Loading...
HomeMy WebLinkAbout20150366 Ver 1_401 Application_20150415.COPY TO: ESP Associates, P.A. (A) Addressee P.O. Box 7030 (B) ESP Main Project File Charlotte, NC 28241 (C) PM's Project File , 3475 Lakemont Blvd. ❑ Approved as Changed Fort Mill, SC 29708 . .......................... ............................... 704.S83 4949 (NC) LETTER OF TRANSMITTAL 803.802.2440 (SC) ❑ Returned After Loan to Us www.espassoctates corn ESP Project Name: Amber Meadow ESP Project No.: BR01.402 u TO NC Div of Energy, Mineral and Land Resource (DEMLR) Stormwater Permitting Program 1617 Mail Service Center Raleigh, NC 27699 -1617 We are Sending• ❑x Enclosed ❑Change Order ❑Samples ❑Computations ❑Literature ❑Specifications ❑Copy of Letter ❑Floppy Disk Attention Mike Randall Date April 2, 2015 ❑ Originals ❑ Sepia(s) ❑ Print(s) ❑ 1 2 Set(s) of Plans ❑ Under separate cover via ❑ Other Copies Dated Sheet Description 1 03/30/15 24x36 1 Full Set of Preliminary Plat and Construction Documents 1 03/30/15 11 pgs PCN for Buffer Disturbance These are Being Sent: ❑ For Your Approval ❑ Approved as Noted ❑ For Your Use ❑ Approved as Submitted x ❑ For Your Review and Comment ❑ Approved as Changed ❑ For Your Signature ❑ Returned for Corrections ❑ For Bids Due ❑ Returned After Loan to Us 0 Corrected and Returned ❑ As Requested By ❑ Courier ED UPS ❑ Mail ❑Other Mike, as discussed, enclosed are revised plans for Amber Meadow showing the buffer disturbance for the project If you have any questions or need additional information please contact me at 803 - 835 -0918 n McMannis D IM @112 ^ n APR - ®-6 D E N R - wATFla RGeni ior• J. If enclosures are not as noted, kindly notify us immediately Signed & Date Tristan McMannis -4/2/2015 Signed & Date o�0F W ATF94G 1 1 > =a Office Use Only Corps action ID no 2 0 1 5 0 3 6 6 DWQ project no Form Version 1 3 Dec 10 2008 Page 1 of 11 PCN Form — Version 1 3 December 10, 2008 Version Pre - Construction Notification (PCN) Form A. Applicant Information 1. Processing la Type(s) of approval sought from the Corps El Section 404 Permit El Section 10 Permit 1 b Specify Nationwide Permit (NWP) number or General Permit (GP) number 1c Has the NWP or GP number been verified by the Corps? ❑ Yes ❑ No 1 d Type(s) of approval sought from the DWQ (check all that apply) [:1401 Water Quality Certification — Regular ❑ Non -404 Jurisdictional General Permit ❑ 401 Water Quality Certification — Express ® Riparian Buffer Authorization le Is this notification solely for the record because written approval is not required? For the record only for DWQ 401 Certification ❑ Yes ❑ No For the record only for Corps Permit ® Yes ® No 1f Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? If so, attach the acceptance letter from mitigation bank or in -lieu fee program ❑ Yes ® No 1 g Is the project located in any of NC's twenty coastal counties If yes, answer 1 h below ❑ Yes ® No 1h Is the project located within a NC DCM Area of Environmental Concern (AEC)? ❑ Yes ® No 2. Project Information 2a Name of project Amber Meadow 2b County Union 2c Nearest municipality / town Village of Marvin 2d Subdivision name Amber Meadow 2e NCDOT only, T I P or state project no N/A lffr 3. Owner Information APR 3a Name(s) on Recorded Deed Longview South, LLC (c /o Greg Tomchin) 3b Deed Book and Page No DB 1491 PG 224, DB 5598 PG 854 L. 401 8 BVVA E R RESO(/RCE 3c Responsible Party (for LLC if applicable) Stephen Puckett, Sr c 3d Street address 3608 Round Oak Road 3e City, state, zip Charlotte, NC 28210 3f Telephone no 704 - 458 -1198 3g Fax no. 3h Email address. spuckeff@greenleafdvlp.com Page 1 of 11 PCN Form — Version 1 3 December 10, 2008 Version r" 4. Applicant Information (if different from owner) 4a Applicant is E] Agent ®Ot_her, specify ,Developer 4b Name Cisco Garcia, VIA LAnd'Development 4c Business name (if applicable) Pulte Homes Corp 4d Street address 11121 Carmel Commons Blvd, Suite 450 4e City, state, zip Charlotte, NC 28226 4f Telephone no 704 - 543 -4922 4g Fax no 704- 414 -7099 4h Email address csco garcia@pultegroup com 5. Agent/Consultant Information (if applicable) 5a Name 5b Business name (if applicable) 5c Street address 5d City, state, zip 5e Telephone no 5f Fax no 5g Email address Page 2 of 11 PCN Form — Version 1 3 December 10, 2008 Version B. Project Information and Prior Project History 1. Property Identification is Property identification no (tax PIN or parcel ID) 06222003C, 06201007C lb Site coordinates (in decimal degrees) Latitude 35 0161 Longitude - -80 8064 (DD DDDDDD) ( -DD DDDDDD) is Property size 24 05 acres 2. Surface Waters 2a Name of nearest body of water (stream, river, etc.) to McBride Branch proposed project 2b Water Quality Classification of nearest receiving water C 2c River basin Portion of Sixmde Creek within Santee 3. Project Description 3a Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application The site is currently undeveloped and contains a combination of open field with brush and woods 3b List the total estimated acreage of all existing wetlands on the property 060 3c List the total estimated linear feet of all existing streams (intermittent and perennial) on the property Approx 1,699 -If 3d Explain the purpose of the proposed project The project concsists of a 44 -unit age restricted community with associated wet pond,a proposed greenway for the Village of Marvin and construction of a public sanitary sewer system to serve the Amber Meadow Subdivision 3e Describe the overall project in detail, including the type of equipment to be used The project involves the construction of approximately 1,810 -If of 8' wide greenway trail which may be either mulch or concrete. The trail is located within a 30' easement inside the stream buffer, and is to be generally centered in the easement except where necessary to be adjusted to avoid existing trees and minimize impacts Additionally, a portion of public sanitary sewer line (45 -If) and manhole construction will occurr within the buffer Construction equipment for both projects is anticpated to be a combination hand tools and motorized equipment Lastly, the stormwater ouffall has been extended to accommodate the proposed greenway trail and minimize other disturbance within the buffer by avoiding the need for an additional culvert within the buffer under the trail downstream of the stormwater outfall. 4. Jurisdictional Determinations 4a Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property / ❑ Yes ❑ No ® Unknown project (including all prior phases) in the past? Comments 4b If the Corps made the jurisdictional determination, what type ❑ Preliminary ❑ Final of determination was made? 4c If yes, who delineated the jurisdictional areas? Agency /Consultant Company Wetland and Natural Resource Consultants Name (if known) Tamp Bandy Other 4d If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation 5. Project History 5a Have permits or certifications been requested or obtained for ® Yes ❑ No ❑ Unknown this project (including all prior phases) in the past? 5b If yes, explain in detail according to "help file" instructions Project is in for review with Village of Marvin currently as part of the Amber Meadow subdivision project Erosion control permitting is in process with NCDENR, and stormwater approval has been granted by NCDENR DEMLR Page 3 of 11 PCN Form — Version 1 3 December 10, 2008 Version 6. Future Project Plans 6a Is this a phased project' ❑ Yes ® No 6b If yes, explain Page 4 of 11 PCN Form — Version 1 3 December 10, 2008 Version C' Proposed Impacts Inventory 1 Impacts Summary la Which sections were completed below for your project (check all that apply) ❑ Wetlands ❑ Streams - tributaries ® Buffers ❑ Open Waters ❑ Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted 2a 2b 2c 2d 2e 2f Wetland impact Type of jurisdiction number— Type of impact Type of wetland Forested (Corps - 404, 10 Area of impact Permanent (P) or (if known) DWQ — non -404, other) (acres) Temporary T W1 ❑ PMT ❑ Yes ❑ Corps ❑ No ❑ DWQ W2 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W3 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W4 ❑ P ❑ T ❑ Yes ❑ Corps E] No ❑DWQ W5 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W6 ❑ P ❑ T El Yes El Corps ❑ No ❑ DWQ 2g. Total wetland impacts 2h Comments. 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted 3a 3b 3c 3d 3e 3f 3g Stream impact Type of impact Stream name Perennial Type of jurisdiction Average Impact number - (PER) or (Corps - 404, 10 stream length Permanent (P) or intermittent DWQ — non -404, width (linear Temporary (T) (INT)? other) (feet) feet) S1 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ S2 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ S3 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ S4 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ S5 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ S6 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ 3h Total stream and tributary impacts 31 Comments. Page 5 of 11 PCN Form — Version 1 3 December 10, 2008 Version 4. Open Water Impacts , If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U S then individually list all open water impacts below 4a Open water impact number — Permanent (P) or Temporary T 4b Name of waterbody (if applicable) 4c Type of impact 4d Waterbody type 4e Area of impact (acres) 01 ❑ PEI T 02 ❑P ❑T 03 ❑P ❑T 04 ❑P ❑T 4f. Total open water impacts 4g Comments 5. Pond or Lake Construction If pond or lake construction proposed, then com fete the chart below. 5a Pond ID number 5b Proposed use or purpose of pond 5c Wetland'Impacts (acres) 5d Stream Impacts (feet) 5e Upland (acres) Flooded Filled Excavated Flooded Filled Excavated Flooded P1 P2 K Total 5g Comments 5h Is a dam high hazard permit required ❑ Yes ❑ No If yes, permit ID no 51 Expected pond surface area (acres) 5j Size of pond watershed (acres) 5k Method of construction Page 6 of 11 PCN Form — Version 1 3 December 10, 2008 Version 6. Buffer Impacts (for DWQ) If project will impact a protected riparian buffer, then complete the chart below If yes, then individually list all buffer impacts below If any impacts require mitigation, then you MUST fill out Section D of this form 6a. ❑ Neuse ❑ Tar - Pamlico ® Other Sixmile Project is in which protected basin? Creek ❑ Catawba ❑ Randleman 6b. 6c 6d 6e 6f. 6g Buffer impact number — Reason for Buffer Zone 1 impact Zone 2 impact Permanent (P) impact Stream name mitigation (square feet) (square feet) or Temporary required? T B1 ®P ❑ T Greenway Construction McBride Branch ® No 0 25,547 B2 ®P ❑ T Sewery McBride Branch ® Nos 0 1,174 -sf B3 ®P ❑ T S -� ' Rip -Rap McBride Branch ❑Yes 0 N 0 700 -sf 6h Total buffer impacts 27,421 -sf 61 Comments. D. Impact Justification and Mitigation 1. Avoidance and Minimization la Specifically,describe measures taken to avoid or minimize the proposed impacts in designing project The greenway has been designed to run along the uphill portion of the buffer to avoid impacts to wetlands Additionally, notes have been added to the plans to have the greenway field staked and verified prior to construction to avoid removing existing trees The sanitary sewer pipe connects within 26' of the outer edge of the buffer to an existing sewer line (within an existing easement) located in the buffer lb Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques Clearing along the greenway will be kept to within 3' on each side of the 8' wide greenway Where possible hand tools will be used for clearing of vegetation Greenway will be staked in field an dvenfied prior to construction to avoid existing trees Additionally, the 200' buffer is being re- vegetated with 88 large maturing trees 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a Does the project require Compensatory Mitigation for ❑ Yes ® No impacts to Waters of the U S or Waters of the State? 2b If yes, nutigation is required by (check all that apply) ❑ DWQ ❑ Corps ❑ Mitigation bank 2c If yes, which mitigation option will be used for this project? ❑ Payment to in -lieu fee program ❑ Permittee Responsible Mitigation 3. Complete if Using a Mitigation Bank 3a Name of Mitigation Bank 3b Credits Purchased (attach receipt and letter) Type Quantity Page 7 of 11 PCN Form — Version 1 3 December 10, 2008 Version 3c Comments 4. Complete if Making a Payment to In -lieu Fee Program 4a Approval letter from in -lieu fee program is attached ❑ Yes _ 4b Stream mitigation requested linear feet 4c If using stream mitigation, stream temperature ❑ warm ❑ cool ❑cold 4d Buffer mitigation requested (DWQ only) square feet 4e Riparian wetland mitigation requested acres 4f Non - riparian wetland mitigation requested acres 4g Coastal (tidal) wetland mitigation requested acres 4h Comments 5. Complete if Using a Permittee Responsible Mitigation Plan 5a If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan 6. Buffer Mitigation (State Regulated Riparian Buffer Rules) — required by DWQ 6a Will the project result in an impact within a protected riparian buffer that requires buffer mitigation? ❑ Yes ® No 6b If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation Calculate the amount of mitigation required Zone 6c Reason for impact 6d Total impact (square feet) Multiplier 6e. Required mitigation (square feet) Zone 1 3 (2 for Catawba) r Zone 2 15 6f Total buffer mitigation, required: 6g If buffer mitigation is required, discuss what type of mitigation is proposed (e g , payment to private mitigation bank, permittee responsible riparian buffer restoration, payment into an approved 16-lieu fee fund). 4 6h Comments Page 8 of 11 PCN Form — Version 1 3 December 10, 2008 Version E. Stormwater Management and Diffuse Flow Plan (required by DWQ) 1. Diffuse Flow Plan 1a Does the project include or is it adjacent to protected riparian buffers identified ®Yes ❑ No within one of the NC Riparian Buffer Protection Rules lb If yes, then is a diffuse flow plan included? If no, explain why Comments Plan has been approved by NCDENR DEMLR for the proposed wet pond which is designed to treat 90% TSS and detain the 1 00y storm' Additionally, ❑ Yes ® No slopes downhill of the outfall in the buffer are generally flat and uniform falling at about 1 % towards the stream 2. Stormwater Management Plan 2a What is the overall percent imperviousness of this project'? 284% 2b Does this project require a Stormwater Management Plan? ® Yes ❑ No 2c If this project DOES NOT require a Stormwater Management Plan, explain why 2d If this project DOES require a Stormwater Management Plan, then provide a brief, narrative" description of the plan- The project involves the construction of a proposed 44 -unit age restricted community in the Village of Marvin with associated roads and infrastructure stormwater is collected on -site and conveyed to a proposed wet detention basin designed to treat stormwater to 90% TSS and attenuate up to the 100 -year storm event The stormwater plan has been approved under Stormwater Permit # SW3150202 ❑ Certified Local Government 2e Who will be responsible for the review of the Stormwater Management Plans ® DWQ Stormwater Program ❑ DWQ 401 Unit 3. Certified Local Government Stormwater Review 3a In which local government's jurisdiction is this project? ❑ Phase II 3b Which of the following locally - implemented stormwater management programs ❑ NSW ❑ USMP apply (check all that apply)- ❑ Water Supply Watershed ❑ Other 3c Has the approved Stormwater Management Plan with proof of approval been ❑ Yes ❑ No attached? 4. DWQ Stormwater Program Review ❑ Coastal counties 4a Which of the following state - implemented stormwater management programs apply ❑ HOW ❑ ORW (check all that apply) ® Session Law 2006 -246 ❑ Other. 4b Has the approved Stormwater Management Plan with proof of approval been attached? ® Yes ❑ No 5. DWQ 401 Unit Stormwater Review 5a Does the Stormwater Management Plan meet the appropriate requirements9 ❑ Yes ❑ No 5b Have all of the 401 Unit submittal requirements been met? ❑ Yes ❑ No Page 9 of 11 PCN Form — Version 1 3 December 10, 2008 Version F. Supplementary Information 1. Environmental Documentation (DWO Requirement) la Does the project involve an expenditure of public (federal /state/local) funds or the ❑ Yes ® No use of public (federal /state) land? lb If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State ❑ Yes ❑ No (North Carolina) Environmental Policy Act (NEPA/SEPA)? 1c If you answered "yes" to the above, has the document review been finalized by the State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval ❑ Yes ❑ No letter ) Comments 2. Violations (DWQ Requirement) 2a Is the site in violation of DWQ Wetland Rules (15A NCAC 2H 0500), Isolated Wetland Rules (15A NCAC 2H 1300), DWQ Surface Water or Wetland Standards, ❑ Yes ® No or Riparian Buffer Rules (15A NCAC 2B 0200)? 2b Is this an after - the -fact permit application? ❑ Yes ® No 2c If you answered `yes" to one or both of the above questions, provide an explanation of the violation(s) 3. Cumulative Impacts (DWQ Requirement) 3a Will this project (based on past and reasonably anticipated future impacts) result in ❑ Yes ® No additional development, which could impact nearby downstream water quality? ti 3b If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWQ policy If you answered "no," provide a short narrative description 4. Sewage Disposal (DWO Requirement) 4a Clearly detail the ultimate treatment methods and disposition (non - discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility Wastewater from the project is conveyed by a proposed public sewer main system One branch of the proposed system connects into an existing public sewer system to the north of the subject site in the Tullamore subdivision, the other branch connects to the southeast of the project to an existing public system located within the riparian buffer Page 10 of 11 PCN Form — Version 1 3 December 10, 2008 Version 5.' Endangered Species and Designated Critical Habitat (Corps Requirement) 5a Will this project occur in or near an area with federally protected species or habitat? ❑ Yes ❑ No 5b Have you checked with the USFWS concerning Endangered Species Act impacts? ❑ Yes ❑ No 5c If yes, indicate the USFWS Field Office you have contacted ❑ Raleigh ❑ Asheville 5d What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? 6. Essential Fish Habitat (Corps Requirement) 6a Will this project occur in or near an area designated as essential fish habitat? ❑ Yes ❑ No 6b What data sources did you use to determine whether your site would impact Essential Fish Habitat? 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation status (e g , National Historic Trust designation or properties significant in North Carolina history and archaeology)? ❑ Yes ❑ No 7b What data sources did you use to determine whether your site would impact historic or archeological resources? 8. Flood Zone Designation (Corps Requirement) 8a Will this project occur in a FEMA - designated 100 -year floodplain? ❑ Yes ® No 8b If yes, explain how project meets FEMA requirements 8c What source(s) did you use to make the floodplain determination? NC Flood Maps, and NFIP GIS Cisco Garcia, VP Land Development Applicant/Agent's Printed Name Date Applicant/Agent's Signature (Agent's signature is valid only if an authorization letter from the applicant is provided ) Page 11 of 11 PCN Form — Version 1 3 December 10, 2008 Version