HomeMy WebLinkAbout20150366 Ver 1_401 Application_20150415.COPY TO:
ESP Associates, P.A.
(A)
Addressee
P.O. Box 7030
(B)
ESP Main Project File
Charlotte, NC 28241
(C)
PM's Project File ,
3475 Lakemont Blvd.
❑
Approved as Changed
Fort Mill, SC 29708
. ..........................
...............................
704.S83 4949 (NC)
LETTER OF TRANSMITTAL
803.802.2440 (SC)
❑
Returned After Loan to Us
www.espassoctates corn
ESP Project Name:
Amber Meadow
ESP Project No.:
BR01.402 u
TO NC Div of Energy, Mineral and Land Resource (DEMLR)
Stormwater Permitting Program
1617 Mail Service Center
Raleigh, NC 27699 -1617
We are Sending•
❑x Enclosed ❑Change Order
❑Samples ❑Computations
❑Literature ❑Specifications
❑Copy of Letter ❑Floppy Disk
Attention Mike Randall
Date April 2, 2015
❑ Originals
❑ Sepia(s)
❑ Print(s)
❑
1 2 Set(s) of Plans
❑ Under separate cover via
❑ Other
Copies Dated Sheet Description
1 03/30/15 24x36 1 Full Set of Preliminary Plat and Construction Documents
1 03/30/15 11 pgs PCN for Buffer Disturbance
These are Being Sent:
❑
For Your Approval
❑
Approved as Noted
❑
For Your Use
❑
Approved as Submitted
x
❑
For Your Review and Comment
❑
Approved as Changed
❑
For Your Signature
❑
Returned for Corrections
❑
For Bids Due
❑
Returned After Loan to Us
0 Corrected and Returned
❑ As Requested
By ❑ Courier ED UPS ❑ Mail ❑Other
Mike, as discussed, enclosed are revised plans for Amber Meadow showing the buffer disturbance for the project
If you have any questions or need additional information please contact me at 803 - 835 -0918
n McMannis D IM @112 ^ n
APR - ®-6
D E N R - wATFla RGeni ior• J.
If enclosures are not as noted, kindly notify us immediately
Signed & Date Tristan McMannis -4/2/2015
Signed & Date
o�0F W ATF94G
1 1 > =a
Office Use Only
Corps action ID no
2 0 1 5 0 3 6 6 DWQ project no
Form Version 1 3 Dec 10 2008
Page 1 of 11
PCN Form — Version 1 3 December 10, 2008 Version
Pre - Construction Notification (PCN) Form
A. Applicant Information
1.
Processing
la
Type(s) of approval sought from the
Corps
El Section 404 Permit El Section 10 Permit
1 b Specify Nationwide Permit (NWP) number or General Permit (GP) number
1c
Has the NWP or GP number been verified by the Corps?
❑ Yes
❑ No
1 d
Type(s) of approval sought from the DWQ (check all that apply)
[:1401 Water Quality Certification — Regular ❑ Non -404 Jurisdictional General Permit
❑ 401 Water Quality Certification — Express ® Riparian Buffer Authorization
le
Is this notification solely for the record
because written approval is not required?
For the record only for DWQ 401
Certification
❑ Yes ❑ No
For the record only for Corps Permit
® Yes ® No
1f
Is payment into a mitigation bank or in -lieu fee program proposed for mitigation
of impacts? If so, attach the acceptance letter from mitigation bank or in -lieu
fee program
❑ Yes
® No
1 g
Is the project located in any of NC's twenty coastal counties If yes, answer 1 h
below
❑ Yes
® No
1h
Is the project located within a NC DCM Area of Environmental Concern (AEC)?
❑ Yes
® No
2.
Project Information
2a
Name of project
Amber Meadow
2b
County
Union
2c
Nearest municipality / town
Village of Marvin
2d
Subdivision name
Amber Meadow
2e
NCDOT only, T I P or state
project no
N/A
lffr
3.
Owner Information APR
3a
Name(s) on Recorded Deed
Longview South, LLC (c /o Greg Tomchin)
3b
Deed Book and Page No
DB 1491 PG 224, DB 5598 PG 854 L. 401 8 BVVA E R RESO(/RCE
3c
Responsible Party (for LLC if
applicable)
Stephen Puckett, Sr
c
3d
Street address
3608 Round Oak Road
3e
City, state, zip
Charlotte, NC 28210
3f
Telephone no
704 - 458 -1198
3g
Fax no.
3h
Email address.
spuckeff@greenleafdvlp.com
Page 1 of 11
PCN Form — Version 1 3 December 10, 2008 Version
r"
4.
Applicant Information (if different from owner)
4a
Applicant is
E] Agent ®Ot_her, specify ,Developer
4b
Name
Cisco Garcia, VIA LAnd'Development
4c
Business name
(if applicable)
Pulte Homes Corp
4d
Street address
11121 Carmel Commons Blvd, Suite 450
4e
City, state, zip
Charlotte, NC 28226
4f
Telephone no
704 - 543 -4922
4g
Fax no
704- 414 -7099
4h
Email address
csco garcia@pultegroup com
5.
Agent/Consultant Information (if applicable)
5a
Name
5b
Business name
(if applicable)
5c
Street address
5d
City, state, zip
5e
Telephone no
5f
Fax no
5g
Email address
Page 2 of 11
PCN Form — Version 1 3 December 10, 2008 Version
B. Project Information and Prior Project History
1. Property Identification
is Property identification no (tax PIN or parcel ID)
06222003C, 06201007C
lb Site coordinates (in decimal degrees)
Latitude 35 0161 Longitude - -80 8064
(DD DDDDDD) ( -DD DDDDDD)
is Property size
24 05 acres
2. Surface Waters
2a Name of nearest body of water (stream, river, etc.) to
McBride Branch
proposed project
2b Water Quality Classification of nearest receiving water
C
2c River basin
Portion of Sixmde Creek within Santee
3. Project Description
3a Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this
application
The site is currently undeveloped and contains a combination of open field with brush and woods
3b List the total estimated acreage of all existing wetlands on the property
060
3c List the total estimated linear feet of all existing streams (intermittent and perennial) on the property
Approx 1,699 -If
3d Explain the purpose of the proposed project
The project concsists of a 44 -unit age restricted community with associated wet pond,a proposed greenway for the
Village of Marvin and construction of a public sanitary sewer system to serve the Amber Meadow Subdivision
3e Describe the overall project in detail, including the type of equipment to be used
The project involves the construction of approximately 1,810 -If of 8' wide greenway trail which may be either mulch or
concrete. The trail is located within a 30' easement inside the stream buffer, and is to be generally centered in the
easement except where necessary to be adjusted to avoid existing trees and minimize impacts Additionally, a portion of
public sanitary sewer line (45 -If) and manhole construction will occurr within the buffer Construction equipment for both
projects is anticpated to be a combination hand tools and motorized equipment Lastly, the stormwater ouffall has been
extended to accommodate the proposed greenway trail and minimize other disturbance within the buffer by avoiding the
need for an additional culvert within the buffer under the trail downstream of the stormwater outfall.
4. Jurisdictional Determinations
4a Have jurisdictional wetland or stream determinations by the
Corps or State been requested or obtained for this property /
❑ Yes ❑ No ® Unknown
project (including all prior phases) in the past?
Comments
4b If the Corps made the jurisdictional determination, what type
❑ Preliminary ❑ Final
of determination was made?
4c If yes, who delineated the jurisdictional areas?
Agency /Consultant Company Wetland and Natural
Resource Consultants
Name (if known) Tamp Bandy
Other
4d If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation
5. Project History
5a Have permits or certifications been requested or obtained for
® Yes ❑ No ❑ Unknown
this project (including all prior phases) in the past?
5b If yes, explain in detail according to "help file" instructions
Project is in for review with Village of Marvin currently as part of the Amber Meadow subdivision project Erosion control
permitting is in process with NCDENR, and stormwater approval has been granted by NCDENR DEMLR
Page 3 of 11
PCN Form — Version 1 3 December 10, 2008 Version
6. Future Project Plans
6a Is this a phased project' ❑ Yes ® No
6b If yes, explain
Page 4 of 11
PCN Form — Version 1 3 December 10, 2008 Version
C' Proposed Impacts Inventory
1 Impacts Summary
la Which sections were completed below for your project (check all that apply)
❑ Wetlands ❑ Streams - tributaries ® Buffers
❑ Open Waters ❑ Pond Construction
2. Wetland Impacts
If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted
2a
2b
2c
2d
2e
2f
Wetland impact
Type of jurisdiction
number—
Type of impact
Type of wetland
Forested
(Corps - 404, 10
Area of impact
Permanent (P) or
(if known)
DWQ — non -404, other)
(acres)
Temporary T
W1 ❑ PMT
❑ Yes
❑ Corps
❑ No
❑ DWQ
W2 ❑ P ❑ T
❑ Yes
❑ Corps
❑ No
❑ DWQ
W3 ❑ P ❑ T
❑ Yes
❑ Corps
❑ No
❑ DWQ
W4 ❑ P ❑ T
❑ Yes
❑ Corps
E] No
❑DWQ
W5 ❑ P ❑ T
❑ Yes
❑ Corps
❑ No
❑ DWQ
W6 ❑ P ❑ T
El Yes
El Corps
❑ No
❑ DWQ
2g. Total wetland impacts
2h Comments.
3. Stream Impacts
If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this
question for all stream sites impacted
3a
3b
3c
3d
3e
3f
3g
Stream impact
Type of impact
Stream name
Perennial
Type of jurisdiction
Average
Impact
number -
(PER) or
(Corps - 404, 10
stream
length
Permanent (P) or
intermittent
DWQ — non -404,
width
(linear
Temporary (T)
(INT)?
other)
(feet)
feet)
S1 ❑ P ❑ T
❑ PER
❑ Corps
❑ INT
❑ DWQ
S2 ❑ P ❑ T
❑ PER
❑ Corps
❑ INT
❑ DWQ
S3 ❑ P ❑ T
❑ PER
❑ Corps
❑ INT
❑ DWQ
S4 ❑ P ❑ T
❑ PER
❑ Corps
❑ INT
❑ DWQ
S5 ❑ P ❑ T
❑ PER
❑ Corps
❑ INT
❑ DWQ
S6 ❑ P ❑ T
❑ PER
❑ Corps
❑ INT
❑ DWQ
3h Total stream and tributary impacts
31 Comments.
Page 5 of 11
PCN Form — Version 1 3 December 10, 2008 Version
4. Open Water Impacts ,
If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of
the U S then individually list all open water impacts below
4a
Open water
impact number
— Permanent
(P) or
Temporary T
4b
Name of waterbody
(if applicable)
4c
Type of impact
4d
Waterbody type
4e
Area of impact (acres)
01 ❑ PEI T
02 ❑P ❑T
03 ❑P ❑T
04 ❑P ❑T
4f. Total open water impacts
4g Comments
5. Pond or Lake Construction
If pond or lake construction proposed, then com fete the chart below.
5a
Pond ID
number
5b
Proposed use or purpose of
pond
5c
Wetland'Impacts (acres)
5d
Stream Impacts (feet)
5e
Upland
(acres)
Flooded
Filled
Excavated
Flooded
Filled
Excavated
Flooded
P1
P2
K Total
5g Comments
5h Is a dam high hazard permit required
❑ Yes ❑ No If yes, permit ID no
51 Expected pond surface area (acres)
5j Size of pond watershed (acres)
5k Method of construction
Page 6 of 11
PCN Form — Version 1 3 December 10, 2008 Version
6. Buffer Impacts (for DWQ)
If project will impact a protected riparian buffer, then complete the chart below If yes, then individually list all buffer impacts
below If any impacts require mitigation, then you MUST fill out Section D of this form
6a.
❑ Neuse ❑ Tar - Pamlico ® Other Sixmile
Project is in which protected basin?
Creek
❑ Catawba ❑ Randleman
6b.
6c
6d
6e
6f.
6g
Buffer impact
number —
Reason for
Buffer
Zone 1 impact
Zone 2 impact
Permanent (P)
impact
Stream name
mitigation
(square feet)
(square feet)
or Temporary
required?
T
B1 ®P ❑ T
Greenway
Construction
McBride Branch
® No
0
25,547
B2 ®P ❑ T
Sewery
McBride Branch
® Nos
0
1,174 -sf
B3 ®P ❑ T
S -� '
Rip -Rap
McBride Branch
❑Yes
0 N
0
700 -sf
6h Total buffer impacts
27,421 -sf
61 Comments.
D. Impact Justification and Mitigation
1. Avoidance and Minimization
la Specifically,describe measures taken to avoid or minimize the proposed impacts in designing project
The greenway has been designed to run along the uphill portion of the buffer to avoid impacts to wetlands Additionally, notes
have been added to the plans to have the greenway field staked and verified prior to construction to avoid removing existing
trees The sanitary sewer pipe connects within 26' of the outer edge of the buffer to an existing sewer line (within an existing
easement) located in the buffer
lb Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques
Clearing along the greenway will be kept to within 3' on each side of the 8' wide greenway Where possible hand tools will be
used for clearing of vegetation Greenway will be staked in field an dvenfied prior to construction to avoid existing trees
Additionally, the 200' buffer is being re- vegetated with 88 large maturing trees
2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State
2a Does the project require Compensatory Mitigation for
❑ Yes ® No
impacts to Waters of the U S or Waters of the State?
2b If yes, nutigation is required by (check all that apply)
❑ DWQ ❑ Corps
❑ Mitigation bank
2c If yes, which mitigation option will be used for this project?
❑ Payment to in -lieu fee program
❑ Permittee Responsible Mitigation
3. Complete if Using a Mitigation Bank
3a Name of Mitigation Bank
3b Credits Purchased (attach receipt and letter)
Type
Quantity
Page 7 of 11
PCN Form — Version 1 3 December 10, 2008 Version
3c Comments
4. Complete if Making a Payment to In -lieu Fee Program
4a Approval letter from in -lieu fee program is attached
❑ Yes _
4b Stream mitigation requested
linear feet
4c If using stream mitigation, stream temperature
❑ warm ❑ cool ❑cold
4d Buffer mitigation requested (DWQ only)
square feet
4e Riparian wetland mitigation requested
acres
4f Non - riparian wetland mitigation requested
acres
4g Coastal (tidal) wetland mitigation requested
acres
4h Comments
5. Complete if Using a Permittee Responsible Mitigation Plan
5a If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan
6. Buffer Mitigation (State Regulated Riparian Buffer Rules) — required by DWQ
6a Will the project result in an impact within a protected riparian buffer that requires
buffer mitigation?
❑ Yes ® No
6b If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation Calculate the
amount of mitigation required
Zone
6c
Reason for impact
6d
Total impact
(square feet)
Multiplier
6e.
Required mitigation
(square feet)
Zone 1
3 (2 for Catawba)
r
Zone 2
15
6f Total buffer mitigation, required:
6g If buffer mitigation is required, discuss what type of mitigation is proposed (e g , payment to private mitigation bank,
permittee responsible riparian buffer restoration, payment into an approved 16-lieu fee fund). 4
6h Comments
Page 8 of 11
PCN Form — Version 1 3 December 10, 2008 Version
E.
Stormwater Management and Diffuse Flow Plan (required by DWQ)
1.
Diffuse Flow Plan
1a
Does the project include or is it adjacent to protected riparian buffers identified
®Yes ❑ No
within one of the NC Riparian Buffer Protection Rules
lb
If yes, then is a diffuse flow plan included? If no, explain why
Comments Plan has been approved by NCDENR DEMLR for the proposed wet
pond which is designed to treat 90% TSS and detain the 1 00y storm' Additionally,
❑ Yes ® No
slopes downhill of the outfall in the buffer are generally flat and uniform falling at
about 1 % towards the stream
2.
Stormwater Management Plan
2a
What is the overall percent imperviousness of this project'?
284%
2b
Does this project require a Stormwater Management Plan?
® Yes ❑ No
2c
If this project DOES NOT require a Stormwater Management Plan, explain why
2d
If this project DOES require a Stormwater Management Plan, then provide a brief, narrative" description of the plan-
The project involves the construction of a proposed 44 -unit age restricted community
in the Village of Marvin with
associated roads and infrastructure stormwater is collected on -site and conveyed to
a proposed wet detention basin
designed to treat stormwater to 90% TSS and attenuate up to the 100 -year storm event The stormwater plan has been
approved under Stormwater Permit # SW3150202
❑ Certified Local Government
2e
Who will be responsible for the review of the Stormwater Management Plans
® DWQ Stormwater Program
❑ DWQ 401 Unit
3.
Certified Local Government Stormwater Review
3a
In which local government's jurisdiction is this project?
❑ Phase II
3b
Which of the following locally - implemented stormwater management programs
❑ NSW
❑ USMP
apply (check all that apply)-
❑ Water Supply Watershed
❑ Other
3c
Has the approved Stormwater Management Plan with proof of approval been
❑ Yes ❑ No
attached?
4. DWQ Stormwater Program Review
❑ Coastal counties
4a
Which of the following state - implemented stormwater management programs apply
❑ HOW
❑ ORW
(check all that apply)
® Session Law 2006 -246
❑ Other.
4b
Has the approved Stormwater Management Plan with proof of approval been
attached?
® Yes ❑ No
5. DWQ 401 Unit Stormwater Review
5a
Does the Stormwater Management Plan meet the appropriate requirements9
❑ Yes ❑ No
5b
Have all of the 401 Unit submittal requirements been met?
❑ Yes ❑ No
Page 9 of 11
PCN Form — Version 1 3 December 10, 2008 Version
F. Supplementary Information
1. Environmental Documentation (DWO Requirement)
la Does the project involve an expenditure of public (federal /state/local) funds or the
❑ Yes ® No
use of public (federal /state) land?
lb If you answered "yes" to the above, does the project require preparation of an
environmental document pursuant to the requirements of the National or State
❑ Yes ❑ No
(North Carolina) Environmental Policy Act (NEPA/SEPA)?
1c If you answered "yes" to the above, has the document review been finalized by the
State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval
❑ Yes ❑ No
letter )
Comments
2. Violations (DWQ Requirement)
2a Is the site in violation of DWQ Wetland Rules (15A NCAC 2H 0500), Isolated
Wetland Rules (15A NCAC 2H 1300), DWQ Surface Water or Wetland Standards,
❑ Yes ® No
or Riparian Buffer Rules (15A NCAC 2B 0200)?
2b Is this an after - the -fact permit application?
❑ Yes ® No
2c If you answered `yes" to one or both of the above questions, provide an explanation of the violation(s)
3. Cumulative Impacts (DWQ Requirement)
3a Will this project (based on past and reasonably anticipated future impacts) result in
❑ Yes ® No
additional development, which could impact nearby downstream water quality?
ti
3b If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the
most recent DWQ policy If you answered "no," provide a short narrative description
4. Sewage Disposal (DWO Requirement)
4a Clearly detail the ultimate treatment methods and disposition (non - discharge or discharge) of wastewater generated from
the proposed project, or available capacity of the subject facility
Wastewater from the project is conveyed by a proposed public sewer main system One branch of the proposed system
connects into an existing public sewer system to the north of the subject site in the Tullamore subdivision, the other branch
connects to the southeast of the project to an existing public system located within the riparian buffer
Page 10 of 11
PCN Form — Version 1 3 December 10, 2008 Version
5.'
Endangered Species and Designated Critical Habitat (Corps Requirement)
5a
Will this project occur in or near an area with federally protected species or
habitat?
❑ Yes ❑ No
5b
Have you checked with the USFWS concerning Endangered Species Act
impacts?
❑ Yes ❑ No
5c
If yes, indicate the USFWS Field Office you have contacted
❑ Raleigh
❑ Asheville
5d
What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical
Habitat?
6.
Essential Fish Habitat (Corps Requirement)
6a Will this project occur in or near an area designated as essential fish habitat?
❑ Yes ❑ No
6b
What data sources did you use to determine whether your site would impact Essential Fish Habitat?
7.
Historic or Prehistoric Cultural Resources (Corps Requirement)
7a
Will this project occur in or near an area that the state, federal or tribal
governments have designated as having historic or cultural preservation
status (e g , National Historic Trust designation or properties significant in
North Carolina history and archaeology)?
❑ Yes ❑ No
7b
What data sources did you use to determine whether your site would impact historic or archeological resources?
8. Flood Zone Designation (Corps Requirement)
8a Will this project occur in a FEMA - designated 100 -year floodplain?
❑ Yes ® No
8b
If yes, explain how project meets FEMA requirements
8c What source(s) did you use to make the floodplain determination? NC Flood Maps, and NFIP GIS
Cisco Garcia,
VP Land Development
Applicant/Agent's Printed Name
Date
Applicant/Agent's Signature
(Agent's signature is valid only if an authorization letter from the applicant
is provided )
Page 11 of 11