Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
SW6221101_Design Calculations_20230327
PN79439.2 SOF Technical Support Training Annex Fort Bragg, NC 03/22/2023 BIORETENTION CELL # REQUIRED VOLUME DA IA Rd WQV Dp SOIL MEDIA SAm K A 1 421,487 237,759 1 19,588 1 19588.12 1 B5 2 57,336 31,155 1 2,576 1 2500 1 B4 3 36,539 24,840 1 2,015 1 2500 1 B3 4 50,100 35,607 1 2,879 1 2500 1 Summary of Calculations Dm Q m FSu Qu Su nu Dmf Du #u 2.5 0.181 10 1.814 0.2 0.011 11.8 6 4 2.5 0.023 10 0.231 0.2 0.011 5.5 4 2 2.5 0.023 10 0.231 0.2 0.011 5.5 4 2 2.5 0.023 10 0.231 0.2 0.011 5.5 4 2 # = Bioretention Basin Number DA sf)= Drainage Area IA (sf)= Impervious Area Rd (in) = Runoff Depth %I = Percent Impervious = IA / DA Rv = Runoff Coefficient = = 0.05 + ( 0.9 * %I ) WQV (cf)= Water Quality Volume = 3630 * RD * Rv * DA Dp t)= Depth of Pond at max stage S (sf) = Surface Area of Media K (in/hr) = media permeability Dm (ft)= Depth of Media Qm (cfs)= Flowrate thru Media at max stage=((K*2)*SA*Dp)/(Dm*3600*24) = Modified Darcy FSu = Factor of Safety for underdrains Qu (cfs)= Design Flowrate of underdrains Su (%)= Slope of Underdrains nu = Mannings Roughness Coefficient of Underdrains Dmf (in)= Diameter of Manifold = 16*(((L7*0.011)/(0.005^0.5))^(3/8)) = Manning Du (in)= Diameter of Underdrains #u = Number of Underdrains required = Qud/(((0.005^0.5)/0.011)*((Dud/16)^(8/3))) Project Name: VLC Project Number: XXX Project Location : Butner, NC Designed by: NSR Date : 8/30/2018