HomeMy WebLinkAboutNCC203816_NOT Closeout Documents_20230328FINAL INSPECTION REPORT
Town of Huntersville - Land Development
105 Gilead Rd, Ste 300, Huntersville INC 28078
(704)-875-7007
Termination of coverage under the NPDES General Stormwater Permit for Construction Activities (NCG01) should be requested by the
permittee via a Notice of Termination. Please note that this correspondence must be uploaded as part of completing the Notice of
Termination Process.
NCG01 COC #
NCC203816
Project Name
The Park -MOB; Huntersville Business Park (409387)
Financially Responsible Owner (FRO)
LPSD Properties, LLC
FRO Address
1072 X Ray Dr. Gastonia, NC 28054
Project Location
13539 Reese Bv. West Huntersville, NC 29078
River Basin / Watershed
McDowell
EC Final Inspection Date
10/18/2022
Start Time
1 8:45 AM
I Time
9:15 AM
Inspector Name
Anne Loftin
Others Present
Robert Hayes-Bolten Menk
Weather Conditions
Sunny
Soil Conditions
Workable
Onsite Contact Made
Yes
Name
Robert Hayes
Title/Company
Bolten Menk
Report Sent
Yes
See dispatch list at bottom of report
Erosion/Sediment measures removed?
Yes
Site Permanently Stabilized?
Yes
Comment
BMP's Installed Per Approved Plan?
Yes
As -Built BMP Project #
as -built approved 3/6/23 434409
FINAL INSPECTION COMMENTS
Final Inspection report written after as -built approval (3/20/23).Project is completed, stable and the erosion measures removed.
Ongoing maintenance will be important to ensure the BMP bonds are released at the end of the two-year maintenance period (as noted
in the final inspection photo document). This project has 1 Underground Detention BMP. Owner given the Declaration document and
maintenance bond approved.
DISPATCH
FRO pbutala@ppsd.com; Mark Peterson <mpeterson@medicalmanagement.com> has requested to be on compliance
correspondence; clarkrowe@delcompany.com; dale@delcompany.com (site contractors); Jake Bachman
<Jacob.Bachman@bolton-menk.com>;
1of1
Report Date: 3/20/2023