Loading...
HomeMy WebLinkAboutSW8030909_Approved Plans_20031201 (2)oll 0 'i4,v,fy 41, NOT TO SCALE aaa OR r NORMAL CROWN ED. 0 5w lw TYPICAL ROADWAY SECTION I INCH -Sof -.1.6 �1� 7 A r su off k con -• m 34.W ISOMETRIC NOT TO SCALE Eaus —m,4novwm SUPERELEIED SILT FENCE DETAIL TYPICAL ROADWAYVASECTION NOT TO SCALE 26" FRAME AND GRATE 5' 22' UP TO 18" 5" Ro z S BRICK. BLOCK, CMU r OR PRECAST BOX PLAN OUTLET PIPE ;4' A -7 TT_" BASIN FRAME AND GRATE MAY VARY IN SECTION BJILT UPON CALCULATIONS. CRUSHED STONE NONESSENTIAL DIMENSIONS KNOCK -OUT PANELS PLAN TEMP. CONSTRUCTION 'wPmvOvs AREA: SECTION IN ALL WALLS ENTRANCE BUILDINGS -0.0 :1.1 A - ----- 7& EROSION CONTROL NOTES, S=TS PARKING So = 1.91 Ckw PATH ' DROP INLET NOT TO SCALE NOT TO SCALE SIDEWALK Go. = 0.00 ft. I 1. ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH STATE AND LOCAL REQUIREMENTS. OTHER (GRIN Cal %Ifi) - 0.38 2. SUFFICIENT EROSION CONTROL PRACTICES MUST BE INSTALLED Am MAINTAINED TO TOTAL ISO.. STORM DRAIN 5CHFDUI,F. RETAIN SMMENT WITHIN THE BOUNDARIES OF THE SITE. THE AREA OF DISTURBANCE FOR THIS PROM IS UMIMD TO THE BOUNDARY OF THE TEMPORARY SILT FENCE. ALL DISTURBED AREAS SHALL BE NONEROSIVE AND STABLE WITHN THIRTY (30) TOTAL AREA - ILOB 3.80 as GREEN. .4 orr"IT, OEM= scr—rINEITTIM WORKING DAYS OR 120 CALENDAR DAYS AFTER COMPLETION OF THE ACTIVITY. 8.08 ac. (100) = 47 X WHICHEVER IS SHORTER I CONSTRUCTION SEQUENCE: 3 JBP A. INSTALL SILT FENCE DOWNSLOPE OF FILLED AREAS AND OTHER AREAS SUSCEPTIBLE SHOW SWALES AND BERM 11/24/63 TO GULLYING AS NEEDED. JBP U. CMSTRUCT STORMWATER POND (TO SERVE AS SEDIMENT TRAP DURING CONSTRUCTION). 2 REV. F-- WCOMIR COMMENTS 11/3/03 C. COMPLETE GRADING. I JBP D. STABILIZE AND SEED ALL DENUDED AREAS AND FJDESLOPES. ISSUED FOR RE EN 9-/15/03 4. REFER TO SEEDING SCHEDULE FOR SEEDING INSTRUCTIONS. REVJ3Y 5. MAINTENANCE.' ALL.EROSION AND SEDIMENT CONTROL PRACTICES TO BE INSPECTEDDESCRIPTION WEEKLY AM AFTER EVERY RUNOFF PRODUCING RANFALL EVENT. NEEDED REPAIRSLIP&TE 4 Ga 35, 4141J WILL BE MADE IMMEDIATEI.Y. TOPDRESS IT-UPOkARY SEEDING WITH 50#/ACRE hall—N REVISIONS am. IN MARCH. IF COVER IS NEEDED THROUGH THE FOLLOWING SUMMER. OVERSEER WITH �MNuflun SO#/ACRE K REEN OBE LESPEDEZA. 6. WA)OMUM GRADED SLOPE SHALL NOT EXCEED THREE (3) TO ONE (1). 7 ONCE THE CONSTRUCTION HAS BEEN COMPLETED AND A GOOD v'x ASH SCREEN - - - - - - - - - - - VEGETATIVE GROUND COVER HAS BEEN ESTABLISHED. ALL TEMPORARY EROSION CONTROL = SEAL 7 MEASURES SHALL BE REMOVED. _AL W3 sm GENERAL NOTES -4ILG t I.r DIA. STEEL PIPE 1 . TOPOGRAPHY INFORMATION PROVIDED BY ST. JAMES PLANTATION. IV2,11103 4G. 80 eot NOTE Z CONTRACTOR TO FIELD VERIFY ALL EXISTING UNDERGROUND UTILITIES BEFORE L TRASH2rEW 708 IN O.C. I TWENDED ER% FRAME: AFTER G BEGINNING CONSTRUCTION. 3. STORMWATER FROM ALL IMPERVIOUS SURFACES IS TO BE DIRECTED TO THE PROPOSED PLAN STORMWATER POND. 4 BUILDING ROOF DRAINS TO TE INTO PROPOSED STDRMDRAIN SYSTEM. ASH SCREEN 5: THE STORMWATER POND IS TO BE LOCATED IN A RECORDED EASEMENT WITH A MINIMUM OF A 10 AR -FOOT MAINTENANCE EA LOCATED AROUND THE PERIMETER. EIRCY. BLOCK OR M TO BOX 5. THERE ARE NO WETLANDS WITHIN THE PROJECT BOUNDARY ACCORDING TO THE OWNERS CERTIFIED PROFESSIONAL ENViMMENTAUST, LAND MANAGEMENT GROUP. 7. ENTIRE rSECLIRED OF 3" SL AREA TO BE DISTURBED. Z FSTIXRAGE ENAOIN NORMAL WATER ORIFICE INVENT: 3&D MML _113URFACE-34.0SL 12' Ir TO IV % N-1 I PIPE OLnLE7 MACH GALVANIZED TARE CLOTH24' (11 MESH 0.020 WIRE) 1kr PER I' 1' 1/4* PER I' CAPE FEAM ------- EXISIM LAGOON INVERT: 32.5 MSL SEE DETAIL FOR POND SECTION N, 'A41 Engineering, Inc. • SHED STONE FOCITI r p BARS 0 12' O.C., Elt SIECnm PDRD BOTTOM: 2ELO LIM TYP. CART PATH SEC TION ........... NOT TO SCALE POND OUTLET DETAIL RECEIVED P NAM J. fthW I 700�23 MULCHING Mkr66d� APPdRATION RATES• NOT TO SCALE NON ? 6 DESIGN : J. Pbw MUMEEIR CHM; AJO. — I SOALE: M.W MATERIAL . " WAUTY NOTES 1 — 1� Z PROM p6j&�41 10' MAINTENANCE ACCESS APPROVED J. P~ I DATE 9 05 SEPT 03 / 2 CO PIPE 3.0 EMERGENCY SPLLWAI: 36.0 MEL THE PLAYERS CLUB TEMPO�AR*�E&NV _5�17. STORAGE ELEVATION: �Sl ma,,_ CLUBHOUSE rRAss TYPE -I IM71AL i 112I.%N�ll SF. — OM L P2M.UVAI ELEVATION: 4.2.M& _A �_ _ L _ AT i 92AM-4mp w PBS i il .. AN, JAL 1-0 I NA N-A T 9UIQQMTW WETLAND SMIES PLANTINGS BOTTOM OF 6 — — — — — — — — — — — — — ST. JAMES PLANTATION ON &I VEGETATIVE 514EL.F (POND) I — — — — FOREELAY: 28.0 MEL 3 6 PERMANENT SEEDING GENATIewim CprTmN APPROV'"Fl GRASS repE 1ODD SEEDING -_ INMAI I N ANCE COMWEIR 1-2 WIL APR TNMI 4IME 25 LIM 10-I­ MMIOR -`m EAGN FB`Wlscll AM - 1 �� 10 1-2 UK N. 13 m 10-10_111 wS SIN oil. 25 M ­T10 - - 0"�1 1 um=�c luL M. m 143-10,10 m"m 0 m — - I'mm --. 1/2 -1 - - NA S.R. _h some.1 :­21 W. V-0cow POND BOT7OM:2a.O MSL WV-. '.'-"_' STORMWATER MANAGEMENT tfttkhlb - r Owv ; w -.Jr A-lopl. ft—to Wm.. la— AND VEGETATE PCM SLOPES ABOVE PERMAN WITH ""U'suvv 0�29oq 4 EROSION CONTROL BE "DA aploss `EVELAm—F __ — POND WITH FOREBAY SECTION f __ . - NOT TO SCALE 700-23 1 1._j m D o> 3. 3 E O 3 0 0 C.D co C_ CD a m Cl- cv 0 0 0 0 1 INCH = 50' NORMAL WATER SURFACE-� ELEVATION = 34.0' 11L lu / Jll� �4o JL Ji- i sll AIL ' x _il- MULCHING M MATERIAL RATE/PER'AO E .QGALITY NOTES STRAW i -2 ns Dry,,"uncho ed, Should come from wheat or oats; read by hand or machine; must \ uneathered avoid weeds. be tacked down. TFMP,I'7RAR /_�F DING' _ifL. .JIL �.1,L sIL - 1 2�154yW - - - -,I,_ 32,751 7 46" GRASS TYPE AMOUNT 1000 S . TIME OF SEEDING INITIAL FERTILIZATION 1000 SF. MAINTENANCE RYE GRAIN 1-2 LBS. NOV. THRU JAN. 25 LBS. 10-10-10 NA NA NA BROWNTOP MILLET 1-2 LBS. JUNE THRU AUG. 25 LBS. 10-10-10 NA NA NA PERMANENT SEEDING GRASS TYPE AMOUNT 1000 SF. TIME OF SEEDING FERTI ZATION 1000 SF. INITIAL MAINTENANCE BERMUDA, COMMON 1-2 LBS. APR. THRU JUNE 25 LBS. 10-10-10 MARCH - APRIL 12 LBS. 10-10-10 EACH 4-8 WEEKS 1-2 LBS. N. AUG. - SEPT. 12 LBS. 10-10-10 FESCUE, TALL (KENTUCKY 31) 5-7 LBS. SEPT. THRU OCT. FEB. THRU OCT. 25 LBS, 10-10-10 FEB. - MARCH 12 LBS. 10-10-10 MAY & DEC. 1/2 TO 1 LB. N. SEPT. - OCT. 12 LBS. 10-10-10 SERICEA LESPEDEZA (SLOPES) 1-2 LBS. MARCH THRU APR. 25 LBS. 10-10-10 FEB. - MARCH 1/2 TO 1 LB. N. NA WOpp eN ZL FIB OST �R FgeRlc NO � awR FFi l � l�R D A'1%0 T C ISOMETRIC SILT FENCE DETAIL NOT TO SCALE BRICK, BLOC OR PRECAST 12" CRUSHED STONE SECTION rf A/ l r A A I fl R VARIES 10' ROADS 10' ROADS 2-1/2" 1-2 BIT. PVMT. }� 1 4":1 FOOT TIP 1/4*: 1 FOOT (TYP) y ETIE XISTING GRADE \\\�/\\\�� . //�\i\\i�\ . TIE TO N 0 T TO SCALE EXISTING GRADE B" COMPACTED ABC NORMAL CROWN TYPICAL ROADWAY SECTION R/W VARIES I 10' ROADS 10' ROADS 2-1/2" 1-2 BIT. PVMT. 1/4*: 1 FOOT (TTYP TIE TO EXISTINGRAD.1/4":1 FOOT G E �/�\i�\\\\ EXISTING GRADE COMPACTED ABC NOT TO SCALE \ C 8" SUPERELEVATED TYPICAL ROADWAY SECTION I�� W PLAN I l i y 35' t 15' t N L - - _ --J BASIN FRAME AND GRATE MAY VARY IN SECTION 00 DCK-OUT PANELS NONESSENTIAL DIMENSIONS TEMP. CONSTRUCTION PLAN IN ALL WALLS ENTRANCE DROP INLET EROSION CONTROL NOTES: NOT TO SCALE NOT TO SCALE 0 1 I O A I� N 1. ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH STATE AND LOCAL REQUIREMENTS. 2. SUFFICIENT EROSION CONTROL PRACTICES MUST BE INSTALLED AND MAINTAINED TO RETAIN SEDIMENT WITHIN THE BOUNDARIES OF THE SITE. THE AREA OF DISTURBANCE STORK DRAIN SCHEDULE FOR THIS PROJECT IS LIMITED TO THE BOUNDARY OF THE TEMPORARY SILT FENCE. ALL DISTURBED AREAS SHALL 3E NONEROSIVE AND STABLE WITHIN THIRTY (30) Line Length (ft) Size (in) Nat'l Slope (%) Invert Down (ft) Invert Up (ft) Rim El Down (ft) Rim El Up (ft) FESI-CB2 191 24 CPP 1.05 32.00 34.00 34.00 40.00 C132-C63 154 24 CPP 1.00 34.00 35.54 40.00 43 .00 CB3-CB4 136 18 CPP 1.00 36.04 37.40 43.00 43.00 C134-CI35 120 18 1 C P 1 1.00 1 37.40 1 38.60 1 43.00 1 43.00 FE56-07 125 30 CPP 156 3150 33.50 34.00 41.00 CB7-CB8 q4 24 CPP 1.00 34.00 34.94 41.00 41.50 C58-CBq 106 18 CPP 1.00 35.44 36.50 41.50 43.00 CBq-CBIO 013 18 CPP 1.00 36.50 37.43 43.00 43.00 CI37-CI3I1 156 18 1 CPP 0.50 34.50 35 8 41.00 1 3ci00 C II-C 1 116 18 C 0 50 35 8 35 86 3 00 3 00 CB12-CB13 73 18 1 CPP 0.51 35.86 3623 3q.00 41.00 PLAN WORKING DAYS OR 120 CALENDAR DAYS AFTER COMPLETION OF THE ACTIVITY, WHICHEVER IS SHORTER. 3. CONSTRUCTION SEQUENCE: A. INSTALL SILT FENCE DOWNSLOPE OF FILLED AREAS AND OTHER AREAS SUSCEPTIBLE TO GULLYING AS NEEDED. B. CONSTRUCT STORMWATER POND (TO SERVE AS SEDIMENT TRAP DURING CONSTRUCTION). C. COMPLETE GRADING. D. STABILIZE AND SEED ALL DENUDED AREAS AND SIDESLOPES. 4. REFER TO SEEDING SCHEDULE FOR SEEDING INSTRUCTIONS. 5. MAINTENANCE: ALL EROSION AND SEDIMENT CONTROL PRACTICES TO BE INSPECTED WEEKLY AND AFTER EVERY RU14OFF PRODUCING RAINFALL EVENT. NEEDED REPAIRS WILL BE MADE IMMEDIATELY. TOPDRESS TEMPORARY SEEDING WITH 50#/ACRE NITROGEN IN MARCH. IF COVER IS NEEDED THROUGH THE FOLLOWING SUMMER. OVERSEED WITH 50#/ACRE KOBE LESPEDEZA. 6. MAXIMUM GRADED SLOPE SHALL NOT EXCEED THREE (3) TO ONE (1). TRASH SCREEN 7. ONCE THE CONSTRUCTION HAS BEEN COMPLETED AND A GOOD VEGETATIVE GROUND COVER HAS BEEN ESTABLISHED, ALL TEMPORARY EROSION CONTROL MEASURES SHALL BE REMOVED. GENERAL NOTES: 1.5" DIA. STEEL PIPE 1. TOPOGRAPHY INFORMATION PROVIDED BY ST. JAMES PLANTATION. NOTE: 2. CONTRACTOR TO FIELD VERIFY ALL EXISTING UNDERGROUND UTILITIES BEFORE TRASH SCREEN TO BE #4 REBAR @ 6" BEGINNING CONSTRUCTION. O.C. +- E.W., WELDED TO 3x3x1/8 ANGLE FRAME; HOT DIP AFTER FABRICATION 3. STORMWATER FROM ALL IMPERVIOUS SURFACES IS TO BE DIRECTED TO THE PROPOSED STORMWATER POND. 4. BUILDING ROOF DRAINS TO TIE INTO PROPOSED STORMDRAIN SYSTEM. 5. THE STORMWATER POND IS TO BE LOCATED IN A RECORDED EASEMENT WITH A TRASH SCREEN MINIMUM OF A 10-FOOT MAINTENANCE AREA LOCATED AROUND THE PERIMETER. 6. THERE ARE NO WETLANDS WITHIN THE PROJECT BOUNDARY ACCORDING TO THE BRICK, BLOCK OR CMU OWNERS CERTIFIED PROFESSIONAL ENVIRONMENTALIST, LAND MANAGEMENT GROUP. SECURED TO BOX 7. ENTIRE AREA TO BE DISTURBED. TOP OF OUTLET: 35.1 MSL OIL TEMP. STORAGE ELEVATION NORMAL WATER SURFACE=34.0 MSL ORIFICE INVERT: 34.0 MSL IS 1 1" 2 24" PIPE ATTACH GALVANIZED WIRE CLOTH OUTLET - (8 MESH 0.020 WIRE) INVERT: III < 32.5 MSL I _ 4 .4 I III SEE DETAIL FOR POND SECTION 6" CRUSHED STONE - FOOTING nn C�nnr,C�nn�, nrin�f POND BOTTOM: 28.0 MSL #4 BARS @ 12" O.C., E.w. SECTION POND OUTLET DETAIL RECEIVED NOT TO SCALE SUGGESTED WETLAND SPECIES PLANTINGS ON (od VEGETATIVE SHELF (POND) GENUS/SPECIES COMMON NAME Juncus effusus Soft rush Iris versicolor Blue flag Distichlis spicato Spike grass Asclepias incarnate Swamp milkweed VEGETATE POND SLOPES ABOVE PERMANENT WATER LEVEL AND SCALE SIDE SLOPES WITH BERMUDA GRASS t4dv QJ 8' TO 11' W/ , . TYP. CART PATH SECTION NOT TO SCALE nwe 10' MAINTENANCE ACCESS 3.0 PROJ # �jW g d 0 D-q EMERGENCY SPILLWAY: \/ S.D. PIPE - - 36.0 MSL ^ TEMP. STORAGE ELEVATION: 35.1 MSL _ 3 - - - - - - _ 1 NORMAL POOL ELEVATION: 34.0 MSL �1 BOTTOM OF FOREBAY: 28.0 MSL 6 3 3 6 rr7novrn POND BOTTOM:28.0 MSL NC is c : r_... ,ITAL Date POND WITH FO R E B A Y SECTION StW4.-icte4 Pellint �° ° (9goq NOT TO SCALE ST. JAMES PLANTATION PROJECT r SI TE 4 S.R. 1102 ATLANTIC INTRACOAST AL WATERWAY VICINITY MAP - NOT LEGEND SILT FENCE 404 WETLANDS _,L _,IL 111_ .1IL _11L 11 PROP. CONTOUR EXIST. CONTOUR ---- --- PROPOSED SPOT EL. PROJECT BOUNDARY - - - - DRAINAGE AREA 111 1 1 1 1 1 1 1 1 11 1 1 1 1 1 1 1{{! I I BUILT UPON CALCULATIONS: IMPERVIOUS AREA: BUILDINGS = 0.93 ac. STREETS = 0.58 ac. PARKING = 1.91 aC. SIDEWALK = 0.00 ac. OTHER (Golf Cart Path) = 0.38 ac. TOTAL = 3.80 ac. TOTAL AREA = 8.08 ac. 3.80 ac. (100) = 47 % 8.08 ac. JBP 3 SHOW SWALES AND BERM 11/24/03 JBP 2 REV. PER NCDENR COMMENTS 11/3/03 JBP 1 ISSUED FOR REVIEW 9/15/03 REV. DESCRIPTIONREV Y DATE REVISIONS CA SEAL. 028858 = ®err lli STO PLA N TATI O N CAPE FEAR Engineering, Inc. 151 Poole Rd, Suite 100 Belville, NC 28451 TEL (910) 383-1044 FAX (910) 383-1045 www.capefeareng.com DRAWN J. Petroff PROJECT NUMBER 700-23 DESIGN J. Petroff CHECK: A.Mills SCALE Noted APPROVED J. Petroff DATE 08 SEPT 03 THE PLAYERS CLUB CLUBHOUSE AT ST. JAMES PLANTATION 414 STORMWATER MANAGEMENT AND EROSION CONTROL PROJECT NUMBER 700-23 SHEET NUMBER 1