FOR DISPOSAL. 14. ANY GRADING BEYOND THE DENUDED LIMITS SHOWN ON THE PLAN IS IN VIOLATION OF THE C11Y /COUN1`Y EROSION CONTROL ORDINANCE AND IS SUBJECT TO A FINE. 15. MAINTAIN MINIMUM 10' CLEAR ZONE FROM TOP OF CHANNEL BANK TO DENUDED LIMITS. 16. GRADING MORE THAN ONE ACRE WITHOUT AN APPROVED EROSION CONTROL PLAN IS A VIOLATION OF THE DENR EROSION CONTROL ORDINANCE AND IS SUBJECT TO A FINE. 17. ADDITIONAL MEASURES TO CONTROL EROSION AND SEDIMENT MAY BE REQUIRED BY A REPRESENTATIVE OF THE TOWN OF STALLINGS OR NC DENR ENGINEERING DEPARTMENT. 18. SLOPES SHALL BE GRADED NO STEEPER THAN 2:1. FILL SLOPES GREATER THAN 10' REQUIRE ADEQUATE TERRACING. 19. A GRADING PLAN MUST BE SUBMITTED FOR ANY LOT GRADING EXCEEDING ONE ACRE THAT WAS NOT PREVIOUSLY APPROVED. 20. TEMPORARY DRIVEWAY PERMIT FOR CONSTRUCTION ENTRANCES IN NCDOT RIGHT OF WAY MUST BE PRESENTED AT PRE - CONSTRUCTION MEETING. 21. THE APPROXIMATE AREA OF THE LIMITS OF CLEARING, GRADING, AND CONSTRUCTION IS 19 ACRES. CONSTRUCTION SE UENCE: 1. OBTAIN GRADING EROSION CONTROL PLAN APPROVAL FROM NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES. 2. SET UP AN ON -SITE PRE- CONSTRUCTION CONFERENCE WITH NC DENR PLANNING DEPARTMENT (704-821 -0311 5)HTO DISCUSS EROSION ONTRIOLSMEASURES. 3. APPLY FOR AND OBTAIN DRIVEWAY PERMITS. UPON OBTAINING DRIVEWAY PERMITS, INSTALL GRAVEL CONSTRUCTION ENTRANCE IN ACCORDANCE WITH DETAILS PROVIDED. 4. PRIOR TO CONSTRUCTION OF SEDIMENT BASIN #2, THE EXISTING SEWER BETWEEN (AND INCLUDING) EX. MH -14 THROUGH EX. MH -16 MUST BE REMOVED /RELOCATED AND ACCEPTED BY THE UNION COUNTY PUBLIC WORKS. 5. INSTALL SILT FENCE, INLET PROTECTION, SEDIMENT BASIN, DIVERSION DITCHES, TREE PROTECTION, TEMPORARY STREAM CROSSINGS AND OTHER MEASURES AS SHOWN ON PHASE 1 PLANS, CLEARING ONLY AS NECESSARY TO INSTALL THESE DEVICES. THIS IS TO INCLUDE THE EROSION CONTROL MEASURES ALONG CHESTNUT LANE FOR THE CONSTRUCTION OF THE TURN LANE AND ROAD IMPROVEMENTS. 6. CLEAN WATER DIVERSION DITCHES MUST BE MATTED AND STABILIZED IMMEDIATELY AFTER CONSTRUCTION. 7. IN CONJUNCTION WITH THE EXTERNAL WIRE AND GRAVEL INLET PROTECTION, SILT SACKS, OR SIMILAR INLET PROTECTION MEASURES, SHALL BE PROVIDED IN ALL STORM INLETS NOT DISCHARGING TO A SEDIMENT BASIN. 8. CALL FOR ON -SITE INSPECTION BY INSPECTOR. UPON APPROVAL BY INSPECTOR CLEARING & GRUBBING MAY BEING. 9. LIMIT CLEARING AND GRUBBING OF SITE TO AREAS THAT WILL BE MASS GRADED IN PHASE 1. WHENEVER POSSIBLE, EXISTING VEGETATION SHALL REMAIN IN PLACE TO PREVENT EROSION OF SITE. 10. ANY OFF -SITE BORROW AND /OR WASTE REQUIRED FOR THIS PROJECT MUST COME FROM AN APPROVED EROSION CONTROL PLAN SITE, A SITE REGULATED UNDER THE MINING ACT OF 1971, OR A LANDFILL REGULATED -BY THE DIVISION OF SOLID WASTE MANAGEMENT. DEBRIS FROM DEMOLITION ACTIVITIES SHOULD BE DISPOSED OF AT AN APPROVED FACILITY. 11. BEGIN GRADING ACTIVITIES AS SHOWN IN PHASE 1. AS SITE IS GRADED, CONTRACTOR SHALL MINIMIZE THE AMOUNT OF STORM WATER FLOWING OVER FILL SLOPES BY USING DIVERSION DITCHES AND SLOPE DRAINS. DITCHES AND SLOPE DRAINS SHOWN ON PLANS DEPICT REQUIRED DIVERSION DITCHES AND SLOPE DRAINS AT FINAL PAD GRADE. ADDITIONAL MEASURES MAY BE NEEDED AS GRADING PROGRESSES. 12. MAINTAIN AND ADJUST E&SC MEASURES AS MASS GRADING PROGRESSES TO MAINTAIN PROPER E &SC CONTROL. 13. INSTALL STORM WATER COLLECTION SYSTEM, VELOCITY DISSIPATERS AND PROTECT INLETS WITH SILT FENCE, GRAVEL FILTERS, SILT TRAPS OR OTHER APPROVED MEASURES AS SHOWN ON THE PLANS. 14. THE CONTRACTOR SHALL DILIGENTLY AND CONTINUOUSLY MAINTAIN ALL EROSION CONTROL DEVICES AND STRUCTURES. INSPECT ONCE PER WEEK AND AFTER EACH RAINFALL. 15. STABILIZE SITE AS AREAS ARE BROUGHT TO GRADE. SEDIMENT BASIN #1 AND SEDIMENT BASIN #2 SHALL BE CONVERTED OVER TO PERMANENT WATER QUALITY FACILITY AFTER THE ENTIRE SITE HAS BEEN STABILIZED. FAILURE TO DO SO COULD CAUSE THE PLANTED PLANTS IN POND TO DIE WHEN INUNDATED WITH SILT. 16. SEDIMENT BASIN #1 AND SEDIMENT BASIN #2 ARE TO BE INCREASED IN DEPTH TO THE DESIGNED ELEVATIONS SHOWN IN THE STORMWATER MANAGEMENT FACILITY PLANS. 17. SEDIMENT BASINS SHALL NOT BE REMOVED OR CONVERTED TO POST- CONSTRUCTION STORM WATER PONDS UNTIL AFTER ROADS HAVE BEEN BUILT AND STABILIZED AND UNTIL APPROVED BY THE LAND QUALITY SECTION INSPECTOR. 18. INLET PROTECTION MUST REMAIN IN PLACE WITHIN WORK AREA UNTIL ALL AREAS OF THE PROJECT ARE STABILIZED. 19. COORDINATE WITH EROSION CONTROL INSPECTOR FROM THE LAND QUALITY SECTION OF NCDENR AND LYNNE HAIR AT THE TOWN OF STALLINGS PLANNING DEPARTMENT (704- 821 -0315) PRIOR TO REMOVAL OF EROSION CONTROL MEASURES. 20. ALL EROSION CONTROL MEASURES SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE N.C. EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL. 21. WHEN VEGETATION IS ESTABLISHED, CALL FOR FINAL SITE INSPECTION. IF THE SITE IS APPROVED THE PERFORMANCE BOND, IF REQUIRED, WILL BE RELEASED. \CHESTNUT HOMEOWNERS ASSOCIATION, ING PIN 07141006 CHESTNUT SUBDIVISION, PHASE 2 I� /� PB. H PG. 251 EX. YARROW STREET LOT 07 41 , ° 7 ; ;, TQP OF � PIN 07141106 / �� � � i � � BANK 50 PUBLIC R/W / r \ CHESTNUT SUBDIVISION, PHASE 2\ PB.LOT . 251 \ b j / \\ \ 1 / / 20' PERMANENT PIN 07141107 % SEWER EASEMENT � p 36 \ h �� D.B 3731, PG. 440 �/ i \ \ / % X: • l / OPO�ED 100 YEAR /FLOOD PLAIN INDIVIDUAL LOT EROSION CONTROL MEASURES LOT# TYPE LOT# TYPE LOT# TYPE 1 B 19 C 37 B 2 B 20 C 38 B 3 B 21 C 39 B 4 B 22 C 40 B 5 B 23 C 41 B 6 B 24 C 42 B 7 B 25 C 43 B 8 B 26 B 44 B 9 C 27 B 45 B 10 C 28 B 46 B 11 C 29 B 47 B 12 C 30 B 48 B 13 C 31 B 49 B 14 C 32 B 50 B 15, C 33 B 51 B 16 C 34 B 52 B 17 C 35 C 53 B 18 C 36 C 54 B * See sheet D -5 for Individual Lot Erosion Control Measures LIMITS OF \ 7 / J f' / i / DISTURBANCE TYP.) VET (TYP.) YARROW STREET 'g3/ !/ / 50' PUBLIC R/W DUKE POWER / DUKE ENERGY CORPORATION PIN 07141007A TYPE ,IB" I DOUBLE ROW I 'I/ 3 \\ SILT FENCE (TYP.) TYPE PROPERTY LINE L- ''' ` INLET PROTECTION I (TYP,) SILT FENCE OUTLET I - € a `" \ \ \� \ \ W/ SILT SACK \ PROTECTION (TYP.) RETAINING WALL (BY OTHERS) g } \I \ \ I I \ r \ / T ✓ l•: RIP RAP'AF�RON 'PER . � / ! / \ \ / \ \ \ \ STD. 876.02. (SEE DETAIL). .1. 1 // I \ \ \ \ \ \ / ! / TYPE \ A \ \ \ \ /'.'.:.:.:. \ k \ * \ DOUBLE. ROW. :::::::: •:; : ;SILT : FEN>rE ::.:: �' I ' � \ ` �2 V6 �: :. (�P) .•.E:: '•� \ \ \� \ \HYPE \ "G1 is y \ E \�\ `� \/ TYPE "O" .... \. �. I ::: :.: \I�\ TYP ' \ l is / W: : . • : • . TYPE "B" \ DEDICF W • \ \ I \ \ \ I ET PROTECTION \ / TREE �:•:•:•:•:•: � :•: W SILT SACK RE � (TYP.) m \ - ^I is :�.: •... \'•'I :ff:j.1 \ \ ; \ \ \ Y\ l .' \ \ \ \ \\ iYPE�76" \ - ,� r is '•:•::•:•'• ":•:� .....'•' \:•:;'1':�' k: \t \ \ \� I � \ \ \ � NOTE: THE PHASE I MEASURES SHOWN ON THE PLANS REFLECT THE IN PLACE EROSION CONTROL NECESSARY TO ALLOW THE SITE TO BE CLEARED AND GRUBBED IN PREPARATION FOR THE INITIAL STAGE OF THE GRADING WORK. THE PHASE II MEASURES DEPICTED ON THE PLANS SHOW THE IN PLACE EROSION CONTROLS THAT WILL REMAIN AT THE COMPLETION OF THE FINAL STAGE OF THE GRADING WORK REQUIRED BY THE PROJECT. DURING EACH INTERIM STAGE OF THE GRADING WORK, THE CONTRACTOR SHALL BE REQUIRED TO INSTALL ANY ADDITIONAL TEMPORARY MEASURES THAT MAY BE NECESSARY TO CONTROL SEDIMENT AND EROSION THAT OCCURS AS A RESULT OF CHANGES TO THE EXISTING GROUND ELEVATION CONTOURS. AS DIRECTED BY THE TOWN OF STALLINGS OR STATE INSPECTORS. EROSION CONTROL INSPECTION SCHEDULE THE PERSON RESPONSIBLE FOR LAND DISTURBING ACTIVITIES MUST INSPECT THE SEDIMENT AND EROSION CONTROL MEASURES ON A PROJECT AFTER EACH PHASE TO ENSURE THE APPROVED PLAN IS BEING FOLLOWED. AT A MINIMUM, THE INSPECTIONS SHALL BE PERFORMED AFTER EACH OF THE FOLLOWING PHASES OF A PLAN: a. INSTALLATION OF PERIMETER EROSION AND SEDIMENT CONTROL MEASURES. b. INSTALLATION OF SEDIMENT TRAPS /BASINS. c. CLEARING AND GRUBBING OF EXISTING GROUND COVERS. d. COMPLETION OF ANY PHASE OF GRADING THAT REQUIRES PROVISION OF STABILIZATION. e. INSTALLATION OF MEASURES DURING ANY PHASE OF THE PROJECT. f. COMPLETION OF CONSTRUCTION OR DEVELOPMENT. g. INSTALLATION OF STORMWATER RETENTION MEASURES. h. QUARTERLY UNTIL THE ESTABLISHMENT OF PERMANENT GROUND COVER IS FULLY ESTABLISHED. *CONTACT NCDENR AT (704)663 -1699 FOR ADDITIONAL INFORMATION LENNAR CAROLINAS, LLC DB 4305 PG 730 PIN 07141008 I I I I I i I I _ I I I I I / I � / I / FI.l�yy r.'_':'.".'.'.'��.'.'l.' /'.'. TYPE "CSC -CHRISTOPHER G. MOWBRAY ✓:.�_ :: � � / \ \ � \✓ \ � _ � i � \ \ PIN 07141026 PROPERTY LINE \ \ 013 ROW TYRE ----- - - - - -- D \ \ ----- - - - - -- I IL T FENCE �� `- I ARTHUR P. AND (TYP. \ DOUBLE ROW MARTHA A. REIN JR. SILT FENCE ( DB 3493 PG 310 (TYP.) I PIN 07141025 LIMITS OFD EXISTING CREEK RA AP ON R \ \ \ \ DISTURBANCE BUFFER NCDOT STD. 876.02 (SEE DETAIL) \ \ \ d LA c{ DE ICAD/ \ \ \\ \\ \ \ \ DON ELLY CARLTON CAMERON TOP OF ( ) \ \ \ I I TREE A SAVE \ \ \ DB 3634 PG 699 BAN RS K \ PIN 07141022 41020 NOTEL ANY EXISTING EASEMENTS TO BE ABANDONED MUST BE APPROVED BY THE BOARD OF COUNTY COMMISSIONERS, UNION COUNTY DOES NOT HAVE THE AUTHORITY TO DO SO. TOTAL DISTURBED /DENUDED AREA = 17.45t AC. EROSION CONTROL LEGEND Ill����ln SILT FENCE OUTLET INLET PROTECTION FILTER BERM moo CHECK DAM - BERM -BERM PERIMETER BERM - SF- SF -SF- SILT FENCE -1p -TP -TP - TREE PROTECTION -LD U) LIMITS OF DISTURBANCE WOODED AREA ==>==>==>==*==* DIVERSION DITCH CONSTRUCTION ENTRANCE iucHJra GRAPHIC SCALE 50 0 25 50 100 FINAL DRAWING - NOT RELAM' FORD ANSTRUCTION 0 �8 00 �► n VJ A i V A " ., F i ' : F��'yc. N, o\G � ,E V w s 3 o d �yalaai i` 9 W CV W� e o� r W E E E U rrn z �Nw Fil ' E WP'. E" z °a d m P. ~ 00 W Y`l 0 O � U 0 0 � a° W PROJECT NO. MRH -13040 FH.ENAKE: MRH13040 -EC2 CHECKED RY: RMR DEAN BY: CM /JL/RMR SCALE: 1"=50' DATE: 07 -25 -2014 SHEET NO. 7 R C- ■ V 'J MCADAMS io L \\ \ I %A \ \ CENTERLINE {:) EXIO \ \ EXISTING \ 20' UTILITY 1 % OF CREEK EASEMENT XISTIN&'CREEK BUFFER ` REVOCABLE LIVING TRUST DB 4680 PG 414 PIN 071 41020 NOTEL ANY EXISTING EASEMENTS TO BE ABANDONED MUST BE APPROVED BY THE BOARD OF COUNTY COMMISSIONERS, UNION COUNTY DOES NOT HAVE THE AUTHORITY TO DO SO. TOTAL DISTURBED /DENUDED AREA = 17.45t AC. EROSION CONTROL LEGEND Ill����ln SILT FENCE OUTLET INLET PROTECTION FILTER BERM moo CHECK DAM - BERM -BERM PERIMETER BERM - SF- SF -SF- SILT FENCE -1p -TP -TP - TREE PROTECTION -LD U) LIMITS OF DISTURBANCE WOODED AREA ==>==>==>==*==* DIVERSION DITCH CONSTRUCTION ENTRANCE iucHJra GRAPHIC SCALE 50 0 25 50 100 FINAL DRAWING - NOT RELAM' FORD ANSTRUCTION 0 �8 00 �► n VJ A i V A " ., F i ' : F��'yc. N, o\G � ,E V w s 3 o d �yalaai i` 9 W CV W� e o� r W E E E U rrn z �Nw Fil ' E WP'. E" z °a d m P. ~ 00 W Y`l 0 O � U 0 0 � a° W PROJECT NO. MRH -13040 FH.ENAKE: MRH13040 -EC2 CHECKED RY: RMR DEAN BY: CM /JL/RMR SCALE: 1"=50' DATE: 07 -25 -2014 SHEET NO. 7 R C- ■ V 'J MCADAMS CONSTRUCTION SEQUENCE: 1. OBTAIN GRADING EROSION CONTROL PLAN APPROVAL FROM NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES. 2. SET UP AN ON -SITE PRE - CONSTRUCTION CONFERENCE WITH NC DENR PLANNING DEPARTMENT (04 821 -0315)HTO DISCUSS EROSION CONTROLS MEASURES. 3. APPLY FOR AND OBTAIN DRIVEWAY PERMITS. UPON OBTAINING DRIVEWAY PERMITS, INSTALL GRAVEL CONSTRUCTION ENTRANCE IN ACCORDANCE WITH DETAILS PROVIDED. 4. PRIOR TO CONSTRUCTION OF SEDIMENT BASIN #2, THE EXISTING SEWER BETWEEN (AND INCLUDING) EX. MH -14 THROUGH EX. MH -16 MUST BE REMOVED /RELOCATED AND ACCEPTED BY THE UNION COUNTY PUBLIC WORKS. 5. INSTALL SILT FENCE, INLET PROTECTION, SEDIMENT BASIN, DIVERSION DITCHES, TREE PROTECTION, TEMPORARY STREAM CROSSINGS AND OTHER MEASURES AS SHOWN ON PHASE 1 PLANS, CLEARING ONLY AS NECESSARY TO INSTALL THESE DEVICES. THIS IS TO INCLUDE THE EROSION CONTROL MEASURES ALONG CHESTNUT LANE FOR THE CONSTRUCTION OF THE TURN LANE AND ROAD IMPROVEMENTS. 6. CLEAN WATER DIVERSION DITCHES MUST BE MATTED AND STABILIZED IMMEDIATELY AFTER CONSTRUCTION. 7. IN CONJUNCTION WITH THE EXTERNAL WIRE AND GRAVEL INLET PROTECTION, SILT SACKS, OR SIMILAR INLET PROTECTION MEASURES, SHALL BE PROVIDED IN ALL STORM INLETS NOT DISCHARGING TO A SEDIMENT BASIN. 8. CALL FOR ON -SITE INSPECTION BY INSPECTOR. UPON APPROVAL BY INSPECTOR CLEARING & GRUBBING MAY BEING. 9. LIMIT CLEARING AND GRUBBING OF SITE TO AREAS THAT WILL BE MASS GRADED IN PHASE 1. WHENEVER POSSIBLE, EXISTING VEGETATION SHALL REMAIN IN PLACE TO PREVENT EROSION OF SITE. 10. ANY OFF -SITE BORROW AND /OR WASTE REQUIRED FOR THIS PROJECT MUST COME FROM AN APPROVED EROSION CONTROL PLAN SITE, A SITE REGULATED UNDER THE MINING ACT OF 1971, OR A LANDFILL REGULATED BY THE DIVISION OF SOLID WASTE MANAGEMENT. DEBRIS FROM DEMOLITION ACTIVITIES SHOULD BE DISPOSED OF AT AN APPROVED FACILITY. 11. BEGIN GRADING ACTIVITIES AS SHOWN IN PHASE 1. AS SITE IS GRADED, CONTRACTOR SHALL MINIMIZE THE AMOUNT OF STORM WATER FLOWING OVER FILL SLOPES BY USING DIVERSION DITCHES AND SLOPE DRAINS. DITCHES AND SLOPE DRAINS SHOWN ON PLANS DEPICT REQUIRED DIVERSION DITCHES AND SLOPE DRAINS AT FINAL PAD GRADE. ADDITIONAL MEASURES MAY BE NEEDED AS GRADING PROGRESSES. 12. MAINTAIN AND ADJUST E &SC MEASURES AS MASS GRADING PROGRESSES TO MAINTAIN PROPER E &SC CONTROL. 13. INSTALL STORM WATER COLLECTION SYSTEM, VELOCITY DISSIPATERS AND PROTECT INLETS WITH SILT FENCE, GRAVEL FILTERS, SILT TRAPS OR OTHER APPROVED MEASURES AS SHOWN ON THE PLANS. 14. THE CONTRACTOR SHALL DILIGENTLY AND CONTINUOUSLY MAINTAIN ALL EROSION CONTROL DEVICES AND STRUCTURES. INSPECT ONCE PER WEEK AND AFTER EACH RAINFALL. 15. STABILIZE SITE AS AREAS ARE BROUGHT TO GRADE. SEDIMENT BASIN #1 AND SEDIMENT BASIN #2 SHALL BE CONVERTED OVER TO PERMANENT WATER QUALITY FACILITY AFTER THE ENTIRE SITE HAS BEEN STABILIZED. FAILURE TO DO SO COULD CAUSE THE PLANTED PLANTS IN POND TO DIE WHEN INUNDATED WITH SILT. 16. SEDIMENT BASIN #1 AND SEDIMENT BASIN #2 ARE TO BE INCREASED IN DEPTH TO THE DESIGNED ELEVATIONS SHOWN IN THE STORMWATER MANAGEMENT FACILITY PLANS. 17. SEDIMENT BASINS SHALL NOT BE REMOVED OR CONVERTED TO POST - CONSTRUCTION STORM WATER PONDS UNTIL AFTER ROADS HAVE BEEN BUILT AND STABILIZED AND UNTIL APPROVED BY THE LAND QUALITY SECTION INSPECTOR. 18. INLET PROTECTION MUST REMAIN IN PLACE WITHIN WORK AREA UNTIL ALL AREAS OF THE PROJECT ARE STABILIZED. 19. COORDINATE WITH EROSION CONTROL INSPECTOR FROM THE LAND QUALITY SECTION OF NCDENR AND LYNNE HAIR AT THE TOWN OF STALLINGS PLANNING DEPARTMENT (704 -821 -0315) PRIOR TO REMOVAL OF EROSION CONTROL MEASURES. 20. ALL EROSION CONTROL MEASURES SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE N.C. EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL. 21. WHEN VEGETATION IS ESTABLISHED, CALL FOR FINAL SITE INSPECTION. IF THE SITE IS APPROVED THE PERFORMANCE BOND, IF REQUIRED, WILL BE RELEASED. EROSION CONTROL NOTES: 1. SOIL STABILIZATION SHALL BE ACHIEVED ON ANY AREA OF A SITE WHERE LAND- DISTURBING ACTIVITIES HAVE TEMPORARILY OR PERMANENTLY CEASED ACCORDING TO THE FOLLOWING SCHEDULE: a. ALL PERIMETER DIKES, SWALES, DITCHES, PERIMETER SLOPES AND ALL SLOPES GREATER THAN 3 HORIZONTAL TO 1 VERTICAL (3:1) SHALL BE PROVIDED TEMPORARY OR PERMANENT STABILIZATION WITH GROUND COVER AS SOON AS PRACTICAL BUT IN ANY EVENT WITHIN 7 CALENDAR DAYS FROM THE LAST LAND- DISTURBING ACTIVITY. b. ALL OTHER DISTURBED AREAS SHALL BE PROVIDED TEMPORARY OR PERMANENT STABILIZATION WITH GROUND COVER AS SOON AS PRACTICAL BUT IN ANY EVENT WITHIN 14 CALENDAR DAYS FROM THE LAST LAND- DISTURBING ACTIVITY. 2. SEEDING OF AREAS GRADED SHALL BE IN ACCORDANCE WITH NORTH CAROLINA EROSION AND SEDIMENT CONTROL DESIGN MANUAL. 3. REPRESENTATIVES OF THE NC DENR OR THE TOWN OF STALLINGS ENGINEERING DEPARTMENT MAY REVIEW AND EVALUATE THE METHODS USED AND THE OVERALL EFFECTIVENESS OF THE EROSION CONTROL PROGRAM. THE APPROVED EROSION AND SEDIMENT CONTROL PLAN MAY BE AMENDED BY THE APPROVING AUTHORITY IF AN ON SITE INSPECTION INDICATED THAT THE APPROVED CONTROL MEASURES ARE NOT EFFECTIVE IN CONTROLLING EROSION AND SEDIMENTATION OR IF BECAUSE OF CHANGED CIRCUMSTANCES THE APPROVED PLAN CANNOT BE CARRIED OUT. 4. CONTRACTOR SHALL LOCATE AND VERIFY THE LOCATION OF ALL UTILITIES PRIOR TO BEGINNING CONSTRUCTION. 5. THE CONTRACTOR SHALL NOTIFY NORTH CAROLINA ONE CALL CENTER (811) OR 1 -800- 632 -4949 BEFORE BEGINNING ANY EXCAVATION OR UTILITY WORK. CONTACT UNION COUNTY FOR LOCATING EXISTING WATER AND SEWER LINES. 6. EROSION AND SEDIMENT CONTROL PRACTICES SHALL BE MAINTAINED, SO THAT SEDIMENT CARRYING RUNOFF FROM THE SITE WILL NOT ENTER STORM DRAINAGE FACILITIES. 7. PROPERTIES AND RIGHT -OF -WAY ADJOINING THE SITE SHALL BE KEPT CLEAN OF MUD OR SILT CARRIED FROM THE SITE BY VEHICULAR TRAFFIC OR RUNOFF. 8. ALL CONSTRUCTION TRAFFIC SHALL ENTER AND EXIT THE SITE VIA THE CONSTRUCTION ENTRANCES. 9. EXCAVATED MATERIAL FROM TRENCHES SHALL BE PLACED ON THE UPGRADE SIDE OF THE TRENCH TO ALLOW MATERIAL TO ERODE INTO THE TRENCH. CONSTRUCTION MAINTENANCE AND REMOVAL OF ALL EROSION CONTROL DEVICES ARE THE RESPONSIBILITY OF GRADING CONTRACTOR UNLESS OTHERWISE NOTED. 10. NO OFF -SITE BORROW AREAS SHALL BE UTILIZED DURING GRADING OF THE SITE. ALL FILL SHALL BE OBTAINED WITHIN LIMITS OF DISTURBANCE SHOWN ON PLANS. 11. ON -SITE BURIAL PITS REQUIRE AN ON -SITE DEMOLITION LANDFILL PERMIT FROM THE ZONING ADMINISTRATOR. 12. NO OPEN BURNING ALLOWED. 13. ALL TREES & BRUSH REMOVED DURING CLEARING & GRUBBING OF SITE SHALL BE CHIPPED ON SITE AND HAULED OFF SITE FOR DISPOSAL. 14. ANY GRADING BEYOND THE DENUDED LIMITS SHOWN ON THE PLAN IS IN VIOLATION OF THE CITY/COUNTY EROSION CONTROL ORDINANCE AND IS SUBJECT TO A FINE. 15. MAINTAIN MINIMUM 10' CLEAR ZONE FROM TOP OF CHANNEL BANK TO DENUDED LIMITS. 16. GRADING MORE THAN ONE ACRE WITHOUT AN APPROVED EROSION CONTROL PLAN IS A VIOLATION OF THE DENR EROSION CONTROL ORDINANCE AND IS SUBJECT TO A FINE. 17. ADDITIONAL MEASURES TO CONTROL EROSION AND SEDIMENT MAY BE REQUIRED BY A REPRESENTATIVE OF THE TOWN OF STALLINGS OR NC DENR ENGINEERING DEPARTMENT. 18. SLOPES SHALL BE GRADED NO STEEPER THAN 2:1. FILL SLOPES GREATER THAN 10' REQUIRE ADEQUATE TERRACING. 19. A GRADING PLAN MUST BE SUBMITTED FOR ANY LOT GRADING EXCEEDING ONE ACRE THAT WAS NOT PREVIOUSLY APPROVED. 20. TEMPORARY DRIVEWAY PERMIT FOR CONSTRUCTION ENTRANCES IN NCDOT RIGHT OF WAY MUST BE PRESENTED AT PRE - CONSTRUCTION MEETING. 21. THE APPROXIMATE AREA OF THE LIMITS OF CLEARING, GRADING, AND CONSTRUCTION IS 19 ACRES. THE PHASE I MEASURES SHOWN ON THE PLANS REFLECT THE IN PLACE EROSION CONTROL NECESSARY TO ALLOW THE SITE TO BE CLEARED AND GRUBBED IN PREPARATION FOR THE INITIAL STAGE OF THE GRADING WORK. THE PHASE II MEASURES DEPICTED ON THE PLANS SHOW THE IN PLACE EROSION CONTROLS THAT WILL REMAIN AT THE COMPLETION OF THE FINAL STAGE OF THE GRADING WORK REQUIRED BY THE PROJECT. DURING EACH INTERIM STAGE OF THE GRADING WORK, THE CONTRACTOR SHALL BE REQUIRED TO INSTALL ANY ADDITIONAL TEMPORARY MEASURES THAT MAY BE NECESSARY TO CONTROL SEDIMENT AND EROSION THAT OCCURS AS A RESULT OF CHANGES TO THE EXISTING GROUND ELEVATION CONTOURS. AS DIRECTED BY THE TOWN OF STALLINGS OR STATE INSPECTORS. THE PERSON RESPONSIBLE FOR LAND DISTURBING ACTIVITIES MUST INSPECT THE SEDIMENT AND EROSION CONTROL MEASURES ON A PROJECT AFTER EACH PHASE TO ENSURE THE APPROVED PLAN IS BEING FOLLOWED. AT A MINIMUM, THE INSPECTIONS SHALL BE PERFORMED AFTER EACH OF THE FOLLOWING PHASES OF A PLAN: a. INSTALLATION OF PERIMETER EROSION AND SEDIMENT CONTROL MEASURES. b. INSTALLATION OF SEDIMENT TRAPS /BASINS. c. CLEARING AND GRUBBING OF EXISTING GROUND COVERS. d. COMPLETION OF ANY PHASE OF GRADING THAT REQUIRES PROVISION OF STABILIZATION. e. INSTALLATION OF MEASURES DURING ANY PHASE OF THE PROJECT. f. COMPLETION OF CONSTRUCTION OR DEVELOPMENT. g. INSTALLATION OF STORMWATER RETENTION MEASURES. h. QUARTERLY UNTIL THE ESTABLISHMENT OF PERMANENT GROUND COVER IS FULLY ESTABLISHED. *CONTACT NCDENR AT (704)663 -1699 FOR ADDITIONAL INFORMATION MATCH LINE LIMITS OF A JACK AND BETTY STAFF DISTURBANCE (n DB 3602 PG 154 FILTER BERM (TYP.) / PIN 07141115 (TYP.) JOHN HOWARD FAISON IV DB 1162 PG 684 S PIN 07141001 cn In- _ /-cmn-(n-(n-cn-(n-(n m m_J NOTE: ANY EXISTING EASEMENTS TO BE ABANDONED MUST BE APPROVED BY THE BOARD OF COUNTY COMMISSIONERS, UNION COUNTY DOES NOT HAVE THE AUTHORITY TO DO SO. SEE SHEET C -7A �� � 7 R71 PROPERTY LINE \ (TYPE - - - - - EXISTING STNUT LANE - - - 6 - - - ® -Z - UBLIC R /W) - SILT FENCE (TYP.) HENRY 0. AND ELSIE G. EUBANKS PIN 07141001D SILT FENCE (TYP.) I� I � I Ow IU 0 I o z� I ao w zz as w TOTAL DISTURBED /DENUDED AREA = 17.451 AC. - 000 _ A `1 V_INUET PROTECTION W/ SILT SACK (TYP.) DONALD E. AND KATHLEEN F. GOESSEL PIN 07141001J GREGORY SETH LEONARD D8 6234 PG 721 PIN 07141001E CHECK 1 (TYP.) rA EX. FAIRFOREST- DRIVE (VARIABLE PUBLIC R /W) GARY AND LAURA SHEPARD / DB 3633 PG 342 PIN 07141019 JAMES AND LYNDA GREENLESS DB N/A PG N/A PIN 07141040 , -EX. RED BARN TRAIL (VARIABLE PUBLIC R /W) CHANG YUNG KI AND SOON SUN PIN 07141016A / MARK AND NANCY DECHANT DB N/A PG N/A PIN 07141015 LIMITS OF DISTURBANCE \ (TYP.) SILT FENCE \ (TYP.) MIRZA R. ROKSANA DB 6228 PG 711 PIN 07141001L EROSION CONTROL LEGEND glllllll� - BERM -BERM -SF -SF -SF - -TP -TP -TP - LD LD - SILT FENCE OUTLET INLET PROTECTION FMW1_l ; F -T* 5, CHECK DAM PERIMETER BERM SILT FENCE TREE PROTECTION LIMITS OF DISTURBANCE GRAPHIC SCALE 50 0 25 50 100 FINAL DRAWING - NOT RELEASfthF`0I@OC4NSTRUCTION �-i N N All 1z. A o 08 2 0 f A V „ununrrp A ' pe •� o AL��9' -; 57 '• �: RE U K w U 3 2 V y N Z F ~ ru � 3 z a � 3 N N N gTn � A o rc o e 0 z P M ly b 7 7 o 2aaiaaa i` 14 cq I� co rn o z Ox o o� x z CQ W OFF Ey UMZ 1- �y+ E F W o O C- Z . 7 0 m U pP4p,,,, d O O° w Q z° � W 0 O F U _O °a W PROJECT No. MRH -13040 ED.ENAMfF:, MRH13040 -EC2 CHECKED BY: RMR DRAWN BY: CM /JL /RMR SCALE: 1"=50' DATE: 07 -25 -2014 SHEET NO. C -7C M MCADAMS CHESTNUT HOMEOWNERS NOTES: ASSOCIATION, INC 1. COORDINATE ALL CURB AND STREET GRADES IN INTERSECTION WITH INSPECTOR. PIN 07141006 I MATCH LINE -SEE THIS SHEET 2. ALL ROAD IMPROVEMENTS AT CHESTNUT LANE ARE TO BE COORDINATED WITH THE NCDOT i S � EXISTING YARROW \ CHESTNUT SUBDIVISION, PHASE 21 I PRIOR TO CONSTRUCTION. STREET PB. H PG. 251 3. DEVELOPER WILL PROVIDE STREET SIGNS. LOT 50 4. SIGHT TRIANGLES SHOWN ARE THE MINIMUM REQUIRED. / \ PIN 07141106 // I 5. IN ROLLING AND HILLY TERRAINS, SWEEPING OF THE STONE BASE AND /OR APPLICATION OF A 50 PUBLIC R/lf \ // /� i I �� \' Nb TACK COAT MAY BE REQUIRED NEAR INTERSECTION. THESE REQUIREMENTS WILL BE ESTABLISHED BY THE INSPECTOR AND BASED ON FIELD CONDITIONS. 6. APPROVAL OF THIS PLAN IS NOT AN AUTHORIZATION TO GRADE ADJACENT PROPERTIES. WHEN \ 4 9 FIELD CONDITIONS WARRANT OFF —SITE GRADING, PERMISSION MUST BE OBTAINED FROM THE ��\�\ \ AFFECTED PROPERTY OWNERS. \ / 36 ,/ `\ 7. IN ORDER TO ENSURE DRAINAGE, KEEP A MINIMUM OF 0.5 %SLOPE ON THE CURB. 8. SUBSURFACE DRAINAGE FACILITIES MAY BE REQUIRED IN THE STREET RIGHT —OF —WAY IF DEEMED NECESSARY BY THE INSPECTOR. CHESTNUT SUBDIVISION, PHASE 2 9. THE PURPOSE OF THE STORM DRAINAGE EASEMENT (SDE) IS TO PROVIDE STORM WATER PB. H PG. 251 CONVEYANCE AND ANY STRUCTURES AND /OR OBSTRUCTION TO STORM WATER FLOW IS LOT 51 PROHIBITED. PIN 07141107 / \ / / `� o� : . . . //� /til / /,/,// �\ ` l ' 10. HIGH — DENSITY POLYETHYLENE (HOPE) STORM DRAINAGE PIPE INSTALLED WITHIN EXISTING OR \\ \� \\ /— / :: /a •/ / �) / / / \� \ \\\ PROPOSED PUBLIC STREET RIGHT —OF —WAY MUST BE APPROVED BY THE TOWNS INSPECTOR 0 PRIOR TO ANY BACKFILL BEING PLACED. BACKFlLL MATERIAL MUST BE APPROVED BY THE \ - \ \ \ /l x TOWN INSPECTOR PRIOR TO PLACEMENT OF THE MATERIAL WITHIN THE PUBLIC STREET \ \ / // F /:: /� / / / / \ \ y \. \ \ c'o S / /, _ / / \ EXISTING CHESTNUT LANE \ \ RIGHT —OF —WAY. — 1 I r / 7:: I / / \ \s\ 11. THE DEVELOPER SHALL MAINTAIN EACH STREAM, CREEK, OR BACKWASH CHANNEL IN AN \\ // i / (60' PUBLIC R /W) UNOBSTRUCTED STATE AND SHALL REMOVE FROM THE CHANNEL AND BANKS OF THE STREAM ALL DEBRIS, LOGS, TIMBER, JUNK AND OTHER ACCUMULATIONS. 37 12. PROOF ROLLING OF STREET SUBGRADE AND AGGREGATE BASE MATERIAL SHALL BE PERFORMED PB. H PG. 251 PHASE 2 \ / T ' /// / / Itl \ ! . ;:;: �• i j < < ' / // / \ \ \i \ `� ° \\ BY THE CONTRACTOR IN THE PRESENCE OF THE OWNERS ENGINEER. THE ENGINEER SHALL CHESTNUT SUBDIVISION, / / / LOT 57 PROVIDE WRITTEN VERIFICATION TO THE TOWN THAT THE SUBGRADE AND AGGREGATE BASE MATERIAL MEET THE DENSITY REQUIREMENT AS SPECIFIED. FAILURE TO PROVIDE ENGINEERS PIN 07141113 r *i VERIFICATION OF THE SUBGRADE AND STONE BASE COURSE COMPACTION COULD RESULT IN r SI �v DELAY OF ACCEPTANCE OF THE DEVELOPMENT BY THE TOWN. ��'\ X\ \ 1' \ 3'4 CHESTNUT SUBDIVISION, PHASE 2 / �A PB. H PG. 251 .` \ \�\\ \ LOT 58 v V v ( I I I I 11 1 vvvA� v v A PIN 07141114 40 �` I I h`. I \ \ 9 A A V AA 1. 33 (I I I 1 G — — — l ` l �\� V 1 I i I �0 / III ' \ VA \ I 111 ------- '------- ------ - - - - -- v� 11 I I 4 J �� / /� r /// I / // I /', / / /✓. /. /.:. \ /�. \ {�I I I II A 'V 31 AI A A\ �.:i: ::- ROPOSED CDS UNITSt REFER TO SW SHEETS FOR DETAILS RETAINING WALL':'::. DESIGNED BY OTHERS ) _ _ _ ...:_:J /�ra.h l: - I I" I i 10' WIDE NO CLEAR I \ I BUFFER ALONG PROPERTY LINE \ 1 \ 43 LENNAR CAROLINAS, LLC 1`Y \ DB 4305 PG 730 PIN 07141008 A111I `: \;.;.;.;.;_;I.;.;�;___;..:1 ::::::..�.;;:. STAINING WALL ; 1 ;:;C::: \: '` 11 1 � I \ 1 \ \ � \ \ �` I \ /� D DICATE �I: {DESIGNED BY :::: :::.:::::::::::::�:;:;:;:;:Y.;. .;.1.;:11 1 1 \ 1 , \ P \ \ \ TREE SAVE ■ � 1 — T/ / / /, j .I:OTHERS) .................... I i JOHN HOWARD FAISON IV I I / 5 / DB 1162 PG 684 r::' : �.'.�. . . y . .' >._ � . . . � . ✓. '. '.' a;:\.:.:.EASEMENT :2: PIN 071410D7 PROPOSED EXSTING CHESTNUT LANE—` \ \ \ \ \ \ \ \ 1 SW SHEETS (60' PUBLIC R /W) III I I r r �I I I - FOR DETAILS :::::::::::: III I� HENRY 0. AND ,/ �I I (. / I I 11 I \ \ N4 - - _y;:�:...;�.,. / J / // / ,;_ / ELSIE G. EUBANKS V - / 1 I / / 46 // / \ \ \ -_ -- _ %' / -- - CHRISTOPHER G. MOWBRAY PIN 07141001D 1 / 1 Y / T II ' / i \ \ \ •�;..'�.:_ : :: V�-- ._:. ^. - . i f� � t t 1 I I I / I \ \ PIN 07141026 ( \ 113 \ \ \ \'��� .�:- .�T - --' ""* x1.111 � \ I / 26 `\ - ARTHUR P. AND � MARTHA A. HEIN JR. I�I IIV/ _J / , c i _� 48 // / // JJ I I ll/ III_II I 1 ( 4g ) -r / 1 / , / 1 /r / / / / I I ` \ \ \ \. I DB 3493 PG 310 III11 IIM O i 53 ' S2 51 5O `� I \ _l / / / / -� -! -� -rte- /I I I I 1 \ \ \ PIN 07141025 ELAINE A. NICHOLS , 11 54 / i / / J / T 7 I \ DONNELL CARLTON CAMERON / / D(= ICA ED \4 \ PIN 07141001E / I ` // , /' TREE SAVE PIN 07141022 ��— \ DB 6b64 07 PG 699 i EN I :. I�I I EA VA v A \V I A\ 1 1 I i� - -- /� RELY N T , /� L' / / ' / l r'— J )\ �` r i �/� I I I 11 \ \I I t.. '.11 I 1 \ I \ \ \ \ \ \\ \ \\ I 1 1 LIC If \ \t\; \'\ \\ III DONALD E. AND t ' KATHLEEN F. GOESSEL I �� 6 l ! / / \ \ \ 1 I PIN N F. G01) I I • / .:.:!. 'r 1 \ \ `� 7 �\ .:...\:,.t GRADING LEGEND EX. RED BARN , tk r _ _ _ \ \ �`\=C \ EXISTING I TRAIL' ! �' I _ _ _ -- / \ \ �\ \ \\\ \ \L \\ \ \\ ^ \- ^\ 20' UTILITY (VARIABLE PUBLIC R /W) \\ \ \ I\ j \ \ ` _ __ \ \ \\ \\ EASEMENT , ® FLARED END SECTION STORM DRAINAGE 10' CURB TRANSITION 1 t4' \ i \ l \\ \ \\ `\ \ \ \ \ \\ \ , I I \ \ STORM SERVICE LINE ,'a I \ I \ `\ I \ \ \ ; i 8 \ \ \ \\ \ -\ \ • CATCH BASIN ROOF DRAIN, 8" ADS I O� O /> \ \\\ \9 \ \ \ \ . RD —RD— DROP INLET NON - PERFORATED TUBING OR EXISTING EQUAL 1.0% MIN. SLOPE 3' MIN POND ■ STORM SERVICE INLET COVER PVC SCHEDULE 40 IN TRAFFIC AREAS CHESTNUT LANE TO HAVE I I _ 1 \ \ \ \ ° • STORM SERVICE ROOF -DRAIN r - ! - ` — TP —TP— TREE PROTECTION 1.5" OVERLAY ACROSS �\ \ v \\ \\ \ _ _' \ ` \ REVOCABLE LIVING TRUST ENTIRE WIDTH OF ROAD — �, _ \ \ ALONG FRONTAGE \ \\I\t \ > — � — T--�- \ \ \ \ \ \ \l DB 4680 PG 414 O STORM MANHOLE LD LIMITS OF DISTURBANCE 7 7 \ PIN 07141020 -- - ��J WOODED AREA \ DRAINAGE FLOW ARROW 250 10' CONTOUR \� \ \� \ GREGORY SETH LEONARD l ti LINE BREAK SYMBOL 252 2' CONTOUR CHANG YUNG KI �\ \ \\ DB 6234 PG 721 I AND SOON SUN _250_______ \0 •` PIN 07141001E 250.50 EXISTING 10' CONTOUR PIN 07141016A \ �\0 l 250.00 TOP &BOTTOM CURB ELEVATIONS \\ _252- EXISTING 2' CONTOUR ----- - l TW= 223.00 -TOP OF WALL ELEVATION ��\ \y \ \\ l BW= 213.00 - BOTTOM OF WALL ELEVATION — EASEMENT LINE (NOTE: BOTTOM OF WALL IS GROUND l ELEVATION NOT WALL FOUNDATION) \� 250.60 SPOT ELEVATION mom 0 MATCH LINE - SEE THIS SHEET IN I luo,mc GRAPHIC SCALE 60 0 30 60 120 1 inch = 60 ft. FINAL DRAWING — NOT RELEASED FOR CONSTRUCTION M 00 VJ M � V puun „� c L "nnnuiu•• w cz+ a B j z w s ' rc Z s g s s z b 8 N N N N N N N < ®4 ®a ®® co N C\1 VA �o z x � oa 0 a �zC,2� W L.N. E U in `,7 t .. 4 x E-F E W O z � U m 'y U d O a U z O Q PROJECT NO. MRH -13040 m2NAmE: MRH13040 -G1 CHECKED BY: RMR RR&wN RY: CM /JL /RMR SCALE: 1 " =60, DATE: 07 -25 -2014 sMET NO. C -8 �JI MCADAMS CHESTNUT SUBDIVISION, PHASE 2 GRADING LEGEND R A. GENERAL NOTES PB. H PG. 251 1. ALL WORK AND MATERIALS SHALL CONFORM TO THE LATEST EDITION OF THE NCDOT STANDARD PIN 0714113 SPECIFICATIONS UNLESS OTHERWISE SPECIFIED IN THIS MANUAL 1 M FLARED END SECTION STORM DRAINAGE 2. ONLY REINFORCED CONCRETE PIPE IS ALLOWED WITH THE STREET PAVEMENT (PUBLIC ROADS) EXCEPT / STORM SERVICE LINE FOR CULVERTS EQUAL TO OR GREATER THAN (60) SIXTY INCHES IN DIAMETER. FOR CULVERTS EQUAL J CATCH BASIN TO OR GREATER THAN (60) SIXTY INCHES, CORRUGATED STEEL OR ALUMINUM PIPE IS ALLOWED IF IT \ RD -RD- ROOF DRAIN, 8" ADS HAS A CONCRETE POURED INVERT. MINIMUM GAUGE FOR METAL PIPE SHALL BE 14 GAUGE. / P\ NON- PERFORATED TUBING OR EQUAL 1.0% MIN. SLOPE 3' MIN. 0 x65 1 \\ r 71 5.100 DROP INLET 3. ALL STORM DRAINAGE PIPE OUTSIDE THE STREET PAVEMENT SHALL BE REINFORCED CONCRETE PIPE, ■ STORM SERVICE INLET COVER PVC SCHEDULE 40 IN CORRUGATED METAL PIPE OR HIGH DENSITY POLYETHYLENE (HDPE) PIPE, AS APPROVED BY THE CHESTNUT SUBDIVISION, PHASE 2 / TRAFFIC AREAS CITY/COUNTY ENGINEER. NO OTHER TYPE OF PIPE SHALL BE USED WITHOUT PRIOR APPROVAL FROM PB. H PG. 251 � \ \ THE CITY /COUNTY ENGINEER. ALL PIPES SHALL BE LAID WITH THE BELL OR GROOVE UPGRADE AND PIN 0714114 \ / \ \ \ • STORM SERVICE ROOF -DRAIN -� -TP - TREE PROTECTION THE JOINT ENTIRELY INTERLOCKING. I 1 4. ALL CONCRETE SHALL BE 3600 PSI. IN ORDER TO USE PRE -CAST STORM DRAINAGE STRUCTURES I 40 O STORM MANHOLE LD LIMITS OF DISTURBANCE IN ANY STREET RIGHTS -OF -WAY, PRIOR APPROVAL SHALL BE OBTAINED FROM THE TOWN ENGINEER. / WOODED AREA 5. ALL HIGH - DENSITY POLYETHYLENE PIPE SHALL BE CORRUGATED EXTERIOR /SMOOTH INTERIOR, C / 6 RCIP/ �-� DRAINAGE FLOW ARROW�J CONFORM TO THE REQUIREMENTS OF AASHTO SPECIFICATION M294 FOR CORRUGATED POLYETHYLENE // \` / / �AD 714.0 250 10' CONTOUR PIPE AND SHALL REQUIRE COUPLING BANDS AND FITTINGS. -/ / / ` / 50'x68'\ , / LINE BREAK SYMBOL 252 2' CONTOUR / / 6. CONCRETE PIPE USED WITHIN THE STREET RIGHT -OF -WAY SHALL BE A MINIMUM OF CLASS III - - \ \ ; /\ 250.50 TOP & BOTTOM CURB ELEVATIONS -250- ------ EXISTING 10' CONTOUR REINFORCED CONCRETE PIPE, WITH A MINIMUM DIAMETER OF FIFTEEN (15) INCHES (EIGHTEEN (18) / \ \ \ /7 \ CB -A/ 250.00 INCHES MINIMUM ON CROSS DRAIN CULVERTS WITHIN THE COUNTY). \ - 252- - - - - -- / 1 \ \ \ �• / � EXISTING 2' CONTOUR TW= 223.00 -TOP OF WALL ELEVATION EASEMENT LINE 7. THE MINIMUM COVER FOR ALL PIPE IS TWO (2) FEET. SPECIAL APPLICATIONS FOR LESS THAN TWO ' \� BQ" // BW= 213.00 - BOTTOM OF WALL ELEVATION - (2) FEET OF COVER WILL BE REVIEWED INDIVIDUALLY. 4i \` / / / / (NOTE: BOTTOM OF WALL IS GROUND ELEVATION NOT WALL FOUNDATION) 8. CONCRETE MORTAR JOINTS SHALL BE USED FOR JOINING ALL CONCRETE PIPES. THE PIPE SHALL BE ' CLEAN AND MOIST WHEN MORTAR IS APPLIED. THE LOWER PORTIONS OF THE BELL OR GROOVE SHALL I / I PAD 7 \ 1 4.50 \ f /� / / BE FILLED WITH MORTAR SUFFICIENT TO BRING THE INNER SURFACE FLUSH AND EVEN WHEN THE NEXT 1 8 JOINT IS FITTED INTO PLACE. THE REMAINDER OF THE JOINT SHALL THEN BE FILLED WITH MORTAR AND I 1 50'x75' 250.60 SPOT ELEVATION CB -A7 (/ A BEAD OR RING OF MORTAR FORMED AROUND THE OUTSIDE OF THE JOINT. THE APPLICATION OF \ //I may / / PAD 71/175 MORTAR MAY BE DELAYED UNTIL FILL IS COMPLETED WHEN THE PIPE IS LARGER THAN THIRTY (30) I \ \ I / \ / INCHES. \ \ \ / j / / /: 50')(55' 9. PREFORMED JOINT SEALER, WHICH CONFORMS TO AASHTO SPECIFICATION M -198 FOR TYPE B FLEXIBLE PLASTIC GASKETS, MAY BE USED IN LIEU OF THE MORTAR JOINING METHOD. 10. COUPLING BANDS AND FITTINGS SHALL BE USED FOR JOINING ALL HDPE PIPE. COUPLING BANDS SHALL COVER AT LEAST ONE FULL CORRUGATION ON EACH SECTION OF PIPE. GASKET COUPLING 10' WIDE NO CLEAR-1 42 BANDS ARE REQUIRED BETWEEN ALL PIPE JOINTS. THE GASKET SHALL BE MADE OF CLOSED -CELL BUFFER ALONG I O / SYNTHETIC EXPANDED RUBBER MEETING THE REQUIREMENTS OF ASTM D1056, TYPE 2. THE PIPE PROPERTY LINE 1 \ MANUFACTURER SHALL INSTALL GASKETS ON THE COUPLING BAND. ALL COUPLING BANDS SHALL MEET \ OR EXCEED THE SOIL- TIGHTNESS REQUIREMENT OF AASHTO STANDARD SPECIFICATION FOR HIGHWAY \ I \ PAD 7\16.00, BRIDGES, SECTION 23, PARAGRAPH 23.1.5.4(E). PIPE FITTINGS SHALL CONFORM TO AASHTO M252 OR \ \ \ 5O'X AASHTO M294. \ \ \ I / LPAD/ 7113 75 11. THE INTERIOR SURFACES OF ALL STORM DRAINAGE STRUCTURES SHALL BE POINTED UP AND \ \ 69" R P 50'>10 SMOOTHED TO AN ACCEPTABLE STANDARD USING MORTAR MIXED TO MANUFACTURER'S SPECIFICATIONS. - ' - - \ - - \' / / / /t / / / RETAINING WALL 12. ALL PIPES IN STORM DRAIN STRUCTURES SHALL BE FLUSH WITH THE INSIDE WALL. \ \\ \ 1'l /l 1 _ �- _� �_ _ �L _/ / / / / (DESIGNED BY OTHERS) 13. ANY STORM DRAIN STRUCTURES OVER THREE (3) FEET AND SIX (6) INCHES IN HEIGHT MUST HAVE I I \ \ 43 /' / I / / / / / / % / / / / / / PROPOSED STEPS IN ACCORDANCE WITH STANDARD DETAILS SET FORTH IN THIS MANUAL. \ \ \ / / / 100 YEAR PAP / / LfMIT OF / / / / / FLOOD LINE 14. ALL FRAMES, GRATES, RINGS, COVERS, ETC., MUST CONFORM TO THE STANDARDS SET FORTH IN PA� 715.901 I / / / /1 6t EXISTING THIS MANUAL \ \ (r PQND 50 x7� I . / 15. ALL GRADED CREEK BANKS AND SLOPES SHALL BE AT A MAXIMUM OF TWO (2) FEET HORIZONTAL \\ I /// // i I / / PjA,J 7/I 3f 7 // / /I /// / TO ONE (1) FOOT VERTICAL (2:1) AND NOT TO EXCEED 10' WITHOUT TERRACING. \ / / 16. ALL BACKFILL SHALL BE NON- PLASTIC IN NATURE, FREE FROM ROOTS, VEGETATIVE MATTER, WASTE, 2:1 SLOPE \ / / / z _Z� CONSTRUCTION MATERIAL OR OTHER OBJECTIONABLE MATERIAL. SAID MATERIAL SHALL BE CAPABLE OF I I BEING COMPACTED BY MECHANICAL MEANS AND SHALL HAVE NO TENDENCY TO FLOW OR BEHAVE IN A \ \ \ / / 44 PLASTIC MANNER UNDER THE TAMPING BLOWS OR PROOF ROLLING. 17. MATERIALS DEEMED BY THE GEOTECH ENGINEER AS UNSUITABLE FOR BACKFILL PURPOSES SHALL BE \ / / REMOVED AND REPLACED WITH SELECT BACKFILL MATERIAL. P D 1714/.80 ( / 18. BACKFlLLING OF TRENCHES SHALL BE ACCOMPLISHED IMMEDIATELY AFTER THE PIPE IS LAID. THE 1 150'0 ' //^ r /77 I / PAD/'71/3.VO FILL AROUND THE PIPE SHALL BE PLACED IN LAYERS NOT TO EXCEED EIGHT (8) INCHES, EACH LAYER I // / SHALL BE THOROUGHLY COMPACTED TO 95% OF THE MAXIMUM DENSITY OBTAINABLE WITH THE STANDARD _ _ _ _ I /[/ / / / / / �; ; EXISTING ; :I cn PROCTOR TEST (A DENSITY OF 100% STANDARD PROCTOR IS REQUIRED FOR THE TOP EIGHT (8) 6 7R� �// / I/ / / f' { POND INCHES). €/ -- -�- - -- ' I/ 19. COMPACTION REQUIREMENTS SHALL BE ATTAINED BY THE USE OF MECHANICAL COMPACTION / I I / 45/ / / / / / i / ! � / / / / / / / / { ./ .' METHODS. EACH LAYER OF BACKFILL SHALL BE PLACED LOOSE AND THOROUGHLY COMPACTED IN l I �II I cn 20. UNDER NO CIRCUMSTANCES SHALL WATER BE PERMITTED TO RISE IN UNBACKFILLED TRENCHES JOHN HOWARD FAISON IV / PAD 714.20 i I I / / I I / / / 14 / I \ / � AFTER THE PIPE HAS BEEN PLACED. DB 1162 PG 684 / ' 111 I I I / \ / / / / 50/x75 N V \ \ \ \ \ PIN 07141001 / / / 1 I PA �12 \25 \ ' ~'] CHESTNUT LANE TO HAVE / / �-�'� _ _ _I ' I -� / \ \ \ �50\'x76' 1.5" OVERLAY ACROSS / / _ f / �9 {A9 \ n ENTIRE WIDTH OF ROAD ' / / __ \ _ \ ALONG FRONTAGE - i / 1 I \ C�A20 MATCH LINE - SEE SHEET C -11 46 /// /'+v '� NINE -- - - - -- I �/ �// { / / / / PROPOSED CDS UNITS I � { EXISTING / � / /PAD7�14. � 0 / � I \ \ \ \ � _ (REFER TO SW SHEETS I \ 1 CHESTNUT LANE / / / 50/X7 // / I _ I \ \ PAp \ \7 \�1\ - FOR DETAILS). CDS (60' PUBLIC R /W) / / /p - _ _ - UNITS ARE NOT TO BE \\ \\ \\ �0�?C \6 \ \� , - -� LOCATED G THE I I 10' WIDE NO CLEAR / / ( PUBLIC RIGHT TE WAY HENRY 0 AND { TEMPORARY- - - - - \ / / / / / / 1 1 I \- _ - } 1 1 _ 1_ L _ / _ _ _ PROPERTY. RIVATE ELSIE G EUBANKS i_' CONSTRUCTION _ _ BUFFER ALONG i T - _ _ - PROPERTY LINE PIN 07141001D I II{ I � { EASEMENT \\ -- / / / 11 / BI n1 I/ //�AD/7/11 .j25 'A1g 50/x76 / r � i 52 , -Q I \ AT} -yu"yo / �� i T' -�i -r 7 I I \ ELAINE A NICHOLE // I I I / / -L \ \ p r 20' Pueuc / / , I 1 PAD 0 x�5 / I / / / / ✓ / j { II tl v VA \ PIN 07141001 II I EASEM NRAIN 54 Ir I AD 725.40 ' PAII 72 1 ' PAD 722.10 I PAL 721 • 10 I ce -AZ4 I � /, D 725.50 , ' ' 6p� \ 50 ' 50 x67 50 x67 50 x PROPOSED 20 30" l 1 PAD 726.50 5O'X67 50 xB� I I ��CPW UTILITY UT1LI \EA \ 1 1 50' x67_' I { i III 151 RCP CRE K II- - I � � / %� I � / T - - - -I--+ TREE SAVE I �. . ♦ \ \ \ \ \ DONALD E AND CATHLEEN F GOESSEL PIN 07141001J \ C - AIL CB �14 E JLJF --- - ......____ _ . 18" RCP l f - / RCP I d IIIIIIIG� ri 15 " � 'A \\ c'B I \ \ \� 9 \ - \ \ \ \ \ EXISTING 8 aAS'EE%hEI�T Za� \ \ \ \ \ \ POND 3 1 \ 4 1 \ 5 O O) t E \7,T675� \\ \ r \ \O \O PAD 720.10 I PAD 720.0 , f1AD�_17.50 \ F3A� 7Qa \ \ EX. RED BARN ` 1 I I I \ D 724.10 PAD 172.50 , 50'x65' , 50 x6� - i \ � x63 \ \ 1 T PAD 725.50 PAD 725.0 , , 5buc65 \ TRAIL v , �v 50 x5 _ 1 50'x 6� I \ PAD 726.50 X50 x65 1 50 x65. � \ (VARIABLE PUBLIC R /W) \ \\ \ \ s� \ I 1 5O'X65' 1 \ I \ I \ \ \ I \ I I \ \ \ _ \ \ i \ \ \ \ \ \ �' REVOCABLE LIVING TRUST D 4680 PG 4 CHANG YUNG KI \ \t \\ \ I I I I \ \\ \ ` i - 1 �` PIN07141020 AND SOON SUN \ , \ PIN 07141016A /^ /\ \ 1 \ , 1 T _ 10' WIDE NO CLEAR \ \ \ GRAPHIC SCALE \ \ \ \\ \ \ BUFFER ALONG \ GREGORY SETH LEONARD PROPERTY LINE 40 0 20 40 a0 DB 6234 PG 721 PIN 07141001E MATCH NE - SEE SHEET C -11 1 inch = 4D f� LI FINAL DRAWING - NOT RELEASED FOR CONSTRUCTION d -SIZE WM11 Q A auw u AL,� y 0 57 7 e w � o z o B z z i w N 2 N VN1 N y ON O K p O $ rc � z M a 1j•' N N N N H N N a cq GO W CCQ �o z yLx a CQ U F Q', o p z F•�-i P i E" W � O z a to x d 00 0 z O w O � F PROJECT NO. MRH -13040 FN.ENAME: MRH13040 -G1 CHECKED BY: RMR DRAWN BY: CM /JL /RMR DATE: 071 25 -0 DATE: 07-1 SHEET N0. C -9 �JI MCADAMS GRADING LEGEND ® FLARED END SECTION CATCH BASIN DROP INLET ■ STORM SERVICE INLET • STORM SERVICE ROOF -DRAIN Q STORM MANHOLE �-- DRAINAGE FLOW ARROW �. LINE BREAK SYMBOL 250.50 TOP & BOTTOM CURB ELEVATIONS 250.00 TW= 223.00 -TOP OF WALL ELEVATION BW= 213.00 - BOTTOM OF WALL ELEVATION (NOTE: BOTTOM OF WALL IS GROUND ELEVATION NOT WALL FOUNDATION) 250.60 SPOT ELEVATION I_�eh1�1�f: _ ► • � f \ CHESTNUT HOMEOWNERS I ASSOCIATION INC PIN 07141006 STORM DRAINAGE \ CHESTNUT SUBDIVISION, PHASE 2 PB. H PG. 251 STORM SERVICE LINE \ LOT 50 i PIN 07141106 RD -RD- ROOF DRAIN, 8" ADS NON - PERFORATED TUBING OR EQUAL 1.0% MIN. SLOPE 3' MIN. COVER PVC SCHEDULE 40 IN TRAFFIC AREAS -TP -TP - TREE PROTECTION \ / t LD LIMITS OF DISTURBANCE J WOODED AREA \ 250 10' CONTOUR , �i \` PAD' 705.60 252 2' CONTOUR // 50'X6 _250- - - - - -- i EXISTING 10' CONTOUR CHESTNUT SUBDIVISION, PHASE 2 / // - /l / �� /� _252 ______ EXISTING 2' CONTOUR PB. H PG. 251 ✓ % : ' LOT 51 EASEMENT LINE PIN 07141107 It CB_BS � /3 /" RCP \ C134 / i 1 1-134 DOWNSPOUTS FOR LOT / \/ �/ ✓(/ / / j/ DUKE POWER DUKE ENERGY 37 TO CONNECT TO _ _ I R0 POSED 20' \ / / / / °' I� / / CORPORATION CATCH BASIN AS TO - - L \ UT IL Y �ASEMENT. \ / / PROPOSED 20' / % /' // / /t ENSURE IMPERVIOUS 30• IRS' TILITY.EASEM N,T. / PIN 07141007A ARE FROM BUILDING IS \� \ \ l� 1 TREATED IN \ RIP SRAP� >U-nLl\ STORMCEPTORS \ / ) / , EX TING .::: )S 15'x. . / I EASEMEN�' /. C8NCI2EI HEADWAL7 X /1 i:: >l : N�DO s #D/ (➢YP ) ( EE DF/TAIL) 2 -85.LF :48Y CM PAD 708.50 / / I l l I I / 9:18% (CONTRACT I ( / / ( / J %I : '- TO�:MATCH r50'X�0' \ / / : B FOR : INVER \ \\ \\ ELEV.TIONS �v A o /35 / $A *ET`Y RAIL . ! I / P�tD 7I 10.50 PAD 78/50 r / > \ C�B A6\ `\\ 5 X6�\\ \\ ��\ ^ /RC /` I .. DRAIN EASEMENT ' .I 54 II I 0 'X75' y / /�✓ / / \ / // 66" RCP \ \ \ O JJ j �\ \ ,� \.\ , I E TING SE ` Il LIN REh N / �' \ � v '�i �, �'t,•.•.. -._.. r, -� �+ 1:1. li � I 1 I II ' T I � I 134 1. ALL WORK AND MATERIALS SHALL CONFORM TO THE LATEST EDITION OF THE NCDOT STANDARD SPECIFICATIONS UNLESS OTHERWISE SPECIFIED IN THIS MANUAL 2. ONLY REINFORCED CONCRETE PIPE IS ALLOWED WITH THE STREET PAVEMENT (PUBLIC ROADS) EXCEPT FOR CULVERTS EQUAL TO OR GREATER THAN (60) SIXTY INCHES IN DIAMETER. FOR CULVERTS EQUAL TO OR GREATER THAN (60) SIXTY INCHES, CORRUGATED STEEL OR ALUMINUM PIPE IS ALLOWED IF IT HAS A CONCRETE POURED INVERT. MINIMUM GAUGE FOR METAL PIPE SHALL BE 14 GAUGE. 3. ALL STORM DRAINAGE PIPE OUTSIDE THE STREET PAVEMENT SHALL BE REINFORCED CONCRETE PIPE, CORRUGATED METAL PIPE OR HIGH DENSITY POLYETHYLENE (HDPE) PIPE, AS APPROVED BY THE CITY /COUNTY ENGINEER. NO OTHER TYPE OF PIPE SHALL BE USED WITHOUT PRIOR APPROVAL FROM THE CITY /COUNTY ENGINEER. ALL PIPES SHALL BE LAID WITH THE BELL OR GROOVE UPGRADE AND THE JOINT ENTIRELY INTERLOCKING. 4, ALL CONCRETE SHALL BE 3600 PSI. IN ORDER TO USE PRE -CAST STORM DRAINAGE STRUCTURES IN ANY STREET RIGHTS -OF -WAY, PRIOR APPROVAL SHALL BE OBTAINED FROM THE TOWN ENGINEER. 5. ALL HIGH - DENSITY POLYETHYLENE PIPE SHALL BE CORRUGATED EXTERIOR /SMOOTH INTERIOR, CONFORM TO THE REQUIREMENTS OF AASHTO SPECIFICATION M294 FOR CORRUGATED POLYETHYLENE PIPE AND SHALL REQUIRE COUPLING BANDS AND FITTINGS. 6. CONCRETE PIPE USED WITHIN THE STREET RIGHT -OF -WAY SHALL BE A MINIMUM OF CLASS III REINFORCED CONCRETE PIPE, WITH A MINIMUM DIAMETER OF FIFTEEN (15) INCHES (EIGHTEEN (18) INCHES MINIMUM ON CROSS DRAIN CULVERTS WITHIN THE COUNTY). 7. THE MINIMUM COVER FOR ALL PIPE IS TWO (2) FEET. SPECIAL APPLICATIONS FOR LESS THAN TWO (2) FEET OF COVER WILL BE REVIEWED INDIVIDUALLY. 8. CONCRETE MORTAR JOINTS SHALL BE USED FOR JOINING ALL CONCRETE PIPES. THE PIPE SHALL BE CLEAN AND MOIST WHEN MORTAR IS APPLIED. THE LOWER PORTIONS OF THE BELL OR GROOVE SHALL BE FILLED WITH MORTAR SUFFICIENT TO BRING THE INNER SURFACE FLUSH AND EVEN WHEN THE NEXT JOINT IS FITTED INTO PLACE. THE REMAINDER OF THE JOINT SHALL THEN BE FILLED WITH MORTAR AND A BEAD OR RING OF MORTAR FORMED AROUND THE OUTSIDE OF THE JOINT. THE APPLICATION OF MORTAR MAY BE DELAYED UNTIL FILL IS COMPLETED WHEN THE PIPE IS LARGER THAN THIRTY (30) INCHES. 9. PREFORMED JOINT SEALER WHICH CONFORMS TO AASHTO SPECIFICATION M -198 FOR TYPE 6 FLEXIBLE PLASTIC GASKETS, MAY BE USED IN LIEU OF THE MORTAR JOINING METHOD. 10. COUPLING BANDS AND FITTINGS SHALL BE USED FOR JOINING ALL HDPE PIPE. COUPLING BANDS SHALL COVER AT LEAST ONE FULL CORRUGATION ON EACH SECTION OF PIPE. GASKET COUPLING BANDS ARE REQUIRED BETWEEN ALL PIPE JOINTS. THE GASKET SHALL BE MADE OF CLOSED -CELL SYNTHETIC EXPANDED RUBBER MEETING THE REQUIREMENTS OF ASTM D1056, TYPE 2. THE PIPE MANUFACTURER SHALL INSTALL GASKETS ON THE COUPLING BAND. ALL COUPLING BANDS SHALL MEET OR EXCEED THE SOIL- TIGHTNESS REQUIREMENT OF AASHTO STANDARD SPECIFICATION FOR HIGHWAY BRIDGES, SECTION 23, PARAGRAPH 23.1.5.4(E). PIPE FITTINGS SHALL CONFORM TO AASHTO M252 OR AASHTO M294. 11. THE INTERIOR SURFACES OF ALL STORM DRAINAGE STRUCTURES SHALL BE POINTED UP AND SMOOTHED TO AN ACCEPTABLE STANDARD USING MORTAR MIXED TO MANUFACTURER'S SPECIFICATIONS. 12. ALL PIPES IN STORM DRAIN STRUCTURES SHALL BE FLUSH WITH THE INSIDE WALL. 13. ANY STORM DRAIN STRUCTURES OVER THREE (3) FEET AND SIX (6) INCHES IN HEIGHT MUST HAVE STEPS IN ACCORDANCE WITH STANDARD DETAILS SET FORTH IN THIS MANUAL 14. ALL FRAMES, GRATES, RINGS, COVERS, ETC., MUST CONFORM TO THE STANDARDS SET FORTH IN THIS MANUAL. 15. ALL GRADED CREEK BANKS AND SLOPES SHALL BE AT A MAXIMUM OF TWO (2) FEET HORIZONTAL TO ONE (1) FOOT VERTICAL (2:1) AND NOT TO EXCEED 10' WITHOUT TERRACING. 16. ALL BACKFILL SHALL BE NON- PLASTIC IN NATURE, FREE FROM ROOTS, VEGETATIVE MATTER, WASTE, CONSTRUCTION MATERIAL OR OTHER OBJECTIONABLE MATERIAL. SAID MATERIAL SHALL BE CAPABLE OF BEING COMPACTED BY MECHANICAL MEANS AND SHALL HAVE NO TENDENCY TO FLOW OR BEHAVE IN A PLASTIC MANNER UNDER THE TAMPING BLOWS OR PROOF ROLLING. 17. MATERIALS DEEMED BY THE GEOTECH ENGINEER AS UNSUITABLE FOR BACKFILL PURPOSES SHALL BE REMOVED AND REPLACED WITH SELECT BACKFILL MATERIAL. 18. BACKFILLING OF TRENCHES SHALL BE ACCOMPLISHED IMMEDIATELY AFTER THE PIPE IS LAID. THE FILL AROUND THE PIPE SHALL BE PLACED IN LAYERS NOT TO EXCEED EIGHT (8) INCHES, EACH LAYER SHALL BE THOROUGHLY COMPACTED TO 95% OF THE MAXIMUM DENSITY OBTAINABLE WITH THE STANDARD PROCTOR TEST (A DENSITY OF 100% STANDARD PROCTOR IS REQUIRED FOR THE TOP EIGHT (8) INCHES). 19. COMPACTION REQUIREMENTS SHALL BE ATTAINED BY THE USE OF MECHANICAL COMPACTION METHODS. EACH LAYER OF BACKFILL SHALL BE PLACED LOOSE AND THOROUGHLY COMPACTED IN PLACE. 20. UNDER NO CIRCUMSTANCES SHALL WATER BE PERMITTED TO RISE IN UNBACKFILLED TRENCHES AFTER THE PIPE HAS BEEN PLACED. 'TALI 7b9.p01 ' I c9-A4 X75 1 X33 1 �Q / \ 10' WIDE NO CLEAR q _ \ \AA V A AV PAD A71 1.00 BUFFER ALONG PAD 71 .69 I r // G -C4 \\\ \ \ OI'x7 ' �� PROPERTY LINE 150 xKi5 / / / / iY y:: 1 �NING e c � PAD ��/13'�Oi j 50'x.6,8' / (DESIGNED BY / // g /\ �/ I 32 PROPERTY LINE / OTHERS) / x A II / `� / / �' x. ! / /,r / PA® 7112.10 \ ` PUBLIC STORM 60 / RCP 0'05' X /'5 \ / \ ' PROPOSED / / // / /DRAIN EASEMENT a X100 YEAR / / / / / . / PROPOSED CDS UNITS (. � / / / � ' f \ LO D NE j; cg .(REFER TO SW SHEETS ,/ 1Y :FOR DETAILS). CDS :UNITS ARE NOT TO BE \ ;LOCATED IN THE 1' I / / 1� \ \ \ 2:1 SLOPE PUBLIC RIGHT OF WAY . ; . 1 �I 21 \ \\ `_ \ \ \ /:BUT ON PRIVATE PAD 71.50 \ /� IBA EN�ENT LOT, \ � 0"x\75 / LIMITS OF / / / l::: ..:::. .: / : /: / /' . / I I \ 60' R ' \ / �.;:;:;:; / .1 i fF 711.5 EXISTING \ \ POND q / . . `k'. /I / / ��D��bO., 5 //. I X�0 is I III. � I \ Q2) \ cBE�cB PAD \ 714. \ \ 157 \ I 50'x75' 1 \ \ \\ \ LENNAR CAROLINAS, LLC ' . II \ \ / \ \ ' \ DB 4305, PG 730 j ): I \ \ \ r\ r 5' CP I \ \ PIN 07141008 \..... \ \ PA 7113. 0 / �. �. . : \ \ v PAD I /15.001 50'x75' v2>3 l_ I r EXISTING':':'1':':':'. \ \ \ v I ' \ D DICA D t•-1 POND % \ . . ; . I: :I \ RAd\ 713.0 , • \ \ CP 28 TREE A SAVE / L ... 5o \xep \ \ ` / ...... \ .\ \ ,Y \ ; \� \ PAD 715.7 50'x75 LJ� 1111 ' II \ 1 .� 2� Czj i::::: ::: �:: : : !: \. It �� AD' 71\4 .8 \ \500 75\ \\ / r 4! \ ROPOSED 20' k \ r U TTY AEMN \ �\ --PAD- 716.20 � . . I \ \ 50'x65 T -- ' \ PAD 71 ,.25 T, / / , 0 x73 \ ./ - - . :/: . �: /�\ CHRISTOPHER G. MOWBRAY PIN 07141026 �_-_ - - - -- _- - - - -_ -- PAD\715.2 ARTHUR P. AND � � � MARTHA A. REIN JR. - - - -- - - - - \ \ IIII TREE �SAVE & 50'x60' DB 3493 PG 310 ARF� - - -- PIN 07141025 DONNELLr- rARLTON CAMERON I 1V0f"� DB 3634 -PG 699 PIN 07141022 I GRAPHIC SCALE XISTING 20 UTILITY /EASEMENT f 1 \ ~\- 40 0 20 40 80 (TRYP.)�E = - _ :+_ I FINAL DRAWING - NOT RELEASED FOR 40 ft r 00 'r p VJ A � V L 0 57 = i R z l" z 2 w p sz U 9 A U 2 N N N R R N N N i` W N µy E -1 zcwu W EW, F Humzz �x a E" E- 0 O 'z a d m PA ~ d O O -11 t0 z °z � a z O O C3 PROJECT No. MRH -13040 FH.sN"E: MRH13040 -G2 CHECEED BY: RMR DRAWN BY: CM /JL /RMR SCALE: 071,25 -0 DAT 2014 E: SHEET N0. C -10 J MCADAMS GRADING LEGEND ® FLARED END SECTION STORM DRAINAGE - STORM SERVICE LINE CATCH BASIN - RD -RD- ROOF DRAIN, 8" ADS DROP INLET NON- PERFORATED TUBING OR EQUAL 1.0% MIN. SLOPE 3' MIN. ■ STORM SERVICE INLET COVER PVC SCHEDULE 40 IN TRAFFIC AREAS • STORM SERVICE ROOF -DRAIN -T, -TP - TREE PROTECTION O STORM MANHOLE _LD- LIMITS OF DISTURBANCE WOODED AREA �-- DRAINAGE FLOW ARROW J 250 10' CONTOUR ti LINE BREAK SYMBOL 252 2' CONTOUR 250.50 TOP & BOTTOM CURB ELEVATIONS -250 - - - - - -- EXISTING 10' CONTOUR 250.00 252_ - -- EXISTING 2' CONTOUR TW= 223.00 -TOP OF WALL ELEVATION BW= 213.00 - BOTTOM OF WALL ELEVATION - EASEMENT LINE (NOTE: BOTTOM OF WALL IS GROUND ELEVATION NOT WALL FOUNDATION) 250.60 SPOT ELEVATION 1. ALL WORK AND MATERIALS SHALL CONFORM TO THE LATEST EDITION OF THE NCDOT STANDARD SPECIFICATIONS UNLESS OTHERWISE SPECIFIED IN THIS MANUAL. 2. ONLY REINFORCED CONCRETE PIPE IS ALLOWED WITH THE STREET PAVEMENT (PUBLIC ROADS) EXCEPT FOR CULVERTS EQUAL TO OR GREATER THAN (60) SIXTY INCHES IN DIAMETER. FOR CULVERTS EQUAL TO OR GREATER THAN (60) SIXTY INCHES, CORRUGATED STEEL OR ALUMINUM PIPE IS ALLOWED IF IT HAS A CONCRETE POURED INVERT. MINIMUM GAUGE FOR METAL PIPE SHALL BE 14 GAUGE. 3. ALL STORM DRAINAGE PIPE OUTSIDE THE STREET PAVEMENT SHALL BE REINFORCED CONCRETE PIPE, CORRUGATED METAL PIPE OR HIGH DENSITY POLYETHYLENE (HOPE) PIPE, AS APPROVED BY THE CITY /COUNTY ENGINEER. NO OTHER TYPE OF PIPE SHALL BE USED WITHOUT PRIOR APPROVAL FROM THE CITY /COUNTY ENGINEER. ALL PIPES SHALL BE LAID WITH THE BELL OR GROOVE UPGRADE AND THE JOINT ENTIRELY INTERLOCKING. 4. ALL CONCRETE SHALL BE 3600 PSI. IN ORDER TO USE PRE -CAST STORM DRAINAGE STRUCTURES IN ANY STREET RIGHTS -OF -WAY, PRIOR APPROVAL SHALL BE OBTAINED FROM THE TOWN ENGINEER. 5. ALL HIGH - DENSITY POLYETHYLENE PIPE SHALL BE CORRUGATED EXTERIOR /SMOOTH INTERIOR, CONFORM TO THE REQUIREMENTS OF AASHTO SPECIFICATION M294 FOR CORRUGATED POLYETHYLENE PIPE AND SHALL REQUIRE COUPLING BANDS AND FITTINGS. 6. CONCRETE PIPE USED WITHIN THE STREET RIGHT -OF -WAY SHALL BE A MINIMUM OF CLASS III REINFORCED CONCRETE PIPE, WITH A MINIMUM DIAMETER OF FIFTEEN (15) INCHES (EIGHTEEN (18) INCHES MINIMUM ON CROSS DRAIN CULVERTS WITHIN THE COUNTY). 7. THE MINIMUM COVER FOR ALL PIPE IS TWO (2) FEET. SPECIAL APPLICATIONS FOR LESS THAN TWO (2) FEET OF COVER WILL BE REVIEWED INDIVIDUALLY. 8. CONCRETE MORTAR JOINTS SHALL BE USED FOR JOINING ALL CONCRETE PIPES. THE PIPE SHALL BE CLEAN AND MOIST WHEN MORTAR IS APPLIED. THE LOWER PORTIONS OF THE BELL OR GROOVE SHALL BE FILLED WITH MORTAR SUFFICIENT TO BRING THE INNER SURFACE FLUSH AND EVEN WHEN THE NEXT JOINT IS FITTED INTO PLACE. THE REMAINDER OF THE JOINT SHALL THEN BE FILLED WITH MORTAR AND A BEAD OR RING OF MORTAR FORMED AROUND THE OUTSIDE OF THE JOINT. THE APPLICATION OF MORTAR MAY BE DELAYED UNTIL FILL IS COMPLETED WHEN THE PIPE IS LARGER THAN THIRTY (30) INCHES. 9. PREFORMED JOINT SEALER, WHICH CONFORMS TO AASHTO SPECIFICATION M -198 FOR TYPE B FLEXIBLE PLASTIC GASKETS, MAY BE USED IN LIEU OF THE MORTAR JOINING METHOD. 10. COUPLING BANDS AND FITTINGS SHALL BE USED FOR JOINING ALL HOPE PIPE. COUPLING BANDS SHALL COVER AT LEAST ONE FULL CORRUGATION ON EACH SECTION OF PIPE. GASKET COUPLING BANDS ARE REQUIRED BETWEEN ALL PIPE JOINTS. THE GASKET SHALL BE MADE OF CLOSED -CELL SYNTHETIC EXPANDED RUBBER MEETING THE REQUIREMENTS OF ASTM D1056, TYPE 2. THE PIPE MANUFACTURER SHALL INSTALL GASKETS ON THE COUPLING BAND. ALL COUPLING BANDS SHALL MEET OR EXCEED THE SOIL- TIGHTNESS REQUIREMENT OF AASHTO STANDARD SPECIFICATION FOR HIGHWAY BRIDGES, SECTION 23, PARAGRAPH 23.1.5.4(E). PIPE FITTINGS SHALL CONFORM TO AASHTO M252 OR AASHTO M294. 11. THE INTERIOR SURFACES OF ALL STORM DRAINAGE STRUCTURES SHALL BE POINTED UP AND SMOOTHED TO AN ACCEPTABLE STANDARD USING MORTAR MIXED TO MANUFACTURER'S SPECIFICATIONS. 12. ALL PIPES IN STORM DRAIN STRUCTURES SHALL BE FLUSH WITH THE INSIDE WALL. 13. ANY STORM DRAIN STRUCTURES OVER THREE (3) FEET AND SIX (6) INCHES IN HEIGHT MUST HAVE STEPS IN ACCORDANCE WITH STANDARD DETAILS SET FORTH IN THIS MANUAL. 14. ALL FRAMES, GRATES, RINGS, COVERS, ETC., MUST CONFORM TO THE STANDARDS SET FORTH IN THIS MANUAL. 15. ALL GRADED CREEK BANKS AND SLOPES SHALL BE AT A MAXIMUM OF TWO (2) FEET HORIZONTAL TO ONE (1) FOOT VERTICAL (2:1) AND NOT TO EXCEED 10' WITHOUT TERRACING. 16. ALL BACKFILL SHALL BE NON- PLASTIC IN NATURE, FREE FROM ROOTS, VEGETATIVE MATTER, WASTE, CONSTRUCTION MATERIAL OR OTHER OBJECTIONABLE MATERIAL. SAID MATERIAL SHALL BE CAPABLE OF BEING COMPACTED BY MECHANICAL MEANS AND SHALL HAVE NO TENDENCY TO FLOW OR BEHAVE IN A PLASTIC MANNER UNDER THE TAMPING BLOWS OR PROOF ROLLING. 17. MATERIALS DEEMED BY THE GEOTECH ENGINEER AS UNSUITABLE FOR BACKFILL PURPOSES SHALL BE REMOVED AND REPLACED WITH SELECT BACKFILL MATERIAL. 18. BACKFILLING OF TRENCHES SHALL BE ACCOMPLISHED IMMEDIATELY AFTER THE PIPE IS LAID. THE FILL AROUND THE PIPE SHALL BE PLACED IN LAYERS NOT TO EXCEED EIGHT (8) INCHES, EACH LAYER SHALL BE THOROUGHLY COMPACTED TO 95% OF THE MAXIMUM DENSITY OBTAINABLE WITH THE STANDARD PROCTOR TEST (A DENSITY OF 100% STANDARD PROCTOR IS REQUIRED FOR THE TOP EIGHT (8) INCHES). 19. COMPACTION REQUIREMENTS SHALL BE ATTAINED BY THE USE OF MECHANICAL COMPACTION METHODS. EACH LAYER OF BACKFILL SHALL BE PLACED LOOSE AND THOROUGHLY COMPACTED IN PLACE. 20. UNDER NO CIRCUMSTANCES SHALL WATER BE PERMITTED TO RISE IN UNBACKFILLED TRENCHES AFTER THE PIPE HAS BEEN PLACED. EXISTING --- CHESTNUT LANE (60' PUBLIC R /W) � Il lj lf�/ I It I j SI I III I E tI I I JACK AND BETTY STAFF I I I I I DB 3602 PG 154 II I I/ I PIN 07141115 I I� I IAlI i 'u L� � I�iI�II - - - -- \ \I� 1 f I I � II II I II I I I I I CHESTNUT LANE TO HAVE I II I I 1.5" OVERLAY ACROSS I I ENTIRE WIDTH OF ROAD II I i ALONG FRONTAGE III I I I I 15" RCP I 1 Vic� I w� I1 I I' I 15" RCP III II II II I I PROPOSED EDGE OF III I I I I PAVEMENT TEMPORARY II II I II II I I CONSTRUCTION EASEMENT III I II \I I I HENRY 0. AND I I II f ELSIE G. EUBANKS I 1 PIN 07141001D I I I t I II I I II II I I I I JOHN HOWARD FAISON IV I I \ I DB 1162 PG 684 18 i I { • I I 15" RCP PIN 07141001 II ,iIII � III I I I III�T-4� JI I I I I I ( n I EXISTING EDGE OF I II I PAVEMENT EXISTING III RIGHT OF WAY MATCH LINE - SEE SHEET C -9 - _ MATCH LINE _ '\7\ \ \\A r C -9 _ 7 E SIX TING RIGHT OF WAY EXISTING FDGF OF CHESTNUT LANE �\ (60' PUBLIC R /W) MARK AND NANCY DECHANT DB N/A PG N/A PIN 07141015 \ CHESTNUT LANE TO HAVE \ \ \ 1.5" OVERLAY ACROSS \ ENTIRE WIDTH OF ROAD ALONG FRONTAGE �4 \ GARY AND LAURA SHEPARD DB 3633 PG 342 PIN 07141019 iumurm GRAPHIC SCALE 40 0 20 40 80 FINAL DRAWING - NOT 4LASED'Mh CONSTRUCTION �1 W C14 cod �� Zm All 00 �o E VJ A V AL 035.7 7 :.A\. Nc I • o\G�,,, M. RE���.�• a ° 0 e 2 3 Z W � � 2 N 2 W N y W z b s 0 Q r- 5 N N N N N N N O W a d 0 x O O � xz�� W LW.,F EU z I.-Ix RI E" E W p �21z a pw d O O U z o O a C^ PE07ECT NO. MRH -13040 FHENAME: MRH13040 -G2 cHECEED BY. RMR DR&" Hr: CM /JL /RMR SCALE: 1 "=40' DATE' 07 -25 -2014 SHEET NO. C -11 1=111 MCADAMS A. GENERAL NOTES 1. ALL WORK AND MATERIALS SHALL CONFORM TO THE LATEST EDITION OF THE NCDOT STANDARD SPECIFICATIONS UNLESS OTHERWISE SPECIFIED IN THIS MANUAL. 2. ONLY REINFORCED CONCRETE PIPE IS ALLOWED WITH THE PUBLIC STREET PAVEMENT EXCEPT FOR CULVERTS EQUAL TO OR GREATER THAN (60) SIXTY INCHES IN DIAMETER. FOR CULVERTS EQUAL TO OR GREATER THAN (60) SIXTY INCHES, CORRUGATED STEEL OR ALUMINUM PIPE IS ALLOWED IF IT HAS A CONCRETE POURED INVERT. MINIMUM GAUGE FOR METAL PIPE SHALL BE 14 GAUGE. 3. ALL STORM DRAINAGE PIPE OUTSIDE THE PUBLIC STREET PAVEMENT SHALL BE REINFORCED SMOOTH LINED HIGH DENSITY POLYETHYLENE (HOPE) PIPE (FOR PIPES 15" AND LARGER), AS APPROVED BY THE CITY /COUNTY ENGINEER. ALL PIPES SHALL BE LAID WITH THE BELL OR GROOVE UPGRADE AND THE JOINT ENTIRELY INTERLOCKING. ALL PIPING FROM STORMWATER POND OUTLET STRUCTURES SHALL BE AS SPECIFIED ON THE POND DETAIL SHEETS 4. ALL CONCRETE SHALL BE 3600 PSI. IN ORDER TO USE PRE -CAST STORM DRAINAGE STRUCTURES IN ANY STREET RIGHTS -OF -WAY, PRIOR APPROVAL SHALL BE OBTAINED FROM THE CITY /COUNTY ENGINEER. 5. ALL HIGH - DENSITY POLYETHYLENE PIPE SHALL BE CORRUGATED EXTERIOR /SMOOTH INTERIOR, CONFORM TO THE REQUIREMENTS OF AASHTO SPECIFICATION M294 FOR CORRUGATED POLYETHYLENE PIPE AND SHALL REQUIRE COUPLING BANDS AND FITTINGS. 6. CONCRETE PIPE USED WITHIN THE STREET RIGHT -OF -WAY SHALL BE A MINIMUM OF CLASS III REINFORCED CONCRETE PIPE, WITH A MINIMUM DIAMETER OF FIFTEEN (15) INCHES (EIGHTEEN (18) INCHES MINIMUM ON CROSS DRAIN CULVERTS WITHIN THE COUNTY). 7. THE MINIMUM COVER FOR ALL PIPE IS TWO (2) FEET. SPECIAL APPLICATIONS FOR LESS THAN TWO (2) FEET OF COVER WILL BE REVIEWED INDIVIDUALLY. 8. COUPLING BANDS AND FITTINGS SHALL BE USED FOR JOINING ALL HDPE PIPE. COUPLING BANDS SHALL COVER AT LEAST ONE FULL CORRUGATION ON EACH SECTION OF PIPE. GASKET COUPLING BANDS ARE REQUIRED BETWEEN ALL PIPE JOINTS. THE GASKET SHALL BE MADE OF CLOSED -CELL SYNTHETIC EXPANDED RUBBER MEETING THE REQUIREMENTS OF ASTM D1056, TYPE 2. THE PIPE MANUFACTURER SHALL INSTALL GASKETS ON THE COUPLING BAND. ALL COUPLING BANDS SHALL MEET OR EXCEED THE SOIL- TIGHTNESS REQUIREMENT OF AASHTO STANDARD SPECIFICATION FOR HIGHWAY BRIDGES, SECTION 23, PARAGRAPH 23.1.5.4(E). PIPEFITTINGS SHALL CONFORM TO AASHTO M252 OR AASHTO M294. 9. ALL PIPES IN STORM DRAIN STRUCTURES SHALL BE FLUSH WITH THE INSIDE WALL. 10. ANY STORM DRAIN STRUCTURES OVER THREE (3) FEET AND SIX (6) INCHES IN HEIGHT MUST HAVE STEPS IN ACCORDANCE WITH STANDARD DETAILS SET FORTH IN THIS MANUAL. 11. ALL FRAMES, GRATES, RINGS, COVERS, ETC., MUST CONFORM TO THE STANDARDS SET FORTH IN THIS MANUAL. 12. ALL GRADED CREEK BANKS AND SLOPES SHALL BE AT A MAXIMUM OF TWO (2) FEET HORIZONTAL TO ONE (1) FOOT VERTICAL (2:1) AND NOT TO EXCEED 10' WITHOUT TERRACING, OR AS DIRECTED BY THE ON -SITE GEOTECHNICAL ENGINEER. 13. ALL BACKFILL SHALL BE NON- PLASTIC IN NATURE, FREE FROM ROOTS, VEGETATIVE MATTER, WASTE, CONSTRUCTION MATERIAL OR OTHER OBJECTIONABLE MATERIAL. SAID MATERIAL SHALL BE CAPABLE OF BEING COMPACTED BY MECHANICAL MEANS AND SHALL HAVE NO TENDENCY TO FLOW OR BEHAVE IN A PLASTIC MANNER UNDER TAMPING BLOWS OR PROOF ROLLING. 14. MATERIALS DEEMED BY THE GEOTECHNICAL ENGINEER AS UNSUITABLE FOR BACKFILL PURPOSES SHALL BE REMOVED AND REPLACED WITH SELECT BACKFILL MATERIAL. 15. BACKFILLING OF TRENCHES SHALL BE ACCOMPLISHED IMMEDIATELY AFTER THE PIPE IS WD. THE FILL AROUND THE PIPE SHALL BE PLACED IN LAYERS NOT TO EXCEED EIGHT (8) INCHES, EACH LAYER SHALL BE THOROUGHLY COMPACTED TO 95% OF THE MAXIMUM DENSITY OBTAINABLE WITH THE STANDARD PROCTOR TEST (A DENSITY OF 100% STANDARD PROCTOR IS REQUIRED FOR THE TOP EIGHT (8) INCHES). 16. COMPACTION REQUIREMENTS SHALL BE ATTAINED BY THE USE OF MECHANICAL COMPACTION METHODS. EACH LAYER OF BACKFILL SHALL BE PLACED LOOSE AND THOROUGHLY COMPACTED IN PLACE. 17. UNDER NO CIRCUMSTANCES SHALL WATER BE PERMITTED TO RISE IN UNBACKFILLED TRENCHES AFTER THE PIPE HAS BEEN PLACED. STORM CHART to 17 to CB -A18 to IK>F:II>•IIIIIIIIIIIIIIE4 .53 1 723.44 I 76.50 G] f•Z! MAE..s*mMAE:3RR ==131493 3 1 E11111d:1 707.03 ) 0.71 0.55 1 0.18 I 0.18 7 7 N�q1] = fA.111 • t ! EI II> • =11<III> • t �Ib> • �I 1 712.00 C l rD1 • t11 KI11 • fL11 r�'Y.1 • fL1I:1 [d•� 29.86 I 5. 0.25 �L4111b� • : INVERT ELEV. SWUM= PIPE PIPE REFERENCE DRAINAGE AREA "A" RUNOFF 1�.. RAINFALL KNOWN R OFF FULL �G 1�� HGL ELEV. (FT.) STRUCTURE ( FT. ) LENGTH SLOPE DIAMETER ELEVATION ( FT) ( ACRES ) COEFFICIENT "A" x "C" FLOW TIME (MIN.) INTENSITY RUCAPACITY NOFF (CFS) VELOCITY FROM I TO DOWN UP (ft) N (in) DOWN UP INC. TOTAL (C) INC. TOTAL INLET SYSTEM (in /hr) (cfs) INC. TOTAL (cfs) (ft/s) DOWN UP FES -A2 TO CB -A3 696.76 698.87 51.00 4.14 36 696.76 704.37 0.19 15.40 0.55 0.10 8.47 5.00 13.50 5.40 46.15 0.00 46.15 135.66 7.61 699.42 701.08 CB -A4 to CB -A5 697.10 697.10 45.37 0.00 66 705.44 705.92 OEM 0.94 14.53 0.55 0.52 7.99 5.00 12.20 5.70 Imm 45.39 0.00 45.39 0.00 1.92 702.46 702.47 CB -A6 to CB -A7 697.10 697.80 72.00 0.97 60 711.30 712.62 0.93 12.45 0.55 0.51 6.85 5.00 9.80 6.20 42.18 0.00 42.18 256.83 2.16 702.62 702.64 CB -A8 to CB -A9 699.00 699.90 MEMOIR= 141.87 0.63 60 712.48 710.96 0.86 10.57 0.55 0.47 5.81 5.00 7.20 6.80 39.59 0.00 39.59 1 207.46 6.37 700.79 701.65 to 17 to CB -A18 to IK>F:II>•IIIIIIIIIIIIIIE4 .53 1 723.44 I 76.50 G] f•Z! MAE..s*mMAE:3RR ==131493 3 1 E11111d:1 707.03 ) 0.71 0.55 1 0.18 I 0.18 7 7 N�q1] = fA.111 • t ! EI II> • =11<III> • t �Ib> • �I 1 712.00 C l rD1 • t11 KI11 • fL11 r�'Y.1 • fL1I:1 [d•� 29.86 I 5. 0.25 �L4111b� • : SWUM= 1 . 1 ��-�'�i[lyi.'��'.'.'�� 1�.. �� " ! : ' 1 �G 1�� 1 11 C C � .�L 1���Ni�.K! 1 1 DRAINAGE STRUCTURE NOTES: 1. ALL CATCH BASIN (CB) TYPE STRUCTURES SHALL BE NCDOT STD. 840.02 WITH NCDOT STD. 840.03 FRAME, GRATE AND HOOD. ALL DROP INLET (DI) TYPE STRUCTURES SHALL BE NCDOT STD. 840.14 WITH NCDOT STD. 840.16 FRAME AND GRATE. ALL OPEN THROAT (OT) TYPE CATCH BASINS SHALL BE NCDOT STD. 840.04. CONTRACTOR MAY SUBMIT ALTERNATIVE STRUCTURES FOR ENGINEERS APPROVAL. 2. REFERENCE POINTS FOR EACH STRUCTURE TYPE ARE AS FOLLOWS: CB - TOP OF CURB DI - CENTER OF GRATE OT - THROAT "TOP ELEVATION" FINAL DRAWING - NOT RELEASED FOR CONSTRUCTION •+ U A �8 ,v^^ V/ A � V u .. EAL o�F T .G I .. OO,G��:' 5 a° z z i 12 wx U IA U a 3 q € no ss ° z o d s �yaaaaJ,J, co p" aaaa�a® A O � N W p d Ox z Fr1 E- O wZ.-U W EW F U m z H F W C F E z a O O a � U 00 U U 0�/� :G v Oz o � t� PROJECT x0. MRH -13040 mxNANE: MRH13010 -GN1 CHECKED BY. RMR DRAWN BY: CM /JL /RMR SCAM: N/A DATE: 07 -25 -2014 sHEer xo. C -12 'J MCADAMS _ ,<ROOT ZONE PROTECTION RADIUS TREE TRUNK 1 ROOT ZONE PROTECTION RADIUS IS 1' FOR EVERY SUGAR MAPLE INCH OF TREE TRUNK DIAMETER, AS SHOWN ON REQUIRED WHERE SITE IS THE PLAN, MEASURED 4.5' ABOVE GROUND. 27 TREE PROTECTION FENCING TO BE INSTALLED AT NUTTALL OAK LIMITS OF ROOT ZONE WHERE REQUIRED. 7 SHRUBS SHRUBS TREE PROTECTION FENCING CONSISTS OF EITHER 38 TREE PROTECTION FENCE OR SILT FENCING WITH TULIP POPLAR ORANGE TREE SAVE BACKING. ROOT ZONE PROTECTION DETAIL 6 NTS TIM SAVE ARFA REQUERED TREE SAVE. 596 (0.99 AC.) PROVIDED TREE SAVE 696 (1.60 AC.) (1.27 AC. + 0.33 AC.) TREE PLANTING SCHEDULE SYMBOL QUANTITY BOTANICAL NAME COMMON NAME SIZE HEIGHT — 34 ACER SACCARUM SUGAR MAPLE 2° REQUIRED WHERE SITE IS tq \ PIN 07141001E 27 QUERCUS NUTTAUI NUTTALL OAK 2" 7 SHRUBS SHRUBS -- 38 URIODENDRON TULIPFERA TULIP POPLAR 2' PIN 07141025 6 CRAPE MYRTLE LAGERSTROEMIA 1NDICA 2. YARD LIGHTS 84 AMERICAN HOLLY ILEX OPACA 1 18" EXISTING CHESTNUT LANE (60' PUBLIC R /W) HENRY 0. AND ELSIE G. EUBANKS PIN 07141001D ELAINE A. NICHOLS PIN 07141001E DONALD E. AND KATHLEEN F. GOESSEL PIN 07141001J EX. RED BARN__ TRAIL (VARIABLE PUBLIC R /W) 10' CURB TRANSITII POSSIBLE LOCATION OF ENTRANCE SIGN CHESTNUT LANE TO HAVE - 1.5" OVERLAY ACROSS ENTIRE WIDTH OF ROAD ALONG FRONTAGE CHANG YUNG KI AND SOON SUN PIN 07141016A I I I I II �I klii I° f Id , EX. YARROW STREET 50' PUBLIC R/1P 4 CHESTNUT SUBDIVISION, PHASE 2 PB. H PG. 251 LOT 51 / PIN 07141107 ✓ / ,i 20' PUBLIC / STORM DRAIN \ / \EASEMENT < :'o CHESTNUT SUBDIVISION, PHASE 2 PB. H PG. 251 LOT 57 PIN 07141113 / / / \ CHESTNUT SUBDIVISION, PHASE 2 PS. H PG. 251 LOT 58 PIN 07141114 / 40 /i A 0.2 OPACITY BUFFER IS - - -- — REQUIRED WHERE SITE IS GREGORY SETH LEONARD ADJACENT TO EXISTING DB 6234 PG 721 REQUIRED WHERE SITE IS tq \ PIN 07141001E / I 1 UNDERSTORY / 7 SHRUBS SHRUBS -- ADJACENT TO EXISTING 43 PIN 07141025 SITE LEGEND SINGLE FAMILY. SIGNAGE YARD LIGHTS `4b POWER POLE �► 1 10' WIDE I I HANDICAP RAMPS 1 CANOPY PROPERTY LINE - - - RIGHT -OF -WAY LINE —X —X —yX —X— FENCE , 1y ' � �Y TREE TO ADD - SEE SCHEDULE 1 UNDERSTORY TREE SAVE EN= OPEN SPACE ,..m GRAPHIC SCALE 60 I 7 SHRUBS 1 inch = 60 ft. I (EXISTING VEGETATION TO BE _ USED IN LIEU WHERE �� - APPLICABLE. I (aal I I I I I JOHN HOWARD FAISON IV DB 1162 PG 684 PIN 07141001 III I I I�) I ! NI I 1 .. I A 0.2 OPACITY BUFFER IS REQUIRED WHERE SITE IS I ADJACENT TO EXISTING 20' TEMPORARY 46 SINGLE FAMILY. CONSTRUCTION 10' WIDE EASEMENT I I 1 CANOPY 1 UNDERSTORY I 7 SHRUBS 20' FUTURE PERMANENT — S.S. EASEMENT — — (EXISTING VEGETATION TO BE USED IN LIEU WHERE Ii APPLICABLE. i 48 V20 51 1 50 i 49 LIGHT PO IE (TYP.) 20' PUBLIC STORM BLIC STORM E{ D $ N' T (SEE D'TAIL� DRAIN EqSEA MENT a r I ms's A,,. /ate • 38 17 16 RETAINING WALL BY OTHERS) 15 13 • (12 11 S O a� A 0.2 OPACITY BUFFER IS \ REQUIRED WHERE SITE IS GREGORY SETH LEONARD ADJACENT TO EXISTING DB 6234 PG 721 SINGLE FAMILY. tq \ PIN 07141001E / ` 1 UNDERSTORY / 7 SHRUBS SHRUBS MARTHA A. HEIN JR. DB 3493 PG 310 PIN 07141025 A 0.2 OPACITY BUFFER IS REQUIRED WHERE SITE IS I ADJACENT TO EXISTING 20' TEMPORARY 46 SINGLE FAMILY. CONSTRUCTION 10' WIDE EASEMENT I I 1 CANOPY 1 UNDERSTORY I 7 SHRUBS 20' FUTURE PERMANENT — S.S. EASEMENT — — (EXISTING VEGETATION TO BE USED IN LIEU WHERE Ii APPLICABLE. i 48 V20 51 1 50 i 49 LIGHT PO IE (TYP.) 20' PUBLIC STORM BLIC STORM E{ D $ N' T (SEE D'TAIL� DRAIN EqSEA MENT a r I ms's A,,. /ate • 38 17 16 RETAINING WALL BY OTHERS) 15 13 • (12 11 S O a� i \ 18 19 ``\ \RETAINING Wi \ \'BY \OTH /ERS) J\ V 20 STORM MANAGEMENT FACILITY REVOCABLE LIVING TRUST DB 4680 PG 414 PIN 07141020 / 24 V� 25 30 29 \ DONNELLY CARLTON CAMERON DB 3634 PG 699 PIN 07141022 A 0.2 OPACITY BUFFER IS REQUIRED WHERE SITE IS ADJACENT TO EXISTING SINGLE FAMILY. 10' WIDE 1 CANOPY 1 UNDERSTORY 7 SHRUBS (EXISTING VEGETATION TO BE USED IN LIEU WHERE APPLICABLE. II LENNAR CAROLINAS, LLC DB 4305 PG 730 PIN 07141008 SAVE CHRISTOPHER G. MOWBRAY PIN 07141026 A 0.2 OPACITY BUFFER IS REQUIRED WHERE SITE IS A 0.2 OPACITY BUFFER IS \ REQUIRED WHERE SITE IS GREGORY SETH LEONARD ADJACENT TO EXISTING DB 6234 PG 721 SINGLE FAMILY. tq \ PIN 07141001E 10' WIDE 1 CANOPY ` 1 UNDERSTORY 7 SHRUBS SHRUBS i \ 18 19 ``\ \RETAINING Wi \ \'BY \OTH /ERS) J\ V 20 STORM MANAGEMENT FACILITY REVOCABLE LIVING TRUST DB 4680 PG 414 PIN 07141020 / 24 V� 25 30 29 \ DONNELLY CARLTON CAMERON DB 3634 PG 699 PIN 07141022 A 0.2 OPACITY BUFFER IS REQUIRED WHERE SITE IS ADJACENT TO EXISTING SINGLE FAMILY. 10' WIDE 1 CANOPY 1 UNDERSTORY 7 SHRUBS (EXISTING VEGETATION TO BE USED IN LIEU WHERE APPLICABLE. II LENNAR CAROLINAS, LLC DB 4305 PG 730 PIN 07141008 SAVE CHRISTOPHER G. MOWBRAY PIN 07141026 A 0.2 OPACITY BUFFER IS REQUIRED WHERE SITE IS ADJACENT TO EXISTING SINGLE FAMILY. 10' WIDE 1 CANOPY 1 UNDERSTORY ` 7 SHRUBS ARTHUR P. AND MARTHA A. HEIN JR. DB 3493 PG 310 PIN 07141025 SITE LEGEND -o- SIGNAGE YARD LIGHTS `4b POWER POLE �► TRAFFIC DIRECTIONAL ARROW HANDICAP PARKING STALL HANDICAP RAMPS ----- - - - - -- PROPERTY LINE - - - RIGHT -OF -WAY LINE —X —X —yX —X— FENCE , 1y ' � �Y TREE TO ADD - SEE SCHEDULE TREE SAVE EN= OPEN SPACE ,..m GRAPHIC SCALE 60 0 30 60 120 1 inch = 60 ft. FINAL DRAWING - NOT RELEASED FOR CONSTRUCTION .r �wzz terr^^ VJ A � V EAL �I 0357W' v..I ...... G��`` M RED z s a � v z In � g y U N U ~p z N yU3 F� �y Z � w z ©<l © ® ® ®® a CO W CV x 0o E- ° d xz W E F E�IUmZ �Nx W C� Cy Z r�7 m x d 00 ua z c� p w� O PROJECT NO. MRH -13040 FRMNAKS: MRH13040 -LS1 CRECM BY: RMR OEAwN BY: CM /JL /RMR SCALE: 1"=60' DATE: 07 -25 -2014 SKEET N0. C -13 M MCADAMS CHESTNUT HOMEOWNERS NOTES: A ♦ ' ASSOCIATION, INC 1. COORDINATE ALL CURB AND STREET GRADES IN INTERSECTION WITH INSPECTOR. ♦ DA: 16.3 C PIN 97141006 2. ALL ROAD IMPROVEMENTS AT CHESTNUT LANE ARE TO BE COORDINATED WITH THE NCDOT EVTr li / YARROW CHESTA S BDI ON, PHASE / � i% PRIOR TO CONSTRUCTION. XI ala�ra== lx 3. DEVELOPER WILL PROVIDE STREET SIGNS. S EET \ , PB LOT S) �� / V III 4. SIGHT TRIANGLES SHOWN ARE THE MINIMUM REQUIRED. SO' PUBIC R/lf PIN 07141100 !i `\ �4. 5. IN ROLLING AND HILLY TERRAINS, SWEEPING OF THE STONE BASE AND /OR APPLICATION OF A TACK COAT MAY BE REQUIRED NEAR INTERSECTION. THESE REQUIREMENTS WILL BE ESTABLISHED BY THE INSPECTOR AND BASED ON FIELD CONDITIONS. ♦ / ' / ' / \ \ \\ \� 6. APPROVAL OF THIS PLAN IS NOT AN AUTHORIZATION TO GRADE ADJACENT PROPERTIES. WHEN ♦ ♦ \ '�/9� ` I �\ FIELD CONDITIONS WARRANT OFF -SITE GRADING, PERMISSION MUST BE OBTAINED FROM THE ♦ ♦ ® AFFECTED PROPERTY OWNERS. ♦ ♦ / 7. IN ORDER TO ENSURE DRAINAGE, KEEP A MINIMUM OF 0.5% SLOPE ON THE CURB. ♦ / 1 8. SUBSURFACE DRAINAGE FACILITIES MAY BE REQUIRED IN THE STREET RIGHT -OF -WAY IF 4 A i I // // / X I / DEEMED NECESSARY BY THE INSPECTOR. DA: 6.76 AC CHESTNUT SUBDIVISION, PHASE 2 1 �i /� 9. THE PURPOSE OF THE STORM DRAINAGE EASEMENT (SDE) IS TO PROVIDE STORM WATER PB. H PG. 251 / / 1 / v /' l %i /� / l CONVEYANCE AND ANY STRUCTURES AND /OR OBSTRUCTION TO STORM WATER FLOW IS LOT 51 i 1 I PROHIBITED. \ PIN 07141107 / 1 Y / / l ` \ o�� i / 1 / \ N I r , 10. HIGH - DENSITY POLYETHYLENE (HDPE) STORM DRAINAGE PIPE INSTALLED WITHIN EXISTING OR ` �I / 1 / Y PROPOSED PUBLIC STREET RIGHT -OF -WAY MUST BE APPROVED BY THE TOWN'S INSPECTOR PRIOR TO ANY BACKFILL BEING PLACED. BACKFILL MATERIAL MUST BE APPROVED BY THE _ L ` \ ' ii/ -B1 TOWN INSPECTOR PRIOR TO PLACEMENT OF THE MATERIAL WITHIN THE PUBLIC STREET RIGHT -OF -WAY. 11. THE DEVELOPER SHALL MAINTAIN EACH STREAM, CREEK, OR BACKWASH CHANNEL IN AN _ \ `� UNOBSTRUCTED STATE AND SHALL REMOVE FROM THE CHANNEL AND BANKS OF THE STREAM - \ // ALL DEBRIS, LOGS, TIMBER, JUNK AND OTHER ACCUMULATIONS. \ � j 37 / / / / / /\ % // 12. PROOF ROLLING OF STREET SUBGRADE AND AGGREGATE BASE MATERIAL SHALL BE PERFORMED ♦ CHESTNUT SUBDIVISION, PHASE 2 / Y BY THE CONTRACTOR IN THE PRESENCE OF THE OWNERS ENGINEER. THE ENGINEER SHALL PB. H PG. 251 v o v t p! v ✓ / / / / / PROVIDE WRITTEN VERIFICATION TO THE TOWN THAT THE SUBGRADE AND AGGREGATE BASE LOT 57 MATERIAL MEET THE DENSITY REQUIREMENT AS SPECIFIED. FAILURE TO PROVIDE ENGINEERS PIN 071411/3 _� / / l II j VERIFICATION OF THE SUBGRADE AND STONE BASE COURSE COMPACTION COULD RESULT IN L 135 DELAY OF ACCEPTANCE OF THE DEVELOPMENT BY THE TOWN. 100 `C EXISTING CHESTNUT LANE (60' PUBLIC R /W) HENRY 0. AND ELSIE G. EUBANKS PIN 07141001D ELAINE A. NICHOLS PIN 07141001E DONALD E. AND KATHLEEN F. GOESSEL PIN 07141001J EX. RED BARN_ TRAIL (VARIABLE PUBLIC R /W) CHESTNUT LANE TO HAVE 1.5" OVERLAY ACROSS ENTIRE WIDTH OF ROAD ALONG FRONTAGE CHANG YUNG KI AND SOON SUN PIN 07141016A _ _. - - - - / / /' I Ir v v vA Avg vv�E" A/ \\ I I I. 00 100 100 00 t� MEN 'm_ x(34 TNUT SUBDIVISION, PHASE 2 / / \ \O c ;I� I II I II I I II \ I Ow PB. H PG. 251 LOT 58 �S - J! ! I I I 1 1 I q PIN 07141114 I fV II It, �V I I I / / \I `, r 00 ��k I 1 I •I s. n '��`` y. �� 1 1 1 \ I� �' - - - - - -- DA: a. ; (`�� 1 �\ -A, ik \I 1 ;., /LO / II11) / \ 1 ,\ C4 \�1` tr /- II -- -� - / - ( \ V 1, 1 i1 •� 11 I , I �} \1 A V 1 1 / 1 I I l I r I/ , i I I 132 Q AC i II ( I 40, I ( I I \ y91 y of II I I\ \ \ I /�/ ! r% / �/ i DA: 0.93 AC r \� 100 jI y -� I � � / ✓ \r \ \ � I I� //�", / / / / / / / /'/ / ::::::::::::::::::::�::r:.ly'i 1 \ I > \\ \ ��\ < ' "' 6 � �\ I l \ \ 43 I �/ / ' .:......:ll.ltl w� DA: 0.76 AC\ I „/ %::Ft:. = x'111 lt'\ \\ \\ \ \ ,�'' \\ 1 I \ \ I I / , , j ,/ , n 6' ,' / / j / j// ��` d \'::'''''F' (' 1 1 \ / I \ \ \ LENNAR CAROLINAS, LLC fl' 1I A: 1.37 AC �♦ \�����a� ` V / ' \ \ \ !/ DB4305PG730 \ I �/ I / / /, / // '' ' 7:'t�.�:.: \ ✓ D , / PIN 07141008 FF I IN ♦ \ / / / I / �, ,/ / / / /j // c °.:i::c i - : : :.:: /: *:':*: *:':': \,/ \ \ \ % I� \ ` -� 29 / i \�1 I I ' ` �'�► ♦ \ I. / ,� 1 _ t /// .. ! .,. _._ /._....... {1... ..11 \ 1 i I l \ I \ I I /I \ / ip I ' ` ♦ ♦ `� ` 44 I i / , ii '! ft' r:':':':':':':':'::: ::rl:::;e::.i 1 \ \ \ y / ` \\ / II III I 1 ♦ •� JOHN HPO D A I i / 4%, D �116 8 // � II::::: :::. :: { IN 8 /',/ /, 1::.:.f :::c.c....:::.:.;.a E : .. Ij / / / I 1 \ �Y ; \ \� TREE SAVE \\ / 1 2� 1 \ 41v* 1 I / I I / / / ..r 1\ " �I , , ♦ ♦ // / / I/ I 4 j :.:...1: 27 / I ` ♦ / / 45 11 l l I 1 / ��{{ l r / //, `.;�ii:y.:::::.: / >. .Y:: :JI ` \ \ 1 11 \ \ \\ \ I , ` ♦ , / /'�-� III I I' 1:;:;:..... ;\r:.:.: \ I k' \ \\ ` \ v\ 1 \ -/�� II �/•'1ts y " , I I I 1 � �/ V A v I I JI ', ` ` // _J- '�^±►_I_ -I F I I f \ \ \ \ \ \ \ . \: ' >> .' . 1, l_ _ 'I. ,.:i /' 12 \ `\ • ` \\ �/ %� ` -- I 1 I� I �/ ♦ ♦ DA: 0.71 AC �' - �_; -- - Yr +` := a= r` 1 s; ; \ \ /'' CHRISTOPHER G. MOWBRAY I I ^• -T t \ PIN 07141026 i�'' I � � � � � _� b■I \ \ , \ \ \ f--.- _ °.:.:F:fl. I , ( , I I I � I \ y \ ; j.�`•� / / v 113 \ \ \ \:'...: t.::':.::.:::... -�.. _ \� it I I ( \ ` v' I / / /' / // / II I \� \ \\ \ \ - _ - _- ---- ---- -- � � i ,/ � i - - -- -- - - - - -- _ _ -`I _\ V )A\ ---/- ' I I / ' 1 vv ' / ARTHUR P. AND MARTHA A. HEIN JR. / (/ / i // / 1 11 I I I \ 1 II I 1 \ \ I DB 3493 PG 310 / ` I PIN 07141025 Ti- 1 '�_ �_7 I I I v v v DONNELQ_( CARLTON CAMERON DB 3634 PG 699 I 1 1 B- 124 PIN 07141022 '1` �i �♦ 1 / fiT T l A: E� CB -At Brt 12 � � .I �I III , I I / CB- , ti / '� / CB -A1 1 i III .� \\\ \ \\ \\ L_ ,1 \J \ .\ Z \ \� 1 i GRADING LEGEND t - - \ \\ Cjj FLARED END SECTION .STORM DRAINAGE STORM SERVICE LINE CATCH BASIN ROOF DRAIN, 8" ADS 1 \ I 3 5 IF '� i \ DROP INLET NON - PERFORATED TUBING OR 4� EQUAL 1.0% MIN. SLOPE 3' MIN STORM SERVICE INLET COVER PVC SCHEDULE 40 IN \ I � 1 \\ \ ` \ � , � ' �%; �_ � ■ TRAFFIC AREAS 1 F\ STORM SERVICE ROOF -DRAIN TP -TP- TREE PROTECTION REVOCABLE LIVING TRUST \ \ DB 4680 PG 414 STORM MANHOLE O LD LIMITS OF DISTURBANCE -- - c, = _ �- _ \\ \\ I PIN 07141020 _ - - _ WOODED AREA t A - - Dl(: 0.97 A� 4f DA. 1.05 AC ' 40 � I M- DRAINAGE FLOW ARROW �J it \ \\ \ \, -DA: 1.00 AC I ' RETAINING WALL 250 � (DESIGNED BY I 10' CONTOUR N LINE BREAK SYMBOL 252 2' CONTOUR %* GREGORY SETH LEONARD ' OTHERS) 250_______ \ DB 6234 PG 721 I - - PIN 07141001E I 250.50 252 EXISTING 10' CONTOUR ' 250.00 TOP &BOTTOM CURB ELEVATIONS EXISTING 2' CONTOUR 0.38 AC ` `` ' I Tw= 223.00 -TOP OF WALL ELEVATION - - - EASEMENT LINE �S BW= 213.00 - BOTTOM OF WALL ELEVATION \ \ i I ELEVATION NOT WALL FOUNDATION) GROUND 250.60 SPOT ELEVATION GRAPHIC SCALE 60 0 30 60 120 IL I inch = 60 ft. FINAL DRAWING - NOT RELEASED FOR CONSTRUCTION A9 W +°I � ■ An OQ Z �� 'yU� VJ � V .y 9 EAL NE.. i 8 < 3 w n N 2 Z a 6 5 g g g < g s Z b _7 S o a ® ®4® ®®® i` W J d o� O xz�U W x � Lw.n E CPO F'i0mz F E wo 0 E Z o x P4 O 0 x a O w z c� A O r Q PROJECT No. MRH -13040 FILENAmE: MRH13040 -DAl CHECKED BY. RMR DRAWN BY: CM /JL/RMR SCALE: 1"=60' DATE: 07 -25 -2014 SHEET N0. C -14 M MCADAMS J O / 4 0 O 150' DECELERATION LENGTH 100' BAY TAPER TIE PROPOSED EDGE LINE INTO EXISTING PAVEMENT MARKING � 1.5" OVERLAY TO EXTEND 10' PAST ° CONNECTION TO EXISTING ASPHALT i { { { { { 1 RED BARN TRAIL 1 (50' RIGHT —OF -WAY) 100' STORAGE —M- M� Kai .5' �FOC 10'X70' NCDOT- SIGHT TRIANGLE � / I TRANSITION TAPER — -- — -- --I END CURB AND GUTTER I GENERAL NOTES: EXISTING (60' 200' STORAGE CHESTNUT RIGHT —OF —WAY) LANE I — x2.00' t - - 112.00' I i 30 "X30" STOP SIGN (CONTRACTOR TO INSTALL) I I 1 I RED BARN TRAIL (50' RIGHT —OF —WAY) EXISTING UTILITIES SHOWN ARE BASED ON FIELD SURVEYS AND THE BEST AVAILABLE RECORD DRAWINGS. THE CONTRACTOR SHALL VERIFY CONDITIONS PRIOR TO BEGINNING AND DURING CONSTRUCTION. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE RELOCATION OF EXISTING UTILITIES AS REQUIRED FOR CONSTRUCTION AND THE COORDINATION OF THE RELOCATION WITH THE APPROPRIATE REGULATING AUTHORITIES. CONTRACTOR SHALL CALL "NORTH CAROLINA ONE CALL" (1- 800 - 632 -4949) AT LEAST 48 HOURS PRIOR TO DIGGING TO VERIFY EXISTING UTILITY LOCATIONS. ALL CONSTRUCTION WITHIN NCDOT RIGHT -OF -WAY SHALL BE TO NCDOT STANDARDS AND SPECIFICATIONS. CONTRACTOR SHALL HAVE COPIES OF ALL NECESSARY NCDOT AND TOWN OF STALLING PERMITS AND APPROVALS PRIOR TO BEGINNING CONSTRUCTION. NO SUBSURFACE INVESTIGATION HAS BEEN CONDUCTED FOR THIS PROJECT. THE CONTRACTOR SHOULD MAKE THEIR OWN INVESTIGATION OF EXISTING CONDITIONS. CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING TRAFFIC CONTROL DEVICES IN ACCORDANCE WITH THE STANDARDS OF NCDOT. CONTRACTOR SHALL PLACE TEMPORARY SILT FENCE (NCDOT STD. 1605.01) AT THE TOE OF ALL FILL SLOPES AND INLET SEDIMENT TRAPS (NCDOT STD. 1632.03) AT ALL DRAINAGE STRUCTURES IMPACTED BY CONSTRUCTION. 150' DECELERATION LENGTH 100' BAY TAPER .— io rrrriartmr�iry i t° 1 T *---� — TRANSITION TAPER END CURB AND GUTTER TIE PROPOSED EDGE - LINE INTO EXISTING PAVEMENT MARKING * PERMANENT THERMOPLASTIC PAVEMENT MARKINGS MARKING LINES MARKING SYMBOLS PA - (4" EX. EDP EDGE LINE QC '— ( "ONLY ") PB — (4" WHITE) 4" X 10' SKIP QD — PU PC — (4" WHITE) 4" X 2' MINISKIP 10' GAP QE — (RIGHT TURN ARROW) PD — (4" WHITE) SOLID LANE LINE OF — (STRAIGHT ARROW) PI — (8" WHITE) o / � QG — TIE PROPOSED EDGE LINE INTO EXISTING PAVEMENT MARKING � 1.5" OVERLAY TO EXTEND 10' PAST ° CONNECTION TO EXISTING ASPHALT i { { { { { 1 RED BARN TRAIL 1 (50' RIGHT —OF -WAY) 100' STORAGE —M- M� Kai .5' �FOC 10'X70' NCDOT- SIGHT TRIANGLE � / I TRANSITION TAPER — -- — -- --I END CURB AND GUTTER I GENERAL NOTES: EXISTING (60' 200' STORAGE CHESTNUT RIGHT —OF —WAY) LANE I — x2.00' t - - 112.00' I i 30 "X30" STOP SIGN (CONTRACTOR TO INSTALL) I I 1 I RED BARN TRAIL (50' RIGHT —OF —WAY) EXISTING UTILITIES SHOWN ARE BASED ON FIELD SURVEYS AND THE BEST AVAILABLE RECORD DRAWINGS. THE CONTRACTOR SHALL VERIFY CONDITIONS PRIOR TO BEGINNING AND DURING CONSTRUCTION. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE RELOCATION OF EXISTING UTILITIES AS REQUIRED FOR CONSTRUCTION AND THE COORDINATION OF THE RELOCATION WITH THE APPROPRIATE REGULATING AUTHORITIES. CONTRACTOR SHALL CALL "NORTH CAROLINA ONE CALL" (1- 800 - 632 -4949) AT LEAST 48 HOURS PRIOR TO DIGGING TO VERIFY EXISTING UTILITY LOCATIONS. ALL CONSTRUCTION WITHIN NCDOT RIGHT -OF -WAY SHALL BE TO NCDOT STANDARDS AND SPECIFICATIONS. CONTRACTOR SHALL HAVE COPIES OF ALL NECESSARY NCDOT AND TOWN OF STALLING PERMITS AND APPROVALS PRIOR TO BEGINNING CONSTRUCTION. NO SUBSURFACE INVESTIGATION HAS BEEN CONDUCTED FOR THIS PROJECT. THE CONTRACTOR SHOULD MAKE THEIR OWN INVESTIGATION OF EXISTING CONDITIONS. CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING TRAFFIC CONTROL DEVICES IN ACCORDANCE WITH THE STANDARDS OF NCDOT. CONTRACTOR SHALL PLACE TEMPORARY SILT FENCE (NCDOT STD. 1605.01) AT THE TOE OF ALL FILL SLOPES AND INLET SEDIMENT TRAPS (NCDOT STD. 1632.03) AT ALL DRAINAGE STRUCTURES IMPACTED BY CONSTRUCTION. 150' DECELERATION LENGTH 100' BAY TAPER .— io rrrriartmr�iry i t° 1 T *---� — TRANSITION TAPER END CURB AND GUTTER TIE PROPOSED EDGE - LINE INTO EXISTING PAVEMENT MARKING * PERMANENT THERMOPLASTIC PAVEMENT MARKINGS MARKING LINES MARKING SYMBOLS PA - (4" WHITE) EDGE LINE QC '— ( "ONLY ") PB — (4" WHITE) 4" X 10' SKIP QD — (LEFT TURN ARROW) PC — (4" WHITE) 4" X 2' MINISKIP 10' GAP QE — (RIGHT TURN ARROW) PD — (4" WHITE) SOLID LANE LINE OF — (STRAIGHT ARROW) PI — (8" WHITE) SOLID GORE LINE QG — (COMB. STR /LT ARROW) PJ — (8" WHITE) DIAGONAL LINE QH — (COMB. STR /RT ARROW) PK — (8" WHITE) CROSSWALK LINE PO — (24" WHITE) STOP BAR PQ — (4" YELLOW) 4" EDGE LINE * TEMPORARY STRIPING FOR TRAFFIC CONTROL PR — (4" YELLOW) 4" X 10' SKIP MAY BE NCDOT STANDARD PAINT S PT — (4" YELLOW) SINGLE CENTER LINE PU — (4" YELLOW) DOUBLE CENTER LINE PY — (8" YELLOW) DIAGONAL 1.5" OVERLAY TO EXTEND 10' PAST CONNECTION TO EXISTING ASPHALT NCDOT STD. DRAWINGS I I 200.02 METHOD OF CLEARING - METHOD II 225.06 METHOD OF GRADING SIGHT DISTANCE AT INTERSECTIONS 225.02 GUIDE FOR GRADING SUBGRADE- SECONDARY AND LOCAL 654.01 PAVEMENT REPAIRS 840.72 PIPE COLLAR 846.01 CONC. CURB, GUTTER AND CURB & GUTTER 1101.01 WORK ZONE ADVANCE WARNING SIGNS 1101.02 TEMPORARY LANE CLOSURES 1101.04 TEMPORARY SHOULDER CLOSURES 1110.02 PORTABLE WORK ZONE SIGNS- MOUNTING HEIGHT & LATERAL CLEARANCE 1250.01 PAVEMENT MARKER SPACING 1605.01 TEMPORARY SILT FENCE 1633.02 TEMPORARY ROCK SILT CHECK TYPE 'B' GRAPHIC SCALE 40 0 20 40 80 1 inch = 40 ft. FINAL DRAWING - NOT RELEASED FOR CONSTRUCTION N �r O A ' U z °� A � V SEAL 0357 e M...REQ,r,,`� gnmun•• b 3 ° 3 3 Z N W O K ma °a a a z �aaassso i` 19 Cq �w CQ �o z Ox o a x z CQ o W�WF F HUm z H F E Wo 0 6+ z r7 � U ti d O Q 9 U °z 04 0 �Q a PROJECT x0. MRH -13040 TNAUE MRH13040 -PM1 CHECKED BY: RMR DRAWN BY: CM /JL/RMR SCALE: f=40' DATE: 07 -25 -2014 SHEET NO. C -15 'J MCADAMS EXISTING CHESTNUT LANE (60' RIGHT —OF —WAY) 48N48" 48N48" 48 "x48" W20 -4 W2\4 20-7a 350' 1 350' 1 350' i TRAFFIC CONTROL GENERAL NOTES A) ALL TRAFFIC CONTROL DEVICES SHALL CONFORM TO THE NORTH CAROLINA DEPARTMENT OF TRANSPORTATION(NCDOT) THE NCDOT ROADWAY STANDARD DRAWINGS AND THE CURRENT EDITION OF THE NCDOT. STANDARD SPECIFICATIONS FOR ROADS AND STRUCTURES. B) THE CONTRACTOR IS TO NOTIFY NCDOT IN WRITING 10 WORKING DAYS IN ADVANCE OF ANY ROAD CLOSURE OR 5 WORKING DAYS PRIOR TO CLOSING ONE OR MORE TRAVEL LANES. C) THE CONTRACTOR SHALL BE REQUIRED TO FURNISH, INSTALL, RELOCATE, AND MAINTAIN ALL TRAFFIC CONTROL DEVICES, SIGNS, BARRICADES, WARNING AND /OR CHANNELIZING DEVICES FOR WORK SITES AND DETOUR ROUTES AS SHOWN IN TRAFFIC CONTROL PLANS UNLESS OTHERWISE SPECIFIED BY THE ENGINEER. D) CONSTRUCTION PHASING MAY DICTATE THAT TWO OR MORE TYPICAL W.A.T.C.H. DIAGRAMS OR STANDARDS BE USED IN ONE AREA OF CONSTRUCTION. CHANNELIZING DEVICES ASSOCIATED WITH THESE TYPICALS SHALL BE MOVED, SUPPLEMENTED, CHANGED, OR REMOVED AS NECESSARY TO COMPLY WITH THE CONSTRUCTION PHASING OF THE PLANS. THE LOCATION AND POSITIONING OF THESE DEVICES SHALL BE APPROVED BY THE ENGINEER TO ENSURE THAT THE MOTORIST DOES NOT RECEIVE FALSE INFORMATION WHEN TWO OR MORE TYPICALS AND /OR ROADWAY STANDARD. DRAWINGS OVERLAP. E) CONTRACTOR SHOULD BE AWARE THAT WHEN THE CONSTRUCTION AREA IS IN OR NEAR A VERTICAL CREST OR HORIZONTAL CURVE, THE WORK AREA SHALL BE EXTENDED SO THAT LANE CLOSURE BEGINS IN ADVANCE OF THE CURVE AND MINIMUM STOPPING SIGHT DISTANCE IS MET. F) THE CONTRACTOR SHALL MARK ALL HAZARDS WITHIN THE LIMITS OF THE PROJECT WITH WELL- MAINTAINED SIGNS, BARRICADES, WARNING AND /OR CHANNELIZING DEVICES. ON CONNECTING ROADS, ALL BARRICADES, SIGNS, WARNING, AND /OR CHANNELIZING DEVICES SHALL BE MOVED, SUPPLEMENTED, CHANGED, OR REMOVED AS REQUIRED DURING THE PROGRESS OF CONSTRUCTION AS APPROVED BY THE ENGINEER. G) WORK ON THE PROJECT OR ANY SEPARATE ACTIVITY THEREIN SHALL NOT START UNTIL ALL OF THE REQUIRED SIGNS, BARRICADES, WARNING, AND /OR CHANNELIZING DEVICES ARE INSTALLED AND APPROVED BY THE ENGINEER. SHIFT TAPER BUFFER 125' 175' CONTRACTOR TO MAINTAIN A- MINIMUM TRAVEL LANE OF 10' i � I WORK AREA 100' A l I a TEMPORARY WORK ZONE TRAFFIC CONTROL NOTES 1. TRAFFIC CONTROL MEASURES SHALL BE IN ACCORDANCE WITH COOT WORK AREA TRAFFIC CONTROL HANDBOOK. 2. PLACE CONES ADJACENT TO WORK AREA AT THE MAXIMUM SPACING EQUAL IN FEET TO 2 TIMES THE POSTED SPEED LIMIT. PLACE CONES SEPARATING OPPOSING TRAFFIC AT THE MAXIMUM SPACING OF 25 FEET. 3. DRUMS OR SKINNY -DRUMS MAY BE USED IN LIEU OF CONES. 4. LANE CLOSURE RESTRICTIONS: 6AM -9AM AND 4PM -6PM. NO LANE CLOSURES SHALL BE LEFT IN PLACE AT NIGHT WHEN WORK IS NOT BEING PERFORMED. MAINTAIN ACCESS TO BUS STOPS AT ALL TIMES. 5. LANE CLOSURES, IF REQUIRED, SHALL FOLLOW GUIDELINES AS OUTLINED IN THE MUTCD. 6. ANY DAMAGED PAVEMENT SHALL BE REPAIRED AS FOLLOWS: A. 10" TYPE B25.OB BASE COURSE B. 2.25" TYPE 119.013 INTERMEDIATE COURSE C. 2.5" TYPE S9.56 SURFACE COURSE r W3 -4 BUFFER TAPER 175' 125' 350' 350' I r I I I � I RED BARN TRAIL (50' RIGHT —OF —WAY) I EGENn CONTROL SIGN LEGEND • CONES /DRUMS DIMENSION SIGNS \-a— FLASHING ARROW u PANEL DIRECTION OF BE PREPARED TOO TRAFFIC FLOW CHANGEABLE MESSAGE SIGN ONE LANE ROAD O FLAGGER TRAFFIC CONTROL SIGN LEGEND NCDOT ID CODE MUTCD SIGN MESSAGE /SHAPE DIMENSION W21 -4 ROAD WORK O AHEAD 48 "x4B" W3 -4 BE PREPARED TOO 48 "x48" STOP W20 -4 ONE LANE ROAD O 48 "x48" AHEAD W20 -7a <0> 48 "x48" R4 -7 24 "X30" W20 -51R RIGHT LANE O 48 "x48" CLOSED AHEAD W20 -51L LEFT LANE O 48 "x48" CLOSED AHEAD W4 -2R 48 "x48" W4 -2L 48 "x48" R3 -5R ONLY ® 30 "x36" R3 -5L 1 30 °x36" R3 -7R RIGHT LANE MUST ❑ 30 "00" TURN RIGHT W4 -71. THRU TRAFFIC O 30 "x36" MERGE LEFT W9 -1R RIGHT LANE O 48 "x48" ENDS W20 -5aR RIGHT 2 LANES CLOSED AHEAD 48 "x48" W20 -5aL LEFT 2 LANES CLOSED AHEAD 48 "x48" GRAPHIC SCALE 40 0 20 40 80 1 inch = 40 ft. FINAL DRAWING - NOT RELEASED FOR CONSTRUCTION N 00 tiV tIn A � V �uun... AL 035�j7� = M. R �to`' "lots'. wt%' 5 8 _p p.p Bit 'g oz 3 3 3 2 N Ix ZN N y N W � Oi A x 3 2 S y S S S N N N N N N N x Q ©< ©Qq® n cc x a z of w FE �U z �I E" E W o E+" z a � x .y V d 00 a 0 U z U U o� O t� PROTECT. NO. MRH -13040 FHENAME: MRH13040 -TC1 CHECKED BY: RMR DRAW" BY: CM /JL /RMR SCALE: 1 " =40' DATE: 07 -25 -2014 SHEETNO. C -16 M MCADAMS UTILITY NOTES CONSTRUCTION SEQUENCE 1.) CONSTRUCTION TI UTILITY DEPARTMENT MSTANDA DS SHALL AND SPECIFCATIONS,NANDWTO UNION COUNTY (FOR REMOVAL AND REPLACEMENT OF EXISTING SANITARY SEWER) YARROW STREET WATER AND SEWER EXTENSION POLICY AND UNION COUNTY WATER /SEWER 50' PUBLIC R/W EXTENSION ORDINANCE. 1. EXISTING MANHOLES 15 AND 16 ARE TO BE PROTECTED FROM 2.) CONTRACTOR IS FULLY RESPONSIBLE FOR ACQUIRING THE LOCATION OF EXISTING DAMAGE UNTIL REMOVED FROM SERVICE. \ �` UTILITIES FROM THE APPROPRIATE PARTIES PRIOR TO CONSTRUCTION. 2. INSTALL AND TEST SS MANHOLES 2 THROUGH 7 PRIOR TO 3.) LATERAL LOCATIONS ARE APPROXIMATE AND SUBJECT TO RELOCATION DURING BYPASS. \ CONSTRUCTION. 3. BLOCK FLOW AT EXISTING SSMH 16 AND PUMP FLOW AROUND \ 4.) IF WATER MAIN CROSSES OVER THE SANITARY SEWER WITH LESS THAN 18 INCHES TO EXISTING MANHOLE 13. BYPASS FLOW FROM EXISTING SS \ OF VERTICAL SEPARATION OR UNDER THE SANITARY SEWER, BOTH LINES ARE TO MANHOLE 16 TO EXISTING SS MANHOLE 13 WHILE INSTALLING \ �� BE CONSTRUCTED OF DUCTILE IRON PIPE 10 FEET EACH SIDE OF THE CROSSING. SANITARY SEWER SERVICE FROM EXISTING SS MANHOLE 14 5.) IF THE SANITARY SEWER IS LESS THAN 24 " UNDER OR 24 " CHESTNUT SUBDIVISION OVER THE STORM TO PROPOSED SS MANHOLE 2. PB. H PG. 251 PHASE 2 DRAIN, USE A MINIMUM OF 20 FEET OF DUCTILE IRON PIPE. 4. CONTRACTOR TO PROVIDE TWO PUMPS ON -SITE FOR BYPASS LOT 51 / 6.) WATER MAIN CROSSING UTILITIES WITH LESS THAN 3 FEET Of VERTICAL CLEARANCE TO ENSURE CONTINUOUS FLOW. PUMPS ARE TO BE SHALL BE CONSTRUCTED OF DUCTILE IRON PIPE. MAINTAINED BY CONTRACTOR. \ / 7.) CONTRACTOR IS RESPONSIBLE FOR PLACING BARRICADES, USING FLAGMEN, ETC. AS 5. INSTALL THE PROPOSED SS MANHOLES AND SEWER MAINS \ PUBLIC` NECESSARY TO INSURE SAFETY TO THE PUBLIC. AS SHOWN ON SHEETS C -17 AND P -1. \ STORM DRAIN 8.) ALL PAVEMENT CUTS, CONCRETE OR ASPHALT, ARE TO BE REPLACED ACCORDING 6. THE NEW SEWER LINE MUST BE INSPECTED AND APPROVED \ ' / EASENi`NfiCr TO STANDARDS OR THE NORTH CAROLINA DEPARTMENT OF TRANSPORTATION. BY THE UNION COUNTY PUBLIC WORKS BEFORE RECONNECT / SSMH -10 9.) SHORING WILL BE ACCORDING TO OSHA TRENCHING STANDARDS PART 1926 AND PUT IN SERVICE SUBPART P, OR AS AMENDED. 7. REMOVE SS MANHOLES 15 AND 16, ALONG WITH SEWER MAIN \ / � � 37 SHEET P-1-\ 10.) FIRE HYDRANTS SHALL BE PLACED AS SHOWN ON THE STREET CROSS SECTION FROM SS MANHOLE 14 TO THE POINT OF NEW CONNECTION \ / DIAGRAMS INCLUDED IN THIS PLAN SET, AND SHALL HAVE A CLEAR SPACE OF 3' (BETWEEN SS MANHOLES 16 AND 17). MANHOLE AND CHESTNUT SUBDIVISION \ �� ` ff FROM ANY PERMANENT STRUCTURES. SANITARY SEWER PIPE COMING OUT OF SERVICE TO BE PHASE 2 \ / S�EWEit LINE A� /; 11.) METERS WILL NOT BE SET IF METER BOXES, SEWER CLEANOUTS, VALVE BOXES OR PB. H PG. 251 THEIR APPURTENANCES ARE DAMAGED OR IMPROPERLY POSITIONED. REMOVED BY CONTRACTOR. LOT 57 12.) VERIFICATION HAS BEEN MADE BY JOHN R. McADAMS CO. THAT EACH LOT IS CAPABLE OF HAVING GRAVITY SEWER SERVICE TO THE CENTER OF THE LOT AT THE _ _ - - - .- - - - - - - - FRONT SETBACK. - - Zl(\, 13.) A FIELD RUN SURVEY WAS COMPLETED BY THE JOHN R. McADAMS COMPANY ON FEBRUARY 5, 2014. CHESTNUT SUBDIVISION, PHASE 2 / NOTES PB. H PG. 251 DRIVEWAYS ARE NOT TO BE LOCATED OVER WATER METERS. METERS LOT 58 / 40 \ WILL NOT BE SET IF WATER METER BOXES, SEWER CLEAN -OUTS, VALVES OR THEIR APPURTENANCES ARE DAMAGED OR IMPROPERLY POSITIONED. DO NOT PLACE SIDEWALKS OVER WATER MAINS. -- - - - DO NOT PLANT TREES OVER WATERMAINS AND SEWER MAINS OR WITHIN EASEMENTS. i PER UNION COUNTY PUBLIC WORKS STANDARDS, ALL WATER LINE MUST MAINTAIN A MINIMUM COVER OF 3' UNLESS DUCTILE IRON PIPE IS I SSMH -14 PROVIDED. I , ANY EXISTING EASEMENTS TO BE ABANDONED MUST BE APPROVED BY THE BOARD OF COUNTY COMMISSIONERS, UNION COUNTY DOES NOT HAVE I 42 THE AUTHORITY TO DO SO. 1 1 1� It 10' WIDE NO CLEAR BUFFER ALONG DEWATERING PROPERTY LINE THE CONTRACTOR SHALL AT ALL TIMES PROVIDE AND MAINTAIN AMPLE MEANS AND EQUIPMENT WITH WHICH TO REMOVE AND PROPERLY DISPOSE OF ANY AND ALL WATER ENTERING THE EXCAVATION OR OTHER PARTS I I' OF THE WORK AND KEEP ALL EXCAVATIONS DRY UNTIL SUCH TIME AS PIPE LAYING AND GRADING IS COMPLETED AND STRUCTURES TO BE PROPERTY LINE ---- " - - - - -- BUILT THEREIN ARE COMPLETED. (TYP.) NO WATER SHALL BE ALLOWED TO RISE AROUND THE PIPE IN 0 MASONRYLUNTIL TRENCHES HE CONCRETE ORLMORTAR HAS NSET (MINIMUM 24R SEWER DINE "C" I I HOURS). ALL WATER PUMPED OR DRAINED FROM THE WORK SHALL BE DISPOSED OF IN SUCH A MANNER AS TO PREVENT SILTATION AND ( i EROSION TO ADJACENT PROPERTY OR OTHER CONSTRUCTION. JOHN HOWARD FAISON IV 45 DB 1162 PG 684 1 ONE ROLL OF MASTIC & 6 IN. EXTERNAL JOINT /SEAM WRAP INSTALLED PIN 07141001 1 ON EACH MANHOLE SECTION. I SHEET P -3 11 II TEMPORARY - - - -- - -- - - -- -- i 4 i CONSTRUCTION I i I EASEMENT 20' TEMPORARY 46 1i HENRY 0. AND I I I CONSTRUCTION ELSIE G. EUBANKS I 1 20' LANDSCAPE BUFFER EASEMENT I PIN 07141001D i I 1 SHEET P -3 I I I I BENCHMARK: 20' FUTURE PERMANENT - - - - - _ - I I MAG NAIL S.S. EASEMENT I I I NORTHING. 482,346.76 ' I EASTING: 1,485,558.34 SSM -158 - - - - -t EXISTING CHESTNUT LANE I I I I __ ELEV.: 727.88 _ �- - - - 4-- - - I_ _ (60' PUBLIC R /W) I ! - - - � -�- '- '_ -f - -� - - - , ; � 47 I i - -��� ___ _ +T I P - _ELAINE A. 1001E S s% I I I I i 58 LF PIN 07141001E I I I I i s _ _ _ I 20' PUBLIC I 6" WL ' I STORM DRAIN i I SHEET P -4 'M1 I I EASEMENT I RED �ARN TRAIL FH USE MUELLER H -61 TAPPING SLEEVE, I y I I 50' PjJBIJC R/W - -- ' -- VALVE, MATERIALS AND � I � �� L------ .�.-- - -or - -- t7 -=- -EI- -- INSTALLATION BY I I DEVELOPER (SEE DETAIL 25 -A) I s 10' CURB TRANSITION 4 t DONALD E. AND ° M KATHLEEN F. GOESSEL 1' ' PIN 07141001J ¢, ' ti 1 EX. RED BARN h TRAIL 1 1 (VARIABLE PUBLIC R /W) 3 \ i t 11 CHANG YUNG KI t AND SOON SUN PIN 07141016A \ a SSMH -19 - - - -, SEWER LINE "MD" j I I O O a O2 0 04 � � I 6 I I 1 1 i I I I I I � POSSIBLE LOCATION OF ENTRANCE `SIGN .SSMH..•. 20� PE � - -�- - \ BUFFER \\ EXISTING 16" GREGORY SETH LEONARD g WATERMAN DB 6234 PG 721 ��* \ PIN 07141001E RETAINING WALL (DESIGNED BY OTHERS) LE 39 SSMH -13 CHESTNUT SUBDIVISION, PHASE 2 PB. H PG. 251 LOT 50 CHESTNUT HOMEOWNERS ASSOCIATION, INC i PIN 07141006 EX. 8" S.S. 71 20 PUBLIC f l f I \ STORM 1 EASEMENT 1� t \ � 1 /'� ✓/. EXISTING 20' UTILITY EASEMENT 1 EX. MH -17 / 'S / \ .:::WETLAND S l : c � .... i\\ '259:LP::::::'. ::: : ' CONNECT TO EXISTIN6`SEWER WITH DOGHOUSE MANHOLE (SEE DETAIL 10) EXISTING INVERT AND ALERT ENGINEER OF ANY DISCREPANCIES OR POTENTIAL CONFLICTS. PUBLIC / nPkJ nPAmi _ \ IH -7 /' \ SSMH -6 , _ �FH 33 SSMH -2 \ 21 { EX. MH -15 'l SSMH -5 / - -/- - \�V�O oo. �#A �- i DUKE POWER /DUKE ENERGY CORPORATION D.B. N /A, PG. N/A PIN 07141007A \ \ O \ % 31 \ ham' 30 \ Uli SSMH -72 EXISTING :SSMH =:1:4: ---- - - - - -- 25 _ \ V - T O u 1 H I V I 13 O it I - -�L SSMH -15A -- --- - I 12 I 4 I � I I I DE ICA D 11 CENTE LIN TREE SAVE II I EA I ' OF CR E I I I T- -- 4- SSMH- 16---- - - - - -� / 10 I Ei. ND..'• :. EXISTING EASE -1, II , N REVOCABLE LIVING TRUST DB 4680 PG 414 PIN 07141020 EXISTING POND � I 1� I I 1 EX. 8" S.S. EX. MH- 13--- - - - - -. MATERIALS SUMMARY - TOTAL SITE 1d /�1�I:i�l►1 6" PVC 2,058 LF 2" PVC 582 LF FIRE HYDRANTS: 19.: EX.MH -16 WATER VALVE \ 2,567 LF 20' PERMANENT 7 SERVICES: \\ RETAINING WALLA .::::: SEWER EASEMENT .: ` 18 (BY DESIGNED D.B. 3731, PG. 440:' 7 PROPERTY LINE I\ OTHERS) • SANITARY SEWER MANHOLE • SEWER CLEAN -OUT SEWER FLOW DIRECTION -- y / j 1 :- 1 ::SHEET P I 1,141 LF �6" WIL :: PROPOSED 20' <: UTILITY EASEMENT ` --------- _ - -__J ........... I'I'I'Iyy�.j�• }� {r. \:':'T . .: I. . . . .1':'[ii IH -7 /' \ SSMH -6 , _ �FH 33 SSMH -2 \ 21 { EX. MH -15 'l SSMH -5 / - -/- - \�V�O oo. �#A �- i DUKE POWER /DUKE ENERGY CORPORATION D.B. N /A, PG. N/A PIN 07141007A \ \ O \ % 31 \ ham' 30 \ Uli SSMH -72 EXISTING :SSMH =:1:4: ---- - - - - -- 25 _ \ V - T O u 1 H I V I 13 O it I - -�L SSMH -15A -- --- - I 12 I 4 I � I I I DE ICA D 11 CENTE LIN TREE SAVE II I EA I ' OF CR E I I I T- -- 4- SSMH- 16---- - - - - -� / 10 I Ei. ND..'• :. EXISTING EASE -1, II , N REVOCABLE LIVING TRUST DB 4680 PG 414 PIN 07141020 EXISTING POND � I 1� I I 1 EX. 8" S.S. EX. MH- 13--- - - - - -. MATERIALS SUMMARY - TOTAL SITE 1d /�1�I:i�l►1 6" PVC 2,058 LF 2" PVC 582 LF FIRE HYDRANTS: 3 SANITARY SEWER: WATER VALVE 8" SEWER LINE 2,567 LF MANHOLES 19 SERVICES: REDUCER 3/4" WATER SERVICE 54 1" IRRIGATION SERVICE X 4" SANITARY SEWER SINGLE LATERAL 54 LOT TABULATION NO. OF LOTS SERVED TOT. TRACT AREA 54 19.90 AC. / \ SEWNR LIN Ell \ "B" i SHEET P -2 • � 28 582 LF / 2" WL / DONNELLY CARLTON CAMERON DB 3634 PG 699 PIN 07141022 UTILITY LEGEND NOTE: PER UNION COUNTY PUBLIC WORKS STANDARDS, ALL WATER LINE CROSSINGS UNDER ROADWAY MUST BE FERROUS METAL OR IN FERROUS METAL SLEEVES: 2" LINE - 2" PVC IN 4" SCH. 40 SLEEVE 6" AND 8" LINES - DUCTILE IRON PIPE LENNAR CAROLINAS, LLC DB 5788 PG 001 PIN 07141008 TREE SAVE CHRISTOPHER R ER G. MOWBRAY PIN 07141026 D.B. N /A, PG. N/A ARTHUR P. AND MARTHA A. HEIN JR. DB 3493 PG 310 PIN 07141025 _++_} FIRE HYDRANT ASSEMBLY WATERLINE 0 WATER METER WATER SERVICE LINE 4N WATER VALVE - SANITARY SEWER SEWER FORCE MAIN REDUCER RIGHT OF WAY LIMIT PLUG PROPERTY LINE o ►�-- BLOW -OFF ASSEMBLY • SANITARY SEWER MANHOLE • SEWER CLEAN -OUT SEWER FLOW DIRECTION ARROW ,m. GRAPHIC SCALE 60 0 30 60 120 1 inch = 60 ft. FINAL DRAWING - NOT RELEASED FOR CONSTRUCTION / / N N U zz.. �C Zz 0' A � V y 11 = 03 � •• - .r w W rc o a Q Z 1 W y m U m 3 36 3 y. p 6 6W' Wn ? V IN N 6 m Z W m N W O rc rc A o 13 �a a, m o rc o o S s w 3 S 4@ rc zM�a? i 0 00 a ®4©® ®®® t` co W w Wx e Mti ,°n C Z.- Z F.E EUmz 0-4Nx E W o E" E z O u7 � to x " U pP4 . d 00 U Z O O PROJECT NO. MRH -13040 FILENAME: MRH13040 -U1 CHECEED BY: RMR DRAWN DY: CM /JL /RMR SCALE: 1"=60' DATE: 07 -25 -2014 SHEET NO. C -17 MU MCADAMS SEWER LINE MATERIALS SDR 35 >3' - <10' 0 SDR 26 >10, - <18• DIP <3 - >18' 1747.7 _7 m .., 710 :•l 680 F/G le III I I I I I I;;i;7A� i' v I I / I I 1 IM'Ll // I I I I I I I I I f I-'rl I I-'" I I I I 111 I III I I I I I I I I I I mm I I I I I I I I i I 1 11 1 1 Intl 1 1 1-- 1 1 1 1 1 1 II E APR;j u 710 (M141 •:• 1 +00 2 +00 3 +00 4 +00 5 +00 6 +00 7 +00 1 LF WM 1 1 1' OFF BO c SEE SHEET P -3 SEWER LINE ' . 11 3' MIN. COVER 37 \ \ \PAD ELEV.: 710.25 , , /5' UCPW UTILITY PAD ELEV.: / EASEMENT 708.50 20 RESTRAINING JOINT -A5 / ` CHESTNUT SUBDIVISION, PHASE 2 FROM TEE 6 "X6' TEE PB. H PG. 251 PAD ELEV.: Err G.V. (NE) OF TEE LOT 51 708.25 GRND. ELEV.= 705.19 \� 6" G.V. (SE) OF TEE COC1 \ PIN 07141107 1 WM INV.= 703.10 Cos DEDICA D 1 SO INV.= 698.03 \ CB- TREE SAVE ff B.O.P.= 697.84 Q MH �' AREA SEWER LINE A 99 (W SEWER LINE A99 SEE DETAIL A \ A) UNDER RCP q RETAINING WALL PROPOSED B" SANITARY \ / REVOCABLE- LIVING TRUST (BY DESIGNED 1 / /� °ooy X00 SEWER LINE (TYP.) / / DB 4680 PG 414 XISTING S" SS REMOVE AND ABANDON OTHERS) / LAT / PIN 07141020 PERMIT #WQ0024882 EXISTING SEWER MANHOLES EX ATED 2/18/2005 15 AND 16 AND SEWER MAIN r^o3• .!� SS � � � � DI -84 MH -13 EX. BETWEEN MANHOLES 14 MH -14 THROUGH 16 AFTER / - _ ACCEPTANCE BY UCPW 15" R W MH -B. , \'� -10 c \ y�� MH -14 9 r' o_ \ \ "'� �M_ `EXISTING 6" WATERMAIN CB -B3 � CONNECT TO EXISTING SEWER WITH / +67 30" RC m _ -,.r '�- DOGHOUSE MANHOLE (SEE DETAIL - �- EXISTING 6" G.V. _ 1 ) EXI RI OF INVERT DISCREPANCIES D ALE T � \ CB -82 1 +00 1 / M/ (CONTRACTOR VERIFY LOCATION) \ OR POTENTIAL CONFLICTS. 5' UGPW :UTILITY " CHESTNUT SUBDIVISION, PHASE 2 CONN CT TO EX STING SE R jam'„ 5� - ®o �- , / ' EASEMENT _ \ SEE DETAIL 10). CONTRACTOR SHALL B 1 - - PB. H PG. 251 \ FIELD VERIFY EXISTING INVERT AND / ` SSMH -2 / \ ALERT ENGINEER of ANY / - SEE PROFILE FOR 252 LF 6'r WM \ LOT 50 EXISTING 6" ° SEWER MAIN 11 OFF 1, PIN 07141106 WATERMAIN \ ISCREPANCIES OR POTENTIAL 1 EX. \ OSSING DETAILS (ROADWAY) GRND. ELl_V.= 702.86 \ REMOVE EXISTING 2" G.V. AND 2" B.O. \ CONFLICTS. \ MH 15 44p 3'. MIN. COVER RESTRAINING WM INV.= 695.96 PROPOSED 20' TIE PROPOSED 6" WATERMAIN INTO 30' .DIP , JOINT DIP SD T.O.P.= 700.16 �' UTILITY EASEMENT \ e \ h ` = EXISTING WATERMAIN 01, CONSTRUCTION SEQUENCE \ \ / ` 11 22 \� TIE TO E . \7 SEE DETAIL A A)R R \ O 21 to EW R RND,' ELEV. =704.56 '.' FOR REMOVAL AND REPLACEMENT OF EXISTING SANITARY SEWER 1 PAD ELEV.: CASEMENT LOT) �, ✓ wM'.INV:= 7ot.os. (FOR �� 1 1 \ 713.70 \ + _ SD, T.O;P. =. 698:77 1 PAD ELEV.: Lh a ° 1. EXISTING MANHOLES 15 AND 16 ARE TO BE PROTECTED FROM '1 \ , 700.75 v ° - -_ PAD ELEV.: g= i �� EX 705.00 DAMAGE UNTIL REMOVED FROM SERVICE. 1 \ 23 3/4" WATER SERVICE ` c s / MH -17 \ 2. INSTALL AND TEST SS MANHOLES 2 THROUGH 7 PRIOR TO I \ \ O 3`4" WATER METER (TYP. 1 BYPASS. 1 1 PAD ELEV.: 1 0�\� 1 \ 24 713.90 R 1 \ ,� * / 1 - ss • 1 3. BLOCK FLOW AT EXISTING SSMH 16 AND PUMP FLOW AROUND ' �� O \ J 1 v z. s o� s• ss TO EXISTING MANHOLE 13. BYPASS FLOW FROM EXISTING SS ' 25 1 PAD ELEV.: 1 �' MANHOLE 16 TO EXISTING SS MANHOLE 13 WHILE INSTALLING 2s PAD ELEV.: 714.80 DRIVEWAY 1 ° a _ 1 (TYP. 1 ° 65•w / ` 3' SEPARATION . DRIVEWAY 1 SANITARY SEWER SERVICE FROM EXISTING SS MANHOLE 14 PAD ELEV.: 1 715.25 \ \ + 8 EX FROM FOC (TYP-) 1 \ TO PROPOSED SS MANHOLE 2. 716.25 1 4" SEWER LATERAL of CB_1s \ . 4. CONTRACTOR TO PROVIDE TWO PUMPS ON -SITE FOR BYPASS ' 4" CLEANOUT (TYP.) 02• 34 \ 35 \ TO ENSURE CONTINUOUS FLOW. PUMPS ARE TO BE 1 2 G.V. \ �' ° y 1 PAD ELEV.: 1 PAD ELEV.: 2" B.O. \• B -1 709.00 708.50 MAINTAINED BY CONTRACTOR. (SEE DETAIL #2) 1 y ce -c8 �y,� CARLTON CAMERON FIRE HYDRANT 5. INSTALL THE PROPOSED SS MANHOLES AND SEWER°RM�A� f '0B' 3634 PG 699 � �;,� LAT ASSEMBLY (TYP.) AS SHOWN ON SHEETS C -17 AND P -1. PIN 07141022 1 7 (SEE DETAIL 7A) 6. THE NEW SEWER LINE MUST BE INSPECTED AND APPROVED 2" G.V. BY THE UNION COUNTY PUBLIC WORKS BEFORE RECONNECT \ ' ', \ _ - DIP 1 33 6 "X2" REDUCER AND PUT IN SERVICE LATERAL \ PAD ELEV.: (SEE DETAIL 7) 7. REMOVE SS MANHOLES 15 AND 16, ALONG WITH SEWER MAIN / CB-C7 711.00 FROM SS MANHOLE 14 TO THE POINT OF NEW CONNECTION a p0 \62.es DIP DIP \ LATERAL LATERAL 11 580 LF 2" WM GRAPHIC SCALE (BETWEEN SS MANHOLES 16 AND 17). MANHOLE AND / ''. �� �� 11' OFF Boc 40 0 20 40 80 SANITARY SEWER PIPE COMING OUT OF SERVICE TO BE ssM " -12 65; ' 1 SEWER L &E $ 3' MIN. COVER Y 1 inch = 40 ft. REMOVED BY CONTRACTOR. I �� ' ' FINAL DRAWTNC - NOT RFLFASFD FOR CONSTRTTCTTON 19 RENSIONS PER STORM FILTER DESIGN 2015 -04-17 APPLICANT: MERITAGE HOMES 11605 NORTH COMMUNITY HOUSE ROAD SUITE 250 CHARLOTTE, NORTH CAROLINA 28277 !!j MCADAMS THE JOHN R MADAMS 'mom *� INC. COMPANY, I��( 11301 Carmel Commons Blvd. Suite 111 Charlotte, North Carolina 28226 License No.: C -0293 (800) 733 -5646 ■ McAdamsCo.com ``71x1111111 ��� \777 7ji� �' .. i •• �••y '�? �: L = 5 = - .F,y 1 :' ��i F� ••.......� Q O�O� o , 'YYYI1l11Ii I\ \1 \ \� PROJECT NO. MRH-13080 PLAN VV PROFILE �� �� SEWER LINE A - STA 0 +00 - 9 +01 WILLOWCROFT TOWN of STALLINGS, NORTH CAROLINA SHEET N0. ],$ COMMENTS PER UNION COUNTY PUBLIC WORKS 2015 -03-24 FILENAME: MRH- 13040 -PP1 17 COMMENTS PER UNION COUNTY PUBLIC WORKS 2015 -03 -20 DESIGNED BY: RMR 16 COMMENTS PER UNION COUNTY PUBLIC WORKS 2015 -03 -10 �!) J MCADAMS _ DRAWN BY: JL /CM 15j COMMENTS PER TOWN OF STALLINGS 2015 -01 -27 HGRIZ. SCALE: 1 = 40 14 COMMENTS PER TOWN OF STAWNGS 2015 -01 -22 PRINT DATE: VERT. SCALE: 1 rr - 4r 13 COMMENTS PER TOWN OF STAWNGS 2015 -01 -09 REVISIONS DATE DATE: 07 -25 -2014 SEWER LINE "B" 0 +00 1 +00 2 +00 3 +00 3 +64.65 PAD 3ELEV.: I PAD CID I 31 1 711.00 I 712.10 I PAD ELEV.: LDRIVEWAY NE "Af s I °�ie� 713.50 FIRE HYDRANT 1 ILLOWCROl 1 ASSEMBLY (TYP.) DRIVE DIP (SEE DETAIL 7 A) a�i0' PUBLIC R/1► LATERAL DIP LATERAL /:. �i+;r llatNN111tii1skiitG11ti1iHkVlttllXiilil N 30 PAD ELEV.: 714.50 I 29 I 28 580 LF 2" WM I PAD ELEV.: I PAD ELEV.: 10' OFF BOC I 715.00 I 715.75 (CUL -DE -SAC) 11' OFF BOG 1 I I (ROADWAY) 1 I 3' MIN. COVER 5' UCPW UTILITY DIP I EASEMENT LATERAL rDIP L J I r4 SEWER LATERAL DRIVEWAY 4" CLEANOUT (TYP.) (TYP) I I 1 27 PAD ELEV.: 716.20 I 3/4" WATER SERVICE I i 3/4" WATER METER 2" G.V. 1 BASEMENT LOT) 2 ?; ' (TYP •) j 2" 8.0. PAD ELEV.: I (BASEMENT LOT) I 23 I 24 I (SEE DETAIL #2) 700.75 ELEV.: i PAD ELEV.: I PAD ELEV.: I PAD I 1 '703.70 1 713.90 1 714.80 I 5 26 -..... _ S WEE LINE A�. I� \ -?xoo y� I PROPOSED 20 1 :: :1. I I UTILITY EASEMENT 1 ��36 e8 PAD ELEV.: I PAD ELEV.: 715.25 I 715.25 1- I � 1 I I 1 1 CHRISTOPHER G. MOWBRAY DB. N /A, PG. N/A PIN 07141026 /ARTHUR P. AND MARTHA A. HEIN JR. DB 3493 PG 310 \PIN 07141025 a -2" WATERMAIN MIN. 2' OFF SIDEWALK PROPOSED MANHOLE (TYP.) (SEE DETAIL) DONNELLY CARLTON CAMERON DB 3634 PG 699 PIN 07141022 LINE "B" SEWER LINE MATERIALS SDR 35 >3' — <10' 0 SDR 26 >10' — <18' DIP <3 — >18, GRAPHIC SCALE 40 0 20 40 80 1 inch = 40 ft. FINAL DRAWING — NOT RELEASED FOR CONSTRUCTION 19 REVISIONS PER STORM FILTER DESIGN 2015 -04-17 APPLICANT: MERITAGE HOMES 11605 NORTH COMMUNITY HOUSE ROAD SUITE 250 CHARLOTTE, NORTH CAROLINA 28277 111Pi /JOOi1i \w7RL�pMCADL1 S 1 1 C AN i, INC. �� 11301 Carmel Commons Blvd. Suite 111 Charlotte, Noah Carolina 28223 License No.: C -0293 �/`� ($oo) 733 -5s4s ■ blcAdamsco.com MCADAMS X11 I 1 1� �7 � � ` .� �� �i,'' �` ?�' 9 : _ �••'. - = ::L �': = = _ 0357 7 - _ 4 < ? o� :FN01 NE , Fk. �o ,,, '��q M•••REOO``\ '1111111 " PROJECT NO. MRH -13080 PLAN & PROFILE SEWER LINE "B" - S'TA 0 +00 - 3 +65 WILLOWCROFT TOWN OF STALLINGS, NORTH CAROLINA SHEET N0. _� 113 COMMENTS PER UNION COUNTY PUBLIC WORKS 2015 -03 -24 iY N A 1 17 COMMENTS PER UNION COUNTY PUBLIC WORKS 2015 -03 -20 DESIGNED BY: RMR 16 COMMENTS PER UNION COUNTY PUBLIC WORKS 2013 o3 -10 11 J MCADAMS DRAWN BY: JL /CM 15 COMMENTS PER TOWN OF STALLINGS 2015 -01 -27 HORIZ. SCALE: 1 = 40 14 COMMENTS PER TOWN OF STALLINGS 2015 -01-22 PRINT DATE: PERT. SCALE: 1 „ = 4. 13 COMMENTS PER TOWN OF STALLINGS 2015 -01 -09 DATE: 07 -25 -2014 REVISIONS DATE N 30 PAD ELEV.: 714.50 I 29 I 28 580 LF 2" WM I PAD ELEV.: I PAD ELEV.: 10' OFF BOC I 715.00 I 715.75 (CUL -DE -SAC) 11' OFF BOG 1 I I (ROADWAY) 1 I 3' MIN. COVER 5' UCPW UTILITY DIP I EASEMENT LATERAL rDIP L J I r4 SEWER LATERAL DRIVEWAY 4" CLEANOUT (TYP.) (TYP) I I 1 27 PAD ELEV.: 716.20 I 3/4" WATER SERVICE I i 3/4" WATER METER 2" G.V. 1 BASEMENT LOT) 2 ?; ' (TYP •) j 2" 8.0. PAD ELEV.: I (BASEMENT LOT) I 23 I 24 I (SEE DETAIL #2) 700.75 ELEV.: i PAD ELEV.: I PAD ELEV.: I PAD I 1 '703.70 1 713.90 1 714.80 I 5 26 -..... _ S WEE LINE A�. I� \ -?xoo y� I PROPOSED 20 1 :: :1. I I UTILITY EASEMENT 1 ��36 e8 PAD ELEV.: I PAD ELEV.: 715.25 I 715.25 1- I � 1 I I 1 1 CHRISTOPHER G. MOWBRAY DB. N /A, PG. N/A PIN 07141026 /ARTHUR P. AND MARTHA A. HEIN JR. DB 3493 PG 310 \PIN 07141025 a -2" WATERMAIN MIN. 2' OFF SIDEWALK PROPOSED MANHOLE (TYP.) (SEE DETAIL) DONNELLY CARLTON CAMERON DB 3634 PG 699 PIN 07141022 LINE "B" SEWER LINE MATERIALS SDR 35 >3' — <10' 0 SDR 26 >10' — <18' DIP <3 — >18, GRAPHIC SCALE 40 0 20 40 80 1 inch = 40 ft. FINAL DRAWING — NOT RELEASED FOR CONSTRUCTION 19 REVISIONS PER STORM FILTER DESIGN 2015 -04-17 APPLICANT: MERITAGE HOMES 11605 NORTH COMMUNITY HOUSE ROAD SUITE 250 CHARLOTTE, NORTH CAROLINA 28277 111Pi /JOOi1i \w7RL�pMCADL1 S 1 1 C AN i, INC. �� 11301 Carmel Commons Blvd. Suite 111 Charlotte, Noah Carolina 28223 License No.: C -0293 �/`� ($oo) 733 -5s4s ■ blcAdamsco.com MCADAMS X11 I 1 1� �7 � � ` .� �� �i,'' �` ?�' 9 : _ �••'. - = ::L �': = = _ 0357 7 - _ 4 < ? o� :FN01 NE , Fk. �o ,,, '��q M•••REOO``\ '1111111 " PROJECT NO. MRH -13080 PLAN & PROFILE SEWER LINE "B" - S'TA 0 +00 - 3 +65 WILLOWCROFT TOWN OF STALLINGS, NORTH CAROLINA SHEET N0. _� 113 COMMENTS PER UNION COUNTY PUBLIC WORKS 2015 -03 -24 F111"AME; MRH- 13040—PP1 17 COMMENTS PER UNION COUNTY PUBLIC WORKS 2015 -03 -20 DESIGNED BY: RMR 16 COMMENTS PER UNION COUNTY PUBLIC WORKS 2013 o3 -10 11 J MCADAMS DRAWN BY: JL /CM 15 COMMENTS PER TOWN OF STALLINGS 2015 -01 -27 HORIZ. SCALE: 1 = 40 14 COMMENTS PER TOWN OF STALLINGS 2015 -01-22 PRINT DATE: PERT. SCALE: 1 „ = 4. 13 COMMENTS PER TOWN OF STALLINGS 2015 -01 -09 DATE: 07 -25 -2014 REVISIONS DATE 720 700 SEWER LINE 19 C 71 1 690 F/G q g $ o m n n 0 +00 1 +00 2 +00 4 252 LF 6" W 3 +00 RETAINING WALL :: ; :(BY OTHERS) : 4 +00 5 +00 11' OFF BOC N " RCP / ` .. T 7 19 1). -- (ROADWAY) Il TAR: :1�iNE : :-: A :: 3' MIN. COVER a 5' U" UT4LiTY EASEMENT: 6 "X6" TEE 6" G.V. (NE) OF TEE POND. 6" G.V. (SE) OF TEE LAT i ■0 Olson an n 710 700 — — I I I I I I I I I I I I I I I I I I I I 1 1690 s $ X $ c o o c n n n n n n n n n n n n n n n n 6 +00 7 +00 8 +00 1.12 C ' 10 (BASEMENT LOT) \\ \ PAD ELEV.: \ PAD ELEV.: \ \ 714.50 \ 715.75 / 6 "X6" TEE RETAINING WALL ' : ' \ \. \ 6" G.V. (N) OF TEE {BY OTHERS) \ \ 11 \\ 6" G.V. (W) OF TEE RIVEWAY \ PAD ELEV.: \ (TYP. \ \ 712.00 / 12 PAD ELEV.: 711.25 MH -t6 -A4 PAD ELEV.: / ' - \ \ \ . \ ` ` 708.25 /C \ \ 13 RESTS AINING GRND. .=703.705.1 O i ` \ JOINT IP WM INV.=703.100� 19 \ PAD ELEV.: SD B.O.P INV.=698.0 97Y84 PAD ELEV.: LE / ` \/ — -,/ / ' \\ \\ 14 \\ 711.75 / O " SEWER LINE MATERIALS SDR 35 >3' <10' 0 SDR 26 >10' - <18' DIP <3 - >18' SEWER LINE 9tEf1 720 720 G.V. ' 0' 6" STUB 2" G.V. & 2" B.O. BOTH IN VALVE BOXES 6 "x2" REDUCER / \ \ GREGORY 71ARD TER AI ✓' UNDER RCP ' ' RCP DB6234 PG 2 - M.. .. . \ PAD ELEV.: PIN 07141001E CHESTNUT SUBDIVISION, PHASE 2 / PAD ELEV.: 722.10 PB 251 7 10 " 0 20 40 eo GRAPHIC SCALE LOT 51 / / JOHN HOWARD FAISON v 6 9LF 6" WM �' \ �� PIN 07141107 \ \ - DB 1162 PG 684 \ 11' OFF BOC 3' MIN' PIN 07141001 COVER SEE SHEET P -4 i inch = 40 ft. i FINAL DRAWING — NOT RELEASED FOR CONSTRUCTION Allllllllllllllllll 19 REVISIONS PER STORM FILTER DESIGN 2015 -04-77 APPLICANT: MERITAGE HOMES 11605 NORTH COMMUNITY HOUSE ROAD SUITE 250 CHARLOTTE, NORTH CAROLINA 28277 " '��/p`■QTT�)) e''MM`` C i • MADAMS THE JOHN R MCADAMS COMPANY, INC" 11301 Carmel Commons Blvd. Suite 111 Charlotte, North Carolina 28226 License No.: C -0293 ■ (800) 733 -5646 McAdamsCO.com \\ \ \1 11I I rr �( � ''' � • •• � ; ?. :9 ; _ _ - L - _ ° 0357 7 _ _ c �, ����� ;F,y :. , n G � 'i ''' I�111111 `oO\G \`` r PROJECT N0. MRH -13080 PLAN &PROFILE SEWER LINE "C" - STA 0 +00 - 8 +32 �� �� SEWER LINE E - STA 0 +00 - 0 +30 WILLOWCROFT TOWN OF STALUNGS NORTH CAROLINA � SHEET N0. � —� 18 COMMENTS PER UNION COUNTY PUBLIC WORKS 2015 -03 -24 FILENAME: MRH- 13040 —PP1 17 COMMENTS PER UNION COUNTY PUBLIC WORKS 2015 -03 -20 DESIGNED BY: RMR 16 COMMENTS PER UNION COUNTY PUBLIC WORKS zols -o3 -10 �JI MCADAMS DRAWN Ex: JL /CM 15 COMMENTS PER TOWN OF STALLINGS 2015-01-27 RORI2. SCALE: 1 = 40, 14 COMMENTS PER TOWN OF STALLINGS 2015 -01 -22 PRINT DATE: VERT. SCALE: 1„ — 4, 13 COMMENTS PER TOWN OF STAWNGS 2015 -07 -09 DATE: 07 -25 -2014 REVISIONS DATE SEWER LINE "D" 0 +00 1 +00 2 +00 3 +00 4 +00 5 +00 SEWER LINE MATERIALS SDR 35 >3' - <10' 0 SDR 26 >10' - <1 8' DIP <3 - >18, 19 REVISIONS PER STORM FILTER DESIGN 2015 -04-17 APPLICANT: MERITAGE HOMES 11605 NORTH COMMUNITY HOUSE ROAD SUITE 250 CHARLOTTE, NORTH CAROLINA 28277 ' ' MGADAMS THE COMPANY, INC. 11301 Carmel Commons Blvd. Suite 111 _ Charlotte North Carolina 2822 / tsoo) 733 -5646 • MCA[1AI118CO.COII1 111 q 1 , ``\����`.� •C' -i - - -- 9 ti'. _ = - - _ 0 57 7 _ ti �2 F ' = -, F,f, G .,..•• •�G.� -i- T Q�`�� - �'1'�'11IRE7,\\ PROJECT NO. M MRH -13080 PLAN &PROFILE �� �� SEWER LINE D - STA 0 +00 - 5 +03 T WILLOWCRUFT TOWN •r 19 O STALL ll�GS, NORTH W..AROU A SHEET NO. _ 4 18 COMMENTS PER UNION COUNTY PUBLIC WORKS 2015 -03 -24 FRENA�; MRH- 13040 —PP1 17 COMMENTS PER UNION COUNTY PUBLIC WORKS 2015 -03-20 DESIGNED BY' RMR 16 COMMENTS PER UNION COUNTY PUBLIC WORKS 2015 -03 10 J MGADAMS DRAINN BY' �� CM �. 15 COMMENTS PER TOWN OF STALLINGS 2015 -01 -27 HORIZ. SCALE: „ 1 40 14 COMMENTS PER TOWN OF STAWNGS 2015 -01_22 PRINT DATE: VERT. SCALE: ,. , 1 = 4 1 s COMMENTS PER TOWN. OF STAWNGS 2015 -07 -09 DATE: 07 -25 -2014 REVISIONS DATE - 10'x70' SIGHT TRIANGL� i I 54 CB -A24 I I \ I II CB -A23 RED BARN TRAIL LOW POINT ELEV = 723.08 HIGH POINT ELEV = 722.61 11 +DD SSMH -19 I I � 10'x70' SIGHTI TRIAN�LE I it I II I I I II I ' I 10 +00 11 +00 12 +00 13 +00 14 +00 15 +00 16 +00 16 +46.52 II �I I I I I 53 II 8 "I SANITARY SEWER n LINE (TYP.) I I I � I I I I I 52 II I I I I i I�I ICI I I III I I 51 I I I DRIVEWAY (TYP.) RER I B 4 13+00 -T- MM I�I III I ICI III l I(I III II so I I I 49 I I I 0 5' UCPW UTILITY I I I 6" WATER LINE EASEMENT I I 6-W a L ; tt- -1 -_ -- ; - -1 - - -JN 15' CONCRETE SIDEWALK (TYP.) (SEE DETAIL) I I i;l Q I;I I I I I III III /I CB I / 50 47 27' 1/ o° N IRS SSMH -16 6" WATER LINE (TYP.) � I 19 I 1 12 I I L---- - - - - -j —e I - -r - -- - - - - -- 1 �I 11 I O1 I T---- - - - - -� I 1 10 �I yI 1 I 1 I 2" WATER LINE 1 7 I I (TYP.) I NO CRN! (NdD BB) GRAPHIC SCALE 40 0 20 40 80 1 inch = 40 ft. FINAL DRAWING — NOT RELEASED FOR CONSTRUCTION Q3 2014 -09 -3 REVISIONS PER UCPW AND NCDENR APPLICANT: HERITAGE HOMES 11605 NORTH COMMUNITY HOUSE ROAD SUITE 250 CHARLOTTE, NORTH CAROLINA 28277 � J0171p\ L MAMS I I COMt'Al \1, INC. 1�� 11301 Carmel Commons Blvd. Suite 111 Charlotte, North Carolina 28226 License No.: C-0293 / MCADAMS 18 1 733 -5646 mcAdamaCo.com %11111111 /M `���1 �,� ```.�` �., = �' 2 9 - - _ EAL _ - 0362 - ADO % F'1, Y ` ' 'YG� NR"" `•• •�•� `i�r �;•...O`G` 11, 1111111111000 PROJECT NO. MRH -13080 PLAN & PROFILE R D BARN 1`�, R %FT ��1� O� �+ ""'�, NORTH I�IROLil \A SHEET N0. 2014 -09 -22 REVISIONS PER STALUNGS FILENaem�MRH- 13040 —P1 2014 -10 -28 ADDRESS UCPW COMMENTS DESIGNED BY. RMR RMR 6 2014 -11 -7 ADDRESS UCPW COMMENTS �JI M PRINT DATE: jj DRA1fN BY: JL CM / 2014 -11 -14 ADDRESS UCPW COMMENTS soR¢. SCALE: 1" 40' © 2015 -01 -OB ADDRESS STAWNGS STORMWATER COMMENTS VERT. SCALE: „ , 1 = 4 A92015-04-17 REVISIONS PER STORM FlLTER DESIGN DATE: 07-25-2014 REVISIONS \ / ' DRIVEWAY \ (TYP.) \ \ \ B -A 2 \ O \ \\\ \ \\ .CB \ \ \ \\ O ; \\ i \ CBS At i \ \ \ \\ O CB -A� GREGORY SETH LEONARD \ \ i DB 6234 PG 721 PIN 07141001E \ SSMH -17 REVOCABLE LIVING 41R4UST PIN 07141020 YARROW STREET EXTENSION 730 CHESTNUT SUBDIVISION, PHASE 2 42 PB. LOT 57 251 / \ \ o \ / \ \, L \ \ \ \ \ \ \ 1 SSMH 14 / �� / \ \ CHESTNUT SUBDIVISION, PHASE 2 PB. H PG. 251 PROPOSED MANHOLE \ � \v/ /// \\ \ ` LOT 51 g \\ \ \ \ \ 1 (TYP.) (SEE DETAIL) \� SS MH -1 \ �i , \ ` SSMH -1V / V SSM -15B \ 5 — \ � 1 � i � � C8 -A8 - 47 \ \\ - -�7 \\ \ IIIIII� �♦ \ \\ / �' // \\ i' \ CONCRETE SIDEWALK \ \\ ROPOSED 8" SANITARY w \ tCCV nCTAII _ 1 / _ / \ WER LINE (TYP.) `- CB-B2, FES-1911 36 GRAPHIC SCALE 40 0 20 40 80 1 inch = 40 ft. FINAL DRAWING — NOT RELEASED FOR CONSTRUCTION Q3 ?A14 -09 -3 RENSIONS PER UCPW AND NCDENR APPLICANT: MERITAGE HOMES 11605 NORTH COMMUNITY HOUSE ROAD SUITE 250 CHARLOTTE, NORTH CAROLINA 28277 ' ' THE JOHN R MADAMS �'�� INC. 11301 Carmel Commons Mvd. Suite 111 Charlotte, North Carolina 28226 License No.: C-0293 M (Soo) 733 -5646 ■ mOAamsco.cwm 1 � iCADAMS 1 1111111 1/ .``` N q ��''o �i ` f1L • �� /,P � % _ °. - = SEAL _ = 0357 - = ' �� •••FjyC[ •• �,, F 7 c, ,• '�i�iT •4f •R"OD `` //11111111111` PROJECT NO. MRH -13080 PLAN &PROFILE YAMOW STREET E=NSTION - WILLOWCROFT TOWN OF STALLINGS, NORTH CAROLINA sREET xo. —� ®2014 -09 -22 REVISIONS PER STALONGS FII.ENAla:: MRH- 13040 —P1 Q5 2014 -10 -28 ADDRESS UCPW COMMENTS DESIGNED BY: RMR J MCADAMS 2014 -11 -7 ADDRESS IJCPW COMMENTS DRAxN sY: JL/CM 8 2014 -11 -14 ADDRESS UCPW COMMENTS aoRrA. scACE: , 1 — 4O PRD+T DATE: Q 20155-01 -08 ADDRESS STAWNGS STORMWATER COMMENTS tiERT. SCALE: 1 „ = 4, A92015-04-17 REVISIONS PER STORM FILTER DESIGN DATE: 07 -25 -2014 REVISIONS WILLOWCROFT DRIVE CHESTNUT SUBDIVISION, PHASE 2 / ' ` PB. H PG. 251 I \\ ►I -_ _ DUKE POWER / DUKE ENERGY LOT PIN 07141007A �20SUTILITY CORPORATION / / 1 I 36 \ EASEMENT EXISTING 6" G.IOV. J � �% l ( VERIFY LOCATN) I� \ / J 34 / J J , r _ _ _ 3 / I 1 �w�_ I Wy � � I J DRIVEWAY CB-82 I (TYP.) I FEES�B7,: °\. - -_ r I l , J 32 ; r ' I r_____ ; _ EXISTING WATERMAIN �.� 1 \ 3 1 L PROPOSED MANHOLE r O 31 l I J J 21 +00 (VERIFY LO CATION) 21 TO INTERCEPT EXISTING SEWER LINE r 5 CONCRETE SID K/ O0 \ \ _ 1 CHRISTOPHER G. MOW BRAY (TYP.) (SEE DETAIL) (TYP.) (SEE DETI Qt I SS -B PIN 07141026 B -83 EXISTING YARRO SSM STREET UTILITY 509 PUBLIC R/W EASEMENT / , / PB. H, PG. 251 4/2 4" VALLEY CURB YARROW STREET 01 -64 �B -�4 _ -SV (SEE DETAIL)r 1 EXTENSION. 1 �o °B- r' / r 2" WATER 50• PUBLIC R 1 j 14 +00 SSMH -11 LINE .SSMH -10 � �. .�.': :: ' � � �" CHESTNUT SUBDIVISION, PHASE 2 oe PB. . 251 LOT 1s+ ' f. Ir _ \ r \ \ / MARTHA A.PHEIN DJR. PIN 07141107 L I / 1 " j �" CB -A3 ,- _ _ _ 0 - _ � � SSMH -12 FES -C2 / / / l ' A ROFT 71 _— _ _ _ 1' 1` I \ DB 3493 PG 310 1/ � PIN 07141025 FES- A2//:::. J Ul': R `20' PUBLIC STORM I 37 I + DRAINAGE EASEMENT.'. I J , r / k_ pROPOSED \ �: 20' UTILITY SS 2 r r / EASEMENT / L _ J / ce -Aa — _ = _ RCTNNING WALL ; : �: / - \ / / 23 / ; (TYP) AY , 1 (BY. OTHERS).-.'.. r / 1 r 1 / I r 1 24 I / / DONNELLY CARLTON CAMERON DB 3634 PG 699 \ \ I �� �_ 1 / J / I l I / 25 / 1 / PIN 07141022 \ \ GRAPHIC SCALE 40 0 20 40 80 1 inch = 40 ft. a FINAL DRAWING - NOT RELEASED FOR CONSTRIJCTTON ,&2014 -09 -3 REVISIONS PER UCPW AND NCDENR APPLICANT: MERITAGE HOMES 11605 NORTH COMMUNITY HOUSE ROAD SUITE 250 CHARLOTTE NORTH CAROLINA 28277 ' MCADAMS JOHN RMCADAMS COWAN INC. 11301 Carmel Commons Blvd. Suite 111 Charlotte, North Carolina 28226 / License No.: C�U�I'93 (800) 733 -5646 M MCAdamsCo.COm RIM ` 110111 11 _ AL = = 0357 - �; �i� '• 1 �; /i F�%, �•••......•'• O��T�� '//'1/1,41. RE %0\ PROTECT NO. MRH-13080 LN &PROFILE WILLOWCROPT DRIVE FT WL LO W C R O TOWN OF STALLINGS NORTH CAROLINA � SHEET NO. P -7 �� J J MCADAMS ®2014 -09 -22 REVISIONS PER STAWNCS FRENAME: MRH- 13040 —P1 Q5 2014 -10 -28 ADDRESS UCPW COMMENTS naslcxEU BY: RMR 6 2014 -11 -7 ADDRESS UCPW COMMENTS DRAWN BY: JL�CM 2014 -11 -14 ADDRESS UCPW COMMENTS HDRTZ. SCALE: _ 1 p — 40 2015 -01 -08 ADDRESS STAWNGS STORMWATER COMMENTS PRINT DATE: VRItT. SCALE: 1 u _ 4' 9 2015 -04-17 REVISIONS PER STORM FlLTER DESIGN o REVISIONS DATE: 07 -25 -2014 ■■■■■■■■■■■■ �Im ®�e� ®■ ■■■ ■■■■s�■■ ■■■■■■■■■■■■■ III■ ■ ■i■ ■ ■ ■■1 ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■■ ■■■■■■■ E�II; �■■■■■■■■■■■■■■ I ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■II�J ■ ■idl ■■ ■III ■�� ■T ■ ■■ ■III ■r ■ii0 = =e■ ■■■■■ �■ �IIL�I■■■■■■■■■■■■■ �IIIJ■■■■■■■■ �1■■e■■■■■■ rl■■■■ i11� ■ ■I ■ ■�'ele ■ ■ ■ ■!- � ■�i� ■.���■ ■ ®■ ■■■■■■■■ I■■■■■■■■■■■■■■■ I■■■ I■■■■■■ 11■■■ ■ ■ ■ ■I ■ ■ ■I ■ ■Ti■il ■ ■ ■I■ ■I+:::::ii ■III■ ■ ■ ■ ■ ■■ ■ ■■ ■ �I■■■■■ rl■■■■■■■■■■■■■■ rl■ I■■ I ■ ■ ■■ ■ ■�� ■■■ ■ =� ■iiii ■il ■��:� ■■■ ■111 ■ ■ ■ ■■ ■III ■ ■ ■ ■ ■■■ ■ ■■ • ■ �1■■e■■■ I■■■■■■■■■■■■■■■ I■■■ I■ ■■ ■■�►��■ ■ ■ ■ ■■ ■!��ii ■ ■ ■11 ■ ■ ■■ ■Ili■ ■ ■■ ■■III■■■■ ■ ■■■ ■■ • ■ 11■■■■■■ �I■■■ ■ ■I ■ ■ ■■ ■ ■ ■ ■t ■I■I ■ ■I ■I!! ■ ■ ■ ■�� ■■ ■/.III■ ■ ■ ■■3�i■�I ■ ■ ■■ ■111 ■ ■ ■ ■:■i11 ■ ■ ■ ■ ■ ■ ■ ■■■ ■ ��■■■■■■ il■■■■■ I■■■■■■■■■■ 1[ �■■ I■ i� ■ ■ ■ ■�����■ ■ ■ ■II ■ ■ ■ ■ ■ ■ ■L'I ■ ■i ■: iii ■ ■ ■ ■■ ■III ■ ■ ■ ■ ■ ■ ■ ■ ■■ ■�1 ■I ■ ■ ■ ■ ■�I ■ ■ ■ ■ ■I ■ ■ ■ ■ ■ ■ ■ ■ ■ ■I® iii ■I ■iM ■�y`�III ■ ■ ■ ■ ■ ■ ■II ■ ■ ■_ ■■ ■illy ■ ■■ ■111 ■ ■ ■ ■■ ■III ■ ■ ■ ■ ■ ■ ■ ■ ■■ ■ �! �■ I■■■■■! I■ ■ ■ ■ ■j ■ ■ ■ ■ ■ ■ ■ ■ ■ ■I ■'■�li� %I�� ■ ■ ■■ Ill■■■ ■ ■ ■rll : %/ ■ ■ ■ ■li ■ ■ ■ ■ ■1111�13ii ■■ ■III ■ ■ ■ ■ ■ ■ ■ ■ ■■ �� ! ����■■■; I'■ ■■ ■ ■a ■ ■ ■ ■ ■ ■ ■ ■ /�'�� ■II ■Iylll ■ ■ ■■ Ill ■ ■■■.■■II ■ ■ ■ ■ ■ ■ ■11 ■ ■ ■■ ■111 ■ ■ ■ ■e ■III ■ ■ ■ ■ ■■■ ■ ■■ ■iilSlll■ ■iii ' �!! ■!'__ ■�!�!,!�i ■ ■ ■II ■ ■!! 011111■■■■ I__I!■i ■ ■ ■ ■ ■II ■ ■l:�i33i ■ ■11 ■ ■ ■■ ■111 ■ ■ ■ ■i�lii ■ ■ ■ ■ ■ ■ ■ ■ ■■ ■111 ■Ili ■ ■ ■ ■II ■ ■ ■ ■ ■IY� ::■i ■ ■ ■ ■ ■ ■II ■ ■II ■Illllrs■■ III ■ ■ ■ ■ ■ ■ ■II ■ ■ ■ ■ ■ ■ ■11 ■ ■• ■:iii ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■■ MINIM II: ■ ■■:li:■: ■:II■ ■ ■� ■ ■ ■mt■■II ■ ■II■ 11111 ■ ■ ■■ 111 ■ ■�i� ■� ■II ■ ■ ■ ■ ■o:!a ■ ■■ ■111 ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■■ ■ 111 ■II ■ ■ ■S ■II ■ ■ ■■ ■Ili � ■ ■ ■ ■ ■ ■i`�1'Ilill ■►!II ■ ■II ■11111!1 ■ ■ ■■ III■■■■■■/ Il: ilil ■ ■ ■ ■��ii! %:11 ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■■ • • ■ ill ■II ■ ■ ■ ■ ■II ■ ■ ■ ■ ■!: ■ \ ■ ■ ■ ■ ■ ■ ■ ■1; 111 ■ ■II ■Illli i ■�I�■ III ■■'ili■�■ % ■ ■ ■/ iii ! %�il� % ■ ■ ■Ia7 ■ ■ ■ ■ ■� ■ ■ ■ ■ ■ ■ ■ ■ ■■ , • ■llilill ■ ■ ■ ■�Ili�i ■ ■■ Ili■\`■■■■ m■■■ II■■ II■ IIIII�I■■■■ I_ I!.■■■■,!: i! �!a� ■ ■ ■ ■ ■ ■ ■ ■1!■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■■ ■ III■ II■■■■■ II■■■ iiihi�!■ ��1■■■■ I■■ II■■ II■ 11191�G■■ II! Cai �o�i��ii ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■I ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■■ ■ 111 ■II ■ ■ ■ ■ ■II ■ ■ ■ ■ ■II ■ ►1 ■■ 1111 ■Q ■■, ■ ■II ■ ■II ■liii ■ ■ ■11► ���■■■ ■■ ■ ■■■ ■ ■ ■ ■ ■ ■�E ■ ■ ■ ■ ■ ■ ■■■ ■ ■ ■ ■■■■■ �III������II ■�� ■i'ii ■r■ 1111 ■ ■I�fl ■ ■II ■ ■II ■ ■ ■ ■■ ■1111 \ ■ ■ ■ ■iiT��1 i • ��� :� •�i1 ■ ■ ■I�1 ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■■ ■ III ■ ■ ■ ■ ■ ■II ■ ■ ■ ■ ■ ■ ■■ ■1111 ■ ■ ■ ■ ■ ■II ■ ■II ■ ■ ■ ■■ ■III I■■■■ i■■■!■ � ■�t�C� ■ ■ ■ ■ ■ ■1 ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■■ ■ III■ e■■■■ II ■ ■ ■ ■ ■ ■ ■ ■ ■�'ia ■ ■ ■ ■ ■II ■ ■II ■ ■ ■ ■■ ■III I■■■■■■■ ■ ■ ■ ■ ■t ■ ■ ■ ■ ■ ■ ®I ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■■ ■IY; ■!■ hill: ■ ■ ■... ■■■■■■ ■ ■ ■II ■ ■li ■ ■,� ■■ICI i ��•. its!. �■■ ■ ■ ■ ■ ■ ■■■■■■■■ ■ ■ ■ ■ ■■ ■ ■■ ■ ■ ■ ■■■ ■ ■■ ■�I ■ ■■1 ■ ■ ■!.■ii■■iC� �■ iii■::: Y■% II■■■■ I% IIII■■■■■■ ■ ■ ■ ■ ■ ■■■■� ■� ■ ■ ■ ■ ■ ■ ■ ■ ■■■ ■ ■ ■■ ■ ■ ■■ ■II ■ ■tl ■■ ■I ■ ■ ■ ■ ■■■ ■� ■i�ie■t ■: Ile■: islAii■ �■ �■■ ■ ■ ■ ■ ■■ ■ ■ ■ ■■ ■ ■ ■ ■ ■ ■ ■ ■ ■■ ■ ■■■ ■ ■ ■ ■ ■■ �I!!l ■ IC■■■■■ �I■ Illlll■!! �!! IIILI■■■■■■■■■■■■ I■■■■■■ II��': �■ �!■ ■ ■ ■ ■ ■ ■■■�■■■■■ ■ ■ ■ ■■■■■■■■ ■ ■ ■ ■■■ eel■■■■■■■■■■■■■■■■■■■■■■■■ i■■ �, ���, �■■ I�ee� ■■ ■■■ ■ ■ ■ ■e■■■ ■ ■ ■ ■■■s■■■■■■ ■ ■■■■ CHESTNUT SUBDIVISION, PHASE 2 / ' ` PB. H PG. 251 I \\ ►I -_ _ DUKE POWER / DUKE ENERGY LOT PIN 07141007A �20SUTILITY CORPORATION / / 1 I 36 \ EASEMENT EXISTING 6" G.IOV. J � �% l ( VERIFY LOCATN) I� \ / J 34 / J J , r _ _ _ 3 / I 1 �w�_ I Wy � � I J DRIVEWAY CB-82 I (TYP.) I FEES�B7,: °\. - -_ r I l , J 32 ; r ' I r_____ ; _ EXISTING WATERMAIN �.� 1 \ 3 1 L PROPOSED MANHOLE r O 31 l I J J 21 +00 (VERIFY LO CATION) 21 TO INTERCEPT EXISTING SEWER LINE r 5 CONCRETE SID K/ O0 \ \ _ 1 CHRISTOPHER G. MOW BRAY (TYP.) (SEE DETAIL) (TYP.) (SEE DETI Qt I SS -B PIN 07141026 B -83 EXISTING YARRO SSM STREET UTILITY 509 PUBLIC R/W EASEMENT / , / PB. H, PG. 251 4/2 4" VALLEY CURB YARROW STREET 01 -64 �B -�4 _ -SV (SEE DETAIL)r 1 EXTENSION. 1 �o °B- r' / r 2" WATER 50• PUBLIC R 1 j 14 +00 SSMH -11 LINE .SSMH -10 � �. .�.': :: ' � � �" CHESTNUT SUBDIVISION, PHASE 2 oe PB. . 251 LOT 1s+ ' f. Ir _ \ r \ \ / MARTHA A.PHEIN DJR. PIN 07141107 L I / 1 " j �" CB -A3 ,- _ _ _ 0 - _ � � SSMH -12 FES -C2 / / / l ' A ROFT 71 _— _ _ _ 1' 1` I \ DB 3493 PG 310 1/ � PIN 07141025 FES- A2//:::. J Ul': R `20' PUBLIC STORM I 37 I + DRAINAGE EASEMENT.'. I J , r / k_ pROPOSED \ �: 20' UTILITY SS 2 r r / EASEMENT / L _ J / ce -Aa — _ = _ RCTNNING WALL ; : �: / - \ / / 23 / ; (TYP) AY , 1 (BY. OTHERS).-.'.. r / 1 r 1 / I r 1 24 I / / DONNELLY CARLTON CAMERON DB 3634 PG 699 \ \ I �� �_ 1 / J / I l I / 25 / 1 / PIN 07141022 \ \ GRAPHIC SCALE 40 0 20 40 80 1 inch = 40 ft. a FINAL DRAWING - NOT RELEASED FOR CONSTRIJCTTON ,&2014 -09 -3 REVISIONS PER UCPW AND NCDENR APPLICANT: MERITAGE HOMES 11605 NORTH COMMUNITY HOUSE ROAD SUITE 250 CHARLOTTE NORTH CAROLINA 28277 ' MCADAMS JOHN RMCADAMS COWAN INC. 11301 Carmel Commons Blvd. Suite 111 Charlotte, North Carolina 28226 / License No.: C�U�I'93 (800) 733 -5646 M MCAdamsCo.COm RIM ` 110111 11 _ AL = = 0357 - �; �i� '• 1 �; /i F�%, �•••......•'• O��T�� '//'1/1,41. RE %0\ PROTECT NO. MRH-13080 LN &PROFILE WILLOWCROPT DRIVE FT WL LO W C R O TOWN OF STALLINGS NORTH CAROLINA � SHEET NO. P -7 �� J J MCADAMS ®2014 -09 -22 REVISIONS PER STAWNCS FRENAME: MRH- 13040 —P1 Q5 2014 -10 -28 ADDRESS UCPW COMMENTS naslcxEU BY: RMR 6 2014 -11 -7 ADDRESS UCPW COMMENTS DRAWN BY: JL�CM 2014 -11 -14 ADDRESS UCPW COMMENTS HDRTZ. SCALE: _ 1 p — 40 2015 -01 -08 ADDRESS STAWNGS STORMWATER COMMENTS PRINT DATE: VRItT. SCALE: 1 u _ 4' 9 2015 -04-17 REVISIONS PER STORM FlLTER DESIGN o REVISIONS DATE: 07 -25 -2014 CHESTNUT LANE- LOS Ex. RED BARN CHANG YUNG KI TRAIL AND SOON SUN (VARIABLE PUBLIC R /W) PIN 07141016A DONALD E. AND / T KATHLEEN F. GOESSEL PIN 07141001) 0 EL NE A. NIC OLS IN 0714171F HENRY 0. AND ELSIE G. EUBANKS -� -� PIN 07141001D MARK C. AND NANCY E. DECHANT PIN 07141015 4 +00 2 +00 _ 1 / r / POSSIBLE LOCATION 0T / r ° ENTRANCE SIGN 1 LOT 1 y r / GREGORY SETH LEONARD ' / DB 6234 PG 721 1 PIN 07141001E - ~ i60 pUBUC R/W i"A�lti ~ ~ 18 +00 ~ ~ DRIVERS EYE 1 r 1 1 L JOHN HOWARD FAISON IV DB 1162 PG 684 PIN 07141001 GRAPHIC SCALE 40 0 20 40 80 1 inch = 40 ft. FINAL DRAWING — NOT RELEASED FOR CONSTRUCTION &2014 -08-22 REVISIONS PER UCPW COMMENTS APPLICANT: MERITAGE HOMES 11605 NORTH COMMUNITY HOUSE ROAD SUITE 250 CHARLOTTE, NORTH CAROLINA 28277 ' , 111L' JOi11� R AlI�A[T1LJL1l�iV COMPANY, u \C. 11301 Carmel Commons Blvd. Suite 111 y� _Y',+- p�j]AL Charlotte, North Carolinas 28 26 License No.: C 0295 j �JLCADAMS �8�� 7 -.86 6 I�IC�BIIISC�.COm M `, 111111/ , ```����` `. C' . ' "9 - "'" -_ �•, _ � • , ]B • � � F1 G+�6!' \� �'..'Y /''77��T 'MI I...... O`G```` PROJECT NO. MRH -13080 PLAN & PROFILE CFWaS l lr LJ 1 LAN11� - j/{lrr/ OF S� `T WILLOWCROFT TOWN OF STALLINGS NORTH CAROLINA s SHEET No. P-8 ©2014 -09 -3 REVISIONS PER UCPW AND NCDENR FILENAME: MRH - 13040 —Pt 201h09 -22 REVISIONS PER STAWNGS DESIGNED BY.- RMR 2014 -10-28 ADDRESS UCPW COMMENTS VIII McAnAMs J DRAWN rrc: JL CM / 2014 -11 -7 ADDRESS UCPW COMMENTS HORIZ. SCALE: p , 1 = 40 © 2014 -11 -14 ADDRESS UCPW COMMENTS PRINT DATE: RTT. SCALE: 1„ — 4, A 2015 -01 -08 ADDRESS STAWNGS STORMWATER COMMENTS 07 -25 -2014 REVISIONS FINAL DRAWING — NOT RELEASED FOR CONSTRUCTION A2014-09-3 REVISIONS PER UCPW AND NCDENR • APPLICANT: MERITAGE HOMES 11605 NORTH COMMUNITY HOUSE ROAD SUITE 250 CHARLOTTE, NORTH CAROLINA 28277 M M�ADAms M TIM JOHN It MCADAM ° °� INC. 11301 Carmel Commons sled. Suite 111 Charlotte, North Carolina 28226 License No.: C -0293 1�1 7,;3-5646 m'� amaCa -com ���� " "" '/ / /// �'( �. ti ".9 '_ i c L _ ; 0357 7 " — ` F '�Rp ,NOS ,, ���T /�'illll�l�OO````` PROJECT N0. MRH -13080 PLAN & PROFILE C� WILLOWCROFT TOWN OF STALLINGS, NORTH CAROLINA sRTaRT xo. P -9 �J MCADAMS ®2014 -09 -22 REVISIONS PER STAWNGS FD.ENAM: MRH- 13040 —P2 ® 2014 -10 -28 ADDRESS UCPW COMMENTS DESIGNED ° RMR 2014 -11-7 ADDRESS UCPW COMMENTS DRAWN Dx' JL /CM 8 2014 -11-14 ADDRESS UCPW COMMENTS goRtz. scAaT;: „ 1 = 40 A 2015 -01 -08 ADDRESS STAWNGS STORMWATER COMMENTS PRINT DATR: �,. SCNLE: _ 1„ — 4' A92015-04-17 REVISIONS PER STORM FlLTER DESIGN REVISIONS DATE: 07 -25 -2014 AL m 16" W/L m w 71 8 > C9 PROTECTED 718 7161 o aw ° ° 716 z p NEW PAVEMENT SECTION p w z 714 — 714 712 712 -50 -40 -30 -20 -10 0 10 20 30 40 50 CHESTNUT LANE 1 +50 736 60.00' R W 736 734 Y 1 734 732 1 732 730 730 N E/P- 725.52 EX. GRADE r II OFF /7 R 728 728 1 a n PROPOSED— ow E/P- 725.43 li GRADE OFFSET- 13.11' R 726 a LL 7.98% -- — - - -- - - -- - w o 726 724 21 724 722 _ - -- ---- "-- - -- //' 1.5" MILLING WITH 1.5" '_ GRADE OSED 722 720 / , oN 720 of 718 m 718 16" W/L 3 716 0 oZ� 0 716 z p NEW PAVEMENT SECTION p waw z 714 — - — 714 712 712 -50 -40 -30 -20 —10 0 10 20 30 40 50 CHESTNUT LANE 1+00 734 6o.00gR w 734 732 1 1 732 730 1 730 J Z n 4 728 a m N 728 m o_ 3 726 1 a — — w o __8.50% - - - -._ - - - -- — - - — -_— "_- 724 /— - �\. __ -- 724 722 - - -- _ ___ - - -- / GRADE 722 - EX. GRADE 720 720 do 718 1 o J 718 M PROTECTE fO w 716 Z 716 3 w, 0 714 ° aJ o 714 ITL 712 1 z ° o z 712 710 710 -50 -40 -30 -20 -10 0 10 20 30 40 50 FINAL DRAWING - NOT RELEASED FOR CONSTRUCTION X X 2.5" 119.OB X � x w w S.0" B25.OB w o_ w � 2.5" 119.OB ° � X w 8.0" B25.OB w d w X w w w w 00 U A � V " 035747 M• RED \ \,��� w K 6 6 a � 2 I/1 2 W V1 N W ��aaasa° 5 N N N N N N H 1• W CV W `a Qi Ox o W�)WE E�..4 Viz H� R i E" E W � O to U P4 z O 0 O z � O c�3 U O O Q U eROncr xo. MRH -13040 "m° MRH13080 —XS1 CHECKED BY: RMR nRa„N ax: CM /JL /RMR scncR: 1 " =5' nsTR' 07 -25 -2014 SHEET NO. XS -1 'JI McAne,Ms CHESTNUT LANE 2 +00 736 7 736 60.00' R W 734 1 7 734 732 1 7 732 730 � J w w G 730 N o �� � �N 7 o n w 3 a tO II vi r 728 1 728 1 n n a a a 7 726 — w 0 7 — — 726 — z zasz -' — 7 724 - _ - -- - - -- � 1.5" MILLING WITH 1.5" R ROPOSED 724 — 1 S9.5B OVERLAY (TYP.) _ _ G GRADE 722 0 722 0 7 720 7 720 A X X 2.5" 119.OB X � x w w S.0" B25.OB w o_ w � 2.5" 119.OB ° � X w 8.0" B25.OB w d w X w w w w 00 U A � V " 035747 M• RED \ \,��� w K 6 6 a � 2 I/1 2 W V1 N W ��aaasa° 5 N N N N N N H 1• W CV W `a Qi Ox o W�)WE E�..4 Viz H� R i E" E W � O to U P4 z O 0 O z � O c�3 U O O Q U eROncr xo. MRH -13040 "m° MRH13080 —XS1 CHECKED BY: RMR nRa„N ax: CM /JL /RMR scncR: 1 " =5' nsTR' 07 -25 -2014 SHEET NO. XS -1 'JI McAne,Ms � 2.5" 119.OB ° � X w 8.0" B25.OB w d w X w w w w 00 U A � V " 035747 M• RED \ \,��� w K 6 6 a � 2 I/1 2 W V1 N W ��aaasa° 5 N N N N N N H 1• W CV W `a Qi Ox o W�)WE E�..4 Viz H� R i E" E W � O to U P4 z O 0 O z � O c�3 U O O Q U eROncr xo. MRH -13040 "m° MRH13080 —XS1 CHECKED BY: RMR nRa„N ax: CM /JL /RMR scncR: 1 " =5' nsTR' 07 -25 -2014 SHEET NO. XS -1 'JI McAne,Ms X w w w w 00 U A � V " 035747 M• RED \ \,��� w K 6 6 a � 2 I/1 2 W V1 N W ��aaasa° 5 N N N N N N H 1• W CV W `a Qi Ox o W�)WE E�..4 Viz H� R i E" E W � O to U P4 z O 0 O z � O c�3 U O O Q U eROncr xo. MRH -13040 "m° MRH13080 —XS1 CHECKED BY: RMR nRa„N ax: CM /JL /RMR scncR: 1 " =5' nsTR' 07 -25 -2014 SHEET NO. XS -1 'JI McAne,Ms 00 U A � V " 035747 M• RED \ \,��� w K 6 6 a � 2 I/1 2 W V1 N W ��aaasa° 5 N N N N N N H 1• W CV W `a Qi Ox o W�)WE E�..4 Viz H� R i E" E W � O to U P4 z O 0 O z � O c�3 U O O Q U eROncr xo. MRH -13040 "m° MRH13080 —XS1 CHECKED BY: RMR nRa„N ax: CM /JL /RMR scncR: 1 " =5' nsTR' 07 -25 -2014 SHEET NO. XS -1 'JI McAne,Ms CHESTNUT LANE 3 +50 �' 736 X 2.5" 119.06 zs" ns.o6 X 736 � w so.00gR w w 8.0" 625.08 w w 8.0" w w 734 a w i 734 w a x w 732 732 w d N c 730 0 730 n Nil n w C' N Ix 728 728 \ [L Lm w O 2.29E 4.53E w ° \ 726 w - - - - - -- - - - - -- 726 5.5E Tm iIIIIii1io'- MEME - PROTEC 724 724 - - _ - - - - - - - - - -- 1.5 MILLING WITH 1.5 -- PROPOSED S9.5B OVERLAY (TYP.) ° GRADE 722 722 EX. GRADE K N ° ° 720 720 FAR Z N 718 718 a� FL 0 0 716 716 z p 0 o � z NEW PAVEMENT SECTION - 714 714 712 712 —50 —40 —30 —20 —10 0 10 20 30 40 50 CHESTNUT LANE 3 +00 736 736 60.00' R w 734 734 732 732 _ n ° N °' 730 730 728 tl II n 728 w o w o a 209% 0.83E - -- w o -- - - - -- - - - -- -- - 726 726 3.01 PROT TED z- 724 724 - - - - -- --- - - - -�� PROPOSED 722 ° GRADE 722 EX. GRADE 1.5" MILLING WITH 1.5" oN S9.5B OVERLAY (TYP.) on 720 720 n Z N 718 an 718 716 o ° w 716 Z o o o Lu z NEW PAVEMENT SECTION 714 - 714 712 712 —50 —40 —30 —20 —10 0 10 20 30 40 50 CHESTNUT LANE 2 +50 736 736 so.001R w 734 i 734 732 732 J w 2M. a �' 730 N 730 II Wq y n tl IN ° II N II F 728 a 728 \0 w o a.e3x isax \ w o \"- ° -- - -- - - - -- 726 — — 726 2.05E / " " 724 - - - - -- - - - -- - -- 724 S9.5B OVERLAY (TYP.) - ROPOSED GRADE 722 N 722 m� 720 720 D 718 718 ON °PROTECT a o 716 w w n O 716 Z p O_ a w o w 0 Z NEW PAVEMENT SECTION - 714 714 712 712 —50 —40 —30 —20 —10 0 10 20 30 40 50 FINAL DRAWING — NOT RELEASED FOR CONSTRUCTION R1 N M . 8 IF 0 IF IN CAL-11: rn pz A � V AL��9 i 0357 7 '��nn n�o• a 8 3g Z 'o 0 o i'oV �.SI. N ry ry N N N z• x O Boa zwv W�Wx F E" E'IU�Z FBI F H W � F to U z O o 0 Z o U O o U eaascr No. MRH -13040 FHENAM: MRH13080 —XS1 CHECKED BY: RMR 0a'"N BY. CM /JL /RMR SCAM: 1 11=5' ' Wars: 07 -25 -2014 SHEET N0. XS -2 M MCADAMS N �' X X 2.5" 119.06 zs" ns.o6 X � w w w 8.0" 625.08 w w 8.0" w w R1 N M . 8 IF 0 IF IN CAL-11: rn pz A � V AL��9 i 0357 7 '��nn n�o• a 8 3g Z 'o 0 o i'oV �.SI. N ry ry N N N z• x O Boa zwv W�Wx F E" E'IU�Z FBI F H W � F to U z O o 0 Z o U O o U eaascr No. MRH -13040 FHENAM: MRH13080 —XS1 CHECKED BY: RMR 0a'"N BY. CM /JL /RMR SCAM: 1 11=5' ' Wars: 07 -25 -2014 SHEET N0. XS -2 M MCADAMS 57< �' X X zs" ns.o6 X � 0 � w w w 8.0" 825.OB 8.0" 625.OB w a w w a x w R1 N M . 8 IF 0 IF IN CAL-11: rn pz A � V AL��9 i 0357 7 '��nn n�o• a 8 3g Z 'o 0 o i'oV �.SI. N ry ry N N N z• x O Boa zwv W�Wx F E" E'IU�Z FBI F H W � F to U z O o 0 Z o U O o U eaascr No. MRH -13040 FHENAM: MRH13080 —XS1 CHECKED BY: RMR 0a'"N BY. CM /JL /RMR SCAM: 1 11=5' ' Wars: 07 -25 -2014 SHEET N0. XS -2 M MCADAMS 57< X X 2.5" 119.06 X � x w w w 8.0" 825.OB w a w R1 N M . 8 IF 0 IF IN CAL-11: rn pz A � V AL��9 i 0357 7 '��nn n�o• a 8 3g Z 'o 0 o i'oV �.SI. N ry ry N N N z• x O Boa zwv W�Wx F E" E'IU�Z FBI F H W � F to U z O o 0 Z o U O o U eaascr No. MRH -13040 FHENAM: MRH13080 —XS1 CHECKED BY: RMR 0a'"N BY. CM /JL /RMR SCAM: 1 11=5' ' Wars: 07 -25 -2014 SHEET N0. XS -2 M MCADAMS RE 718 1 ZN O 718 716 716 714 714 —50 —40 —30 —20 —10 0 10 20 30 40 50 CHESTNUT LANE 4 +50 736 60.00gR W 736 734 734 I 1 I 732 1 732 730 N II N M 730 728 aJ LL a 01111 728 o.6zX__ 11 726 �- -- 6.45X w ° - - - -- 726 724 -- -- - - - - - PROTECTED 40,4,2, 724 PROPOSED 722 1.5" MILLING WITH 1.5" 59.56 OVERLAY (TYP.) 720 1 M 720 N 0 718 718 716 o 716 z p NEW PAVEMENT SECTION p w z 714 - Lo - 714 712 712 —50 —40 —30 —20 —10 0 10 20 30 40 50 CHESTNUT LANE 4 +00 736 60.00' R W 736 734 734 732 1 732 W ro z 730 N u N M 730 728 w o a 4 728 I— 0.74X 5.76X - - - -- -- 7261 - - - - - - -- - -- 726 PROTECTED 724 - - - - - - - - - - -- - - - - -- 1s° w�L ° 724 o PROPOSED 722 1 1.5" MILLING WITH 1.5" MU 722 720 1 S9.5B OVERLAY (TYP.) ` ' 1 720 �i 718N W,, 718 aw 716 BE BE a5 O a 716 Z O NEW PAVEMENT SECTION p w z 714 - - 714 712 712 —50 —40 —30 —20 —10 0 10 20 30 40 50 FINAL DRAWING — NOT RELEASED FOR CONSTRUCTION NCO C9 d p„a w Ow c� Z_ O NEW PAVEMENT SECTION O` Z � 2.5" 119.08 O N ,X w ::118,*. 0" 625.06 w d w co X X 2.5" 119.06 X � x ,,,_, w 8.0" 625.06 w d ,,,_, 57< X 2.5" 119.OB X � X w w 8.0" B25.OB w o_ w A � V ��. CAR U w v 3 (l Z 7 LJ 3 g w a � 5 S S o S S w s w o (A rc rc w N a a m 5 N N N N N N N a � W N �o z Ox o CQ U W E",Urnz �N x FBI F E W� o z a CO U pw '" d z 00 Z o U O O U PROJECT xo. MRH -13040 FREx""¢: MRH13080 —XS1 CHECKED BY: RMR DRAWN sr: CM /JL /RMR scvs: 1'=5' neTe: 07 -25 -2014 s�sr NO. XS -3 M MCADAMS CHESTNUT LANE 5 +00 60.00' R W 736 ' 30 00' ' 7 736 3 734 7 734 732 1 J 7 732 1 M M C4 Z Z n E E/P :725.69 1 1 730 7 7. O OFFSET -m39' R 730 �� „ „ m mM 728 728 53.7X w °- - - - - - -- — — — - - - - - - - - 726 - - -- - --- - 726 1 1 1 724 1 1 - - - - --- -- - 1.5" MILLING WITH 1.5" G GRADE 7 1 S9.5B OVERLAY (TYP.) 7 722 E EX. GRADE S 722 PROTECTED 7 720 P 720 R 0" 625.06 w d w co X X 2.5" 119.06 X � x ,,,_, w 8.0" 625.06 w d ,,,_, 57< X 2.5" 119.OB X � X w w 8.0" B25.OB w o_ w A � V ��. CAR U w v 3 (l Z 7 LJ 3 g w a � 5 S S o S S w s w o (A rc rc w N a a m 5 N N N N N N N a � W N �o z Ox o CQ U W E",Urnz �N x FBI F E W� o z a CO U pw '" d z 00 Z o U O O U PROJECT xo. MRH -13040 FREx""¢: MRH13080 —XS1 CHECKED BY: RMR DRAWN sr: CM /JL /RMR scvs: 1'=5' neTe: 07 -25 -2014 s�sr NO. XS -3 M MCADAMS X X 2.5" 119.06 X � x ,,,_, w 8.0" 625.06 w d ,,,_, 57< X 2.5" 119.OB X � X w w 8.0" B25.OB w o_ w A � V ��. CAR U w v 3 (l Z 7 LJ 3 g w a � 5 S S o S S w s w o (A rc rc w N a a m 5 N N N N N N N a � W N �o z Ox o CQ U W E",Urnz �N x FBI F E W� o z a CO U pw '" d z 00 Z o U O O U PROJECT xo. MRH -13040 FREx""¢: MRH13080 —XS1 CHECKED BY: RMR DRAWN sr: CM /JL /RMR scvs: 1'=5' neTe: 07 -25 -2014 s�sr NO. XS -3 M MCADAMS 57< X 2.5" 119.OB X � X w w 8.0" B25.OB w o_ w A � V ��. CAR U w v 3 (l Z 7 LJ 3 g w a � 5 S S o S S w s w o (A rc rc w N a a m 5 N N N N N N N a � W N �o z Ox o CQ U W E",Urnz �N x FBI F E W� o z a CO U pw '" d z 00 Z o U O O U PROJECT xo. MRH -13040 FREx""¢: MRH13080 —XS1 CHECKED BY: RMR DRAWN sr: CM /JL /RMR scvs: 1'=5' neTe: 07 -25 -2014 s�sr NO. XS -3 M MCADAMS A � V ��. CAR U w v 3 (l Z 7 LJ 3 g w a � 5 S S o S S w s w o (A rc rc w N a a m 5 N N N N N N N a � W N �o z Ox o CQ U W E",Urnz �N x FBI F E W� o z a CO U pw '" d z 00 Z o U O O U PROJECT xo. MRH -13040 FREx""¢: MRH13080 —XS1 CHECKED BY: RMR DRAWN sr: CM /JL /RMR scvs: 1'=5' neTe: 07 -25 -2014 s�sr NO. XS -3 M MCADAMS Ogg CHESTNUT LANE 6 +50 736 so.00g 736 R w 734 734 J 732 N ° m a 732 m N N W n 0 730 n N ;; 730 �w �bu 728 ° T63X � � a � 728 - &825 — w 0 - - - - -- --- -- - - -- ---- - - - - -- 726 726 EX. GRADE S9.5B OVERLAY (TYP.) 724 /- \ GRADE 724 722 / 1 722 oz 16" W/L 720 o PROTECTED 720 718 1 0 0 >� 718 716 716 714 714 -50 -40 -30 -20 -10 0 10 20 30 40 50 CHESTNUT LANE 6 +00 736 so.00'1 w 736 734 1.00' 734 732 J W 4.00' 5.00' 732 I n rc 1 < N N I 730 „ ow ESP -7z &ea ; N 730 T OFFSET- tt.7o' R STANDAR 728 w 0 2.5' C &G 728 — - - - - - -- -_ w __ w 0 2.00% 74, — — — — — — — — — — — — 726 — _ ffl.5" 7OVERLAY H 1.5" — — — — 726 (TYP.) PROTECT ED 724 16" WA GRADE 724 722 722 720 720 0 718 1 0 ?N o 718 716 716 714 714 -50 -40 -30 -20 -10 0 10 20 30 40 50 CHESTNUT LANE 5 +50 736 6o.00gR w 736 734 BENCH 734 732 Z 732 730 ^ " N N 730 a U w E/P =725.92 �� 2.5' C& 728 W o oFFSEr =11.9r R 728 ''— 3.475 2.1 w O 2.00% 7261 - - - -- - - -- -- — - -- -- 726 1 — 1 724 i6" W/L \--PROPOSED 724 EX. GRADE 1.5" MILLING WITH 1.5" GRADE 722 722 1 i 720 720 � o � 718 1 0 >0 0 718 716 716 714 714 -50 -40 -30 -20 -10 0 10 20 30 40 50 FINAL DRAWING - NOT RELEASED FOR CONSTRUCTION W J Z O NEW PAVEMENT SECTION p a° Z X X 2.5" 119.OB X x w w 8.0" B25.OB w w Z O NEW PAVEMENT SECTION p �' � zs" ns.oe X o � w w 8.0" B25.OB w � w W J Z O NEW PAVEMENT SECTION p a W W Z X X 2.5" 119.08 X � R w w 8.0" 825.08 w o_ w � g Q A � V AL ~�9 " 35 7�., 'I, fT ���mun"• U C 3 a 6i 5 N N N N N N N (n W .7 d Ox o 0a xti�U F F+-t F F W Ig o O �z a z O o 0 z o U O O U PROncx xo. MRH -13040 F°.eN "ME° MRH13080 -XS1 CHECKED BY: RMR oR""''t B"° CM /JL /RMR SCALE: 1'=5' Hers: 07 -25 -2014 SHSSI' N0. XS -4 'JI McAnaMs Z O NEW PAVEMENT SECTION p �' � zs" ns.oe X o � w w 8.0" B25.OB w � w W J Z O NEW PAVEMENT SECTION p a W W Z X X 2.5" 119.08 X � R w w 8.0" 825.08 w o_ w � g Q A � V AL ~�9 " 35 7�., 'I, fT ���mun"• U C 3 a 6i 5 N N N N N N N (n W .7 d Ox o 0a xti�U F F+-t F F W Ig o O �z a z O o 0 z o U O O U PROncx xo. MRH -13040 F°.eN "ME° MRH13080 -XS1 CHECKED BY: RMR oR""''t B"° CM /JL /RMR SCALE: 1'=5' Hers: 07 -25 -2014 SHSSI' N0. XS -4 'JI McAnaMs W J Z O NEW PAVEMENT SECTION p a W W Z X X 2.5" 119.08 X � R w w 8.0" 825.08 w o_ w � g Q A � V AL ~�9 " 35 7�., 'I, fT ���mun"• U C 3 a 6i 5 N N N N N N N (n W .7 d Ox o 0a xti�U F F+-t F F W Ig o O �z a z O o 0 z o U O O U PROncx xo. MRH -13040 F°.eN "ME° MRH13080 -XS1 CHECKED BY: RMR oR""''t B"° CM /JL /RMR SCALE: 1'=5' Hers: 07 -25 -2014 SHSSI' N0. XS -4 'JI McAnaMs � g Q A � V AL ~�9 " 35 7�., 'I, fT ���mun"• U C 3 a 6i 5 N N N N N N N (n W .7 d Ox o 0a xti�U F F+-t F F W Ig o O �z a z O o 0 z o U O O U PROncx xo. MRH -13040 F°.eN "ME° MRH13080 -XS1 CHECKED BY: RMR oR""''t B"° CM /JL /RMR SCALE: 1'=5' Hers: 07 -25 -2014 SHSSI' N0. XS -4 'JI McAnaMs AZ oil W J Z_ O NEW PAVEMENT SECTION p a �" w Z � X z.s" ns.o6 X � X x w 8.0" B25.OB w � w w _^ O d w° w Z O NEW PAVEMENT SECTION p a W Z � w z.s" ns.oe o cn w 8.0" B25.OB w a Lx,_I —n Z O NEW PAVEMENT SECTION O a w O Z X X 2.5" 119.OB X � x Li w 8.0" 625.OB w d w A � V • 0357 7 ' .�F,�,T• Opp ��. a w a a a � �aaa�aa�, N N N N ts•! N N x cQ �o z x a O O � 10 c', U x w x F E �x RI E" E W o E" E � Z Oa O O U .-I d z 0 0 0 Z o c� U O O U raonscl• xo. MRH -13040 FuartnW; MRH13080 —XS1 CHECKED BY- RMR DRA"x Dy° CM /JL /RMR scncr: 1 " =5' nsTa: 07 -25 -2014 s73EET NO. XS -5 19I MCADAMS CHESTNUT LANE 8 +00 '1 738 738 60.00' R W 736 3Q QQ, 1.001--1 Mile, 1 736 7341 4.1 10' 5.00' 11 1 734 w 732 732: N II ° N II STAND RD ROPOSED 730 a 2.5' C G PROP. S W GRADE 730 098% 2.00 % 728 728 1 1 ••- - - - - -- _ice 1 726 726 EX. GRADE 1.5" MILLING WITH 1.5" 16" W/L 724 S9.5B OVERLAY (TYP.) 724 722 722 I ^ I 720 — >N o 720 718 718 716 716 -50 -40 -30 -20 -10 0 10 20 30 40 50 CHESTNUT LANE 7 +50 738 738 so.00R w 1.00' 736 BENCH 736 4. o' 5.00' 734 734 1 W j rn 1 732 °° o 732 N II W I _ N II ^ N lit STAND RD ROPOSED 730 730 w w a PROP 2.3o7c w � w o —S 2.00% 728 _ — ------- - - - - -- 728 - 1.5" MILLING WITH 1.5' 726 726 EX. GRADE i6" W/L 724 724 722 722 m 3 720 ° '^ O 720 718 718 716 716 -50 -40 -30 -20 -10 0 10 20 30 40 50 CHESTNUT LANE 7 +00 738 738 60.00' R W 736 , 1.00' 736 734 734 1 1 J i7 Z rNi, I 732 IT 732 O N _ N II WF Zn O 730 ^ WJ ^ N N II 730 w a w a 2.5' C &G PROPPS/W GRADE 2.0176 ° z.67X w O O 2.00% 728 728 - -- s.ssx -- ---- - - - - -- - - - 726 1.5" MILLING WITH 1.5" I 726 EX. GRAD S9.5B OVERLAY T PROTECTED i6" W/L 724 724 722 722 O ° 720 • 720 N Ld 718 718 716 716 -50 -40 -30 -20 -10 0 10 20 30 40 50 FINAL DRAWING - NOT RELEASED FOR CONSTRUCTION AZ oil W J Z_ O NEW PAVEMENT SECTION p a �" w Z � X z.s" ns.o6 X � X x w 8.0" B25.OB w � w w _^ O d w° w Z O NEW PAVEMENT SECTION p a W Z � w z.s" ns.oe o cn w 8.0" B25.OB w a Lx,_I —n Z O NEW PAVEMENT SECTION O a w O Z X X 2.5" 119.OB X � x Li w 8.0" 625.OB w d w A � V • 0357 7 ' .�F,�,T• Opp ��. a w a a a � �aaa�aa�, N N N N ts•! N N x cQ �o z x a O O � 10 c', U x w x F E �x RI E" E W o E" E � Z Oa O O U .-I d z 0 0 0 Z o c� U O O U raonscl• xo. MRH -13040 FuartnW; MRH13080 —XS1 CHECKED BY- RMR DRA"x Dy° CM /JL /RMR scncr: 1 " =5' nsTa: 07 -25 -2014 s73EET NO. XS -5 19I MCADAMS _^ O d w° w Z O NEW PAVEMENT SECTION p a W Z � w z.s" ns.oe o cn w 8.0" B25.OB w a Lx,_I —n Z O NEW PAVEMENT SECTION O a w O Z X X 2.5" 119.OB X � x Li w 8.0" 625.OB w d w A � V • 0357 7 ' .�F,�,T• Opp ��. a w a a a � �aaa�aa�, N N N N ts•! N N x cQ �o z x a O O � 10 c', U x w x F E �x RI E" E W o E" E � Z Oa O O U .-I d z 0 0 0 Z o c� U O O U raonscl• xo. MRH -13040 FuartnW; MRH13080 —XS1 CHECKED BY- RMR DRA"x Dy° CM /JL /RMR scncr: 1 " =5' nsTa: 07 -25 -2014 s73EET NO. XS -5 19I MCADAMS —n Z O NEW PAVEMENT SECTION O a w O Z X X 2.5" 119.OB X � x Li w 8.0" 625.OB w d w A � V • 0357 7 ' .�F,�,T• Opp ��. a w a a a � �aaa�aa�, N N N N ts•! N N x cQ �o z x a O O � 10 c', U x w x F E �x RI E" E W o E" E � Z Oa O O U .-I d z 0 0 0 Z o c� U O O U raonscl• xo. MRH -13040 FuartnW; MRH13080 —XS1 CHECKED BY- RMR DRA"x Dy° CM /JL /RMR scncr: 1 " =5' nsTa: 07 -25 -2014 s73EET NO. XS -5 19I MCADAMS A � V • 0357 7 ' .�F,�,T• Opp ��. a w a a a � �aaa�aa�, N N N N ts•! N N x cQ �o z x a O O � 10 c', U x w x F E �x RI E" E W o E" E � Z Oa O O U .-I d z 0 0 0 Z o c� U O O U raonscl• xo. MRH -13040 FuartnW; MRH13080 —XS1 CHECKED BY- RMR DRA"x Dy° CM /JL /RMR scncr: 1 " =5' nsTa: 07 -25 -2014 s73EET NO. XS -5 19I MCADAMS 742 740 738 736 734 732 730 728 726 724 722 720 —50 CHESTNUT LANE 9 +50 742 740 738 736 734 732 730 728 726 724 722 720 50 742 740 738 736 734 732 730 728 726 724 722 720 —50 —40 —40 —30 —20 —10 0 CHESTNUT LANE 9 +00 10 20 30 40 742 740 738 736 734 732 730 728 726 724 722 720 50 z_ O p z M o W n, ww z Z NEW PAVEMENT SECTION O N O NEW PAVEMENT SECTION 5" p a I NEW PAVEMENT SECTION 2.5" 119.08 p Z 'I'll a w ° z E 99.5B 2.5' 119.08 x w X w 8.0" B25.0B X �,,� X w X w a X w X X w 742 740 738 736 734 732 730 728 726 724 722 720 —50 —40 —40 —30 —20 —10 0 CHESTNUT LANE 9 +00 10 20 30 40 742 740 738 736 734 732 730 728 726 724 722 720 50 738 736 734 732 730 728 726 724 722 720 718 716 —50 —30 —20 —10 0 CHESTNUT LANE 8 +50 10 20 30 w 738 736 734 732 730 728 726 724 722 720 718 716 50 w Ow Z z O O NEW PAVEMENT SECTION 5" p a I NEW PAVEMENT SECTION p Z o M ° z -X 99.5B 2.5' 119.08 Of X �,,� w 8.0" B25.OB X X w a x w 2.5" 119.08 _n w X w X w 8.0" B25.OB X w nw 'a n_ w 738 736 734 732 730 728 726 724 722 720 718 716 —50 —30 —20 —10 0 CHESTNUT LANE 8 +50 10 20 30 w 738 736 734 732 730 728 726 724 722 720 718 716 50 —40 —30 —20 —10 N 10 20 30 Me FINAL DRAWING — NOT RELEASED FOR CONSTRUCTION p.rU A � V till,, M. 111101t �i z w 3 2 8 in z w z o � a 0 0 s s s a co �Do ol Wx O� o o� xz0 W;DWE z �+ x E Wo E E+ � Z .7 to o �to v 00 0 N u z o to U z O O U PRDIECr ND. MRH -13040 FmNAml: MRH13080 —XS1 CRRCJCRD BY: RMR DRARN DY: CM /JL /RMR SCADS: 1'=5' DATE: 07 -25 -2014 sRRRT NO. XS -6 IMI MCADAMS w Ow Z O NEW PAVEMENT SECTION 5" p a I Z -X 99.5B 2.5' 119.08 Of X �,,� w 8.0" B25.OB X w a x w —40 —30 —20 —10 N 10 20 30 Me FINAL DRAWING — NOT RELEASED FOR CONSTRUCTION p.rU A � V till,, M. 111101t �i z w 3 2 8 in z w z o � a 0 0 s s s a co �Do ol Wx O� o o� xz0 W;DWE z �+ x E Wo E E+ � Z .7 to o �to v 00 0 N u z o to U z O O U PRDIECr ND. MRH -13040 FmNAml: MRH13080 —XS1 CRRCJCRD BY: RMR DRARN DY: CM /JL /RMR SCADS: 1'=5' DATE: 07 -25 -2014 sRRRT NO. XS -6 IMI MCADAMS SIAM coi Rf W J Z_ O NEW PAVEMENT SECTION p a "' Z � 2.5" 119.08 N w w 8.0" 825.06 w w o 60.00' R W 'I I � I � w � Mo N o � � o w II rn 11 N I 4.81% - - -- - -- -- -- - -- -- 1.5" MILLING WITH 1.5" — — '— — S9.56 OVERLAY (TYP.) _ � EX. GRADE 3 GRADE I o ` ' o o I NEW PAVEMENT SECTION n- 16" W/L n W o Z O O PROTECTED > �i z X X 2.5 119.08 X a � X w w 6.0" B25.OB w a W o_ w 60.00' R W I � ° II W II M II N N nCj °Gi I ,ri M� W ° 3.37% 1.94 % -- W -- . - - --.— — w O -- _..__ -- .—..— 1.5" MILLING WITH 1.5" 4• I S9.5B OVERLAY TYP. � m EX. GRADE ROPOSED m!I, GRADE I � 16" /L I z O NEW PAVEMENT SECTION O z N w � wll X X 2.5 "119.06 X aW � x w w 6.0" 625.06 w d w U A � V y U F � W Q y rc m Fy a co rn �o a xWQEW ., I x x �x F � m o z z z�u P4 E-1 U u 0 Mz F o O o o � x F W o U o Oz 0 U O O U PROJECT No. MRH -13040 FmN"'E° MRH13080 —XS1 CHECKED BY: RMR oHn1rN Hx: CM /JL /RMR scncE: 1"=5' DATE: 07 -25 -2014 SHEET N0. XS- 7 WI MCADAMS CHESTNUT LANE 11 +00 1 742 742 60.00' R W 740 30, 740 738 738 736 J ZN M 736 n N n � E/P- 731.94 °? oFFSEr- 10.99• R n 734 ^ 734 �0 — a W - - - - - - 732 W ° o. - - - -- - 732 — F70% " 730 / — " 730 — —' — — — — _ -" ' 59.56 OVERLAY (TYP.) 728 _ -PROPOSED UNAUL 728 726 16" W/L 726 00 PROTECTED z N 0O 724 724 LJ 722 722 720 720 —50 —40 —30 —20 —10 0 10 20 30 40 50 CHESTNUT LANE 10 +50 742 742 740 740 738 738 736 736 734 734 732 732 730 730 728 728 726 726 724 724 722 722 —50 —40 —30 —20 —10 0 10 20 30 40 50 CHESTNUT LANE 10 +00 q 740 740 738 738 736 736 734 734 732 732 730 730 728 728 726 726 724 724 722 722 720 720 —50 —40 —30 —20 —10 0 10 20 30 40 50 FINAL DRAWING — NOT RELEASED FOR CONSTRUCTION SIAM coi Rf W J Z_ O NEW PAVEMENT SECTION p a "' Z � 2.5" 119.08 N w w 8.0" 825.06 w w o 60.00' R W 'I I � I � w � Mo N o � � o w II rn 11 N I 4.81% - - -- - -- -- -- - -- -- 1.5" MILLING WITH 1.5" — — '— — S9.56 OVERLAY (TYP.) _ � EX. GRADE 3 GRADE I o ` ' o o I NEW PAVEMENT SECTION n- 16" W/L n W o Z O O PROTECTED > �i z X X 2.5 119.08 X a � X w w 6.0" B25.OB w a W o_ w 60.00' R W I � ° II W II M II N N nCj °Gi I ,ri M� W ° 3.37% 1.94 % -- W -- . - - --.— — w O -- _..__ -- .—..— 1.5" MILLING WITH 1.5" 4• I S9.5B OVERLAY TYP. � m EX. GRADE ROPOSED m!I, GRADE I � 16" /L I z O NEW PAVEMENT SECTION O z N w � wll X X 2.5 "119.06 X aW � x w w 6.0" 625.06 w d w U A � V y U F � W Q y rc m Fy a co rn �o a xWQEW ., I x x �x F � m o z z z�u P4 E-1 U u 0 Mz F o O o o � x F W o U o Oz 0 U O O U PROJECT No. MRH -13040 FmN"'E° MRH13080 —XS1 CHECKED BY: RMR oHn1rN Hx: CM /JL /RMR scncE: 1"=5' DATE: 07 -25 -2014 SHEET N0. XS- 7 WI MCADAMS 60.00' R W 'I I � I � w � Mo N o � � o w II rn 11 N I 4.81% - - -- - -- -- -- - -- -- 1.5" MILLING WITH 1.5" — — '— — S9.56 OVERLAY (TYP.) _ � EX. GRADE 3 GRADE I o ` ' o o I NEW PAVEMENT SECTION n- 16" W/L n W o Z O O PROTECTED > �i z X X 2.5 119.08 X a � X w w 6.0" B25.OB w a W o_ w 60.00' R W I � ° II W II M II N N nCj °Gi I ,ri M� W ° 3.37% 1.94 % -- W -- . - - --.— — w O -- _..__ -- .—..— 1.5" MILLING WITH 1.5" 4• I S9.5B OVERLAY TYP. � m EX. GRADE ROPOSED m!I, GRADE I � 16" /L I z O NEW PAVEMENT SECTION O z N w � wll X X 2.5 "119.06 X aW � x w w 6.0" 625.06 w d w U A � V y U F � W Q y rc m Fy a co rn �o a xWQEW ., I x x �x F � m o z z z�u P4 E-1 U u 0 Mz F o O o o � x F W o U o Oz 0 U O O U PROJECT No. MRH -13040 FmN"'E° MRH13080 —XS1 CHECKED BY: RMR oHn1rN Hx: CM /JL /RMR scncE: 1"=5' DATE: 07 -25 -2014 SHEET N0. XS- 7 WI MCADAMS 60.00' R W I � ° II W II M II N N nCj °Gi I ,ri M� W ° 3.37% 1.94 % -- W -- . - - --.— — w O -- _..__ -- .—..— 1.5" MILLING WITH 1.5" 4• I S9.5B OVERLAY TYP. � m EX. GRADE ROPOSED m!I, GRADE I � 16" /L I z O NEW PAVEMENT SECTION O z N w � wll X X 2.5 "119.06 X aW � x w w 6.0" 625.06 w d w U A � V y U F � W Q y rc m Fy a co rn �o a xWQEW ., I x x �x F � m o z z z�u P4 E-1 U u 0 Mz F o O o o � x F W o U o Oz 0 U O O U PROJECT No. MRH -13040 FmN"'E° MRH13080 —XS1 CHECKED BY: RMR oHn1rN Hx: CM /JL /RMR scncE: 1"=5' DATE: 07 -25 -2014 SHEET N0. XS- 7 WI MCADAMS U A � V y U F � W Q y rc m Fy a co rn �o a xWQEW ., I x x �x F � m o z z z�u P4 E-1 U u 0 Mz F o O o o � x F W o U o Oz 0 U O O U PROJECT No. MRH -13040 FmN"'E° MRH13080 —XS1 CHECKED BY: RMR oHn1rN Hx: CM /JL /RMR scncE: 1"=5' DATE: 07 -25 -2014 SHEET N0. XS- 7 WI MCADAMS VN ,'".0 O z 5V A � V EAL 35747 ' OIF Fti .. . ,,pP A! RE���``�� 'Ohnnnr" "` v � � s s s d 5 N N N N N N N P4 W V1 PQ CQ W M 0x o x k WxWx E o E Z F W o h I c � m x z 0 0 0 1:4 0 uz o U 0 O U PROJECT NO. MRH -13040 FD.RRANR: MRH13080 -XS1 CHECKED BY: RMR DRAWN BY: CM /JL /RMR SCALE: 1'=5' DATE: 07 -25 -2014 sBRRT xO. �( e XS Q -V �J ADAMS co MAN CHESTNUT LANE 13 +00 744 60.00' R w 744 742 742 740 740 J W � 738 Z° 738 736 ' L W � ^ N 736 a-o a 734 W - - -- -- - - - -- _ — �LL - - - -- 734 — - - - - - -- -- — - - - -- 732 _ - — — I ' PROTECTED 732 16" W/L 730 EX. GRADE / \ 736 728 / 728 726 726 724 724 722 722 -50 -40 -30 -20 -10 0 10 20 30 40 50 FINAL DRAWING - NOT RELEASED FOR CONSTRUCTION co Z N r Z p NEW PAYMENT SEC110N aw O Z � 2:5" 119.06 � w w 8.0" 625.06 w w N V � V ,o N 0 3'i4l � w < � < z 2 w � S O O 3 3 a � w s A s S o d s rc < m y N r O F-� 5 N N N N N N N ;4 m Wp � �x Z 0 W H��z �x PIF E Wo 0 z a to ..I z O o 0 z o c� U O O U Psorscr No. MRH -13040 FONaw-' MRH13080 —XS1 cHEcKRo BY: RMR nsamv nv: CM /JL /RMR SCAM.. 111=51 DATE: 07 -25 -2014 s=n No. " ^ _ A M MCADAMS A M MCADAMS EU 1 OF 1 ewn ie Irl�l � - , M ANN OWNTITIEB FOR CONCRETE NMIID OMP INLET PIPE _trr:e MIRTH NETOHi OTNIIC YARDS OF CONCRETE IN BOX D®OCTIOX9 FOR ONE i:nuyil D A B H BUTTON BLAB H PER Fi. HT. H MIN. TOTAL C.B. 116i� 12" 3' -0" 2' -0" V -8" 0.882 0.247 0.891 0.763 0.020 0.082 18" W -8" sl�rlllrlrarirrrrlrrrlirl�m���erll�rl�rrerrlrs�rmrl V -11" 0.862 0.247 0.458 0.815 0.023 0.036 18" 9' -8" 2' -W 2' -2" €ill 0.247 0.515 0.877 0.033 rrr i[IIM ■r�llrtrllrrll�rrrrlrlrr>•��� 2' -8" 0.882 0.247 0.868 1.021 0.069 DA85 rlrsrlrr. 3' -8" 2' -1' rrrrrrrrrs�s 0.882 .....�����.t..��l...r�sn�mm� 0.782 1.141 0.082 0.127 88" 3' -8" W -0" 8' -B" lu 0.217 �1111rlilww�s.t.attawra. ' 0.19E �1i® I�..a..1w..1..wlat...� FC NHCmoff' l>rttzrcrl1 � • • arum F�=�EEiA R43i1[% E!' f. 4iCR aAiL: ,4EP163��FEA1��iEiLis:9f,'aa 9F351Mr11t31T- 41�iRt'Y14R6"111Ii�l.lXlr" R' 04PJ! Ir!"iiIMr1MM lF9l�1LfL9SfL1�EEPIFFBERT MLtlU NI?'3N .iI�(I:ET,�T.P1Ef.!f�f1c4T.i M 1]!<.D'MKINX7.1 , . G�TL1 EU 1 OF 1 ewn ie W (• C3 y 2lrg,. AI et xl N7 I R Ng a a 2' -i. H Lv Q ut tp d n 1- 01I1NOTED D.I. O�' rr 21_x]7 4 DOWEL "A" SECTION E -E SECTION E -E SHEET 1 aF 1 EET i OF i EET 1 OF 1 aUT .4e. cenmSSMw.mtEED•gnd5 t1111e11LC1l1 neVU1UtlUl1 aBl�fo Pao • a"naP U- 470268 Series 247 and 247 Cutoff NIGHTTIME FRIENDLY 03 -20 -2014. Y 50.150W HP5, 100 -1JSW MH Series 247 247105 RN 120 R3 AY 247155 RN 120 R3 AY 2471 OS RN 120 R5 AY 247 15S RN 120 R5 AY Series 247 Cutoff 247105 RN 120 R2 FCTL 24710M XN MTI R2 FCTL oaornwa Features: Die- costaluminum housing and hood far long -life performance Die- costtngger latch n0 option auail deleforersy access to internal components Optical assembly designed for mart mum performance Hinged hood andcapauescrew pho Ision afford quick easy access to electrical and optical area for relampi ng e r servicing SllpfiRer with three set screws allows secure installation to pole sizes 2- 378"or YOD. E39mogolbasesocketstandard All elect ical componentswarranted by American Electric Oghbng's 6yearguarantee ComplieswMAN51:C 1362, C136. 10,CI36.15,CIM.31(regularonly), C136.16(FConly) Suitable for -30°C MH AI- CHPS Applications: Walkways Pathway Parks me 1427mm1 23.6" I688mm1 ENeANe PmleoeeAm OPAI iM EPq fo,IMAmetkanflNdYtlmsela34]IS Iby.fl. A(WOX. WL =361bS sheeiloL -zai -A w""° "' uammu American Revolution U- 470268 Series 247 and 247 Cutoff 50 -1 SOW HP5, 100 -175W MH E%ample:247 155 RN 120 R5 AY EC 247 MINI OIMENBIONN RN ANN OWNTITIEB FOR CONCRETE NMIID OMP INLET PIPE SPAN MIRTH NETOHi OTNIIC YARDS OF CONCRETE IN BOX D®OCTIOX9 FOR ONE PIPE D A B H BUTTON BLAB H PER Fi. HT. H MIN. TOTAL TOTAL C.B. R.C. 12" 3' -0" 2' -0" V -8" 0.882 0.247 0.891 0.763 0.020 0.082 18" W -8" 2' -0" V -11" 0.862 0.247 0.458 0.815 0.023 0.036 18" 9' -8" 2' -W 2' -2" 0.388 0.247 0.515 0.877 0.033 0.018 i[IIM 2' -0' 2' -8" 0.882 0.247 0.868 1.021 0.069 DA85 80" 3' -8" 2' -1' W -2" 0.882 0.247 0.782 1.141 0.082 0.127 88" 3' -8" W -0" 8' -B" 0.882 0.217 0.808 1.288 0.19E O.bB W (• C3 y 2lrg,. AI et xl N7 I R Ng a a 2' -i. H Lv Q ut tp d n 1- 01I1NOTED D.I. O�' rr 21_x]7 4 DOWEL "A" SECTION E -E SECTION E -E SHEET 1 aF 1 EET i OF i EET 1 OF 1 aUT .4e. cenmSSMw.mtEED•gnd5 t1111e11LC1l1 neVU1UtlUl1 aBl�fo Pao • a"naP U- 470268 Series 247 and 247 Cutoff NIGHTTIME FRIENDLY 03 -20 -2014. Y 50.150W HP5, 100 -1JSW MH Series 247 247105 RN 120 R3 AY 247155 RN 120 R3 AY 2471 OS RN 120 R5 AY 247 15S RN 120 R5 AY Series 247 Cutoff 247105 RN 120 R2 FCTL 24710M XN MTI R2 FCTL oaornwa Features: Die- costaluminum housing and hood far long -life performance Die- costtngger latch n0 option auail deleforersy access to internal components Optical assembly designed for mart mum performance Hinged hood andcapauescrew pho Ision afford quick easy access to electrical and optical area for relampi ng e r servicing SllpfiRer with three set screws allows secure installation to pole sizes 2- 378"or YOD. E39mogolbasesocketstandard All elect ical componentswarranted by American Electric Oghbng's 6yearguarantee ComplieswMAN51:C 1362, C136. 10,CI36.15,CIM.31(regularonly), C136.16(FConly) Suitable for -30°C MH AI- CHPS Applications: Walkways Pathway Parks me 1427mm1 23.6" I688mm1 ENeANe PmleoeeAm OPAI iM EPq fo,IMAmetkanflNdYtlmsela34]IS Iby.fl. A(WOX. WL =361bS sheeiloL -zai -A w""° "' uammu American Revolution U- 470268 Series 247 and 247 Cutoff 50 -1 SOW HP5, 100 -175W MH E%ample:247 155 RN 120 R5 AY EC 247 los RN 120 RV AY tamN Wb117 Black ntlaNl LC tampincluded - -Tunes Wam a /Source eallazt Vdn a Dsnibutron Dark Bral,ze 247 American 05 50W 5 HPS RN Realtor Normal 12012W K Tell RewMhn W IOW M MH' PowerFattar 208 20W R3 Typelil Pas[TOP 10 t00W RH Reanor Hl9ia 240 240V RS Type VS Open Plug in (bWnN 15 ISOW Power FaRar 272 27N W 1ypeV4 Wledto Ll&L2PMIt iflon oe JyyS(, D 1]SW' %N Hgh Reactance /Lag 347 34N PC Phatocs'ecified. riper Normal Power Factor 480 48W i[IIM sH shoring Cap° %H High Reactance /tag MTl Muld Gowned 120V ss 5ta mess Stcei Hardware a CSAcediOed Hgh Power Factor MR MU1ti bsp Wired 240V Hs (� See bailastmatdxbr G CWA' W7 Mu1d -tap Wimd277V optla Tool- IessEntry EISAmmpliantopiions CT p41 TT3 Tu -tap Wlmd34N AY Acrylk DF Double Fuse(208,240,480V) K SCWA DR Oual Tap12N240 py p01y[arbolW[e Wired240V FC NHCmoff' NL phol.o.,oul Reonun le (blend NEMAPhowcurAd Raosgode oulandanQ NR No Phocacanlral Receplade' U- 470268 - with 14' of cord attached, 125 deg. C, #12 black solid CU wire, #12 white solid CU wire. Notes: 1 When onleredwlthlnetal halidethesewatbges do nat comply with Caiifomia TItie M regulations. 2 CAballasttsndavallable Mthl75W 4o mmal n mtheus,maswaese 3 F. urwhaepaneis 4 s 5 NighUi mFrie l ynaDlC WpsYNidtlOryfm dniributonswilzblty 6 Otheica Decork ideplgrecontatative local Americanudya Iaghungrepmse4Wve OnN, MTn o my aw lahle w th 240. 4Bo, Dtt D 0. MT2 9 Kann Hno nMgTT OTthiM e¢Voidz ULlMng 9 Hn.SHno[avalWblewlM NROptlon 10 HPSa 11 Acrylic ith.ortfiedubleWtbK Verson 12 SNps with unitfeitllnztalled Eile[ida MLAmen n OFbnz L1gMInB' (dial° p gw,. .an y6.,vyy tamN Wb117 Black ntlaNl LC tampincluded 02 rurn,e Biome LD tnmpincluded, Deluxe /Coated Duou DDB Dark Bral,ze GY Gay $a WK Whte (blank) Open BoatedPlug EC -in Encapsulated Plug-in Teonoal aleck OF Open Plug in (bWnN Terminal Blacklstan R Wledto Ll&L2PMIt iflon oe JyyS(, B 3W1re0perzt on(lt,µL2Pai bone PC Phatocs'ecified. riper Vhwfinepeuf d° i[IIM sH shoring Cap° dL ULUstad ss 5ta mess Stcei Hardware a CSAcediOed HL NEdALabel(2x31 Hs House Sdesheld Eugnq' TL Tool- IessEntry 5F Single Fuse(l2G277,34]W LOH Ladder Rest" DF Double Fuse(208,240,480V) phol.o.,oul Reonun le (blend NEMAPhowcurAd Raosgode oulandanQ NR No Phocacanlral Receplade' U- 470268 - with 14' of cord attached, 125 deg. C, #12 black solid CU wire, #12 white solid CU wire. Notes: 1 When onleredwlthlnetal halidethesewatbges do nat comply with Caiifomia TItie M regulations. 2 CAballasttsndavallable Mthl75W 4o mmal n mtheus,maswaese 3 F. urwhaepaneis 4 s 5 NighUi mFrie l ynaDlC WpsYNidtlOryfm dniributonswilzblty 6 Otheica Decork ideplgrecontatative local Americanudya Iaghungrepmse4Wve OnN, MTn o my aw lahle w th 240. 4Bo, Dtt D 0. MT2 9 Kann Hno nMgTT OTthiM e¢Voidz ULlMng 9 Hn.SHno[avalWblewlM NROptlon 10 HPSa 11 Acrylic ith.ortfiedubleWtbK Verson 12 SNps with unitfeitllnztalled Eile[ida MLAmen n Ame canEleRricLighting L1gMInB' p gw,. .an y6.,vyy 1se1cBRndSNsdsgYlac B 3B35Cnlwnbue P".Rwlnv.1l Pip -5 611 w�W 7uulty Brantl5119MIIg,IM . gYn9M1b,e5ervM.Bev.IRS / l3 aM1eea7IX24]A read] lul:]40.5a]4119 www.amM[anelttnitllgMiyFOln w 5 N 9 Series 247 U- 470268 American Revolution Series 247 and 247 Cutoff 50 -1SOW HPS,1OO -175W MH Series24lmntinu Mae ed us C6 a ad so a a ME NN csUXKXN m � 17M 2470751UAY nrpCT rs, A'ga1WN "elfin 429 P. t. m.n.nen IM•. n. w.imrX ..xm.,aM SEEM No milli SEMEME mill MEMEME ox ",awe UIVMO:In LLn4:M NCUnIIn1 Fgprc fr ffi 347155 RS AY agRWMAAWRut.0T(Ki NgMPp HOIp'4 -20 t. .I.g4n,m'lYp PMwn.liP. -usveP CiN"MC nlNl] a1M]u,Lny N.'qM X sM BUL237A £t Z t B M71WMFC N01LLUaauaw. lu`f..l Abu us Het {m =2)11. C'mdaN- ivP,ll, lAaY41, FW,1,9 0 1 > 9 B 9 65bleeN WISNNauna"L I-+IBT. MUSS.- a OA pug� % 196 %S ' CNgsuA4 E BOLT, ZINC NO,, Hex PIT, air5st- silt A 2+C1,,1RNeR i30LT O3P1k _4AAY),ZING sib tiEY-to" AF111%L L P[ U SHAL1, 13E 14 ,'W,115 OA.LVAN[UG, sttld_, ta4K -Pug" zy, " Hosues, h ON 09 AL-1 slM IbWAM JO FEET g{- .Li3WfK, h!ANrP.2` 2. T4iE �d -EE`tE hlA.4EL' ik-QFllR•Ai 5c"¢.YMU. 5i li Tib ` FKWF$[ t" AND c.W WA RI , Sio I'm U9 Sfi7k4s PS�i 2.a'4' �N1AK�', apx 9f 4€IIf,.Tt4 ?, ALt- StAGEr NAME SIbtMS f3TF sU@:,N -j^T TO LE AFF ROVY4 of THE 10W PLF.hMM OR F$?i. oftio leiE �Q t 6f ZEUrW 04 4N.45W YOM PR5'A1fff foie cep E"raN[ OW 90"A41W TYPE - V OR kQMast '2 Ti£LOTIFR" IRYV . INS ag T-F.OM IVAN# ARISW GP W4 QV)gR aY PW (3M a77 Ec PIiM OM tRONALEW WRF7TE4 FEDERAL BrOa4CATIC14 FO-96 MEGTiOu APO ASTM 049%L 'fkE 7;bebzsARENT C- V Ovt.32LA1' PIN Moot se ON Tie awl AN f'R'tY3fiM1 Lis" DF Tkfi IFi)Li4A1T WkItE i6?tRO- ,31i33fA'E s/L£fBYa 5 YLV UREET MAMA` %4lA" OF AYOAL LFsPM CAS K 84It FA4t .Milt LOWER C L- TSktiR$ a5' N 1 =f33iG N3 F+b+A 4'f WE TBE Si[P K4M0 5?AnLL 6B, IMP -` pN3 PI.AOER OS FTKSn T:€ SEBN : Aq"f SiiB, -'f W 1'L9:N 3 t]k" t� LFdIiEA,i S: ALL &E [%E4,tiC^iiEO si nE �dsf cTTT Aia3A °DL NWd35 LC>wETS2 L CA-9- :. L E FTIERS 225 i)F 191447. r¢ C,AS' C ` CPTrH29 3O LSl Ifi alt AKk N tb%441< TI flMM4 }dE14VAY OP' Fat43: ENLOQ. JANIM5 SHALL M W Fl tZOW , DJ PHWA 1,90 WAY 0' POkr. afgF X 1Na4F5 #ES M('" FOXBORO SHALL Se #(ykWd j UFW4 A.ND R1Ma59 OV P1g(Ys4 Tae f +T -spe 9ose+. 0ORPOR ahtY "aF` FiA7M i}I~ 70P AM W)rMM e f R�IX LE1 "Isps as M, & A10 Wt P i. Ee CEWESIS S A V MACRO 010 F'ACM TLE LEFT -$me )R out 4 SLx"Xivenr L Sh&1 WdRukY9 LW TV.Low 4P YEElT2Ch .EOTivE ££T6•% wm.t BLACK tliuTL 0(tO U c�lil D 1 PVt E - 90- ARRVOTIVE o Mia lr si %,AW -1 (k4 fill" `,R$d "TO 0*_ W_ _MN AM E1G- 16 -e1`, O- er CSCfilR3Z- OF 0£ 1001 FLAT YWIPN ha> ec T w w,'tu u�w guar D L is - ancaT o SAM is ar Am c ET a gT,er 4:u If51�� {�• M 41A MA -WAYY wE M wbK'Ff TLFi�c 6 wZ aTr6r E%fl'.1 l/?aHi dn5& Llr'tiii2,x 2" N +KIG+4Y: N r'tRJ+APAVar cwNT. 1 END PYt ^ PS,ACC'2J. SNd :'f'A4 aT IB1RR TO F71V4Tcc 61Rr�1'. 4 Lk'PPJ2 CMSG LE3'fF35' 4' N 1, 4 I Ie2.. A?P " Lg3y.+Y{g'. CAa? L2r1i32a ,' #+i LEkx+T. 441 P\yJA 15FRtuYAY O ".F{IJF. __""► IGM !3[&) 44F1l4 A51Ni rAii'ifr OR lFf' -O' FG4G31 F,S? 5°M aT i35"12Ah1r'E 'itJ A 6QW7.E. &TRF.0 -T • {KfiMN4T x1 N A OCAP BA t'B2 OLL'i°'E-xu0.G. 1.Ee LFFFR %aSLx I,Emms T N PE)CY4Te N' FWIAI�Aai O" 7'6X'II'� F -$T111l F.'1Ri C, LE55 THAN M COUAL TO WO E Sff, Tt W OE40 Em is Nor hamsaw, s: ALL $ Ala ARE %XX-CT TO Tig APPROVAL OF TFE TOVwa 1n. >?W as l us M- NR7T To 5 9�. ZWOPSTA14M �p��[� yB�v /�pyt�p ®�gry�t .. t e4NE. %}Na@L a4T1.ffiaBar®Na41e43 •^n-` fie Y. Y(GN 4"Y F- 3TP.j3?T � 5369 -0* cuaa sstrrtn Puy, ), • -aP Was, M. i NttK�r. �• -p• f t2ryi - -- °JIq:F'y16H� N 111111111111 �� 5'1}"C;j;,F NrAt9 <'PIb[i S TWO STREET NaNe M,TRv"Rk'.q F r MAIM %RE1TT 14105 3 iR same IAnes.. 2 ANY vAUl rm F N Tw5 #'T ARP A9;IMr � AiTN/DYEiD its Tc - (- 5a^' ff H 1L ND T.I� A*UX fyJdTER PAGE C3P :14 ..� y._ NVq`k r e; <]P %ON _....,."L„'.�NhMCi 5105 TO FINAL DRAWING - NOT RELEASED FOR CONSTRUCTION A _1q Ca N�V U � N z N ov s A � V \,, \ \ \I \1111 II IIAAAI 03$7 �j ... . .. M �4p111❑IEP 8 in z K w a 2 S z 8 i -Z z 3 m on 5 cat i v a 3 aw � TS o 9 p bu S O `i d 1 r 444 s s s N r- 1r_�,1 N Fe.r wv y z x01 z N U W :4pwF HU Z W E F W C O z 1_4 W m U I1 H 1+1 ~ O O UV/ ll! O O PROJECT No. MRH -13040 FIIX1A1M' MRH- 13040 -DT CHECEED BY. RMR DRAWN BY. CM /JL /RMR t�MD-2 �_ -�r.I MCADAMS mill MEMNON SESIMM IMMMM 0 1 > 9 B 9 65bleeN WISNNauna"L I-+IBT. MUSS.- a OA pug� % 196 %S ' CNgsuA4 E BOLT, ZINC NO,, Hex PIT, air5st- silt A 2+C1,,1RNeR i30LT O3P1k _4AAY),ZING sib tiEY-to" AF111%L L P[ U SHAL1, 13E 14 ,'W,115 OA.LVAN[UG, sttld_, ta4K -Pug" zy, " Hosues, h ON 09 AL-1 slM IbWAM JO FEET g{- .Li3WfK, h!ANrP.2` 2. T4iE �d -EE`tE hlA.4EL' ik-QFllR•Ai 5c"¢.YMU. 5i li Tib ` FKWF$[ t" AND c.W WA RI , Sio I'm U9 Sfi7k4s PS�i 2.a'4' �N1AK�', apx 9f 4€IIf,.Tt4 ?, ALt- StAGEr NAME SIbtMS f3TF sU@:,N -j^T TO LE AFF ROVY4 of THE 10W PLF.hMM OR F$?i. oftio leiE �Q t 6f ZEUrW 04 4N.45W YOM PR5'A1fff foie cep E"raN[ OW 90"A41W TYPE - V OR kQMast '2 Ti£LOTIFR" IRYV . INS ag T-F.OM IVAN# ARISW GP W4 QV)gR aY PW (3M a77 Ec PIiM OM tRONALEW WRF7TE4 FEDERAL BrOa4CATIC14 FO-96 MEGTiOu APO ASTM 049%L 'fkE 7;bebzsARENT C- V Ovt.32LA1' PIN Moot se ON Tie awl AN f'R'tY3fiM1 Lis" DF Tkfi IFi)Li4A1T WkItE i6?tRO- ,31i33fA'E s/L£fBYa 5 YLV UREET MAMA` %4lA" OF AYOAL LFsPM CAS K 84It FA4t .Milt LOWER C L- TSktiR$ a5' N 1 =f33iG N3 F+b+A 4'f WE TBE Si[P K4M0 5?AnLL 6B, IMP -` pN3 PI.AOER OS FTKSn T:€ SEBN : Aq"f SiiB, -'f W 1'L9:N 3 t]k" t� LFdIiEA,i S: ALL &E [%E4,tiC^iiEO si nE �dsf cTTT Aia3A °DL NWd35 LC>wETS2 L CA-9- :. L E FTIERS 225 i)F 191447. r¢ C,AS' C ` CPTrH29 3O LSl Ifi alt AKk N tb%441< TI flMM4 }dE14VAY OP' Fat43: ENLOQ. JANIM5 SHALL M W Fl tZOW , DJ PHWA 1,90 WAY 0' POkr. afgF X 1Na4F5 #ES M('" FOXBORO SHALL Se #(ykWd j UFW4 A.ND R1Ma59 OV P1g(Ys4 Tae f +T -spe 9ose+. 0ORPOR ahtY "aF` FiA7M i}I~ 70P AM W)rMM e f R�IX LE1 "Isps as M, & A10 Wt P i. Ee CEWESIS S A V MACRO 010 F'ACM TLE LEFT -$me )R out 4 SLx"Xivenr L Sh&1 WdRukY9 LW TV.Low 4P YEElT2Ch .EOTivE ££T6•% wm.t BLACK tliuTL 0(tO U c�lil D 1 PVt E - 90- ARRVOTIVE o Mia lr si %,AW -1 (k4 fill" `,R$d "TO 0*_ W_ _MN AM E1G- 16 -e1`, O- er CSCfilR3Z- OF 0£ 1001 FLAT YWIPN ha> ec T w w,'tu u�w guar D L is - ancaT o SAM is ar Am c ET a gT,er 4:u If51�� {�• M 41A MA -WAYY wE M wbK'Ff TLFi�c 6 wZ aTr6r E%fl'.1 l/?aHi dn5& Llr'tiii2,x 2" N +KIG+4Y: N r'tRJ+APAVar cwNT. 1 END PYt ^ PS,ACC'2J. SNd :'f'A4 aT IB1RR TO F71V4Tcc 61Rr�1'. 4 Lk'PPJ2 CMSG LE3'fF35' 4' N 1, 4 I Ie2.. A?P " Lg3y.+Y{g'. CAa? L2r1i32a ,' #+i LEkx+T. 441 P\yJA 15FRtuYAY O ".F{IJF. __""► IGM !3[&) 44F1l4 A51Ni rAii'ifr OR lFf' -O' FG4G31 F,S? 5°M aT i35"12Ah1r'E 'itJ A 6QW7.E. &TRF.0 -T • {KfiMN4T x1 N A OCAP BA t'B2 OLL'i°'E-xu0.G. 1.Ee LFFFR %aSLx I,Emms T N PE)CY4Te N' FWIAI�Aai O" 7'6X'II'� F -$T111l F.'1Ri C, LE55 THAN M COUAL TO WO E Sff, Tt W OE40 Em is Nor hamsaw, s: ALL $ Ala ARE %XX-CT TO Tig APPROVAL OF TFE TOVwa 1n. >?W as l us M- NR7T To 5 9�. ZWOPSTA14M �p��[� yB�v /�pyt�p ®�gry�t .. t e4NE. %}Na@L a4T1.ffiaBar®Na41e43 •^n-` fie Y. Y(GN 4"Y F- 3TP.j3?T � 5369 -0* cuaa sstrrtn Puy, ), • -aP Was, M. i NttK�r. �• -p• f t2ryi - -- °JIq:F'y16H� N 111111111111 �� 5'1}"C;j;,F NrAt9 <'PIb[i S TWO STREET NaNe M,TRv"Rk'.q F r MAIM %RE1TT 14105 3 iR same IAnes.. 2 ANY vAUl rm F N Tw5 #'T ARP A9;IMr � AiTN/DYEiD its Tc - (- 5a^' ff H 1L ND T.I� A*UX fyJdTER PAGE C3P :14 ..� y._ NVq`k r e; <]P %ON _....,."L„'.�NhMCi 5105 TO FINAL DRAWING - NOT RELEASED FOR CONSTRUCTION A _1q Ca N�V U � N z N ov s A � V \,, \ \ \I \1111 II IIAAAI 03$7 �j ... . .. M �4p111❑IEP 8 in z K w a 2 S z 8 i -Z z 3 m on 5 cat i v a 3 aw � TS o 9 p bu S O `i d 1 r 444 s s s N r- 1r_�,1 N Fe.r wv y z x01 z N U W :4pwF HU Z W E F W C O z 1_4 W m U I1 H 1+1 ~ O O UV/ ll! O O PROJECT No. MRH -13040 FIIX1A1M' MRH- 13040 -DT CHECEED BY. RMR DRAWN BY. CM /JL /RMR t�MD-2 �_ -�r.I MCADAMS �2 4" 1011 k" --- 8 3/4 " ---- -- - 7112 " — —7 1/4" — U8" — 6 114" ---+ _ 5•. — .....,.0 2 LUGS 3/8" x 114" 7176" b" UNION COUNTY PUBLIC WORKS DEPARTMENT UNION COUNTY, N.E. NUIC; A 27" DIAMETER PRE -CAST RING SHALL BE PLACED 4 AROUND EACH VALVE BOX. 1/4" BOTTOM ;SCREW TYPE) VALVE BOX — GROUND r � s 7 DETAIL A —A WATER MAIN CROSSING UNDER STORM DRAIN 54' - J DIP M BEND —7 3 /8 "— •-1J2° 314" —5 9J2" - ----- 6 3/4" -- 1 112" 1" WATER COVER UNION COUNTY PUBLIC WORKS DEPARTMENT 1 UNION COUNTY, N.C. [VALVE BOX INSTALLATION 10_04E;, 1 A PAINT COLORS I BODY_ ..FIRE HYDRANT RED RUST OLEUM ENAMEL # 1210 FIRE HYDRANT RED BONNET _.JVGH GLOSS WHITE REST OLEUM ENAMEL 0 27165 CAPS- _- ..._HIGH GLOSS WHITE - RUST -OLEUM ENAMEL A 2766 I 1 HYDRANTS TO BE SET AT BURY LINE- EDGE OF RIW AT PROPERTY TO BE SET AT CORNERS LEVEL MIN. CLEARANCE 78" x 78' x 6" A MINIMUI4 OF 5" OF CONCRETE WILL BE PLACED 13MBER THE BASE UNION COUNTY PUBLIC WORKS DEPARTMENT UNION COUNTY, N.C. FIRE HYDRANT INSTALLATION CONCRETE RIN 14 GAUGE STRANDED COATED COPPER TRACER 2" WATER UNION COUNTY PUBLIC WORKS DEPARTMENT UNION COUNTY. N.C. 14 GAUGE STRANDED BLUE COATED COPPER TRACER WIRE l UNION COUNTY PUBLIC WORKS DEPARTMENT 3 j UNION COUNTY, N.C. UNDISTURBED EARTH 2 L CONCRETE Y PLAN �+5° BEraDs ALSO 90° 22 lit° 111/? DITCH BANK CONCRETE DITCHBOTTOM DITCH CONCRETE PAD BANKS CONCRETE PAD 459 BEND FORD 9022 BEND TEE SEE NOTE TEST PRESSURE ' H L H t Y11 t � H H- 14247 -A 4 TO" 29" =i * 2'6" VALVE BOX 27" VALVE BOX 2'0" 1'6" 200 6„ 1'6" 6" PVC PIPE 29" I I 6" PVC PIPE I 1'6" 14 GAUGE STRANDED BLUE COATED COPPER TRACER WIRE 2" CAST IRON HARCO ADAPTOR HYDRANT TEE 14 GAUGE STRANDED BLUE COATED COPPER TRACER WIRE I 2" CAST IRON HARCO ADAPTOR 1'6" 1'6" 2'6" 17" TO" 2'0" 3'9" 2'0" 2'6" 2'0" 200 8„ 2'0" 1'6" TO" 2'0" 3'9" 29" 4'6" 2'6" 8" OR 6" WATERMAIN� / (54 LF DIP RESTRAINT) / 2'3" 2" PVC 8' OR 6" WATERMAIN 1 (54 LF DIP RESTRAINT) / 2' OF 2" BRASS NIPPLE 2" THREADED VALVE 2" PVC 2'3" 2' OF 2" BRASS NIPPLE 2" THREADED VALVE 5'0" 39" 410" 3'0" 6X2 MJ PLUG 12„ 6X2 MJ PLUG 5'3" 2'6" 6'0" UNION COUNTY PUBLIC WORKS DEPARTMENT 7'0" STANDARD DETAIL 5101' COUNTY PUBLIC WORKS DEPARTMENT I STANDARD DETAIL 310" 1'0" 4'0" TO" 4'6" 3'9" UNION COUNTY, N.C. 8" OR 6 "X2" REDUCER 3'6" 200 FUNION NE °DNTY,N.G. HYDRANT TEE X2" REDUCER 3'6" A1 4'3" _ UNDISTURBED EARTH 2 L CONCRETE Y PLAN �+5° BEraDs ALSO 90° 22 lit° 111/? DITCH BANK CONCRETE DITCHBOTTOM DITCH L BANKS 221/2°- BEND ANCHORAGE SCHEDULE PIPE SIZE 111/42 BEND 221/2°- BEND 459 BEND FORD 9022 BEND TEE SEE NOTE TEST PRESSURE L H L H L H L H L H H- 14247 -A 19" TO" 29" 110" 2'6" 1'6" 27" 1'6" 2'0" 1'6" 200 6„ 1'6" 19" 29" 1'6" TO" 1'6" 4'0" 1'6" TO" 1'6" 300 1'6" 1'6" 2'6" 17" TO" 2'0" 3'9" 2'0" 2'6" 2'0" 200 8„ 2'0" 1'6" TO" 2'0" 3'9" 29" 4'6" 2'6" 3'6" 2'3" 300 2'6" 1'9" 4'0" 2'3" 49" 3'0" 5'0" 39" 410" 3'0" 200 12„ 5'3" 2'6" 6'0" 3'3" 7'0" 3'6" 5101' 3'6" 300 310" 1'0" 4'0" TO" 4'6" 3'9" 6'0" 3'9" 4'6" 3'6" 200 14„ 4'0" 2'6" 5'3" 3'6" 6'0" 4'3" 6'6" 5'0" 5'0" 5'0" 300 3'0" 2'9" 4'6" 3'6" 5'0" 4'6" 7'0" 4'3" 5'0" 4'0" 200 16„ 4'0" 3'0" 6'3" 3'9" 6'5" 5'3" 8'0" 5'3" 7'6" 4'0" 300 PLAN TEE THRUST BLOCK DIMENSIONS BASED ON SOIL BEARING CAPACITY CONTRACTOR SMALL USE TIE RODS TO SHIM AS NECESSARY OF 2000 P.S.F. AND A WATER TEST PRESSURE OF 150 P.S.I. SIZES OF THRUST SECURE VERTICAL BENDS BLOCKS MAY BE REVISED BY THE ENGINEER WHERE BEARING CAPACITY �— OF SOIL VARIES. PROVIDE TAR PAPER JOINT BETWEEN CONCRETE THRUST BLOCK AND PORTION OF PIPE BEING ANCHORED. DITCH - BOTTOM + , ; ALL CONCRETE THRUST BLOCKS SHALL BE 2500 P.S.I. CONCRETE. r?� MAXIMUM VERTICAL DEFLECTION SHALL BE 221/2 ". MIN. 1112 (U. YO JOINTS SHALL REMAIN FREE OF CONCRETE FOR INSPECTION, REPAIR OR UNDISTURBED EARTH OF CONCRETE REPLACEMENT OF JOINTS. VERTICAL BEND STANDARD DETAIL UNION COUNTY PUBLIC WORKS DEPARTMENT STANDARD DETAIL E: DNIDNGDDNTY,N.E. THRUST BLOCK SPECIFICATIONS TRUST BLOCK 1 17 SADDLE GROUND LEVEL TERMINATE 1' BELOW GROUND LEVEL VALVE BOX 2 ". COUPLING J 1 6" PVC PIPE RESTING ON BRICK J 2' GALVANIZED PIPE 3' LONG 2" - 90° BEND 2" GATE VALVE - MECHANICAL JOINT 2" BLOW -OFF SERVICE TUBING `CONNECTOR �- CORPORATION -VALVE BOX 2" GALVANIZED PIPE 2' LONG CONCRETE BLOCKING r r ' A. 3 NTY BOOK DBP . T ,T �A313 II 3sr E BLOW—OFF 2 NOTE: ROMAC 101N SHALL REPLACE MUELLER FOR PIPE DIAMETER UP TO 8" SMITH BLAIR 317, FORD FC 202 OR ROMAC 202N SHALL REPLACE MUELLER FOR PIPE DIA.12" AND UP STANDARD DETAIL SERVICE CONNECTION 10-0411 5 Y ° Y L 1 1 1 ■ ■ Y Y 111 ILI ,Mm Iwo,, L••I L . � EXISTING WATER MAIN THRUST BLOCKING DIP TAPPING SLEEVE 8 VALVE ENCASEMENT a a o a OPTION "A" TIE IN - DUCTILE IRON DETAIL NOTE: OPTION "A" OR "B" WILL BE REQUIRED, DEPENDING ON THE AMOUNT OF SPACE AVAILABLE, TO BE FIELD VERIFIED EXISTING WATER MAIN THRUST BLO KING RESTRAINT JOINT PIPE FROM VALVE TO 54' PAST CASING TAPPING SLEE VE `°� -- &VALVE 54' - a rENCASEIIENT DIP WATER MAIN OPTION "B" TIE IN - D1. RESTRAINT JOINT DETAIL UNION COUNTY PUBLIC WORKS DEPARTMENT SCALE: UNIONCOUNTY.NE TAPPING SLEEVE ITS, 11 -17 -06 Et;EaA� 1�TZEs 0 METER BOX LID TO HAVE AMR LOCATOR TAL.LIAN'Cz 1200 OR EQUAL FOR SOW £RT, STANDARD LID FOR 6641 CRT! N 61A.OERIPROPERTY OWNER TO INSTALL NIPPLE, VALVE AND VALVE BOX BEFORE METER WILL BE SET, 3) METER AND €RT BY UNION COUNTY 0 PREVAILINS RATE ELECTRONIC RADIO ' TRANSMITTER VALVE COX BY j 1 } BUILDERIPRUPERTY OWNER , i BLUE GAUGE TEO COPPER 8' to 10" � J J1 I L 3 TRACER ANGLE VALVE h ' WITH INK WINGS) € EXPANSION % I I I � \ CONNECTOR tid2•, -'^AMR METER I p CLEARANCE Pt I 1 bYe 1 1 i CHECK VALVE VALVE BY BUILDER/RROPERTY OWNER I TiJ$)CYa CONNECTOR YOKE BRASS NIPPLE BY BUILDERIP€OPERTY OWNER 7 1 UNION COUNTY 3 i l PUBLIC WORKS DEPARTMENT �'} STANDARD DETAIL seA1.E; UN {ONCtXBJTY, METES INSTALLATION FOR AMR METERS NTH DATE, L..._._.._.__.__ -..,_ __,.., -„ 2.., .2 ..- 2..2_....- .........._...- ,.2.2........22__. _.`__ 222.2...._..._....._.......° -- .--._ __ 1-2-14 T • 7P IN 6" -12" LIFT NOTE: CAREFULLY COMPACTED SELECT BACKFILL 1 FT.ABOVE TOP OF PIPE HAND TAMP EARTH NOTES: MINIMUM COVER IS 36" 2" PVC SDR 21 (200 PSI) 6 " -8" PVC SOR 18 12" OR LARGER DIP NOTE: NO STONES LARGER THAN #67 STONE SHALL BE USED IN SELECT BACKFILL UNION COUNTY PUBLIC WORKS DEPARTMENT UNION COUNTY, .WATER TRENCH V B 0 -1 -10 R 9rW FINAL DRAWING — NOT RELEASED FOR CONSTRUCTION N�N7 N C4 4 19z 00� V/ A � V X" 35747 L J °F'z o �,, fill z 9 Z 12 you U Z Z W 2 y y m w 3 z O41 p w 'n W w Z M gI On a a a a a I '0 0 0o 5 S 5 5 N N N N P4 ®a a © ®® a a° w �w cm Wp � x � O wZ�U W� x EW, F Q1 O % O U Z �x F F W o E" E z a in m x C O NN W u z rrrsss� 1 Owe A F PROJECT xo. MRH -13040 ""'NAME: MRH- 13040 —DT CHECKED RTr: RMR DRAwN RY: CM /JL /RMR SCALE: N/A DATE: 07 -25 -2014 sBEE'f xo. D -3 �J MCADAMS SERVICE HARDWA RE 2 "PVC MUELLER FORD H -13420 S70 SADDLE UP TO 8" SEE NOTE FC 101 BALL CORPORATION B -25008 FB1000G YOKE H -5020 Y 502 ANGLE BALL VALVE B -24273 BA94 -323WG CHECK VALVE H- 14247 -A HHS91 -323 CONNECTORS COPPER STYLE 110 GRIP JOINT EXPANSION CONNECTION m EC 23 NOTE: ROMAC 101N SHALL REPLACE MUELLER FOR PIPE DIAMETER UP TO 8" SMITH BLAIR 317, FORD FC 202 OR ROMAC 202N SHALL REPLACE MUELLER FOR PIPE DIA.12" AND UP STANDARD DETAIL SERVICE CONNECTION 10-0411 5 Y ° Y L 1 1 1 ■ ■ Y Y 111 ILI ,Mm Iwo,, L••I L . � EXISTING WATER MAIN THRUST BLOCKING DIP TAPPING SLEEVE 8 VALVE ENCASEMENT a a o a OPTION "A" TIE IN - DUCTILE IRON DETAIL NOTE: OPTION "A" OR "B" WILL BE REQUIRED, DEPENDING ON THE AMOUNT OF SPACE AVAILABLE, TO BE FIELD VERIFIED EXISTING WATER MAIN THRUST BLO KING RESTRAINT JOINT PIPE FROM VALVE TO 54' PAST CASING TAPPING SLEE VE `°� -- &VALVE 54' - a rENCASEIIENT DIP WATER MAIN OPTION "B" TIE IN - D1. RESTRAINT JOINT DETAIL UNION COUNTY PUBLIC WORKS DEPARTMENT SCALE: UNIONCOUNTY.NE TAPPING SLEEVE ITS, 11 -17 -06 Et;EaA� 1�TZEs 0 METER BOX LID TO HAVE AMR LOCATOR TAL.LIAN'Cz 1200 OR EQUAL FOR SOW £RT, STANDARD LID FOR 6641 CRT! N 61A.OERIPROPERTY OWNER TO INSTALL NIPPLE, VALVE AND VALVE BOX BEFORE METER WILL BE SET, 3) METER AND €RT BY UNION COUNTY 0 PREVAILINS RATE ELECTRONIC RADIO ' TRANSMITTER VALVE COX BY j 1 } BUILDERIPRUPERTY OWNER , i BLUE GAUGE TEO COPPER 8' to 10" � J J1 I L 3 TRACER ANGLE VALVE h ' WITH INK WINGS) € EXPANSION % I I I � \ CONNECTOR tid2•, -'^AMR METER I p CLEARANCE Pt I 1 bYe 1 1 i CHECK VALVE VALVE BY BUILDER/RROPERTY OWNER I TiJ$)CYa CONNECTOR YOKE BRASS NIPPLE BY BUILDERIP€OPERTY OWNER 7 1 UNION COUNTY 3 i l PUBLIC WORKS DEPARTMENT �'} STANDARD DETAIL seA1.E; UN {ONCtXBJTY, METES INSTALLATION FOR AMR METERS NTH DATE, L..._._.._.__.__ -..,_ __,.., -„ 2.., .2 ..- 2..2_....- .........._...- ,.2.2........22__. _.`__ 222.2...._..._....._.......° -- .--._ __ 1-2-14 T • 7P IN 6" -12" LIFT NOTE: CAREFULLY COMPACTED SELECT BACKFILL 1 FT.ABOVE TOP OF PIPE HAND TAMP EARTH NOTES: MINIMUM COVER IS 36" 2" PVC SDR 21 (200 PSI) 6 " -8" PVC SOR 18 12" OR LARGER DIP NOTE: NO STONES LARGER THAN #67 STONE SHALL BE USED IN SELECT BACKFILL UNION COUNTY PUBLIC WORKS DEPARTMENT UNION COUNTY, .WATER TRENCH V B 0 -1 -10 R 9rW FINAL DRAWING — NOT RELEASED FOR CONSTRUCTION N�N7 N C4 4 19z 00� V/ A � V X" 35747 L J °F'z o �,, fill z 9 Z 12 you U Z Z W 2 y y m w 3 z O41 p w 'n W w Z M gI On a a a a a I '0 0 0o 5 S 5 5 N N N N P4 ®a a © ®® a a° w �w cm Wp � x � O wZ�U W� x EW, F Q1 O % O U Z �x F F W o E" E z a in m x C O NN W u z rrrsss� 1 Owe A F PROJECT xo. MRH -13040 ""'NAME: MRH- 13040 —DT CHECKED RTr: RMR DRAwN RY: CM /JL /RMR SCALE: N/A DATE: 07 -25 -2014 sBEE'f xo. D -3 �J MCADAMS 18" MAX, I `114 "MESHSCREEN STRAIGHT WALL OF M 1/4" x 2" STAINLESS STEEL STRPS TO BE LOCATED OVER INLET 2' -0" R.C. FROM BASE 2- 314" x 3" S.S. ANCHOR 5' - 0" FOR PIPES BOLTS PER STRAP OVER 18" 4' 0" FOR PIPES 18" & SMALLER V x 2' x 2• CONCRETE ANCHOR PRECAST INVERTS ONLY GENERAL NOT [11 1 ROLL OF MASTIC AND A 6" EXTERNAL JOINTiSEAM WRAP INSTALLED ON EACH MANHOLE SECTION (21 MANHOLE VACUUM TESTING - AFTER EACH MANHOLE IS INSTALLED AND ALL PIPES ARE CONNECTED, BUT BEFORE BACKFIL LING, THE MANHOLE SHALL BE VACUUM TESTED. ALL PIPES ENTERING THE MANHOLE. SHALL BE PLUGGED AND BRACED, THE CONTRACTOR SHALL FURNISH ALL MATERALS, LABOR AND EQUIPMENT NECESSARY TO PERFORM THE TESTING, A VACUUM OF 10 INCHES OF MERCURY SHALL BE CREATED ON THE INSIDE OF THE MANHOLE. AT THE VACUUM OF 10 INCHES OF MERCURY, THE PUMP SHALL BE STOPPED AND THE TIRE SHALL BE MEASURED FOR THE VACUUM TO DROP TO 9 INCHES. FAILURE OF THE TEST SHALL BE ANY AMOUNT OF TIME LESS THAN THE FOLLOWING. 4 FT. DIAMETER MANHOLE z 60 SECONDS 5 FT. DIAMETER MANHOLE m 75 SECONDS - 6 FT. DIAMETER MANHOLE = 90 SECONDS 7 FT. DIAMETER MANHOLE =105 SECONDS 8 FT. DIAMETER MANHOLE =120 SECONDS 10 FT. DIAMETER MANHOLE =150 SECONDS UPON TEST FAILURE, THE CONTRACTOR SHALL REPAIR ALL LEAKS AND RETEST THE MANHOLE UNTIL THE TEST HAS PASSED, UNION COUNTY PUBLIC WORKS DEPARTMENT I SCALE... �" . U1410N COUNTY, N.C. MANHOLE DATP: 7 71-11, 10 1 mm 4" SCH. 40 - 1/8 BEND SOLVENT WELD CONNECTION (TYPI 4" SCH. 40 PVC NIPPLE. LENGTH VARIES DEPENDING ON DEPTH OF SEWER MAIN TO MININZE ADDITIONAL BENDS. SDR 35 PVC 828x4 WYE INSTALL ROTATED 45° FROM THE SPRING LINE WHO Lin UNION COUNTY PUBLIC WORKS DEPARTMENT UNION COUNTY, N.C. f ESMTtR /W 4" PVC FEMALE ADAPTOR W /SHC. 40 PLUG 4 " SCH, 40 PVC 1% MIN.. SLOPE GRAVITY SEWER MAIN (SEE SPECIFICATIONS) SEWER LATERAL 4" SCH, 40 PVC CAP ON 4" STUB OUT DID. WASHED STONE /FLOWABLE FILL R/W WILLOWCROFT SUBDIVISION 111=1o, 50' PUBLIC R/W 5' UTILITY 5' UTILITY EASEMENT EASEMENT SIDEWALK 3/8" PER FT L-3/4" WATER SERVICE WW�ITH 3/4' WATER METER 4" SEWER LATERAL WITH 4" CLEANOUT 5' 3/8" PER FT, 8" SANITARY SEWER 2.00% 2.0' VALLEY CURB 6" OR 2" WATER LINE 10' OFF BOC (CUL -DE -SAC) 11' OFF BOC (ROADWAY) RIGHT -OF -WAY LINE FINAL DRAWING - NOT RELEASED FOR CONSTRUCTION N�% H An, 00 Wter^ A � V .` o/ SAL�� .,F'Pp � •REOO,,��. b � a � s s ° m � is 6 � � b i N jQ� N 6 y y pN w � s o II"1,1 a 1 i '1 o 24aaaa� 5 N N N N N N N i` 0� w w o z M x a W � F E- E-4 U DID Z w O O F' Z ~' rn � m V pP. ~ d O ° a Uz a O ' A PROJECT NO. MRH -13040 Fu"Am: MRH- 13040 -DT CHECKED BY: RMR DRAWN BY: CM /JL /RMR SCALE: N/A DATE' 07 -25 -2014 SID;EI' NO. D -4 'Jl MCADAMs GRAVITY SEWER - BEDDING DETAIL T 1• 8" NOTES: V CAREFULLY COMPACTED SELECT FOR PVC -- USE SDR 35 FOR 10 FT. OR LESS. BACKFILL 1 FT.ABOVE TOP OF PIPE USE SDR 26 FOR 10 FT. OR MORE. USE DUCTILE IRON - IF UNDER 3 FT. DEEP 44" #67 STONE OR OVER 18 FT. DEEP. NOTES: NO STONES LARGER THAN #67 STONE SHALL BE USED IN SELECT BACKFILL CLASS C 8" T 8 • TAMP IN 6 " -12" LIFTS PVC C900 SDR 18 (200 PSI) NOTE: OR CAREFULLY COMPACTED SELECT DUCTILE IRON CLASS 350 BACKFILL 1 FT.ABOVE TOP OF PIPE WITH PROTECTED 401 LINE NOTES: HAND TAMP NO STONES LARGER THAN #67 STONE EARTH SHALL BE USED IN SELECT BACKFILL 2' -4" FORCE MAIN UNION COUNTY PUBLIC WORKS DEPARTMENT STANDARD DETAIL UNION COUNTY, N.C. SEWER BEDDING 8 A 5" SCH 40 STEEL PIPE .. .... WITH EPDXY COATING .., ': • THREE COURSES OF GRAD° RINGS MAXIMUM g72 °' RUST -OLEUM 9335 ABOVE GRADE 9578 BELOW GRADE - 9373 PRNER 18" MAX, I `114 "MESHSCREEN STRAIGHT WALL OF M 1/4" x 2" STAINLESS STEEL STRPS TO BE LOCATED OVER INLET 2' -0" R.C. FROM BASE 2- 314" x 3" S.S. ANCHOR 5' - 0" FOR PIPES BOLTS PER STRAP OVER 18" 4' 0" FOR PIPES 18" & SMALLER V x 2' x 2• CONCRETE ANCHOR PRECAST INVERTS ONLY GENERAL NOT [11 1 ROLL OF MASTIC AND A 6" EXTERNAL JOINTiSEAM WRAP INSTALLED ON EACH MANHOLE SECTION (21 MANHOLE VACUUM TESTING - AFTER EACH MANHOLE IS INSTALLED AND ALL PIPES ARE CONNECTED, BUT BEFORE BACKFIL LING, THE MANHOLE SHALL BE VACUUM TESTED. ALL PIPES ENTERING THE MANHOLE. SHALL BE PLUGGED AND BRACED, THE CONTRACTOR SHALL FURNISH ALL MATERALS, LABOR AND EQUIPMENT NECESSARY TO PERFORM THE TESTING, A VACUUM OF 10 INCHES OF MERCURY SHALL BE CREATED ON THE INSIDE OF THE MANHOLE. AT THE VACUUM OF 10 INCHES OF MERCURY, THE PUMP SHALL BE STOPPED AND THE TIRE SHALL BE MEASURED FOR THE VACUUM TO DROP TO 9 INCHES. FAILURE OF THE TEST SHALL BE ANY AMOUNT OF TIME LESS THAN THE FOLLOWING. 4 FT. DIAMETER MANHOLE z 60 SECONDS 5 FT. DIAMETER MANHOLE m 75 SECONDS - 6 FT. DIAMETER MANHOLE = 90 SECONDS 7 FT. DIAMETER MANHOLE =105 SECONDS 8 FT. DIAMETER MANHOLE =120 SECONDS 10 FT. DIAMETER MANHOLE =150 SECONDS UPON TEST FAILURE, THE CONTRACTOR SHALL REPAIR ALL LEAKS AND RETEST THE MANHOLE UNTIL THE TEST HAS PASSED, UNION COUNTY PUBLIC WORKS DEPARTMENT I SCALE... �" . U1410N COUNTY, N.C. MANHOLE DATP: 7 71-11, 10 1 mm 4" SCH. 40 - 1/8 BEND SOLVENT WELD CONNECTION (TYPI 4" SCH. 40 PVC NIPPLE. LENGTH VARIES DEPENDING ON DEPTH OF SEWER MAIN TO MININZE ADDITIONAL BENDS. SDR 35 PVC 828x4 WYE INSTALL ROTATED 45° FROM THE SPRING LINE WHO Lin UNION COUNTY PUBLIC WORKS DEPARTMENT UNION COUNTY, N.C. f ESMTtR /W 4" PVC FEMALE ADAPTOR W /SHC. 40 PLUG 4 " SCH, 40 PVC 1% MIN.. SLOPE GRAVITY SEWER MAIN (SEE SPECIFICATIONS) SEWER LATERAL 4" SCH, 40 PVC CAP ON 4" STUB OUT DID. WASHED STONE /FLOWABLE FILL R/W WILLOWCROFT SUBDIVISION 111=1o, 50' PUBLIC R/W 5' UTILITY 5' UTILITY EASEMENT EASEMENT SIDEWALK 3/8" PER FT L-3/4" WATER SERVICE WW�ITH 3/4' WATER METER 4" SEWER LATERAL WITH 4" CLEANOUT 5' 3/8" PER FT, 8" SANITARY SEWER 2.00% 2.0' VALLEY CURB 6" OR 2" WATER LINE 10' OFF BOC (CUL -DE -SAC) 11' OFF BOC (ROADWAY) RIGHT -OF -WAY LINE FINAL DRAWING - NOT RELEASED FOR CONSTRUCTION N�% H An, 00 Wter^ A � V .` o/ SAL�� .,F'Pp � •REOO,,��. b � a � s s ° m � is 6 � � b i N jQ� N 6 y y pN w � s o II"1,1 a 1 i '1 o 24aaaa� 5 N N N N N N N i` 0� w w o z M x a W � F E- E-4 U DID Z w O O F' Z ~' rn � m V pP. ~ d O ° a Uz a O ' A PROJECT NO. MRH -13040 Fu"Am: MRH- 13040 -DT CHECKED BY: RMR DRAWN BY: CM /JL /RMR SCALE: N/A DATE' 07 -25 -2014 SID;EI' NO. D -4 'Jl MCADAMs BURY FABRIC EDGES - 6" AND COVER WITH WELL COMPACTED FILL NQJE i. INLET MAINTENANCE SHALL BE DOCUMENTED IN PROJECT LOG BOOK. 2. FILTER TYPES SHALL BE APPROVED BY THE CITY INSPECTOR PRIOR TO INSTALLATION.. 3, FILTER BAGS MAY BE REMOVED WHEN SITE IS STABILIZED AT THE DIRECTION OF THE ENGINEER. 4. FILTER BAGS SHALL BE REMOVED PRIOR TO STREET ACCEPTANCE. S. FILTER BAGS SHALL BE CLEANED OR REPLACED ON A REGULAR BASIS (NOT BE MORE THAN HALF FULL AT ANY TIME). 6. FILTER BAGS SHALL NOT BE ALLOWED IN EXISTING CITY OR NCDOT ROADS. WUTE 1• RfaW FOR REMOVAL FROM FILTER O171fro M LUMP I LATCH BASIN ( I jI CURET w INSTALLATION CATCH BASIN INLET PROTECTION TEMPORARY EROSION CONT MATTING FULL DITCH WIDTH, NORTH AMERICAN GREEN SC 150 OR EQUAL EXTEND FILTER FABRIC UP SIDES OF RIPRAP 8 COVER WITH WELL COMPACTED FILL \� 18 "MIN. SEED DITCH 8 SURROUNDING - AREAS IMMEDIATELY AS DITCHLINE CONSTRUCTION PROGRESSES (SEE SCHEDULE) 4 FT. MIN. - 3 1 FT. MIN. TYPE 1 V - SHAPED GRASS LINED DITCH lilWJdlE 3 } �1 i FT. MIN UNDISTURBED i SUBGRADE NOT TO SCALE SMOOTHLY BLEND CONTACT AREAS ALONG DITCH EDGES SMOOTHLY BLEND CONTACT AREAS ALONG DITCH EDGES -KEY RIPRAP FULLY INTO UNDISTURBED EARTH AS INDICATED UNDISTURBED SMOOTHLY BLEND CONTACT AREAS ALONG DITCH EDGES PERMANENT EROSION CONTROL`t=11 fF1 Ir' MATTING FULL DITCH WIDTH, FIRM, UNDISTURBED NORTH AMERICAN GREEN EARTH SUBGRADE P300 OR EQUAL TYPE 3 V - SHAPED PERMANENT MAT LINED DITCH USAGE: Contractor shall install dlchlines and ditch types at locations indicated on the plan. Specific ditch linings shall be utilized at locations shown on the plans W provide erosion protection during 10 year storm events. Type 3 ditches may be substituted for Type 2 ditches. MATERIALS AND Seeding for ditch types 1 and 3 shalt be in accordance with "Permanent Seeding for Gross Lined Channels" schedule. The erosion INSTALLATION' resistance of ditch types 1 and 3 is dependent upon a well established stand of grass. The contractor shall repair fabrics and matfings, re -seed and repair ditches as necessary to establish a permanent weilcstablished grass lining in all grass lined ditches. Erosion & Filter Fabrics shall be the types specified or equal products with equal or better characteristics. All matiings and fabrics shall be anchored and installed in accordance with manufacturer's instructions and recommendations. AI joints shall be overlapped a minimum of 2 feet. RioRap for Type 2 ditches shall be " NCDOT Class B Stone for Erosion Control Ditchlines shall be overexcavated as required to properly key of recess stone into the ditehline as detailed. Carefully place stone to avoid damaging filter fabric. Place and fit stone carefully to match the ditch geometry as detailed. Always instalt dochlines from the lowest point in an upstream direction. Lining materials shall be Installed and completed as ditchline contraction progresses. Dlchlines for roadways should be installed concurrently as rough gelding progresses. MAINTENANCE: Inspect all ditefutrim after each rainfall event. Repair and/or replace any damaged lining, grading, seeding or other problems until which time ail ditchltnes are permanently stabilized and not subject to erosion. TYPICAL DITCHLINE DETAILS NOT TO SCALE 9ENERAL NOTES: DRIVE 5' STEEL POST AT LEAST 24" INTO SCUD GROUND. USE STAPLES V APART HMIZON7LLY AND VERTICALLY TO ATTACH THE FILTER FABRIC TO THE WRE FENCE. THE FLOOR OF THE BASIN IN THE OUTLET ZONE AND BERMS SHOULD BE SEEDED IMMEDIA7ELLY AFTER THE BASIN IS CONSTRUCTED. MOST OF THE SEDIMENT BASIN WILL ACIIMULAIE IN THE FIRST BAY, SO THIS SHOULD BE READILY ACCESSIBLE FOR MAINTENANCE. THE TOP OF THE FABRIC SHOULD BE 6 INCHES HIGHER THAN THE INVERT OF THE SPILLWAY. DO NOT SPUCE THE FABRIC, BUT USE A CONTINUOUS PIECE ACROSS THE BASIN. CIR MESH. 700 9/m2 CUR EROSION BLANKET AND TREE PROTECTION FENCE FOLDED OVER TO REDUCE PORE SZE HAVE ALL BEEN USED SUCCESSFULLY. BAFFLE INSTALLATION 1 CAREFULLY PLACED -z "'""II" `FILTER FABRIC FULL STREAM CHANNEL 5' 4NKK HEIGHT ti, NCDOT CLASS B STONE DITCH WIDTH, DUPONT sac aAlaer m s serMOPATr DITCH LINING TYPAR STYLE 3601 OR nc•1ID4m TYPE 2 EQUAL wml plave. V - SHAPED RIPRAP LINED DITCH see I- SEED DITCH & SURROUNDING wsm vuaa. W. s:I AREAS IMMEDIATELY AS BURY MATTING EDGES DITCHLINE CONSTRUCTION 6" AND COVER WITH PROGRESSES (SEE SCHEDULE) WELL COMPACTED FILL 5 u . SURFACE FLOW DIVERSION 4 FT. MIN. ISM" i..ay.YU '{Yh l�.,f� Y 3 a Lew. a/r 1 FT. MIN. „ „A NOT TO SCALE SMOOTHLY BLEND CONTACT AREAS ALONG DITCH EDGES SMOOTHLY BLEND CONTACT AREAS ALONG DITCH EDGES -KEY RIPRAP FULLY INTO UNDISTURBED EARTH AS INDICATED UNDISTURBED SMOOTHLY BLEND CONTACT AREAS ALONG DITCH EDGES PERMANENT EROSION CONTROL`t=11 fF1 Ir' MATTING FULL DITCH WIDTH, FIRM, UNDISTURBED NORTH AMERICAN GREEN EARTH SUBGRADE P300 OR EQUAL TYPE 3 V - SHAPED PERMANENT MAT LINED DITCH USAGE: Contractor shall install dlchlines and ditch types at locations indicated on the plan. Specific ditch linings shall be utilized at locations shown on the plans W provide erosion protection during 10 year storm events. Type 3 ditches may be substituted for Type 2 ditches. MATERIALS AND Seeding for ditch types 1 and 3 shalt be in accordance with "Permanent Seeding for Gross Lined Channels" schedule. The erosion INSTALLATION' resistance of ditch types 1 and 3 is dependent upon a well established stand of grass. The contractor shall repair fabrics and matfings, re -seed and repair ditches as necessary to establish a permanent weilcstablished grass lining in all grass lined ditches. Erosion & Filter Fabrics shall be the types specified or equal products with equal or better characteristics. All matiings and fabrics shall be anchored and installed in accordance with manufacturer's instructions and recommendations. AI joints shall be overlapped a minimum of 2 feet. RioRap for Type 2 ditches shall be " NCDOT Class B Stone for Erosion Control Ditchlines shall be overexcavated as required to properly key of recess stone into the ditehline as detailed. Carefully place stone to avoid damaging filter fabric. Place and fit stone carefully to match the ditch geometry as detailed. Always instalt dochlines from the lowest point in an upstream direction. Lining materials shall be Installed and completed as ditchline contraction progresses. Dlchlines for roadways should be installed concurrently as rough gelding progresses. MAINTENANCE: Inspect all ditefutrim after each rainfall event. Repair and/or replace any damaged lining, grading, seeding or other problems until which time ail ditchltnes are permanently stabilized and not subject to erosion. TYPICAL DITCHLINE DETAILS NOT TO SCALE 9ENERAL NOTES: DRIVE 5' STEEL POST AT LEAST 24" INTO SCUD GROUND. USE STAPLES V APART HMIZON7LLY AND VERTICALLY TO ATTACH THE FILTER FABRIC TO THE WRE FENCE. THE FLOOR OF THE BASIN IN THE OUTLET ZONE AND BERMS SHOULD BE SEEDED IMMEDIA7ELLY AFTER THE BASIN IS CONSTRUCTED. MOST OF THE SEDIMENT BASIN WILL ACIIMULAIE IN THE FIRST BAY, SO THIS SHOULD BE READILY ACCESSIBLE FOR MAINTENANCE. THE TOP OF THE FABRIC SHOULD BE 6 INCHES HIGHER THAN THE INVERT OF THE SPILLWAY. DO NOT SPUCE THE FABRIC, BUT USE A CONTINUOUS PIECE ACROSS THE BASIN. CIR MESH. 700 9/m2 CUR EROSION BLANKET AND TREE PROTECTION FENCE FOLDED OVER TO REDUCE PORE SZE HAVE ALL BEEN USED SUCCESSFULLY. BAFFLE INSTALLATION Temporary earthen diversion dike pAN�u�: 1. AREA UNDER EMBANKMENT SWUL BE CLEWED, GRUBBED, AND STRIPPED OF ANY VEGETATION AND ROOT LMT. THE POOL AREA SHIML BE CLEANED. tL THE FILL WWEGAL FOR THE EMBMKMENT SHALL BE FREE OF ROOTS OR OTHER WOODY VEGETATION M WELL GvERS® STONES ROCKS ORGWM kaIM& 0 OTHER OBEIION M MVTERAL THE EMBMIKME SHALL M R COMPACTED BY iMV FILLS ACTH IPMFM WHILE BEING CONSTRUCTED. SPILLYMYS SHOULD NOT BE SS EW CONSTRUCTED THROUGH FILL SECTIONS 3. SEDIMENT SHNL BE REMOVID AND TRAP PESDREO TO HE ORIgNa1 DIMENSIONS WHEN THE SEDIMENT RAs ACCUMULATED E- THE ]DESIGN DEPTH OF THE TRAP. REMOVED SEDIMENT SIWL BE DEPMIIED IN A SWAN MEA IN SUCH T° ONE-HALF A IMtJNER THAT R WILL NOT ERODE. l THE WPM SH IL BE INSPECTED AFTER EACH RAN MD REPASS MME AS NECESSARY. 8. CONSRt N OPERATION S MU. BE CARTED OUf IN SUCH A MANNER RANT ER050N AND WATER MO M IS MINIMIZED. 6. ALL CUT AND FILL SIDPES SHALL BE 21 OR FtAT(Eit. 7. IF SEDIMENT MIN IS IN USE W DAYS OR LONGER, EMBMMR SHOULD BE SEEDED OR OWHERMSE PROPERLY STABILIZED. 8. STORAGE AREA IS SHOM! AS RECTANWtAR FOR ILLUSIPATNE PURPOSES CIILY, AND MAY BE CNSRUCIED N ANY SHAPE PRA'IDED THE MINIMUM SOPADE VOLUME REDUIRMENT IS MET. THE BASIN SHOULD AS0 BE ORE SUCH THAT THE FILTER AND TIE MIN FLOW OF WATER AND SEDIMENT ME ON OPPOSNE ENDS ON THE LONGER BASIN MNNSONS. B. REWIRED S7OIUGE B 1800 CUBIC FEET OF STORAGE VOLUME PER DENUDED ACRE RECOMMENDED STORAGE IS 180D CUM FEET OF STORAGE PER ACRE OF DRNNIGE ARIL 10. THE LENGTH OF THE STONE OUTLET (SR UMNY) B TO BE EYED ON A 10 YEAR STORM, 11. WHENEVER TOPOGPAPHY ALLOWS, WE BASED LENGTH SHOULD BE TWICE (2K) THE WIN MOTH. TO AUDW MR SETNNO B+FFILS SHOULD BE PROVIDED IN ARE WIN WERE THE LENGTH M LESS TARN TMCE THE MM. 12 CLE a WT SHAL W PLACED IN Al SEDIMENT BASNS AT THE LOW MWF N THE BATH THE STAPES SHALL SE MID® SHOWING WE HALF FULL. CIFMOINf PLANT, OF THE WIN. 13. SAFETY FENDING W HIGH SHOULD BE PLACED AROUND AL SEDIMENT` BASKS 14. FIT DESIGN OF RISER TYPE SEDIMENT WINS, REFER TO THE NORTH U'rI M DEPATMENT OF ENVIRONMENT, HEALTH, ND NAURA R90URC6, Is Is NOT TO SCALE � I7m1 wMaeeac a sXXtees vrrAL e4A. �\ ate rime s as asrawaMx L afME MIIOIO MB aap'Mra aR OalaLL .�i•�a eS LID MB6I LOMWerMF MI,aF PSC ra r8rM8 a L.sAf.wrilvaxlva:vmW mMfn • .•i��i••••, STREAM CHANNEL 5' 4NKK HEIGHT ti, r m sac aAlaer m s serMOPATr •+ nc•1ID4m «r air- Iea'+ wml plave. Ww see I- r: s "5a 1y wsm vuaa. W. s:I T 9e sea a of e AySTNIATKN ms M � 5 u . SURFACE FLOW DIVERSION 1lKA ISM" i..ay.YU '{Yh l�.,f� Y y S ' 1 a Lew. a/r o saw a RANp � \ aµwNTVm, r oa air TEMPORARY STREAM CROSSING OPTION 1. Keep cloning and excavation of the stream banks and bed and approach x matearaen sMOmaR r oa 2. Divert all surface water from the construction site onto undisturbed areas adjoining the stream. 3. Keep stream crossings at right angles to the stream flaw. `A distance of 30 feet. Raise bridge abutments and culvert fills a minimum of 1 \ runoff and to allow flood flaws to pass around the structure. S. Stabilize all disturbed areas subject to flowing water, including planned overflow areas, with riprap or other suitable means if design velocity exceeds the allowable for the in -place soil (Table 8.05x, Appendix 8.05). 6. Ensure that bypass channels necessary to dewater the crossing site are w-iP, MINT IAi compact, and stabilize the bypass channel appropriately. 7. Remove temporary stream crossings immediately when they are no longer :::::•• a¢A CHANNEL TRENCHING 8. Any in -stream sediment control measures must be removed upon Stabilization of the area. aaaaalpaaaal ■O rata®'l naaae�laaaBlL . laraaalnaaEEa 'aaaaallaaaRHEi I I JOHN! solo/ Maaaal saaaa! seIs ® •'• IaOal aMEMO jINS aalHMaaa11aalaa' •••WI aWa61WNADe. as aTAa Nae/r laaillaaleElh���a :ia������e!�nI!: tf i is alee1 aaaP..::.....-_.., G... ��...L i:::iii:Iiiilai: E: LIIEBI1EE :ii RESSSisiiiiE! I::Iiil:Iiil:E ..............I:::;aaaI'I €iiiiiiiiiiil' .....:IESii :::::::::...........aaaei ° °aaar ieeiiEEFEie liiiiiil EEHEEi !EEEEHTTHHHEiiiilEEHlaaalj aaaair ■lea slaaarii ! laaa! saaaaailaaaHl:::a 9aaaa,saraT laaMEHyiiiiiiiEiiiilFliiieiil 'eeiiie : e::: :::::::::IsssE::::riilaanleraar !ESis:iii::Iiiil iiii: Tii: E: i :II'i:::EEEIt:i:BMF-- :c! :EEEEii:iEEI ..............iiiilaaallaaaaal IF nail aaal,aarai [Maaaa Tessa// aawlEgNllBESesEalssTlsss !::::i::a::a:aa:::::! an €g', aW Wnaaaaa. Temporary earthen diversion dike pAN�u�: 1. AREA UNDER EMBANKMENT SWUL BE CLEWED, GRUBBED, AND STRIPPED OF ANY VEGETATION AND ROOT LMT. THE POOL AREA SHIML BE CLEANED. tL THE FILL WWEGAL FOR THE EMBMKMENT SHALL BE FREE OF ROOTS OR OTHER WOODY VEGETATION M WELL GvERS® STONES ROCKS ORGWM kaIM& 0 OTHER OBEIION M MVTERAL THE EMBMIKME SHALL M R COMPACTED BY iMV FILLS ACTH IPMFM WHILE BEING CONSTRUCTED. SPILLYMYS SHOULD NOT BE SS EW CONSTRUCTED THROUGH FILL SECTIONS 3. SEDIMENT SHNL BE REMOVID AND TRAP PESDREO TO HE ORIgNa1 DIMENSIONS WHEN THE SEDIMENT RAs ACCUMULATED E- THE ]DESIGN DEPTH OF THE TRAP. REMOVED SEDIMENT SIWL BE DEPMIIED IN A SWAN MEA IN SUCH T° ONE-HALF A IMtJNER THAT R WILL NOT ERODE. l THE WPM SH IL BE INSPECTED AFTER EACH RAN MD REPASS MME AS NECESSARY. 8. CONSRt N OPERATION S MU. BE CARTED OUf IN SUCH A MANNER RANT ER050N AND WATER MO M IS MINIMIZED. 6. ALL CUT AND FILL SIDPES SHALL BE 21 OR FtAT(Eit. 7. IF SEDIMENT MIN IS IN USE W DAYS OR LONGER, EMBMMR SHOULD BE SEEDED OR OWHERMSE PROPERLY STABILIZED. 8. STORAGE AREA IS SHOM! AS RECTANWtAR FOR ILLUSIPATNE PURPOSES CIILY, AND MAY BE CNSRUCIED N ANY SHAPE PRA'IDED THE MINIMUM SOPADE VOLUME REDUIRMENT IS MET. THE BASIN SHOULD AS0 BE ORE SUCH THAT THE FILTER AND TIE MIN FLOW OF WATER AND SEDIMENT ME ON OPPOSNE ENDS ON THE LONGER BASIN MNNSONS. B. REWIRED S7OIUGE B 1800 CUBIC FEET OF STORAGE VOLUME PER DENUDED ACRE RECOMMENDED STORAGE IS 180D CUM FEET OF STORAGE PER ACRE OF DRNNIGE ARIL 10. THE LENGTH OF THE STONE OUTLET (SR UMNY) B TO BE EYED ON A 10 YEAR STORM, 11. WHENEVER TOPOGPAPHY ALLOWS, WE BASED LENGTH SHOULD BE TWICE (2K) THE WIN MOTH. TO AUDW MR SETNNO B+FFILS SHOULD BE PROVIDED IN ARE WIN WERE THE LENGTH M LESS TARN TMCE THE MM. 12 CLE a WT SHAL W PLACED IN Al SEDIMENT BASNS AT THE LOW MWF N THE BATH THE STAPES SHALL SE MID® SHOWING WE HALF FULL. CIFMOINf PLANT, OF THE WIN. 13. SAFETY FENDING W HIGH SHOULD BE PLACED AROUND AL SEDIMENT` BASKS 14. FIT DESIGN OF RISER TYPE SEDIMENT WINS, REFER TO THE NORTH U'rI M DEPATMENT OF ENVIRONMENT, HEALTH, ND NAURA R90URC6, Is Is NOT TO SCALE � I7m1 wMaeeac a sXXtees vrrAL e4A. �\ ate rime s as asrawaMx L afME MIIOIO MB aap'Mra aR OalaLL .�i•�a eS LID MB6I LOMWerMF MI,aF PSC ra r8rM8 a L.sAf.wrilvaxlva:vmW mMfn • .•i��i••••, STREAM CHANNEL 5' 4NKK HEIGHT ti, r m sac aAlaer m s serMOPATr •+ nc•1ID4m CFIANNEI wml plave. Ww see I- wsm vuaa. W. s:I T 9e sea a of AySTNIATKN MEMMO sQ ME�THOU •B" N1ATIM� HMO AND IWMLMO OR aalet SOMMER AASSEMMMX AS FOLLOWS: • NSAT THE VENT INTO THE HIE IN THE 7EE WITH THE LONG END PONING TO THE REAR, THE SIDE WITH THE DOLL 7M7m BE SCREW To SECURE R. • GLUE THE BNUE7. ((NNOT INW10ED. AVABAME AT PILNBINO AND HARDWARE STORES) W -8' LONG OEPEMDI S ON THE IENOM LEE TO PUL TE BUYNFR TD TE SEE OF SKIMMER + PRIME ONLY ONE ED OF THE PVC PIPE FOR THE BABEL AND WE FEMALE COUPLING ON THE FLEXIBLE JOINT. THEN GLUE THE PIPE TO THE OOUPIINO. • YABHIIT ILF (BO IT CAN BE DISASMOM LATER) SLIP THE OTHER END OF WE PIPE (A Uri GREASE a �COIMIENOD NM THE BRUSHING AT ME OUTLET END OF 71E PIPE ON WE SOMOL SECURE 111E PIPE BY TIMTNINO PHILLIPS HEM SLEW SO THAT THE POINT OOS SIGHTLY INTO TIE PIPE NUAAII AS INSTALL + LAY TE ASSUBM SOMMER ON WE BOTTOM OF ME BASIN WIN THE REGIME JOINT AT THE INLET OF THE PIPE 7NROUM THE DAM OR AT THE OMEMMN MITI WE MM • REMOVE ANY DUTY OR MORTAR M THE PIPE AND SLID THE 4" OMMAG OVER WE PIPE INET. MOM THE 7OD SCREW SU ME POINTS ,AST PIERCE THE SEE OF WE �E TO SECURE THE CON ECIION. • POSITION TREE SOIRER OVER THE EXCAVATED PIT IN THE BASIN. + THE S(BWFR SHOULD SETTLE LEVEL ACROSS THE TOP OF THE PPE THE THE DOOR M R. 50 THAT DEBITS WANDS OM 01HEtMISE. DEBRIS THAT A=NTI AIM AROUND THAT FLOAT DILL now WW WE FLOAT AND IDG WE SCREEN MEN WE WATER LEVEL DROPS. • ADJUST THE FLEXIBLE JOINT CONNECTION, F NECESSARY, EWECALLY F THE SKIMMER IS PULLED To ME SHE AND THE BANTU¢ IS HOT ALP= ANTI THE OUTLET PPE THE FLOAT B BALANCED 80 THAT THE REAR SETTLES DOOR AS THE LAST FEW INCHES OF WRIER MAIN FROM THE BASED. THE POSITIONS ME r1AAT AND THE WARDS TO CONTAIN FLOATING OEM ON THE OU79iE OF THE FLOAT AS THE WATER LEVEL DROPS. + F ME SOM ER B Nor LETSL OEM CAN FLOW UNDER THE FLOAT AND CLOG THE SCREEN AND POOMY THE ORIFICE. • PLACE A SKATE AT ME OONMEMM OF THE FLEXIBLE JOINT SO THE BACK HOE OPERATOR DILL KM0W ME ILCATM WEN EEAVA7ING ACCUMULATED SEDIMENT FROM LUAET WE MM MM AND NOT DAMAGE R. • AFTER INSTALLING ME SNMIER CHECK TO MINE SURE THE OMRCE HAS NOT FALLEN OUT MILE MOVING THE S NMFR. WINNER![ • WE THE ROPE PROVIDED AROUND THE TEE BETWEEN THE VENT AND THE HORIZONTAL TUBE. • SNM IT B POLYPROPYLENE (LOPE. WITH B SIPPERY, USE A DOOR MDT THAT MARL NOT CGE LOOSE. + BEMIRE THE 07HER END TO A STNS ON THE DAM M THE SIDE OF THE BASAL • PUT TDMM M THE ROPE 90 WE SHIMMER MBL SETTLE IN70 THE PIT AFTER THE BASIN DRAMS. • F YOU NEED TO LENOTEN THE ROPE USE ONE THAT WILL FLOAT. OTIM MIS4, IT MAY UNIX AND BE COVERED BY SEDIENT AND ACT AS AN ANCHOR TO KEEP THE MMMM FROM FWAYM (INS IS IINUMN FROM SAO WM F ME SGNER IS CLOGGED WTI WIN TRASH AND THERE B WATER IN WE BASH, USUALLY A FEW JEMM M THE ROPE TO MAKE TE SKMMR 800 LP AND DOWN MILL DISLODGE THE DM MS AM IE OE FLIED F THIS DOES NOT WORK PULL THE SMMMER OVER TO WE SIDE 675 EASIER TO DO WAN WE BASNN PARTIALLY FUR) AND REMOVE WE DEERS ALSO 04ECK WE OEM INSIDE THE SUM TO SEE F R B CLOMM F SO ISM THE DFRRS sFludT IweFR TIE 9GMME1. F SEDIMENT ACOUMULAM TO THE POINT THE SIMMER CANNOT SETTLE LOW E7MAG1 A GRAN TE FN71E BASED BULL THE SOMMER OVER 70 ONE SIDE AND EXCAVAIE ME SEDIMENT VON A BACKHOE anrrfo BARREL M OIOE TIROUax 7NE TALL F WE SIGNER IS CLOGGED DESPITE REMOVING OEM AND R APPEARS THAT ETER TE BARR7. BEiM TE GGICE AND THE FLEXIBLE JOINT OR WE PPE IM M ON THE DAM IS OMM TAKE THE FOLLAMING STEPS TO CLEAN THE SOCKAGE (SWRENT WILL SMEMM ACCUMULATE IN THE PIPE). • VIAL WE SDIIER OVER TO TIE ML • FOMD\£ WE PIN AID OPEN ME DOOR TO ACCESS THE ORFICE • REMOVE THE OMM PLUG M CM. + RAISE TIE INLET AS HIGH AS PRACTICAL • FR THE BARREL WIN WA10 LASE A BUCKET AND RUNNEL OR A PUMP) TO REMOVE WE CLOG USING WE WATER AND PELHME • AFTER TE OBSRUCTON IS REMOVED CNIRNE FAXIRNO WATER INTO ME BABEL TO RUST OUT ACOUM"% OMAN AND SEDIMENT TO PREVENT FUTURE ==N2 • A PLUMBERS SNAKE CAN BE USED BUT FUM MF WT THE S AMT AND OEBRS M V V Cv' °v 0 v D v (STRAW) CHANNEL MATTING INSTALLATION DETAIL i� T1Ti'P.Ti'3 CONSTRUCTION 1. THE TOP OF THE EARTH DIKE OVER THE INLET PIPE AND THOSE DKES CARRYING WATER TO THE PIPE SHALL BE AT LEAST 1 FOOT HIGHER AT ALL POINTS THAN THE TOP OF THE INLET PIPE 2. THE PIPE SHALL BE FLEXIBLE WITH WATER TIGHT CONNECTING BANDS. FLEXIBLE PIPE SHOULD BE STAKED ON EITHER SIDE 3. A RIP RAP APRON SHALL BE PROVIDED AT THE OUTLET, IF EMPTYING INTO A DISTURBED AREA. RIP FAJRIH DIKE max 19 -guage hardware cloth 4` iEMFNr PR _ ------ _....,....__ (a mesh openings) _ ®T SPECIFICATIONS: 4. THE SOIL AROUND AND UNDER THE INLET PIPE AND ENTRANCE SECTION SHALL BE RAND TAMPED IN a Jim M THE TOP OF THE EARTH DIKE 5. FOLLOW -UP INSPECTION AND ANY NEEDED MAINTENANCE SHALL BE PERFORMED AFTER EACH STORM BY THE FINANCIALLY RESPONSIBLE PARTY OR HIS AGENT. 6. 0= PIPE SHOULD BE TAKEN OVER OR THROUGH ANY SILT FENCE, TAKING CARE NOT TO VOID THE EFFECTIVENESS OF THE SILT FENCE FLEXIBLE PIPE SLOPE DRAIN PLAN La + SECTION A -A 1A L+ ,,..:r blanket NOTES: SEE APPROPRIATE SCHEDULE FOR DIMENSIONS 1. La is the length of the riprap apron. 2. d = 1.5 times the maximum stone diameter but not less than 6" 3. In well- defined extend the apron up the channel banks to an elevation of 6" above the maximum tailwater depth or to the top of the bank which ever is less. 4. A filter blanket or filter fabric should be installed between the riprap and soil foundation. PIPE CULVERT OUTLET PROTECTION FOR DEFINED CHANNEL rxam e.WET A seem ar ]-0 ,iYaKrm®� A�YMaaaY 6 r0 B Mar AY.W9E R 11E . ". aorasacvrowaxM . NIA a MFM:PAID MMI SUMO •� /sat a oawa eA • ep / ....�a /' ••• '•wa ant Faa a�w agw • ie aw owaaa eEawTA .. �sAarmexmsA so e a ra wi°Oaoml v'-oN, ,FIONAma aE � vTA:VA SLOPE DEAL n Wi END ROLL OVERLAP n Y-W MN. I--- aNaE,r ae ewe r A: T�icvae va BOTTOM OF SLOPE NCDOT 95 or #57 washed stone % _ 'T 16" NCDOT #5 or #57 washed stone Figure6.51a Hardware cloth and gravel inlet protection 2 Can definitely Sgeaits a the 1. Will. grade a ahMloe tlepraeNan apprmohe9 Me filtered ml°` 2Mw S-fmt steal 1. mabli Sp 2 feet MM Ma amend water sumosiberIg Me glee Spero panto of 4 around Ma pMmeta of Me MIaU a matlmum of 4 feet apart 1 Surround Me pros ell elre mail mrdeam doM. Secure the eke meeh to Me steel poste at Me lap, modus and bottom. RaaMq a 2-foot Bap of Me Wke mesh under Me Install far an l:aMg a raeanmandM. 4. Plats wean grant MC COT Fv or #57 afal an a 2.1 Map. eft a helghl M 16 Inches oround Me efts, and smooth W are awn grade. 5.0a. Me mntrm:rM9 dralm" erw hoe bem stabilized. snow eommulated sedhnmt and wkbllah Mal Trading elmatim. B.Cam ct Me arse and el Hb It WIM pa Property groundeowr. HARDWARE CLOTH & GRAVEL INLET PROTECTION STREAM CHANNEL 5' 4NKK HEIGHT ti, r m 1\ yyy(,Vy ll � yW �i1AL 1I)1� 61y 4 11; SURFACE FL OW O O Q9 C) �I O ° ° DIVERSION OO O O 0 . ° -° ° w6 Co. SOC)o o° O ° - o see I- j visas .. "• r 1Raa 68lMf$ SURFACE FLOW DIVERSION a rA P.wMa ,r m a Lew. a/r o saw a RANp � \ aµwNTVm, r oa air TEMPORARY STREAM CROSSING OPTION 1. Keep cloning and excavation of the stream banks and bed and approach x matearaen sMOmaR r oa 2. Divert all surface water from the construction site onto undisturbed areas adjoining the stream. 3. Keep stream crossings at right angles to the stream flaw. `A distance of 30 feet. Raise bridge abutments and culvert fills a minimum of 1 \ runoff and to allow flood flaws to pass around the structure. S. Stabilize all disturbed areas subject to flowing water, including planned overflow areas, with riprap or other suitable means if design velocity exceeds the allowable for the in -place soil (Table 8.05x, Appendix 8.05). 6. Ensure that bypass channels necessary to dewater the crossing site are w-iP, MINT IAi compact, and stabilize the bypass channel appropriately. 7. Remove temporary stream crossings immediately when they are no longer :::::•• a¢A CHANNEL TRENCHING 8. Any in -stream sediment control measures must be removed upon Stabilization of the area. CC��C METHOD "A' n seIs ® •'• •••WI aWa61WNADe. as aTAa Nae/r aEA Mme araL 1r aaL.l LLP RL IIEW Yale �i tf i is V V Cv' °v 0 v D v (STRAW) CHANNEL MATTING INSTALLATION DETAIL i� T1Ti'P.Ti'3 CONSTRUCTION 1. THE TOP OF THE EARTH DIKE OVER THE INLET PIPE AND THOSE DKES CARRYING WATER TO THE PIPE SHALL BE AT LEAST 1 FOOT HIGHER AT ALL POINTS THAN THE TOP OF THE INLET PIPE 2. THE PIPE SHALL BE FLEXIBLE WITH WATER TIGHT CONNECTING BANDS. FLEXIBLE PIPE SHOULD BE STAKED ON EITHER SIDE 3. A RIP RAP APRON SHALL BE PROVIDED AT THE OUTLET, IF EMPTYING INTO A DISTURBED AREA. RIP FAJRIH DIKE max 19 -guage hardware cloth 4` iEMFNr PR _ ------ _....,....__ (a mesh openings) _ ®T SPECIFICATIONS: 4. THE SOIL AROUND AND UNDER THE INLET PIPE AND ENTRANCE SECTION SHALL BE RAND TAMPED IN a Jim M THE TOP OF THE EARTH DIKE 5. FOLLOW -UP INSPECTION AND ANY NEEDED MAINTENANCE SHALL BE PERFORMED AFTER EACH STORM BY THE FINANCIALLY RESPONSIBLE PARTY OR HIS AGENT. 6. 0= PIPE SHOULD BE TAKEN OVER OR THROUGH ANY SILT FENCE, TAKING CARE NOT TO VOID THE EFFECTIVENESS OF THE SILT FENCE FLEXIBLE PIPE SLOPE DRAIN PLAN La + SECTION A -A 1A L+ ,,..:r blanket NOTES: SEE APPROPRIATE SCHEDULE FOR DIMENSIONS 1. La is the length of the riprap apron. 2. d = 1.5 times the maximum stone diameter but not less than 6" 3. In well- defined extend the apron up the channel banks to an elevation of 6" above the maximum tailwater depth or to the top of the bank which ever is less. 4. A filter blanket or filter fabric should be installed between the riprap and soil foundation. PIPE CULVERT OUTLET PROTECTION FOR DEFINED CHANNEL rxam e.WET A seem ar ]-0 ,iYaKrm®� A�YMaaaY 6 r0 B Mar AY.W9E R 11E . ". aorasacvrowaxM . NIA a MFM:PAID MMI SUMO •� /sat a oawa eA • ep / ....�a /' ••• '•wa ant Faa a�w agw • ie aw owaaa eEawTA .. �sAarmexmsA so e a ra wi°Oaoml v'-oN, ,FIONAma aE � vTA:VA SLOPE DEAL n Wi END ROLL OVERLAP n Y-W MN. I--- aNaE,r ae ewe r A: T�icvae va BOTTOM OF SLOPE NCDOT 95 or #57 washed stone % _ 'T 16" NCDOT #5 or #57 washed stone Figure6.51a Hardware cloth and gravel inlet protection 2 Can definitely Sgeaits a the 1. Will. grade a ahMloe tlepraeNan apprmohe9 Me filtered ml°` 2Mw S-fmt steal 1. mabli Sp 2 feet MM Ma amend water sumosiberIg Me glee Spero panto of 4 around Ma pMmeta of Me MIaU a matlmum of 4 feet apart 1 Surround Me pros ell elre mail mrdeam doM. Secure the eke meeh to Me steel poste at Me lap, modus and bottom. RaaMq a 2-foot Bap of Me Wke mesh under Me Install far an l:aMg a raeanmandM. 4. Plats wean grant MC COT Fv or #57 afal an a 2.1 Map. eft a helghl M 16 Inches oround Me efts, and smooth W are awn grade. 5.0a. Me mntrm:rM9 dralm" erw hoe bem stabilized. snow eommulated sedhnmt and wkbllah Mal Trading elmatim. B.Cam ct Me arse and el Hb It WIM pa Property groundeowr. HARDWARE CLOTH & GRAVEL INLET PROTECTION FINAL DRAWING - NOT RELEASED FOR CONSTRUCTION � N� • 2 w 0 sz o r v/ V \a1 nu IA aAAA N 0 ti AL Y0317 ............. ,co aAaaI THEE I I\1 \ \ \\ �.I 1 8 w o 3 s w z P L 3 Q Z 9 U z w¢J ¢a ¢ a 8 Tit 3 pW W M1 6 N 2 Z m W m 41 M O m Y G A m Vl a: ou m a w z r a 0 o d < n N S N N N N N � ®aa9aa�a O DO r N o z Ox o z CQ W EW.A F HO�z �Y•L�-T x F+ E E W o E" E 'z a z to O i ti d O o 0 9 0 00 U °z o V O � W O PROJECT No. MRH -13040 MONSOON FII'MAKE: MRH - 13740 -DT CHECKED BY. RMR DRAWN BY: CM /JL /RMR scACE: N/A BA'L'E: 07 -25 -2014 SHEET NO. D -5 �� MCADAMS STREAM CHANNEL 5' 4NKK HEIGHT ti, 1\ yyy(,Vy ll � yW 1I)1� 61y 4 11; SURFACE FL OW O O Q9 C) �I O ° ° DIVERSION OO O O 0 . ° -° ° w6 Co. SOC)o o° O ° - o y STONE APPROACH SECTION / j 5:1 MAX. SLOPE ON ROAD ` STONE OVER FILTER CLOTH SURFACE FLOW DIVERSION ORIGINAL STREAMBANK� y y 0 STONE Temporary aaome FILTER CLOTH TEMPORARY STREAM CROSSING OPTION 1. Keep cloning and excavation of the stream banks and bed and approach sections to a minimum. 2. Divert all surface water from the construction site onto undisturbed areas adjoining the stream. 3. Keep stream crossings at right angles to the stream flaw. 4. Align road approaches with the center line of the crossing for a minimum distance of 30 feet. Raise bridge abutments and culvert fills a minimum of 1 foot above the adjoining approach sections to prevent erosion from surface runoff and to allow flood flaws to pass around the structure. S. Stabilize all disturbed areas subject to flowing water, including planned overflow areas, with riprap or other suitable means if design velocity exceeds the allowable for the in -place soil (Table 8.05x, Appendix 8.05). 6. Ensure that bypass channels necessary to dewater the crossing site are stable before diverting the stream. Upon completion of the crossing, fill, compact, and stabilize the bypass channel appropriately. 7. Remove temporary stream crossings immediately when they are no longer needed. Restore the stream channel to its original crass - section, and smooth and appropriately stabilize all disturbed areas. 8. Any in -stream sediment control measures must be removed upon Stabilization of the area. TEMPORARY STREAM CROSSING FINAL DRAWING - NOT RELEASED FOR CONSTRUCTION � N� • 2 w 0 sz o r v/ V \a1 nu IA aAAA N 0 ti AL Y0317 ............. ,co aAaaI THEE I I\1 \ \ \\ �.I 1 8 w o 3 s w z P L 3 Q Z 9 U z w¢J ¢a ¢ a 8 Tit 3 pW W M1 6 N 2 Z m W m 41 M O m Y G A m Vl a: ou m a w z r a 0 o d < n N S N N N N N � ®aa9aa�a O DO r N o z Ox o z CQ W EW.A F HO�z �Y•L�-T x F+ E E W o E" E 'z a z to O i ti d O o 0 9 0 00 U °z o V O � W O PROJECT No. MRH -13040 MONSOON FII'MAKE: MRH - 13740 -DT CHECKED BY. RMR DRAWN BY: CM /JL /RMR scACE: N/A BA'L'E: 07 -25 -2014 SHEET NO. D -5 �� MCADAMS NOTE: 1. THE RISER /BARREL SHALL BE DESIGNED TO CARRY THE 10 -YFAR STORM RISER TYPE SEDIMENT BASIN WITH SKIMMER NOTE1 t. alze le lmw WE v NRM Am 1p00M m1N Ate cerm a xon m E MWxm w M mmEm L rmm m M olMBam M.oamw alaN um 6NR+YI2BII1 Pm IsNw APVt IXavt sfMOwL A IWWw amBD EATOe6BONm6M xXNw IMO ASmO MOo 611E IR OR WLMRr Ai M YSW WT WII2T AT A YNIBY wYi Q z1 AieA p1aHI 1wrm nw1Ti nwa MPEE NOEIma N.vmr lr. L HIVE EVILE xB avBNUWI2W MDe6M MxEAro E .PAVm IN, N mwA66M61pWY mAIBLL a6Wx}N Wvu EIYRAd]m MT M.1WEr6MIANN 91NL EATM aIIEWFLf al1AB WM Ile a6I66 M 6mMY CYIEEL M pYI aWL MAKA W16TamE WL ATM 861xM'NI a6 S. MNOM6MFN06MMtlx EWLEEQIK IBMNIIIrx ,op a M ArxY12 a1IN4 YAIe.N ,xn m 6mMN W1Mn Nt L xl. aPew.Be I6 aNENErocmPAOaemvmaEem ]. MPL/YIa6FU mlm ILMm0Y.9WmNMR@Y aIxAEL aaM xm E NIOwD. L xe mmRYWWax MxoWalru xnAENr6M xWR iL 6 PFx.TIFY L . a o.lamaBxB YANNZ .NE m ILm FASSW T EI Yomm W.. 1L x+Y 0a1YYFO AEA..6IPB6 ro RBYAYe O SenEsxa®. A'A'A' RP -NP APRm 111W MX D� -11i'A � I�R C�MVIE�LMR I oEmN°1a• APNON Wom-1r Mx. p :z 6fA.lYX NOTE m 6 TIED IXYM ri SmE mW A Vf-x "-Y/d ti£ wAE,m 9ECRIw II-B APPROVED I1 RIPRAP APRON AT PIPE OUTLETS O 2' -6. OR 2' -0" STANDARD CURB AND GUTTER, STD. PER 10.17A O SAFETY RAIL, STD. 50.D4A & 50.048 BO 4' -0- (MIN.) SIDEWALK. STD. 10.22 H1 2' -0- VALLEY GUTTER. STD. 10.17B Q CURB TRANSITION STANDARD CURB AND GUTTER TO 2' -0" VALLEY GUTTER, STD. 10.19 LH = DISTANCE FROM END OF WINGWALL TO END OF SAFETY RAIL LOT = DISTANCE FROM i OF CULVERT TO END OF 2' -6' CURB AND GUTTER GUTTER. LC2 = DISTANCE FROM END OF WINGWALL TO END OF 2' -6' CURB AND GUTTER. .NOTES: t. SEE SID. NO. 10.36B FOR GENERAL NOTES AND CLEAR ZONE DISTANCES. 2. M ALTERNATIVE FOR STREETS WRIT WIDER PLANTING STRIPS AND SIDEWALI(S: IN LIEU OF A PLANTING STOP ALONG THE CULVERT CROSSING, PROVIDE A MINIMUM 8 -FOOT WIDE SIDEWALK LOCATED AT THE BACK OF CURB, FOR LENGTH 'LC1" ON EITHER SIDE OF THE CULVERT CENTERUNE SEE NOTE PLANTING STRIP 2 IL �L -PIPE CULVERT• - 8 ENOM'PL- OR WINDWALL SECTION A - A ENDW'P1L OR WINGWAl1 A L SDE A R�20W 10' TRANSITION 0 ENDWALL ON WINGWALL -1-I -0 "�_ _ I STANDARD CURB S M I� AND GUTTER R� -- -- L- L- - V MN, TIP. OS HOE 2) I ^,LOCO'-0" R121 rU X 1i 25'Le MIN. - - - - -_ Isl I " u. R/W MWALL ON _NNGWM�� \ T '-- -. + - -SME SEE NOTE 7 ON SR, NO. 10.388 CULVERT CROSSINGS ON RESIDENTIAL AND COMMERCIAL STREETS NOT TO NOTES: 0. GRAVEL PAD TO BE 12'x 50' AND 6' THICK MINIMUM b. TURNING RADIUS SUFFICIENT TO ACCOMMODATE LARGE TRUCKS IS TO BE PROVIDED, 0. ENTRANCE(S) SHOULD BE LOCATED TO PROVIDE FOR MAXIMUM UTILITY BY ALL CONSTRUCTION VEHICLES. d. MUST BE MAINTAINED IN A CONDITION WHICH WILL PREVENT TRACKING OR DIRECT FLOW OF MUD ONTO STREET. PERIODIC TOPDRESSING WITH STONE SILL BE NECESSARY; KEEP SOME HANDY. a. ANY MATERIAL WHICH STILL MAKES IT ONTO THE ROAD MUST BE CLEANED UP IMMEDIATELY. COARSE AGGREGATE 2 -3" NOTES: APPLICABLE AT ALL POINT OF INGRESS k EGRESS UNTIL SITE IS STABILIZED, FREQUENT CHECKS OF THE DEVICE AND TIMELY MAINTENANCE MUST BE PROVIDED. TEMPORARY CONSTRUCTION ENTRANCE /EXIT GENERAL NOTES: 1. UNLESS OTHERWISE DETERMINED BY THE CITY ENGINEER, WE MEASURES ILLUSTRATED SHALL BE USED WHEN CULVERT DIAMETER. D. IS GREATER THAN OR EQUAL TO 24 INCHES AND WHEN THE DIFFERENCE IN ELEVATION BETWEEN THE CULVERT INVERT AND THE TOP OF SLOPE. It IS GREATER THAN OR EQUAL TO 5 FEET. 2. INSTALLATION OF 2' -6" CURB AND GUTTER MAY NOT BE REQUIRED WHEN AN ADEQUATE CLEAR ZONE IS PROVIDED FOR VEHICLES WITH A MAXIMUM OF 6:1 SLOPE (SEE TABLE 1). 3. INSTALLATION OF SAFETY RAIL MAY NOT BE REQUIRED W14EN A 10 -FOOT PEDESTRIAN CLEAR ZONE IS PROVIDED BEHIND THE SIDEWALK WITH A MAXIMUM OF &i SLOPE WHERE NO SIDEWALK IS REQUIRED. INSTALLATION OF SAFETY RAIL MAY NOT BE REQUIRED WHEN A 15 -FOOT PEDESTRWI CLEAR ZONE IS PROVIDED BEHIND THE CURB WITH A MAXIMUM OF &i SLOPE. 4. FOR CULVERT CROSSINGS WITHOUT ENDWALLS, LH AND LC2 SHALL BE MEASURED FROM THE OUTSIDE OF THE NEAREST WALL OF TIRE CULVERT BARREL S. FOR MULITIPLE BARREL CULVERT CROSSINGS Let SHALL BE MEASURED FROM THE CENTERUNES OF THE OUTBOARD CULVERT BARRELS S. WHEN NECESSARY. AS DETERMINED BY THE CITY ENGINEER. ADDITIONAL MEASURES MAY BE REQUIRED. 7. INSTALLATION OF SAFETY RAIL IS REWIRED ON BOTH SIDES OF STREET IF SIDEWALK 6 REWIRED ON BOTH SIDES. S INSTALLATION OF OF SAFETY RAIL IS REQUIRED ON BO SIDES OF STREET IF NO SIDEWALK IS REQUIRED EXCEPT WHEN A 15 -FOOT PEDESTRIAN CLEAR ZONE IS PROVIDED BEHIND THE CURB WITH A MAXIMUM OF 6:1 SLOPE 9. INSTALLATION OF SAFETY RAIL IS REQUIRED ON THE SIDEWALK SIDE OF STREET IF SIDEWALK IS ONLY REWIRED ON ONE SIDE OF STREET. INSTALL EITHER SAFIEY PAL OR 15 -FT CLEAR ZONE ON SIDE WITHOUT SIDEWALK. 10. DESIGN ADT IS CALCULATED ASSUMING A TRIP GENERATION OF 10 DAILY TRIPS PER SINGLE FAMILY DWEWNG UNIT. TABLE 1. CLEAR ZONE DISTANCES LOCAL, COLLECTOR, AND COMMERCIAL STREETS DESIGN ACT CLEAR ZONE FROM EDGE OF PAVEMENT TANGENT SECTION CURVE (WITHIN 125' OF CULVERT UNDER 750 10' 15' 750 - 1500 12' 18' 1501 - SM 14' 21' OVER 6000 18' 24' SEE STD. NO. 10.36A FOR PLAN AND CROSS SECTONAL SCHEMATICS. A Filter f0 CIO" 1 or B Erosion Control Stone \ SECTION A -A Stone should be placed over the channel banks to keep water from cutting around the dam. CULVERT CROSSINGS ON RESIDENTIAL AND COMMERCIAL STREETS 09 1WJ RPFB B' -B" SSA ]8 T6 6 Blrtb TB .." . 6 WI1W 9FE $m. B W8.I6 NR aEXYYL X81E8. 1 KEY /ANCHOR MATERIAL AT „O„ W OTO P °' -P" TY Yi T9 t6 6 BOTIYI PLPFe 18' 0° V B- C99 �•--- 12- MIN. Oro y N. Z 9y00 m= yD x 00yyOy x.NDym 2W00 9' -13e TIeFE PIPE4 18' -0 1196° I 6BPA.611° BNIB IN T6 aF F°RSNa 9 -r Y x0s x" �" TELL FIA m PypM 10 "� l.- 2-i- Yn FILL FCE N"P11° "X" > a6 Z% Lj O LLJd,YZ 00 x 6<�j Ff.Sa Cx O' y y<. d T % m0 yy. 2 2 0 'y'y y xTDm y.1J.• 16 6 IV, A 68F]M r FILL FY4 r II° 11N1 2° W18 SX TIE6 iWIIn Vt °V"Y11 °V "B i'.8" a EI - Rmen WtlN _ °X° m II °Y 1'.B('r� Q< O O,y LLJ6 Y C WQILL Off..11 aFO x GENERAL m 36' MIN. SPACING TYP.+ T{ Fs I VIII 6 X. %LLW x'-2SW OO 2, -,QNT CONTRACTOR TO I ENSURE SILT DOE NOT ENTER CREEK VIP1'.1" B-"1 ey BWIfOYHEe I i n '� r %�LLOaJ 009rT •9 .x {.. 'e P[Pn / �fi° ) �� I SILT FENCE L - LOW SIDE OF LOT ^L DIRECT CONTACT WITH THE SOIL CCCZONJ/ ly Ayy D °T m �fi. .N f smucnW ENTRANCE AT DRIVEWAY 2056 •DIMENSIONS SHOWN ARE 8.X TWEE Y8 a =7 T4 Y.O Ww <O N 'r° IgB��TE�FF a -Xt O ]Y" ° ] REQUIREMENT THAT MUTT BE 2 P]RB T ° u6A. B lt" nx° flWB a- NA mna 6 F9wxw _ B •M B• T6 6 B" MET. - Bn - OVERLAP O M""' 2 T 1 %PET TI / / /�,,[/,/.yyy� /� ]N• -6 TPA. 611^ °X° BNB a -N Ix Bona 6 Fwrlle T668° V L GEGTION M WO O GRASS. MAT/BLANKETS SHALL ^E, z'n1e11° 2' -rte^ a, ° SECTION - M 4. THE DETAIL SHOWN IS FOR SLOPE >:3:i.;.ti,.''•( +•.F'" -'' Y.]g P ANA SECTION BB MATING. FOR CHANNEL OR PIPE PLAN SECTION - N PLEASE REFER TU NCESCPOM •WWATER TABLE STANDARD A6.17 AND MANUFACTURER'S GUIDELNES. OT 1]' -B' tlx Plrte wLL Ol Mlw1mL IA 6NMLL O ,Y -V ISO PIPm� °" wLl 6 Ml6nLL PYI petal -9 9 S m M C °r. y s P 2-VI 0 t' -B" ^ 2- ° B4 YI W ) 81R FX6 4.V1 B^ FILL FIR RE[in. una 2 PIPER a PIPED 841 BrYE Lpg1X Ip. ip1 M. EYi Bl NA W' " 8 IS - N 8 J % .M ` e Q O a y m j4 m • - VEt' -e^ aP xl ® 1 AR. FA6 ) 4 -V1 B B" ilLL FLLY B1 a p BEI"F. enEL Y PIPER 8 PIw •" I� BAR 922E LENYm W. EMf NB. 6W1 B1 14 6' -8^ 8 P8 12 J Y N 9 a a0 °3, •n m / B 2 Bt P Ba N B'-B° 1 1] 8 Se LL m EX m T O '017 / .N M. F �- " ". I z.W LWTTI�'XX BY N PTPZ xuT B8 N BX0�1 4' -B° 4 1Y B' -a° 1 1] I fY B aB p ro 0 = a, A9i Z M O 1" ,y( y.B4 ° B II 4 Rj w 89 Xl n vr.x 2 m-- N E6' -8" - - N 6� V 10 w Y 106 18 BO 2 w S. W '-' ~ 6 Ra l9•M S a m w Cr 1 1 • - ' 1 a" a Ywlp 1 I` I/ , y:l £ Y BY N L' XWl 61 t .z° Y m n -V +6 w 10 t1�0 W f 6 ,Y -1 • °O I' a. IPEeY°PAIE "B 1 ( 1@ N •' -e° • it • tl W y 9 - e° MO/E 1 nSA LIRE X2 N {'.9° • +1 4 11 W m O Q FLA u1¢ NJ N a' -W 1• m le 71 Q 6r.1 m '.0 - -- - - B° • xt 61 8.11 M 67 ,B 74 O 00 W A O 8" B" FN£ E- VY1t9 -V8. Y -VI N 8 14 8 N Q O W m 0 TAPER DETAIL NY N e' -6" B 1I 0 14 Q O O •� - m O 2 TPA. 0 t. 281 FIR :.m E -88 V -10 SIR. ,.ITS" J 4A O Mm FggT. JT. 4 x -BI 1 -A N •.X, 11° nLL v 9 y a y _ 4 -Nl J 8 9M. 0 1' -x" FILL Y NA. 0 I' -10- TI N 21' -x° 86 n f w 6 1.9.0 ~ II AA. 01• -1 BJ RILE Y.Xf. 1.XY nLE s.p z.va a -va W ^ alX ry N 41' -Y° efi B f ra 0 0: ei 9 B FARE 8 -X1, 1 -W v2 pR. FA6 TY za- e" a ne W 9 m son m'-e° a n9 W t In Xfi ELEVATION +wz, 1,va, 1 -v4 8 24 x 0 � m " m 2 ELEVATION a pA. • +' -a^ P1u F]R 8 -M. 1 -M2 HA. 8 4Y x 0 AO 2 T4 N r-S' Y 8 2Y 5 r, 0 W O • S. V2 T° N 6'-B" Y -zo 8 88 5 r. O IN 9 ' 2f a' -e• 81Y° I • `� II� ° 8• V{ X1 N N -B° N ltr V1 N - " 1Y 68 VY /1 fi' -1° 8 ZO V1 1N 1]I 1B 96 B YB Is J ZO, M• m W -J (p 9 9I Z1 B• -B• ]° s1E "� r 11 f V2,F , t.V{ T6 N ( V1 n V2 N4 SA V� -B" 12 Go 1N 1]4 B' -8" 1Y 60 18 ]6 6'-1" 0 20 B 20 It° B 1B a0 18 J 2 X- m W z O 6 O x r y 3B-{ 2' -e° q - n2" 21 SA YA" a 11 n 4'.•" • 18 B 11 • 1B C. LL �WR r 10 ^mm, m, 28 Y. -e" e° J "N' a N T- 2'-V IS X1 C -6" N. ��� TI E N 9' -t0° A 10 { 10 i NI- 6' 6" °I .1 - I2 N 8'110" 4 m 4 ,0 IOM X4 9•_ °• �TT a -pf a -N rY N 9' -Y° 4 8 ♦ e - W e'"6" i' 1 °-I I-TT .y" 2B N S' -2° 4 8 4 8 "N" BARB MX BARS Z. BARS N. BAR8 N. BARB Z. eAR5 a -x+ a -N FEI 1 6 R ^x °. "N ". A "2" BN mINYAxa Pu Sur m .. WING ELEVATION W] OW.n.. W. AS ze W" 8.9 6 BM. • "" "• a ^z° Bw D6pNlaxs ASE our ro M. 0 11" plp. WING ELEVATION N11.m.a. IYB. BW m. m as 808 10.x pIEET 2 6 Y 91EET 1 6 Y ET 2 6 2 838.28 838.28 838.28 838 °28 DPERVIGI6 GMATE AS LDSCTEU A TIRE OF CONSTAI IEIPBiAw K L EYAVAl01 9WL E PEA60E➢ p YLY mY QOID6 6 pNN$ YBLry e v m m�o �WOLn E raEn ro ®.EFL NAf xEAS PIA sM4x Harr. S M S=i, INm E AL lNS MY. ImR I2FA 1HW GW E wCH . AS YE V W9p MY. A mYl PN MWe NN YpEO A6YNIELY O1MY 8L9E iWV VY1L6 998°L" MIDe AT M ID . 6 M IESSINAM e ANUM XA19p%A. M O] rAYrSA VBL BBirx M RM AIYBW RM ANS M M "YPSY "' A �111ST� t� M SAW TUN RON USIONOW 6 M YYY SITE TOM Serr" 62MN1 BnEVOY IDE Ep 6601 IpPOp OYSA. ISO SWAY mVa®L S O6TEL M IDY1Er6M1 SLAW S BO£ AN NE FOR MPNGM 6 Seu- 10 B LLYAIfR M MRM£0 MFA M iYP Ne IE i9! TINY PIm1R NWL FE OF ewmmlT SlS m RVARE M VYa. NEA Mi VAIm VSL Mm FWR NIIO A T. YVJK SiIILOp FAIDL M O]IIMFIIX VEL PFpl1N SIIW.IN IESNATlY1 VIIX p A0OFW6 VIIN M PL.1N Mm TW.W IL M OdA AW ACO UA 11NpE£ M m11MClm vnl mmv4re Aw AcnB.A.XreO BEmEtlr xe IEVAm sP6E }: IppVAL 6 M YPn1VN2i ®F. R]WE OEYNL•0R ®iS, gLBY, Np 1FIFVMY OEM v� PTA a mEVirema�'uRwM s ° np s�Ame xm xrAmm TYPICAL PUMP AROUND SETUP PLAN VIEW COFFER DAM DETAIL PP RAP PAD 40x YIN. THICKNESS B" AT WE DF9IWFR'S DISCRETION, ALTERNATE DEWATERNG SIRUCTUPES MY WE USED AL. SEDIMENT TAYA FILTER BOK SIPAW BALE /BIT FIIREE IS HOWEVER, �CIAaEA' OF WE DEWATFRNG SIRUCNRE USED. ALL MUST EE SMD AND OPEMiE TO ALLOW Al PUMPED WATER MO BE FWTF S 10 PREVENT SEDMDHIS f1R011 ERIXWK AND YDNNG OFF S1E TEMPORARY DEWATERING STRUCTURE (SPECIAL STILLING BASIN) PROFILE VIEW EAR1H FILL TWA EIEVATNN To BE OEIERAINFD BY FNYNtF'R'R Ar TN£ a INSrAUAnmL v m IY AIFNT USE COFFERDAM DETAIL FOR SPECIFIC LONSTRICTIDN REQUIREMENTS OF TEMPORARY COFFERDAM GNPERVIIMS DIKU TEMPORARY COFFER DAM PROFILE VIEW APHROPMAIE SDI RP RAP PAD YIN. WIOtNFSS C Stone Check dam x. ror y1F LT 1pOpL2��p��L��Y��EOI YWYY NfA M Y"6 wIYXMIm°Ons ILMII N -v0 6 arm6+®B m E Tn® IPA. . ;S:or: Ia TEMPORARY SPLASH PAD DETAIL PLAN VIEW t9 ,.. N SSAY6. NL A m FMYEi VE xL NNam ae1E uO°rNe'°en1e� um.uL EROSION CONTROL NOTES: 1. SOIL STABILIZATION SHALL BE ACHIEVED ON ANY AREA OF A SITE WHERE LAND - DISTURBING ACTIVITIES HAVE TEMPORARILY OR PERMANENTLY CEASED ACCORDING TO THE FOLLOWING SCHEDULE: O. ALL PERIMETER DIKES, SWALES, DITCHES, PERIMETER SLOPES AND ALL SLOPES GREATER THAN 3 HORIZONTAL TO 1 VERTICAL (3:1) SHALL BE PROVIDED TEMPORARY OR PERMANENT STABILIZATION WITH GROUND COVER AS SOON AS PRACTICAL BUT IN ANY EVENT WITHIN 7 CALENDAR DAYS FROM THE LAST LAND - DISTURBING ACTIVITY. b. ALL OTHER DISTURBED AREAS SHALL BE PROVIDED TEMPORARY OR PERMANENT STABILZATION WITH GROUND COVER AS SOON AS PRACTICAL BUT IN ANY EVENT WITHIN 14 CALENDAR DAYS FROM THE LAST LAND- DISTURBING ACTIVITY. 2. SEEDING OF AREAS GRADED SHALL BE IN ACCORDANCE WITH NORTH CAROLINA EROSION AND SEDIMENT CONTROL DESIGN MANUAL. 3. REPRESENTATIVES OF THE NC DENR OR THE TOWN OF STAWNGS ENGINEERING DEPARTMENT MAY REVIEW AND EVALUATE THE METHODS USED AND THE OVERALL EFFECTIVENESS OF THE EROSION CONTROL PROGRAM. THE APPROVED EROSION AND SEDIMENT CONTROL PLAN MAY BE AMENDED BY THE APPROVING AUTHORITY IF AN ON SITE INSPECTION INDICATED THAT THE APPROVED CONTROL MEASURES ARE NOT EFFECTIVE IN CONTROLLING EROSION AND SEDIMENTATION OR IF BECAUSE OF CHANGED CIRCUMSTANCES THE APPROVED PLAN CANNOT BE CARRIED OUT. 4. CONTRACTOR SHALL LOCATE AND VERIFY THE LOCATION OF ALL UTILITIES PRIOR TO BEGINNING CONSTRUCTION. 5. THE CONTRACTOR SHALL NOTIFY NORTH CAROLINA ONE CALL CENTER (811) OR 1 -800- 632 -4949 BEFORE BEGINNING ANY EXCAVATION OR UTILITY WORK. CONTACT UNION COUNTY FOR LOCATING EXISTING WATER AND SEWER LINES. 6. EROSION AND SEDIMENT CONTROL PRACTICES SHALL BE MAINTAINED, SO THAT SEDIMENT CARRYING RUNOFF FROM THE SITE WILL NOT ENTER STORM DRAINAGE FACILITIES. 7. PROPERTIES AND RIGHT -OF -WAY ADJOINING THE SITE SHALL BE KEPT CLEAN OF MUD OR SILT CARRIED FROM THE SITE BY VEHICULAR TRAFFIC OR RUNOFF. 8. ALL CONSTRUCTION TRAFFIC SHALL ENTER AND EXIT THE SITE VIA THE CONSTRUCTION ENTRANCES. 9. EXCAVATED MATERIAL FROM TRENCHES SHALL BE PLACED ON THE UPGRADE SIDE OF THE TRENCH TO ALLOW MATERIAL TO ERODE INTO THE TRENCH. CONSTRUCTION MAINTENANCE AND REMOVAL OF ALL EROSION CONTROL DEVICES ARE THE RESPONSIBILITY OF GRADING CONTRACTOR UNLESS OTHERWISE NOTED. 10. ON -SITE BURIAL PITS REQUIRE AN ON -SITE DEMOLITION LANDFILL PERMIT FROM THE ZONING ADMINISTRATOR. 11. ANY GRADING BEYOND THE DENUDED LIMITS SHOWN ON THE PLAN IS IN VIOLATION OF THE CITY /COUNTY EROSION CONTROL ORDINANCE AND IS SUBJECT TO A FINE. 12. GRADING MORE THAN ONE ACRE WITHOUT AN APPROVED EROSION CONTROL PLAN IS A VIOLATION OF THE DENR EROSION CONTROL ORDINANCE AND IS SUBJECT TO A FINE. 13. ADDITIONAL MEASURES TO CONTROL EROSION AND SEDIMENT MAY BE REQUIRED BY A REPRESENTATIVE OF THE TOWN OF STAWNGS OR NC DENR ENGINEERING DEPARTMENT.. 14. SLOPES SHALL BE GRADED NO STEEPER THAN 2:1. FILL SLOPES GREATER THAN 10' REQUIRE ADEQUATE TERRACING. 15. A GRADING PLAN MUST BE SUBMITTED FOR ANY LOT GRADING EXCEEDING ONE ACRE THAT WAS NOT PREVIOUSLY APPROVED. 16. TEMPORARY DRIVEWAY PERMIT FOR CONSTRUCTION ENTRANCES IN NCDOT RIGHT OF WAY MUST BE PRESENTED AT PRE - CONSTRUCTION MEETING. 17. THE APPROXIMATE AREA OF THE LIMITS OF CLEARING, GRADING, AND CONSTRUCTION IS 17.45 ACRES. SIDE VIEW STANDARD TEMPORARY SILT FENCE NON -WOVEN GEOTEXILE FILTER CLOTH FABRIC 4' ABOVE SOURCE WATER. KEY /ANCHOR MATERIAL TO TOE OF SLOPE. EMBANKMENT MATTING DETAIL SEEDING SCH Shoulders, Side Ditches. Slopes (Max 3:1) am TIM 17ANm im AND is - New I T40 Aeealee a2B So/am NW 1 -101 Ta Bear 300 bE(kaN AMmt Re W NW/e" Mer 1 -. Apr is TW /`ells no NW/wam Apr 16 - Am 30 Ndw Om1mm MawXFaesTea 26 be/ON Jul i -AN is TW ►Dale eta 190 Maas .MGra,d,p eavt as 6VIme OWN M*mw -*A m '111' 30 00/a Slopes (3:1 to 2:1) Merl -401 sakes LUISNIM (emsMQ 10 IW/MM OIr 1 - Apr 114 AM Fes Feeaa 100 DNyaN GJr 1 - An 30) Or AM To - - LuEepme 10 Niq/am QAr i - Jm 30 Or Add eared Oemmm BW"Nk a 96 10/aaN Am 1 - M 1 onm Hear WW 120 6%Am Sweeny iq MNet a No/am auras slaaryerd�n -omlm '111, 30 In/ave sp 1 Mr 1 ad 111111D Feerr 1220 W/� Qkw 1 - Mer 1) AAA AMmA The 25 !A/awN ONmK aaallWlm IS 10 r Sd Oxwerwdkw aerdoe 1s M di@§ adarWANN aaNXae. War aMaWM fr WWASm Of dWAded OUL TM dM VIP Wm LNM M USING Wlarb dew EWr Ind oondit l aswr emOV mle eaNkaam as pamLk. Owbmpway - wmmd aeerdYp to WII aemm far daaM pemLaMi w0rlaIS Do mt aim a pa ap cover 7o Tae ever 12' k height erka erMlS. GOWTAM fmar my, he elWee SILL SEEDBED PREPARATION 1.) CHISEL COMPAC7E111 AREAS AND SPREAD TOPSOIL 3 NOES DEEP OVER AWMISE SOL OMMONS, F ATAMML 2.) RP THE ENTIRE AREA TO 6 MOM OWK 3.) REMOVE ALL LOBE ROCK. R00784 AND OMM OBSIRIICIIOIIS LEJWMID SURFACE RFJISOMMY SM007H MD IMMFOMd. 4.) APPLY AGRNXLTUIRAL UW. AND 9UPEAPN08PtM1E UNFONMY AND MIX Wlill SOLFlL 5.) CONTINUE 7LlAGE UNTIL, A WELL- PLMM3111 ED, FIRM REASONABLY LNNFORN SEEDBED IS PREPARED 4 TO OD OM DEER. 6•) SEED ON A FIMLY PREPARED SEEDBED AND COVER SEED LO MY WITH SEIMING EiQUIPAENT OR CULTPACK AFTER SU Ma 7.) WACH NWVA7ELY AFTER SEEDIN MWANCHOR MI OL L) W94 LT ALL SO= AREAS AND MAKE NECESSARYREPARS OR RESEmM10S WINK 74 PLANING SEASON, F POSSISLE.F Sr" SHOULD RE OYES MOM DAMAGED, REESTABOJSHFOLtGMMNi ORIGINAL I.W. FER11UM AND SIMI G RA7EL 9.) CONSULT OONVERSATON INSPECTOR ON MAMt1OGM_CETREA7MENT AiD EE nLMIGION AF7F.R PERMANENT ONO G EffMOUSIM N APPLY. AORIOIL7URN. LMESMM - 2 IONS/ ACRES (3 IONS/ ACRE IN CLAY SOLE) FERTLM - 1.000 be. / ACE -10 -10-10 SUPERPHOSPHATE- 500 WD. / AM -20M ANALYSIS MUM 2 7ONS / ACRE - SMALL GRAIN S7Rt6M AN07FER - ASPH&T BOA" O 300 GARS./ ACRE GENERAL CONSTRUCTION SEQUENCE 1. ObtaN land dkbMft Pa..11t 2. bataM Gravel 000nblrodon �rllraloe(e), diversion dl6olae, an farloee, eedNlerlt bash and/or ether meld ave as alawn on Ale approved plan and aq speotd earl No noted In 'Etter of App le ral.' 3. Cd 704 - 963 -IM for oneb I It 111, by the �l and erA 1, OOldra' of ee, 4. � alaarbgB griAMM and Grading. MaNtatl rrwaaares as 5. Inaw tM abanwaft OOMa0G0r1 eyebm cad III al , k" wMh an fenaR brawl 610ere, ee Lment _rape or athr p approved me0eaee 08 elawn On Bar lea. S. Graded dwas and fw as to be planted or prwlded wM prate An dewver suf6drd to III, ero '. ~ 30 Lea ldrq days after the aoTrlpi IN,n of mW phone of gra�g AM arson uapn efiidl no f Eller land dNwbkq ootN6pr wig Dove wiULil 30 worMnG dqa or paMdad eAtlf III al SIR, 7. A@ l anetra n I� pepngnre 1111011W I, qmm Sners, gravel S. When conebuctlan offn I III UYneN uy tlEet�iMendaandrlaardyatl�ortae and L�arodon ad for I N 9 MA teUan�ae Eq�i d an�OaMd}ee�0.6TPEaat, or NP rap y in p at i IE 1MMe�appratma, 5le Para tr�artoe bond, EROSION CONTROL EROSION CONTROL EROSION CONTROL KEY /ANCHOR MATERIAL AT MEASURES MEASURES TYPE TOP OF SLOPE. C99 �•--- 12- MIN. (LOTS GRADING BACK TO FRONT) (LOTS ALONG CREIX OR BMWs) SPACING TYP.4 CONTRACTORS ADD QUIRED TO CONTRACTORS ENSUE GOES i ADD MEASURES TO ENSURE SILT DOES S NOT LEAVE STE. I I ELT NOT STE. I I NOT LEAVE SIM I GENERAL NOTES: 36' MIN. SPACING TYP.+ Fs I VIII SILT FENCE GRAVEL L OUTUET D- (SEE SHEET D -4) I (� -El CONTRACTOR TO I ENSURE SILT DOE NOT ENTER CREEK 1. LAY BLANKET LOOSELY AND r ` I STAKE OR STAPLE TO MAI SILT FENE L DEC LOW SI OF LOT (n I SILT FENCE L - LOW SIDE OF LOT I SILT FENCE ON LOW SIDE OF LOT DIRECT CONTACT WITH THE SOIL SILT FENCE GRAVEL OUTLET (SEE SHEET D -4 / sRUCnW ENTPANCE AT DRIVEWAY _ DO NOT STRETCH. smucnW ENTRANCE AT DRIVEWAY 2. •DIMENSIONS SHOWN ARE MINIMUM, MANUFACTURED PRODUCT MAY HAVE ADDITIONAL REQUIREMENT THAT MUTT BE MET. OVERLAP 3. SLOPE SURFACE SHALL BE FREE IN SLICE OF ROCKS, SOIL CLODS, STICKS. •.. •- .nL' ", < .� ;4 "•'; ::_:: <, Ai. GRASS. MAT/BLANKETS SHALL ^E, HAVE GOOD SOIL CONTACT. 4. THE DETAIL SHOWN IS FOR SLOPE >:3:i.;.ti,.''•( +•.F'" -'' MATING. FOR CHANNEL OR PIPE OUTFALL MATTING SPECIFICATIONS. • - - PLEASE REFER TU NCESCPOM •WWATER TABLE STANDARD A6.17 AND MANUFACTURER'S GUIDELNES. SIDE VIEW STANDARD TEMPORARY SILT FENCE NON -WOVEN GEOTEXILE FILTER CLOTH FABRIC 4' ABOVE SOURCE WATER. KEY /ANCHOR MATERIAL TO TOE OF SLOPE. EMBANKMENT MATTING DETAIL SEEDING SCH Shoulders, Side Ditches. Slopes (Max 3:1) am TIM 17ANm im AND is - New I T40 Aeealee a2B So/am NW 1 -101 Ta Bear 300 bE(kaN AMmt Re W NW/e" Mer 1 -. Apr is TW /`ells no NW/wam Apr 16 - Am 30 Ndw Om1mm MawXFaesTea 26 be/ON Jul i -AN is TW ►Dale eta 190 Maas .MGra,d,p eavt as 6VIme OWN M*mw -*A m '111' 30 00/a Slopes (3:1 to 2:1) Merl -401 sakes LUISNIM (emsMQ 10 IW/MM OIr 1 - Apr 114 AM Fes Feeaa 100 DNyaN GJr 1 - An 30) Or AM To - - LuEepme 10 Niq/am QAr i - Jm 30 Or Add eared Oemmm BW"Nk a 96 10/aaN Am 1 - M 1 onm Hear WW 120 6%Am Sweeny iq MNet a No/am auras slaaryerd�n -omlm '111, 30 In/ave sp 1 Mr 1 ad 111111D Feerr 1220 W/� Qkw 1 - Mer 1) AAA AMmA The 25 !A/awN ONmK aaallWlm IS 10 r Sd Oxwerwdkw aerdoe 1s M di@§ adarWANN aaNXae. War aMaWM fr WWASm Of dWAded OUL TM dM VIP Wm LNM M USING Wlarb dew EWr Ind oondit l aswr emOV mle eaNkaam as pamLk. Owbmpway - wmmd aeerdYp to WII aemm far daaM pemLaMi w0rlaIS Do mt aim a pa ap cover 7o Tae ever 12' k height erka erMlS. GOWTAM fmar my, he elWee SILL SEEDBED PREPARATION 1.) CHISEL COMPAC7E111 AREAS AND SPREAD TOPSOIL 3 NOES DEEP OVER AWMISE SOL OMMONS, F ATAMML 2.) RP THE ENTIRE AREA TO 6 MOM OWK 3.) REMOVE ALL LOBE ROCK. R00784 AND OMM OBSIRIICIIOIIS LEJWMID SURFACE RFJISOMMY SM007H MD IMMFOMd. 4.) APPLY AGRNXLTUIRAL UW. AND 9UPEAPN08PtM1E UNFONMY AND MIX Wlill SOLFlL 5.) CONTINUE 7LlAGE UNTIL, A WELL- PLMM3111 ED, FIRM REASONABLY LNNFORN SEEDBED IS PREPARED 4 TO OD OM DEER. 6•) SEED ON A FIMLY PREPARED SEEDBED AND COVER SEED LO MY WITH SEIMING EiQUIPAENT OR CULTPACK AFTER SU Ma 7.) WACH NWVA7ELY AFTER SEEDIN MWANCHOR MI OL L) W94 LT ALL SO= AREAS AND MAKE NECESSARYREPARS OR RESEmM10S WINK 74 PLANING SEASON, F POSSISLE.F Sr" SHOULD RE OYES MOM DAMAGED, REESTABOJSHFOLtGMMNi ORIGINAL I.W. FER11UM AND SIMI G RA7EL 9.) CONSULT OONVERSATON INSPECTOR ON MAMt1OGM_CETREA7MENT AiD EE nLMIGION AF7F.R PERMANENT ONO G EffMOUSIM N APPLY. AORIOIL7URN. LMESMM - 2 IONS/ ACRES (3 IONS/ ACRE IN CLAY SOLE) FERTLM - 1.000 be. / ACE -10 -10-10 SUPERPHOSPHATE- 500 WD. / AM -20M ANALYSIS MUM 2 7ONS / ACRE - SMALL GRAIN S7Rt6M AN07FER - ASPH&T BOA" O 300 GARS./ ACRE GENERAL CONSTRUCTION SEQUENCE 1. ObtaN land dkbMft Pa..11t 2. bataM Gravel 000nblrodon �rllraloe(e), diversion dl6olae, an farloee, eedNlerlt bash and/or ether meld ave as alawn on Ale approved plan and aq speotd earl No noted In 'Etter of App le ral.' 3. Cd 704 - 963 -IM for oneb I It 111, by the �l and erA 1, OOldra' of ee, 4. � alaarbgB griAMM and Grading. MaNtatl rrwaaares as 5. Inaw tM abanwaft OOMa0G0r1 eyebm cad III al , k" wMh an fenaR brawl 610ere, ee Lment _rape or athr p approved me0eaee 08 elawn On Bar lea. S. Graded dwas and fw as to be planted or prwlded wM prate An dewver suf6drd to III, ero '. ~ 30 Lea ldrq days after the aoTrlpi IN,n of mW phone of gra�g AM arson uapn efiidl no f Eller land dNwbkq ootN6pr wig Dove wiULil 30 worMnG dqa or paMdad eAtlf III al SIR, 7. A@ l anetra n I� pepngnre 1111011W I, qmm Sners, gravel S. When conebuctlan offn I III UYneN uy tlEet�iMendaandrlaardyatl�ortae and L�arodon ad for I N 9 MA teUan�ae Eq�i d an�OaMd}ee�0.6TPEaat, or NP rap y in p at i IE 1MMe�appratma, 5le Para tr�artoe bond, EROSION CONTROL EROSION CONTROL EROSION CONTROL MEASURES MEASURES MEASURES TYPE C99 (LOTS GRADING FRONT TO BACK) (LOTS GRADING BACK TO FRONT) (LOTS ALONG CREIX OR BMWs) CONTRACTORS ADD QUIRED TO CONTRACTORS ENSUE GOES i ADD MEASURES TO ENSURE SILT DOES S NOT LEAVE STE. I I ELT NOT STE. I I NOT LEAVE SIM I 8' MINIMUM SILT FENCE RETURN I SILT FENCE GRAVEL OUTLET IN LOW POINTS (SEE SHEET D -4 jJ II Fs I VIII SILT FENCE GRAVEL L OUTUET D- (SEE SHEET D -4) I (� -El CONTRACTOR TO I ENSURE SILT DOE NOT ENTER CREEK I I I OR WETLANDS � I I I SILT FENE L DEC LOW SI OF LOT (n I SILT FENCE L - LOW SIDE OF LOT I SILT FENCE ON LOW SIDE OF LOT B' MINIMUM SILT tT9lCE RETURN SILT FENCE GRAVEL OUTLET (SEE SHEET D -4 8• MINIMUM SILT PENCE RETURN sRUCnW ENTPANCE AT DRIVEWAY _ aNSmucnaN ENTRANCE AT DRIVEWAY 1111111 smucnW ENTRANCE AT DRIVEWAY FINAL DRAWING - NOT RELEASED FOR CONSTRUCTION In w�S ° CIO z coy, PH VJ 1� � V .A1TII LEFBP C R _ L " 3574. ' A''rrEnnuTOAA b 9 S Pj 00 8 w t2 �T 6 3 S w a g z a f In 2 N 2 = y o z o f2 Y ss o xo c o rri� �masIS IS N O O � m gi X 4 4 4 4 4 01 0 0 5 0 ®©<� ©aka L� R'r CQ GO FA N o z O >~ o xO z to WF�.1 PA HUMz rN-+ W P4 El F W O z a 14 m L) .-4 U P4 O0. O 0 U U z o C7 O W 06 p I+•1 F PROJECT No. MRH -13040 FO,ENA"T": MRH- 13040 -DT CHECKED BY: RMR DRAWN BY: CM /JL /RMR SCALE: N/A DATE: 07 -25 -2014 SHEET NO. D -6 EJ MCADAMS swea c i� to mg P-MITC UMM } 'erw 5ci N AND Nam t To TO S I...E f-£tl mil Pt.05T1Q €1NING WKM AMI,g sec `N` f0.5TENE� ARQUND EtmnE P�EXM.ETE"r?' Tva sTAt 31t1T t�5CY.[ i Concrete Waste Management KNIR -$ IN wow fluw NS 4 S. @iI NO D.,..... o E C ( .. Asa efun A k' vFaTS VAM sTAUS WWI, ww BAG D 0 O 0 ml P T§ C c T* 7 1 NIX as tK At 1Q ma ftA o uilw -t ?471 fiQ SCN.£ :.._ BEfb+ NOt Ta %CA1.E tYFE 'BEtDW awr TYPE *AM Qwr am XMI WIN WOOD PWIXS L xc T t. PM t WY QETcANINEG IN TN€ €IELO, SRAM SE I&MIM 5d m. C' rde z Tw WNCAM W�US iM (SEE PA a} lfiIIiNAvw MCAM IM&I"T & IRSIAU£4 1Kf(iR1 9Q m PF IN TE A4W CACIM. w paa sa SPILL PREVENTION CONTROL AND CLEANUP: 1. IF A SPILL OCCURS, DEMOBILIZE AT AS SOON AS POSSIBLE. 2. IF THERE IS A CHANCE THAT THE SPILL COULD ENTER A STORM DRAIN OR SEWER, PLUG INLET AND TURN OFF OR DIVERT ANY INCOMING WATER. 3. COVER THE SPILL WITH ABSORBENT MATERIAL SUCH AS KITTY LITTER OR SAWDUST. DO NOT USE STRAW. DISPOSE OF THE USED ABSORBENT PER MANUFACTURER'S INSTRUCTIONS. IF THE SPILL IS FLAMMABLE, DISPOSE OF AS DIRECTED BY THE LOCAL FIRE MARSHAL.. 4. KEEP THE AREA WELL VENILATED. 5. MINOR SPILLS - MINOR SPILLS TYPICALLY INVOLVE SMALL QUANTITIES OF OIL, GASOLINE, PAINT, ETC., WHICH CAN BE CONTROLLED BY THE FIRST RESPONDER. AT THE DISCOVERY OF THE SPILL. USE ABSORBENT MATERIALS ON SMALL SPILLS RATHER THAN HOSING OR BURNING THE SPILL. 6. SEMI - SIGNIFICANT SPILLS - SEMI - SIGNIFICANT SPILLS CAN STILL BE CONTROLLED BY THE FIRST RESPONDER ALONG NTH AID OF OTHER PERSONAL SUCH AS LABORERS AND THE FOREMAN. THIS RESPONSE MAY REQUIRE THE CESSATION OF ALL OTHER ACTIVITIES. 7. SIGNIFICANT/HAZARDOUS SPILLS - FOR SIGNIFICANT OR HAZARDOUS SPILLS THAT CANNOT BE CONTROLLED BY PERSONNEL IN THE IMMEDIATE VINCIITY, THE SERVICES OF A SPILLS CONTRACTORS OR A HAZ -MAT TEAM SHOULD BE OBTAINED IMMEDIATELY, CONSTRUCTION PERSONNEL SHOULD NOT ATTEMPT TO CLEAN UP THE SPILL UNTIL APPROPRIATE AND QUALIFIED STAFF AS ARRIVED AT THE JOB SITE. 8. SPILLS SHOULD NOT BE BURIED OR WASHED WITH WATER. 9. USED CLEAN UP MATERIAL, CONTAMINATED MATERIALS, AND RECOVERED SPILL MATERIAL THAT ARE NO LONGER SUITABLE FOR THE INTENDED PURPOSE SHOULD BE STORED AND DISPOSED OF PROPERLY. 10. WATER USED FOR CLEANING AND DECONTAMINATION SHOULD NOT BE ALLOWED TO ENTER STORM DRAINS OR WATERCOURSES AND SHOULD BE COLLECTED AND DISPOSED OF AS DESCRIBED IN LIQUID WASTE MANAGEMENT. 11. PROPER STORAGE, CLEANUP AND SPILL REPORTING INSTRUCTIONS FOR HAZARDOUS MATERIALS STORED OR USED ON THE PROJECT SITE SHOULD BE POSTED AT ALL TIMES IN AN OPEN, CONSPICUOUS AND ACCESSIBLE LOCATION. 12. WASTE STORAGE AREAS SHOULD BE KEPT CLEAN, WELL ORGANIZED AND EQUIPPED WITH AMPLE CLEANUP SUPPLIES AS APPROPRIATE FOR THE MATERIALS BEING STORED. PERIMETER CONTROLS, CONTAINMENT STRUCTURES, COVERS AND LINERS SHOULD BE REPAIRED OR REPLACED AS NEEDED TO MAINTAIN PROPER FUNCTION. 13. CALL SPILL PREVENTION/HAZARDOUS SPILL CONTACT AT 1- 888 -481 -0125. CONCRETE WASTE MANAGEMENT: 1. PCC AND AS WASTE SHOULD NOT BE ALLOWED TO ENTER STORM DRAINS OR WATERCOURSES. 2. PCC AND AC SLURRY OR HARDENED WASTES SHOULD BE COLLECTED AND PROPERLY DISPOSED OF OUTSIDE THE HIGHWAY RIGHT -OF -WAY IN CONFORMANCE WITH STANDARD SPECIFICATIONS OR PLACED IN A TEMPORARY CONCRETE WASHOUT FACILITY. 3. INSTALL A SIGN ADJACENT TO EACH TEMPORARY CONCRETE WASHOUT FACILITY TO INFORM CONCRETE EQUIPMENT OPERATORS TO UTILIZE THE PROPER FACILITIES. 4. A FOREMAN AND /OR CONSTRUCTION SUPERVISOR SHOULD MONITOR ONSITE CONCRETE WORKING TASKS, SUCH AS SAW CUTTING, CORING, AND GROOVING TO ENSURE PROPER METHODS ARE IMPLEMENTED. 5. DO NOT ALLOW SAW -CUT PCC SLURRY TO ENTER STORM DRAINS OR WATERCOURSES. RESIDUE FROM GRINDING OPERATIONS SHOULD BE PICKED UP BY MEANS OF A VACUUM ATTACHMENT TO THE GRINDING MACHINE. SAW CUTTING RESIDUE SHOULD NOT BE ALLOWED TO FLOW ACROSS THE PAVEMENT, AND SHOULD NOT BE LEFT ON THE SURFACE OF THE PAVEMENT. 6. VACUUM SLURRY RESIDUE AND DISPOSE IN A TEMPORARY FACILITY AND ALLOW SLURRY TO DRY. DISPOSE OF DRY SLURRY RESIDUE IN ACCORDANCE WITH SOLID WASTE MANAGEMENT. 7. COLLECT AND DISPOSE OF RESIDUE FROM GROOVING AND GRINDING OPERATIONS IN ACCORDANCE WITH SOLID WASTE MANAGEMENT. 8. TEMPORARY CONCRETE WASHOUT FACILITIES SHOULD BE LOCATED A MINIMUM OF 50 FEET FROM STORM DRAIN INLETS, OPEN DRAINAGE FACILITIES, AND WATERCOURSES, UNLESS DETERMINED INFEASIBLE BY THE ENGINEER OR CRM. EACH FACILITY SHOULD BE LOCATED AWAY FROM CONSTRUCTION TRAFFIC OR ACCESS AREAS TO PREVENT DISTURBANCE OR TRACKING. 9. TEMPORARY CONCRETE WASHOUT FACILITIES SHOULD BE CONSTRUCTED ABOVE GRADE OR BELOW GRADE AT THE OPTION OF THE CONTRACTOR. TEMPORARY CONCRETE WASHOUT FACILITIES SHOULD BE CONSTRUCTED AND MAINTAINED IN SUFFICIENT QUANTITY AND SIZE TO CONTAIN ALL LIQUID AND CONCRETE WASTE GENERATED BY WASHOUT OPERATIONS. 10. TEMPORARY WASHOUT FACILITIES SHOULD HAVE A TEMPORARY PIT OR BERMED AREAS OF SUFFICIENT VOLUME TO COMPLETELY CONTAIN ALL LIQUID AND WASTE CONCRETE MATERIALS GENERATED DURING WASHOUT PROCEDURES. 11. PERFORM WASHOUT OF CONCRETE MIXER TRUCKS IN DESIGNATED AREAS ONLY. WASHOUT MAY BE COLLECTED IN AN IMPERMEABLE BAG FOR DISPOSAL. SEE ALSO CONCRETE TRUCK WASHOUT. 12. ONCE CONCRETE WASTE ARE WASHED INTO THE DESIGNATED AREA AND ALLOWED TO HARDEN, THE CONCRETE SHOULD BE BROKEN UP, REMOVED, AND DISPOSED OF PER SOLID WASTE MANAGEMENT.. FINAL DRAWING - NOT RELEASED FOR CONSTRUCTION N U Q 00 00 z �u A V „�t�unT �fq o N R L 0357 M. RE ''�fnnuN�d z i wz a o a O_ m w b o ® ®4 ©® ®® i` Qi CV CQ D N MCO�.1x to z 0 U Wx x E-i E E4Umz I.-Ix WW E E W � O E z 'a to U a O U z o a° 0 � w o � A PROJECT NO: MRH -13040 F11E"A" : MRH- 13040 -DT CHECKED BY: RMR DRAWN BY: CM /JL /RMR SCALE: N/A DATE: 07 -25 -2014 SHEET NO. D -7 1111 MCADAMS . _ ❑ ❑ k05TAKEG v v H w w SPILL PREVENTION CONTROL AND CLEANUP: 1. IF A SPILL OCCURS, DEMOBILIZE AT AS SOON AS POSSIBLE. 2. IF THERE IS A CHANCE THAT THE SPILL COULD ENTER A STORM DRAIN OR SEWER, PLUG INLET AND TURN OFF OR DIVERT ANY INCOMING WATER. 3. COVER THE SPILL WITH ABSORBENT MATERIAL SUCH AS KITTY LITTER OR SAWDUST. DO NOT USE STRAW. DISPOSE OF THE USED ABSORBENT PER MANUFACTURER'S INSTRUCTIONS. IF THE SPILL IS FLAMMABLE, DISPOSE OF AS DIRECTED BY THE LOCAL FIRE MARSHAL.. 4. KEEP THE AREA WELL VENILATED. 5. MINOR SPILLS - MINOR SPILLS TYPICALLY INVOLVE SMALL QUANTITIES OF OIL, GASOLINE, PAINT, ETC., WHICH CAN BE CONTROLLED BY THE FIRST RESPONDER. AT THE DISCOVERY OF THE SPILL. USE ABSORBENT MATERIALS ON SMALL SPILLS RATHER THAN HOSING OR BURNING THE SPILL. 6. SEMI - SIGNIFICANT SPILLS - SEMI - SIGNIFICANT SPILLS CAN STILL BE CONTROLLED BY THE FIRST RESPONDER ALONG NTH AID OF OTHER PERSONAL SUCH AS LABORERS AND THE FOREMAN. THIS RESPONSE MAY REQUIRE THE CESSATION OF ALL OTHER ACTIVITIES. 7. SIGNIFICANT/HAZARDOUS SPILLS - FOR SIGNIFICANT OR HAZARDOUS SPILLS THAT CANNOT BE CONTROLLED BY PERSONNEL IN THE IMMEDIATE VINCIITY, THE SERVICES OF A SPILLS CONTRACTORS OR A HAZ -MAT TEAM SHOULD BE OBTAINED IMMEDIATELY, CONSTRUCTION PERSONNEL SHOULD NOT ATTEMPT TO CLEAN UP THE SPILL UNTIL APPROPRIATE AND QUALIFIED STAFF AS ARRIVED AT THE JOB SITE. 8. SPILLS SHOULD NOT BE BURIED OR WASHED WITH WATER. 9. USED CLEAN UP MATERIAL, CONTAMINATED MATERIALS, AND RECOVERED SPILL MATERIAL THAT ARE NO LONGER SUITABLE FOR THE INTENDED PURPOSE SHOULD BE STORED AND DISPOSED OF PROPERLY. 10. WATER USED FOR CLEANING AND DECONTAMINATION SHOULD NOT BE ALLOWED TO ENTER STORM DRAINS OR WATERCOURSES AND SHOULD BE COLLECTED AND DISPOSED OF AS DESCRIBED IN LIQUID WASTE MANAGEMENT. 11. PROPER STORAGE, CLEANUP AND SPILL REPORTING INSTRUCTIONS FOR HAZARDOUS MATERIALS STORED OR USED ON THE PROJECT SITE SHOULD BE POSTED AT ALL TIMES IN AN OPEN, CONSPICUOUS AND ACCESSIBLE LOCATION. 12. WASTE STORAGE AREAS SHOULD BE KEPT CLEAN, WELL ORGANIZED AND EQUIPPED WITH AMPLE CLEANUP SUPPLIES AS APPROPRIATE FOR THE MATERIALS BEING STORED. PERIMETER CONTROLS, CONTAINMENT STRUCTURES, COVERS AND LINERS SHOULD BE REPAIRED OR REPLACED AS NEEDED TO MAINTAIN PROPER FUNCTION. 13. CALL SPILL PREVENTION/HAZARDOUS SPILL CONTACT AT 1- 888 -481 -0125. CONCRETE WASTE MANAGEMENT: 1. PCC AND AS WASTE SHOULD NOT BE ALLOWED TO ENTER STORM DRAINS OR WATERCOURSES. 2. PCC AND AC SLURRY OR HARDENED WASTES SHOULD BE COLLECTED AND PROPERLY DISPOSED OF OUTSIDE THE HIGHWAY RIGHT -OF -WAY IN CONFORMANCE WITH STANDARD SPECIFICATIONS OR PLACED IN A TEMPORARY CONCRETE WASHOUT FACILITY. 3. INSTALL A SIGN ADJACENT TO EACH TEMPORARY CONCRETE WASHOUT FACILITY TO INFORM CONCRETE EQUIPMENT OPERATORS TO UTILIZE THE PROPER FACILITIES. 4. A FOREMAN AND /OR CONSTRUCTION SUPERVISOR SHOULD MONITOR ONSITE CONCRETE WORKING TASKS, SUCH AS SAW CUTTING, CORING, AND GROOVING TO ENSURE PROPER METHODS ARE IMPLEMENTED. 5. DO NOT ALLOW SAW -CUT PCC SLURRY TO ENTER STORM DRAINS OR WATERCOURSES. RESIDUE FROM GRINDING OPERATIONS SHOULD BE PICKED UP BY MEANS OF A VACUUM ATTACHMENT TO THE GRINDING MACHINE. SAW CUTTING RESIDUE SHOULD NOT BE ALLOWED TO FLOW ACROSS THE PAVEMENT, AND SHOULD NOT BE LEFT ON THE SURFACE OF THE PAVEMENT. 6. VACUUM SLURRY RESIDUE AND DISPOSE IN A TEMPORARY FACILITY AND ALLOW SLURRY TO DRY. DISPOSE OF DRY SLURRY RESIDUE IN ACCORDANCE WITH SOLID WASTE MANAGEMENT. 7. COLLECT AND DISPOSE OF RESIDUE FROM GROOVING AND GRINDING OPERATIONS IN ACCORDANCE WITH SOLID WASTE MANAGEMENT. 8. TEMPORARY CONCRETE WASHOUT FACILITIES SHOULD BE LOCATED A MINIMUM OF 50 FEET FROM STORM DRAIN INLETS, OPEN DRAINAGE FACILITIES, AND WATERCOURSES, UNLESS DETERMINED INFEASIBLE BY THE ENGINEER OR CRM. EACH FACILITY SHOULD BE LOCATED AWAY FROM CONSTRUCTION TRAFFIC OR ACCESS AREAS TO PREVENT DISTURBANCE OR TRACKING. 9. TEMPORARY CONCRETE WASHOUT FACILITIES SHOULD BE CONSTRUCTED ABOVE GRADE OR BELOW GRADE AT THE OPTION OF THE CONTRACTOR. TEMPORARY CONCRETE WASHOUT FACILITIES SHOULD BE CONSTRUCTED AND MAINTAINED IN SUFFICIENT QUANTITY AND SIZE TO CONTAIN ALL LIQUID AND CONCRETE WASTE GENERATED BY WASHOUT OPERATIONS. 10. TEMPORARY WASHOUT FACILITIES SHOULD HAVE A TEMPORARY PIT OR BERMED AREAS OF SUFFICIENT VOLUME TO COMPLETELY CONTAIN ALL LIQUID AND WASTE CONCRETE MATERIALS GENERATED DURING WASHOUT PROCEDURES. 11. PERFORM WASHOUT OF CONCRETE MIXER TRUCKS IN DESIGNATED AREAS ONLY. WASHOUT MAY BE COLLECTED IN AN IMPERMEABLE BAG FOR DISPOSAL. SEE ALSO CONCRETE TRUCK WASHOUT. 12. ONCE CONCRETE WASTE ARE WASHED INTO THE DESIGNATED AREA AND ALLOWED TO HARDEN, THE CONCRETE SHOULD BE BROKEN UP, REMOVED, AND DISPOSED OF PER SOLID WASTE MANAGEMENT.. FINAL DRAWING - NOT RELEASED FOR CONSTRUCTION N U Q 00 00 z �u A V „�t�unT �fq o N R L 0357 M. RE ''�fnnuN�d z i wz a o a O_ m w b o ® ®4 ©® ®® i` Qi CV CQ D N MCO�.1x to z 0 U Wx x E-i E E4Umz I.-Ix WW E E W � O E z 'a to U a O U z o a° 0 � w o � A PROJECT NO: MRH -13040 F11E"A" : MRH- 13040 -DT CHECKED BY: RMR DRAWN BY: CM /JL /RMR SCALE: N/A DATE: 07 -25 -2014 SHEET NO. D -7 1111 MCADAMS