HomeMy WebLinkAboutNC0050610_NOV2020PC0413_20201009Water Quality Lab & Operations, Inc.
P.O. Box 1167/ 1522 Tynecastle Highway
Banner Elk, NC 28604
Ph. 828-898-6277 Fax 828-898-6255
October 9, 2020
Lon T. Snider, Regional Supervisor
450 West Hanes Mill Road, Suite 300
Winston-Salem, NC 27105
Re: The Ponds WWTP, NOV-2020-PC-0413
Dear Mr .Snider:
NC Department of
Environmental Quality
..• Received
OCT 2 0 2020
Winston-Salem
Regional Office '
In response to the inspection report and Notices of Violation noted in the report, we would offer
the following items:
• The plant description -will be updated as requested upon the next permit renewal cycle.
• The sampler has been relocated per specifications noted in the report.
• Concerning the alarm and telemetry system referenced, an electrician, Donald Williams,
is expected to complete repair of both on 10/9/2020.
• The pipe from the EQ to the digester has been repaired.
• Concerning the repairs to the plant, Avery Machine and Welding is currently working on
replacing railings, grates, walkways, and attending to other areas of the plant that require
maintenance where there was visible rust. This work is ongoing but by our estimation, it
is over 50% complete and will. proceed without cessation until all of the aforementioned
have been addressed.
• A new blower has been purchased and is at the plant. We are awaiting the arrival of
pulleys, which have been ordered, in order to complete the installation of the blower.
• A new settleometer has been purchased and is in use. It is being stored in the blower
house of The Ponds.
• At the time of inspection, the pin was low. The ORC has since replaced the pin.
• A new generator has been placed at the plant and should be installed shortly, pending the
remaining electrical work which must be completed by a licensed electrician. We are on
the electrician's schedule and expect the work to be completed within the next few
weeks.
Thank you for the opportunity to address the items contained in your report. As evidenced above,
____we have.expended considerable time and money in completing necessary repairs and addressing
any deficiency noted in the inspection report. Water Quality Utilities is committed to complying
with the regulations concerning maintenance and operation of its wastewater plants.
Thank you for your time and consideration. Please feel free to contact us if we can be of further
assistance or provide additional information.
ySin'elIulI our
Owner
I4r