Loading...
HomeMy WebLinkAbout160001_Compliance Evaluation Inspection_20230329 G'fiivision of Water Resources Facility Number 1Z - OO 0 Division of Soil and Water Conservation 0 Other Agency Type of Visit: &Compliance Inspection 0 Operation Review 0 Structure Evaluation 0 Technical Assistance Reason for Visit: Routine 0 Complaint 0 Follow-up 0 Referral 0 Emergency 0 Other 0 Denied Access Date of Visit: b3L;tj/ ,q3j Arrival Time: 0 Departure Time: �}® County: (ar} t/C� Region: W Farm Name: J0yte Owner Email: Owner Name: Phone: Mailing Address: Physical Address: Facility Contact: Title: Phone: Onsite Representative: Integrator: Certified Operator: Q �` � ,��'C e i Certification Number: 17 C �5 Back-up Operator: Certification Number: Location of Farm: Latitude: Longitude: Design Current Design Current Design Current Swine Capacity Pop. Wet Poultry Capacity Pop. Cattle Capacity Pop. Wean to Finish I ILa er I I Dairy Cow Wean to Feeder I INon-La er I I Dairy Calf Feeder to Finish Dairy Heifer Farrow to Wean Design Current Dry Cow Farrow to Feeder Dry Poultry Capacity Pop. Non-Dairy Farrow to Finish La ers Beef Stocker Gilts Non-Layers Beef Feeder Boars Pullets Beef Brood Cow Turkeys Other Turkey Poults Other Discharees and Stream Impacts 1. Is any discharge observed from any part of the operation? ❑ Yes No ❑ NA ❑ NE Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? ❑ Yes ❑ No ❑ NA ❑ NE b. Did the discharge reach waters of the State?(If yes, notify DWR) ❑ Yes ❑ No ❑ NA ❑ NE c. What is the estimated volume that reached waters of the State(gallons)? d. Does the discharge bypass the waste management system?(If yes, notify DWR) ❑ Yes f�No ❑ NA ❑ NE 2. Is there evidence of a past discharge from any part of the operation? ❑ Yes E]�No ❑ NA ❑ NE 3. Were there any observable adverse impacts or potential adverse impacts to the waters ❑ Yes ErNo ❑ NA ❑ NE of the State other than from a discharge'? Page 1 of 3 511212020 Continued Facilit Number: I fo _ p Date of Inspection: 3 79 2 Waste Collection&Treatment 4.Is storage capacity(structural plus storm storage plus heavy rainfall)less than adequate? ❑ Yes Q'No ❑ NA ❑ NE a.If yes,is waste level into the structural freeboard? ❑ Yes ❑ No ❑ NA ❑ NE Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: Spillway?: Designed Freeboard(in): Observed Freeboard(in): 30 5.Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes [i]'No ❑ NA ❑ NE (i.e.,large trees,severe erosion,seepage,etc.) 6.Are there structures on-site which are not properly addressed and/or managed through a ❑ Yes [r No ❑ NA ❑ NE waste management or closure plan? If any of questions 4-6 were answered yes,and the situation poses an immediate public health or environmental threat,notify DWR 7.Do any of the structures need maintenance or improvement? ❑ Yes Q o ❑ NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes [ No ❑ NA ❑ NE (not applicable to roofed pits,dry stacks,and/or wet stacks) 9.Does any part of the waste management system other than the waste structures require ❑ Yes O'NNo ❑ NA ❑ NE maintenance or improvement? Waste Application 10.Are there any required buffers,setbacks,or compliance alternatives that need ❑ Yes E'No ❑ NA ❑ N f maintenance or improvement? 11. Is there evidence of incorrect land application? If yes,check the appropriate box below. ❑ Yes ErNo ❑ NA ❑ N F ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals(Cu,Zn,etc.) ❑ PAN ❑ PAN> 10%or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area 12. Crop Type(s): 13. Soil Type(s): 14.Do the receiving crops differ from those designated in the CAWMP? ❑ Yes [ No ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes allo ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes [i]"No ❑ NA ❑ NE acres determination? 17. Does the facility lack adequate acreage for land application? ❑ Yes [allo ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes [El No ❑ NA ❑ NE Required Records&Documents 19. Did the facility fail to have the Certificate of Coverage&Permit readily available? ❑ Yes ❑ No ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available?If yes,check ❑ Yes [-No ❑ NA ❑ NE the appropriate box. ❑WUP ❑Checklists ❑Design ❑Maps ❑ Lease Agreements ❑Other: 21.Does record keeping need improvement? If yes,check the appropriate box below. ❑ Yes [allo ❑ NA ❑ NE ❑Waste Application ❑Weekly Freeboard ❑Waste Analysis ❑Soil Analysis ❑Waste Transfers ❑Weather Code ❑Rainfall ❑Stocking ❑Crop Yield ❑120 Minute Inspections ❑Monthly and V Rainfall Inspections ❑Sludge Survey 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes [ No ❑ NA ❑ NE 23. If selected,did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes �No ❑ NA ❑ NE Page 2 of 3 21412015 Continued Facility Number: - ()Of I Date of Inspection: 0 3 2q Z 24. Did the facility fail to calibrate waste application equipment as required by the permit? [—] Yes ❑ No aNi A ❑ NE 25. Is the facility out of compliance with permit conditions related to sludge? If yes,check [—] Yes allo ❑ NA ❑ NE the appropriate box(es)below. ❑Failure to complete annual sludge survey ❑Failure to develop a POA for sludge levels ❑Non-compliant sludge levels in any lagoon List structure(s)and date of first survey indicating non-compliance: 26. Did the facility fail to provide documentation of an actively certified operator in charge? ❑ Yes �o ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessments(PLAT)certification? ❑ Yes ❑ No E�fNA ❑ NE Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document ❑ Yes Q'No ❑ NA ❑ NE and report mortality rates that were higher than normal? 29.At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes D"&o ❑ NA ❑ NE If yes,contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the ❑ Yes �o ❑ NA NE permit?(i.e.,discharge,freeboard problems,over-application) 31. Do subsurface tile drains exist at the facility? If yes,check the appropriate box below. ❑ Yes ❑-No ❑ NA ❑ NE ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes [ No ❑ NA 0 NE 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on-site representative? ❑ Yes Eallo ❑ NA ❑ NE 34. Does the facility require a follow-up visit by the same agency? ❑ Yes [,-J-No ❑ NA 0 NE Comments(refer to question ft Explain any YES answers and/or any additional recommendations or any other comments. Use drawings of facility to better explain situations(use additional pages as necessary). NO 110j,3 Si rt(e, a 005 l`U s Wt-" �;l Me C� �, Gv (OV-V'- tot% i aw, Reviewer/Inspector Name: �-t' t'il �2)�l�ZZc� Phone: Reviewer/Inspector Signature: /?G '� Date: Page 3 of 3 511212020