Loading...
HomeMy WebLinkAboutNC0021211_Authorization to Construct_20120328A INA NCDENR North Carolina Department of Environment and Division of Water Quality Beverly Eaves Perdue Charles Wakild, P.E. Governor Director March 28, 2012 Mr. Victor Quick City of Graham 1204 East Gilbreath Street Graham, North Carolina 27253 Natural Resources Dee Freeman Secretary SUBJECT: Authorization to Construct A to C No. 021211 A02 City of Graham Graham WWTP Dear Mr. Quick: A letter of request for an Authorization to Construct was received February 27, 2012, by the Division of Water Quality (Division), and final plans and specifications for the subject project have been reviewed and found to be satisfactory. Authorization is hereby granted for the construction of modifications to the existing 3.5 MGD Wastewater Treatment Plant, with discharge of treated wastewater into the Haw River in the Cape Fear River Basin. This authorization results in no increase in design or permitted capacity and is awarded for the construction of the following specific modifications: Installation of a caustic (sodium hydroxide) storage facility to include four (4) 330 gallon intermediate bulk containers (IBC's) and a containment slab with drain; a chemical feed pump station to be housed in the existing RAS pump station # 1 with two (2) .5-8 gph peristaltic metering pumps capable of pumping sodium hydroxide to both the primary clarifier and secondary clarifier effluent application points, in conformity with the project plans, specifications, and other supporting data subsequently filed and approved by the Department of Environment and Natural Resources. This Authorization to Construct is issued in accordance with Part III, Paragraph A of NPDES Permit No. NCO02121 I issued July 9, 2010, and shall be subject to revocation unless the wastewater treatment facilities are constructed in accordance with the conditions and limitations specified in Permit No. NCO021211. 1617 Mail Service Center, Raleigh, North Carolina 27699-1617 Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 Phone: 9IM07-63001 FAX: 919-807.6492 Internet: www.ncwaterouality.org An Equal OpporNnily I Affirmative Action Employer None Carolina �turally Mr. Victor Quick March 28, 2012 Page 2 The sludge generated from these treatment facilities must be disposed of in accordance with G.S. 143-215.1 and in a manner approved by the Division. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by the Division, such as the construction of additional or replacement wastewater treatment or disposal facilities. The Winston-Salem Regional Office, telephone number (336) 771-5000, shall be notified at least forty-eight (48) hours in advance of operation of the installed facilities so that an on site inspection can be made. Such notification to the regional supervisor shall be made during the normal office hours from 8:00 a.m. until 5:00 p.m. on Monday through Friday, excluding State Holidays. Upon completion of construction and prior to operation of this permitted facility, a certification must be received from a professional engineer certifying that the permitted facility has been installed in accordance with the NPDES Permit, this Authorization to Construct and the approved plans and specifications. Mail the Certification to: Infrastructure Finance Section, DWQ/DENR, 1633 Mail Service Center, Raleigh, NC 27699-1633. Upon classification of the facility by the Certification Commission, the Permittee shall employ a certified wastewater treatment plant operator to be in responsible charge (ORC) of the wastewater treatment facilities. The operator must hold a certificate of the type and grade at least equivalent to or greater than the classification assigned to the wastewater treatment facilities by the Certification Commission. The Permittee must also employ a certified back-up operator of the appropriate type and grade to comply with the conditions of T15A:8G.0202. The ORC of the facility must visit each Class I facility at least weekly and each Class II, III and IV facility at least daily, excluding weekends and holidays, must properly manage the facility, must document daily operation and maintenance of the facility, and must comply with all other conditions of T15A:8G.0202. A copy of the approved plans and specifications shall be maintained on file by the Permittee for the life of the facility. During the construction of the proposed additions/modifications, the permittee shall continue to properly maintain and operate the existing wastewater treatment facilities at all times, and in such a manner, as necessary to comply with the effluent limits specified in the NPDES Permit. You are reminded that it is mandatory for the project to be constructed in accordance with the North Carolina Sedimentation Pollution Control Act, and when applicable, the North Mr. Victor Quick March 28, 2012 Page 3 Carolina Dam Safety Act. In addition, the specifications must clearly state what the contractor's responsibilities shall be in complying with these Acts. Prior to entering into any contract(s) for construction, the recipient must have obtained all applicable permits from the State. Failure to abide by the requirements contained in this Authorization to Construct may subject the Pennittee to an enforcement action by the Division in accordance with North Carolina General Statute 143-215.6A to 143-215.6C. The issuance of this Authorization to Construct does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances which may be imposed by other government agencies (local, state, and federal) which have jurisdiction. One (1) set of approved plans and specifications is being forwarded to you. If you have any questions or need additional information, please contact Seth Robertson, P.E. at telephone number (919) 707-9175. Sincerely, c�6k/7� Charles Wakild, P.E. MM:sr cc: Mark J. Messere, P.E. - Hazen and Sawyer, P.C. Alamance County Health Department DWQ Winston-Salem Regional Office, Surface Water Protection Technical Assistance and Certification Unit Point Source Branch, NPDES Program Michelle McKay, E.I. ATC File City of Graham A To C No. 021211 A02 Issued March 28, 2012 Engineer's Certification L , as a duly registered Professional Engineer in the State of North Carolina, having been authorized to observe (periodically/weekly/full time) the construction of the modifications and improvements to the Graham WWTP, located on Gilbreath Street in Alamance County for the City of Graham, hereby state that, to the best of my abilities, due care and diligence was used in the observation of the following construction: Installation of a caustic (sodium hydroxide) storage facility to include four (4) 330 gallon intermediate bulk containers (IBC's) and a containment slab with drain; a chemical feed pump station to be housed in the existing RAS pump station #1 with two (2) .5-8 gph peristaltic metering pumps capable of pumping sodium hydroxide to both the primary clarifier and secondary clarifier effluent application points, in conformity with the project plans, specifications, and other supporting data subsequently filed and approved by the Department of Environment and Natural Resources. I certify that the construction of the above referenced project was observed to be built within substantial compliance and intent of the approved plans and specifications. Signature Date Registration No. Mail this Certification to: Attn: Michelle McKay, E.I. Infrastructure Finance Section DENR/DWQ 1633 Mail Service Center Raleigh, NC 27699-1633