Loading...
HomeMy WebLinkAboutNCC203816_NOT Closeout Documents_20230328FINAL INSPECTION REPORT Town of Huntersville - Land Development 105 Gilead Rd, Ste 300, Huntersville INC 28078 (704)-875-7007 Termination of coverage under the NPDES General Stormwater Permit for Construction Activities (NCG01) should be requested by the permittee via a Notice of Termination. Please note that this correspondence must be uploaded as part of completing the Notice of Termination Process. NCG01 COC # NCC203816 Project Name The Park -MOB; Huntersville Business Park (409387) Financially Responsible Owner (FRO) LPSD Properties, LLC FRO Address 1072 X Ray Dr. Gastonia, NC 28054 Project Location 13539 Reese Bv. West Huntersville, NC 29078 River Basin / Watershed McDowell EC Final Inspection Date 10/18/2022 Start Time 1 8:45 AM I Time 9:15 AM Inspector Name Anne Loftin Others Present Robert Hayes-Bolten Menk Weather Conditions Sunny Soil Conditions Workable Onsite Contact Made Yes Name Robert Hayes Title/Company Bolten Menk Report Sent Yes See dispatch list at bottom of report Erosion/Sediment measures removed? Yes Site Permanently Stabilized? Yes Comment BMP's Installed Per Approved Plan? Yes As -Built BMP Project # as -built approved 3/6/23 434409 FINAL INSPECTION COMMENTS Final Inspection report written after as -built approval (3/20/23).Project is completed, stable and the erosion measures removed. Ongoing maintenance will be important to ensure the BMP bonds are released at the end of the two-year maintenance period (as noted in the final inspection photo document). This project has 1 Underground Detention BMP. Owner given the Declaration document and maintenance bond approved. DISPATCH FRO pbutala@ppsd.com; Mark Peterson <mpeterson@medicalmanagement.com> has requested to be on compliance correspondence; clarkrowe@delcompany.com; dale@delcompany.com (site contractors); Jake Bachman <Jacob.Bachman@bolton-menk.com>; 1of1 Report Date: 3/20/2023