No preview available
HomeMy WebLinkAbout20230158 Ver 1_More Info Received_20230215Baker, Caroline D From: Thompson, Emily B CIV USARMY CESAW (USA) < Emily.B.Thompson@usace.army.mil > Sent: Wednesday, February 15, 2023 4:35 PM To: Trone, Rick Cc: Thomas, Zachary T Subject: [External] NWP 29 and SAW-2021-00808, Chapel Ridge Tracts / 1400 Barnside Lane / Apex NC / Wake County CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. Mr. Trone (on behalf of Toll Brother, Inc.), This email serves to notify you that your proposed work may be authorized by the above referenced general permit provided a 401 Certification is issued or waived. Once a 401 Certification is issued or waived, the Corps will provide you with a final general permit verification. Your proposed work shall not commence until after the 401 Certification has been issued or waived AND until a final general permit verification has been provided to you. Additional special conditions may be added to the final general permit verification. Please contact me if you have any questions regarding this provisional verification or the Corps of Engineers regulatory program. Sincerely, Emily Emily B. Thompson Regulatory Specialist U.S. Army Corps of Engineers Washington Regulatory Field Office 2407 W. 5th Street Washington, NC 27889 (910) 251-4629 Emily.B.Thompson@usace.army.mil We at the U.S. Army Corps of Engineers Regulatory Branch are committed to improving service to our customers. We would appreciate your feedback on how we are performing our duties. Our automated Customer Service Survey is located at: httDS://reaulatorv.ODS.usace.armv.mil/customer-service-survev/ Thank you for taking the time to visit this site and complete the survey From: Trone, Rick <rtrone@withersravenel.com> Sent: Wednesday, February 15, 2023 3:12 PM To: Thompson, Emily B CIV USARMY CESAW (USA) <Emily.B.Thompson@usace.army.mil> Cc: Thomas, Zachary T <zachary.thomas@ncdenr.gov> Subject: [URL Verdict: Neutral][Non-DoD Source] RE: 401 WQC Requirements per 40 CFR Part 121 Emily, Please see the attached exhibit. I hope this is sufficient for you needs but if you need anything else, please let me know. Thanks, Rick TroneWithersRavenel 115 MacKenan Drive I Cary, NC 27511 Office:919.469.3340 1 Direct:919.538.8184 rtrone@withersravenel.com 410101919]:1►11MIIV&M,I17►Eel 0191610XONY01III a From: Thompson, Emily B CIV USARMY CESAW (USA) <Emily.B.Thompson@usace.army.mil> Sent: Wednesday, February 15, 2023 11:17 AM To: Trone, Rick <rtrone@withersravenel.com> Subject: RE: 401 WQC Requirements per 40 CFR Part 121 No problem — glad there was already a more accurate map. Please add the date to the text box so it's easily identifiable — thanks! Emily Emily B. Thompson Regulatory Specialist U.S. Army Corps of Engineers Washington Regulatory Field Office 2407 W. 5th Street Washington, NC 27889 (910) 251-4629 Emily. B.Thompsona-usace.army. mil We at the U.S. Army Corps of Engineers Regulatory Branch are committed to improving service to our customers. We would appreciate your feedback on how we are performing our duties. Our automated Customer Service Survey is located at: httos:Hreaulatorv.00s.usace.armv.mil/customer-service-survev/ Thank you for taking the time to visit this site and complete the survey From: Trone, Rick <rtrone@withersravenel.com> Sent: Wednesday, February 15, 2023 11:07 AM To: Thompson, Emily B CIV USARMY CESAW (USA) <Emily.B.Thompson@usace.army.mil> Subject: [URL Verdict: Neutral][Non-DoD Source] RE: 401 WQC Requirements per 40 CFR Part 121 For some reason I didn't include it. The revision date will be automatically added in the small text on the left margin in CAD. If you need something more visible, we can type it in down in the bottom box. Thanks, Rick TroneWithersRavenel 115 MacKenan Drive I Cary, NC 27511 Office:919.469.3340 1 Direct:919.538.8184 rtrone@withersravenel.com CONFIDENTIALITY AND NONDISCLOSURE From: Thompson, Emily B CIV USARMY CESAW (USA) <Emily.B.Thompson@usace.army.mil> Sent: Wednesday, February 15, 2023 11:00 AM To: Trone, Rick <rtrone@withersravenel.com> Subject: RE: 401 WQC Requirements per 40 CFR Part 121 Hi Rick, I did not see this map in the application —just the one with NWPR labels and Pond 2 unmapped. Please add the measurements for each AR and a revision date that I can reference to avoid confusion in the future. Sincerely, Emily Emily B. Thompson Regulatory Specialist U.S. Army Corps of Engineers Washington Regulatory Field Office 2407 W. 5th Street Washington, NC 27889 (910) 251-4629 Emily. B.Thompsona-usace.army. mil We at the U.S. Army Corps of Engineers Regulatory Branch are committed to improving service to our customers. We would appreciate your feedback on how we are performing our duties. Our automated Customer Service Survey is located at: httos://reaulatorv.00s.usace.armv.mil/customer-service-survev/ Thank you for taking the time to visit this site and complete the survey From: Trone, Rick <rtrone@withersravenel.com> Sent: Wednesday, February 15, 2023 10:54 AM To: Thompson, Emily B CIV USARMY CESAW (USA) <Emily.B.Thompson@usace.army.mil> Subject: [URL Verdict: Neutral][Non-DoD Source] RE: 401 WQC Requirements per 40 CFR Part 121 Emily, Just wanted to make sure I understand correctly. You're asking for an exhibit like the one attached updated that also includes the measurements of each feature including the pond? I thought I had submitted the one attached, but it doesn't look like I did. I can get the measurements of each resource added to this. Thanks, Rick TroneWithersRavenel 115 MacKenan Drive I Cary, NC 27511 Office:919.469.3340 1 Direct:919.538.8184 rtrone@withersravenel.com CONFIDENTIALITY AND NONDISCLOSURE From: Thompson, Emily B CIV USARMY CESAW (USA) <Emily.B.Thompson@usace.army.mil> Sent: Tuesday, February 14, 2023 1:58 PM To: Trone, Rick <rtrone@withersravenel.com> Subject: RE: 401 WQC Requirements per 40 CFR Part 121 Hi Rick, I'm reviewing our database/PCN and see that the JD request was submitted under NWPR, but it was vacated prior to issuance of the AJD. That action was closed out administratively on our end. Do the property owners want a delineation concurrence for the site? The current maps are not accurate for issuing the DC at this time and not quite what I need to be able to input them into our database for the permitting process either. Will you update the JD map to include the pond that was filled, the measurements of each feature, and a revision date? If you have any questions, please let me know. Thanks! Emily Emily B. Thompson Regulatory Specialist U.S. Army Corps of Engineers Washington Regulatory Field Office 2407 W. 5th Street Washington, NC 27889 (910) 251-4629 Emily. B.Thompsona-usace.army. mil We at the U.S. Army Corps of Engineers Regulatory Branch are committed to improving service to our customers. We would appreciate your feedback on how we are performing our duties. Our automated Customer Service Survey is located at: httos://reaulatorv.00s.usace.armv.mil/customer-service-survev/ Thank you for taking the time to visit this site and complete the survey From: Trone, Rick <rtrone@withersravenel.com> Sent: Wednesday, February 8, 2023 10:56 AM To: Thompson, Emily B CIV USARMY CESAW (USA) <Emily.B.Thompson@usace.army.mil> Subject: [URL Verdict: Neutral][Non-DoD Source] RE: 401 WQC Requirements per 40 CFR Part 121 You're welcome. Please let me know if you need anything. Thanks, Rick TroneWithersRavenel 115 MacKenan Drive I Cary, NC 27511 Office:919.469.3340 1 Direct:919.538.8184 rtrone@withersravenel.com From: Thompson, Emily B CIV USARMY CESAW (USA) <Emily.B.Thompson@usace.army.mil> Sent: Wednesday, February 8, 2023 10:52 AM To: Trone, Rick <rtrone@withersravenel.com> Cc: Thomas, Zachary T <zachary.thomas@ncdenr.gov> Subject: RE: 401 WQC Requirements per 40 CFR Part 121 Hi Rick, Thank you for the heads up, and it now makes sense why I wasn't receiving a response to my emails! Yes, I'll be the reviewer for this project and you may see other PMs in the Wilmington District for other projects in the RFO work area as well. Hi Zach, it's nice to (kind of) meet you — I'll be sending you an email about another project shortly Sincerely, Emily Emily B. Thompson Regulatory Specialist U.S. Army Corps of Engineers Washington Regulatory Field Office 2407 W. 5th Street Washington, NC 27889 (910) 251-4629 Emily. B.Thompsona-usace.army. mil We at the U.S. Army Corps of Engineers Regulatory Branch are committed to improving service to our customers. We would appreciate your feedback on how we are performing our duties. Our automated Customer Service Survey is located at: httos://reaulatorv.or)s.usace.armv.mil/customer-service-survev/ Thank you for taking the time to visit this site and complete the survey From: Trone, Rick <rtrone@withersravenel.com> Sent: Wednesday, February 8, 2023 10:38 AM To: Thompson, Emily B CIV USARMY CESAW (USA) <Emily.B.Thompson@usace.army.mil> Cc: Thomas, Zachary T <zachary.thomas@ncdenr.gov> Subject: [URL Verdict: Neutral][Non-DoD Source] RE: 401 WQC Requirements per 40 CFR Part 121 Hi Emily, Kelsey no longer works for DWR and this project is assigned to Zach Thomas. I copied him here. Will you be the reviewer instead of Lyle? Thanks, Rick TroneWithersRavenel 115 MacKenan Drive I Cary, NC 27511 Office:919.469.3340 1 Direct:919.538.8184 rtrone@withersravenel.com From: Thompson, Emily B CIV USARMY CESAW (USA) <Emily.B.Thompson@usace.army.mil> Sent: Wednesday, February 8, 2023 10:23 AM To: kelsey.rowland@ncdenr.gov Cc: Trone, Rick <rtrone@withersravenel.com> Subject: 401 WQC Requirements per 40 CFR Part 121 Good morning Kelsey, This email is concerning the attached Pre -construction notification (PCN) received by the U.S. Army Corps of Engineers (USACE) on January 26, 2023. The Corps Action ID Number associated with this project is: SAW-2021-00808. Please provide a written response within 14 days from the date of this email, regarding the North Carolina Division of Water Resources (DWR) receipt date for this project, otherwise, we will consider our receipt date as accurate. Also, within 14 days, please notify me if the certification request does not contain the nine (9) components listed in Section 121.5(b) of the 2020 Clean Water Act Section 401 Certification Rule. As specified in the September 16, 2022, Programmatic Agreement (PA) between the USACE, Wilmington District, and the North Carolina Department of Environmental Quality, Division of Water Resources, the reasonable period of time (RPOT) for DWR to act on a Section 401 certification request is 120 days unless the RPOT is extended per the terms of this PA. As such, unless we receive an email request for an extension of the RPOT, the USACE will consider the Section 401 certification for this project to be waived on May 29, 2023. Please contact me if you have any questions regarding this request. Respectfully, Emily Emily B. Thompson Regulatory Specialist U.S. Army Corps of Engineers Washington Regulatory Field Office 2407 W. 5th Street Washington, NC 27889 (910)251-4629 Emily. B.Thompsona-usace.army.mil We at the U.S. Army Corps of Engineers Regulatory Branch are committed to improving service to our customers. We would appreciate your feedback on how we are performing our duties. Our automated Customer Service Survey is located at: https://regulatory.ops.usace.army.miI/customer-service-survey/ Thank you for taking the time to visit this site and complete the survey.