Loading...
HomeMy WebLinkAbout20230459 Ver 1_Shoreline Stabilization_20230329a. ROY COOPER Governor V ^`. MICHAELS. REGANy. rF° _,.. Secretary :mks S. DANIEL SMITH NORTH CAROUNA Director Environmental Quality State of North Carolina Department of Environment Quality Division of Water Resources 15A NCAC 02H .0500 — Water Quality Certification, Shoreline Stabilization FORM: SSGP 09-2020 Shoreline Stabilization Application Form Three copies of the application (including attachments) and the application fee should be sent to: If sending via US Postal Service Paul Wojoski DWR — 401 & Buffer Permitting Branch 1617 Mail Service Center Raleigh, NC 27699-1617 !f sending via delivery service (UPS, FedEx, etc.) Paul Wojoski DWR — 401 & Buffer Permitting Branch 512 N. Salisbury Street Raleigh, NC 27604 NOTE: Before submitting this form, please ensure you have submitted the Pre -Filing Meeting Request Form as we will not be able to accept your application without this important first step. The Pre -Filing Meeting Request Form is used in accordance with 40 C.F.R. Section 121.4(a) which states "At least 30 days prior to submitting a certification request, the project proponent shall request a pre -filing meeting with the certifying agency." In accordance with 40 C.F.R. Section 121.5(b)(7), and (c)(5), all certification requests must include documentation that a pre -filing meeting request was submitted to the certifying authority at least 30 days prior to submitting the certification request. Click here to read more information on when this form is needed prior to application submission or here to view the form. Attach documentation of -Filing Mee equest to this application. Date of Pre -filing Meeti quest: (required) FIECElVED DWR I Version f applicable) MAR 2 9 2023 A. Applicant Information (15A NCAC 02H .0502(a)1 1)!7Q-YJAiER RESOURCE I. Owner Information 401 & BUFFER PERMRTiNQ Name: Barbara Meckes Mailing Address: 646 Harbor Drive East Lexington, NC 27292 Telephone Number: 919/414-6440 Fax Number: E-mail Address: barbmeckes@earthlink.net North Carolina Department of Environmental Quality I Division of Water Resources 512 North Salisbury Street 1 1617 Mail Service Center I Raleigh. North Carolina 27699-1617 919.707.9000 2. Agent/ Contact Person Information A signed and dated copy of the Agent Authorization letter must be attached If the Agent has signed this application form. (A form can be downloaded here: htto://www.saw.usace.army.mil/Portais/59/docs/reguiatorv/regdocs/Pennits/SAMPLE AGENT ALITI-IORIZ ATION FORM.pdf) Name: N/A Company Affiliation: Mailing Address: Telephone Number: Fax Number: E-mail Address: B. Project Information 115A NCAC 02H .0502(a) & (b)l 1. Attach a vicinity map (i.e. street map) clearly showing the location of the property with respect to local landmarks such as towns, rivers, and roads. 2. Provide a detailed site plan showing property boundaries and proposed locations of vegetation clearing, buildings, retaining walls, docks, impervious surfaces, rip rap, excavation or dredging below Full Pond/ Normal Water Level elevations, and construction access corridors. You may use the diagram provided at the end of this application form. 3. Attach a photograph of the shoreline/ buffer proposed to be stabilized. (Include a scale of some sort- a yard stick, shovel handle, etc.) 4. Location of the property (where work is to be conducted) County: Davidson Nearest Town: Lexington Lake/ river/ ocean adjacent to property: High Rock Lake Property size (acres): 110 acres Subdivision name or site address (include phase/lot number): Lot 9. Stoney Point Harbor, 646 Harbor Dr. East Lexington ,Directions to site - please include road names and numbers, landmarks, etc.: 1-85 to Lexington exit for NC Hwy 8 go south on NC Hwy 8 L on Stonev Point Dr enter security access code at gate, L on Harbor Drive East, property is at end of road Latitude fln decimal degrees) 35.37.3244 Longitude (decimal degrees) $0.12.3209 5. Describe the existing land use or condition of the site at the time of this application (residential, undeveloped; etc.): Single-family residential community FORM: SSGP 09-2020 Page 2 of 6 6. Describe proposed work (include discussion as to how hardening of shoreline has been avoided, or why it is necessary): To stabilize an eroding shoreline and protect it from further erosion. 7. Will work be conducted from land?® From water? ❑ 8. Total amount of impacts below the normal pool lake level J Normal Water Level Permanent impacts (including all excavation, backfill, rip rap, retaining itialls,•etc.) in square feet: 200 Sq. Ft Temporary impacts in square feet: None 9. Total amount of impacts above the normal pool lake level / Normal Water Level and 50 feet land -ward Permanent impacts (including back fill, excavation, rip rap, retaining walls, etc.) in square feet: 600 So. Ft Temporary impacts (temporary clearing, construction corridor) in square feet: 500 Sq. Ft. 10. Please describe the vegetation above the normal pool lake level/ Normal Water Level and 50 feet landward to be impacted (number of trees, for instance): Six to eight trees will be removed in order to complete the stabilization proiect 11. Signature By signing below,1, as the project proponent, certify to the following: • The project proponent hereby certifies that all Information contained herein is true, accurate, and complete to the best of my knowledge and belief • The project proponent hereby requests that the certifying authority review and take action on this CWA 401 certification request within the applicable reasonable period of time i3.0 Owner/Agent's Signature*. [15A NCAC 02H .0502(f)l Date 'Agent's signature is valid only if an authorization letter from the owner is provided 12. Please approximately sketch the following information on this plan and oroufde dimensions for each item: a. All proposed. vegetation clearing b. Location of rip rap or fill to be placed above the Full Pond/ Normal Water Level elevation c.. Location of rip rap or fill to be placed below the Full Pond/ Normal Water Level elevation FORM: SSGP 09-2020 • , Page 3 of 6 d. Location of any proposed structures such as buildings, retaining wp-lls, docks, etc. e. Location of any excavation or dredging below the Full Pond/ Normal Water Level elevation (Pull Pond/ Normal Water em I Shoreline Plan View S%::rwsi �� r��-s.r✓ra Plan View 1 FORM: SSGP 09-2020 Page 4 of 6 et . Lake c3 (At Full Pond/ Normal iI `atQr Levd) " Sias View�- LL.. FORM: SSGP 09-2020 Page 5 of 6 3 It. below full pond water level 4 ft. above full pond water level 2 ft. additional clearing 'if necessary 20 ft. bank 'Side Vi FORM; SSGP 09-2020 Pave 6 of 6 NCDEQ 401 WATER QUALITY CERTIFICATION SHORELINE IMPACT AREA CALCULATIONS APPLICANT: Barbara Meckes Lot 9, Stoney Point Harbor STABILIZATION IMPACT AREA CALCULATIONS The attached shoreline site plan shows 100 LF of proposed shoreline stabilization measures. Detail 3 indicates a proposed shoreline slope that is graded at 2:1 and reflects the estimated normal pool level and the estimated height of the subject shoreline above the normal pool level. Calculation 1— Impact Area Below Normal Pool Level (Item 8 on.NCDEQ_Form SSGP 09-2020) Area of Impact = Shoreline Length x Depth* x Slope = (100') x (1') x (2) = 200 sq.. ft. *For this calculation, an average water depth of 1 ft. has been assumed. This will produce a conservative overestimate of the stabilization impact area. Calculation 2 Impact Area Above the Normal Pool Level (Item 9 on NCDEQ Form SSGP 09-2020) Permanent Impact From Shoreline Stabilization Measures Height of Bank Above Normal Pool Varies Across the Shoreline Estimate 100 LF of Shoreline = 3 ft. Above Normal Pool Area of Impact = Length x Height x Slope =(100'xXx2) '600 sq. ft.' impact from Construction Above Shoreline Stabilization Assume'5 ft. Wide Zone Area of Impact = 100' x 5 ft. = 500 sq. ft. Total Area of Impact Above Normal Pool Level = 1100 sq. ft. 517E MW ` BAf2F.>AP-A Met4--E5, l�NA�c1�oRlZEn F-tP P In rl VEGETATION AND EROSION CONTROL FABRIC rVlr%-nLt^ ^M a - 3 CLASS 2 RIP RAP EROSION CONTROL FA. LAKE @- OTrOM TYPICAL CONDITIONS 36" TO 72" ERODED CUT WAVE EXPOSURE FOR: BARBARA MECKES LOCATION: LOT 9, STONEY POINT HARBOR RESERVOIR: HIGH ROCK LAKE PROJECT: SHORELINE STABILIZATION PROGRAM PHASE I SITE EVALUATION YADKIN, INC. - BADIN, NORTH CAROLINA DRAWING TITLE: DETAIL MODERATE RIP RAP STABILIZATION 3 1 s I. b',.�: .ate s.... '; 1'y+y''. .:.•I• 1.: i• 3/22/23, 11:39 AM Go:-4 gle Maps 646 Harbor Dr E G 646 Harbor Dr E - Google Maps vlazatlan Family Mex{can s� Faith Baptist Church p R Restauranr tSouthm�ntl� (e; Edward's Mowef.Repairy Carricli s Custom Guns SummervilleptistChurc',Nortl` JSAuto CarolinaWildlife Access Boat... les' Mountain View s Baptist Church ® Pebble Beach <> y Raven` eint x_ v F' LT. Resource Group III Gl- III 6 gle `ei Healing Springs ©Valor Memorial Park Map data ©2023 2000 ft r https://www.google.com/maps/place/646+Harbor+Dr+E +Lexington,+NC+27292/@35.6362486,-80.2147325,14ztdata=!4m6!3m5!lsOx8853846ablb34fdl:Ox9dcd72el9ee26f4O!8m2!3d35.6255944!4d-8... 1/1