Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
SW8980817_Current Permit_20130403
4 CDENR North Carolina Department of Environment and Natural Resources Division of Water Quality Pat McCrory Charles Wakild, P. E. John E. Skvarla_ III Governor Director Secretary April 3, 2013 Jack Potts, V.P. Inland American Real Estate Trust, Inc., Sole Member Manager IA Jacksonville, Gateway, LLC 2901 Butterfield Rd. Oak Brook, II 60523 Subject: Stormwater Permit No. SW8 980817 Renewal Gateway Plaza — Western Blvd. at Gateway South High Density Project Onslow County Dear Mr. Potts: The Wilmington Regional Office received a complete 8 year Stormwater Management Permit Renewal Application for Gateway Plaza — Western Blvd. at Gateway South on April 29, 2013. The Division is hereby notifying you that permit SW8 980817 has been renewed on May 3, 2013, and shall be effective until September 8, 2021. The renewal and reissuance of this stormwater permit does not imply that the site is currently in compliance with the terms and conditions of this state stormwater permit. The plans previously approved on September 8, 1999, in accordance with the regulations set forth in Title 15A NCAC 21-1.1000 effective September 1, 1995, remain in full force and effect. Please attach this cover letter and permit addendum to your High Density Permit originally issued on September 8, 1999 and as modified thereafter. This permit is subject to the conditions and limitations as specified therein. Please pay special attention to the conditions listed in this permit regarding the Operation and Maintenance of the BMP(s), recordation of deed restrictions, procedures for changes of ownership, transferring the permit, and renewing the permit. Failure to establish an adequate system for operation and maintenance of the stormwater management system, to record deed restrictions, to transfer the permit, or to renew the permit, will result in future compliance problems. . If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing by filing a written petition with the Office of Administrative Hearings (OAH). The written petition must conform to Chapter 150E of the North Carolina General Statutes, and must be filed with.the OAH within thirty (30) days of receipt of this permit. You should contact the OAH with all questions regarding the filing fee (if a filing fee is required) and/or the details of the filing process at 6714 Mail Service Center, Raleigh, NC 27699-6714, or via telephone at 919-431-3000, or visit their website at www.NCOAH.com. Unless such demands are made this permit shall be final and binding. If you have any questions, need additional copies of the permit or approved plans, please contact David Cox with the Division of Water Quality in the Wilmington Regional Office at (910) 796-7215. Sin0erely, fioy'6haries�akild, P.E., Director Division of Water Quality GDS/dwc: S:1WQS1Stormwater\Permits & Projects119981980817HD12013 05 permit 980817 cc: Dave Newsom, Wilmington Regional Office Wilmington Regional Office 127 Cardinal Drive Extension, Wilmington, North Carolina 28405 One Phone: 910-796-72151 FAX: 910-350-20041 DENR Assistance: 1-877-623-6748 NorthCarohna Internet: www.ncwaterquality.org Naturally n _ r_.._i n-----:— ——.:..,, n. -- --- State Stormwater Management Systems Permit No. SW8 980817 Modification STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY STATE STORMWATER MANAGEMENT PERMIT HIGH DENSITY DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO Inland American Real Estate Trust, Inc., Member, IA Jacksonville Gateway, LLC Gateway Plaza Western Boulevard and Gateway South, Jacksonville, Onslow County FOR THE construction, operation and maintenance of one (1) wet detention pond in compliance with the provisions of 15A NCAC 2H .1000 (hereafter referred to as the "stormwater rules') and the approved stormwater management plans and specifications and other supporting data as attached and on file with and approved by the Division of Water Quality and considered a part of this permit. This permit shall be effective from the date of issuance until September 8, 2021, per the Permit Extension Acts, and shall be subject to the following specified conditions and limitations: I. DESIGN STANDARDS This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. 2. This stormwater system has been approved for the management of stormwater runoff as described in Section 1.7 of this permit. The stormwater control has been designed to handle the runoff from 1,387,173 square feet of impervious area. 3. The wet pond is designed for 90% TSS removal, therefore, no vegetated filter is required. 4. The tract will be limited to the amount of built -upon area indicated in this permit, and per approved plans. The built -upon area for the future development is limited to 127,933 square feet. 5. All stormwater collection and treatment systems must be located in either dedicated common areas or recorded easements. The final plats for the project will be recorded showing all such required easements, in accordance with the approved plans. 6. The runoff from all built -upon area within the permitted drainage area(s) of this project must be directed into the permitted stormwater control system. Page 2 of 8 Permit Number: j J " q�op (to be provided by DWQ) Drainage Area Number: Wet Detention Basin Operation and Maintenance Agreement I will keep a maintenance record on this BMP. This maintenance record will be kept in a log in a known set location. Any deficient BUT elements noted in the inspection will be corrected, repaired or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the BMP. The wet detention basin system is defined as the wet detention basin, pretreatment including forebays and the vegetated filter if one is provided. This system (check one): ❑ does ® does not incorporate a vegetated filter at the outlet. This system (check one): ❑ does ® does not incorporate pretreatment other than a forebay. Important maintenance procedures: - Immediately after the wet detention basin is established, the plants on the vegetated shelf and perimeter of the basin should be watered twice weekly if needed, until the plants become established (commonly six weeks). - No portion of the wPt detention pond should be fertilized after the first initial fertilization that is required to establish the plants on the vegetated shelf. - Stable groundcover should be maintained in the drainage area to reduce the sediment load to the wet detention basin. - If the basin must be drained for an emergency or to perform maintenance, the flushing of sediment through the emergency drain should be minimized to the maximum extent practical. - Once a year, a dam safety expert should inspect the embankment. After the wet detention pond is established, it should be inspected once a month and within 24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal County). Records of operation and maintenance should be kept in a location and must be available upon request. 2Q12 OCT 2 9 Inspection activities shall be performed as follows. Any problems that are fo shall be repaired immediately. BMP element: Potentialproblem: How I will remediate theproblem: The entire BMP Trash/debris is present. Remove the trash/debris. The perimeter of the wet Areas of bare soil and/or Regrade the soil if necessary to detention basin erosive gullies have formed. remove the gully, and then plant a ground cover and water until_ it is established. Provide lime and a one-time fertilizer application. Vegetation is too short or too Maintain vegetation at a height of long. approximately six inches. Form SW401-Wet Detention Basin O&M-Rev.4 Page 1 of 4 Permit Number: (to be provided by DWQ) Drainage Area Number: BMP element: Potentialproblem: How I will remediate theproblem: The inlet device: pipe or The pipe is clogged. Unclog the pipe. Dispose of the swale sediment off -site. The pipe Ls cracked or Replace the pipe. otherwise damaged. Erosion is occurring in the Regrade the swale if necessary to swale. smooth it over and provide erosion control devices such as reinforced turf matting or riprap to avoid future problems with erosion. The forebay Sediment has accumulated to Search for the source of the a depth greater than the sediment and remedy the problem if original design depth for possible. Remove the sediment and sediment storage. dispose of it in a location where it will not cause impacts to streams or the BMP. Erosion has occurred. Provide additional erosion protection such as reinforced turf matting or riprap if needed to prevent future erosion problems. Weeds are present. Remove the weeds, preferably by hand. If pesticide is used, wipe it on the plants rather than spraying. The vegetated shelf Best professional practices 1 rune according to best professILORal show that pruning is needed practices to maintain optimal plant health. Plants are dead, diseased or Determine the source of the dying. problem: soils, hydrology, disease, etc. Remedy the problem and replace plants. Provide a one-time fertilizer application to establish the ground cover if a soil test indicates it is necessary. Weeds are present. Remove the weeds, preferably by hand. If pesticide is used, wipe it on the plants rather than spraying. The main treatment area Sediment has accumulated to Search for the source of the a depth greater than the sediment and remedy the problem if original design sediment possible. Remove the sediment and storage depth. dispose of it in a location where it will not cause impacts to streams or the BMP. Algal growth covers over Consult a professional to remove 50% of the area. and control the algal growth. Cattails, phragmites or other I Remove the plants by wiping them invasive plants cover 50% of with pesticide (do not spray). the basin surface. i _ — a-- O'k .r '_ 4 ., � VW ®--- OCT 21202 L Form SW401-Wet Detention Basin O&M-Rev.4 ON. _---Page 4 Permit Number: (to be provided by DWQ) Drainage Area Number: BMP element: Potentialproblem: How I will remediate theproblem: The embankment Shrubs have started to grow Remove shrubs immediately, on the embankment. Evidence of muskrat or Use traps to remove mnuskrats and beaver activity is present. consult a professional to remove beavers. A tree has started to grow on Consult a dam safety specialist to the embankment. remove the tree. An annual inspection by an Make all needed repairs. appropriate professional shows that the embankment needs repair. if applicable), The outlet device Clogging has occurred. Clean out the outlet device. Dispose of the sediment off -site. The outlet device is damaged Repair or replace the outlet device. The receiving water Erosion or other signs of Contact the local NC Division of damage have occurred at the Water Quality Regional Office, or outlet. the 401 Oversight Unit at 919-733- 1786. The measuring device used to determine the sediment elevation shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. When the permanent pool depth reads 15.00 feet in the main pond, the sediment shall be removed. When the permanent pool depth reads 13.00 feet in the forebay, the sediment shall be removed. BASIN DIAGRAM (fill in the blanks) 0 Permanent Pool Elevation 41.00 Sediment Removal 28.00 Pe .anen Pool - - - - - - - - - - - - - - - - Volume Sediment Removal Elevation 26.00 Volume Bottom Elevatio 27.00 -ft Min. ------"-----------"--""""----""------""""""" "-""-" Sediment Bottom Elevation 25.00 1-ft r Storage Sedimei Storage IFOREBAY Form SW401-Wet Detention Basin O&M-Rev.4 MAIN POND OC`� � g 2012 ��. ,_.......Page"3 of Permit Number: (to be provided by DWQ) I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Project name:Gateway Plaza BMP drainage area number:I and only Print name:Jack Potts Title:Principal Financial Officer Address:2901 Butterfiled Road - Oak Brook, IL 60523 Phone:(630) 218-6000 Signature: Date: Note: The legally responsible party shIuld not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. I, *04 6_.0 LSAx , a Notary Public for the State of AW, , County of 11 do hereby certify that Z4-r-k 1�v 5 personally appeared before me this XIA day of 6 u,4 r , fl, and acknowledge the due execution of the forgoing wet de en ion basin maintenance requirements. Witness my hand and official seal, OL'SEAL SWHB NOT ASS ON EXP RES:0414 SEAL My commission expires x pCY 2 9 2012 Y. t Form SW401-Wet Detention Basin O&M-Rev.4 Page 4 of 4 State of North Carolina Department of Environment and Natural Resources Division of Water Quality VR 2 3 2)013 (NCDENR DWQ) STORMWATER MANAGEMENT PERMIT RENEWAL APPLICATION FORM This form may be photocopied for use as an original This form is to be completed by the current permit holder pursuant to Title 15A NCAC 2H.1003 (h1 t21. This states that stormwater management permits, issued for projects that require the construction of engineered stormwater control measures (High Density Permits), shall be required to submit an application to renew the permit 180 days prior to expiration of the permit. Renewed permits are valid for a period of 8 years per Session Law 2011-398 (SB 781) Section 60. (c). I. SUBMITTAL REQUIREMENTS Only complete application packages will be accepted and reviewed by the North Carolina Department of Environment and Natural Resources (NCDENR) Division of Water Quality (DWQ). A complete package includes all of the items listed below. The complete application package should be submitted to the appropriate DWQ Regional Office. (The appropriate office may be found by clicking on the interactive online map at hapX=tal.nedenr.ore/vveb/wo� Copies of the original permit can be obtained from the Regional Office of the Division of Water Quality.) This Renewal i.c for STORMW,A.TEIt PERMIT #: SW Si'- VVO- W17 Please check which of the following permit renewal scenarios apply. Initial in the spaces provided that you have provided the required information. A. Renewal Only: -$505 fee i -Renewal Form - Sign and complete all sections (send original & 1 copy) -Recorded Documents Required By Permit: Deed restrictions, covenants, condominium/planned community declaration & easements (if not already submitted to NCDENR DWQ). Copies are acceptable. -Designer's Certification (if required by permit and not already received by NCDENR DWQ) (See the last page of your permit for a copy of the certification form.) -I Have a Copy of the Current Operation and Maintenance Agreement (O&M): Please Keep this on Fi with your permit. -I Do Not Have a Copy of the Current O&M: Initial This Line to Request a copy. (If NCDENR DWQ does not have a copy on file, then you will be notified to submit a new O & M form.)—� 0 B. Renewal and Modification: -$505 Fee and Pages 1 & 2 of this Renewal Form -SWU-101 Application Form (birtal,�tedert orgCzveb /ws/sxlsMi%fbtrns darn) _�_ -Recorded Documents Required By Permit: Deed restrictions, covenants, condominium/planned community declaration & easements (if not already submitted to NCDENR DWQ). Copies are acceptable. - Under #II. 1. on SWU-101 Application Form -- Check Box for Modification w/Renewal -Designer's Certification (if required by permit and not already received by NCDENR DWQ) (See the last page of your permit for a copy of the certification form.) - O&M Agreement (.h M14wLtal.ncdenr.err ltoebl a/wsfstrlbmp-mangy) ECEIVE Form SWU-102 (Renewal Form) Rev 15Aug2012 Page 1 of 4 APR 2 9 200 coo,,, �. BY: .niv a!e-,e.i ❑ C. Renewal and Either., 1.) Perms t Transfer m a New Penmitte . or 2) hwad Nam CCU Please submit all items in I.A. and: Request a NCDENR DWQ site inspection if transferring permit to new property owner. Submit One of the Two Following Forms below (forms available at: 1. HOA Name/Ownership Change Form: For planned communities (per Chapter 47C or Chapter 47F of the General Statutes) 2. Name/Ownership Change Form: For all other transfers Please make sure all required information is submitted with the Name/Ownership Change form (as stated in each of the available forms) and that all required signatures and initials are filled in properly. Otherwise the name change or transfer can not be processed and the original owner will remain as the permit holder. XT1 a '•_ Ce [ tt -_ U.i ' • • ' 13ti � tea. ' �.. i, � c.. ' r � ,1. 4 ! t .. & C. that yQu are Wbmitting to NCDENR • II. APPLICANT'S CERTIFICATION Note: The legally responsible party is the current permittee and/or the legally responsible representative until such time that the permit is officially transferred through a request to DWQ by the permittee. I, (print or type name of permittee or person IegaUy responsible for the permit) certify that I have a copy of the DWQ Approved Permit and O&M Agreement on -site (OR I have obtained a copy from DWQ and it will be kept on site), that I am responsible for the performance of the maintenance procedures and the site has been, and will be, maintained according to the O & WL Agreement. I agree to notify DWQ of any problems with the system and prior to any changes to the system or changes in ownership I will (or have through this renewal application) notify NCDENR DWQ and submit the proper forms to modify or transfer the permit. All information provided on this permit renewal PermitteeTitle:_ __T 43e_IMn,,e �V�404jf NOTARIZATION: is, to the best of my knowledge, correct and complete. a � I, a Notary Public for the State of �{ '►a S County of p C do hereby certify that — _ S'�.frL Lo iL6 personally appeared before me this day of k r' l� Del, , and acknowledge the due execution of the forgoing stormwater BMP maintenance requirements. Witness my hand and official seal, My commission expires: 4- 6 Notary Signature: ON SEAL }�pd. sja�oF V P�C.wFx4�� Form SW U-102 (Renewal Form) Rev 15Aug2012 Page 2 of 4 C C G I V E APR 292013 III. GENERAL INFORMATION 1. Stormwater Management Permit Number: SW $ O zsl7 2. Permit Holder's name (specify the name of the corporation, individual, etc.): 1A JAI-JE-51A.-I v, Be- G4rXw.� tT 3. Print Owner/Signing Official's name and title (person legally responsible for permit): J� 'zt s — �C �r� eau P%aA.A+4 4. Mailing Address for person listed in item 2 above: ref- QWk/ �'xav� /[, COBS a T City: pA- 6&E4L State: r L- Zip: 46S Phone: Fax: j l©so) �349- - a3? 3 Email: �100�+��INl�gaP-��✓\. 5. Project Name: C ;A, � 6. Location of Project (street address): City: , J �i. ivy% F 0� County: t9Wr ©aj k a.. Zip: da'G`Ve- 7. Directions to project (from nearest major intersection): Form SWU-102 (Renewal Form) Rev 15Aug2012 Page 3 of 4 ECEIVED APR 2 9 2013 ev:— N. PERMIT INFORMATION: 1. Specify the type of stormwater treatment: []Constructed Wetland ❑Bioretention N Vet Detention Pond ❑Dry Detention Basin ❑Infiltration Basin ❑Infiltration Trench ❑Sand Filter ❑Other: 2. If any changes were made to the original DWQ approved project list them in the space below (attach additional pages if needed and provide "As -Built" drawings with this application). If mWor changes have been made to your project please request a plan revision or modification of the permit and submit "As Built" drawings along with a final or updated stormwater system engineer certification (if not already provided to NCDENR). DWQ Engineer and Designer Certification Forms are available from each NCDENR DWQ Regional Office. Form SWU-102 (Renewal Form) Rev 15Aug2012 Page 4 of 4 nECE1VED � APR 2 s zoo BY: Permit No` k y ov (to be provided by DWQ) Am O2ot W A 7F x�� NCDENR o. STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM WET DETENTION BASIN SUPPLEMENT This form must be filled out printed and submitted. The Required Items Checldist (Part Ill) must be printed, filled out and submitted along with all of the required information. 1. PROJECT FORMATION _ — Project name Gateway Plaza Contact person David K. Newsom, PE - Crystal Coast Engineering, PA Phone number 910-325-0006 Date 5/15/2012 Drainage area number 1 JIL DESIGN WORKATION Site Characteristics Drainage area 1,568,783 fe Impervious area, post -development 1,387,173 fe °% impervious 88.42 % Design rainfall depth 1.5 in Storage Volume: Non -SA Waters Minimum volume required Volume provided I RR 43 OK, volume provided is equal to or in excess of volume required. Storage Volume: SA Waters 1.5' runoff volume ft Pre- development 1-yr, 24-hr runoff ft3 Post -development 1-yr, 24-hr runoff f? Minimum volume required ft3 Volume provided ff3 Peak Flow Calculations Is the pre/post control of the lyr 24hr storm peak flow required? Y (Y or N) 1-yr, 24-hr rainfall depth 3.7 in Rational C, pre -development 0.15 (unifless) RECEIVED Rational C, post -development 0.62 (unifless) Rainfall intensity: 1-yr, 24-hr storm 0.15 in/hr OK O CT U 2 2012 Pre -development 1-yr, 24-hr peak flow 0.82 ft /sue Post -development 1-yr, 24-hr peak flow 4.49 ft3/sec BY: Pre/Post 1-yr, 24-hr peak flow control 3.67 fe/seC Elevations Temporary pool elevation 43.46 fmsl Permanent pool elevation 41,00 fmsl SHWT elevation (approx. at the perm. pool elevation) N/A fmsl Top of 1 Oft vegetated shelf elevation 41.50 fmsl Bottom of 10ft vegetated shelf elevation 40.50 fmsl Data not needed for calculation option #1, but OK if provided. Sediment cleanout, top elevation (bottom of pond) 26.00 fmsl Sediment cleanout, bottom elevation 25.00 fmsl Data not needed for calculation option #1, but OK if provided. Sediment storage provided 1.00 It Is there additional volume stored above the state -required temp. pool? N (Y or N) Elevation of the top of the additional volume 43.46 fmsl OK Form SW401Met Detention Basin-Rev.9-4/18/12 Parts I. & II. Design Summary, Page 1 of 2 Permit No. (to be provided by DWQ) r Surface Areas Area, temporary pool 74,719 fl? Area REQUIRED, permanent pool 58,045 ft SAIDA ratio 3.70 (unitless) Area PROVIDED, permanent pool, ApMd,cc� 60,145 ftz OK Area, bottom of 1Oft vegetated shelf, Ab,,,_,w 41,042 ffr Area, sediment cleanout, top elevation (bottom of pond), Abdt_d„d 2,230 fe Volumes Volume, temporary pool 165,883 ft3 OK Volume, permanent pool, Vpe1d_pw 430,082 ft3 Volume, forebay (sum of forebays if more than one forebay) 94,075 ft3 Forebay % of permanent pool volume 21.9% % OK SAIDA Table Data Design TSS removal 90 % Coastal SAIDA Table Used? Y (Y or N) Mountain/Piedmont SAIDA Table Used? N (Y or N) SAIDA ratio 3.70 (unitless) Average depth (used in SAIDA table): Calculation option 1 used? (See Figure 10-2b) Y (Y or N) Volume, permanent pool, Vp81d-Pdy 430,082 ft Area provided, permanent pool, Apd nydd 60,145 ft' Average depth calculated 7.15 it OK Average depth used in SAIDA, da (Round to nearest 0.51t) 7.2 it OK Calculation option 2 used? (See Figure 10-2b) N (Y or N) Area provided, permanent pool, Ape11,_,,d 60,145 f? Area, bottom of 1Oft vegetated shelf, Abe" 41,042 it1 Area, sediment cleanout, top elevation (bottom of pond), Abt-„d 2,230 fi "Depth" (distance btw bottom of 10ft shelf and top of sediment) 14.50 ft Average depth calculated ft Average depth used in SAIDA, da,,, (Round to down to nearest 0.5ft) ft Drawdown Calculations Drawdown through orifice? Y (Y or N) Diameter of orifice (if circular) 4.50 in Area of orifice ('If -non -circular) in Coefficient of discharge (Co) 0.60 (unitless) Driving head (H j 0.84 it Drawdown through weir? N (Y or N) Weir type (unitless) Coefficient of discharge (Cw) (unitless) Length of weir (L) it Driving head (H) it Pre -development 1-yr, 24-hr peak flow 0.82 ft3/sea Post -development 1-yr, 24-hr peak flow 0.48 ft3/sec Storage volume discharge rate (through discharge orifice or weir) 0,48 ft3/sec Storage volume drawdown time 3.97 days OK, draws down in 2-5 days. Additional Information i XJP,C IVED Vegetated side slopes 3 :1 OK Vegetated shelf slope Vegetated shelf width 10 :1 10A ft OK OK ry OCT 0 2 2012 Length of flowpath to width ratio 6 :1 OK Length to width ratio 6.0 :1 OK BY: Trash rack for overflow & orifice? Y (Y or N) OK Freeboard provided 1.0 it OK Vegetated filter provided? N (Y or N) OK Recorded drainage easement provided? Y (Y or N) OK Capures all runoff at ultimate build -out? Y (Y or N) OK Drain mechanism for maintenance or emergencies is: Pump Form SW401-Wet Detention Basin-Rev.94118/12 Parts I. & H. Design Summary, Page 2 of 2 Gateway Plaza Stormwater Permit No Onslow County SW8 980817 Modification Designer's ^er tification State Stormwater Management Systems Permit No. SW8 980817 Modification Page 1 of 2 1. �1L2'�� , as a duly registereq�,y��/ in the State of North Carolina, having been authorized to observe (periodically/weekly/full time) the construction of the project, roject) for roject Owner) hereby state that, to the best of my abilities, ue care and diligence was use in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. have checked the items listed on Page 2 of this form as a part of this Certification. Noted deviations from approved plans and specification: SEAL Signature 1$143 Registration er -9 •.,GItV�.. p �• Date �t/ 40Z /5 ECEIVE All 112111 8Y. Page 8 of 9 State Stormwater Management Systems Permit No. SW8 980817 Modification Certification Requirements: Page 2 of 2 a'�1. The drainage area to the system contains approximately the permitted acreage. Wo�2. The drainage area to the system contains no more than the permitted amount of built -upon area. �3. All the built -upon area associated with the project is graded such that the runoff drains to the system. 6 /(/4. The outlet/bypass structure elevations are per the approved plan. ��5. The outlet/bypass structure is located per the approved plans. 274AZ6. A trash rack is provided on the outlet/bypass structure. ? 4- All slopes are stable and grassed with the specified permanent vegetation. F8. Vegetated slopes are no steeper than 3:1. Z�. The inlets are located per the approved plans and do not cause short-circuiting of the system. 10. Required drawdown devices are correctly sized and situated at the correct ���� elevation, per the approved plans. 4 ' 1. All required and permitted design depths, areas and volumes are provided. fit/--2. All required parts of the system are provided, such as a vegetated shelf, and a forebay. 13. The overall dimensions of the system, as shown on the approved plans, are provided. cc: NCDENR-DWQ Regional Office Onslow County Building Inspections gECEIVE APR 2 6 2013 13Y: Page 9 of 9 High Density Commercial Subdivisions Deed Restrictions & Protective Convenances In accordance with Title 15 NCAC 2H.1000 and S.L. 2006-246, the Management Regulations, deed restrictions and protective covenants are required for High Density Commercial Subdivisions where lots will be subdivided and sold and runoff will be treated in an engineered stormwater control facility. Deed restrictions and protective covenants are necessary to ensure that the development maintains a built -upon area consistent with the design criteria used to size the stormwater control facility. T"e.r► I, Woka -,acknowledge, affirm and agree by my signature below, that I will cause the following deed.kestrictions and covenants to be recorded prior to the sale of any lot within the project known as Gateway Plaza : 1. The following covenants are intended to ensure ongoing compliance with State Stonnwater Management Pennit Number , as issued by the Division of Water Quality under the Stormwater Management Regulations. 2. The State of North Carolina is made a beneficiary of these covenants to the extent necessary to maintain compliance with the stormwater management pennit. 3. These covenants are to run with the land and be binding on all persons and parties claiming under them. 4. The covenants pertaining to stormwater may not be altered or rescinded without the express written consent of the State of North Carolina, Division of Water Quality. 5. Alteration of the drainage as shown on the approved plan may not take place without the concurrence of the Division of Water Quality. 6. The maximum allowable built -upon area is 1,38T I73 square feet. *Note: If the BUA per lot varies, please substitute the following statement for the one above and provide a complete listing of the proposed BUA for each lot: The maximum built -upon area per lot, in square feet, is as listed below: Lot # BUA Lot # BUA Lot # BUA Lot # BUA This allotted amount includes any built -upon area constructed within the lot property boundaries, and that portion of the right-of-way between the front lot line and the edge of the pavement. Built upon area includes, but is not limited to, structures, asphalt, concrete, gravel, brick, stone, slate, coquina and parking areas, but does not include raised, open wood decking, or the water surface of swimming pools. 7. AU runoff from the built -upon areas on the lot must drain into the permitted system. This may be accomplished through a variety of means including roof drain gutters which drain to the street, grading the lot to drain toward the street, or grading perimeter swales to collect the lot runoff and directing them into a component of the stormwater collection system. Lots that will naturally drain into the system are not required to provide these additional measures. 8. The owner of each lot, whose ownership is not retained by the permittee, is required to submit a separate stormwater permit application to the Division of Water Quality and receive a permit prior to construction. 9. The project and each lot will maintain a 30** foot wide vegetated buffer between alf iwpa ious areas and surface waters. E, **50 foot for projects located in the 20 coastal counties. �uN 7 2oi2 Form DRPC-1 Rev.2 05Nov2009 Page 1 of 2 Hi-gh Density Commercial Subdivisions Deed Restrictions & Protective Convenances Si 1, State of do hereby certify that before me this the I `r day of a Notary Public in the County of f ,. o personally appeared 20 :, and acknowledge ue execution of?.I fore 7�7, stru t. Witness my hand and official seal, ,, .e 1 1 B77 SEAL mission expires OFFICIAL SEAL JENALE AUKLAND NOTARY PUBLIC - STATE OF ILLINOIS MY COMMISSION EXPIRES:09N&14 Form DRPC-1 Rev.2 05Nov2009 Page 2 of 2