Loading...
HomeMy WebLinkAbout20221496 Ver 2_Appendix G Cover Page (Apex Gateway)_20230324i/ r `i ` � �y 1AQ t` ■ •NMENTAL Appendix G — Buffer Determination and Approval Documents ATLAS Environmental, Inc. 338 S. Sharon Amity Road #411 Charlotte, North Carolina 28211; 704-512-1206 (o) / 828-712-9205 (m) www.atlasenvi.com / Offices in Asheville and Charlotte September 23, 2022 Jacob Sinclair, P.G., PWS Senior Environmental Specialist Atlas Environmental Inc. P.O. Box 17323 Asheville NC 28806 Subject: Stream Buffer Determination Project Real Apex, NC Cape Fear River Basin Dear Mr. Sinclair, WATER RESOURCES DEPARTMENT Apex 22-007 On September 21st, 2022, you met with Jimmy McClure at the subject site to evaluate three (3) drainage features and determine if they are subject to the Town of Apex (Town) riparian buffer rules. Based on the information obtained during the evaluation and per the requirements set forth in Section 6.1.11 of the Town Unified Development Ordinance (UDO), I concur with the stream classifications as shown on the attached sketch dated July 18, 2022. Drainage Shown as Shown as on Determination made Determined Buffer Feature on USGS Soil Survey n the.field Width CH 100 Not Present Not Present Perennial 0 feet CH 200 Not Present Present Intermittent 50 feet WL2200 Present Present Ephemeral 0feet This on -site determination shall expire five (5) years from the date of this letter. Landowners or affected parties that dispute a determination made by the Division of Water Resources (DWR) or Delegated Local Authority in the Jordan Lake watershed may request a determination by the DWR Director. An appeal request must be made within sixty (60) days of date of this letter or from the date the affected party (including downstream and/or adjacent owners) is notified of this letter. A request for a determination by the Director shall be referred to in writing c/o Paul Wojoski, DWR -- 401 & Buffer Permitting Branch; 1617 Mail Service Center, Raleigh, NC 27699-1617. Otherwise the appeal procedure will be in accordance with UDO Section 6.1.11. if you dispute the Director's determination, you may file a petition for an administrative hearing. You must file the petition with the Office of Administrative Hearings within sixty (60) days of receipt of this notice of decision. A petition is considered filed when it is received in the Office of Administrative Hearings during normal office hours. The Office of Administrative Hearings accepts filings Monday through Friday between the hours of 8:00am and 5:00pm, except for official State holidays. To request a hearing, send the original and one (1) copy of the petition to the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, NC 27699-6714. A copy of the petition must also be served to the Department of Natural Resources, c/o Bill Lane, General Counsel, 1601 Mail Service Center, Raleigh, NC 27699-1601. This determination is final and binding unless, as detailed above, you ask for a hearing or appeal within sixty (60) days. This project may require a Section 404/401 Permit for the proposed activity. Any inquiries should be directed to the US Army Corp of Engineers (Raleigh Regulator Field Office) at (919) 554-4894. If you have any questions, please do not hesitate to contact me at (919) 372--7470. Sincerely, James Miseiagno, CES, CPESC Environmental Field Services Supervisor TowN OF APE-x The .Peale of Good Living PO Box 7,5o Apex, NC 27502 1 (919) 2,49-3400 1 www.apexnc.org ,�P�x Riparian Buffer Call z• •¢ Application -'z C A�Q This application is required to be fully completed and submitted to Town staff prior to conducting a buffer call. Please submit the application package electronically to iames.misciagno(aapexnc.org. PROPERTY INFORMATION Owner(s): Site Address: 4 owners, See notes below. 106 NC Highway 751 Apex, NC 27523 CONSULTANT INFORMATION (If applicable) Name: Jennifer Robertson Address: 338 S. Sharon Amity Road #411 Charlotte, NC 28211 Email: jrobertson@atlasenvi.com Phone: 704-512-1206 CHECKLIST Please place a checkmark in the spaces provided below to indicate that the required information has been provided with this submittal, Right of Entry Form X NCDEQStream Identification Forms X {v. 4.11) X Sketch Map* Topo Map (most recent version) X 1970 Wake County Soil Survey Map *Sketch map should show all drainage features on the property with all applicable riparian buffers shown. Please clearly indicate or list which features are being called with this application. NOTES Peggy G Gray Trustee (PIN: 60523), Reginald Horton Mills Etal (PIN: 17900), Reginald Horton Mills Jr and Alexa H (PIN: 73702), William Stephen Mills (PIN: 71694) SIGNATURE (Consultant or Responsible Party) By my signature below, i certify that the information provided with this application is accurate and truthful. Date: September 12, 2022 Town of Apex Water Resources Department Revised 6/30/2022 NORTH CAROLINA WAKE e6bMTY CHATHAM COUNTY RIGHT OF ENTRY This Right of Entry is executed this 3t51 day off 5� �, 2022 by Dan Gray, Trustee and _Lisa Bateman, Trustee _ (the "owners ") WHEREAS, the Town of Apex ("Town") is seeking to make a stream buffer determination across the property known as Apex Gateway in the Town of Apex , North Carolina and designated as PIN # 60523, 17900, 73702, 71694 by the Wake County Revenue Department (the "Subject Property"); WHEREAS, the Owners are agreeable to provide the Town with this Right of Entry under the terms and conditions stated herein so that the above referenced determination may proceed. NOW THEREFORE in light of the above premises, the owners do hereby grant and give freely and without coercion, the right of access and entry to the Subject Property on the terms and conditions as stated below: I. The Town of Apex and its contractors may enter the Subject Property for the purpose of conducting on -site environmental investigations and issuing a determination based on those investigations as it relates to stream buffer determination, z, This Right of Entry does not convey to the Town any title or ownership interest in the Subject Property. 3. The Town and its employees, contractors, agents and representatives enter upon the Subject Property at their own risk and assume all risks related to the property. 4- The undersigned agrees and warrants to hold harmless the Town of Apex, its agencies, departments, contractors, and subcontractors, and discharges and waives any action, either equitable or legal that arise from the activities described above on the property except in the case of negligence by the Town, Witness: s 1 C.tr�_ By: NORTH CAROLINA CHAT14AM COUNTY RIGHT OF ENTRY This Right of Entry is executed this -En-day of w e r 20 22 by Dan Gray, Trustee and Lisa Bateman, Trustee (the a Owners WHEREAS, the Town of .Apex ("Town') is seeking to make a strew buffer determination across the property known as Apex Gateway in the Town of Apex — , North Carolina and designated as PIN # 60523, 1790a, 73702, 71694 by the Wake County Revenue Department (the "Subject PrvperW); WHEREAS, the Owners are agreeable to provide the Town with this Right of Entry under the terms and conditions stated herein so that the above referenced determination may proceed. NOW THEREFORE in light of the above premises, the owners do hereby grant and give freely and without coercion, the right of access and entry to the Subject Property on the terms and conditions as stated below: 1. The Town of Apex and its contractors may enter the Subject Property for the purpose of conducting on -site environmental investigations and issuing a determination based on those investigations as it relates to stream buffer determination. 2. 3- 4- This Right of Entry does not convey to the Town any title or ownership interest in the Subject Property. The Town and its employees, contractors, agents and representatives enter upon the Subject Property at their own risk and assume all risks related to the property. The undersigned agrees and warrants to hold harmless the Town of Apex, its agencies, departments, contractors, and subcontractors, and discharges and waives any action, either equitable or legal that arise from the activities rperty except in the case of negligence by the By: — By: NORTH CAROLINA WAKE COUNTY CHATHAM COUNTY RIGHT OF ENTRY This Right of Entry is executed this 30 day of August , 20 22 by Mills Chatham Investment Properties, t.t.0 and (the it Owner I. WHEREAS, the Town of Apex ("Town") is seeking to make a stream buffer determination across the property known as Apex Gateway in the Town of Apex , North Carolina and designated as PIN # 60523, 17900, 73702, 71894 by the Wake County Revenue Department (the "Subject Property"); WHEREAS, the Owner are agreeable to provide the Town with this Right of Entry under the terms and conditions stated herein so that the above referenced determination may proceed. NOW 'THEaREFORE in light of the above premises, the Owner do hereby grant and give freely and without coercion, the right of access and entry to the Subject Property on the terms and conditions as stated below: 1. TheTown own of Apex and its contractors may enter the Subject Property for the purpose of conducting on -site environmental investigations and issuing a determination based on those investigations as it relates to stream buffer determination. 2. This Right of Entry does not convey to the Town any title or ownership interest in the Subject Property. 3. The Town and its employees, contractors, agents and representatives enter upon the Subject Property at their own risk and assume all risks related to the property. 4. The undersigned agrees and warrants to hold harmless the Town of Apex, its agencies, departments, contractors, and subcontractors, and discharges and waives any action, either equitable or legal that arise from the activities described above on the property except in the case of negl' ence by the Town. Witness: By�31 . . ..... . I: NC DW0 ,fi•Pam irlentificntian Fnrm Vercian 4.11 Date: 04-13-2022 I Project Rea Project/Site: ectlSite:CH ioo 35 8162 Latitude: 74 Evaluator: T Casey A Baggarley County: Chatham Longitude:-78.944766 Total Points: Stream is at feast intermittent �� Stream Determination (circle one) Other New Hill and Green Level if �! 19 or perennial if z 30' Ephemeral Intermittent PeVftial e.g. Quad Name: v � A. Geomorphology (Subtotal = 25 ) Absent Weak Moderate Strong I'- Continuity of channel bed and bank 0 1 2 3 2. Sinuosity of channel along thalweg 0 1 2 3 3. in -channel structure: ex. riffle -pool, step -pool, sequence 0 1 2 3 -ripple-pool 4. Particle size of stream substrate 0 1 2 3 5. Active/relict floodpiain 0 1 2 3 6. Depositional bars or benches 0 1 2 3 7. Recent alluvial deposits 0 1 2 3 8. Headcuts 0 1 2 3 9. Grade control 0 0.5 1 1.5 10. Natural valley 0 0.5 1 1.5 11. Second or greater order channel No = 0 Yes = 3 ° artificial ditches are not rated; see discussions in manual B_ Hvrlrnlnov ISuhtntal = 10.5 1 12, Presence of Baseflow 0 1 2 3 13. Iron oxidizing bacteria 0 1 2 3 14. Leaf litter 1.5 1 0.5 0 15. Sediment on plants or debris 0 0.5 1 1.5 16. Organic debris lines or piles 0 0.5 1 1.5 17. Soil -based evidence of high water le? No = 0 Yes = 3 C;. Rinlnnv (RiffitotA = �� " I ) 14 S 1 . I -A 18. Fibrous roots in stroambed 3 2 1 0 19. Rooted upland plants in streambed 3 2 1 0 20. Macrobenthos (note diversity and abundance) 0 1 2 3 21. Aquatic Mollusks 0 1 2 3 22, Fish 0 0.5 1 1.5 23. Crayfish 0 0.5 1 1.5 24. Amphibians 0 0.5 1 1.5 25. Algae 0 0.5 1 1.5 26. Wetland plants in streambed FACW = 0.75; OsL = 1.5 Other = 0 'perennial streams may also be identified using other methods. See p. 35 of manual. Notes: Sketch: 3 z 3 3 3 2 2 2 1 1 3 3 2 1 0.� 1 3 3 3 3 1 1 1.5 0.5 1.5 0 ko_� oA St GIs or LJ5;'6- S NC DWO Stream Identilirnfinn Fnrm Version 4.11 Date: 11-16-2021 ProjectiSite:project Real CH 200 Latitude: 35.74862 Evaluafor:T Casey A Baggarley county: Chatham Longitude:-78.95033 Total Points: Stream Determination (circle one) Other New Hill and Green Level Stream is at least intermittent 23 if � 19 or perennial if � 30` Ephemeral Inter� ittent Perennial Y" e.g. Quad Name: A. Geomorphology Subtotal = 10 Absent Weak Moderate Strong 1" Continuity of channel bed and bank 0 1 2 3 2. Sinuosity of channel along thalweg 0 1 2 3 3. In -channel structure: ex. riffle -pool, step -pool, ripple -pool sequence 0 1 2 3 4. Particle size of stream substrate 0 1 2 3 5. Active/relict. floodplain 0 1 2 3 6. Depositional bars or benches 0 1 2 3 7. Recent alluvial deposits 0 1 2 3 8, Headcuts 0 1 2 3 9; Grade control 0 0.5 1 1.5 10. Natural valley 0 0.5 1 1.5 11. Second or greater order channel No = 0 Yes = 3 artificial ditches are not rated; see discussions in manual R_ Hvrtrnlf)nv fSjihtntal = 6.S 1 12. Presence of Baseflow 0 1 2 3 13. Iron oxidizing bacteria 0 1 2 3 14. Leaf litter 1.5 1 0.5 0 15. Sediment on plants or debris 0 0.5 1 1.5 16. Organic debris lines or piles 0 0.5 1 1.5 17. Soil -based evidence of high water table? No = 0 Yes = 3 t' Rininnv !Si ihtntal = fi_r 1 18. Fibrous roots in streambed 3 2 1 0 19. Rooted upland plants in strearnbed 3 2 1 0 20. Macrobenthos (note diversity and abundance) 0 1 2 3 21. Aquatic Mollusks 0 1 2 3 22. Fish 0 0.5 1 1.5 23. Crayfish 0 0.5 1 1.5 24. Amphibians 0 0.5 1 1.5 25. Algae 0 0.5 1 1.5 26. Wetland plants in streambed FACW = 0.75; OBL = 1.5 Other = 0 'perennial streams may also be identified using other methods. See p. 35 of manual. Notes: Sketch: '�Xk ql)-31 7 67 1)- a 2 1 1 1 1 0 0 2 1 1 O 1 1 0.5 0:5 0.5 3 1 2 1 0 0 1 1 0.5 0 NC" DWO Stream irientifieatinn Fnrm Vet-cion 4.11 Date: 0 /21 2022 9 Project Rea Project/Site: 2200 0 8 Latitude: 35.75 5 Evaluator: J Sinclair county: Chatham Longitude:-78.94634 Total Points: Stream is least intermittent 6.25 afmmDetermination (circle one) Other New Hill and Green Level at if? 19 or perennial if z 30" Ephemera ntermittent Perennial e.g. Quad Name: A. Geomorphology (Subtotal = 1 ) Absent Weak Moderate Strong 1" Continuity of channel bed and bank 0 1 2 3 2. Sinuosity of channel along thalweg 0 1 2 3 3. In -channel structure: ex. riffle -pool, step -pool, sequence 0 1 2 3 -ripple-pool 4. Particle size of stream substrate 0 1 2 3 5. Active/relict floodplain 0 1 2 3 6. Depositional bars or benches 0 1 2 3 7. Recent alluvial deposits 0 1 2 3 8. Headcuts 0 1 2 3 9. Grade control 0 0.5 1 1.5 10. Natural valley 0 0.5 1 1.5 11. Second or greater order channel No = 0 Yes = 3 artificial ditches are not rated; see discussions in manual R H%irlrnlnrni lCiihfntal = A 1 12. Presence of Baseflow 0 1 2 3 13. Iron oxidizing bacteria 0 1 2 3 14. Loaf litter 1.5 1 0.5 0 15. Sediment on plants or debris 0 0.5 1 1.5 16. Organic debris lines or piles 0 0.5 1 1.5 17. Soi[-based evidence of high water table? No = 0 Yes = 3 C: Rinlnnv (Ri ihtntA = 1.) q 1 18. Fibrous roots in streambed 3 2 1 0 19. Rooted upland plants in streambed 3 2 1 0 20. Macrobenthos (note diversity and abundance) 0 1 2 3 21. Aquatic Mollusks 0 1 2 3 22. Fish 0 0.5 1 1.5 23. Crayfish 0 0.5 1 1.5 24. Amphibians 0 0.5 1 1.5 25. Algae 0 0.5 1 1.5 26. Wetland plants in streambed FACW = 0.75; OBI = 1.5 Other = 0 'perennial streams may also be identified using other methods. See p. 35 of manual. Notes: Sketch: There is no connection between the pond and the feature shown on the soil survey map (WL 2200) 0 0 0 0 0 0 0 1 0 0 0 1 O 0 3 ra 0.5 0.75 Chataham County NC Soil Survey, 2006 Portion of Green Level Quadrangle Soil Survey - CrC CrD MdB CrD ChA Md8 UdC CrC CrC U PeA CrB MdC Portion of Wake County MrA eek MrA Map Sheet 64 MrA MrA Approx. Review Area BA ChA Portion of New Hill Quadrangle Soil Survey �PeA PeA Watland WL 220o Ma CrC Channel not present in field p No Connection to Pond IVIIA I a CrB WE CrC rD 751 CrB o Cr CrD CrB MhE CrC urLo Pond 1 Channel CH 200 ,' CrD CrD Potentially Non Jurisdictional CrB lnterrnittent G rcz iCrD CrB + f' + Channel CH t00 1, l t. � anne, _ Perennial 751 CrD Not Shown On Soils Map �: r ,y ►t crl3zz CrC CrC' C'rB CrC i ii I W CrB Project Name: Project Real LA ; Location: 106 NC Highway 751 Apex, NC 27523 71SPONMENTAL For: Beacon Partners Attn: Ms. Maggie Houston Coordinates: 35.746871-78.94794 LEate: August 26, 2022 `j"l 9(}3/'-)b?-a- O O q v rD In w u-I N Go C0 0 co w r� 0 o) rn N a 0 d CD 0' fD w Q N O i2E—+ O T n o W �• n CD o D' Z n O fll O 3 b rnCD (D Ln �{ C r� [D n, X � z `n n NJ rD o �n r�r W O cn LA n > Nl- 19 cn f r t �r9�J(dl.rpYj`r}liy} 's r •' .' ..4 � Or F ��� ��r�..,� •r .Icn 50 rn �+ � �'� � ` _ _�..._ `+ '\ .����` � ` 1 t �,. .,� ram•"�,, � 311 NZ vs _ '-'r � � � fit /'.,tt� •.• � ��'``ti,�, ",• I`.�-.���/ ti' ~ + �� Q 1 ��� � �' 'fir 5`Y'ti�,� � �� i "1`'S�`'• �.� >r+ � ri _ri ..�` � � S� 4 "ice 1 ,55 t J •'y 4*. `j •'� , ..�,� ` _ � �� �-•� .l�+�r �, ��� - it T,` ���� n �'�^�yp�: `�' 7 ` ' S ' i � : • S i • i 4 { i Ala Ll CD "•,_ 1 f"M � 11t � -1 '_` I � +`" _ -_,,. ; L�• ; ¢� �-_i�iR�Krr,y�; �" -'�� ti� ..-. — � -ti..»-•r•+f'1 h �� .i f .r � I� fv ,y ; I ` � I y i' i � ; 5 i � v. 1.••r-'-'� �`.;.r' err " ti�� I 1� '� 1 1 ! y . y C 1 1 i ! ' ! ; {. CD�t rr•� t{{�.r-'� �rJ + f; 1i�4�� `��:'ii�{i'' •, 2 O `y� � �t �' �•`�, ,1 � r �.J �� "�..,, �'4, I Y; i =4. , , , ! � 1 R • ' f +�� ; ! 4 i r 1 i �, . p o I ,� f ',,: r,y„� Irk: c �4 r� ill.,; r.:',.���,}:.�;;, r 11 v+.. •A f ''�.;''•. ■ '�- �4 �1 4 ''" '''.� i,� :,- ;•,' 1 Yj:`tii > S f aCD . - al \`•y . h F• F •' t': i !� CD .r""+'• J t `_.„'C' _".--r- �."'`y r } I JJ{ :,�,: 1. s .� + t t { t..}+. , i . !rl . •' -•.+" .r.• ���` e' t, � i"t -��! 11 _ i � 1 1: � _ � r �v ' r 7 ry � ti f 1L !� � �'r.: -f- � Project Name: Project Real RQ C Location: 106 NC Highway 751 Apex, NC 27523 ONENTAL For: Beacon Partners Attn: Ms. Maggie Houston Figure: I Coordinates: 35,742748,-78,950662 1 Date: Sept 16, 2022 209-P' Project Name: Project Real AON A C Location: 106 NC Highway 751 Apex, NC 27523 Fto NENTAI_ For: Beacon Partners Attn: Ms. Maggie Houston Figure: I Coordinates: 35.742748,-78.950662 1 Date: Sept 16, 2022 j �/'o 3/ ';0 9-z 41 Ul 0 0 0 o .1 @ 3 = 0 R z 0 0) E7t N n C1 V t 44 V � � {fop• o n M ` > Ln CD NJ Un z o (0 (D N o a N 0 Q rn 3 v- m N m Q N O N r-� C v CD O (D (D 6 (D N O N CD N ry ry 2 RD N Ln ;p a CD rr Q o� o`erC o s► �. rr 0 a CD((DD ((DD W al rt > Gov oh Co CD rt O (� N C rn � CL r- � O > n � Z7 CD 0 W iD 0 n r (n N O wET ov .. a o v / Nv � n (D 0 CD v N C'Y n Ln O n rn n a� oo N)0 w m Q a CD N 0- (D O wo (D Q) Q O Q � � � n � CD7 2 � -o p CD CD CD n Q o � � a N t * o :� -� CD Q CD o N O N W Z3 O r a a n �� cDi >oT N dl a') O D 0 -11 0 a) i T c N on O �. 03 rt Cf�{ d z rt �i v � W CJt q z .� y � � 90 3 `n � N D ° `n n o y� �3 O a Q cn m n m a 9a 0 [V O 1 La p N� IN r- d '� fD 0' o_ 3 p R3 n 0 o n ro 1 10 o x 0 C) >EZD)- �_ 0> A o� a omoZ (D oCCcoDD o W o� O �� �p (D 7 O 0 o p� --> fll ,!h .A W rl3 -1 w o C o o y O O m lrz>-ol LI cDi o n 10 am t 3 r� (D om moor- oc o Q o o � o m CD m 4 v W � O � Ul N3 n� W3 >Q C) yOL 0 0 c7 w_ 0 o t 3 _ o r� n ' o o -d N V D WATER RESOURCES DEPARTMENT December 28, 2202222 Gray Harrell Beacon Partners 5oo East Morehead St., Ste. 200 Charlotte, NC 28202 Subject: Riparian Buffer Authorization Certificate (22-015) Apex Gateway Jordan Lake Watershed Dear Mr. Harrell, The Town of Apex has received a Request for a "No Practical Alternatives" determination for the subject private development project. In accordance with UDO Section 6.i.1i(G)(4), you have our authorization to impact the riparian buffer as shown in the table below for the purposes of constructing a road crossing and grading for the subject project. Riparian Buffer Impacts Approved: Amount of Amount of Required Type of Total Impact Plan Location Total Impact Mitigation Mitigation Impact rove Approved ftZ pp ( ) or Reference Requiring Ratio ftZ ( ) Mitigation (ftZ) Zone i buffer 2,694 Application 0 3:1 0 Zone a buffer 3,372 Application 0 1.5:1 0 In accordance with UDO Section 6.1.11, the approved impacts above do not require mitigation. Please be note that the US Army Corps of Engineers approval may require compensatory mitigation for wetland and stream impacts. The Town will not approve or release the construction drawings for the subject project until we receive proof that all required state and federal permits are approved; and any required mitigation payments have been made. This authorization certificate is for the purpose and design that is described in your application and shown on approved construction plans. If you modify your project, you must notify the Town and you may be required to submit a new application. If the property is sold, the new owner must be given a copy of this authorization letter and is thereby responsible for complying with all conditions. As always, you should obtain or otherwise comply with any other federal, state or local TOWN OF APEX The Peak of Good Living PO Box 25o Apex, NC 275O2 1 (919) 249-3400 1 www.apexnc.org Town of Apex Riparian Buffer Authorization Certificate (22-015) Page 2 of 3 permits before you begin your project. This authorization requires you to follow the conditions listed below. The Additional Conditions of the Certification are: i. Erosion & Sediment Control Practices Erosion and sediment control practices must be in full compliance with all specifications governing the proper design, installation and operation and maintenance of such Best Management Practices in order to protect surface water standards. The erosion and sediment control measures for the project must be designed, installed, operated, and maintained in accordance with the most recent version of the North Carolina Sediment and Erosion Control Planning and Design Manual, Town standards, and the Town Soil Erosion and Sedimentation Control ordinance. a. The design, installation, operation, and maintenance of the sediment and erosion control measures must be such that they equal, or exceed, the requirements specified in the most recent version of the North Carolina Sediment and Erosion Control Manual, Town standards, and Town Erosion Control ordinance. The devices shall be maintained on all construction sites, borrow sites, and waste pile (spoil) projects, including contractor -owned or leased borrow pits associated with the project. b. For borrow pit sites, the erosion and sediment control measures must be designed, installed, operated, and maintained in accordance with the most recent version of the North Carolina Surface Mining Manual. c. The reclamation measures and implementation must comply with the reclamation in accordance with the requirements of the Sedimentation Pollution Control Act. 2. No Waste, Spoil, Solids, or Fill of Any Kind No waste, spoil, solids, or fill of any kind shall occur in wetlands, waters, or riparian areas beyond the footprint of the impacts depicted in the application. All construction activities, including the design, installation, operation, and maintenance of sediment and erosion control Best Management Practices, shall be performed such that no violations of state water quality standards, statutes, or rules occur. 3. Diffuse Flow An additional condition is that all stormwater shall be directed as diffuse flow at non -erosive velocities through the protected stream buffers and will not re -concentrate before discharging into the stream as identified within 15A NCAC 2B .0267(8) and Town UDO Section 6.i.11. Any disputes over determinations regarding this Authorization (associated with the approved buffer impacts to Zones i and 2) shall be referred in writing to the NC Department of Environmental Quality (DEQ) Director within thirty (30) days of receipt of this notice for a decision. TOWN OF APEX The Peak of Good Living PO Box 25o Apex, NC 27502 1 (919) 249-3400 1 www.apexnc.org Town of Apex Riparian Buffer Authorization Certificate (22-015) Page 3 of 3 To contest the Director's decision, you must file a petition for an administrative hearing. You may obtain the petition form from the office of Administrative Hearings. You must file the petition with the office of Administrative Hearings within sixty (6o) days of receipt of this notice. A petition is considered filed when it is received in the office of Administrative Hearings during normal office hours. The Office of Administrative Hearings accepts filings Monday through Friday between the hours of 8:ooam and 5:oopm, except for official State holidays. The original and one (1) copy of the petition must be filed with the Office of Administrative Hearings. The mailing address for the Office of Administrative Hearings is: Office of Administrative Hearings 6714 Mail Service Center Raleigh, NC 27699-6714 Telephone: (919)-733-2698 A copy of the petition must also be served on DEQ as follows: Mr. Bill Lane, General Counsel Department of Environmental Quality 16oi Mail Service Center Raleigh, NC 27699-i6oi This Authorization shall expire five (5) years from the date of this letter. This letter does not authorize any impacts to either Waters of the United States or Waters of the State. Please contact the US Army Corps of Engineers (USACE) or DEQ if any impacts are proposed to either of these waters. If you have any questions, please contact me at robert.patterson@apexnc.org or (919) 249-1166. Sincerely, Robert D. Patterson, PE Senior Engineer TOWN OF APEX The Peak of Good Living PO Box 25o Apex, NC 275O2 1 (919) 249-3400 1 www.apexnc.org