NORTH CAROLINA
ErrOM"fh#rrrdf Quairry
North Carolina Division of Water Resources
Transportation Permitting Unit
In -Field Minor 401 Water Quality Certification, Buffer Certification and Isolated Water Permit
Modification
Project Name/ TIP Project No: Havelock By-pass/ R-1015 Date: 3/31/2023
DOT Division: 2 County: Craven DWR Project No. / Permit Type: 20181598 v.11
DOT Staff:
ACE Staff:
Modification E
Brad McMannen
DWR Staff: Garcv Ward
DWR Regional Office: Washington
Rip -rap plating is proposed for the slope at Sites 11 and 12 to control the continual sloughing and erosion issues. As a result, at
Permit Site 11, 0.0306 ac of mechanized clearing is now proposed as fill and at Permit Site 12 0.1491 ac of mechanized
clearing is now proposed as fill resulting in no net change in permanent impacts at these sites. No additional clearing is needed
for this work. See attached revised permit drawing Sheet 53 as well as updated impact summary Sheets 165 and 167.
Additionally, due to a revised design on the interchange bridge and the associated retaining wall at Permit Site 3, there is
decrease of 0.002 ac of mechanized clearing and a decrease of 0.0372 ac of fill. The change is virtually undetectable on plans
therefore the permit drawing has not been revised, however the impact summary sheets now reflect these revisions.
Modification Sketch:
See attached drawings
e-�jQE North Carolina Department of Environmental Quality I Division of Water Resources
512 North Salisbury Street 11617 Mail Service Center I Raleigh, North Carolina 27699-1617
919.707.9000
In -Field Modification
Page 2 of 3
This in -field modification is required for the following reason(s):
The information contained in the application or presented in support thereof is incorrect in the
following manner:
x Conditions under which the original certification was issued have changed in the following manner:
The slopes at Site 11 and 12 have experienced continual sloughing and erosion.
This in -field modification is valid only if issued by an authorized agent of the Division of Water Resources,
Transportation Permitting Unit'
This in -field modification authorizes the NCDOT to
to place rip -rap plating on the slopes at Site 11 and Site 12 to control sloughing and erosion
in Craven County. The project shall be constructed as described in the Modification
Description and Sketch on Page 1 of this document dated 3/31/2023 to improve/construct the
the slopes at Site 11 and Site 12. The approved design is that described in the Modification Description
and Modification Sketch on Page 1 of this document dated 3/31/2023. Any further changes to the original
Water Quality Certification dated April 3, 2019_may require a formal written modification request.
The description of the proposed action provides adequate assurance that the proposed action in the
Neuse River Basin in conjunction with the proposed development will not result in a violation of applicable
Water Quality Standards and discharge guidelines. Therefore, the State of North Carolina certifies that
this activity will not violate the applicable portions of Section 301, 302, 303, 306, 307 of PL 92-500 and PL
95-217 if conducted in accordance with the application and conditions hereinafter set forth. Should your
project change, you are required to notify the DWR and submit a new application. If the property is sold,
the new owner must be given a copy of this Certification and approval letter, and is thereby responsible
for complying with all conditions. For this approval to remain valid, you are required to comply with all the
conditions listed below. In addition, you should obtain all other federal, state, or local permits before
proceeding with your project including (but not limited to) Sediment and Erosion control, Coastal
Stormwater, Non -discharge and Water Supply watershed regulations. This Modification Approval shall
expire on the same day as the expiration date of the corresponding Corps of Engineers Permit.
Conditions(s) of Modification Approval:
1. All the authorized action activities and conditions of the certification associated with the original
Water Quality Certification dated April 3, 2019 and all other corresponding modification still apply
except where superseded by this certification.
2. Additional Conditions:
Failure to construct the proposed action as described in the Modification Description and Sketch on
North Carolina Department of Environmental Quality I Division of Water Resources
512 North Salisbury Street 11617 Mail Service Center I Raleigh, North Carolina 27699-1617
919.707.9000
In -Field Modification
Page 3 of 3
Page 1 of this document and/or violations of any condition herein set forth may result in revocation of this
modification approval and may result in criminal and/or civil penalties. This modification approval shall
become null and void unless the above conditions are made conditions of the Federal 404 and/or Coastal
Area Management Act Permit. If the Corps of Engineers requires a formal written modification to the 404
permit for the proposed action, the NC DWR must require a formal written modification to the 401 WQC,
and therefore, this in -field modification is invalid. If additional (wetland, stream, buffer) impacts for this
project (now or in the future) exceed (one tenth of one acre, 300 linear feet, or one-third of an
acre/150 linear feet, respectively), or if mitigation is required above and beyond the current mitigation
requirement for this project, this in -field modification is invalid and a formal written modification is
required.
This in -field modification is effective upon the date the last party signs this document. This in -field
modification is made upon mutual agreement between DOT and DWR as indicated by the signatures
below and is, therefore, not subject to appeal by either party. Appeals by third parties must be made
within sixty (60) days of notification pursuant to the contested case provisions of the Administrative
Procedure Act, NC Gen. Stat. §15013-23 et seq.
DWR Staff Signature: (it/a4";Ze
Date: 3/31 /23
DOT Staff Signature
Date: 3/31 /23
USACE Staff Signature:
Date:
— An authorized agent of the Transportation Permitting Unit is defined as DWR staff that are DOT -funded and
review and issue 401 Water Quality Certification for DOT projects. These staff include Central Office and Regional
Office personnel.
North Carolina Department of Environmental Quality I Division of Water Resources
f 512 North Salisbury Street 11617 Mail Service Center I Raleigh, North Carolina 27699-1617
err M rw�r�`
919.707.9000
Submitted 3/3/2023
FN_
W
5X
XI
SITE 11
SITE
VVv
t Ac��5
,174�
® DENOTES EXCAVATION DENOTES MECHANIZED DENOTES FILL IN
IN WETLAND CLEARING WETLAND
PERMIT DRAWING
SHEET 53 OF 167
0
W
N
W
W
N
O
O
b
N
N
W
Z
J
U
i
►a
so o So• lw IeG•
GR/PRIC SCALE
Submitted 3/3/2023
STEEL BEAM GUAROR
SEE ROADWAY TYPICALS FOR
GUTTER.CURB AND GUTTER
OR FIN/SHED GRADE DETAILS'"':'
rl
GEOTEXTILE FOR ROCK PLATING
EMBANKMENT
NOTES:
7CLEARANCE MIN
SHOULDER OR
BREAK POINT OF SLOPE)
N SELECT MATERIAL (ABC)
SEE GEOTEXTILE
OVERLAP DETAIL
KY MAX
SLOPE STAKE POINT AND
CONSTRUCTION LIMIT
(TOE OF SLOPE)
GROUND LINE —
/ rTHICK A
(SEE N44
I
O
PLATING DETAIL NO. 1 - TYPIC SECTION
CONSTRUCTION LIMIT
SLOPE STAKE POINT
(TOP OF SLOPE)
GEOTEXTILE FOR
ROCK PLATING (TYP)
GEOTEXTILE OVERLAP DETAIL
(PLAN VIEW)
SEE GEOTEXTILE
OVERLAP DETAIL
rTHICK RIPRAP
(SEE NOTE 3)
I. SEE ROADWAY PLANS AND SUMMARY SHEETS FOR ROCK PLATING LOCATIONS.
2. FOR ROCK PLATING.S£E SECTION 275 OF THE STANDARD SPECIFICATIONS.
3. USE CLASS 1.2 OR B RIPRAP UNLESS REQUIRED OTHERWISE IN THE ROADWAY SUMMARY SHEETS.
AR
STEEL BENDRAIL 4'-6'MIN
SEE iTYPICALS FOR
GUTT AND GUTTER
OR FINISH£ GRADE DETAILS:'
C7P,01=P�i.�2 r
I
GEOTEXTILE FOR ROCK PLATING
EMBANKMENT
z
o�
H
aQ
HO~CCU
L.LJHz
00cl)=
]�,
Y gAN MIN
lY
W Q Q LL =
SHOU pE� ��
BREAK JbMI>�fiOPROF SIAP
e�[teN1Gl YOCIC �7lAtWL�
Q U O
CLASS N SELECT MATERIAL f /
20 ff l.Lp S'lO'�JP/from tOE
H= Zw
(n � W O J
or tL?' faae& Aopel U*ni
c) Q
rTHI;K RIPRAP
(SEE NOTE 3)
wh.acheva r greater
0 U) (�
SEE GEOTEXTILEr
OVERLAP DETAIL
co I --I
�
W M
f7c, .slop
up to
P OF STAKEPOINT
FOE
SLOCVNSTAUCTIONLIMIT
GROUND LINE
LINE
cc
Mo i fC,A ROCK PLATING DETAIL NO.2 - TYPICAL SECTION p
CONSTRUCTION LIMIT
GROUND U SLOPE STAKE POINT
(TOP OF SLOPE)
GEOTEXTILE
FOR ROCK PLATING
EXISTINGII GROUND
v \
ILL
0
Z
H
i R
Q
Z
OC
H
0
�
J
�
Q
a
TE
AIL
Z
RIPRAP
Q
rTHICK
(SEE NOTE 3)
TOE OF
STEEL BEAM
Cn
0
SLOPE f GUTTER
GUARDRaL
4-6' MIN
lF APPLICABLE
>-
1„V
j�
GUTTER
Q
CURB AND
GUTTER
Q
SUBDRAIN COARSE AGGREGATE�`-
6'DIAPERFORATED SUBDRAIN PIPE BERM WIDTH jR, 0
oo�SEE ROADWAY TYPICALS FOR GUTTER OR CURB FACE cc
AND GUTTER.GUARDRAIL AND BERM DETAILS
ROCK PLATING DETAIL NO. 4 - TYPICAL SECTION
SHEET 1 OF 1
275.01
Submitted 3/3/2023
WETLAND AND SURACE WATER IMPACTS SUMMARY
WETLAND IMPACTS SURFACE WATER IMPACTS
Site
No.
Station
(From/To)
Structure
Size / Type
Permanent
Fill In
Wetlands
(ac)
Temp.
Fill In
Wetlands
(ac)
Excavation
in
Wetlands
(ac)
Mechanized
Clearing
in Wetlands
(ac)
Hand
Clearing
in
Wetlands
(ac)
Permanent
SW
impacts
(ac)
Temp.
SW
impacts
(ac)
Existing
Channel
Impacts
Permanent
(ft)
Existing
Channel
Impacts
Temp.
(ft)
Natural
Stream
Design
(ft)
1
42+12 TO 54+15 -L- RT
ROADWAY FILL
0.59
0.32
0.25
2
57+70 TO 76+06 -L- RT
ROADWAY FILL
2.68
1.68
0.70
0+00 TO 33+68-RP 1CD- RT
3
70+94 TO 122+68 -L- RT/LT
ROADWAY FILL
26.18
0.33
3.05
22+61 TO 29+63-RP1AB- LT
4
127+97 TO 132+42 -L- LT/RT
ROADWAY FILL
1.53
0.09
5
136+88 TO 140+23 -L- LT/RT
ROADWAY FILL
0.10
0.13
0.17
0.11
6
138+19 TO 149+15 -L- LT/RT
ROADWAY FILL
5.17
0.37
7
154+60 TO 163+94 -L- LT/RT
ROADWAY FILL
2.52
0.32
8
167+89 TO 168+21 -L- LT/RT
ROADWAY FILL
0.02
< 0.01
9
170+05 TO 197+19 -L- LT/RT
Dual Bridges; 12@ 135', 72" MBT
4.90
0.03
0.03
0.65
3.92
10
197+45 TO 210+28 -L- LT/RT
ROADWAY FILL
6.69
0.55
11
211+31 TO 218+97 -L- LT/RT
ROADWAY FILL
2.85
0.18
12
218+39 TO 224+77 -L- LT/RT
ROADWAY FILL
2.61
< 0.01
< 0.01
13
229+73 TO 238+69 -L- LT/RT
ROADWAY FILL
6.85
0.37
14
7+87 TO 11+18-Y3RPB- LT/RT
72" RCP, BURIED
0.83
0.16
0.05
< 0.01
337.9
56.1855
15
12+60 TO 13+72-Y3RPB- LT/RT
ROADWAY FILL
0.32
0.03
16
237+79 TO 244+33 -L- LT/RT
72" RCP, BURRIED 1'
2.42
0.22
0.03
< 0.01
200.9
58.8936
17
52+61 TO 53+18-Y3DET- LT/RT
72" RCP, BURRIED 1'
0.04
0.01
0.01
0.03
0.02
129.7
88.99
17A
52+61 TO 53+18-Y3DET- LT/RT
60" TEMP PIPE
0.05
0.01
18
20+55 TO 24+91-Y3RPD- LT/RT
ROADWAY FILL
0.98
0.02
0.10
18A
55+30 TO 57+16-Y3DET- LT/RT
TEMP DETOUR
0.15
0.03
19
16+94 TO 17+92-Y3RPD- LT/RT
84" RCP, BURIED 1'
0.09
0.05
0.06
< 0.01
261.2
44.1
TOTALS*:
j 67.38
j 0.36
j 2.55
j 7.23
j 3.95
j 0.16
j 0.04
j 930
j 248
j 0
*Rounded totals are sum of actual impacts
NOTES:
Bridge Impacts at Site 9: 0.02 acres for Temporary Bents, <0.01 acres for all permanent bents.
2016 09 09
Submitted 3/3/2023
WETLAND AND SURACE WATER IMPACTS SUMMARY
WETLAND IMPACTS SURFACE WATER IMPACTS
Site
No.
Station
(From/To)
Structure
Size / Type
Permanent
Fill In
Wetlands
(ac)
Temp.
Fill In
Wetlands
(ac)
Excavation
in
Wetlands
(ac)
Mechanized
Clearing
in Wetlands
(ac)
Hand
Clearing
in
Wetlands
(ac)
Permanent
SW
impacts
(ac)
Temp.
SW
impacts
(ac)
Existing
Channel
Impacts
Permanent
(ft)
Existing
Channel
Impacts
Temp.
(ft)
Natural
Stream
Design
(ft)
38A
489+64 TO 493+80 -L- LT/RT
ROADWAY FILL
0.49
0.03
38B
496+92 TO 498+23 -L- LT/RT
ROADWAY FILL
0.30
0.06
39
507+39 TO 518+70 -L- LT/RT
2 @ 10'X8' RCBC
3.00
0.08
0.21
0.22
0.03
984.87
116.37
40
RP2AC/RP2A/LP2A
ROADWAY FILL
5.38
0.12
0.78
41
41+40 TO 47+97-RP2AC- LT/RT
EXTEND 3@ 9'X7' RCBC
0.03
0.01
0.11
0.05
0.08
48.71
56.79
42
34+08 TO 37+91 -Y4- LT
72" RCP, BURIED 1'
0.01
0.04
0.06
< 0.01
< 0.01
20.43
11.6
43
33+80 TO 35+02 -Y4- RT
72" RCP, BURIED 1'
< 0.01
0.01
0.04
< 0.01
< 0.01
41.75
10.35
44
51+17 TO 53+70 -Y4- LT
2 @ 84" RCP, BURIED1'
0.24
0.02
0.09
0.02
< 0.01
121.5
10.7
45
50+49 TO 57+08-Y4DET- LT/RT
2 @ 84" RCP, BURIED1'
0.35
0.12
0.04
0.02
116.4
98.9
45A
50+47 TO 57+03-Y4DET-
TEMP DETOUR
0.51
0.19
46
533+11 -L- RT
30" RCP
< 0.01
< 0.01
10.0
16.0
47
563+36 -L- RT
36" RCP
< 0.01
12.0
SUB TOTAL THIS SHEET:
9.80
0.51
0.29
1.49
0.19
0.34
0.13
1356
321
SUB TOTAL SHEET 1:
67.38
0.36
2.55
7.23
3.95
0.16
0.04
930
248
SUB TOTAL SHEET 2:
21.89
0.25
0.81
2.49
3.77
0.05
0.01
584
61
0
TOTALS*:
99.07
1.12
3.65
11.21
7.91
0.55
0.18
2869
630
0
*Rounded totals are sum of actual impacts
NOTES:
At Site 45/45A, 0.03 acre of Temporary Fill in Wetlands in the Hand Clearing area for erosion control measures.