Loading...
HomeMy WebLinkAbout20230165 Ver 1_PCN revision_20230327F. Stormwater Management and Diffuse Flow Plan (DWR requirement) 1. Diffuse Flow Plan 1 a. Does the project include or is it adjacent to protected riparian buffers ❑ Yes ❑x No identified within one of the NC Riparian Buffer Protection Rules? 1 b. All buffer impacts and high ground impacts require diffuse flow or other form of stormwater treatment. If the project is subject to a state implemented riparian buffer protection program, include a plan that fully documents how diffuse/dispersed flow will be maintained. All Stormwater Control Measures (SCM) must be designed in accordance with the NC Stormwater Design Manual (https://deg.nc.gov/about/divisions/energy-mineral-land-resources/energy-mineral-land-permit- guidance/stormwater-bmp-manual). Associated supplement forms and other documentation must be provided. ❑ Level Spreader What Type of SCM are you ❑ Vegetated Conveyance (lower seasonal high water table- SHWT) providing? ❑ Wetland Swale (higher SHWT) (Check all that apply) ❑ Other SCM that removes minimum 30% nitrogen ❑ Proposed project will not create concentrated stormwater flow through the buffer For a list of options to meet the diffuse flow requirements, click here. Attach diffuse flow documentation. 2. Stormwater Management Plan 2a. Is this an NCDOT project subject to compliance with NCDOT's Individual NPDES permit NCS000250? * El Yes No 2b. Does this project meet the requirements for low density projects as defined in 15A NCAC 02H .1003(2)? * ❑x Yes ❑ No To look up low density requirements, click here: http1/reports.oah. state. nc.us/ncac/title%2015a%20-%20environmentaI%20cluality/chapter%2002%20- %20environmental%20management/subchapter%20h/15a%20ncac%2002h%20.1003.pdf 2c. Does this project have a stormwater management plan (SMP) ❑x Yes ❑ No reviewed and approved under a state stormwater program or state - approved local government stormwater program? * ❑ n/a — project disturbs < 1 acre Note: Projects that have vested rights, exemptions, or grandfathering from state or locally implemented stormwater programs or projects that satisfy state or locally -implemented stormwater programs through use of community in -lieu programs should answer "no" to this question. 2d. Which of the following stormwater management program(s) apply? ❑ Local Government (Check all that apply.)* ❑x State If you have local government approval, please include the SMP on their overall impact map. ❑ Phase II ❑ USMP Local Government Stormwater Programs * ❑ NSW ❑ Water Supply Page 16 of 21 PCN Form Version 4.3- April 20, 2022 Please identify which local government stormwater program you are using. Click to enter. State Stormwater Programs * 0 Phase II ❑ HQW or ORW ❑ Coastal Counties ❑ Other Comments: The SMP plan will be provided separately from this request for review and approval. Page 17 of 21 PCN Form Version 4.3- April 20, 2022