Loading...
HomeMy WebLinkAbout820655_Routine Inspection_20230328Type of Visit: ,0 Compliance Inspection 0 Operation Review 0 Structure Evaluation 0 Technical Assistance Reason for Visit: A5-Routine 0 Complaint 0 Follow-up 0 Referral 0 Emergency 0 Other 0 Denied Access Arrival Time: Departure Time: 1/�L Date of Visit: County4y �_ L Farm Name: Owner Email: Owner Name: Le, �111) Phone: Mailing Address: Physical Address: Facility Contact: "Q-44. 11 Title: i7 Onsite Representative: Certified Operator: Back-up Operator: Location of Farm: 47 V_r Latitude: Discharges and Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: 0 Structure 0 Application Field F-1 Other: a. Was the conveyance man-made? b. Did the discharge reach waters of the State? (If yes, notify DWR) c. What is the estimated volume that reached waters of the State (gallons)? Phone: _'7 f Region: OrWo� Integrator: Certification Number: 2 Y 7 Certification Number: d. Does the discharge bypass the waste management system? (If yes, notify DWR) 2. Is there evidence of a past discharge from any part of the operation? 3. Were there any observable adverse impacts or potential adverse impacts to the waters of the State other than from a discharge? Longitude: E] Yes R�No E] NA Ej NE E] Yes E] No F-1 NA E] NE E] Yes Ej No F-1 NA E] NE E] Yes E] No F-1 NA Ej NE Ej Yes E�J'No F-1 NA 0 NE 0 Yes 2 No F-1 NA E] NE Page I of 3 511212020 Continued [—Facility Number: jDate of Inspection: Vgw& j Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? F-1 Yes -Ef- "N� o F-1 NA F] NE a. If yes, is waste level into the structural freeboard? F-1 Yes E] No F-1 NA E] NE Structure I Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: Spillway?: Designed Freeboard (in): 6 Observed Freeboard (in): V 5. Are there any immediate threats to the integrity of any of the structures observed? E] Yes EErNo F-1 NA 0 NE (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a 0 Yes E!fNo F1 NA 0 NE waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWR 7. Do any of the structures need maintenance or improvement9 F-1 Yes No F-] NA NE _f:�] 8. Do any of the structures lack adequate markers as required by the permit? F-1 Yes _eNo F__j NA NE (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require E] Yes E�No F-] NA NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need Yes,_[D/No F-] NA [—] NE maintenance or improvement? 11. Is there evidence of incorrect land application? If yes, check the appropriate box below. [:] Yes &No F-1 NA F-1 NE Fj Excessive Ponding E] Hydraulic Overload 0 Frozen Ground E] Heavy Metals (Cu, Zn, etc.) F-1 PAN F-1 PAN > 10% or 10 lbs. Ej Total Phosphorus Ej Failure to Incorporate Manure/Sludge into Bare Soil F_� Outside of Acceptable Crop Window Evidence of Wind Drift Ej Application Outside of Approved Area 12. Crop Type(s): Zy 13. Soil Type(s): A-,)6 14. Do the receiving crops differ from those designated in the CAWMP? F] Yes ,ZNo F-1 NA F] NE 15. Does the receiving crop and/or land application site need improvement? 01yes F-1 No F-] NA E] NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable E] Yes E2-No F-1 NA E] NE acres determination? 17. Does the facility lack adequate acreage for land application? Ej Yes 13'No F_� NA F-1 NE 18. Is there a lack of properly operating waste application equipment? Ej Yes La"No F� NA E]NE Required Records & Documents 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? Yes L2,/No F-1 NA 0 NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check Yes Pl�o F-1 NA [:] NE the appropriate box. F�WUP E]Checklists Design F� maps 0 Lease Agreements E]Other: 2 1. Does record keeping need improvement? If yes, check the appropriate box below. F_� Yes 12-No F-1 NA Ej NE F-1 Waste Application E] Weekly Freeboard F-1 Waste Analysis E] Soil Analysis F-1 Waste Transfers Ej Weather Code F-1 Rainfall F-1 Stocking F-1 Crop Yield 0 120 Minute Inspections E] Monthly and I" Rainfall Inspections E]Sludge Survey 22. Did the facility fail to install and maintain a rain gauge? Ej Yes -4allo F-1 NA Ej NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? Ej Yes J�rNo F-1 NA E] NE Page 2 of 3 511212020 Continued lFacility Number: 1,S-5_ _j Date of Inspection: 3 24. Did the facility fail to calibrate waste application equipment as required by the permit? E] Yes _E��rNo 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check Yes ETNo the appropriate box(es) below. F-1 Failure to complete annual sludge survey F-1 Failure to develop a POA for sludge levels F_� Non -compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail to provide documentation of an actively certified operator in charge? F_� Yes E] No 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? E] Yes F-1 No 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the permit? (i.e., discharge, freeboard problems, over -application) 3 1. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below. r_1 Application Field F-1 Lagoon/Storage Pond F-1 Other: 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? 34. Does the facility require a follow-up visit by the same agency? Reviewer/Inspector Name: Reviewer/Inspector Signature: Page 3 of 3 [—] NA E] NE F__j NA F] NE NA NE NA NE E] Yes _[;]-No F] NA F-1 NE E] Yes [��rNo F] NA 0 NE 0 Yes 2rNo F] NA E] NE F] Yes �o F] NA F-] NE E] Yes CfNo F-1 NA NE Yes J��rNo [:] NA NE Yes J2�No Ej NA NE Phone: r1l"li 5�2es— Date: 511212020 FACILITY#:q,� FARM NAME: Q&P� 4��o LAGOON LEVEL PERMIT (#ig) - DUE EVERY 5 YEARS - B(PERIATION DATE NUMBER OF ANIMALS CURRENT NUMBER OF ANIMAL OIC CARD YES OR NO WASTE UTILIZATION PLAN (WUP) (#20) SOIL TYPES CROP TYPES - ODOR CONTROL CHECK LIST YES OR NO - Irrigation Plan Maps YES OR NO WASTE REPORT (#21) -GOOD FOR 60 DAYS BEFORE OR AFTER DATE_\ N �3 NITROGEN LEVEL DATE IVI b'-1 DATE NITROGEN LEVELJ, NITROGEN LEVEL /I - EVERY 3 YEARS: SOIL REPORT (#2i� DATE - P-1 (N.0 MORE THEN 400) - P H (Note if 4 or less) - CuIZN (NO MORE THEN k00) CU (IF PEANUTS NO MORE THEN 300) Not over PAN CROP TYPES FLOW RATES Not over PAN FLOW RATES I RR2 (#21) NITROGEN (N) CROP TYPES NITROGEN (N) Not over PAN CROP TYPES FLOW RATES NITROGEN (N) Not over PAN FLOW RATES CROP TYPES NITROGEN (N) ZN CALBRIATION (#24) EACH REEL SHOULD BE CALIPRAT�D EVERY OTHER YEAR DATE OF CALIBRATION FLOW RATES RAIN FALL (#21) -INITIAL AFTER I" RAIN EVENT -LOOK FOR ANY LEVEL THAT IS LESS THEN THE DESIGNED FREEBORED POA NEEDED. -DUE EVERY YEAR: DATE SLUDGE (#21 &26) 0: 3, P: % RATIO OF SLUDGE 0: P: % RATIO OF SLUDGE 0: P: % RATIO OF SLUDGE 0: P -. % RATIO OF SLUDGE OTHER FORMS (#22 AND #21) RAIN BREAKER FORM CROP YEILDS MORTALITY *If fields are grazed there will be no crop yields VISUAL CHECK FOUNDATION OR PIT LEAKS PIPE LEAKS LAGOON SEEPAGE LAGOON BARE AREAS TREES OR GRASS NEED TO BE REMOVED EROSION - DITCHES - WINTER CROP(OVERSEEDED) HARVESTED FIELDS GOOD HEALTHY CORPS- CORRECT CROPS NO PONDING REELS FEED BINS LAGOON GARBAGE Bermuda grass: Opens March I st - Ends September 30t" Small Grain Over seed-. Opens October Ist- Ends March 31st Corn: Opens February I 5th - Ends June 30th Cotton: Opens March I 5th - Ends August 1 �,t Rye: Opens September I -,t - Ends March 3 1 3t Oats: -Opens September 13t- Ends April 15th Wheat: Opens September 1-3t - Ends April 30th Soybeans: Opens April 13t - Ends September I Sth Fescue: Opens August I �,t - Ends July 31 st Sorghum Hay: Opens March I 5th - Ends August 31 st