Loading...
HomeMy WebLinkAbout20061103 Ver 1_Year 3 Monitoring Report_20150414Northgate Park (Ellerhe Creek) Stream Restoration Monitoring Report EEP Project # 272 Contract #: 6230 USACE Action ID #: 200620453 DWR Project #: N/A County: Durham Monitoring Year 03 Submitted to: as stem E a e er�� PROGRAM NCDENR -EEP, 1652 Mail Service Center, Raleigh, NC 27699 -1652 Data Collection: 2014 Construction Completed: December 2008 Submitted: January 2015 Monitoring Firm K C I ASSOCIATES OF NC Landmark Center II, Suite 220 4601 Six Forks Road Raleigh, NC 27609 Phone: (919) 278 -2514 Fax: (919) 783 -9266 Project Contact: Adam Spiller Email: adam.spiller(&kci.com KCI Project No: 16146867 Design Firm [ij a URS Corporation — North Carolina 1600 Perimeter Park Drive Suite 400 Morrisville, North Carolina 27560 (919) 461 -1100 Fax (919) 461 -1415 Northgate Park (Ellerhe Creek) KCI Associates of North Carolina EEP Project # 272 2014 - MY03 Table of Contents 1.0 EXECUTIVE SUMMARY / PROJECT ABSTRACT ............................ ..............................1 2.0 METHODOLOGY ...................................................................................... ..............................2 3.0 REFERENCES ............................................................................................ ..............................3 Appendix A — Project Vicinity Map and Background Tables Figure1. Vicinity Map ..................................................................................... ..............................5 Table la. Project Restoration Components ....................................................... ..............................6 Table lb. Project Component Summations ....................................................... ..............................7 Table 2. Project Activity and Reporting History ............................................ ..............................7 Table 3. Project Contacts Table ...................................................................... ..............................8 Table 4. Project Attribute Table ...................................................................... ..............................9 Appendix B — Visual Assessment Data Figure 2. Current Condition Plan View ........................................................... ............................... l l Table 5. Visual Stream Morphology Stability Assessment ............................. .............................14 Table 6. Vegetation Condition Assessment ..................................................... .............................16 StreamStation Photos .................................................................................................. .............................17 Vegetation Monitoring Plot Photos .............................................................................. .............................23 Appendix C — Vegetation Plot Data Table 7. Vegetation Plot Criteria Attainment .................................................. .............................25 Table 8. CVS Vegetation Plot Metadata .......................................................... .............................25 Table 9. CVS Stem Count Total and Planted by Plot and Species .................. .............................26 Appendix D — Stream Survey Data Cross - Section Plots ...................................................................................................... .............................28 LongitudinalProfile Plots ............................................................................................ .............................33 PebbleCount Plots ....................................................................................................... .............................35 Table 10. Baseline- Stream Data Summary Table .............................................. .............................40 Table 11 a. Monitoring — Cross - Section Morphology Data Table ........................ .............................43 Table 1 lb. Monitoring — Stream Reach Morphology Data Table ....................... .............................44 Appendix E — Hydrologic Data Table 12. Verification of Bankfull Events ......................................................... .............................47 Northgate Park (Ellerhe Creek) KCI Associates of North Carolina EEP Project # 272 2014 - MY03 1.0 EXECUTIVE SUMMARY / PROJECT ABSTRACT In 2008, the North Carolina Ecosystem Enhancement Program (EEP) restored and enhanced a reach of Ellerbe Creek, an Unnamed Tributary to Ellerbe Creek (UT 3), and stream buffer within Northgate Park in Durham County, NC. The project also included the creation of two stormwater wetlands with outfalls to the project streams. The 5.9 -mi2 project watershed is located in US Geological Survey Hydrologic Unit 03020201 -05 -0010 (NC Division of Water Quality Sub -basin 03- 04 -01) of the Neuse River Basin. This Hydrologic Unit is within EEP's Ellerbe Creek Local Watershed Plan (2003) area and is also listed as a Targeted Local Watershed (TLW) in EEP's Neuse River Basin Priorities Plan (2010).This project is within the Falls Lake watershed, a drinking supply reservoir for the City of Raleigh. The drainage area for the site is urban residential land. The State has a permanent conservation easement of 7.5 acres and the project is located entirely within Northgate Park, which is a City of Durham public park. The project stream begins at the pedestrian bridge near the baseball diamond and flows 2,284 linear feet to the culvert under Acadia Street. The project goals and objectives are listed below. Project Goals • Improving water quality. • Enhancing flood attenuation. • Restoring aquatic and riparian habitat. Project Objectives • Restoring the Project Reach to a stable urban stream channel that will retain its dimension, pattern, and profile over time, and that is capable of transporting watershed flows and sediment load efficiently. • Using Priority II restoration to change Ellerbe Creek from a G5c type stream channel to a E type channel. • Enhancing the capacity of the site to mitigate flood flows by improving the connection of the stream to its floodplain. • Improving aquatic habitat by establishing a heterogeneous bed morphology with riffle -pool sequences supported by in- stream structures. • Restoring the riparian buffer from park grasses and herbaceous vegetation to Piedmont Bottomland Forest to provide filtration of nutrients and organic matter inputs into the stream, to improve wildlife habitat, and to provide shade for the stream channel. • Reducing sediment inputs from localized streambank erosion by re- establishing stream geometry and by stabilizing and revegetating the stream banks. • Installing three stormwater wetland best management practices (BMPs) to reduce stormwater pollutants (namely nitrogen and phosphorus) and improve water quality prior to discharging into the stream. Construction was completed at the site in December 2008. In March 2009, live stakes were planted along the stream and the stormwater wetlands were planted. The planting of the riparian buffer was delayed until November 2009 when the rest of the site was planted with tublings and containerized plants. After planting, six vegetation plots were installed following the CVS -EEP vegetation monitoring procedure, five in buffer restoration areas and one in the planted stream riparian zone. Repairs were conducted at the site beginning in late 2013 and ending in March 2014. Once construction was completed, newly repaired banks were planted with live stakes and disturbed construction areas were planted with native transplants. The vegetation monitoring success criterion for the planted stream riparian zone is a density of 320 stems /acre after the third year of monitoring and an allowance for 10% mortality in the fourth and fifth years with a final density of 260 stems /acre. The vegetation monitoring success criterion for the buffer restoration zone is a density of 320 stems /acre after the fifth year of monitoring. Plot I is located in the stream riparian zone and Plots 2 -6 are located in the buffer enhancement and restoration zones. The third- Northgate Park (Ellerbe Creek) KCI Associates of North Carolina EEP Project # 272 1 2014 - MY03 year vegetation monitoring was based on the Level 2 CVS -EEP vegetation monitoring protocol. The site's average density for this monitoring period was 182 planted stems /acre. Five of the six plots had less than 320 planted stems /acre, with plot 6 being the only one to meet the success criteria. Despite this lack of planted woody vegetation, volunteer species are robust throughout the site and including volunteers, the site averaged 3,642 total stems /acre. The easement includes a few isolated areas of managed herbaceous zones (as shown in Figure 2) for public safety sight line considerations and pedestrian trail access. Invasive species are present throughout the site, but are only scattered in small patches throughout the easement. The 2014 monitoring found some areas with low densities of trees. The streamside vegetation, especially the willows (Salix spp.) on the lower half of the site, has also been impacted by beaver, and they have destroyed many of the previously large and healthy trees along the bankfull bench. There is no beaver dam or lodge on -site; the beaver are most likely accessing the site from downstream of the project reach. The project as -built survey was conducted in January 2009 and KCI conducted the first -year monitoring survey in January 2010. The longitudinal profile in Appendix D includes the longitudinal profile data from both of these surveys. The as -built profile data are limited in that the survey measurements taken were not annotated in the field and water surface measurements were not taken. As a result, the survey is not detailed enough to generate baseline profile morphology data. The five detailed cross - sections were installed after the as -built survey, so there are no baseline dimensional data, but there are first -year dimensional data. Because of the repair work that occurred in 2013 and 2014, cross - sections 3, 4, and 5 were all reinstalled in October 2014. An effort was made to install these as close to the original cross - sections as possible, but there are slight differences between the first two years and the current year of monitoring. This year's cross - sectional survey showed all cross - sections functioning as intended. Cross - sections 1 and 2 continue to trend towards stability. The banks of cross - sections 3 and 5 received vegetated soil lifts and the bank of cross - section 4 was graded as part of the repair work mentioned above. The third year of monitoring found both Reach 1 and 2 to be stable and functioning as designed. Although the bed shows areas of significant aggradation along Reach 1 and degradation along Reach 2 compared to the as -built conditions, it shows little change compared to the MY01 and MY02 surveys. Areas of bank erosion and structural failure mentioned in previous reports were corrected during the repairs mentioned above. As a part of the stream success criterion, the stream must experience at least two bankfull events, each in separate monitoring years. The site has experienced multiple bankfull events since construction. Summary information/data related to the occurrence of items such as beaver or encroachment and statistics related to performance of various project and monitoring elements can be found in the tables and figures in the report appendices. Narrative background and supporting information formerly found in these reports can be found in the Baseline Monitoring Report and in the Mitigation Plan documents available on the EEP's website. All raw data supporting the tables and figures in the appendices are available from EEP upon request. 2.0 METHODOLOGY The survey data were collected with a total station instrument, using control coordinates supplied by URS and the as -built surveyor, Level Cross. The MY03 stream survey was completed on December 22, 2015 The stationing for the longitudinal profile is based on the thalweg stationing and has been adjusted to match grade control structures from previous longitudinal profiles. The CVS -EEP protocol, Level 2 (http:/ /cvs.bio.unc.edu /methods.htm) was used to collect vegetation data from the site. The MY03 vegetation survey was conducted on October 22, 2014. Northgate Park (Ellerbe Creek) KCIAssociates of North Carolina EEP Project # 272 2 2014 - MY03 3.0 REFERENCES DWQ, 2000. Neuse Riparian Buffer Mitigation Rules. 15A NCAC 2B.0242 (http://ncrules.state.nc.us/ncac/title%2015a%20- % 20environment %20and %20natural %20resources /chapter %2002 %20 - %20environmental %20management /subchapter %20b / 15a %20ncac %2002b %20.0242.html) EEP. 2003. Ellerbe Creek Local Watershed Plan. ( htt p:// www .nceep.net/services /lwps/Upper Neuse/Ellerbe_Creek Local_ Watershed_Plan.pdf) EEP. 2010. Neuse River Basin Restoration Priorities. (draft available: http: / /www.neeep .net /services /restplans/DRAFT RBRP Neuse_201007.pd1) Lee, M. T., R. K. Peet, S. D. Roberts, and T. R. Wentworth. 2006. CVS -EEP Protocol for Recording Vegetation, Version 4.0 ( http: / /cvs.bio.unc.edu/methods.htm). USACE. 2003. Stream Mitigation Guidelines. (http: / /www. saw.usace. army. mil /wetlands/Mitigation /Documents /Stream/). Weakley, A. S. 2006. Flora of the Carolinas, Virginia, Georgia, and Surrounding Areas. (http://www.herbarium.unc.edu/FloraArchives/WeaklaFlora 2006-Jan.%ff). Northgate Park (Ellerbe Creek) KCI Associates of North Carolina EEP Project # 272 3 2014 - MY03 Appendix A Project Vicinity Map and Background Tables Northgate Park (Ellerbe Creek) KCIAssociates ofNorth Carolina EEP Project # 272 4 2014 - MY03 Ferns kasr�oo GRANVILLE d0. •Q Rowemont Dr 3 •�i Q d o �a F Astor ct E m so ORANGE L = y� Glasgow Kirkwood Dr _ e slO • , E Fairlawn Rd �- Commie St Richwood Rd WAKE Ellen St o z C A❑ 3 Lombard Ave m♦ s ♦ ? 501 ♦ E m 501 oyj ♦ .A =irk Rd — — � I Stadium Dr ; i Fawn Ave •� obtc 0 ve / n � P 6tM1z ^ North Pointe Dr / Front St Reichard St S. Delatleld Ave A c � o Rd -- ? M"r-Y Ave 3 ob a GreeK m y ul 3 y rpe _ x10 J Maynard Ave w �e c / Leon St Leon St Indian Trl r 9P w / 65 (Sunset Ave Ruby St c SP nt ve to c� NOR T GAT PARK _ Pershing St desO Wils E U o d Wilsonst o� / 3 Woodrow m ` S[ F St ClubBlvd Brookline Z SI LL �% a ♦ , G/ Englewood Ave o a O N V ♦, Knox St Knox St i9 — in m ♦ < 65 rn �' o £' m m m ♦ _ _ ' � � 3 Knox St < < vfn ♦ 2 `m > w m o .'fin+ —_ �St ♦ `O Demerius St v`i ♦ Green St O Clark St 5 ♦ .J Pratt Ave V%m., St Green St N Elder St d�.. / rn` Markham Ave s o 8 o < Elba St ♦ to = Macon St Urban Ave N O Fnym Rd 70 Dacian Ave Dacian Ave ❑ � g 3w _ � ♦ O ( ♦ Trinity Ave ♦ Minerva Ave Figure 1. Vicinity Map Roads ^i Major Streams QCounties wa Municipalities Project Location r� - 1:24,000 �; OS Ill ' Northgate Park inch = 2,000 feet xSte k Hillandale Golf Course Project #127 Lt' kaoncement K C I „ Local Watershed Plan Boundary 0 500 1,000 2,000 Pao�aoM Feet Table 1. Project Components and Mitigation Credits North ate Park (Ellerbe Creek), EEP Project #272 Miti ation Credits Riparian Non - riparian Nitrogen Phosphorous Stream Wetland Wetland Buffer Nutrient Nutrient Offset Offset Type R RE R RE R RE Length 867 1,247 Credits 867 831 TOTAL 1,698 CREDITS Project Components Project Existing Approach Restoration -or- Component Stationing/ Restoration Mitigation Footage/ (PI, PII Restoration -or- Location Acreage etc.) Equivalent Footage /Acreage Ratio Reach ID Reach 1 10 +00 —25+20 1,520 PII Enhancement 1 1,247* 1.5:1 Reach 2 25 +20 —32+70 646 PII Restoration 750 1:1 UT 3 100 +00 —101+17 104 PII Restoration 117 1:1 Buffer Restoration 3.63 1:1 Buffer I W_�I I Enhancement 0.23 3:1 Comp onent Summation Riparian Stream Non - Riparian Upland Restoration Level wetlands Buffer (square feet) (linear feet) Wetlands (Acres) (Acres) (Acres) Restoration 867 158,172 Enhancement I 1,247 T 10,000 Enhancement II TOTAL SMU 1,698 TOTAL RBMU 161,505 *The stream length for Reach 1 does not include the following easement exceptions: stream with one -sided easement, Lavender Street Road right -of -way, pedestrian bridge crossing Northgate Park (Ellerbe Creek) KCI Associates of North Carolina EEP Project # 272 6 2014 - MY03 Table 2. Project Activity and Reporting History Project Number and Name: 272 - Northgate Park (Ellerbe Creek) Elapsed Time Since Grading Complete: 6 yr 1 months Elapsed Time Since Planting Complete: 5 yr 2 months Number of Reporting Years: 3 Activity or Report Data Collection Complete Actual Completion or Deliver Concept Plan Jan 06 Restoration Plan Jun 06 Final Design - 90% May 07 Construction Dec 08 As -Built Survey Jan 09 Live Stake Planting Mar 09 Riparian Buffer Planting Nov 09 Year 1 Monitoring Nov 09 - Jan 10 May 10 Year 2 Monitoring Sept 10 - Dec 10 Dec 10 Repair Mar 14 Year 3 Monitoring Jan 15 Jan 15 Northgate Park (Ellerbe Creek) KCI Associates of North Carolina EEP Project # 272 7 2014 - MY03 Table 3. Project Contacts Table Project Number and Name: 272 - Northgate Park (Ellerbe Creek) Design Firm URS 1600 Perimeter Park Drive, Suite 400 Morrisville, North Carolina 27560 Contact: Ms. Kathleen McKeithan Phone: 919 461 -1597 Construction Contractor Environmental Quality Resources, LLC 1405 Benson Court, Suite C Arbutus, MD 21227 Contact: Mr. John Talley Phone: (443) 304 -3310 ext.110 Fax: (443) 304 -3315 Planting Contractor HARP 301 McCullough Drive, 4th Floor Charlotte, North Carolina 28262 Contact: Mr. Alan Peoples Phone: (704) 841 -2841 Repair Design Firm KCI Associates of NC Landmark Center Il, Suite 220 4601 Six Forks Rd. Raleigh, NC 27609 Contact: Mr. Adam Spiller Phone: (919) 278 -2514 Fax: (919) 783 -9266 Repair Construction Contractor Carolina Environmental Contracting, Inc. PO Box 1905 Mount Airy, NC 27030 -6905 Contact: Ms. Joanne Cheatham Phone: (336) 320 -3849 Monitoring Performers MY -00 - 03 KCI Associates of NC Landmark Center Il, Suite 220 4601 Six Forks Rd. Raleigh, NC 27609 Contact: Mr. Adam Spiller Phone: (919) 278 -2514 Fax: (919) 783 -9266 Northgate Park (Ellerbe Creek) KCI Associates of North Carolina EEP Project # 272 8 2014 - MY03 Table 4. Project Attribute Table Project Number and Name: 272 - North ate Park Ellerbe Creek Project County Durham County Ph sio ra hic Region Piedmont Ecore ion Triassic Basin Project River Basin Neuse USGS HUC for Project (14 digit) 03020201050010 NCDWQ Sub -basin for Project 03 -04 -01 Within extent of EEP Watershed Plan? Yes - Ellerbe Creek LWP WRC Class (Warm, Cool, Cold) Warm % of project easement demarcated 100% Beaver activity observed during design phase? No Restoration Component Attribute Table Reach 1 Reach 2 UT 3 Drainage Area 5.9 s .mi. 5.9 s .mi. - Stream Order Third Third First Restored length (feet) 1,466 690 117 Perennial or Intermittent Perennial Perennial Perennial Watershed Type (Rural, Urban, Developing, etc.) Urban Watershed LULC Distribution Urban Ag -Row Crop Ag- Livestock Forested Water/Wetlands 38% 0% 0% 62% <1% Watershed impervious cover ( %) - NCDWQ AU /Index Number 27- 5 -(0.7) NCDWQ Classification WS -IV; NSW 303d listed? Yes Upstream of a 303d listed segment? Yes Reasons for 303d Listing or Stressor impaired biological integrity Total acreage of easement 7.5 Acres Total vegetated acreage within the easement 1.0 Acre Total planted acreage as part of the restoration 6.4 Acres Ros en Classification of pre-existing G5c G5c - Ros en Classification of As -built C5 C5 - Valley Type U U U Valley Sloe 0.0006 0.0005 U Valley side slope range (e.g. 2 -3 %) U U U Valley toe slope range (e.. 2 -3 %) U U U Trout waters designation No Species of concern, endangered etc.? (Y/N) No Dominant soil series and characteristics Series Chewacla and Wehadkee Depth Cla % - - - K - - T - - "N /A" is for items that do not apply. " -" is for items that are unavailable. "U" is for items that are unknown. Northgate Park (Ellerbe Creek) KCI Associates of North Carolina EEP Project # 272 9 2014 - MY03 Appendix B Visual Assessment Data Northgate Park (Ellerbe Creek) KCIAssociates ofNorth Carolina EEP Project # 272 10 2014 - MY03 * ,4y "�7 p 4 h LEGEND EASEMENT BOUNDARY ...................... AS -BUILT STATIONED ........................ PHOTO POINT (PP) ........................... v� CROSS - SECTION (XS) ....................... �o BMP............... ............................... a PROJECT CONDITION VEG PLOT ACHIEVING DENSITY CRITERION ......................... VEG PLOT BELOW ■ DENSITY CRITERION ......................... VEG PLOT TOTAL / PLANTED STEM DENSITY ................... 3642/182 LOW PLANTED STEM DENSITY............ I I wy F Lu R� try �,►��f} ��•- yyy} " �• � _. �1 ��; �' rt ¢1V' Y Lu 1S . F•i / i Fr. Tt e Lij uj ui Lu A. Z N �.. X_ • i�� Vii•.., r-1 LL W O Q r• . •�0 r A 2013 REPAIR ITEMS SOIL LIFT ............................ ............................... GRADED BANK ..................... ............................... , �U RIFFLE GRADE CONTROL ....... ............................... C ' �o QZ KJ O �a Z pU wx 5 z w M Y O L o � u z Q J W U } ° z o U m Q N z 2 F- W lo� _ of co O W J 0 z o w W F o j U z Y O z Q o 0 z � CV ¢_ U) r` w < Q C U = U ¢ W �w 0 J p z� w a DATE JAN 2015 KD GRAPHIC CURRENT CONDITION PLAN VIEW 1147 P 4 �' „ N'T to * L� �t�. � �� `� ,�• sdu. },pp. a.1F�i 1r 3E�� }•h' •� //� � ®'p'f � °.� J . ,�• +iR i R' "� ! �.'. 1 rt'�'a t. yy� ♦ 'Y .r ' r` ` a ✓Y g �° +MpL p' /t �f r' si 1 ,. ?s• "tom -,,�� p ;`- _0" - " l y.•y � l --., _� ••. , i y J f �y. -� '�` °s 1_ �����y� �• �-.,�`1�' y`bFf .4.t .�.�i' `,` � � Y p .r} � l ��.1; Y d t � 'p ' -�fi~ ,�•�-.° •�K ,� -y. - M J, - a�i .1 +,:• ` ',, F° !� `j ,yr �'� , a , �. �.r�N. -" � .� �}�.`� �ap�a.. {. 11 � 1 i.1 r�w � 'fir ��'r . +� , �_ r � k �' •� � '� `+ �, .,a. t + ! . J", - a t,3� r• tl, 4. �; i,- R� m Lu W 2 (n LLl LLJ co i r. ". LEGEND N PROJECT CONDITION Lu 2013 REPAIR ITEMS EASEMENT BOUNDARY ...................... W (n VEG PLOT ACHIEVING DENSITY CRITERION ......................... a Z O SOIL LIFT............................ ............................... AS -BUILT STATIONED.. ...................... 0 O = VEG PLOT BELOW ■ DENSITY CRITERION ......................... Z g GRADED BANK ..................... ............................... PHOTO POINT (PP) ........................... 0__ VEG PLOT TOTAL / PLANTED STEM DENSITY ................... 3642/182 RIFFLE GRADE CONTROL ....... ............................... CROSS - SECTION (XS) ....................... °moo LOW PLANTED STEM DENSITY............ BMP............... ............................... � w Y z Z O K { r ru c I2 N Lu W (n U a Z O Lu LLl Lu o 0 O = cf) Z g r z � w Y o wN z + N LL W C) } J ° o F co Z = w elf (if U) 0 J O z o � z 0 Z 0 z Q F- ° 0 L1J Q (n w Q L (7 F U 2 () a m f— w w �OO ° w z � onre JAN 2015 ­Le GRAPHIC CURRENT CONDITION PLAN VIEW SHEET 2 OF 3 I, i Cl ,� n. N H W W 2 • U W W W z J U Q MWATER a� LAND #2 r . I� LEGEND EASEMENT BOUNDARY ...................... AS -BUILT STATIONED ........................ PHOTO POINT (PP) ........................... CROSS - SECTION (XS) ....................... °moo BMR............... ............................... n f w A, lk ' A PROJECT CONDITION VEG PLOT ACHIEVING DENSITY CRITERION ......................... VEG PLOT BELOW ■ DENSITY CRITERION ......................... VEG PLOT TOTAL / PLANTED STEM DENSITY ................... 3642/182 LOW PLANTED STEM DENSITY............ 2013 REPAIR ITEMS SOILLIFT ............................ ............................... GRADED BANK ..................... ............................... RIFFLE GRADE CONTROL ....... ............................... iM ,d_ 1 i ,r L z O O a M I F ¢z �w O O- O z oox x� 111111 z a z w It Y o ' ■.� 11 W W z o J M LLI Lu Go .. W.Z F n W 0 0 " JO z x W + `i Z Z N YO D o o ►'�" Q �.f a_ N ¢ * W r w f— N W .� Q it = U = W w O 0 W pnp, z a onre. JAN 2015 1 -. `� + • 1 scare. GRAPHIC r�1 CURRENT CONDITION PLAN VIEW Y .�•'.•Y SHEET 3 OF 3 i rj-� -_7 i` LEGEND EASEMENT BOUNDARY ...................... AS -BUILT STATIONED ........................ PHOTO POINT (PP) ........................... CROSS - SECTION (XS) ....................... °moo BMR............... ............................... n f w A, lk ' A PROJECT CONDITION VEG PLOT ACHIEVING DENSITY CRITERION ......................... VEG PLOT BELOW ■ DENSITY CRITERION ......................... VEG PLOT TOTAL / PLANTED STEM DENSITY ................... 3642/182 LOW PLANTED STEM DENSITY............ 2013 REPAIR ITEMS SOILLIFT ............................ ............................... GRADED BANK ..................... ............................... RIFFLE GRADE CONTROL ....... ............................... iM ,d_ 1 i ,r L z O O a M I F ¢z �w O O- O z oox x� 111111 z a z w It Y o ' ■.� 11 W W z o J M LLI Lu Go .. W.Z F n W 0 0 " JO z x W + `i Z Z N YO D o o ►'�" Q �.f a_ N ¢ * W r w f— N W .� Q it = U = W w O 0 W pnp, z a onre. JAN 2015 1 -. `� + • 1 scare. GRAPHIC r�1 CURRENT CONDITION PLAN VIEW Y .�•'.•Y SHEET 3 OF 3 Table 5. Visual Stream Morphology Stability Assessment Project Number and Name: 272 - Northgate Park (Ellerbe Creek) Reach 1 Assessed Length 1520 Number Number with Footage with Adjusted %for Major Stable, Total Number of Amount of %Stable, Stabilizing Stabilizing Stabilizing Channel Channel Performing Number in Unstable Unstable Performing Woody Woody Woody Category Sub - Category Metric as Intended As -built Segments Footage as Intended Vegetation Vegetation Vegetation 1. Bed 1. Vertical Stability (Riffle and Run units) 1. Aegradation - Bar formation/growth sufficient to significantly deflect flow laterally (not to include point bars) 0 0 100% 2. Deeradation - Evidence of downcutting 0 0 100% 2. Riffle Condition* 1. Texture /Substrate - Riffle maintains coarser substrate 8 8 100% 3. Meander Pool Condition' 1. Depth Sufficient (Max Pool Depth : Mean Bankfull Depth > 1.6) 6 13 46% 2. Length appropriate ( >30% of centerline distance between tail of upstream riffle and head of 6 13 46% downstrem riffle) 4.Thalweg Position' 1. Thalweg centering at upstream of meander bend 0 0 N/A 2. Thalweg centering at downstream of meander (Glide) 0 0 N/A 2. Bank 1. Scoured/ Eroding Bank lacking vegetative cover resulting simply from poor growth and/or scour and erosion 0 o 0 0 100 /0 0 0 100 /o Banks undercut /overhanging to the extent that mass 2. Undercut wasting appears likely. Does NOT include undercuts that are modest, appear sustainable and are 0 o 0 0 100 /0 0 0 100 /o providing habitat. 3. Mass Wasting lBank slumping, calving, or collapse 0 1 0 1 100% 1 0 1 0 1 100% Totals 0 0 100% 0 0 100% 3. Engineered Structures 1. Overall Integrity Structures physically intact with no dislodged boulders or logs. 6 6 o 100% 2. Grade Control Grade control structures exhibiting maintenance of grade across the sill. 6 6 o 100% 2a. Piping Structures lacking any substantial flow underneath sills or arms. 6 6 o 100% Bank erosion within the structures extent of 3. Bank Protection influence does not exceed 15 %. (See guidance for 6 6 100% this table in EEP monitoring guidance document) Pool forming structures maintaining — Max Pool 4. Habitat Depth : Mean Bankfull Depth ratio > 1.6 6 6 100% Rootwads /logs providing some cover at base -flow. 'This is not a meandering reach, so all pools are associated with structures. Northgate Park (Ellerbe Creek) KC[ Associates of North Carolina EEP Project # 272 14 2014 - MY03 Table 5. Visual Stream Morphology Stability Assessment Project Number and Name: 272 - Northgate Park (Fllerbe Creek) Reach Assessed Length 750 Number Number with Footage with Adjusted %for Major Stable, Total Number of Amount of %Stable, Stabilizing Stabilizing Stabilizing Channel Channel Performing Number in Unstable Unstable Performing Woody Woody Woody Category Sub-Catetiory Metric as Intended As -built Segments Footage as Intended Ve etation Ve etation Ve etation 1. Bed 1. Vertical Stability (Riffle and Run units) 1. Aegradation -Bar formation /growth sufficient to significantly deflect flow laterally (not to include point bars) 0 0 o 100% 2. Degradation - Evidence of downcutting 0 0 100% 2. Riffle Condition 1. Texture /Substrate - Riffle maintains coarser substrate 5 5 100% 3. Meander Pool Condition 1. Depth Sufficient (Max Pool Depth : Mean Bankfull Depth > 1.6) 4 6 o 67 /o 2. Length appropriate ( >30% of centerline distance between tail of upstream riffle and head of 4 6 67% downstrem riffle) 4.Thalweg Position (R )alweg centering at upstream of meander bend 5 - 100% 2. Thalweg centering at downstream of meander (Glide) 5 5 100% 2. Bank 1. Scoured /Eroding Bank lacking vegetative cover resulting simply from poor growth and/or scour and erosion 0 0 100 °�� 0 0 o 100% Banks undercut /overhanging to the extent that mass 2. Undercut wasting appears likely. Does NOT include undercuts that are modest, appear sustainable and are o 0 0 100 /0 0 0 0 100 /o providing habitat. 3. Mass Wasting Bank slumping, calving, or collapse 0 0 100% 0 0 100% 'totals T 0 0 100% 0 0 100 % 3. Engineered Structures 1. Overall Integrity Structures physically intact with no dislodged boulders or logs. 4 4 100% 2. Grade Control Grade control structures exhibiting maintenance of grade across the sill. 4 4 o 100% 2a. Piping Structures lacking any substantial flow underneath sills or arms. 2 ? 100% Bank erosion within the structures extent of 3. Bank Protection influence does not exceed 15 %. (See guidance for 2 2 100% this table in EEP monitoring guidance document) Pool forming structures maintaining — Max Pool Ad 4. Habitat Depth : Mean Bankfull Depth ratio > 1.6 2 2 100% Rootwads/logs providing some cover at base -flow. . Northgate Park (Ellerbe Creek) KC[ Associates of North Carolina EEP Project # 272 15 2014 - MY03 Table 6. Vegetation Condition Assessment Project Number and Name: 272 - Northgate Park (Ellerbe Creek) PlantedAcrea a 6.4 EasementAcrea a 7.5 CCPV Number of Combined Vegetation Category Definitions Mapping Threshold Depiction Polygons Acreage % of Planted Acreage Very limited cover of both woody Pattern and 1. Bare Areas 0.1 acres 0 0.00 o 0.0% and herbaceous material. Color Woody stem densities clearly below 2. Low Stem Density Pattern and target levels based on MY3, 4, or 5 0.1 acres 2 0.14 2.2% Areas Color stem count criteria. Wr 2, 0,14 Areas with woody stems of a size 3. Areas of Poor Pattern and class that are obviously small given 0.25 acres 0 0.00 0.0% Growth Rates or Vigor Color the monitoring ear. Cumulative Total 2 0.14 4. Invasive Areas of Areas or points (if too small to Pattern and 1000 SF 0 0.00 0.0% Concern render as polygons at map scale). Color 5. Easement Areas or points (if too small to Pattern and Encroachment Areas render as polygons at map scale). none Color 0 0.00 0.0% Northgate Park (Ellerbe Creek) KCI Associates of North Carolina EEP Project # 272 16 2014 - MY03 Stream Station Photos PP #1 - MY01- 1/19/10 PP #1 - MY03 - 10/22/14 PP #2A - MY01- 1/19/10 PP #2A - MY03 - 10/22/14 PP #2B MY01 1/ 19/10 PP #2B MY03 10/22/14 Northgate Park (Ellerbe Creek) KCIAssociates of North Carolina EEP Project # 272 17 2014 - MY03 PP #3A - MY01 - 1/19/10 PP #3A - MY03 - 10/22/14 PP #3B - MY01 - 1/19/10 PP #3B - MY03 - 10/22/14 PP #4 MY01 - 1/19/10 PP #4 - MY03 - 10/22/14 Northgate Park (Ellerbe Creek) KCIAssociates of North Carolina EEP Project # 272 18 2014 - MY03 PP #5 - MY01 - 1/19/10 PP #5 - MY03 - 10/22/14 PP #6A - MY01- 1/19/10 PP #6A - MY03 - 10/22/14 PP #6B - MY01- 1/19/10 PP #6B - MY03 - 10/22/14 Northgate Park (Ellerbe Creek) KCIAssociates of North Carolina EEP Project # 272 19 2014 - MY03 PP #7A - MY01 - 1/19/10 PP #7A - MY03 - 10/22/14 PP #7B - MY01 - 1/19/10 PP #7B - MY03 - 10/22/14 PP #8A - MY01 - 1/19/10 PP #8A - MY03 - 10/22/14 Northgate Park (Ellerbe Creek) KCIAssociates of North Carolina EEP Project # 272 20 2014 - MY03 PP #8B - MY01 - 1/19/10 PP #8B - MY03 - 10/22/14 PP #9A - MY01- 1/19/10 PP #9A - MY03 - 10/22/14 PP #9B - MY01 - 1/19/10 PP #9B - MY03 - 10/22/14 Northgate Park (Ellerbe Creek) KCIAssociates of North Carolina EEP Project # 272 21 2014 - MY03 PP #9C - MY01- 1/19/10 PP #9C - MY03 - 10/22/14 PP #10 - MY01- 1/19/10 PP #10 - MY03 - 10/22/14 Northgate Park (Ellerbe Creek) KCIAssociates of North Carolina EEP Project # 272 22 2014 - MY03 Vegetation Monitoring Plot Photos Plot 1 Photo — Taken looking southeast from the plot origin. MY03 — 10/22/14 Plot 2 Photo — Taken looking south from the plot origin. MY03 — 10/22/14 Plot 3 Photo — Taken looking east from the plot origin. MY03 — 10/22/14 Plot 4 Photo — Taken looking south from the plot origin. MY03 — 10/22/14 Plot 5 Photo — Taken looking east from the plot origin MY03 — 10/22/14 Plot 6 Photo — Taken looking south from the plot origin. MY03 — 10/22/14 Northgate Park (Ellerbe Creek) KCIAssociates of North Carolina EEP Project # 272 23 2014 - MY03 Appendix C Vegetation Plot Data Northgate Park (Ellerbe Creek) KCI Associates of North Carolina EEP Project # 272 24 2014 - MY03 Table 7. Vegetation Plot Criteria Attainment Project Number and Name: 272 - Northgate Park (Ellerbe Creek) Vegetation Plot ID Vegetation Survlval Threshold Met? 1 No 2 No 3 No 4 No 5 No 6 Yes Table 8. CVS Vegetation Plot Metadata Project Number and Name: 272 - Northgate Park (Fllerbe Creek) Report Prepared By Tommy Seel i nger Date Prepared 1/27/2015 14:38 database name KCI- 2014 - Elerbe.mdb database location M: \2014 \16146867 NGP Monitoring computer name 12- 3ZV4FP1 file size 148521216 DESCRIPTION OF WORKSHEETS IN THIS DOCUMENT ------------ Metadata Description of database file, the report worksheets, and a summary of project(s) and project data. Proj, planted Each project is listed with its PLANTED stems per acre, for each year. This excludes live stakes. Proj, total stems Each project is listed with its TOTAL stems per acre, for each year. This includes live stakes, all planted stems, and all natural /volunteer stems. Plots List of plots surveyed with location and summary data (live stems, dead stems, missing, etc.). Vigor Frequency distribution of vigor classes for stems for all plots. Vigor bySpp Frequency distribution of vigor classes listed by species. Damage List of most frequent damage classes with number of occurrences and percent of total stems impacted by each. Damage bySpp Damagevalues tallied by type for each species. Damage by Plot Damage values tallied by type for each plot. Planted Stems by Plot and Spp A matrix of the count of PLANTED living stems of each species for each plot; dead and missing stems are excluded. ALL Stems by Plot and spp A matrix of the count of total living stems of each species (planted and natural volunteers combined) for each plot; dead and missing stems are excluded. PROJECT SUMMARY------------------------------------- Project Code 272 project Name Ellerbe Creek Description Stream and Buffer Restoration and Enhancement River Basin Neuse length(ft) 2200 stream -to -edge width (ft) 40 area (sq m) 16349.28 Required Plots (calculated) 6 Sampled Plots 16 Northgate Park (Ellerbe Creek) KCI Associates of North Carolina EEP Project # 272 25 2014 - MY03 Table 9. CVS Stem Count Total and Planted by Plot and Species Project Number and Name: 272 - North gate Park (Merbe Creek) Current Plot Data (MY3 2014) Annual Means Scientific Name Common Name Species Type E272 -A -0001 E272 -A -0002 E272 -A -0003 E272 -A -0004 E272 -A -0005 E272 -A -0006 MY3 (2014) MY2 (2010) MY1(2009) Pno P -all T Pno P -all T Pno P -all T Pno P -all T Pno P -all T Pno P -all T Pno P -all T Pno P -all T PnoLS P -all T Acer maple Tree 5 5 5 Acernegundo boxelder Tree 1 1 Acerrubrum red maple Tree 3 3 6 1 Acersacchorum sugar maple Tree 1 3 31 3 1 1 1 1 1 3 1 1 31 3 61 41 4 5 Alnus serrulata hazel alder Shrub 1 2 1 1 12 1 1 15 54 3 3 3 Aronia arbutifolia Red Chokeberry Shrub 1 1 1 1 1 1 Bacchoris halimifolia eastern baccharis Shrub 1 1 Betula nigra river birch Tree 2 3 1 6 15 Celtis laevigata sugarberry Tree 1 3 1 1 5 8 8 8 9 9 9 Cercis canadensis eastern redbud Tree 2 2 2 2 2 2 Cornus dogwood Shrub or Tree 1 3 3 3 Cornus amomum silky dogwood Shrub 2 2 4 4 6 2 3 3 Diospyros virginiana common persimmon Tree 3 3 3 3 4 4 6 7 7 12 10 10 10 2 2 2 Fraxinus pennsylvanica green ash Tree 20 7 5 1 33 1 1 30 1 1 1 Ilex cornuta Chinese holly Exotic 1 1 Juglans nigra black walnut Tree 1 3 1 2 1 11 8 Juniperus virginiana eastern redcedar Tree 1 1 2 23 2 1 2 2 3 3 3 31 5 5 6 5 5 5 Liquidambarstyrocifluo sweetgum Tree 69 62 28 14 16 189 144 Liriodendron tulipifera tuliptree Tree 20 1 6 6 2 2 3 2 2 36 4 4 9 5 5 5 Morus alba white mulberry Exotic 4 1 1 1 6 Oxydendrum arboreum sourwood Tree 1 1 1 1 1 1 Physocarpus ninebark Shrub 1 1 Pinus toeda loblolly pine Tree 10 29 53 6 2 26 126 4 Platanus occidentalis American sycamore Tree 4 1 10 3 18 1 1 30 1 1 1 Prunus virginiana chokecherry Shrub 1 1 Quercus oak Tree 1 1 41 1 Quercus coccinea scarlet oak Tree 1 1 7 1 1 1 1 9 1 1 1 4 4 4 Quercus lyrata overcup oak Tree 1 1 1 1 1 1 1 1 1 1 1 1 Quercus michauxii swamp chestnut oak Tree 3 3 3 3 3 3 6 6 6 9 9 9 12 12 12 Quercus pagoda cherrybark oak Tree 1 1 1 1 Quercus phellos willow oak Tree 3 31 3 3 41 3 3 3 Quercus rubra northern red oak Tree 11 11 2 Salix nigra black willow Tree 1 1 1 4 1 1 5 2 2 2 Sambucus canadensis Common Elderberry Shrub 1 1 2 1 1 11 1 1 1 Spiraea spirea Shrub 11 11 11 Symphoricarpos orbicu coralberry Shrub 1 1 1 1 1 1 Taxodium distichum bald cypress Tree 2 2 Ulmus elm Tree 1 Ulmus americana American elm Tree 1 1 1 1 1 3 Ulmus parvifolia IChinese elm Tree 1 1 Unknown I Shrub or Tree 1 2 2 2 14 14 14 Stem count size (ares) size (ACRES) Species count Stems per ACRE 4 4 139 7 7 93 0 01 153 2 2 61 6 61 31 8 8 63 27 27 540 57 57 361 85 89 89 1 1 1 1 1 1 6 6 6 0.02 0.02 1 0.02 1 0.02 0.02 0.02 1 0.15 0.15 0.15 21 21 15 31 3 171 01 01 15 2 2 11 2 2 8 41 41 12 10 10 31 17 17 26 20 22 22 162 162 5625 283 283 3764 0 0 6192 80.9 80.9 2469 243 243 1255 324 324 2550 182 1821364J2 384 384 2435 573 600 600 Northgate Park (Ellerbe Creek) KCIAssociates ofNorth Carolina EEP Project # 272 26 2014 - MY03 Appendix D Stream Survey Data Northgate Park (Ellerbe Creek) KCIAssociates of North Carolina EEP Project # 272 27 2014 - MP03 Cross - Section Plots River Basin: Elevation Watershed: Neuse XS ID XS - 1, Reach 1, Riffle Drainage Area (sq mi): 5.9 Date: 1/7/2015 Field Crew: T. Seelinger, A. Eason 7.6 299.66 9.3 299.25 n a: 14.5 298.25 16.7 298.42 r 297.93 19.0 297.65 20.2 297.30 IliM�l 296.33 23.7 295.73 24.2 294.67 l 294.57 27.4 294.30 28.5 294.16 30.0 294.10 31.8 294.06 33.7 293.95 35.9 293.93 37.7 294.18 40.3 294.53 41.8 295.13 42.5 296.30 44.8 297.54 46.7 298.22 49.0 299.54 - Neuse River Basin, Ellerbe Creek, MY03, XS - 1, Reach 1, Riffle 303 301 -- - - - - -- -------------------------------------------------- - - - - -- -- 299 0 297 ------------------------- ---------------------- - - - - -- -- -- - - - - -- w - Bankfull - - - -Flood Prone Area 295 MY01, 1/15/10 MY02, 9/14/10 51.3 300.58 ■ MY03. 1/7/15 293 0 10 20 30 40 50 Station (feet) Station Elevation Watershed: Ellerbe Creek, MY03 XS ID XS - 1, Reach 1, Riffle Drainage Area (sq mi): 5.9 Date: 1/7/2015 Field Crew: T. Seelinger, A. Eason Station Elevation 0.0 302.61 0.3 302.40 2.6 302.24 4.0 302.23 5.7 301.01 7.6 299.66 9.3 299.25 11.3 298.37 14.5 298.25 16.7 298.42 17.8 297.93 19.0 297.65 20.2 297.30 21.9 296.33 23.7 295.73 24.2 294.67 25.5 294.57 27.4 294.30 28.5 294.16 30.0 294.10 31.8 294.06 33.7 293.95 35.9 293.93 37.7 294.18 40.3 294.53 41.8 295.13 42.5 296.30 44.8 297.54 46.7 298.22 49.0 299.54 SUMMARY DATA Bankfull Elevation: 296.9 Bankfull Cross - Sectional Area: 51.4 Bankfull Width: 22.8 Flood Prone Area Elevation: 299.9 Flood Prone Width: 42.7 Max Depth at Bankfull: 3.0 Mean Depth at Bankfull: 2.3 W / D Ratio: 10.1 Entrenchment Ratio: 1.9 Bank Height Ratio: 1.0 River Basin: Neuse Watershed: Ellerbe Creek, MY03 XS ID XS - 2, Reach 1, Pool Drainage Area (sq mi): 5.9 Date: 1/7/2015 Field Crew: IT. Seelinger, A. Eason Station Elevation 0.0 302.1 0.5 301.8 2.5 301.6 4.4 301.1 6.3 300.5 8.4 299.4 10.2 298.6 12.2 298.2 14.8 298.1 17.3 298.3 19.6 298.0 20.9 297.7 21.8 296.9 23.0 295.9 24.5 294.8 25.5 294.5 26.3 293.8 28.2 293.0 30.1 292.9 32.3 292.7 33.9 292.5 35.4 292.6 37.0 293.0 38.5 293.4 41.2 294.2 42.5 294.7 43.1 296.5 44.7 297.5 46.9 298.6 49.3 299.7 52.0 300.6 55.4 301.6 57.4 301.6 57.6 301.9 SUMMARY DATA Bankfull Elevation: 297.8 Bankfull Cross - Sectional Area: 89.1 Bankfull Width: 24.7 Flood Prone Area Elevation: - Flood Prone Width: - Max Depth at Bankfull: 5.3 Mean Depth at Bankfull: 3.6 W / D Ratio: - Entrenchment Ratio: - Bank Hei ht Ratio: - Neuse River Basin, Ellerbe Creek, MY03, XS - 2, Reach 1, Pool 303 301 299 297 ti W 295 - - • Bankfull MY01, 1 115 110 293 MY02, 9/14/10 MY03, 1/7/15 291 0 10 20 30 40 50 60 Station (feet) River Basin: Neuse Watershed: Ellerbe Creek, MY03 XS ID XS - 3, Reach 1, Riffle Drainage Area (sq mi): 5.9 Date: 11/21/2015 Field Crew: IT. Seelinger, A. French Station Elevation 0.0 300.19 1.7 299.85 4.9 298.89 9.3 297.96 13.9 296.78 17.1 296.70 18.8 296.90 20.9 297.15 24.0 296.67 26.3 296.13 27.1 294.15 27.3 293.19 28.9 292.70 31.0 292.21 32.9 291.89 35.0 291.97 36.8 291.92 38.7 291.77 40.5 291.83 42.9 291.84 44.4 291.88 46.0 292.12 47.3 292.70 48.3 293.42 50.0 294.69 52.6 295.72 55.1 296.95 59.4 296.80 64.5 296.81 68.4 296.96 72.3 298.50 76.1 300.36 80.9 300.60 82.6 300.77 82.6 301.75 SUMMARY DATA Bankfull Elevation: 296.1 Bankfull Cross - Sectional Area: 98.5 Bankfull Width: 28.7 Flood Prone Area Elevation: 300.5 Flood Prone Width: 74.6 Max Depth at Bankfull: 4.4 Mean Depth at Bankfull: 3.4 W / D Ratio: 8.4 Entrenchment Ratio: 2.6 Bank Height Ratio: 1.0 * =pins reset for MY03 due to construction activity on site Neuse River Basin, Ellerbe Creek, MY03, XS - 3, Reach 1, Riffle 302 300 - ---------------------------------------------------- - - - - -- - - 298 296 - - - - - - -- - - -- ------------------ -- ------------ - - - - -- -- -- W 294 • Bankfull - - • Flood Prone Area 292 MY01, 1115110 MY02, 9/14/10 290 t MY03 *, 1/21/15 0 10 20 30 40 50 60 70 80 Station (feet) * =pins reset for MY03 due to construction activity on site River Basin: Elevation Neuse 300.19 A. Watershed: 4.9 Ellerbe Creek, MY03 9.3 XS ID T. Seelin er, A. French XS - 4, Reach 2, Riffle 296.70 18.8 Drainage Area (sq mi): 5.9 297.15 24.0 Date: 26.3 1/21/2015 27.1 i, 27.3 293.19 28.9 292.70 31.0 292.21 32.9 291.89 35.0 291.97 36.8 291.92 38.7 291.77 40.5 291.83 42.9 291.84 44.4 291.88 46.0 292.12 47.3 292.70 48.3 293.42 50.0 294.69 52.6 295.72 55.1 296.95 59.4 296.80 64.5 296.81 68.4 296.96 72.3 298.50 76.1 300.36 80.9 300.60 82.6 300.77 82.6 301.75 ` - - - -_ Neuse River Basin, Ellerbe Creek, MY03, XS - 4, Reach 2, Riffle 302 -- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 300 298 296 ----- - - - - -- -- ------------- - - - - -- ---- - - - - -- ------- - - - - -- ti W 294 - - - • Bankfull - - • Flood Prone Area 292 MY01, 1/15/10 MY02, 9/15/10 �- MY03 *, 1/21/2015 290 0 10 20 30 40 50 60 70 80 Station (feet) *=pins reset for MY03 due to construction activity on site Station Elevation 0.0 300.19 1.7 299.85 4.9 298.89 9.3 Field Crew: T. Seelin er, A. French Station Elevation 0.0 300.19 1.7 299.85 4.9 298.89 9.3 297.96 13.9 296.78 17.1 296.70 18.8 296.90 20.9 297.15 24.0 296.67 26.3 296.13 27.1 294.15 27.3 293.19 28.9 292.70 31.0 292.21 32.9 291.89 35.0 291.97 36.8 291.92 38.7 291.77 40.5 291.83 42.9 291.84 44.4 291.88 46.0 292.12 47.3 292.70 48.3 293.42 50.0 294.69 52.6 295.72 55.1 296.95 59.4 296.80 64.5 296.81 68.4 296.96 72.3 298.50 76.1 300.36 80.9 300.60 82.6 300.77 82.6 301.75 SUMMARY DATA Bankfull Elevation: 296.4 Bankfull Cross - Sectional Area: 98.5 Bankfull Width: 28.7 Flood Prone Area Elevation: 300.9 Flood Prone Width: >75 Max Depth at Bankfull: 4.6 Mean Depth at Bankfull: 3.4 W / D Ratio: 8.4 Entrenchment Ratio: >3.0 Bank Height Ratio: 1.0 River Basin: Neuse Watershed: Ellerbe Creek, MY03 XS ID XS - 5, Reach 2, Riffle Drainage Area (sq mi): 5.9 Date: 11/21/2015 Field Crew: IT. Seelinger, A. French Station Elevation 0.0 297.88 0.1 296.86 4.1 296.83 7.7 296.74 11.6 296.70 15.6 296.52 18.0 296.42 19.3 295.44 21.2 294.07 21.9 293.77 21.8 293.05 23.3 293.16 24.6 293.00 27.1 292.79 28.1 292.82 29.1 292.81 30.7 292.95 32.2 292.94 33.3 292.93 34.7 293.07 35.9 293.07 37.5 293.09 38.4 293.09 39.2 293.38 40.3 293.68 41.8 294.12 44.0 293.88 46.0 293.59 47.2 294.06 48.7 295.21 51.8 295.89 55.1 296.00 59.5 296.24 62.0 296.22 62.1 296.99 SUMMARY DATA Bankfull Elevation: 296.3 Bankfull Cross - Sectional Area: 87.4 Bankfull Width: 33.5 Flood Prone Area Elevation: 300.3 Flood Prone Width: >90 Max Depth at Bankfull: 3.5 Mean Depth at Bankfull: 2.6 W / D Ratio: 12.8 Entrenchment Ratio: >2.5 Bank Height Ratio: 1.0 * =pins reset for MY03 due to construction activity on site Neuse River Basin, Ellerbe Creek, MY03, XS - 5, Reach 2, Riffle 301 ------------------------------------------------------------------------ 299 297 o -- -------- - - - - -- ----------------- - - - - -- ----- - - - - -- 295 ti W - - • Bankfull - - - • Flood Prone Area 293 MY01, 1 /15 /10 MY02, 9/15/10 291 MY03 *, 1/21/15 0 10 20 30 40 50 60 70 80 90 Station (feet) * =pins reset for MY03 due to construction activity on site H Z O d W W W 304 303 302 301 300 299 298 297 296 295 294 293 292 291 290 ■ ■ Longitudinal Profile Ellerbe Creek EEP Project Number 272- MY03 Stations 10 +00 - 20 +00 SBKF _ - 0.0008x + 299.38 - — — — — — — — — — — — — — — - — — — — — — — — — — — — — — — — — 23 — - — — — — — — — — — — — — — — — — _ Sws = -0.001 Ix + 296.68 — ■ 1000 1100 1200 1300 1400 1500 1600 1700 1800 1900 STATION (FT) As- Built, 1/09 MY -01, 1115110 MY -02, 9/14/10 MY -03, 1/21/15 — — — Water Surface ■ Bankfull A In- Stream Structures 2000 300 299 298 297 296 295 Pro z 293 H d� a292 W 291 290 289 288 287 286 ■ ■ Longitudinal Profile Ellerbe Creek EEP Project Number 272- MY03 Stations 20 +00 - 33 +00 SBA _ - 0.0019x + 301.82 ■ ■ constructed riffles ■ _ SWS = - O.00lx + 296.19 - / --- - - - - - - - - - - - - - - - - - - - J�]� ( 111 - - - - - - - - - - - - - - - - - - A- - - - - - - - - - - - 2000 2100 2200 2300 2400 2500 2600 2700 2800 2900 3000 3100 3200 3300 STATION (FT) As- Built, 1/09 MY -01, 1115110 AMY -03, 1/21/15 - - - Water Surface ■ Bankfull o In- Stream Structures Pebble Count Plots Cross - Section 1 Riffle - MY03 100% Particle Size Distribution Ellerbe Creek XS 1 Riffle Particle Millimeter Count Silt/Clay < 0.062 S/C 2 Very Fine Fine Medium Coarse Very Coarse .062-.125 .125-.25 .25-.50 .50-1 1 - 2 S A N D S 19 Very Fine Fine Fine Medium Medium Coarse Coarse Very Coarse Very Coarse 2 - 4 4-5.7 5.7-8 8-11.3 11.3-16 16-22.6 22.6-32 32-45 45-64 G R A V E L S 2 80% —� MY01 2 2 ro 60% 40% t MY02 T MY03 8 8 13 u 0 13 4 20% 0% 4 Small Small Large Large 64-90 90-128 128-180 180-256 C O B L 12 0.01 D16 D35 D50 D65 D84 ID95 0.1 Size (mm) 0.93 15 24 62 110 170 1 1 10 100 Particle Size - Millimeters Size Distribution mean 0.3 dispersion 1.3 skewness 0.00 1000 10000 Type silt/clay sand gravel cobble boulder bedrock hardpan wood/det artificial 2% 16% 47% 34% 1% 0% 0% 0% 0% 19 5 4 Small Small Medium Lrg- Very Lrg 256-362 362-512 512- 1024 1024-2048 B L D R 1 Bedrock >2048 BDRK 1 jr Total 118 Note: Cross- Section 2 Pool - MY03 100% Particle Size Distribution Ellerbe Creek XS 2 Pool Particle Millimeter Count Silt/Clay < 0.062 S/C Very Fine Fine Medium Coarse Very Coarse .062-.125 .125-.25 .25-.50 .50-1 1 - 2 S A N D S 1 37 Very Fine Fine Fine Medium Medium Coarse Coarse Very Coarse Very Coarse 2 - 4 4-5.7 5.7-8 8-11.3 11.3-16 16-22.6 22.6-32 32-45 45-64 G R A V E L S 1 ro 80% 60% —� MY01 1 1 1 40% t MYOz 1 2 3 3 20% 6 Small Small Large Large 64-90 90-128 128-180 180-256 C O B L 9 0% 0.01 D16 D35 D50 D65 D84 ID95 0.1 Size (mm) 0.66 0.95 43 89 150 200 1 10 100 Particle Size - Millimeters Size Distribution mean 0.3 dispersion 1.4 skewness -0.03 1000 10000 Type silt/clay 0% sand 38% gravel 19% cobble 43% boulder 1% bedrock 0% hardpan 0% wood/det 0% artificial 0% 13 15 6 Small Small Medium Lrg- Very Lrg 256-362 362-512 512- 1024 1024-2048 B L D R 1 t Bedrock >2048 BDRK Total 101 Note: Cross - Section 3 Riffle - MY03 Particle Size Distribution Ellerbe Creek XS 3 Riffle Particle Millimeter Count Silt/Clay < 0.062 S/C (, Very Fine Fine Medium Coarse Very Coarse .062-.125 .125-.25 .25-.50 .50-1 1 1 -2 S A N D S 1 17 42 2 100% Very Fine Fine Fine Medium Medium Coarse Coarse Very Coarse Very Coarse 2 - 4 4-5.7 5.7-8 8-11.3 11.3-16 16-22.6 22.6-32 32-45 45-64 G R A V E L S 2 80% 6o i° ° MY02 1 1 2 4 w t MY t MY03 40% 0 4 1 20% 0% 0.01 0.1 Size mm D16 0.18 D35 0.30 D50 0.38 D65 0.49 D84 48 D95 100 1 10 loo Particle Size - Millimeters Size Distribution mean 2.9 dispersion 57.4 skewness 0.57 1000 10000 Type silt/clay 6% sand 62% gravel 21% cobble 11% boulder 0% bedrock 0% hardpan 0% wood/det 0% artificial 0% 6 Small Small Large Large 64-90 90-128 128-180 180-256 C O B L 3 8 Small Small Medium Lrg- Very Lrg 256-362 362-512 512- 1024 1024-2048 B L D R Bedrock >2048 BDRK Total 100 Note: Cross - Section 4 Riffle - MY03 100% Particle Size Distribution Ellerbe Creek XS 4 Riffle Particle Millimeter Count Silt/Clay < 0.062 S/C 33 Very Fine Fine Medium Coarse Very Coarse .062-.125 .125-.25 .25-.50 .50-1 1 1 - 2 S A N D S 1 10 47 2 > 1 Very Fine Fine Fine Medium Medium Coarse Coarse Very Coarse Very Coarse 2 - 4 4-5.7 5.7-8 8-11.3 11.3-16 16-22.6 22.6-32 32-45 45-64 G R A V E L S 2 80% 60 /° ° �MYO1 2 2 1 w t MY02 t MYOs 40% 0 20% 0% 0.01 0.1 Size mm D16 0.062 D35 0.14 D50 0.28 D65 0.34 D84 0.46 D95 3.9 1 10 100 Particle Size - Millimeters Size Distribution mean 0.2 dispersion 3.7 skewness 0.45 1000 10000 Type silt/clay 33% sand 60% gravel 7% cobble 0% boulder 0% bedrock 0% hardpan 0% wood/det 0% artificial 0% Small Small Large Large 64-90 90-128 128-180 180-256 C O B L Small Small Medium Lrg- Very Lrg 256-362 362-512 512- 1024 1024-2048 B L D R Bedrock >2048 BDRK IF—Total 101 Note: Cross - Section 5 Riffle - MY03 l00% Particle Size Distribution Ellerbe Creek XS 5 Riffle Particle Millimeter Count Silt/Clay < 0.062 S/C Very Fine Fine Medium Coarse Very Coarse .062-.125 .125-.25 .25-.50 .50-1 1 - 2 S A N D S 1 4 Very Fine Fine Fine Medium Medium Coarse Coarse Very Coarse Very Coarse 2 - 4 4-5.7 5.7-8 8-11.3 11.3-16 16-22.6 22.6-32 32-45 45-64 G R A V E L S 80% 60% 4 � w MY02 t MY03 2 4 40% 0 2 6 20% 0% 0.01 0.1 1 10 100 Particle Size - Millimeters 1000 10000 *constructed riffle installed before start of MY03 23 Small Small Large Large 64-90 90-128 128-180 180-256 C O B L 14 10 20 11 Small Small Medium Lrg- Very Lrg 256-362 362-512 512- 1024 1024-2048 B L D R 2 D16 D35 D50 D65 D84 I D95 Size mm 22 54 71 110 170 230 Size Distribution mean 0.1 dispersion 3.1 skewness 0.42 Type silt/clay sand gravel cobble boulder bedrock hardpan wood/det artificial 0% 5% 41% 52% 2% 0% 0% 0% 0% Bedrock >2048 BDRK JF Total 105 Note: Table 10. Baseline - Stream Data Summary Table Project Number and Name: 272 - Northgate Park (Ellerbe Creek) Segment Reach: Reach 1 (1,520 ft.) Parameter USGS Gage Data Regional Curve Interval Pre - Existing Condition Project Reference Stream Designs As -built Dimension Min Max Mean Min Max Med Min Max Mean Min Max Mean Min Max Mean Min Max Mean Bankfull Width (ft) 30.8 13.5 30.0 Floodprone Width (ft) 60 300 Bankfull Cross - Sectional Area (ft 2) 118.6 30.8 54.6 Bankfull Mean Depth (ft) 3.9 2.3 1.8 Bankfull Maximum Depth (ft) 4.6 3.8 2.5 Width/Depth Ratio 8.0 5.9 16.7 Entrenchment Ratio 1.9 22.2 Bank Height Ratio 1.7 0.9 1.0 Pattern Channel Beltwidth (ft) 50 100 50 125 40 60 Radius of Curvature (ft) 150 180 16 30 165 180 Meander Wavelength (ft) 700 1000 115 200 700 1000 Meander Width Ratio 1.6 3.2 3.7 9.3 1.3 2.0 Profile Riffle Length (ft) Riffle Slope (ft /ft) 0.014 0.005 0.002 Pool Length (ft) Pool Spacing (ft) 45 521 45 93 83 172 S u bstrate d50 (mm) d84 (mm) Additional Reach Parameters Valley Length (ft) Channel Length (ft) 1,466 1,466 Sinuosity 1.02 1.33 1.01 Water Surface Slope (ft /ft) 0.0009 0.0019 0.0006 BF Slope (ft /ft) Rosgen Classification G5c E5 C5 Note: The Pre - Existing Condition and Project Reference Stream Data are the same for both reaches and are from the Restoration Plan document. The Design data are also from the Restoration Plan, except for the Dimension Parameter, which is from the Construction Plans. As -Built data were not taken due to project delays. Northgate Park (Ellerbe Creek) KCI Associates of North Carolina EEP Project # 272 40 2014 - MY03 Table 10. Baseline - Stream Data Summary Table Project Number and Name: 272 - Northgate Park (Ellerbe Creek) Segment Reach: Reach 2 (750 ft.) Parameter USGS Gage Data Regional Curve Interval Pre - Existing Condition Project Reference Stream Design As -built Dimension Min Max Mean Min Max Med Min Max Mean Min Max Mean Min Max Mean Min Max Mean Bankfull Width (ft) 30.8 13.5 40.0 Floodprone Width (ft) 60 300 1 1 A Bankfull Cross - Sectional Area (ft 2) 118.6 0 30.8 75.6 Bankfull Mean Depth (ft) 3.9 2.3 1.9 Bankfull Maximum Depth (ft) 4.6 3.8 2.8 Width/Depth Ratio 8.0 5.9 21.1 Entrenchment Ratio 1.9 22.2 Bank Height Ratio 1.7 0.9 1.0 Pattern Channel Bchwidth (ft) 50 100 50 125 80 100 Radius of Curvature (ft) 150 180 16 30 63 100 Meander Wavelength (ft) 700 1000 115 200 260 300 Meander Width Ratio 1.6 3.2 3.7 9.3 3.2 4.0 Profile Riffle Length (ft) Riffle Slope (ft /ft) 0.014 0.005-IF 0.001 Pool Length (ft) Pool Spacing (ft) 45 521 45 93 83 172 S u bstrate d50 (mm) d84 (mm) Additional Reach Parameters Valley Length (ft) ' Channel Length (ft) 1,466 690 Sinuosity 1.02 1.33 1.02 Water Surface Slope (ft /ft) 0.0009 0.0019 0.0005 BF Slope (ft /ft) Rosgen Classification G5c E5 C5 Note: The Pre - Existing Condition and Project Reference Stream Data are the same for both reaches and are from the Restoration Plan document. The Design data are also from the Restoration Plan, except for the Dimension Parameter, which is from the Construction Plans. As -Built data were not taken due to project delays. Northgate Park (Ellerbe Creek) KCI Associates of North Carolina EEP Project # 272 41 2014 - MY03 Table 10. Baseline - Stream Data Summary Table Project Number and Name: 272 — Northgate Park (Ellerbe Creek) Segment Reach: UT 3 (117 ft.) Parameter USGS Gage Data Regional Curve Interval Pre - Existing Condition Project Reference Stream Design As -built Dimension Min Max Mean Min Max Med Min Max Mean Min Max Mean Min Max Mean Min Max Mean Bankfull Width (ft) 13.5 3.2 Floodprone Width (ft) 300 Bankfull Cross - Sectional Area (ft 2) 30.8 1.5 Bankfull Mean Depth (ft) 2.3 0.5 Bankfull Maximum Depth (ft) 3.8 0.7 Width/Depth Ratio 5.9 6.4 Entrenchment Ratio 22.2 Bank Height Ratio 0.9 1.0 Pattern Channel Bchwidth (ft) 50 125 Radius of Curvature (ft) 16 30 Meander Wavelength (ft) 115 200 Meander Width Ratio 3.7 9.3 Profile Riffle Length (ft) Riffle Slope (ft /ft) 0.005 Pool Length (ft) Pool Spacing (ft) 45 93 S u bstrate d50 (mm) d84 (mm) Additional Reach Parameters Valley Length (ft) Channel Length (ft) 117 Sinuosity 1.33 Water Surface Slope (ft /ft) 0.0019 BF Slope (ft /ft) J Rosgen Classification 7 E5 E5 Note: The Project Reference Stream Data are from the Restoration Plan document. The Design data are from the Construction Plans. There were no Pattern or Profile data for UT3 in the Restoration Plan. Northgate Park (Ellerbe Creek) KCI Associates of North Carolina EEP Project # 272 42 2014 - MY03 Table lla. Monitoring - Cross - Section Morphology Data Tables Project Number and Name: 272 - Northgate Park (Ellerbe Creek) Segment Reach: Reach 1 (1,520 ft.) and Reach 2 (750 ft.) Parameter Cross- Section 1 Riffle - Reach 1 Cross- Section 2 Pool - Reach 1 Cross- Section 3 Riffle - Reach 1 Dimension MYO MYl MY2 MY3 MY4 MY5 MYO MYl MY2 MY3 MY4 MY5 MYO MYl MY2 MY3* MY4 MY5 Record Elevation (datum) used 296.9 296.9 296.9 297.8 297.8 297.8 296.1 296.1 296.1 Bankfutl Width (ft) 24.0 23.8 22.8 28.5 29.2 24.7 25.0 23.8 28.7 Floodprone Width (ft) 42.0 42.0 42.7 1 - - - 62.0 62.0 74.6 Bankfull Cross - Sectional Area (ft) 45.0 43.1 51.4 82.4 77.3 89.1 53.4 63.4 98.5 Bankfull Mean Depth (ft) 1.9 1.8 2.3 2.9 2.6 3.6 2.1 2.7 3.4 Bankfall Maximum Depth (ft) 2.8 2.8 3.0 5.8 4.3 5.3 3.4 3.8 4.4 Width/Depth Ratio 12.8 13.1 10.1 - - - 11.7 8.9 8.4 Entrenchment Ratio 1.8 1.8 1.9 2.5 2.6 2.6 Bank Height Ratio 1.0 1.0 1.0 1.0 1.0 1.0 Cross- Sectional Area Between End Pins (ft2) - 188.5 178.6 - 250.3 262.5 - 327.4 326.1 d50 (mm) A 1.2 1 0.35 24 0.08 0.33 43 L 1 0.06 0.39 1 0.38 Parameter Cross- Section Riffle - 4 Reach 2 Cross- Section 5 Riffle - Reach 2 Dimension MYO MYl MY2 MY3* MY4 MY5 MYO MYl MY2 MY3* MY4 MY5 Record Elevation (datum) used 296.4 296.4 296.4 296.3 296.3 296.3 Bankfull Width (ft) 25.2 28.4 28.7 1 36.1 26.9 33.5 Floodprone Width (ft) >75 >75 >75 >90 >90 >90 Bankfull Cross - Sectional Area (ft 2) 80.2 84.9 98.5 82.0 1 81.2 87.4 Bankfull Mean Depth (ft) 3.2 3.0 3.4 2.3 3.0 2.6 Bankfull Maximum Depth (ft) 4.5 4.4 4.6 4.0 4.4 3.5 Width/Depth Ratio 7.9 9.5 8.4 15.9 8.9 12.8 Entrenchment Ratio >3.0 >3.0 >3,0 >2.5 >2.5 >2.5 Bank Height Ratio 1.0 1.0 1.0 1.0 1.0 1.0 Cross - Sectional Area Between End Pins (ft) 326.9 330.7 - 151.8 124.7 d50 (mm) ..IF O.66 0.28 0.06 0.06 71 *= Cross - sections 3, 4, and 5 reset in October 2014, before MY3 survey Northgate Park (Ellerbe Creek) KCI Associates of North Carolina EEP Project # 272 43 2014 - MY03 Table l lb. Monitoring - Stream Reach Morphology Data Table Project Number and Name: 272 - Northgate Park (Ellerbe Creek) Segment Reach: Reach 1 (1,520 ft.) Parameter MY- 01 (2009) MY- 02 (2010) MY- 03 (2011) MY- 04 (2012) MY- 05 (2013) Dimension Min Mean Med Max SD n Min Mean Med Max SD n Min Mean Med Max SD n Min Mean Med Max SD n Min Mean Med Max SD n Bankfull Width (ft) 24.0 24.5 25.0 2 23.8 23.8 23.8 & 2 22.8 25.8 28.7 2 Floodprone Width (ft) 42.0 52.0 62.0 2 42.0 52.0 62.0 2 42.7 58.7 74.6 2 Bankf ill Mean Depth (ft) 1.9 2.0 2.1 2 1.8 2.3 2.7 2 2.3 2.8 3.4 2 Bankfull Max Depth (ft) 2.8 3.1 3.4 2 2.8 3.3 3.8 2 3.0 3.7 4.4 2 Bankf ill Cross - Sectional Area (ft2) 45.0 49.2 53.4 2 43.1 53.3 63.4 2 51.4 75.0 98.5 2 Width/Depth Ratio 11.7 12.3 12.8 2 8.9 11.0 13.1 2 8.4 9.2 10.1 2 Entrenchment Ratio 1.8 2.2 2.5 2 1.8 2.2 2.6 2 1.9 2.2 2.6 2 Bank Height Ratio 1.0 1.0 1.0 2 1.0 1.0 1.0 2 1.0 1.0 1.0 2 Pattern Channel Beltwidth (ft) Radius of Curvature (ft) Rad. of Curv.: Bankfull Width (ft /ft) Meander Wavelength (ft) * * x Meander Width Ratio * * R Profile Riffle Length (ft) 24.5 34.6 84.6 33.0 34.0 34.0 2 45.0 89.0 75.1 146.8 Riffle Slope (ft /ft) 0.0000 0.0006 0.0010 0.0011 0.0010 0.0008 2 0.001 0.002 0.002 0.004 Pool Length (ft) 10.1 36.7 52.8 29.0 36.4 36.0 43.5 25.6 5 17.5 34.5 33.7 53.9 F0.0023 PoolMaxDepth(ft) 1.6 2.4 2.4 3.2 0.65 6 1.7 2.7 2.6 3.4 Pool Spacing(ft) 28.9 89.3 211.4 92.7 257.0 212.0 479.3 136.0 5 29.3 199.8 217.7 358.7 Additional Reach Parameters Valley Length (ft) 1,518 1,518 1,518 Channel Thalweg Length (ft) 1,580 1,580 1,580 Sinuosity 1.04 1.04 1.04 Water Surface Slope (ft /ft) 0.0014 0.0014 0.0011 Bankfull Slope (ft /tt 0.0060 0.0008 Rosgen Classification C5 C5 C5 Ri % /Ru % /P % /G % /S% 10/35/20/35/0 17/54/17/11/1 SC % /Sa % /G % /C % /B % /Be% 25/26/35/14/0/0 5/60/25/10/0/0 3/39/29/29/1/0 dl 6/d35/d50/d84/d95 0.062/0.15/1.2/51 /110 0.019/0.3/0.39/44 /94 0.6/5.4/23/51/103 /158 % of Reach with Eroding Banks 15% 0% *Reach 1 was enhanced, and is not a meandering channel Northgate Park (Ellerbe Creek) KCI Associates of North Carolina EEP Project # 272 44 2014 - MY03 Table llb. Monitoring - Stream Reach Morphology Data Table Project Number and Name: 272 - Northgate Park (Fllerbe Creek) Segment Reach: Reach 2 (750 ft.) Parameter MY- 01 (2009) MY- 02 (2010) MY- 03 (2011) MY- 04 (2012) MY- 05 (2013) Dimension Min Mean Med Max SD I n Min Mean Med Max SD n Min Mean Med Max I SD n Min Mean Med Max I SD n Min Mean Med Max SD n Bankfull Width (ft) 25.2 30.7 36.1 2 23.8 25.4 28.4 2 28.7 31.1 33.5 2 Floodprone Width (ft) 36.1 55.55 75 2 42.0 68.5 90.0 2 >75 >90 2 Bankfull Mean Depth (ft) 2.3 2.7 3.2 2 1.8 2.8 3.0 2 2.6 3.0 3.4 2 Bankfull Max Depth (ft) 4.0 1 4.3 4.5 2 2.8 1 4.1 4.4 2 3.5 1 4.0 1 4.6 1 2 Bankfull Cross - Sectional Area (ft) 80.2 81.1 82.0 2 43.1 72.3 84.9 2 87.4 93.0 98.5 2 WidthMepth Ratio 7.9 11.9 15.9 2 8.9 9.2 13.1 2 8.4 10.6 12.8 2 Entrenchment Ratio 2.5 2.8 3.0 1 2 1.8 2.6 3.0 2 >2.5 >3.0 2 Bank Height Ratio 1.0 1.0 1.0 2 1.0 1.0 1.0 2 1.0 1.0 1.0 2 Pattern Channel Beltwidth (ft) 59.0 74.0 94.0 0 Radius of Curvature (ft) 51.0 68.0 107.0 Rad. of Curv.: Bankfull Width (ft /ft) Meander Wavelength (ft) 237.0 276.0 303.0 Meander Width Ratio 2.1 2.7 3.4 Profile Riffle Length (ft) 9.2 16.1 29.2 12.1 154104.0 25.0 3 30.6 39.1 41213.91 2 Riffle Slope (ft /ft) 0.001 0.001 0.003 0.001 0.001 0.00.003 3 0.003 0.006 0.2 Pool Length (ft) 18.4 66.9 91.3 64.0 80.0 73 3 57.1 71.9 71.9 9 3 PoolMaxDepth(ft) 2.5 2.9 2.3.6 3 2.7 4.1 3.4 3 PoolSpacing(ft) 67.7 156.6 183.7 154.8 170.0 185.7 2 167.2 254.1 32 Additional Reach Parameters Valley Length (ft) 658 658 658 Channel Thalweg Length (ft) 710 710 710 Sinuosity 1.08 1.08 1.08 Water Surface Slope (ft /ft) 0.00017 0.0009 0.001 Bankfull Slope (ft /ft) 0.0005 0.0019 Rosgen Classification C5 C5 C5 Ri% / Ru% / P% / G% / S% 10/30/20/40/0 11/17/32/39/1 SC % /Sa % /G % /C % /B % /Be% 68/15/16/1/0/0 65/27/8/0/0/0 16/33/24/26/1/0 d16/d35/d50/d84/d95 0.062/0.062/.0062 /2.3/20 0.062/0.062/0.062 /0.4/16 11/27/36/55/85/117 % of Reach with Eroding Banks 41% 0% Northgate Park (Ellerbe Creek) KCI Associates of North Carolina EEP Project # 272 45 2014 - MY03 Appendix E Hydrologic Data Northgate Park (Ellerbe Creek) KCI Associates of North Carolina EEP Project # 272 46 2014 - MY03 Table 12. Verification of Bankfull Events Project Number and Name: 272 - Northgate Park (Ellerbe Creek) Date of Data Collection Date of Occurrence Method Photo Number 6/14/2009 6/11/2009 Site visit to evaluate indicators of stage after storm event N/A 11/11/2009 11/11/2009 Site visit to evaluate indicators of stage after storm event N/A 12/25/2009 12/25/2009 Eye-witness account N/A 1/25/2010 1/25/2010 Site visit to evaluate indicators of stage after storm event N/A 5/17/2010 5/17/2010 Site visit to evaluate indicators of stage after storm event N/A 9/30/2010 9/30/2010 Site visit to evaluate indicators of stage after storm event N/A 6/30/2013 6/30/2013 Site visit to evaluate indicators of stage after storm event 1 -2 9/24/2014 9/24/2014 Site visit to evaluate indicators of stage during storm event 3 -4 Photo 1. Bankfull event 6/30/2013 Photo 2. Bankfull event 6/30/2013 Photo 3. Bankfull event 9/24/2014 Photo 4. Bankfull event 9/24/2014 Northgate Park (Ellerbe Creek) KCI Associates of North Carolina EEP Project # 272 47 2014 - MY03