Loading...
HomeMy WebLinkAbout20150112 Ver 1_Stormwater Plans and Data_20150409MEMORANDUM b7 O /� 0// ), April 7, 2015 To: Ms Karen Higgins, NCDENR Dept. of Water Quality 401 & Buffer Permitting From: Harris B. Gupton, PE, PLS Subject: Country Meadows- Plans & Data for Approval Enclosed is 3 full sets of (1) Application (2) plans on the subject project, (3) computation sets on all six erosion control ponds/basins with (4) portion of the set dedicated to the erosion control measures during construction and (5) conversion of three of the ponds to permanent dry detention ponds for additional water purification and to serve as devices to provide pre /post outlet control. Due to the complexity of the project, number of sheets and other data, the Water Quality 401 & Buffer Permitting information is mainly contained on sheets 23 & 24, obviously in conjunction with the Erosion Control Sheets. To help simply your review we have enclosed an extra set of prints of sheets 23 & 24 that have been color coded with the specific locations of permanent grass trapezoidal grass swales that (are shown on LDS Application, sheet 2) shall be established at locations where pipes empty prior to entering 3 permanent dry detention basin(highlighted in Yellow) with outlet controls for pre -post quantity releases. These swales ranging from 207 feet to 412 feet of said grassed swale at each pipe outlet (a total of approximately 1,998 ft) prior to entering the dry detention basins. In addition, there are over 3,000 linear feet of erosion berm/grassed swales that shall remain as permanent supplementary, devices until project is completed and stabilized to assist in maintaining water quality. (these are highlighted in Green) on said additional sheets. NOTE: The Application Sheet has been signed by myself as agent for review, but the original has been sent overnight to the Owner in Florida and will be sent to you as soon as we receive them back and definitely before issuing permit. If you need additional information please advise. Thank you and Boyd for your assistance on this project. Respectfully Submitted APR 1'7 Gupton & Webb, PA R '9 2015 Harris B. Gupton, PE, PLS D Ely R�^ -- —_ 401 A SLIF UFF R RESOURCES R PERP41 1NG PO Box 1070 KING, NORTH CAROLINA 27021 336 985 6519 fax 336 985 6521 hquPtonAquPtonco com L copy v Permit No. (to be provided by DEMLR) State of North Carolina Department of Environment and Natural Resources Division of Energy, Mineral and Land Resources STORMWATER MANAGEMENT PERMIT APPLICATION FORM LOW DENSITY SUPPLEMENT This form may be photocopied for use as an original A low density project is one that meets the appropriate criteria for built upon area and transports stormwater runoff primarily through vegetated conveyances. Low density projects should not have a discrete stormwater collection system as defined by 15A NCAC 2H .1002(18). Low density requirements and density factors can be found in Session Law 2008 -211, 15A NCAC 2H .1000, Session Law 2006 -246 and the State of North Carolina Stormwater Best Management Practice Manual. Curb and gutter systems are allowed provided they meet the requirements in 15A NCAC 2H .1008(g). I. PROJECT INFORMATION Project Name : Country Meadows Contact Person: Harris B. Gunton PE Phone Number: ( 336 )705 -0633 Number of Lots:69 Allowable Built Upon Area (BUA) Per Lot *:Avg. 4,500sf Number of Dwelling Units Per Acre**: 1.0 Low Density Development (check one): ❑ without curb & gutter ® with curb & gutter, outlets to (check one): ® Swales ® Vegetated Area *If lot sizes are not uniform, attach a table indicating the number of lots, lot sizes and allowable built upon area for each lot. The attachment must include the project name, phase, page numbers and provide area subtotals and totals. BUA shall be shown in units of square feet. * *(Phase H Post - Construction [non -SAI only) II. BUILT UPON AREA Refer to DEMLR's forms and applications website for specific language that must be recorded in the deed restrictions for all subdivided projects. (http://i)ortal.ncdenr.org/web/Ir/state-stonnwater-fonus—doc-s) Complete the following calculation in the space provided below where: • SA Site Area - the total project area above Mean High Water. • DF Density Factor - the appropriate percent built upon area divided by 100. • RA Road Area - the total impervious surface occupied by roadways. • OA Other Area - the total area of impervious surfaces such as clubhouses, tennis courts, sidewalks, etc. • No. of Lots - the total number of lots in the subdivision. • BUA per Lot - the computed allowable built upon area for each lot including driveways and impervious surfaces located between the front lot line and the edge of pavement. • Total allowable lot BUA - the computed allowable built upon area for all lots combined. • Total BUA from lot listing - the sum of built upon area allocated for each lot on the list of non - uniform lots. Form SW401 -Low Density- Rev.3- 2/10/09 Page 1 of 4 Calculation: For uniform lot sizes: (SA: 2,872,058 ft2 x DF: 0.24) - (RA: 216,493 ft2) - (OA: 28314 ft2) = BUA per Lot = 6,441 ft2 (No of Lots: 69) For non - uniform lot sizes: a. (SA: ft2 x DF: ) - (RA: ft2) - (OA: ft2) = Total allowable lot BUA = ft2 b. Total BUA from lot listing: 4,500sf b must be < a III. DESIGN INFORMATION Complete the following table. If additional space is needed the information should be provided in the same format as Table 1 and attached to this form. Rainfall intensity data can be found in Appendix 8.03 of the State of North Carolina Erosion and Sediment Control Planning and Design Manual or at http : //hdsc.nws.noaa.gov/hdsc /pfds/ Table 1. Swale design information based on the 10 -year storm. Swale No. Drainage Area (ac) Impervious Area (ac) Grassed Area (ac) C Q (cfs) Slope ( %) Vallow (' Ps) Vactual (fps) Flow Depth (ft) 2.0 1.92 0.42 1.50 0.5 6.528 0.010 5.0 3.28 0.49 22 2: 0.91 0.05 0.86 0.5 3.090 0.023 5.0 3.47 0.32 1.22 0.10 1.12 0.5 4.148 0.035 5.0 4.40 0.36 Z $ k 4.86 0.43 4.46 0.5 16.524 0.043 5.0 6.58 0.48 1.32 0.10 1.22 0.5 6.19 0.010 1 5.0 3.12 0.46 X hit '� 6.08 .57 5.51 0.5 20.672 0.032 5.0 6.89 0.66 S1 1a, 3.330 3.02 .031 0.5 11.32 0.012 5.0 3.77 0.62 11 12 13 14 15 16 17 18 19 20 Form SW401 -Low Density-Rev 3- 2/10/09 Page 2 of 4 For uniform lot sizes: (SA: 2,872,058 f x DF• 0.24) (RA: 216,493 ft2) - (OA: 28314 ftz) = BUA per Lot = 6,441 ft2 (No of Lots: 69a For non - uniform lot sizes: a. (SA: ft2 x DF: ) - (RA: ft2) - (OA: ft) = Total allowable lot BUA = ft2 b. Total BUA from lot listing: 4,500sf. b must be <_ a M. DESIGN INFORMATION Complete the following table. If additional space is needed the information should be provided in the same format as Table 1 and attached to this form. Rainfall intensity data can be found in Appendix 8.03 of the State of North Carolina Erosion and Sediment Control Planning and Design Manual or at http : //hdsc.nws.noaa.gov/hdsc /pfds/ T„t.to 1 Q11701P APQ;rm ;nfn mnt ;n» ha.ced on the 10 -ve2r storm Swale No. Drainage Area (ac) Impervious Area (ac) Grassed Area (ac) - C Q (cfs) Slope ( %) Vauow (fps) Vamal (fps) Flow Depth (ft) 20 1.92 0.42 1.50 0.5 6.528 0.010 1 5.0 3.28 0.49 ZZ 0.91 0.05 0.86 0.5 3.090 0.023 5.0 3.47 0.32 Z4 1.22 0.10 1.12 0.5 4.148 0.035 5.0 4.40 0.36 28 Jjr 4.86 0.43 4.46 0.5 16.524 0.043 5.0 6.58 0.48 /70 1� 1.32 0.10 1.22 0.5 6.19 10.010 5.0 3.12 0.46 4Z 9: 6.08 .57 5.51 0.5 20.672 0.032 1 5.0 6.89 0.66 01 1:9 3.330 3.02 .031 0.5 11.32 0.012 5.0 3.77 0.62 11 12 13 14 15 16 17 18 19 20 Form SW401 -Low Density- Rev.3- 2110/09 Page 2 of 4 IV. REQUIRED ITEMS CHECKLIST The following checklist outlines design requirements per the North Carolina Administrative Code Section 15A NCAC 2H. 1000, NCDENR BUT Manual (2007), Session Law 2006 -246, and Session Law 2008 -211. Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate that the following requirements have been met and supporting documentation is provided as necessary. If the applicant has designated an agent on the Stormwater Management Permit Application Form, the agent may initial below. If any item is not met, then iustification must be attached. Only complete items n through p for projects with curb outlets. Page/Plan Initials Sheet No. N/A a. tFor projects in the 20 coastal counties: Per NCAC 2H.1005, a 50 foot wide vegetative buffer is provided adjacent to surface waters. For Redevelopment projects, a 30' wide vegetative buffer adjacent surface waters is provided. 23 &24 b. t For HQW or ORW projects outside the 20 coastal counties: A 30 foot wide vegetative buffer is provided adjacent to surface waters. 23 &24 c. t For Phase Il Post - Construction projects: All built upon area is located at least 30 feet landward of all perennial and intermittent surface waters. d. Deed restriction language as required on form SWU -101 shall be recorded as a restrictive covenant. A copy of the recorded document shall be provided to DWQ within 30 days of platting and prior to the sale of any lots. Yes e. Built upon area calculations are provided for the overall project and all lots. Yes f. Project conforms to low density requirements within the ORW AEC. (if applicable per 15A NCAC 2H .1007) Yes g. Side slopes of swales are no steeper than 3:1; or no steeper than 5:1 for curb outlet swales. See Calc h. Longitudinal slope of swales is no greater than 5 %; for non -curb outlet projects, calculations for shear stress and velocity are provided if slope is greater than 5 %. Yes i. At a minimum, swales are designed to carry the 10 year storm velocity at a non- erosive rate. Yes j. Swales discharging to wetlands are designed to flow into and through the wetlands at a non- erosive velocity (for this flow requirement into wetlands, non - erosive is velocity < 2 ft/s). Yes k. Swale detail and permanent vegetation is specified on the plans. Yes 1. Swale detail provided on plans; includes grass type(s) for permanent vegetative cover. Yes m. Swales are located in recorded drainage easements. n.tt Length of swale or vegetated area is at least 100 feet for each curb outlet. o.tt The system takes into account the run -off at ultimate built -out potential from all surfaces draining to the system (delineate drainage area for each swale). p tt Curb outlets direct flow to a swale or vegetated area. T Projects in the Neuse, Tar - Pamlico, Catawba River basins, and Randleman Lake may require additional buffers. tt Only complete these items for projects with curb outlets. Form SW401 -Low Density- Rev.3- 2/10/09 Page 3 of 4 V. SWALE SYSTEM MAINTENANCE REQUIREMENTS 1. Mowing will be accomplished as needed according to the season. Grass height will not exceed six inches at any time; and grass will not be mowed too close to the ground or "scalped ". 2. Swales will be inspected monthly or after every runoff producing rainfall event for sediment build -up, erosion, and trash accumulation. 3. Accumulated sediment and trash will be removed as necessary. Swales will be reseeded or sodded following sediment removal. 4. Eroded areas of the swales will be repaired and reseeded. Swales will be revegetated as needed and in a timely manner based on the monthly inspections. Side slopes must be maintained at the permitted slope. 5. Catch basins, curb cuts, velocity reduction devices, and piping will be inspected monthly or after every significant runoff producing rainfall event. Trash and debris will be cleared away from grates, curb cuts, velocity reduction devices and piping. 6. Swales will not be altered, piped, or filled in without approval from NCDENR Division of Energy, Mineral and Land Resources. I acknowledge and agree by my signature below that I am responsible for the performance of the six maintenance procedures listed above. I agree to notify DEMLR of any problems with the system or prior to any changes to the system or responsible party. Print Name and Title:Charlie Aultman 76 -755 -4 Signature: Date: 4_1/16//_I� Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. I, do hereby certify that a Notary Public for the State of County of personally appeared before me this _ day of , and acknowledge the due execution of the forgoing swale maintenance requirements. Witness my hand and official seal, Notary signature SEAL My commission expires Form SW401 -Low Density- Rev.3- 2/10/09 Page 4 of 4 Permit No. (to be provided by DEMLR) State of North Carolina Department of Environment and Natural Resources Division of Energy, Mineral and Land Resources STORMWATER MANAGEMENT PERMIT APPLICATION FORM LOW DENSITY SUPPLEMENT This form may be photocopied for use as an original A low density project is one that meets the appropriate criteria for built upon area and transports stormwater runoff primarily through vegetated conveyances. Low density projects should not have a discrete stormwater collection system as defined by 15A NCAC 2H .1002(18). Low density requirements and density factors can be found in Session Law 2008 -211, 15A NCAC 2H .1000, Session Law 2006 -246 and the State of North Carolina Stormwater Best Management Practice Manual. Curb and gutter systems are allowed provided they meet the requirements in 15A NCAC 2H .1008(g). I. PROJECT INFORMATION Project Name : Country Meadows Contact Person: Harris B. Gupton, PE Phone Number: ( 336 )705 -0633 Number of Lots:69 Allowable Built Upon Area (BUA) Per Lot *:Avg. 4,500sf Number of Dwelling Units Per Acre**: 1.0 Low Density Development (check one): ❑ without curb & gutter ® with curb & gutter, outlets to (check one): ® Swales ® Vegetated Area *If lot sizes are not uniform, attach a table indicating the number of lots, lot sizes and allowable built upon area for each lot. The attachment must include the project name, phase, page numbers and provide area subtotals and totals. BUA shall be shown in units of square feet. * *(Phase H Post - Construction [non -SAS only) II. BUILT UPON AREA Refer to DEMLR's forms and applications website for specific language that must be recorded in the deed restrictions for all subdivided projects. (http: / /portal.ncdenr.org /web /lr /state- stormwater -forms docs) Complete the following calculation in the space provided below where: • SA Site Area - the total project area above Mean High Water. • DF Density Factor - the appropriate percent built upon area divided by 100. • RA Road Area - the total impervious surface occupied by roadways. • OA Other Area - the total area of impervious surfaces such as clubhouses, tennis courts, sidewalks, etc. • No. of Lots - the total number of lots in the subdivision. • BUA per Lot - the computed allowable built upon area for each lot including driveways and impervious surfaces located between the front lot line and the edge of pavement. • Total allowable lot BUA - the computed allowable built upon area for all lots combined. • Total BUA from lot listing - the sum of built upon area allocated for each lot on the list of non - uniform lots. Form SW401 -Low Density- Rev.3- 2/10/09 Page 1 of 4 Calculation: For uniform lot sizes: (SA: 2,872,058 ft2 x DF: 0.24) - (RA: 216,493 ft2)-OA: 28314 ft2) = BUA per Lot = 6,441 ft2 (No of Lots: 69) For non - uniform lot sizes: a. (SA: ft2 x DF: ) - (RA: ft2) - (OA: ft2) = Total allowable lot BUA = ft2 b. Total BUA from lot listing: 4,500sf b must be < a III. DESIGN INFORMATION Complete the following table. If additional space is needed the information should be provided in the same format as Table 1 and attached to this form. Rainfall intensity data can be found in Appendix 8.03 of the State of North Carolina Erosion and Sediment Control Planning and Design Manual or at http : //hdsc.nws.noaa.gov/hdsc /pfds/ Table 1. Swale design information based on the 10 -year storm. Swale No. Drainage Area (ac) Impervious Area (ac) Grassed Area (ac) C Q (cfs) Slope ( %) Vauow (fps) Vactual (fps) Flow Depth (ft) Zo If 1.92 0.42 1.50 0.5 6.528 0.010 5.0 3.28 0.49 ZZ e 0.91 0.05 0.86 0.5 3.090 0.023 5.0 3.47 0.32 Z4 4- 1.22 0.10 1.12 0.5 4.148 1 0.035 5.0 4.40 0.36 0 28 dr 4.86 0.43 4.46 0.5 16.524 0.043 5.0 6.58 0.48 /7B 1.32 0.10 1.22 0.5 6.19 0.010 1 5.0 3.12 0.46 4Z S: 6.08 .57 5.51 0.5 20.672 0.032 5.0 6.89 0.66 SJ W 3.330 3.02 .031 0.5 11.32 0.012 5.0 3.77 0.62 11 12 13 14 15 16 17 18 19 20 Form SW401 -Low Density -Rev 3- 2/10/09 Page 2 of 4 IV. REQUIRED ITEMS CHECKLIST The following checklist outlines design requirements per the North Carolina Administrative Code Section 15A NCAC 2H .1000, NCDENR BMP Manual (2007), Session Law 2006 -246, and Session Law 2008 -211. Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate that the following requirements have been met and supporting documentation is provided as necessary. If the applicant has designated an agent on the Stormwater Management Permit Application Form, the agent may initial below. If any item is not met, then justification must be attached. Only complete items n through p for projects with curb outlets. Page/Plan Initial-, Sheet Nn_ N/A a. tFor projects in the 20 coastal counties: Per NCAC 2H.1005, a 50 foot wide vegetative buffer is provided adjacent to surface waters. For Redevelopment projects, a 30' wide vegetative buffer adjacent surface waters is provided. 23 &24 b. t For HQW or ORW projects outside the 20 coastal counties: A 30 foot wide vegetative buffer is provided adjacent to surface waters. 23 &24 c. t For Phase II Post - Construction projects: All built upon area is located at least 30 feet landward of all perennial and intermittent surface waters. d. Deed restriction language as required on form SWU -101 shall be recorded as a restrictive covenant. A copy of the recorded document shal l be provided to DWQ within 30 days of platting and prior to the sale of any lots. Yes e. Built upon area calculations are provided for the overall project and all lots. Yes f. Project conforms to low density requirements within the ORW AEC. (if applicable per 15A NCAC 2H. 1007) Yes g. Side slopes of swales are no steeper than 3:1; or no steeper than 5.1 for curb outlet swales. See Calc h. Longitudinal slope of swales is no greater than 5 %; for non -curb outlet projects, calculations for shear stress and velocity are provided if slope is greater than 5 %. Yes i. At a minimum, swales are designed to carry the 10 year storm velocity at a non - erosive rate. Yes j. Swales discharging to wetlands are designed to flow into and through the wetlands at a non- erosive velocity (for this flow requirement into wetlands, non - erosive is velocity < 2 ft/s). Yes k. Swale detail and permanent vegetation is specified on the plans. Yes 1. Swale detail provided on plans; includes grass type(s) for permanent vegetative cover. Yes m. Swales are located in recorded drainage easements. n.tt Length of swale or vegetated area is at least 100 feet for each curb outlet. o." The system takes into account the run -off at ultimate built -out potential from all surfaces draining to the system (delineate drainage area for each swale). p.tt Curb outlets direct flow to a swale or vegetated area. t Projects in the Neuse, Tar - Pamlico, Catawba River basins, and Randleman Lake may require additional buffers. tt Only complete these items for projects with curb outlets. Form SW401 -Low Density-Rev 3- 2/10/09 Page 3 of 4 V. SWALE SYSTEM MAINTENANCE REQUIREMENTS Mowing will be accomplished as needed according to the season. Grass height will not exceed six inches at any time; and grass will not be mowed too close to the ground or "scalped ". 2. Swales will be inspected monthly or after every runoff producing rainfall event for sediment build -up, erosion, and trash accumulation. 3. Accumulated sediment and trash will be removed as necessary. Swales will be reseeded or sodded following sediment removal. 4. Eroded areas of the swales will be repaired and reseeded. Swales will be revegetated as needed and in a timely manner based on the monthly inspections. Side slopes must be maintained at the permitted slope. 5. Catch basins, curb cuts, velocity reduction devices, and piping will be inspected monthly or after every significant runoff producing rainfall event. Trash and debris will be cleared away from grates, curb cuts, velocity reduction devices and piping. 6. Swales will not be altered, piped, or filled in without approval from NCDENR Division of Energy, Mineral and Land Resources. I acknowledge and agree by my signature below that I am responsible for the performance of the six maintenance procedures listed above. I agree to notify DEMLR of any problems with the system or prior to any changes to the system or responsible party. Print Name and Title:Charlie Aultman Address: 13146 NW Gilson Road, Palm Ci Date: Signature: Note. The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president a Notary Public for the State of do hereby certify that County of personally appeared before me this _ day of , and acknowledge the due execution of the forgoing swale maintenance requirements Witness my hand and official seal, Notary signature SEAL My commission Form SW401 -Low Density -Rev 3- 2/10/09 Page 4 of 4 COUNTRY MEADOWS Mountainview Road King, NC VEGETATIVE S WALEBERM CALCULATIONS March 30, 2015 Mountain View Commercial Properties, LLC 13146 Northwest Gilson Road Palm City, FL 34990 276- 755 -4139 Stormwater Vegitafive Swale Calculations Sheets.xls PROJECT NAME: COUNTRY MEADOWS - Mountain View Rd. DATE: 3/30/2015 PROJECT NO.: 12536 BY: BSH VEGETATIVE SWALE CALCULATIONS I. VELOCITY IN BARE EARTH SWALE, 10 -YR STORM Page 2 Stormwater Vegitative Swale Calculations Sheets.xls Imam COMMENTS LINER IS REQUIRED ®��� ®® LINER IS REQUIRED © LINER IS REQUIRED LINER IS REQUIRED OEM Page 2 Stormwater Vegitative Swale Calculations Sheets.xls dw;�Jw CL/PTtDNdr. iYEBB_ Pro_ - Ian., .ter. Y–a -. ,- a SWALE CALCULATIONS (CON -T.) II DESIGN OF VEGETATIVE SWALE LINERS Liner • EXCELSIAR CURLEX II Td = 2 — (Table 8.058) CALCULATED SWALE SWALE Q 10 -YR n Calculated S T Calculated # cfs Tab 8 OS De th ft ft /ft lb/s ft Top Width 20 6 528 0 025 049 0 010 0 306 593 22 3 090 0 036 0 32 0 023 0 459 489 24 4 148 0 036 0 33 0 035 0 721 4 98 SWALE CONSTRUCTION Design Bottom Top Side ADe th Width Width Slopes 1 003 00 9 00 3 0 76 300 756 3 0 83 0 00 4 98 3 COMMENTS T < Td LINER IS ADEQUATE LINER IS ADEQUATE LINER IS ADEQUATE 28 16 524 0 025 0 48 0043 1 285 687 1 00 4 00 10 00 3 LINER IS ADEQUATE 42 20 670 0 025 066 0 032 1 301 6 96 1 16 3 00 9 96 3 LINER IS ADEQUATE 51 11 320 0 025 0 62 0 012 F472 671 1 16 300 996 3 LINER IS ADEQUATE Excelsior TM Cudex II Channel Design Parameters 2 0 DSf shear stress and 7 5 fps velocitv Reference is made to "Manual of Stnrmwa+or R—+ kj— , e by The N C Dept of Natural Resources ' Page 3-13 " Page 14 -1 to 14 -18 A Design depth includes 0 5 -foot freeboard per 14-2 Reference is made to "Erosion and Sediment Control Planning and Design Manual' Page 3 Stonnwater Vegdatrve Swale Calculations Sheets xls V O(/PTI�Nlr WEBBY PL4. croJ engineenng • Innd s»rvny +ng - rsz. planning SWALE CALCULATIONS (CON'T ) III. DESIGN OF EXCELSIOR ENFORCER OR RIP -RAP LINERS: Reference is made to "Erosion And Sediment Control Planning And Design Manual" by The N C Dept of Natural Resources Page 8 0512 " Page 8 05 13 Reference is made to "Erosion and Sediment Control Planning and Design Manual' Table 8 05a and Fig 8 05b Table 8 05e, Table 8 05f, and Table 8 05g Page 4 Stormwater Vegitative Swale Calculations Sheets xis . ��Emnr_ -3 COMMENTS R ADEQUATE -- - - - - -- FYITITI=7k R ADEQUATE Reference is made to "Erosion And Sediment Control Planning And Design Manual" by The N C Dept of Natural Resources Page 8 0512 " Page 8 05 13 Reference is made to "Erosion and Sediment Control Planning and Design Manual' Table 8 05a and Fig 8 05b Table 8 05e, Table 8 05f, and Table 8 05g Page 4 Stormwater Vegitative Swale Calculations Sheets xis 1 0 028 dw;�42W 0 025 6(��'Tdt�N� WEBBY P_A_ 0 045 cvrl an gn�crng - J -d G-y;�q - am. PI . -.9 0 034 SWALE CALCULATIONS (CON'T.) TABLE 8.05e "n" Value for Depth Ranges Lining Type 0-0 5 ft 0 5 -2 O ft >2 0 ft Woven Paper Net 0 016 0 015 0 015 Jute Net 0 028 0 022 0 019 Fiberglass Roving 0 028 0 021 0 019 Straw with Net 0 065 0 033 0 025 Curled Wood Mat 0 066 0 035 0 028 Synthetic Mat 0 036 0 025 0 021 TABLE 8.05f "n" Value for Riprap and Gravel Gravel d50 in 0-0 5 ft 0 5 -1 Oft 1 0-2 Oft >2 0 ft 1 0.033 0 028 0 026 0 025 2 0 045 0 034 0 034 0 031 Riprap 6 0 106 0 054 0 044 0 041 9 0 215 0 068 0 062 0 047 12 0 797 0 084 0 060 0 053 15 — 0 104 0 068 0 059 18 — 0 127 0 076 0 064 21 -- 0 158 0 085 0 070 24 — 0 199 0 095 0 076 TABLE 8.05g Permissible Unit Shear Stress Td Temporary Woven Paper Net 015 Jute Net 045 Fiberglass Roving 380 Single 060 Double 085 Straw with Net 145 Curled Wood Mat 155 Synthetic Mat Curlex If 200 Synthetic Mat Curlex III 250 Unvegetated Synthetic Mat Curlex Enf 325 Unvegetated d50 Stone Size (in ) Gravel Rip rap 1 040 2 080 Rock Rip rap 6 250 9 380 12 500 15 630 18 750 21 880 600 Vegetated Page 5 Stormwater Vegltative Swale Calculations Sheets As Vegetative Swale #20 Worksheet for Trapezoidal Channel Project Description Project File c: \haestad \fmw \12536 sw fm2 Worksheet COUNTRY MEADOWS VEGETATIVE SWALES Flow Element Trapezoidal Channel Method Manning's Formula Solve For Channel Depth Input Data Mannings Coefficient 0 025 Channel Slope 0 010000 ft/ft Left Side Slope 3 000000 H V Right Side Slope 3 000000 H . V Bottom Width 3.00 ft Discharge 653 cfs Results Depth 049 ft Flow Area 218 ft2 Wetted Perimeter 609 ft Top Width 593 ft Critical Depth 045 ft Critical Slope 0 013445 ft/ft Velocity 300 ft/s Velocity Head 014 ft Specific Energy 063 ft Froude Number 087 Flow is subcntical 03/30/15 FlowMaster v5 13 11 34.19 AM Haestad Methods, Inc 37 Brookside Road Waterbury, CT 06708 (203) 755 -1666 Page 1 of 1 Vegetative Swale #22 Worksheet for Trapezoidal Channel Project Description Project File c* \haestad \fmw \12536 sw fm2 Worksheet COUNTRY MEADOWS VEGETATIVE SWALES Flow Element Trapezoidal Channel Method Manning's Formula Solve For Channel Depth Input Data Mannings Coefficient 0.036 ft Channel Slope 0 023000 ft/ft Left Side Slope 3.000000 H V Right Side Slope 3 000000 H : V Bottom Width 3.00 ft Discharge 309 cfs Results Depth 0.32 ft Flow Area 125 ft2 Wetted Perimeter 500 ft Top Width 4.89 ft Critical Depth 0.29 ft Critical Slope 0 031347 ft/ft Velocity 248 ft/s Velocity Head 010 ft Specific Energy 041 ft Froude Number 087 Flow Is subcritical 03/30/15 FlowMaster v513 03 23 42 PM Haestad Methods, Inc 37 Brookside Road Waterbury, CT 06708 (203) 755 -1666 Page 1 of 1 Vegetative Swale #24 Worksheet for Trapezoidal Channel Project Description Project File c. \haestad \fmw \12536 sw fm2 Worksheet COUNTRY MEADOWS VEGETATIVE SWALES Flow Element Trapezoidal Channel Method Manning's Formula Solve For Channel Depth Input Data 033 Mannings Coefficient 0 036 Channel Slope 0 035000 ft/ft Left Side Slope 3.000000 H V Right Side Slope 3.000000 H • V Bottom Width 300 ft Discharge 415 cfs Results Depth 033 ft Flow Area 132 ft2 Wetted Perimeter 5.09 ft Top Width 498 ft Critical Depth 035 ft Critical Slope 0 029902 ft/ft Velocity 314 ft/s Velocity Head 0.15 ft Specific Energy 0.48 ft Froude Number 1.08 Flow is supercritical. 03/30/15 FlowMaster v5 13 12 13.42 PM Haestad Methods, Inc 37 Brookside Road Waterbury, CT 06708 (203) 755 -1666 Page 1 of 1 Vegetative Swale #28 Worksheet for Trapezoidal Channel Project Description Project File c: \haestad\fmw \12536 sw.fm2 Worksheet COUNTRY MEADOWS VEGETATIVE SWALES Flow Element Trapezoidal Channel Method Manning's Formula Solve For Channel Depth Input Data 048 Mannings Coefficient 0 025 Channel Slope 0 042900 ft/ft Left Side Slope 3.000000 H V Right Side Slope 3 000000 H : V Bottom Width 400 ft Discharge 1652 cfs Results Depth 048 ft Flow Area 260 ft= Wetted Perimeter 703 ft Top Width 6.87 ft Critical Depth 068 ft Critical Slope 0.011838 ft/ft Velocity 6.35 ft/s Velocity Head 0.63 ft Specific Energy 1.11 ft Froude Number 182 Flow is supercritical 03/30/15 FlowMaster v5 13 03 29.21 PM Haestad Methods, Inc 37 Brookside Road Waterbury, CT 06708 (203) 755 -1666 Page 1 of 1 Vegetative Swale #42 Worksheet for Trapezoidal Channel Project Description Project File c \haestad \fmw \12536 sw.fm2 Worksheet COUNTRY MEADOWS VEGETATIVE SWALES Flow Element Trapezoidal Channel Method Manning's Formula Solve For Channel Depth Input Data 0.66 ft Mannings Coefficient 0 025 ftz Channel Slope 0.031600 ft/ft Left Side Slope 3 000000 H : V Right Side Slope 3 000000 H V Bottom Width 3.00 ft Discharge 20.67 cfs Results Depth 0.66 ft Flow Area 3.29 ftz Wetted Perimeter 7.18 ft Top Width 6.96 ft Critical Depth 086 ft Critical Slope 0 011385 ft/ft Velocity 628 ft/s Velocity Head 0.61 ft Specific Energy 1.27 ft Froude Number 161 Flow is supercritical 03130/15 FlowMaster v5 13 03 33 58 PM Haestad Methods, Inc 37 Brookside Road Waterbury, CT 06708 (203) 755 -1566 Page 1 of 1 Vegetative Swale #51 Worksheet for Trapezoidal Channel Project Description Project File c \haestad \fmw \12536 sw fm2 Worksheet COUNTRY MEADOWS VEGETATIVE SWALES Flow Element Trapezoidal Channel Method Manning's Formula Solve For Channel Depth Input Data Mannings Coefficient 0 025 Channel Slope 0 012200 ft/ft Left Side Slope 3 000000 H. V Right Side Slope 3 000000 H V Bottom Width 3.00 ft Discharge 1132 cfs Results Depth 062 ft Flow Area 3.01 ft2 Wetted Perimeter 691 ft Top Width 671 ft Critical Depth 062 ft Critical Slope 0 012396 ft/ft Velocity 377 ft/s Velocity Head 022 ft Specific Energy 084 ft Froude Number 099 Flow is subcritical 03/30/15 FlowMaster v513 03 57 56 PM Haestad Methods, Inc 37 Brookside Road Waterbury, CT 06708 (203) 755 -1666 Page 1 of 1 pr-- COUNTRY MEADOWS Mountain View Road King, NC BMP #1 - SKIMMER SEDIMENT BASIN 3/24/2015 Developer Mountain View Commercial Properties, LLC 13146 NW Gibson Road Palm City, FL 34990 APR 0 9 2015 GUPTON & WEBB, P.A. P.O. BOX 1070 King, N.C. 27021 COUNTRY MEADOWS STORMWATER MANAGEMENT SKIMMER BASIN SITE CONDITIONS AND INPUT DATA SKIMMER BMP 91 622 Site Data Hydraulic Length 32 2.63 Acres Total Site Area. 2.63 Acres Total Disturbed Area. 2.63 Acres Total Drainage Area Into Structure 0.53 Acres Proposed BUA/Impervious Area 20.2 % Proposed BUA/Impervious Area 0 Acres Off -Site Drainage Area 24 0.50 Maximum Off -Site BUA/Impervious Area SCS Weighted Curve Number *See table 8 03b Total BUA/Impervious Area Into Structure 0.53 20.2 Acres % Total BUA/Impervious Area Into Structure 3.4 4.93 Inches Inches Desicin Data ;oil, Group "Description CN' rea�(acres) rroauci or - _ - - -CN x' Area,, B Residential - 1/2 Acre 70 263 1841 0 0 0 0 0 0 0 0 0 0 0 0 0 0 , Totals Weighted SCS Curve Number (CN) = 70.00 622 Feet Hydraulic Length 32 Feet Hydraulic Height 0.232 Volumetric Runoff Coefficient, Rv 2 Factor Overland Flow Runoff Factor Pre - Developed Runoff Coefficient, " C " *See table 8 03a 0.25 Factor Post - Developed Runoff Coefficient, " C " *See table 8 03a 0.50 Factor SCS Weighted Curve Number *See table 8 03b 70 CN Precipitation Depth , 2 yr 24 hr Storm * *See table 3.4 4.93 Inches Inches Precipitation Depth , 10 yr 24 hr Storm * *See table 7.36 Inches Precipitation Depth , 100 yr 24 hr Storm * *See table SCS Runoff Curve Number (CN) ;oil, Group "Description CN' rea�(acres) rroauci or - _ - - -CN x' Area,, B Residential - 1/2 Acre 70 263 1841 0 0 0 0 0 0 0 0 0 0 0 0 0 0 , Totals Weighted SCS Curve Number (CN) = 70.00 COUNTRY MEADOWS STORMWATER MANAGEMENT ED STRUCTURE COMPUTED DESIGN DATA Skimmer BMP #1 COMPUTED 1 -YR. WATER QUALITY DATA Water Quality Volume (1 -Inch Storm), WQv. 2,214.88 Cu Ft Water Quality Runoff Volume, Qa* 0.23 Inches Water Quality CN (using Qa) 87 CN Intial Abstraction, la = 0.299 la /P(1 ") = 0.299 Qu (TR -55)= 475.00 csm /in Water Quality Peak Discharge, Qp 0.4 cfs COMPUTED 2 -YR. DATA Time of Concentration, Tc . Intensity for 2 yr Storm, I Peak Rate of Runoff, Tp Pre - Development Peak Flow, Qpre Post - Development Peak Flow, Qpost Sod Storage Volume, S Runoff Depth, Q* COMPUTED 10 -YR. DATA Time of Concentration, Tc Intensity for 10 yr Storm, I Peak Rate of Runoff, Tp Pre - Development Peak Flow, Qpre Post - Development Peak Flow, Qpost Soil Storage Volume, S Runoff Depth, Q* COMPUTED STORAGE REQUIREMENTS Required Surface Area (A =325 x 10 -yr Qp) Required Storage Volume (1800 C F x Disturbed Ac). Temporary Sediment Storage (0 5 Acre - Inches) Permanent Sediment Storage (0 125 Acre - Inches) Storage Estimate Before Cleanout Interval, Vc• Cleanout Interval 6.94 Min 5.01 In /hr 16.50 Min 3.29 cfs 6.59 cfs 4.29 Inches 0.95 Inches 6.94 Min 6.43 In /hr 26.79 Min 4.23 cfs 8.46 cfs *Reference made to "Erosion and Sediment Control Planning and Design Manual' State of N C **Reference made to NOAA ATLAS 14, Volume 2, Version 2 NOAA Website, National Weather Service, Silver Springs, MD 4.29 Inches 1.98 Inches 2,749.50 S F 4,734.00 Cu.Ft 4,773.45 Cu Ft 1,193.36 Cu Ft 3,649.87 Cu.Ft 90 Days COUNTRY MEADOWS STORMWATER MANAGEMENT ED STRUCTURE BASIN CONFIGURATION AND DESIGN Skimmer BMP #1 BASIN CONFIGURATION Width Length Proposed Basin DimensionE 85 X 145 Basin Side Slopes 3 : 1 Water Quality Release Orifice for Faircloth Skimmer: Design Head (Constant for Skimmer), h. Maximum Release Rate Minimum Release Rate Maximum Hole Size Minimum Hole Size. Faircloth Skimmer Barrel Size Faircloth Skimmer Orifice Size Used Orifice Sized Used Release Rates Water Quality Minimum Depth Sediment Storage Depth Min Basin Depth Crest Height of Riser/Weir Basin Volume as Configured at Top of Riser/Weir: 0.013 S F. 0.004 S F 0.005 S F 0.0102 CFS Surface Area 12,325.00 S F 20 In 1 Days 3 Days 1.54 In Dia 086 In Dia 20 In Dia 1 00 In Dia 2.5 Days 0.18 Ft 0.39 Ft 0.57 Ft 5.00 Ft 49,601.06 CF GUPTON & WEBB, P.A. P.O. BOX 1070 Ding, N.C. 27021 COUNTRY MEADOWS STORMWATER RETENTION STAGE-STORAGE COMPUTATIONS =CONTOUR T, ELM ,ONT 4 C OW, Y ­, - �;""VOL' J -2. 1.' -C Um'f- GE Zl STAGES - (ft)' 10740 0 0 0 0 0.0000 1075.0 _7330.51 807234 7,701 7,701 1 8.9491 0.0000 1.26 1076.0 8814.16 8,443 16,144 2 9.6893 0.6931 2.23 1077.0 9618.5 9,216 25,360 3 10.1409 1.0986 3.17 1078.0 1042283 10,021 35,381 4 10.4739 1.3863 41 1079.0 11255.84 10,839 46,220 5 10.7412 1.6094 5.04 1080.0 1208885 11,672 57,892 6 10.9663 1.7918 6.00 1081.0 12987.74 12,538 70,430 7 11.1624 1.9459_ 6.99 1082.0 13886 63 13,437 83,867 -8 11.3370 2.0794 8.00 Sl= 57,892 ft3 ZI = 6 Ks 5,735.95 9 S2 83,867 ft3 Z2 = 8 b E12 STORMWATER RETENTION STAGE-STORAGE COMPUTATIONS BETWEEN CONTOURS XONTOUR CONTOVW, - AC!CVMJ�� L -sT cu- 10740 7330.51 0 0 0 1074.1 7404.69 737 737 0.1 1074.2 7478.87 744 1,481 0.2 1074.3 7553.05 752 2,233 0.3 1074.4 7627.23 759 2,992 0.4 1074.5 7701.41 766 3,758 0.5 1074.6 7775.59 774 4,532 0.6 1074.7 7849.77 781 5,313 0.7 1074.8 7923.95 789 6,102 0.8 1074.9 7998.13 796 6,898 0.9 1075.0 8072.34 804 7,702 1.0 1075.1 8146.52 811 8,513_ 1.1 1075.2 8220.70 818 9,331 1.2 1075.3 8294.88 826 10,157 1.3 1075.4 8369.06 833 10,990 1.4 1075.5 8443.24 841 11,831 1.5 1075.6 8517.42 848 12,679 1.6 1075.7 8591.60 855 13,534 1.7 1075.8 8665.78 863 14,397 1.8 1075.9 8739.96 870 15,267 1.9 10760 8814 16 878 16,145 2.0 1076.1 8894.59 885 17,030 2.1 1076.2 8975.02 893 17,923 2.2 1076.3 9055.45 902 18,825 2.3 1076.4 9135.88 910 19,735 2.4 1076.5 9216.31 918 20,653 2.5 1076.6 9296.74 926 21,579 2.6 1076.7 9377.17 934 22,513 2.7 1076.8 9457.60 942 23,455 2._ 1076.9 9538.03 950 24,405 2.9 1077.0 9618.50 958 25,363 3.0 1077.1 9698.93 966 26,329 3.1 1077.2 9779.36 974 27,303 3.2 1077.3 9859.79 982 28,285 3.3 1077.4 9940.22 990 29,275 3.4 1077.5 10020.65 998 30,273 3.5 1077.6 10101.08 1006 1 31,2791 3. 1077.7 10181.51 1014 32,2931 3.7 1077.8 10261.94 1022 33,3151 3.81 1077.9 10342.37 1030 34,345 3.9 10780 10422.83 1038 35,383 4.0 1078.1 1050613 1046 36,429 4.1 1078.2 10589.43 1055 37,484 4.2 1078.3 10672.73 1063 38,547 4.3 1078.4 10756.03 1071 39,618 4.4 1078.5 10839.33 1080 40,698 4.5 1078.6 10922.63 1088 41,786 4.6 1078.7 11005.93 1096 42,882 4.7 1078.8 11089.23 1105 43,987 4.8 1078.9 11172.53 1113 45,100 4.9 1079.0 11255.84 1121 46,221 5.0 1079.1 11339.14 1130 47,351 5.1 1079.2 11422.44 1138 48,489 5.2 1079.3 11505.74 1146 49,635 5.3 1079.4 11589.04 1155 50,790 5.4 1079.5 11672.34 1163 51,953 5.5 1079.6 11755.64 1171 53,124 5.6 1079.7 11838.94 1180 54,304 5.7 1079.8 11922.24 1188 55,492 5.8 1079.9 12005.54 1196 56,688 5.9 1080.0 1208885 1205 57,893 6.0 1080.1 12172.15 1213 59,106 6.1 1080.2 12255.45 1221 60,327 6.2 1080.3 12338.75 1230 61,557 6.3 1080.4 12422.05 1238 62,795 6.4 1080.5 12505.35 1246 64,041 6.5 1080.6 12588.65 1255 65,296 6.6 1080.7 12671.95 1263 66,559 6.7 1080.8 12755.25 1271 67,830 6.8 1080.9 12838.55 1280 69,110 6.9 1081 0 12987.74 1291 70,401 7 GUPTON & ASSOCIATES P.A. 2200 Silas Crk. Pkwy Suite 2 -B Winston- Salem, N.C. 27103 2 -YR STORM CNAINSAW ROUTING Project COUNTRY MEADOWS "2 -YR FREQUENCY STORM: "Peak Runoff (Qp) = "Time to Peak (Tp) = "Time Step (dT) = "STORAGE EQUATION: 11�= "b = "Initial Elevation (Zo) _ 6.59 efs 16.50 min. 1.65 min. 5735.95 1.29 1074.4 ft. r-maximums 1 658 8,779 1 1 39 107579 001 �I - TIMEs ,- - '�JNFLOW< -4, - ,,:-STORAGE STAGE „ = f ELEVATION; `' OUTFL0W ; s(cfs)'(cu:ft)" �,-. I n117 1 17 1 not I tn7447 1 000 34 067 34 002 107442 000 51 144 100 004 107444 000 68 240 243 009 107449 000 85 345 481 015 107455 0.01 102 449 822 022 107462 0.01 119 540 1266 031 107471 0.01 136 610 1800 041 107481 0.01 153 650 2403 051 107491 0.01 170 6.58 3046 061 107501 0.01 187 631 3696 071 1075 11 0.01 204 572 4320 080 107520 0.01 221 489 4885 088 107528 0.01 238 439 5368 095 107535 0.01 255 384 5802 101 107541 0.01 272 335 6181 106 107546 0.01 289 293 6512 1 10 107550 0.01 306 257 6801 1 14 107554 0.01 323 224 7054 1 17 1075 57 0.01 340 196 7275 120 107560 001 357 1 72 7468 123 107563 0.01 374 1 50 7637 125 107565 0.01 391 1 31 7785 127 107567 0.01 408 1 15 7914 128 107568 0.01 425 100 8027 130 107570 0.01 442 088 8125 131 107571 0.01 459 077 8211 132 107572 0.01 476 067 8286 133 107573 0.01 493 059 8351 134 107574 0.01 510 051 8408 135 107575 0.01 527 045 8458 135 107575 0.01 544 039 8502 136 107576 0.01 56 1 034 8540 136 107576 0.01 578 030 8573 137 107577 0.01 595 026 8602 137 107577 001 612 023 8627 137 107577 0.01 629 020 8649 137 107577 0.01 646 0 18 8668 138 107578 0.01 663 015 8685 138 107578 0.01 680 013 8699 138 107578 0.01 697 012 8711 138 107578 0.01 714 010 8722 138 107578 0.01 73 1 009 8731 138 107578 0.01 748 008 8739 1.39 1075.79 0.01 765 007 8746 1.39 1075.79 0.01 782 1 006 1 8752 1.39 1075.79 0.01 Project: GUPTON & ASSOCIATES P.A. 2200 Silas Crk. Pkwy Suite 2 -B Winston - Salem, N.C. 27103 2 -YR STAGE - DISCHARGE FUNCTION COUNTRY MEADOWS WATER QUALITY DRAW DOWN- 4'x 4' BOX RISER: Riser Weir Length = "Crest Elevation = "Weir Coefficent = "Discharge Coefficient = "Orifice Diameter = "Invert Elevation = "Discharge Coefficient= 6.3 ft. 1079.4 ft. 3.0 0.6 15.0 in. 1074.4 ft. 0.60 # Slummers = 1.0 "Diameter = 0.083 ft. "Area = 0.005 sf. "Vertical Spacing= 0.0 ft. "Invert Elevation = 1074.4 ft. "Discharge Coefficient= 0.6 "EMERGENCY WEIR: "Weir Coefficient= 3.0 "Crest Elevation = 1080.4 ft. "Weir Length = 10.0 ft Faircloth skimmer Constant Head 0.167 ft. GUPTON &ASSOCIATES P.A. 2200 Silas Crk. Pkwy Suite 2-B Winston-Salem, N.C. 27103 10-YR STORM CRAINSAW ROUTING Project COUNTRY MEADOWS "10-YR FREQUENCY STORM: "Peak Runoff (Qp) = 8.46 efs "Time to Peak (Tp) = 26.79 min. "Time Step (dT) = 2.68 min. "STORAGE EQUATION: 1.11" = 5735.95 fib = 1.29 "Initial Elevation (Zo) = 1074.40 ft. Maximums 846 18,746 250 107690 001 Y"'INFLOW' STORAGE: _ELEVATIO n i n) Aeu ft ),�_ ftY�11 4,1a "MY- 27 021 34 0 0 54 082 68 0 03 1074 43 0 00 81 177 'A, 0 07 1074 47 0 00 108 296 14133 1 135 428 959 025 -5 0.01 162 560 1646 038 107478 0.01 189 677 2545 053 107493 0.01 216 770 3632 070 1075 10 001 243 828 4869 088 1075 28 0.01 270 8.46 6199 106 107546 0.01 297 822--- 7558 124 107564 001 324 758 8878 140 107580 001 351 661 10095 1 55 107595 0.01 _37 _8 586 11156 167 107607 001 405 5 14 12097. 1 78 1076 18 0.01 432 451 12922 188 107628 0.01 459 - 396 13646 196 107636 0.01 486 347 14281 203 107643 0.01 513 305 14837 2 09 107649 001 540 267 15326 214 107654 0.01 567 234 15754 219 107659 0.01 594 206 16129 223 107663 0.01 621 180 16459 226 107666 0.01 - 648 158 16747 229 107669 0.01 - 675 139 16999 232 107672 0.01 702 1 22 17221 234 107674 0.01 729 1 07 17416 237 107677 001 756 094 17586 238 107678 0.01 783 082 17736 240 107680 0.01 810 072 17866 241 107681 0.01 837 063 17980 242 107682 0.01 864 055 18080 244 107684 0.01 891 049 18167 244 - 107684 0.01 91 8 043 18244 245 107685 0.01 945 037 18312 246 107686 0.01 972 033 18370 247 107687 0.01 999 029 18421 247 107687 001 1026 025 18466 248 - 107688 001 1053 022 18505 248 107688 0.01. 1080 019 18539 248 107688 0.01 110.7 0 17 18568 249 107689 0.01 1134 0 15 18594 249 107689 0.01 0 13 18617 249 107689 0.01 1161 1188 0 12 18636 249 107689 0.01 0 10 18654 249 107699 0-01 r-124 L 2 0 09 18668 2.50 1076.90 0.0" Faircloth skimmer Constant Head 0.167 ft. POND, �RISER� 'PRIMARY; EMERGENC ELEVATION 110 ' GUPTON & ASSOCIATES P.A. - -,SHIMMER' " `ORIFICE, _WEIR BARREL` . c = _ (cfs) " (cfs) : cfsj 2200 Silas Crk. Pkwy Suite 2 -B l;;,WEI13- Acts) TOTAL �?t OUTFLOW„ Winston - Salem, N.C. 27103 00 0001 10 -YR STAGE - DISCHARGE FUNCTION #NUMI Project: COUNTRY MEADOWS 000 #NUMI WATER QUALITY DRAW DOWN: 24" PIPE RISER: # Skimmers = 1.0 Riser Weir Length = 6.3 ft. "Diameter = 0.083 ft. "Crest Elevation = 1079.40 ft. "Area = 0.005 sf. "Weir Coefficent = 3.0 "Vertical Spacing = 0.0 ft. "Discharge Coefficient = 0.6 "Invert Elevation = 1074.4 ft. 001 "Discharge Coefficient = 0.6 "Orifice Diameter= 15.0 in. "EMERGENCY WEIR: 0011 "Invert Elevation = 1074.4 ft_ "Weir Coefficient = 3.0 "Discharge Coefficient = 0.60 "Crest Elevation = 1080.4 ft. 10752 "Weir Length = 10.0 ft. Faircloth skimmer Constant Head 0.167 ft. POND, �RISER� 'PRIMARY; EMERGENC ELEVATION 110 ' ,STAGE -(t) - -,SHIMMER' " `ORIFICE, _WEIR BARREL` . c = _ (cfs) " (cfs) : cfsj OUTFLOW " (cfs� l;;,WEI13- Acts) TOTAL �?t OUTFLOW„ 10744 00 0001 #NUMI #NUMI 000 000 #NUMI 0001 10746 02 0011 #NUMI #NUMI 001 001 #NUMI 001 10748 04 0011 #NUMI #NUMI 001 001 #NUMI 001 10750 06 0011 #NUMI #NUMI 001 001 #NUMI 001 10752 08 0011 #NUM1 #NUMI 001 001 #NUMI 001 10754 10 0011 #NUMI #NUMI 001 001 #NUMI 001 10756 12 001 #NUMI #NUMI 001 001 #NUMI 001 10758 14 001 #NUMI #NUMI 001 001 #NUMI 001 10760 16 001 #NUMI #NUMI 001 001 #NUMI 001 10762 18 001 #NUMI 4NUM1 001 001 #NUMI i 001 10764 20 001 #NUM1 #NUMI 001 001 #NUMI 001 10766 22 001 #NUMi #NUMI 001 001 #NUMI 001 10768 24 001 #NUMI #NUMI 001 001 #NUMI 001 10770 26 001 #NUMI #NUMI 001 001 #NUMI 001 10772 28 001 #NUMI #NUMI 001 001 #NUMI 001 10774 30 001 #NUMI #NUMI 001 001 #NUMI 001 10776 32 001 #NUMI #NUM, 001 001 #NUMI 001 10778 34 0011 #NUMI #NUMI 001 001 #NUMI 001 10780 3 6 0011 #NUMI #NUMI 001 001 #NUMI 001 10782 38 001 #NUMI #NUMI 001 001 #NUMI 001 10784 40 001 #NUMT #NUMI 001 001 #NUMI 001 10786 42 001 #NUMI #NUMi 001 001 #NUMI 001 10788 44 001 #NUMI #NUMI 001 001 #NUMI 001 10790 46 001 #NUMI #NUMi 001 001 #NUMI 1 001 10792 48' 0 01 #NUMI #NUMI 001 001 #NUMI 001 10794 50, 0 01 000 000 1234 001 #NUMI 001 10796 52 001, 534 1 69 1262 1 70 #NUMI 1 70 10798 54 001 755 i 478 1289 4 79 9NUMi 479 10800 56 001 925 878 13 16 879 #NUMI 879 10802 58 001 1068 1352 1342 1069 #NUMI 10 69 10804 60 001 1194 1890 1368 1195 000 1195 10806 62 0011 1308 2484 1393 1309 268 15 77 10808 64 0011 1413 3131 1418 1414 759 2173 10810 66 001 1511 3825 1442 1443 1394 2837 1081.2 68 001 1602 4564 1466 1467 2147 3614 1081 4 70 001 1689 5346 1490 1491 3000 4491 10816 72 001 1772 61 67 1513 1514 3944 5458 10818 74 001 1850 7027 1536 1537 4970 6507 10820 76 001 1926 7924 15 58 1559 6072 7631 10822 78 001 1999 8855 1580 1581 7245 8826 10824 80 001 2069 1 9821 1602 1603 1 8485 10088 10826 82 001 2137 108 19 1624 1625 9789 11414 10828 84 001 2202 11849 1645 164 11154 12800 10830 86 001 2266 1291 1666 1667 12577 11 142 44 10832 88 001 2328 14000 1687 1688 140561 15744 10834 90 0 01 2389 15120 F7717 07 1708 155 88 172 96 GUPTON & WEBB, P.A. P.O. BOX 1070 King, N.C. 27021 COUNTRY MEADOWS STORMWATER RETENTION POND SUMMARY REPORT CONTOU ONTO CONTOUR' INCR: _ - ACCUM.. "_ ELEV. AREA-- .AREA ` • " VOL:' ` VOL `" . STAGE , ft s ft ~ acres cu ft (cu ft ft 10740 7,33051 017 0 0 0 10750 8,07234 019 7,701 7,701 1 10760 8,814.16 020 8,443 16,144 2 10770 9,61850 022 9,216 25,360 3 10780 10,422 83 024 10,021 35,381 4 1079.0 11,255.841 026 10,839 46,220 5 1080.0 12,088 85 028 11,672 57,892 6 1081 0 12,987.74 030 12,538 70,430 7 10820 13,886.63 032 13,437 83,867 8 POND ELEVATIONS: 5 Ft PRIMARY SPILLWAY: N/A Lbs Top of Dam Elevation 108200 Ft Barrel Length 59 Ft Top of Emergency Spillway Elev 108200 Ft Barrel Size 15 In Emergency Spillway Elevation 108040 Ft Barrel Slope 1 92 % Top of Riser Elevation 107940 Ft Riser Size 24 In Dia Invert of Riser Elevation 107440 Ft Bottom of Pond Elevation 90800 Ft EMERGENCY SPILLWAY Bottom Width 10 Ft FAIRCLOTH SKIMMER: Water Quality Release Orifice for Faircloth Skimmer Design Head (Constant for Skimmer), h 20 In Maximum Release Rate 1 Days Minimum Release Rate 3 Days Maximum Hole Size 0013041 155 In Dia Minimum Hole Size 0004347 089 In Dia Faircloth Skimmer Barrel Size: 20 In Dia ANTI - FLOATATION SUMMARY: Riser Height 5 Ft Riser Weight N/A Lbs Volume of Riser 315 Cu Ft Exposed Barrel Length 0 Ft Volume of Exposed Barrel 00 Cu Ft Weight of Water Displaced 196560 Lbs Saftey Factor (10 %) 216216 Lbs Concrete Required NO REQ C F = C Y Riser Base Size Min Thickness N/A Ft X Riser Base Size Used Thickness- N/A Ft 000 X 000 MAX STAGE ELEV . 107579 MAX FLOW CFS- 0.01 GUPTON & WEBB, P.A. P.O. BOX 1070 King, N.C. 27021 OUTLET STRUCTURE SCHEMATIC MAX STAGE ELEV.. 107690 MAX FLOW CFS. 001 Top of Dam (0 5' Mm) 108200 510 ♦ 160 10 Yr 107690 FLOOD 2 Yr 1075 79 107940 10.00 ft WATER QUALITY L5 00 ft 500 107440 I 15 in. 1.92% PERM SEDIMENT 107400 1073.27 Toe of Dam 107200 COUNTRY MEADOWS Mountain View Road King, NC BMP #2 SKIMMER SEDIMENT BASIN 3/24/2015 Developer Mountain View Commercial Properties, LLC 13146 NW Gibson Road Palm City, FL 34990 APR 0 9 2 15 i WA rEk K GUPTON & WEBB, P.A. P.O. BOX 1070 King, N.C. 27021 COUNTRY MEADOWS STORMWATER MANAGEMENT RISER/SKIMMER BASIN SITE CONDITIONS AND INPUT DATA RISER/SKIMMER BMP 92 Site Data Total Site Area 8.25 Acres Total Disturbed Area 8.25 Acres Total Drainage Area Into Structure 8.25 Acres Proposed BUA/Impervious Area 1.65 Acres Proposed BUA/Impervious Area 20.0 % Off -Site Drainage Area 0 Acres Maximum Off -Site BUA/Impervious Area 0 % Total BUA/Impervious Area Into Structure- 1.65 Acres Total BUA/Impervious Area Into Structure 20.0 % Design Data Hydraulic Length 833 Feet Hydraulic Height 36 Feet Volumetric Runoff Coefficient, Rv 0.230 _ Overland Flow Runoff Factor 1.5 Factor Pre - Developed Runoff Coefficient, " C " "See table 8.03a 0.25 Factor Post - Developed Runoff Coefficient, " C " "See table 8 03a 0.50 Factor SCS Weighted Curve Number *See table 8 03b 70 CN Precipitation Deptn , 2 yr 24 hr Storm Precipitation Depth , 10 yr 24 hr Storm Precipitation Depth , 100 yr 24 hr Storm SCS Runoff Curve Number (CN) * *See table * *See table * *See table 3.4 Inches 4.93 Inches 7.36 Inches Soil Group —Description -CN rea(acres) : - Product of - _< _ CN x Area B Residential - 1/2 Acre 70 825 5775 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Weighted SCS Curve Number (CN) = 0/ /.0u 70.00 Totals COUNTRY MEADOWS STORMWATER MANAGEMENT ED STRUCTURE COMPUTED DESIGN DATA RISER/SKIMMER BMP #2 COMPUTED 1 -YR. WATER QUALITY DATA Water Quality Volume (1 -Inch Storm), WQv 6,887.93 Cu Ft Water Quality Runoff Volume, Qa: 0.23 Inches Water Quality CN (using Qa). 87 CN Intial Abstraction, la = 0.299 la/P(1 ") = 0.299 Qu (TR -55)= 340.00 csm /in Water Quality Peak Discharge, Qp 1 1.0 cfs COMPUTED 2 -YR. DATA Time of Concentration, Tc Intensity for 2 yr Storm, I Peak Rate of Runoff, Tp Pre - Development Peak Flow, Qpre Post - Development Peak Flow, Qpost _ Soil Storage Volume, S Runoff Depth, Q* COMPUTED 10 -YR. DATA 6.97 Min 5.01 In /hr 16.50 Min 10.33 cfs 20.67 cfs 4.29 Inches 0.95 Inches Time of Concentration, Tc 6.97 Min Intensity for 10 yr Storm 1 6.42 In /hr Peak Rate of Runoff, Tp 26.85 Min Pre - Development Peak Flow, Qpre 13.24 cfs Post - Development Peak Flow, Qpost 26.48 cfs Sod Storage Volume, S - 4.29 Inches Runoff Depth, Q` 1.98 Inches COMPUTED STORAGE REQUIREMENTS Required Surface Area (A =325 x 10 -yr Qp) Required Storage Volume (1800 C F. x Disturbed Ac) Temporary Sediment Storage (0 5 Acre - Inches) Permanent Sediment Storage (0 125 Acre - Inches) Storage Estimate Before Cleanout Interval, Vc Cleanout Interval 'Reference made to "Erosion and Sediment Control Planning and Design Manual' State of N C 'Reference made to NOAA ATLAS 14, Volume 2, Version 2 NOAA Website, National Weather Service, Silver Springs, MD 8,606.00 S F 14,850.00 Cu Ft 14,973.75 Cu Ft 3,743.44 Cu Ft. 9,535.34 Cu Ft 90 Days COUNTRY MEADOWS STORMWATER MANAGEMENT ED STRUCTURE BASIN CONFIGURATION AND DESIGN RISER /SKIMMER BMP #2 BASIN CONFIGURATION Width Length Proposed Basin Dimension: 101 X 191 Basin Side Slopes- 3 : 1 Water Quality Release Orifice for Faircloth Skimmer: Design Head (Constant for Skimmer), h Maximum Release Rate Minimum Release Rate Maximum Hole Size 0 041 S.F Minimum Hole Size- 0 014 S F Faircloth Skimmer Barrel Size Faircloth Skimmer Orifice Size Used Orifice Sized Used Release Rates Water Quality Minimum Depth Sediment Storage Depth. Min Basin Depth Crest Height of Riser/Weir. 0 008 S F 0.0162 CFS Surface Area 19,291.00 S F 20 In 1 Days 3 Days 274 In Dia 1 60 In Dia 20 In Dia 1 20 In Dia 4.9 Days 0.36 Ft 0.78 Ft 1.14 Ft 5.00 Ft Basin Volume as Configured at Top of Riser/Weir 81,707.45 C F GUPTON & WEBB, P.A. P.O. BOX 1070 King, N.C. 27021 COUNTRY MEADOWS STORMWATER RETENTION STAGE- STORAGE COMPUTATIONS CONTOUR CONTOUR = I1VCR: °ACCUM.`-' EI.EV: "AREA' r VOL: ,STAGE; In "S -. -'In Zz x ,STAGE r ft s ft (cult), cu ft)' 4(ft ) = ;;;," "'3 " (ft) 1092.0 1255669 0 0 0 0 0.0000 1093.0 13721.2 13,139 13,139 1 9.4833 0.0000 1.27 1094.0 148857 14,303 27,442 2 10.2198 0.6931 2.25 1095.0 16165.69 15,526 42,968 3 106682 1.0986 3.18 1096.0 17445.68 16,806 59,774 4 10.9983 1.3863 4.11 1097.0 18768.57 18,107 77,881 5 11.2629 1.6094 5.04 1098.0 20091.46 19,430 97,311 6 11.4857 1.7918 6.00 1099.0 2193563 21,014 118,325 7 11.6812 1.9459 6.98 1100.0 23779.8 22,858 141,183 8 11.8578 2.0794 800 S1 = 97,311 ft3 Z1 = 6 ICs= 9,655.98 S2 = 141,183 ft3 Z2 = 8 b = 1.29 STORMWATER RETENTION STAGE-STORAGE COMPUTATIONS BETWEEN CONTOURS CONTOUR; 'VOL: AC 10920 1255669 0 0 0 1092.1- 12673.14 1261 1,261 0.1 1092.2 12789.59 1273 2,534 0.2 1092.3 12906.04 1285 3,819 0.3 1092.4 13022.49 1296 5,115 0.4 1092.5- 13138.94 1308 6,423 0.5 - 1092.6 13255.39 1320 7,743 0.6 1092.7 13371.84 1331 9,074 0.7 1092.8 13488.29 1343 10,417 0.8 1092.9- 13604.74 1355 - 11,772 0.9 10930 - 13721 20 1366 13,138 1.0 1093.1 13837.65 1378 14,516 1.1 1093.2 13954.10 1390 15,906 1.2 1093.3- 14070.55-- 1401 17,307 1.3 1093.4 14187.00 1413 - 18,720 1.4. 1093.5 - 14303.45 1425 20,145 1.5 " 1 1093.6 14419.90 1436 21,581 1.6 -6 1093.7 14536.35 1448 23,029 1 _ 7 1.7 - 1093.8 14652.80 1459 24,488 1.8 1093.9 14769.25 471 25,959 1.9 10940 14885.70 1483 27,442 2.0 1094.1 15013.70 1495 28,937 2.1 109412 15141.70 1508 30,445 2.2 1094.3 15269.70 1121 1521 31,96�6 31 6 2.3 1094.4 15397.70 1533 33,499 2 2 10945 15525.70 1 1546 35 5 2.5 1094.6 15653j S59 36,604 2.6 7 1094.7 '094* 15781.70 572 38176 2.7 1094.8 10:94 8 15909.70 1585 39'761 7 2.8 1094 9 1094.9 16037.70 1597 2.9 1095.0 1616569 1610 42,968 3.0 1095.1 16293.69 1623 44,591 3.1. I log - 095.2 16421.69 1636 46,2271 3.2 095.3 1 log 16549.69 1649 47,876 3.3 1095.4 16677.69 1661 49,537 3.4 1095.5 16805.69 1674 51,211 3.5 1095.6 16933.69 52,898 3.6 1095.7 17061.69 1700 54,598 3.7 1095.8 17189.69 1713 56,311 3 8 1095.9 17317.69 1725 58,036 3.9 10960 1744568 1738 59,774 4.0 1096.1 17577.97 1751 61,525 4.1 1096.2 17710.26 1764 63,289 4.2 1096.3 17842.55 1778 65,067 4.3 1096.4 17974.84 1791 66,858 4.4 1096.5 18107.13 1804 68,662 4.5 1096.6 18239.42 1817 70,479 4.6 1096.7 18371.71 1831 72,310 4.7 1096.8 18504.00 1844 74,154 4.8 1096.9 18636.29 1857 76,011 4.9 10970 1876857 1870 77,881 5.0 1097.1 18900.86 1883 79,764 5.1 1097.2 19033.15 1897 81,661 5.2 1097.3 19165.44 1910 83,571 5.3 1097.4 19297.73 1923 85,494 5.4 1097.5 19430.02 1936 87,430 5.5 1097.6 19562.31 1950 89,380 5.6 1097.7 19694.60 1963 91,343 5.7 1097.8 19826.89 1976 93,319 5.8 1097.9 19959.18 1989 95,308 5.9 1098.0 20091 46 2003 97,311 6.0 1098.1 20223.75 2016 99,327 6.1 1098.2 20356.04 2029 101,356 6.2 1098.3 20488.33 2042 103,398 6.3 1098.4 20620.62 2055 105,453 6.4 1098.5 20752.91 2069 107,522 6.5 1098.6 20885.20 2082 109,604 6.6 1098.7 21017.49 2095 111,699 6.7 1098.8 21149.78 2108 113,807 6.8 1098.9 21282.07 2122 115,929 6.9 10990 21935 63 2161 118,090 7 GUPTON & ASSOCIATES P.A. 2200 Silas Crk. Pkwy Suite 2 -B Winston- Salem, N.C. 27103 2 -YR STORM CHAINSAW ROUTING Project COUNTRY MEADOWS "2 -YR FREQUENCY STORM: "Peak Runoff (Qp) = 20.67 cfs "Time to Peak (Tp) = 16.50 min. "Time Step (dT) = 1.65 min. "STORAGE EQUATION: "Ks = 9655.98 "b = 1.29 "Initial Elevation (Zo) = 1092.6 ft. Maximums 2062 27,528 225 109485 003 ".TIME" -, �(nnn): � irINFLOW- (cfs) ` -i.w' STORAGE "; _ "(cu ft). � STAGE =` ; it) .., ELEVATION '(ft), OUTFLOW, 17 054 53 002. 109262 000 34 209 106 003 109263 000 5 1 68 450 752 313 758 0 07 0 14 1092 67 1092 74 001 0 02 85 1083 1501 0 24 1092 84 U 03 102 1191 1408 169 2570 3961 0 36 0 50 1092 96 1093 10 0.03 0 03 136 19 13 5636 0 66 1093 26 0 03 153 2040 7527 082 1093 42 0.03 170 20.62 9544 099 1093 59 003 187 1978 11582 1 15 1093 75 003 204 1795 13537 1 30 1093 90 0.03 22 1 1533 15311 143 109403 0.03 238 1376 16826 1 54 109414 0.03 25 5 1203 18185 1 63 109423 0.03 272 1052 19373 1 72 109432 003 289 920 20412 179 109439 0.03 306 805 21320 1 85 109445 0.03 323 704 22114 1 90 109450 003 340 616 22808 1 95 109455 0.03 357 539 23415 1 99 109459 0.03 374 471 23946 202 109462 0.03 39 1 4 12 24409 205 109465 0.03 408 360 24814 208 109468 003 425 3 15 25167 2 10 109470 0.03 442 276 25476 2 12 109472 0.03 459 241 25746 2 14 109474 0.03 476 2 11 25982 2 15 109475 003 493 1 84 26188 2 17 109477 0.03 510 1 61 26367 218 109478 0.03 527 1 41 26523 2 19 109479 0.03 544 123 26660 220 109480 0.03 56 1 108 26779 221 109481 003 578 094 26883 221 109481 0.03 595 083 26973 222 109482 0.03 612 072 27052 222 109482 003 629 063 27120 223 109483 0.03 646 055 27179 223 109483 0.03 663 048 27230 223 109483 0.03 680 042 27275 224 109484 0.03 697 0 37 27314 224 109484 003 714 032 27348 224 109484 0.03 73 1 028 27377 224 109484 0.03 -748 025 27402 224 1 109484, 0.03 765 022 1 27424 1 2.25 1094.85 0.03 782 019 1 27443 1 2.25 109485 0.03 GUPTON & ASSOCIATES P.A. 2200 Silas Crk. Pkwy Suite 2 -B Winston- Salem, N.C. 27103 2 -YR STAGE - DISCHARGE FUNCTION Project: COUNTRY MEADOWS Faircloth skimmer Constant Head 0.167 ft -_' ELEVATION (ity _STAGE._ (ft) : POND' 'SKIMMER, - ,'tjcfs) ' WATER QUALITY DRAW DOWN: 24" Pipe Riser EMERGENCY ",,`` WEIR,--." (cts) > ' ,' TOTAL , OUTFLOW - (ct's) # Skimmers = 1.0 Riser Weir Length = 6.3 ft. "Diameter= 0.146 ft. "Crest Elevation = 1097.6 ft. "Area = 0.017 sf. "Weir Coefficent = 3.0 003 "Vertical Spacing = 0.0 ft. "Discharge Coefficient = 0.6 04 "Invert Elevation = 1092.6 ft. #NUMI 003 003 "Discharge Coefficient = 0.6 "Orifice Diameter = 15.0 in. "EMERGENCY WEIR: #NUMI "Invert Elevation = 1092.6 ft_ "Weir Coefficient= 3.0 "Discharge Coefficient = 0.60 #NUMI "Crest Elevation = 1098.6 ft. 003 #NUMI 003 "Weir Length = 10.0 ft. Faircloth skimmer Constant Head 0.167 ft -_' ELEVATION (ity _STAGE._ (ft) : POND' 'SKIMMER, - ,'tjcfs) ' RISER _ __ORIFICE ° WEIR BARREL Acts) (cfs) - (cfs) "PRIMARY,- .OUTFLOW- (cfs),. k, EMERGENCY ",,`` WEIR,--." (cts) > ' ,' TOTAL , OUTFLOW - (ct's) 10926 00 000 #NUMI #NUMI 000 000 #NUMB 000 10928 02 003 #NUMI #NUMf 003 003 #NUMI 003 10930 04 003 #NUMI #NUMI 003 003 #NUMI 003 10932 06 003 #NUM1 #NUMI 003 003 #NUMI 003 10934 08 003 #NUMI #NUMI 003 003 #NUMI 003 10936 10 0031 #NUM1 #NUM1 003 003 #NUMI 003 10938 12 003 #NUMI #NUMI 003 003 #NUMI 003 10940 14 003 #NUM1 #NUMI 003 003 #NUMI 003 10942 16 003 #NUMI #NUMI 003 003 #NUMI 003 10944 18 003 #NUMI #NUMI 003 003 #NUMI 003 10946 20 003 #NUMI #NUMI 003 003 #NUMI 003 10948 22 003 #NUMI #NUMI 003 003 #NUMI 003 10950 24 003 #NUMI #NUMI 003 003 #NUMI 003 10952 26 003 #NUMI #NUM1 003 003 #NUMI 003 10954 28 003 #NUMI #NUMI 003 003 #NUMI 003 10956 30 003 #NUMT #NUMI 003 003 #NUMI 003 10958 32 003 #NUMI #NUMI 003 003 #NUMI 003 10960 34 003 #NUMI #NUMI 003 003 #NUMI 003 10962 36 003 #NUMI 4NUM1 003 003 #NUMI 003 10964 38 003 #NUMI #NUMI 003 003 #NUMI 003 10966 40 003 #NUMI #NUMI 003 003 #NUMI 003 10968 42 003, #NUMT #NUMI 003 003 #NUMI 003 10970 44 003 #NUM, #NUMI 003, 003 #NUMI 003 10972 46 003 #NUMI #NUMI 003 003 #NUMI 003 10974 48 003 #NUMI #NUMI 003 003 #NUMI 003 10976 50 003 000 000 1234 003 #NUMI 003 10978 52 003 534 169 l2 62 1 72 #NUMI 172 10980 54 755 478 1289 481 #NUMI 481 10982 56 925 878 13 16 881 #NUMI 881 10984 58 1068 1352 1342 1071 #NUMI 1071 10986 60 A00 1194 1890 1368 1197 000, 1197 10988 62 1308 2484 1393 1311 268 1579 10990 64 1413 3131 1418 1416 759 2175 10992 6 6 1511 3825 1442 1445 1394 2839 10994 68 003 1602 4564 1466 140 1 2147 36 16 10996 70 003 1689 5346 1490 1493 3000 4493 10998 72 003 1772 61 67 1513 1516 3944 5460 11000 74 003 1850 7027 1536 1539 4970 6509 11002 76 003 1926 7924 15 58 1561 6072 7633 11004 78 0031 1999 8855 1580 1583 7245 8828 11006 80 1 003 2069 1 9821 1602 1605 1 8485 10090 11008 8 2 003 21 37 108 19 1624 1627 9789 11416 11010 84 003 2202 11849 1645 1648 11154- 12802 11012 86 003 2266 12910 1666 1669 12577 142 46 11014 88 003 2328 14000 1687 1690 14056 157 46 11016 90 1 0031 2389 15120 1707 1 1710 155 88 ] 72 98 GUPTON & ASSOCIATES P.A. 2200 Silas Crk. Pkwy Suite 2 -B Winston - Salem, N.C. 27103 10 -YR STORM CHAINSAW ROUTING Project COUNTRY MEADOWS "10 -YR FREQUENCY STORM: "Peak Runoff (Qp) = 26.48 efs "Time to Peak (Tp) = 26.85 min. "Time Step (dT) = 2.69 min. "STORAGE EQUATION: "ICs = 9655.98 "b = 1.29 "Initial Elevation (Zo) = 1092.58 ft. Maximums 2648 59,035 1 407 109665 003 v T[ME `- (mm) -,- _ INFLOW_ = (cfs) ` RAGE--,I- = (cu tt)° -,STAGE _ -- =(ft)= ELEVATION (ft), . OUTFLOW (cfs) 27 066 107 003 109261 000 54 256 214 005 109263 000 8 1 551 627 0 12 109270 002 108 924 1513 024 109282 0.03 13 5 1336 2999 040 109298 0.03 162 1746 5150 061 1093 19 0.03 18.9 21 15 7963 086 109344 0.03 216 2406 11372 1 14 109372 003 243 2590 15250 143 109401 0.03 270 26.48 19425 172 109430 0.03 297 2575 23694 201 109459 0.03 324 2379 27845 227 109485 0.03 35 1 2078 31680 251 109509 0.03 378 1843 35029 272 109530 0.03 405 16 17 37999 289 109547 0.03 432 14 19 40604 304 109562 0.03 459 1245 42889 3 18 109576 0.03 486 1093 44894 329 109587 0.03 513 959 46653 339 109597 0.03 540 841 48196 348 109606 003 567 738 49549 3 55 1096 13 0.03 594 648 50735 362 109620 0.03 621 568 51776 368 109626 0.03 648 499 52688 373 109631 0.03 67 5 438 53489 377 109635 0.03 702 384 54191 381 109639 0.03 729 337 54806 384 109642 0.03 756 296 55345 387 109645 0.03 783 259 55818 390 109648 0.03 810 228 56231 392 109650 0.03 837 200 56594 394 109652 0.03 864 1 75 56912 396 109654 0.03 891 1 54 57190 397 109655 0.03 918 135 57434 398 109656 003 945 1 18 57647 400 109658 0.03 972 104 57833 401 109659 0.03 999 091 57996 401 109659 003 1026 080 58138 402 109660 0.03 1053 070 58262 403 109661 0.03 1080 062 58370 403 109661 0.03 1107 0 54 58465 404 109662 0.03 1134 0 47 58547 404 109662 0.03 1161 042 58618 405 109663 0.03 1188 037 58681 405 109663 0.03 1215 032 58736 405 109663 0.03 1242 1 028 58783 1 406 1 109664 1 0.03 Faircloth skimmer Constant Head 0.167 ft. ELEVATION GUPTON & ASSOCIATES P.A. "(Cfs)'�:�'(cfs)7(cfs) "ORIFICE RISER °,,; �ti; WEIR 2200 Silas Crk. Pkwy Suite 2 -B :PRIMARY OUTFLOW EMERGENC WEIR TOTAL`S OUTFLOW- Winston- Salem, N.C. 27103 �(g) ; 10 -YR STAGE - DISCHARGE FUNCTION w` '(cf (cfs)_`'- Project: COUNTRY MEADOWS (cfs) 10926 00 WATER QUALITY DRAW DOWN: #NUMI 24" PIPE RISER: # Skimmers = 1.0 #NUMI Riser Weir Length = 6.3 ft. "Diameter = 0.146 ft. "Crest Elevation = 1097.58 ft. "Area = 0.017 sf. "Weir Coefficent = 3.0 "Vertical Spacing = 0.0 ft. "Discharge Coefficient = 0.6 "Invert Elevation = 1092.6 ft. 0 03 "Discharge Coefficient = 0.6 10932 "Orifice Diameter= 15.0 In. "EMERGENCY WEIR: #NUMI #NUMI "Invert Elevation = 1092.6 ft. "Weir Coefficient = 3.0 003 "Discharge Coefficient = 0.60 "Crest Elevation = 1098.6 ft. #NUMI "Weir Length = 10.0 ft. Faircloth skimmer Constant Head 0.167 ft. ELEVATION STAGE' "(Cfs)'�:�'(cfs)7(cfs) "ORIFICE RISER °,,; �ti; WEIR ;BAR ; �, ��� 1-1 :PRIMARY OUTFLOW EMERGENC WEIR TOTAL`S OUTFLOW- tt ( ) �(g) ; �r w` '(cf (cfs)_`'- (ct's) (cfs) 10926 00 00 #NUMI #NUMI 000 600 #NUMI 000 10928 02 003 #NUMI #NUMI 003 003 #NUMI 003 10930 04 003 #NUMI #NUMI 003 0 03 #NUMI 003 10932 06 003 #NUMI #NUMI 003 003 #NUMI 003 10934 08 003 #NUMI #NUMI 003 003 #NUMI 003 10936 10 00 #NUMI #NUMI 003 003 #NUMI 003 10938 12 003 #NUMI #NUMI 003 0 03 #NUMI 003 10940 14 00 #NUMI #NUMI 003 003 #NUMI 003 10942 1 6 00 #NUMI #NUMI 003 003 #NUMI 003 10944 1 8 0 03 #NUMI #NUMI 0 03 003 #NUMI 003 10946 20 003 #NUMI #NUMI 003 003 #NUMI 003 10948 22 003, #NUMI #NUMI 003 003 #NUMI 003 10950 24 0 03 #NUMI #NUMI —0703 003 #NUMI 003 1695T 26 003 #NUMI #NUMI 003 003 #NUMI 003 10954 28 003 #NUMI #NUMI 003 003 #NUMI 0- 10956, 30 003 #NUMI #NUMI 003 003 #NUMI 003 10958 32 003 #NUMI #NUMI —003 003 #NUMI 003 10960 34 003 #NUMI #NUMI 003 003 #NUMI 003 1096 2 36 003 #NUMI #NUMI 0 03 0 03 #NUMI 003 1096 4 38 003 #NUMI #NUMI 003 003 #NUMI 003 10966 40 003 #NUMI #NUMI 00-3 003 #NUMI 003 10968 42 003 #NUMI #NUMI 003 003 #NUMI 003 10970 44 003 #NUMI #NUMI 003 003 #NUMI 003 10972 46 003 #NUMI #NUMI 003 003 #NUMI 003 10974 48 003 #NUMI #NUMI 003 003 #NUMI 003 10976 50 003 1 69 005 1234 008 #NUMI 008 10978 52 003 560 —774 195 —1262 198 #NUMI 1 98 10980 54 003 12 89 517 #NUMI 5 17 10982 56 003 940 13 16 —926 #NUMI 926 10984 58 003 1082 a25 13 42 1085 #NUMI 1085 10986 60 003 1206 13 68 1209 000 1209 10988 6 2 003 13 19 13 93 13 22 268 1590 10990 64 003 1423 3198 14 18 1421 759 2180 10992 66 003 1520 3897 14 42 14 45 1394 2839 10994 68 003 1611 4641 14 66 14 69 2147 36 16 10996 7 0 1698 5426 14 90 14 93 3000 4493 1099 8 72 1780 6252 15 13 1516 3944 5460 11000 74 1858 71 15 15 36 15 39 4970 6509 11002 76 1-933 80 15 15 58 15 61 6072 7633 11004 78 2006 8950 15 80 15 83 7245 8828 11006 80 9003 2076 9919 —1602 16 05 8485 10090 11008 82 2143 10921 1624 16 27 9789 11416 11010 84 2209 11954 1645 16 48 11154 1280 11012 86 2273 13017 1666 16 69 125 77 142 46 11014 88 2334 141 11 1687 1690 14056, 157 46 110161 90 2395 152341 17 07 1710 155 88 172 98 GUPTON & WEBB, P.A. P.O. BOX 1070 King, N.C. 27021 COUNTRY MEADOWS STORMWATER RETENTION POND SUMMARY REPORT CONTOU ONTOU CONTOUR -INCR: ` ACCUM.. ELEV. - -AREA AREA .VOL. ; VOL~ ° .STAGE '(ft) s ft (acres) 110000 (cu ft) , (ft) 10920 12,556 69 029 0 0 0 1093.0 13,721.20 031 13,139 13,139 1 10940 14,885.70 034 14,303 27,442 2 10950 16,165 69 037 15,526 42,968 3 10960 17,445.68 040 16,806 59,774 4 10970 18,768.571 043 18,107 77,881 5 1098.0 20,091.461 046 19,430 97,311 6 1099.0 21,935.63 050 21,014 118,325 7 1100.0 23,779.80 055 22,858 141,183 8 Maximum Release Rate. 1 Days Minimum Release Rate 3 Days Maximum Hole Size 0040556 273 In Dia Minimum Hole Size POND ELEVATIONS: 498 Ft PRIMARY SPILLWAY: N/A Lbs Top of Dam Elevation 110000 Ft. Barrel Length 0 61 Ft Top of Emergency Spillway Elev. 110000 Ft Barrel Size Lbs 15 In Emergency Spillway Elevation 109860 Ft Barrel Slope. Riser Base Size Min Thickness N/A 015 % Top of Riser Elevation 109758 Ft Riser Size 24 In Dia Invert of Riser Elevation 109260 Ft Bottom of Pond Elevation 90800 Ft EMERGENCY SPILLWAY Bottom Width 10 Ft FAIRCLOTH SKIMMER: Water Quality Release Orifice for Faircloth Skimmer Design Head (Constant for Skimmer), h 20 In Maximum Release Rate. 1 Days Minimum Release Rate 3 Days Maximum Hole Size 0040556 273 In Dia Minimum Hole Size 0013519 1 57 In Dia Faircloth Skimmer Barrel Size: 18 In Dia ANTI - FLOATATION SUMMARY: Riser Height 498 Ft Riser Weight N/A Lbs Volume of Riser 314 Cu Ft Exposed Barrel Length 0 Ft Volume of Exposed Barrel 00 Cu.Ft Weight of Water Displaced 195936 Lbs Saftey Factor (10 %) 215530 Lbs Concrete Required NO REQ C F = C Y Riser Base Size Min Thickness N/A Ft ' X Riser Base Size Used Thickness N/A Ft 000 X 000 MAX STAGE ELEV 109485 MAX FLOW CFS• 003 10 Yr GUPTON & WEBB, P.A. P.O. BOX 1070 King, N.C. 27021 OUTLET STRUCTURE SCHEMATIC MAX STAGE ELEV 109665 MAX FLOW CFS 003 (_05'M!- 3 35 --------------------- - - - - -I - -- 1096.65 -- -1098 60 -- 1 02 (1' Min) FLOOD 2 Yr 109485 109758 WATER QUALITY 498 109260 IF K— PERM SEDIMENT STORAGE 1092 00 / 15 in 61 00 ft 015% Top of Dam 110000 140 109251 Toe of Dam 109200 800ft P.O. Box 1070 King, N.C. 27021 336- 985 -6519 COUNTRY MEADOWS Mountain View Road King, N C. PERMANENT E.D. BASIN #3 4/6/2015 Developer Mountain View Commercial Properties, LLC 13146 NW Gilson Road Palm City, FL 34990 276 -755 -4139 Io�o � APR 0 ,9 2015 I i Hydraflow Table of Contents Hydraflow Hydrographs Extension for AUtoCAD® Civil 3DO 2012 by Autodesk, Inc v9 1 -Year Country Meadows gpw Monday, 04 / 6 12015 Hydrograph No 7, SCS Runoff, Pond 3 - Pre Const . . .... .. ... ..... . .. .. . 1 Hydrograph No 8, SCS Runoff, Pond 3- Post Const. . ... ... .. .... ... 2 Hydrograph No 9, Reservoir, Pond 3 Routed ... . .... . ... ... .... 3 PondReport - BMP 3 ................................................................... ............................... 4 2 - Year Hydrograph No 7, SCS Runoff, Pond 3- Pre Const. ...... 5 Hydrograph No 8, SCS Runoff, Pond 3 -Post Const. ... .... .............. .. 6 Hydrograph No 9, Reservoir, Pond 3 Routed .... . .. 7 10 -Year Hydrograph No 7, SCS Runoff, Pond 3 - Pre Const 8 Hydrograph No 8, SCS Runoff, Pond 3 - Post Const .. . ..... 9 Hydrograph No 9, Reservoir, Pond 3 Routed . ...... .... ... . ..... 10 25 - Year Hydrograph No 7, SCS Runoff, Pond 3 - Pre Const 11 Hydrograph No 8, SCS Runoff, Pond 3 - Post Const. 12 Hydrograph No 9, Reservoir, Pond 3 Routed 13 50 - Year Hydrograph No 7, SCS Runoff, Pond 3 - Pre Const. 14 Hydrograph No 8, SCS Runoff, Pond 3 - Post Const ...... . 15 Hydrograph No 9, Reservoir, Pond 3 Routed 16 100 - Year Hydrograph No 7, SCS Runoff, Pond 3 - Pre Const... .. ..... 17 Hydrograph No 8, SCS Runoff, Pond 3 - Post Const. 18 Hydrograph No 9, Reservoir, Pond 3 Routed 19 IDFReport ................................................................................... ............................... 20 Detention Pond Riser / Outlet - Front View ............................. ............................... 21 Detention Pond Riser / Outlet - Section View ......................... ............................... 22 Input Data Reference Data Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 310 2012 by Autodesk, Inc. v9 Hyd. No. 7 Pond 3 - Pre Const Hydrograph type = SCS Runoff Peak discharge Storm frequency = 1 yrs Time to peak Time interval = 1 min Hyd. volume Drainage area = 20.740 ac Curve number Basin Slope = 0.0% Hydraulic length Tc method = User Time of conc. (Tc) Total precip. = 1.97 in Distribution Storm duration = 6.00 hrs Shape factor Q (Cfs) r 10 1.00 0.00 1 0.0 Pond 3 - Pre Const Hyd. No. 7 - -1 Year 1 Monday, 04 / 6 / 2015 = 1.214 cfs = 2.58 hrs = 12,047 cuft = 67 = Oft = 7.00 min = SCS 6 -Hr = 484 1.0 2.0 3.0 4.0 5.0 6.0 Hyd No. 7 Q (ds) 2.00 1.00 1 0.00 7.0 Time (hrs) Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3136 2012 by Autodesk, Inc. v9 Hyd. No. 8 Pond 3 - Post Const Hydrograph type = SCS Runoff Storm frequency = 1 yrs Time interval = 1 min Drainage area = 20.740 ac Basin Slope = 0.0% Tc method = User Total precip. = 1.97 in Storm duration = 6.00 hrs Q (Cfs) 3.00 +AIZI] 1.00 0.00 --1— 0.0 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Pond 3 - Post Const Hyd. No. 8 —1 Year 2 Monday, 04 / 6 / 2015 = 2.486 cfs = 2.57 hrs = 17,270 cuft = 70 = Oft = 10.00 min = SCS 6 -Hr = 484 1.0 2.0 3.0 4.0 5.0 6.0 Hyd No. 8 Q (cfs) 3.00 2.00 1.00 1 0.00 7.0 Time (hrs) Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2012 by Autodesk, Inc. v9 Hyd. No. 9 Pond 3 Routed Hydrograph type = Reservoir Peak discharge Storm frequency = 1 yrs Time to peak Time interval = 1 min Hyd. volume Inflow hyd. No. = 8 - Pond 3 - Post Const Max. Elevation Reservoir name = BMP 3 Max. Storage Storage Indication method used Q (cfs) 3.00 2.00 1.00 Pond 3 Routed Hyd. No. 9 -- 1 Year 3 Monday, 04 / 6 / 2015 = 0.174 cfs = 6.17 hrs = 13,409 cuft = 1034.77 ft = 15,893 cuft Q (cfs) 3.00 2.00 1.00 PF 1 , 0.00 5 10 15 20 25 30 35 40 45 50 Time (hrs) Hyd No. 9 Hyd No. 8 TLFP1 I Total storage used = 15,893 cult Pond Report 4 Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2012 by Autodesk, Inc. v9 Monday, 04 / 6 ! 2015 Pond No. 1 - BMP 3 Note: Culvert/Onfice outflows are analyzed under inlet (ic) and outlet (oc) control. Weir risers checked for orifice conditions (ic) and submergence (s). Weir Structures Storage / Discharge Table Pond Data [A] Contours - User - defined contour areas. Average end area method used for volume calculation. Begining Elevation = 1034.00 ft Stage / Storage Table [A] [B] [C] Stage (ft) Elevation (ft) Contour area (sgft) Incr. Storage (cult) Total storage (cuft) 0.00 1034.00 19,507 0 0 1.00 1035.00 21,805 20,656 20,656 2.00 1036.00 24,189 22,997 43,653 3.00 1037.00 26,632 25,411 69,064 4.00 1038.00 29,132 27,882 96,946 5.00 1039.00 31,687 30,410 127,355 6.00 1040.00 34,300 32,994 160,349 Culvert / Orifice Structures Note: Culvert/Onfice outflows are analyzed under inlet (ic) and outlet (oc) control. Weir risers checked for orifice conditions (ic) and submergence (s). Weir Structures Storage / Discharge Table [A] [B] [C] [PrfRsrl Clv A [A] [B] [C] [D] Rise (in) = 12.00 3.00 0.00 0.00 Crest Len (ft) = 12.00 16.00 0.00 0.00 Span (in) = 12.00 3.00 0.00 0.00 Crest El. (ft) = 1037.00 1038.00 0.00 0.00 No. Barrels = 1 1 0 0 Weir Coeff. = 3.33 3.33 3.33 3.33 Invert El. (ft) = 1034.00 1034.10 0.00 0.00 Weir Type = 1 Ciplti -- -- Length (ft) = 100.00 0.50 0.00 0.00 Multi -Stage = Yes No No No Slope (%) = 2.00 0.00 0.00 nla - -- - 60.27 6.00 160,349 1040.00 7.78 oc N -Value = .013 .013 .013 n!a Orifice Coeff. = 0.60 0.60 0.60 0.60 Exfll.(Inmr) = 0.000 (by Wet area) Multi -Stage = We Yes No No TW Elev. (ft) = 0.00 Note: Culvert/Onfice outflows are analyzed under inlet (ic) and outlet (oc) control. Weir risers checked for orifice conditions (ic) and submergence (s). Stage / Storage / Discharge Table Stage Storage Elevation Clv A Clv B Clv C PrfRsr Wr A Wr B Wr C Wr D Exfil User Total It cult ft cfs cis cfs cfs cfs cfs cis cfs cis cfs cis 0.00 0 1034.00 0.00 0.00 - - 0.00 0.00 - -- -- - - 0.000 1.00 20,656 1035.00 0.21 is 0.21 is - - 0.00 0.00 -- - - -- 0.208 2.00 43,653 1036.00 0.32 is 0.31 is -- - 0.00 0.00 - -- -- - 0.311 3.00 69,064 1037.00 0.39 is 0.39 is - - 0.00 0.00 -- -- -- - 0.388 4.00 96,946 1038.00 6.57 oc 0.02 is - -- 6.51s 0.00 - - - - 6.532 5.00 127,355 1039.00 7.20 oc 0.01 is - - 6.98s 53.28 -- - -- - 60.27 6.00 160,349 1040.00 7.78 oc 0.00 is -- 7.28s 150.70 -- -- - - 157.98 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2012 by Autodesk, Inc. v9 Hyd. No. 7 Pond 3 - Pre Const Hydrograph type = SCS Runoff Storm frequency = 2 yrs Time interval = 1 min Drainage area = 20.740 ac Basin Slope = 0.0% Tc method = User Total precip. = 2.38 in Storm duration = 6.00 hrs 0 (Cfs) 4.00 KIM 2.00 iW1Z111 0.00 1 0.0 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Pond 3 - Pre Const Hyd. No. 7 — 2 Year 5 Monday, 04 / 6 / 2015 = 3.722 cfs = 2.55 hrs = 22,599 cuft = 67 = Oft = 7.00 min = SCS 6 -Hr = 484 1.0 2.0 3.0 4.0 5.0 6.0 Hyd No. 7 Q (Cfs) 4.00 3.00 2.00 1.00 --L- 0.00 7.0 Time (hrs) Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 31341) 2012 by Autodesk, Inc. v9 Monday, 04 / 6 / 2015 Hyd. No. 8 Pond 3 - Post Const Hydrograph type = SCS Runoff Peak discharge = 5.567 cfs Storm frequency = 2 yrs Time to peak = 2.55 hrs Time interval = 1 min Hyd. volume = 30,058 cuft Drainage area = 20.740 ac Curve number = 70 Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 10.00 min Total precip. = 2.38 in Distribution = SCS 6 -Hr Storm duration = 6.00 hrs Shape factor = 484 Q (Cfs) 6.00 E111111 t' X11 3.00 2.00 1.00 0.00 ' 0.0 1.0 Hyd No. 8 Pond 3 - Post Const Hyd. No. 8 — 2 Year 2.0 3.0 4.0 5.0 6.0 Q (Cfs) 6.00 5.00 4.00 3.00 2.00 1.00 ---J- 0.00 7.0 Time (hrs) Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 31)® 2012 by Autodesk, Inc. v9 Hyd. No. 9 Pond 3 Routed Hydrograph type = Reservoir Peak discharge Storm frequency = 2 yrs Time to peak Time interval = 1 min Hyd. volume Inflow hyd. No. = 8 - Pond 3 - Post Const Max. Elevation Reservoir name = BMP 3 Max. Storage Storage Indication method used. Q (cfs) 6.00 1/ 4.00 3.00 2.00 1.00 w 5 Hyd No. 9 Pond 3 Routed Hyd. No. 9 -- 2 Year 7 Monday, 04 1 6 1 2015 = 0.244 cfs = 6.18 hrs = 24,574 cult = 1035.31 ft = 27,699 cuft Q (cfs) 6.00 5.00 4.00 3.00 2.00 1.00 ' ' ' ' ' ' ' ' 0.00 10 15 20 25 30 35 40 45 50 Time (hrs) Hyd No. 8 ILEH l i i Total storage used = 27,699 cult Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3138 2012 by Autodesk, Inc. v9 Hyd. No. 7 Pond 3 - Pre Const Hydrograph type = SCS Runoff Storm frequency = 10 yrs Time interval = 1 min Drainage area = 20.740 ac Basin Slope = 0.0% Tc method = User Total precip. = 3.45 in Storm duration = 6.00 hrs Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Pond 3 - Pre Const Q (Cfs) Hyd. No. 7 --10 Year 14.00 12.00 10.00 8.00 6.00 4.00 2.00 000 0.0 1.0 2.0 3.0 4.0 5.0 6.0 Hyd No. 7 8 Monday, 04 / 6 / 2015 12.92 cfs 2.52 hrs 60,348 tuft 67 0 ft 7.00 min SCS 6 -Hr 484 Q (cfs) 14.00 12.00 10.00 8.00 6.00 4.00 2.00 0 00 7.0 Time (hrs) 9 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2012 by Autodesk, Inc. v9 Monday, 04 / 6 / 2015 Hyd. No. 8 Pond 3 - Post Const Hydrograph type = SCS Runoff Peak discharge = 16.22 cfs Storm frequency = 10 yrs Time to peak = 2.52 hrs Time interval = 1 min Hyd. volume = 73,580 cuft Drainage area = 20.740 ac Curve number = 70 Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 10.00 min Total precip. = 3.45 in Distribution = SCS 6 -Hr Storm duration = 6.00 hrs Shape factor = 484 Pond 3 - Post Const Q (Cfs) Hyd. No. 8 - -10 Year 18.00 15.00 12.00 9.00 6.00 3.00 0.00 ' ' 0.0 1.0 Hyd No. 8 2.0 3.0 4.0 5.0 6.0 Q (cfs) 18.00 15.00 12.00 9.00 6.00 3.00 —L-- 0.00 7.0 Time (hrs) Storage Indication method used Q (cfs) 18.00 15.00 12.00 �8 . iM 3.00 0.00 � 0 5 Hyd No. 9 Pond 3 Routed Hyd. No. 9 -- 10 Year Q (cfs) 18.00 15.00 12.00 • IN 3.00 _ _ -- �... �_ 0.00 10 15 20 25 30 35 40 45 50 Time (hrs) Hyd No. 8 U= ! Total storage used = 69,239 cult 10 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2012 by Autodesk, Inc. v9 Monday, 04 / 6 / 2015 Hyd. No. 9 Pond 3 Routed Hydrograph type = Reservoir Peak discharge = 0.466 cfs Storm frequency = 10 yrs Time to peak = 6.18 hrs Time interval = 1 min Hyd. volume = 50,490 cuft Inflow hyd. No. = 8 - Pond 3 - Post Const Max. Elevation = 1037.01 ft Reservoir name = BMP 3 Max. Storage = 69,239 cuft Storage Indication method used Q (cfs) 18.00 15.00 12.00 �8 . iM 3.00 0.00 � 0 5 Hyd No. 9 Pond 3 Routed Hyd. No. 9 -- 10 Year Q (cfs) 18.00 15.00 12.00 • IN 3.00 _ _ -- �... �_ 0.00 10 15 20 25 30 35 40 45 50 Time (hrs) Hyd No. 8 U= ! Total storage used = 69,239 cult 11 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2012 by Autodesk, Inc. v9 Monday, 04 / 6 / 2015 Hyd. No. 7 Pond 3 - Pre Const Hydrograph type = SCS Runoff Peak discharge = 19.68 cfs Storm frequency = 25 yrs Time to peak = 2.47 hrs Time interval = 1 min Hyd. volume = 87,663 cuft Drainage area = 20.740 ac Curve number = 67 Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = User Time of conc. (TO = 7.00 min Total precip. = 4.08 in Distribution = SCS 6 -Hr Storm duration = 6.00 hrs Shape factor = 484 Q (Cfs) 21.00 18.00 15.00 12.00 9.00 6.00 3.00 0 00 0.0 1.0 Hyd No. 7 Pond 3 - Pre Const Hyd. No. 7 — 25 Year Q (ds) 21.00 18.00 15.00 12.00 9.00 6.00 3.00 0.00 2.0 3.0 4.0 5.0 6.0 7.0 Time (hrs) 12 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3130 2012 by Autodesk, Inc. v9 Monday, 04 / 6 / 2015 Hyd. No. 8 Pond 3 - Post Const Hydrograph type = SCS Runoff Peak discharge = 23.77 cfs Storm frequency = 25 yrs Time to peak = 2.48 hrs Time interval = 1 min Hyd. volume = 104,145 cuft Drainage area = 20.740 ac Curve number = 70 Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 10.00 min Total precip. = 4.08 in Distribution = SCS 6 -Hr Storm duration = 6.00 hrs Shape factor = 484 Q (Cfs) 24.00 20.00 16.00 12.00 8.00 4.00 0.00 ' ' 0.0 1.0 Hyd No. 8 Pond 3 - Post Const Hyd. No. 8 — 25 Year Q (afs) 24.00 20.00 16.00 12.00 8.00 4.00 0.00 2.0 3.0 4.0 5.0 6.0 7.0 Time (hrs) 13 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3138 2012 by Autodesk, Inc. v9 Monday. 04 / 6 / 2015 Hyd. No. 9 Pond 3 Routed Hydrograph type = Reservoir Peak discharge Storm frequency = 25 yrs Time to peak Time interval = 1 min Hyd. volume Inflow hyd. No. = 8 - Pond 3 - Post Const Max. Elevation Reservoir name = BMP 3 Max. Storage Storage Indication method used. Q (cfs) 24.00 20.00 16.00 12.00 11 4.00 0.00 ' r ' I 0 5 - Hyd No. 9 Pond 3 Routed Hyd. No. 9 -- 25 Year = 4.355 cfs = 5.20 hrs = 80,240 cuft = 1037.22 ft = 75,278 cult 10 15 20 25 30 35 40 45 Hyd No. 8 Total storage used = 75,278 cuft Q (cfs) 24.00 20.00 16.00 12.00 10 4.00 — 1 0.00 50 Time (hrs) 14 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil WO 2012 by Autodesk, Inc. v9 Monday, 04 16 / 2015 Hyd. No. 7 Pond 3 - Pre Const Hydrograph type = SCS Runoff Peak discharge = 25.69 cfs Storm frequency = 50 yrs Time to peak = 2.47 hrs Time interval = 1 min Hyd. volume = 111,337 cuft Drainage area = 20.740 ac Curve number = 67 Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 7.00 min Total precip. = 4.58 in Distribution = SCS 6-Hr Storm duration = 6.00 hrs Shape factor = 484 Q (Cfs) 28.00 24.00 20.00 16.00 12.00 8.00 4.00 0 00 0.0 1.0 Hyd No. 7 Pond 3 - Pre Const Hyd. No. 7 – 50 Year 2.0 3.0 4.0 5.0 6.0 Q (efs) 28.00 24.00 20.00 16.00 12.00 8.00 4.00 —&- 0.00 7.0 Time (hrs) Q (cfs) 35.00 30.00 25.00 20.00 t'5.00 10.00 5.00 0 00 Pond 3 - Post Const Hyd. No. 8 — 50 Year 0.0 1.0 2.0 3.0 4.0 5.0 6.0 Hyd No. 8 Q (Cfs) 35.00 30.00 25.00 20.00 15.00 10.00 5.00 0.00 7.0 Time (hrs) 15 Hydrograph Report Hydraflow Hydrographs Extension Tor AutoCAD® Civil 31)® 2012 by Autodesk, Inc. v9 Monday, 04 1 6 12015 Hyd. No. 8 Pond 3 - Post Const Hydrograph type = SCS Runoff Peak discharge = 30.31 cfs Storm frequency = 50 yrs Time to peak = 2.48 hrs Time interval = 1 min Hyd. volume = 130,291 cuft Drainage area = 20.740 ac Curve number = 70 Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = User Time of conc. (TO = 10.00 min Total precip. = 4.58 in Distribution = SCS 6 -Hr Storm duration = 6.00 hrs Shape factor = 484 Q (cfs) 35.00 30.00 25.00 20.00 t'5.00 10.00 5.00 0 00 Pond 3 - Post Const Hyd. No. 8 — 50 Year 0.0 1.0 2.0 3.0 4.0 5.0 6.0 Hyd No. 8 Q (Cfs) 35.00 30.00 25.00 20.00 15.00 10.00 5.00 0.00 7.0 Time (hrs) Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2012 by Autodesk, Inc. v9 Hyd. No. 9 Pond 3 Routed Hydrograph type = Reservoir Peak discharge Storm frequency = 50 yrs Time to peak Time interval = 1 min Hyd. volume Inflow hyd. No. = 8 - Pond 3 - Post Const Max. Elevation Reservoir name = BMP 3 Max. Storage Storage Indication method used. 16 Monday, 04 / 6 / 2015 = 6.013 cfs = 4.47 hrs = 106,330 cuft = 1037.33 ft = 78,344 cuft Pond 3 Routed Q (cfs) Hyd. No. 9 -- 50 Year Q (cfs) 35.00 35.00 30.00 30.00 25.00 25.00 20.00 20.00 15.00 15.00 10.00 10.00 5.00 5.00 0.00 1 r i ■ 0 5 Hyd No. 9 10 15 20 25 30 35 40 45 50 V vv Time (hrs) Hyd No. 8 III 1 Total storage used = 78,344 cult 17 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3136) 2012 by Autodesk, Inc. v9 Monday, 04 / 6 / 2015 Hyd. No. 7 Pond 3 - Pre Const Hydrograph type = SCS Runoff Peak discharge = 32.12 cfs Storm frequency = 100 yrs Time to peak = 2.45 hrs Time interval = 1 min Hyd. volume = 136,456 cuft Drainage area = 20.740 ac Curve number = 67 Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 7.00 min Total precip. = 5.08 in Distribution = SCS 6 -Hr Storm duration = 6.00 hrs Shape factor = 484 Q (ds) 35.00 30.00 25.00 20.00 t5.00 10.00 5.00 0.00 ' ' 0.0 1.0 Hyd No. 7 Pond 3 - Pre Const Hyd. No. 7 —100 Year Q (ds) 35.00 30.00 25.00 20.00 15.00 10.00 5.00 0.00 2.0 3.0 4.0 5.0 6.0 7.0 Time (hrs) Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3134D 2012 by Autodesk, Inc. v9 Hyd. No. 8 Pond 3 - Post Const Hydrograph type = SCS Runoff Storm frequency = 100 yrs Time interval = 1 min Drainage area = 20.740 ac Basin Slope = 0.0% Tc method = User Total precip. = 5.08 in Storm duration = 6.00 hrs Q (ds) 40.00 30.00 10.00 1.0 2.0 Hyd No. 8 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Pond 3 - Post Const Hyd. No. 8 —100 Year 18 Monday, 04 / 6 / 2015 = 37.21 cfs = 2.47 hrs = 157,787 cuft = 70 = 0 ft = 10.00 min = SCS 6 -Hr = 484 3.0 4.0 5.0 6.0 Q (Cfs) 40.00 30.00 20.00 10.00 1 0.00 7.0 Time (hrs) Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2012 by Autodesk, Inc. v9 Hyd. No. 9 Pond 3 Routed Hydrograph type = Reservoir Storm frequency = 100 yrs Time interval = 1 min Inflow hyd. No. = 8 - Pond 3 - Post Const Reservoir name = BMP 3 Storage Indication method used. Q (Cfs) 40.00 30.00 20.00 10.00 0.00 0 5 --- Hyd No. 9 Peak discharge Time to peak Hyd. volume Max. Elevation Max. Storage Pond 3 Routed Hyd. No. 9 -- 100 Year 19 Monday, 04 / 6 / 2015 = 6.365 cfs = 4.88 hrs = 133,426 cuft = 1037.72 ft = 89,064 cuft 10 15 20 25 30 35 40 45 Hyd No. 8 4ILI I I I Total storage used = 89,064 cuft Q (Cfs) 40.00 30.00 20.00 10.00 —' 0.00 50 Time (hrs) Hydraflow Rainfall Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2012 by Autodesk, Inc. v9 Return Period Intensity - Duration- Frequency Equation Coefficients (FHA) (Yrs) B D E (N/A) 1 57.3018 12.6000 0.8890 45 2 68.6290 13.0000 0.8850 -- 3 0.0000 0.0000 0.0000 - - -- 5 67.5316 12.6000 0.8309 1.35 t0 67.3303 12.4000 0.8000 3,60 25 58.6655 11.0000 0.7384 2.04 50 54.7434 10.3000 0.7025 3 100 47.2780 9.0000 0.6512 0.00 File name: Winston Salem.IDF Intensity = B / (Tc + D) ^E i►111] Monday, 04 / 6 / 2015 Return Period Intensity Values On/hrr (Yrs) 5 min 10 15 20 25 30 35 40 45 50 55 s0 1 4.48 3.58 3.00 2.59 2.28 2.04 1.85 1.69 1.56 1.45 1.35 1.27 2 5.32 428 3,60 3.11 2.74 2.46 2.23 2.04 1.89 1.75 1.64 1.54 3 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5 6.23 5.06 4.29 3.73 3.32 2.99 2.73 2.51 2.33 2.17 2.04 1.92 10 6.85 5.60 4.76 4.17 3.71 3.36 3.07 2.84 2.64 2.47 2.32 2.19 25 7.57 6.20 5.29 4.65 4.16 3.78 3.47 3.22 3.00 2.82 2.66 2.52 50 8.06 6.60 5.66 4.98 4.48 4.08 3.76 3.49 3.27 3.07 2.91 2.76 100 8.48 6.95 5.97 5.28 4.76 4.35 4.02 3.75 3.52 3.32 3.15 3.00 Tc = time in minutes. Values may exceed 60. Precis file name: C:% Users%ashlevwXDocumentslCountry MeadowslWinston Salem.DcD Storm Rainfall Precipitation Table (in) Distribution 1 -yr 2-yr 3 -yr S-yr 10 -yr 25 -yr 50 -yr 100 -yr SCS 24 -hour 2.83 3.42 0.00 4.28 4.96 5.89 6.63 7.40 SCS 6-Hr 1.97 2.38 0.00 2.99 3.45 4.08 4.58 5.08 Huff -1st 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff -2nd 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff -3rd 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff -4th 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff -Indy 0.00 0.00 0100 0.00 0.00 0.00 0.00 0.00 Custom 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Pond No. 1 - BMP 3 - 7.00 - 5.00 -4.00 - 3.00 -2.00 - 1.00 L 0.00 Stage (ft) Project: BMP 3.gpw 12.00 It Riser WeirA - Elev. 1037.00 Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2012 by Autodesk, Inc. v9 Top of pond Elev. 1040.00 --- 16 00 ft Cipolefti weir WeirB - Elev. 1038.00 Bottom of pond Elev. 1034.00 Front View 25-yr NTS - Looking Downstream 10-yr 100-yr 2-yr 50-yr 1 -yr Inflow hydrograph = 5. SCS Runoff - Pond 4 - Post Const Monday, 04 / 6 / 2015 Oo%r%A Al., 4 _ MUD Z - 7.00 - &00 - 5.00 - 4.00 - 3.00 - 2.00 - 1.00 L 0.00 Stage (ft) nyoranow nyorograpns cnension Tor muT� �rvn au zu i z vy numvvasR, inc. vv Top of pond ---\ Elev. 1040.00 Section EIev.1034.00 25 yr NTS 10-yr 100-yr 2-yr 50 -yr 1 yr Inflow hydrograph = 5. SCS Runoff - Pond 4 - Post Const Project: BMP 3.gpw Monday, 04 / 6 / 2015 GUPTON & ASSOCIATES P.A. 2200 Silas Crk. Pkwy. Suite 2 -13 Winston - Salem, N.C. 27103 COUNTRY MEADOWS STORMWATER MANAGEMENT ED STRUCTURE * *See table 2.83 SITE CONDITIONS AND INPUT DATA 1 Factor BASIN #3 1578 Feet Site Data 78 Feet Total Site Area: 20.74 Acres Total Disturbed Area: 20.74 Acres Total Drainage Area Into Structure: 20.74 Acres Proposed BUA/Impervious Area: 3.73 Acres Proposed BUA/Impervious Area: 18.0 % Off -Site Drainage Area: 0 Acres Maximum Off -Site BUA /Impervious Area: 0 % Total BUA/Impervious Area Into Structure: 3.73 Acres Total BUA/Impervious Area Into Structure: 18.0 % Design Data Pre - Developed. * *See table 2.83 Overland Flow Runoff Factor 1 Factor Hydraulic Length: 1578 Feet Hydraulic Height: 78 Feet Time of Concentration, Tc (Pre - developed) : 7.21 Min. Post - Developed: Overland Flow Runoff Factor 1 Factor Hydraulic Length: 2237 Feet Hydraulic Height: 88 Feet Time of Concentration, Tc (Post - developed) : 10.30 Min. *Note: Times of concentration are calculated using Kirpich Method. Use minimum 5 minute Tc. SCS Weighted Curve Number (Pre- developed): SCS Weighted Curve Number (Post- developed): 67.00 CN 70.00 CN Precipitation Depth, 1 yr. 24 hr. Storm: * *See table 2.83 Inches Precipitation Depth, 2 yr. 6 hr. Storm. **See table 2.38 Inches Precipitation Depth, 10 yr. 6 hr. Storm: * *See table 3.45 Inches Precipitation Depth, 25 yr. 6 hr. Storm: * *See table 4.08 Inches GUPTON & ASSOCIATES P.A. 2200 Silas Crk. Pkwy. Suite 2 -13 Winston - Salem, N.C. 27103 COUNTRY MEADOWS STORMWATER MANAGEMENT ED STRUCTURE SITE CONDITIONS AND INPUT DATA BASIN #3 Pre - Developed SCS Runoff Curve Number (CN) Soil Group Description CN Area acres Product of CN x Area P Brush - Weed -Grass Mixt 67 20.74 1389.58 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 I otals 20.74 1;5H9.5H Weighted SCS Curve Number (CN) = 67.00 Post - Developed SCS Runoff Curve Number (CN) Soil Group Description CN Area acres Product of CN x Area B 1/2 Residential 70 20.74 1451.8 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Totals 20.74 1451.80 Weighted SCS Curve Number (CN) = 70.00 "See table 8.03e *Reference made to "Erosion and Sediment Control Planning and Design Manual' State of N.C. COUNTRY MEADOWS STORMWATER MANAGEMENT ED STRUCTURE TEMPORARY BASIN DESIGN Basin #3 BASIN CONFIGURATION (RISER & SKIMMER) Width Length Proposed Basin Dimension: X Basin Side Slopes: 1 Minimum Length /Width Ratio: Maximum Length/Width Ratio: Proposed Length /Width Ratio: Computed Storage Requirements: Soil Storage Volume, S : Required Surface Area: (A =435 x 10 -yr. Qp) Required Storage Volume (1800 C. F. x Disturbed Ac): Temporary Sediment Storage (0.5 Acre - Inches): Storage Estimate Before Cleanout Interval, Vc: Cleanout Interval: Water Quality Release Orifice for Faircloth Skimmer: Design Head (Constant for Skimmer), h: Maximum Release Rate: Minimum Release Rate: Maximum Hole Size: Minimum Hole Size: Faircloth Skimmer Barrel Size 0.038 S.F. 0.015 S.F. Faircloth Skimmer Orifice Size Used: 0.028 S.F. Orifice Size Release Rates: 0.0687 CFS Required Basin Depth (min. 2'): Crest Height of Riser/Weir: Basin Volume as Configured at Top of Riser: Surface Area 26,700.00 2:1 6:1 3.4:1 S.F. 4.29 Inches 26,233.02 S.F. 37,332.00 Cu.Ft. 37,643.10 Cu.Ft. 13,789.33 Cu.Ft. 74,556.38 Days 3.0 In 2 Days 5 Days 2.65 In. Dia 1.68 In. Dia 3.0 In. Dia. 2.25 In. Dia. 2.7 Days 1.40 Ft. 3.00 Ft. 74,556.38 C.F. COUNTRY MEADOWS STORMWATER MANAGEMENT ED STRUCTURE PERMANENT BASIN DESIGN Basin #3 BASIN CONFIGURATION (RISER & ORIFICE Width Length Surface Area In. Approx. Basin Dimension: X 26,700.00 S.F. Basin Side Slopes: 1.4 In. Minimum Length /Width Ratio: 1.5:1 Days Proposed Length /Width Ratio: 3.4:1 Days Computed Storage Requirements: 0.055 S.F. 3.19 In. Dia. Permanent Pool Average Depth: 0 Ft. Percent Impervious Cover: 18.0 % Required SA/DA for 85% TSS Removal: 0.39 % Required SA/DA for 90% TSS Removal: 1.38 % Surface Area / Drainage Area Ratio: 2.96 % Required Surface Area: (85% TSS Removal): 8,040.57 S.F. Required Surface Area: (90% TSS Removal): 12,467.39 S.F. Soil Storage Volume, S : 4.29 Inches Required Permanent Sediment Storage (0.125 Acre - Inches): 9,410.78 Cu.Ft. Required Permanent Sediment Storage Depth (min. 1'): 0.35 Ft. Water Quality Drawdown Orifice: Maximum Head: 4.3 In. Minimum Head: 0.0 In. Design Head (h max /3), h: 1.4 In. Maximum Release Rate: 2 Days Minimum Release Rate: 5 Days Maximum Hole Size: 0.055 S.F. 3.19 In. Dia. Minimum Hole Size: 0.022 S.F. 2.02 In. Dia. Conduit Size Used: 12.0 In. Dia. Orifice Size Used: 0.034 S.F. 2.50 In. Dia. Orifice Size Release Rates: 0.0586 CFS 3.2 Days Crest Height of Spillway: 4.00 Ft. Basin Volume as Configured at Top of Spillway: 94,978.72 C. F. COUNTRY MEADOWS STORMWATER MANAGEMENT ED STRUCTURE COMPUTED DESIGN DATA Basin #3 COMPUTED 1 -YR. WATER QUALITY DATA Volumetric Runoff Coefficient, Rv: 0.212 Water Quality Volume (1 -Inch Storm), WQv: 15,950.22 Cu.Ft. Water Quality Runoff Volume, Qa: 0.21 Inches Water Quality CN (using Qa): 87 CN Intial Abstraction, la: = 0.311 la /P(1 ") = 0.311 Qu (TR -55)= 910.00 csm /in Time of Concentration, Tc Intensity for 1 yr. Storm, I Peak Rate of Runoff, Tp Water Quality Peak Discharge, Qp Runoff Depth, Q' : Water Quality Drawdown Elevation: Water Quality Volume Provided: (Elev. 1034 to 1037) (Volume between Permanent Pool and Riser Orifice) COMPUTED 25 -YR. WATER QUANTITY DATA Pre - developed Runoff Volume: Post - developed Runoff Volume: Runoff Volume to be Detained (Post - Pre): Water Quantity Volume Provided: (Elev. 1034 to 1037) Discharge Rate @ 48 hrs: Approx. Time to Complete Discharge PRE /POST DEVELOPED PEAK DISCHARGES (max. 120 hrs.) Post - Developed Peak Discharge (cfs) 2.486 5.57 16.22 23.77 30.31 37.21 7.21 Min. 4.48 In. /hr. 14.25 Min. 6.2 cfs 0.62 Inches 1034.00 69,064.00 Cu.Ft. 87,663 Pre - Developed 104,145 Peak Discharge Design Storm (cfs) 1 yr. - 24 hr 1.214 2 yr. -6 hr. 3.72 10 yr. - 6 hr. 12.92 25 yr. - 6 hr. 19.68 50 yr. - 6 hr. 25.69 100 yr. - 6 hr. 32.12 (max. 120 hrs.) Post - Developed Peak Discharge (cfs) 2.486 5.57 16.22 23.77 30.31 37.21 7.21 Min. 4.48 In. /hr. 14.25 Min. 6.2 cfs 0.62 Inches 1034.00 69,064.00 Cu.Ft. 87,663 Cu.Ft. 104,145 Cu.Ft. 16,482 Cu.Ft. Cu.Ft. 69,064 0.226 cfs 14 hr. Routed BMP #4 Peak Discharge (cfs) 0.174 0.244 0.466 4.355 6.013 6.365 Depth- Duration - Frequency Table Winston - Salem, NC Winston - Salem, NC Return Period Return Period Duration Duration 1 -yr 2 -yr 5 -yr 10 -yr 25 -yr 50 -yr 100 -yr in /hr in. in. in. in. in. in. in. 5 min 0.37 0.44 0.52 0.57 0.63 0.67 0.71 10 min 0.60 0.71 0.83 0.92 1.01 1.07 1.12 15 min 0.74 0.89 1.05 1.16 1.28 1.35 1.42 30 min 1.02 1.23 1.50 1.68 1.89 2.04 2.17 60 min 1.27 1.54 1.92 2.19 2.52 2.76 3.00 2 hr 1.50 1.82 2.28 2.62 3.06 3.40 3.73 3 hr 1.61 1.95 2.45 2.82 3.31 3.68 4.05 6 hr 1.97 2.38 2.99 3.45 4.08 4.58 5.08 12 hr 2.35 2.85 3.58 4.16 4.97 5.61 6.29 24 hr 2.83 3.42 4.28 4.96 5.89 6.63 7.40 Intensity- Duration - Frequency Table Winston - Salem, NC Return Period Duration 1 -yr 2 -yr 5 -yr 10 -yr 25 -yr 50 -yr 100 -yr in /hr in /hr in /hr in /hr in /hr in /hr in /hr 5 min 4.48 5.32 6.24 6.86 7.58 8.06 8.48 10 min 3.58 4.25 5.00 5.50 6.05 6.42 6.74 15 min 2.98 3.56 4.22 4.63 5.11 5.42 5.68 30 min 2.04 2.46 2.99 3.36 3.78 4.08 4.35 60 min 1.27 1.54 1.92 2.19 2.52 2.76 3.00 2 hr 0.75 0.91 1.14 1.31 1.53 1.70 1.87 3 hr 0.54 0.65 0.82 0.94 1.10 1.23 1.35 6 hr 0.33 0.40 0.50 0.58 0.68 0.76 0.85 12 hr 0.20 0.24 0.30 0.35 0.41 0.47 0.52 24 hr 0.12 0.14 0.18 0.21 0.25 0.28 0.31 Reference Data v LSIOZ s o adv 0 C9 91 1 6(/P7iDN &WEBS, RBI. P.O. Box 1070 King, N.C. 27021 336 - 985 -6519 COUNTRY MEADOWS Mountain View Road King, N.C. PERMANENT E.D. BASIN #4 4/6/2015 Developer Mountain View Commercial Properties, LLC 13146 NW Gilson Road Palm City, FL 34990 276 - 755 -4139 Hydraflow Table of Contents Country Meadows.gpw Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2012 by Autodesk, Inc. v9 Monday, 04 / 6 / 2015 1 -Year Hydrograph No. 4, SCS Runoff, Pond 4 - Pre Const ................................ ............................... 1 Hydrograph No. 5, SCS Runoff, Pond 4 - Post Const ............................... ............................... 2 Hydrograph No. 6, Reservoir, Pond 4 Routed ........................................... ............................... 3 PondReport - BMP 4 ................................................................... ............................... 4 2 - Year Hydrograph No. 4, SCS Runoff, Pond 4 - Pre Const ................................ ............................... 5 Hydrograph No. 5, SCS Runoff, Pond 4 - Post Const ............................... ............................... 6 Hydrograph No. 6, Reservoir, Pond 4 Routed ........................................... ............................... 7 10 - Year Hydrograph No. 4, SCS Runoff, Pond 4 - Pre Const ................................ ............................... 8 Hydrograph No. 5, SCS Runoff, Pond 4 - Post Const ............................... ............................... 9 Hydrograph No. 6, Reservoir, Pond 4 Routed ......................................... ............................... 10 25 - Year Hydrograph No. 4, SCS Runoff, Pond 4 - Pre Const .............................. ............................... 11 Hydrograph No. 5, SCS Runoff, Pond 4 - Post Const ............................. ............................... 12 Hydrograph No. 6, Reservoir, Pond 4 Routed ......................................... ............................... 13 50 - Year Hydrograph No. 4, SCS Runoff, Pond 4 - Pre Const .............................. ............................... 14 Hydrograph No. 5, SCS Runoff, Pond 4 - Post Const ............................. ............................... 15 Hydrograph No. 6, Reservoir, Pond 4 Routed ......................................... ............................... 16 100 - Year Hydrograph No. 4, SCS Runoff, Pond 4 - Pre Const .............................. ............................... 17 Hydrograph No. 5, SCS Runoff, Pond 4 - Post Const ............................. ............................... 18 Hydrograph No. 6, Reservoir, Pond 4 Routed ......................................... ............................... 19 IDFReport ................................................................................... ............................... 20 Detention Pond Riser / Outlet - Front View ............................. ............................... 21 Detention Pond Riser / Outlet - Section View ......................... ............................... 22 Input Data Reference Data Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2012 by Autodesk, Inc. v9 Hyd. No. 4 Pond 4 - Pre Const Hydrograph type = SCS Runoff Peak discharge Storm frequency = 1 yrs Time to peak Time interval = 1 min Hyd. volume Drainage area = 15.800 ac Curve number Basin Slope = 0.0% Hydraulic length Tc method = User Time of conc. (Tc) Total precip. = 1.97 in Distribution Storm duration = 6.00 hrs Shape factor Q (Cfs) 2.00 1.00 0.00 -1 0.0 Pond 4 - Pre Const Hyd. No. 4 —1 Year 1 Monday, 04 / 6 / 2015 = 1.028 cfs = 2.57 hrs = 9,707 cuft = 67 = Oft = 5.00 min = SCS 6 -Hr = 484 1.0 2.0 3.0 4.0 5.0 6.0 Hyd No. 4 Q (Cfs) 2.00 1.00 1 0.00 7.0 Time (hrs) Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2012 by Autodesk, Inc. v9 Hyd. No. 5 Pond 4 - Post Const Hydrograph type = SCS Runoff Storm frequency = 1 yrs Time interval = 1 min Drainage area = 15.800 ac Basin Slope = 0.0% Tc method = User Total precip. = 1.97 in Storm duration = 6.00 hrs Q (cfs) 3.00 2.00 1.00 0.00 1 0.0 1.0 2.0 Hyd No. 5 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Pond 4 - Post Const Hyd. No. 5 —1 Year �q Monday, 0416 / 2015 = 2.126 cfs = 2.53 hrs = 13,567 tuft = 70 = 0 ft = 5.00 min = SCS 6 -Hr = 484 3.0 4.0 5.0 6.0 Q (cfs) 3.00 2.00 1.00 —L-- 0.00 7.0 Time (hrs) Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2012 by Autodesk, Inc. v9 Hyd. No. 6 Pond 4 Routed Hydrograph type = Reservoir Storm frequency = 1 yrs Time interval = 1 min Inflow hyd. No. = 5 - Pond 4 - Post Const Reservoir name = BMP 4 Storage Indication method used. Q (cfs) 3.00 2.00 1.00 0.00 1 0 Peak discharge Time to peak Hyd. volume Max. Elevation Max. Storage Pond 4 Routed Hyd. No. 6 -- 1 Year 3 Monday, 04 l6 1 2015 = 0.128 cfs = 6.12 hrs = 10,721 cuft = 1017.82 ft = 12,528 cuft 5 10 15 20 25 30 35 40 45 Hyd No. 6 Hyd No. 5 Total storage used = 12,528 cuft Q (cfs) 3.00 2.00 1.00 - L 0.00 50 Time (hrs) Pond Report Note: Culvert/Orifice outllows are analyzed under inlet (ic) and outlet (oc) control. Weir risers chocked for orifice conditions (ic) and submergence (s). Stage / Storage / Discharge Table 4 Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2012 by Autodesk, Inc. v9 Monday, 04 / 6 / 2015 Pond No. 3 - BMP 4 Elevation Ch► A Clv B Clv C PrfRsr Wr A Wr B Wr C Wr D Exfll User Total Pond Data cuft ft cfs cis cfs cfs cfs cfs cfs Contours - User - defined contour areas. Average end area method used for volume calculation. Begining Elevation = 1017.00 ft Stage / Storage Table 0 1017.00 0.00 0.00 - - 0.00 0.00 -- Stage (ft) Elevation (ft) 1.00 Contour area (sqft) Incr. Storage (cuft) Total storage (cult) 0.15 is - 0.00 1017.00 0.00 - 13,702 2.00 0 0 0.22 is 1.00 1018.00 - 0.00 16,944 -- -- - 0.219 15,323 15,323 1020.00 2.00 1019.00 0.27 is - 20,293 0.00 - 18,619 33,942 81,478 3.00 1020.00 7.07 is 23,743 - 7.01s 22,018 55,960 5.00 4.00 1021.00 1022.00 27,294 0.00 is - 25,519 81,478 - -- - 87.91 5.00 1022.00 30,945 29,120 110,598 Culvert / Orifice Structures Weir Structures [A] [B] [C] [PrfRsr] [A] [B] [C] [D] Rise (in) = 12.00 2.50 0.00 0.00 Crest Len (ft) = 16.00 24.00 0.00 0.00 Span (in) = 12.00 2.50 0.00 0.00 Crest El. (ft) = 1020.00 1021.00 0.00 0.00 No. Barrels = 1 1 0 0 Weir Coeff. = 3.33 3.33 3.33 3.33 Invert El. (ft) = 1017.00 1017.10 0.00 0.00 Weir Type = 1 Cipiti -- -- Length (ft) = 50.00 0.00 0.00 0.00 Multi -Stage = Yes No No No Slope ( %) = 6.06 0.00 0.00 n/a N -Value = .013 .013 .013 n/a Orifice Coeff. = 0.60 0.60 0.60 0.60 Exfil.(Irdhr) = 0.000 (by Wet area) MUM -Stage = rda Yes No No TW Elev. (ft) = 0.00 Note: Culvert/Orifice outllows are analyzed under inlet (ic) and outlet (oc) control. Weir risers chocked for orifice conditions (ic) and submergence (s). Stage / Storage / Discharge Table Stage Storage Elevation Ch► A Clv B Clv C PrfRsr Wr A Wr B Wr C Wr D Exfll User Total ft cuft ft cfs cis cfs cfs cfs cfs cfs cfs cis cis cis 0.00 0 1017.00 0.00 0.00 - - 0.00 0.00 -- - - - 0.000 1.00 15,323 1018.00 0.15 is 0.15 is - - 0.00 0.00 - - - - 0.146 2.00 33,942 1019.00 0.22 is 0.22 is - - 0.00 0.00 - -- -- - 0.219 3.00 55,960 1020.00 0.28 is 0.27 is - - 0.00 0.00 - - - - 0.272 4.00 81,478 1021.00 7.07 is 0.01 is - - 7.01s 0.00 - - - - 7.016 5.00 110,598 1022.00 8.02 is 0.00 is - - 7.99s 79.92 - - -- - 87.91 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 31)® 2012 by Autodesk, Inc. v9 Hyd. No. 4 Pond 4 - Pre Const Hydrograph type = SCS Runoff Peak discharge Storm frequency = 2 yrs Time to peak Time interval = 1 min Hyd. volume Drainage area = 15.800 ac Curve number Basin Slope = 0.0% Hydraulic length Tc method = User Time of conc. (Tc) Total precip. = 2.38 in Distribution Storm duration = 6.00 hrs Shape factor Q (cfs) 4.00 3.00 41I17 1.00 0.00-1— 0.0 1.0 2.0 Hyd No. 4 Pond 4 - Pre Const Hyd. No. 4 — 2 Year Ei Monday, 04 / 6 12015 = 3.090 cfs = 2.53 hrs = 18,209 cuft = 67 = 0 ft = 5.00 min = SCS 6 -Hr = 484 3.0 4.0 5.0 6.0 Q (Cfs) 4.00 3.00 1*1I11 1.00 ---J- 0.00 7.0 Time (hrs) Hydrograph Report Hydraflow Hydrographs Extension for ALOCAD® Civil 3D® 2012 by Autodesk, Inc. v9 Hyd. No. 5 Pond 4 - Post Const Hydrograph type = SCS Runoff Storm frequency = 2 yrs Time interval = 1 min Drainage area = 15.800 ac Basin Slope = 0.0% Tc method = User Total precip. = 2.38 in Storm duration = 6.00 hrs Q (Cfs) 5.00 4.00 moil] F�I�] 1.00 0.00 ' 0.0 1.0 Hyd No. 5 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Pond 4 - Post Const Hyd. No. 5 — 2 Year 6 Monday, 0416 / 2015 = 4.572 cfs = 2.53 hrs = 23,614 cuft = 70 = Oft = 5.00 min = SCS 6 -Hr = 484 2.0 3.0 4.0 5.0 6.0 Q (Cfs) 5.00 4.00 3.00 2.00 1.00 1 0.00 7.0 Time (hrs) Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3136 2012 by Autodesk, Inc. v9 Hyd. No. 6 Pond 4 Routed Hydrograph type = Reservoir Storm frequency = 2 yrs Time interval = 1 min Inflow hyd. No. = 5 - Pond 4 - Post Const Reservoir name = BMP 4 Storage Indication method used. Q (cfs) 5.00 4.00 3.00 2.00 1.00 W 1 11 ' I Peak discharge Time to peak Hyd. volume Max. Elevation Max. Storage Pond 4 Routed Hyd. No. 6 -- 2 Year 5 10 15 20 Hyd No. 6 Hyd No. 5 7 Monday, 0416 / 2015 = 0.176 cfs = 6.12 hrs = 19,061 cuft = 1018.35 ft = 21,898 cuft 25 30 35 40 45 FFlM I Total storage used = 21,898 cuft Q (cfs) 5.00 4.00 3.00 2.00 1.00 1 0.00 50 Time (hrs) 8 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3138 2012 by Autodesk, Inc. v9 Monday, 04 / 6 / 2015 Hyd. No. 4 Pond 4 - Pre Const Hydrograph type = SCS Runoff Peak discharge = 10.44 cfs Storm frequency = 10 yrs. Time to peak = 2.52 hrs Time interval = 1 min Hyd. volume = 48,626 cuft Drainage area = 15.800 ac Curve number = 67 Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 3.45 in Distribution = SCS 6 -Hr Storm duration = 6.00 hrs Shape factor = 484 Pond 4 - Pre Const Q (mss) Hyd. No. 4 —10 Year 12.00 10.00 8.00 6.00 4.00 2.00 0.00 ' ' 0.0 1.0 Hyd No. 4 Q (Cfs) 12.00 10.00 8.00 6.00 4.00 2.00 0.00 2.0 3.0 4.0 5.0 6.0 7.0 Time (hrs) 9 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3139 2012 by Autodesk, Inc. v9 Monday, 04 / 6 / 2015 Hyd. No. 5 Pond 4 - Post Const Hydrograph type = SCS Runoff Peak discharge = 13.02 cfs Storm frequency = 10 yrs Time to peak = 2.45 hrs Time interval = 1 min Hyd. volume = 57,806 cuft Drainage area = 15.800 ac Curve number = 70 Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 3.45 in Distribution = SCS 6 -Hr Storm duration = 6.00 hrs Shape factor = 484 Pond 4 - Post Const Q (ds) Hyd. No. 5 —10 Year 14.00 12.00 10.00 8.00 6.00 4.00 2.00 0.00 ' ' 0.0 1.0 Hyd No. 5 Q (Cfs) 14.00 12.00 10.00 8.00 6.00 4.00 2.00 0.00 2.0 3.0 4.0 5.0 6.0 7.0 Time (hrs) 10 Hydrograph Report Hydrallow Hydrographs Extension for AutoCAD® Civil 3D® 2012 by Autodesk, Inc. v9 Monday, 04 / 6 / 2015 Hyd. No. 6 Pond 4 Routed Hydrograph type = Reservoir Peak discharge = 0.269 cfs Storm frequency = 10 yrs Time to peak = 6.13 hrs Time interval = 1 min Hyd. volume = 36,650 cuft Inflow hyd. No. = 5 - Pond 4 - Post Const Max. Elevation = 1019.95 ft Reservoir name = BMP 4 Max. Storage = 54,785 cuft Storage Indication method used Pond 4 Routed Q (cfs) Hyd. No. 6 -- 10 Year 14.00 12.00 10.00 8.00 6.00 4.00 2.00 0.00 0 5 - Hyd No. 6 0.00 10 15 20 25 30 35 40 45 50 Time (hrs) Hyd No. 5 L= I Total storage used = 54,785 cult Q (ds) 18.00 15.00 12.00 6.00 91[1117 0.00-1- 0.0 Pond 4 - Pre Const Hyd. No. 4 - 25 Year Q WS) 18.00 15.00 12.00 9%0I87 6.00 3.00 0.00 1.0 2.0 3.0 4.0 5.0 6.0 7.0 Hyd No. 4 Time (hrs) 11 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 31341) 2012 by Autodesk, Inc. v9 Monday, 04 / 6 / 2015 Hyd. No. 4 Pond 4 - Pre Const Hydrograph type = SCS Runoff Peak discharge = 16.04 cfs Storm frequency = 25 yrs Time to peak = 2.45 hrs Time interval = 1 min Hyd. volume = 70,636 cuft Drainage area = 15.800 ac Curve number = 67 Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 4.08 in Distribution = SCS 6 -Hr Storm duration = 6.00 hrs Shape factor = 484 Q (ds) 18.00 15.00 12.00 6.00 91[1117 0.00-1- 0.0 Pond 4 - Pre Const Hyd. No. 4 - 25 Year Q WS) 18.00 15.00 12.00 9%0I87 6.00 3.00 0.00 1.0 2.0 3.0 4.0 5.0 6.0 7.0 Hyd No. 4 Time (hrs) Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2012 by Autodesk, Inc. v9 Hyd. No. 5 Pond 4 - Post Const Hydrograph type = SCS Runoff Storm frequency = 25 yrs Time interval = 1 min Drainage area = 15.800 ac Basin Slope = 0.0% Tc method = User Total precip. = 4.08 in Storm duration = 6.00 hrs Q (Cfs) 21.00 18.00 15.00 12.00 9.00 6.00 3.00 000 0.0 1.0 Hyd No. 5 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Pond 4 - Post Const Hyd. No. 5 — 25 Year 12 Monday, 0416 / 2015 19.23 cfs 2.43 hrs 81,819 cuft 70 0 ft 5.00 min SCS 6 -Hr 484 Q (Cfs) 21.00 18.00 15.00 12.00 9.00 6.00 3.00 0 00 2.0 3.0 4.0 5.0 6.0 7.0 Time (hrs) Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2012 by Autodesk, Inc. v9 Hyd. No. 6 Pond 4 Routed Hydrograph type = Reservoir Peak discharge Storm frequency = 25 yrs Time to peak Time interval = 1 min Hyd. volume Inflow hyd. No. = 5 - Pond 4 - Post Const Max. Elevation Reservoir name = BMP 4 Max. Storage Storage Indication method used � u IL ! ! 0 5 Hyd No. 6 Pond 4 Routed Hyd. No. 6 -- 25 Year 13 Monday, 04 / 6 / 2015 = 3.480 cfs = 5.02 hrs = 59,339 cuft = 1020.15 ft = 59,828 cuft ' 0.00 10 15 20 25 30 35 40 45 50 Time (hrs) Hyd No. 5 F=1 Total storage used = 59,828 cult 14 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3106 2012 by Autodesk, Inc_ v9 Monday, 04 / 6 / 2015 Hyd. No. 4 Pond 4 - Pre Const Hydrograph type = SCS Runoff Peak discharge = 20.98 cfs Storm frequency = 50 yrs Time to peak = 2.43 hrs Time interval = 1 min Hyd. volume = 89,711 cult Drainage area = 15.800 ac Curve number = 67 Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 4.58 in Distribution = SCS 6-Hr Storm duration = 6.00 hrs Shape factor = 484 Q (Cfs) 21.00 18.00 15.00 12.00 9.00 6.00 3.00 000 0.0 1.0 Hyd No. 4 Pond 4 - Pre Const Hyd. No. 4 — 50 Year Q (cfs) 21.00 18.00 15.00 12.00 9.00 6.00 3.00 0 00 2.0 3.0 4.0 5.0 6.0 7.0 Time (hrs) Hydrograph Report Hydraflow Hydrographs Extension for AutoCA1W Civil 3138 2012 by Autodesk. Inc. v9 Hyd. No. 5 Pond 4 - Post Const Hydrograph type = SCS Runoff Storm frequency = 50 yrs Time interval = 1 min Drainage area = 15.800 ac Basin Slope = 0.0% Tc method = User Total precip. = 4.58 in Storm duration = 6.00 hrs Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of cons. (Tc) Distribution Shape factor Pond 4 - Post Const Q (S) Hyd. No. 5 — 50 Year 28.00 24.00 20.00 16.00 12.00 8.00 4.00 000 0.0 1.0 2.0 3.0 4.0 5.0 6.0 Hyd No. 5 15 Monday, 04 / 6 / 2015 24.56 cfs 2.43 hrs 102,359 cuft 70 0 ft 5.00 min SCS 6 -Hr 484 Q (Cfs) 28.00 24.00 20.00 16.00 12.00 8.00 4.00 0 00 7.0 Time (hrs) Storage Indication method used Q (cfs) 28.00 24.00 20.00 16.00 12.00 8.00 4.00 I I so 5 Hyd No. 6 Pond 4 Routed Hyd. No. 6 -- 50 Year -4' - - ' 0.00 10 15 20 25 30 35 40 45 50 Time (hrs) Hyd No. 5 T= I Total storage used = 61,359 cult 16 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2012 by Autodesk, Inc. v9 Monday, 04 / 6 / 2015 Hyd. No. 6 Pond 4 Routed Hydrograph type = Reservoir Peak discharge = 5.080 cfs Storm frequency = 50 yrs Time to peak = 4.17 hrs Time interval = 1 min Hyd. volume = 79,853 cuft Inflow hyd. No. = 5 - Pond 4 - Post Const Max. Elevation = 1020.21 ft Reservoir name = BMP 4 Max. Storage = 61,359 cuft Storage Indication method used Q (cfs) 28.00 24.00 20.00 16.00 12.00 8.00 4.00 I I so 5 Hyd No. 6 Pond 4 Routed Hyd. No. 6 -- 50 Year -4' - - ' 0.00 10 15 20 25 30 35 40 45 50 Time (hrs) Hyd No. 5 T= I Total storage used = 61,359 cult Q (Cfs) 28.00 24.00 20.00 16.00 12.00 8.00 4.00 0 00 0.0 1.0 Hyd No. 4 Pond 4 - Pre Const Hyd. No. 4 — 100 Year 2.0 3.0 4.0 5.0 6.0 Q (Cfs) 28.00 24.00 20.00 16.00 12.00 8.00 4.00 �- 0.00 7.0 Time (hrs) 17 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3138 2012 by Autodesk, Inc. v9 Monday, 04 / 6 / 2015 Hyd. No. 4 Pond 4 - Pre Const Hydrograph type = SCS Runoff Peak discharge = 26.24 cfs Storm frequency = 100 yrs Time to peak = 2.43 hrs Time interval = 1 min Hyd. volume = 109,951 cuft Drainage area = 15.800 ac Curve number = 67 Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 5.08 in Distribution = SCS 6 -Hr Storm duration = 6.00 hrs Shape factor = 484 Q (Cfs) 28.00 24.00 20.00 16.00 12.00 8.00 4.00 0 00 0.0 1.0 Hyd No. 4 Pond 4 - Pre Const Hyd. No. 4 — 100 Year 2.0 3.0 4.0 5.0 6.0 Q (Cfs) 28.00 24.00 20.00 16.00 12.00 8.00 4.00 �- 0.00 7.0 Time (hrs) 18 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3138 2012 by Autodesk, Inc. v9 Monday, 0416 / 2015 Hyd. No. 5 Pond 4 - Post Const Hydrograph type = SCS Runoff Peak discharge = 30.14 cfs Storm frequency = 100 yrs Time to peak = 2.43 hrs Time interval = 1 min Hyd. volume = 123,961 cuft Drainage area = 15.800 ac Curve number = 70 Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 5.08 in Distribution = SCS 6-Hr Storm duration = 6.00 hrs Shape factor = 484 Q (dr.) 35.00 30.00 25.00 20.00 15.00 10.00 5.00 0 00 0.0 1.0 Hyd No. 5 Pond 4 - Post Const Hyd. No. 5 —100 Year Q (efs) 35.00 30.00 25.00 20.00 15.00 10.00 5.00 000 2.0 3.0 4.0 5.0 6.0 7.0 Time (hrs) Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2012 by Autodesk, Inc. v9 Hyd. No. 6 Time to peak Pond 4 Routed Hyd. volume Hydrograph type = Reservoir Storm frequency = 100 yrs Time interval = 1 min Inflow hyd. No. = 5 - Pond 4 - Post Const Reservoir name = BMP 4 Storage Indication method used. Q (cfs) 35.00 30.00 25.00 15.00 10.00 5.00 0.00 1 0 19 Monday, 04 / 6/ 2015 Peak discharge = 6.298 cfs Time to peak = 3.97 hrs Hyd. volume = 101,430 cuft Max. Elevation = 1020.34 ft Max. Storage = 64,705 cuft Pond 4 Routed Hyd. No. 6 -- 100 Year 5 10 15 20 25 30 35 40 45 Hyd No. 6 Hyd No. 5 [III I Total storage used = 64,705 cuft Q (cfs) 35.00 30.00 25.00 20.00 15.00 10.00 5.00 1 0.00 50 Time (hrs) Hydraflow Rainfall Report Hydrallow Hydrographs Extension for AutoCAD® Civil 3D® 2012 by Autodesk, Inc. v9 Return Period Intensity- Durallon- Frequency Equation Coefficients (FHA) (Yrs) B D E (WA) 1 57.3018 12.6000 0.8890 45 2 68.6290 13.0000 0.8850 4.48 3 0.0000 0.0000 0.0000 2.04 5 67.5316 12.6000 0.8309 1.35 10 67.3303 12.4000 0.8000 3.60 25 58.6655 11.0000 0.7384 2.04 50 54.7434 10.3000 0.7025 3 100 47.2780 9.0000 0.6512 0.00 File name: Winston Salem.IDF Intensity = B / (Tc + D) ^E 20 Monday, 04 / 6 / 2015 Return Period Intensity Values (in/hr) (Yrs) 5 min 10 15 20 25 30 35 40 45 50 55 50 1 4.48 3.58 3.00 2.59 2.28 2.04 1.85 1.69 1.56 1.45 1.35 1.27 2 5.32 4.28 3.60 3.11 2.74 2.46 2.23 2.04 1.89 1.75 1.64 1.54 3 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5 6.23 5.06 4.29 3.73 3.32 2.99 2.73 2.51 2.33 2.17 2.04 1.92 10 6.85 5.60 4.76 4.17 3.71 3.36 3.07 2.84 2.64 2.47 2.32 2.19 25 7.57 6.20 5.29 4.65 4.16 3.78 3.47 3.22 3.00 2.82 2.66 2.52 50 8.06 6.60 5.66 4.98 4.48 4.08 3.76 3.49 3.27 3.07 2.91 2.76 100 8.48 6.95 5.97 5.28 4.76 4.35 4.02 3.75 3.52 3.32 3.15 3.00 Tc = time in minutes. Values may exceed 60. Precio. file name- C_ 1UserslashlevwlDocumentslCountry MeadowslWinston Salem.Dw Storm Rainfall Precipitation Table (in) Distribution 1 -yr 2 -yr 3-yr 5-yr 10-yr 25-yr 50-yr 100-yr SCS 24 -hour 2.83 3.42 0.00 4.28 4.96 5.89 6.63 7.40 SCS 6-Hr 1.97 2.38 0.00 2.99 3.45 4.08 4.58 5.08 Huff -1st 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff -2nd 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff -3rd 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff -4th 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff -Indy 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Custom 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Pond No. 3 - B M P 4 Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2012 by Autodssk, Inc. v9 6.00 Top of pond Elev. 1022.00 ---- 5.00 24.00 ft Cipoletti weir 16.00 ft Riser WeirB - Elev. 1021.00 400 WeirA - Elev 1020 00 3.00 2.00 1.00 2.50 in orifice CuIvB -Inv. 1017.10 CulvA - 50.0 LF of 12.0 in @ 6.06% 0.00 Stage (ft) /\ Section , NTS �— Boom 1 .0000 25-yr 10-yr 1 oo-yr 2 -yr 50-yr 1-yr Inflow hydrograph = 5. SCS Runoff - Pond 4 - Post Const Project: BMP 3.gpw Monday, 04 / 6 12015 Pond No. 3 - BMP 4 -6.00 -5.00 -4.00 16.00 It Riser WeirA - Elev. 1020.00 -3.00 -2.00 -1.00 L— 0.00 stew (R) /\ Project: BMP 3.gpw Hydraflow Hydrographs Extension for AuW-AD® Civil 3D® 2012 by Autodwk, Inc. v9 Top of pond Elev. 1022.00 24.00 ft Cipoletfl weir WelrB - Elev. 1021.00 _ 51 0LFof12.0in @6.06% C IvA - Inv. 1017.00 2.5 in nfice Cul B - v 1017 10 0-- o Front View Elleev. 1017.0000 NTS - Looking Downstream 25-yr 10-yr 100-yr 2 -yr 50-yr 1 -yr Infkxw hydrograph = S. SCS Runoff - Pond 4 - Post Const Monday, 0416 / 2015 GUPTON & ASSOCIATES P.A. 2200 Silas Crk. Pkwy. Suite 2 -13 Winston - Salem, N.C. 27103 COUNTRY MEADOWS STORMWATER MANAGEMENT ED STRUCTURE SITE CONDITIONS AND INPUT DATA BASIN #4 Site Data Total Site Area: 15.80 Acres Total Disturbed Area: 15.80 Acres Total Drainage Area Into Structure: 15.80 Acres Proposed BUA/Impervious Area: 2.84 Acres Proposed BUA/lmpervious Area: 18.0 % Off -Site Drainage Area: 0 Acres Maximum Off -Site BUA/Impervious Area: 0 % Total BUA/Impervious Area Into Structure: 2.84 Acres Total BUA/Impervious Area Into Structure: 18.0 % Desian Data Pre - Developed: Overland Flow Runoff Factor Factor Hydraulic Length: Feet Hydraulic Height: Feet Time of Concentration, Tc (Pre - developed) : 5.61 Min. Post - Developed Overland Flow Runoff Factor Factor Hydraulic Length: Feet Hydraulic Height: Feet Time of Concentration, Tc (Post - developed) : 4.95 Min. *Note: Times of concentration are calculated using Kirpich Method. Use minimum 5 minute Tc. SCS Weighted Curve Number (Pre - developed): 67.00 CN SCS Weighted Curve Number (Post - developed): 70.00 CN Precipitation Depth, 1 yr. 24 hr. Storm: **See table 2.83 Inches Precipitation Depth, 2 yr. 6 hr. Storm: **See table Inches Precipitation Depth, 10 yr. 6 hr. Storm: *`See table Inches Precipitation Depth, 25 yr. 6 hr. Storm: * *See table 4.08 Inches CUPTON & ASSOCIATES P.A. 2200 Silas Crk. Pkwy. Suite 2 -13 Winston - Salem, N.C. 27103 COUNTRY MEADOWS RMWATER MANAGEMENT ED STRUCTURE SITE CONDITIONS AND INPUT DATA BASIN #4 Pre - Developed SCS Runoff Curve Number (CN) Soil Grou Description CN Area acres Product of CN x Area B Brush - Weed -Grass Mixt 67 15.8 1058.6 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Totals 15.80 1058.60 Weighted SCS Curve Number (CN) = 67.00 Post - Developed SCS Runoff Curve Number (CN) Soil G_ rou Description CN Area acres Product of CN x Area 1/2 Residential 70 15.8 1106 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 I otals 75.55 I luu.uu Weighted SCS Curve Number (CN) = 70.00 'See table 8.03e `Reference made to "Erosion and Sediment Control Planning and Design Manual" State of N.C. COUNTRY MEADOWS STORMWATER MANAGEMENT ED STRUCTURE TEMPORARY BASIN DESIGN Basin #4 BASIN CONFIGURATION (RISER & SKIMMER) Width Length Proposed Basin Dimension: X Basin Side Slopes: 1 Minimum Length /Width Ratio: Maximum Length/Width Ratio: Proposed Length /Width Ratio: Computed Storage Requirements: Soil Storage Volume, S : Required Surface Area: (A =435 x 10 -yr. Qp) Required Storage Volume (1800 C.F. x Disturbed Ac): Temporary Sediment Storage (0.5 Acre - Inches): Storage Estimate Before Cleanout Interval, Vc: Cleanout Interval: Water Quality Release Orifice for Faircloth Skimmer: Design Head (Constant for Skimmer), h: Maximum Release Rate: Minimum Release Rate: Maximum Hole Size: Minimum Hole Size: Faircloth Skimmer Barrel Size 0.036 S.F 0.014 S.F Faircloth Skimmer Orifice Size Used: 0.022 S.F. Orifice Size Release Rates: 0.0443 CFS Required Basin Depth (min. 2'): Crest Height of Riser/Weir: Basin Volume as Configured at Top of Riser: Surface Area 23,718.00 2:1 6:1 6.8:1 S.F. 4.29 Inches 19,984.65 S. F. 28,440.00 Cu.Ft. 28,677.00 Cu. Ft. 10,972.25 Cu.Ft. Days 2.0 In 2 Days 5 Days 2.56 In. Dia 1.62 In. Dia In. Dia. In. Dia. 3.2 Days 1.20 Ft. Ft. 62,971.28 C. F. COUNTRY MEADOWS STORMWATER MANAGEMENT ED STRUCTURE PERMANENT BASIN DESIGN Basin #4 BASIN CONFIGURATION (RISER & ORIFICE Width Length Surface Area In. Approx. Basin Dimension: X 23,718.00 S.F. Basin Side Slopes: 1 1.5 In. Minimum Length/Width Ratio: 1.5:1 Days Proposed Length /Width Ratio: 6.8:1 Days Computed Storage Requirements: 0.041 S.F. 2.75 In. Dia. Permanent Pool Average Depth: 3.0 Ft. Percent Impervious Cover: 18.0 % Required SA/DA for 85% TSS Removal: 0.89 % Required SA/DA for 90% TSS Removal: 1.38 % Surface Area / Drainage Area Ratio: 3.45 % Required Surface Area: (85% TSS Removal): 6,125.41 S.F. Required Surface Area: (90% TSS Removal): 9,497.82 S.F. Soil Storage Volume, S : 4.29 Inches Required Permanent Sediment Storage (0.125 Acre - Inches): 7,169.25 Cu.Ft. Required Permanent Sediment Storage Depth (min. 1'): 0.30 Ft. Water Quality Drawdown Orifice: Maximum Head: 4.5 In. Minimum Head: 0.0 In. Design Head (h max/3), h: 1.5 In. Maximum Release Rate: 2 Days Minimum Release Rate: 5 Days Maximum Hole Size: 0.041 S.F. 2.75 In. Dia. Minimum Hole Size: 0.017 S.F. 1.74 In. Dia. Conduit Size Used: In. Dia. Orifice Size Used: 0.034 S.F. In. Dia. Orifice Size Release Rates: 0.0599 CFS 2.3 Days Crest Height of Spillway: Ft. Basin Volume as Configured at Top of Spillway: 78,612.77 C. F. COUNTRY MEADOWS STORMWATER MANAGEMENT ED STRUCTURE COMPUTED DESIGN DATA Basin #4 COMPUTED 1 -YR. WATER QUALITY DATA Volumetric Runoff Coefficient, Rv: 0.212 81,819 Water Quality Volume (1 -Inch Storm), WQv: 12,145.98 Cu.Ft. Water Quality Runoff Volume, Qa: 0.21 Inches Water Quality CN (using Qa): 87 CN Intial Abstraction, la: = 0.311 la /P(1 0.311 Qu (TR -55)= 910.00 csm /in Time of Concentration, Tc 5.61 Min. Intensity for 1 yr. Storm, 1 4.48 In. /hr. Peak Rate of Runoff, Tp 14.25 Min. Water Quality Peak Discharge, Qp: 4.8 cfs Runoff Depth, Q* : Water Quality Drawdown Elevation: Water Quality Volume Provided: (Elev. 1017 to 1019) (Volume between Permanent Pool and Riser Orifice) COMPUTED 25 -YR. WATER QUANTITY DATA Pre - developed Runoff Volume: Post - developed Runoff Volume: Runoff Volume to be Detained (Post - Pre): Water Quantity Volume Provided: (Elev. 1017 to 1019) Discharge Rate @ 48 hrs: Approx. Time to Complete Discharge PRE /POST DEVELOPED PEAK DISCHARGES (max. 120 hrs.) Post - Developed Peak Discharge (cfs) 2.126 4.57 13.02 19.23 24.56 30.14 0.62 Inches 1017.00 33,942.00 Cu.Ft. 70,636 Pre - Developed 81,819 Peak Discharge Design Storm (cfs) 1 yr. - 24 hr 1.028 2 yr. -6 hr. 3.09 10 yr. - 6 hr. 10.44 25 yr. - 6 hr. 16.04 50 yr. - 6 hr. 20.98 100 yr. - 6 hr. 26.24 (max. 120 hrs.) Post - Developed Peak Discharge (cfs) 2.126 4.57 13.02 19.23 24.56 30.14 0.62 Inches 1017.00 33,942.00 Cu.Ft. 70,636 Cu.Ft. 81,819 Cu.Ft. 11,183 Cu. Ft. 33,942 Cu.Ft. 0.028 cfs ' " hr. Routed BMP #4 Peak Discharge (cfs) 0.128 0.176 0.269 3.480 5.080 6.298 Depth- Duration - Frequency Table Winston - Salem, NC Winston - Salem, NC Return Period Return Period Duration Duration 1 -yr 2 -yr 5 -yr 10 -yr 25 -yr 50 -yr 100 -yr in /hr) (in.) (in.) (in.) (in.) (in.) (in.) (in.) 5 min 0.37 0.44 0.52 0.57 0.63 0.67 0.71 10 min 0.60 0.71 0.83 0.92 1.01 1.07 1.12 15 min 0.74 0.89 1.05 1.16 1.28 1.35 1.42 30 min 1.02 1.23 1.50 1.68 1.89 2.04 2.17 60 min 1.27 1.54 1.92 2.19 2.52 2.76 3.00 2 hr 1.50 1.82 2.28 2.62 3.06 3.40 3.73 3 hr 1.61 1.95 2.45 2.82 3.31 3.68 4.05 6 hr 1.97 0.50 2.99 0.68 4.08 4.58 5.08 12 hr 2.35 2.85 3.58 4.16 4.97 5.61 6.29 24 hr 2 83 3.42 4.28 4.96 5.89 6.63 7.40 Intensity- Duration - Frequency Table Winston - Salem, NC Return Period Duration 1 -yr 2 -yr 5 -yr 10 -yr 25 -yr 50 -yr 100 -yr in /hr) (in /hr) (in /hr) in /hr in /hr (in /hr) (in /hr 5 min 4.48 6.24 6.86 7.58 8.06 8.48 10 min 3.58 4.25 5.00 5.50 6.05 6.42 6.74 15 min 2.98 3.56 4.22 4.63 5.11 5.42 5.68 30 min 2.04 2.46 2.99 3.36 3.78 4.08 4.35 60 min 1.27 1.54 1.92 2.19 2.52 2.76 3.00 2 hr 0.75 0.91 1.14 1.31 1.53 1.70 1.87 3 hr 0.54 0.65 0.82 0.94 1.10 1.23 1.35 6 hr 0.33 0.40 0.50 0.58 0.68 0.76 0.85 12 hr 0.20 0.24 0.30 0.35 0.41 0.47 0.52 24 hr 0.12 0.14 0.18 0.21 0.25 0.28 0.31 Reference Data V 'OL I v CUPFVN& WE88j, P.A. Jv;� site P.O. BOX 1070 King, N.C. 27021 336-985-6519 COUNTRY MEADOWS Mountain View Road King, N.C. PERMANENT E.D. BASIN # 5 3/24/2015 Developer Mountain View Commercial Properties, LLC 13146 NW Gilson Road Palm City, FL 34990 276-755-4139 M@ 11 ME APR 0 9 2015 DENR - WATER RESOURCES 401 & BUFFER PERMITTING Hydraflow Table of Contents Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2009 by Autodesk. Inc. v6.066 1 - Year Hydrograph No.4, SCS Runoff, Pre - Developed Site ........ Hydrograph No.5, SCS Runoff, Post - Developed Site ...... Hydrograph No.6, Reservoir, Routed Pond ........................ Country Meadows.gpw Thursday, Mar 26. 2015 ........................... ..............................1 ........................... ............................... 2 ............................ ..............................3 Pond Report — Detention Pond .................................... ..............................4 2 -Year Hydrograph No.4, SCS Runoff, Pre - Developed Site .................................... ..............................5 Hydrograph No.5, SCS Runoff, Post - Developed Site .................................. ..............................6 HydrographNo.6, Reservoir, Routed Pond .................................................. ..............................7 10 - Year Hydrograph No.4, SCS Runoff, Pre - Developed Site .................................... ..............................8 Hydrograph No.5, SCS Runoff, Post - Developed Site .................................. ..............................9 Hydrograph No.6, Reservoir, Routed Pond ................................................. .............................10 25 - Year Hydrograph No.4, SCS Runoff, Pre - Developed Site ................................... .............................11 Hydrograph No.5, SCS Runoff, Post - Developed Site ................................... .............................12 Hydrograph No.6, Reservoir, Routed Pond ............................................... .............................13 50 - Year Hydrograph No.4, SCS Runoff, Pre - Developed Site ................................. ............................... 14 Hydrograph No.5, SCS Runoff, Post - Developed Site ................................. .............................15 Hydrograph No.6, Reservoir, Routed Pond .............................................. ............................... 16 100 - Year Hydrograph No.4, SCS Runoff, Pre - Developed Site ................................ ............................... 17 Hydrograph No.5, SCS Runoff, Post - Developed Site ............................... ............................... 18 Hydrograph No.6, Reservoir, Routed Pond ................................................. .............................19 IDFReport .............................................................. ............................... 20 Detention Pond Riser / Outlet — Front View ................ ............................... 21 Detention Pond Riser I Outlet — Section View ............. ............................... 22 Input Data Reference Data Hydrograph Report 1 Hydraflow Hydrographs Extension Tor AutoCAD® Civil 3D® 2009 by Autodesk, Inc. v6.066 Monday, Mar 30, 2015 Hyd. No. 4 Pond 5 - Pre Const Hydrograph type = SCS Runoff Peak discharge = 0.242 cfs Storm frequency = 1 yrs Time to peak = 2.57 hrs Time interval = 1 min Hyd. volume = 2,285 cuft Drainage area = 3.720 ac Curve number = 67 Basin Slope = 9.0% Hydraulic length = 815 ft Tc method = USER Time of conc. (Tc) = 5.00 min Total precip. = 1.97 in Distribution = SCS 6 -Hr Storm duration = 6.00 hrs Shape factor = 484 Q (cfs) 0.50 0.45- 0.40 - 0.35 0.30 0.25 0.20 0.15 0.10 0.05 0.00 ' 0.0 1.0 Hyd No. 4 Pond 5 - Pre Const Hyd. No. 4 -1 Year Q (cfs) 0.50 0.45 0.40 0.35 0.30 0.25 0.20 0.15 0.10 0.05 0.00 2.0 3.0 4.0 5.0 6.0 7.0 Time (hrs) Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2009 by Autodesk, Inc. v6.066 Hyd. No. 5 Hyd. volume Pond 5 - Post Const Curve number Hydrograph type = SCS Runoff Storm frequency = 1 yrs Time interval = 1 min Drainage area = 3.720 ac Basin Slope = 9.0% Tc method = USER Total precip. = 1.97 in Storm duration = 6.00 hrs Q (cfs) 1.00 R •11 0.80 0.70 0.60 0.50 0.40 0.30 0.20 0.10 0.00 ' ' 0.0 1.0 Hyd No. 5 Pond 5 - Post Const Hyd. No. 5 -1 Year VIA Monday, Mar 30, 2015 Peak discharge = 0.501 cfs Time to peak = 2.53 hrs Hyd. volume = 3,194 cuft Curve number = 70 Hydraulic length = 815 ft Time of conc. (Tc) = 5.00 min Distribution = SCS 6 -Hr Shape factor = 484 2.0 3.0 4.0 5.0 6.0 Q (cfs) 1.00 0.90 0.80 0.70 0.60 0.50 0.40 D.30 D.20 0.10 --1- 0.00 7.0 Time (hrs) Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2009 by Autodesk, Inc. v6.066 Hyd. No. 6 BMP 5 - Routed Hydrograph type = Reservoir Storm frequency = 1 yrs Time interval = 1 min Inflow hyd. No. = 5 - Pond 5 - Post Const Reservoir name = BMP #5 Storage Indication method used. Q (Cfs) 1.00 0.90 0.80 0.70 0.60 0.50 0.40 0.30 0.20 0.10 0.00 0.0 2.0 -- Hyd No. 6 BMP 5 - Routed Hyd. No. 6 -- 1 Year 3 Monday, Mar 30, 2015 Peak discharge = 0.191 cfs Time to peak = 6.02 hrs Hyd. volume = 2,894 cult Max. Elevation = 1041.48 ft Max. Storage = 1,374 cult 4.0 6.0 8.0 10.0 12.0 14.0 16.0 Hyd No. 5 Total storage used = 1,374 cult Q (cfs) 1.00 [d •i 0.80 0.70 0.60 0.50 0.40 0.30 0.20 0.10 0.00 18.0 Time (hrs) Pond Report 4 Hydraflow Hydrographs Extension for AutoCADO Civil 3138 2009 by Autodesk. Inc. v6.066 Monday, Mar 30, 2015 Pond No. 2 - BMP #5 Pond Data Contours - User - defined contour areas. Average end area method used for volume calculation. Begining Elevation = 1041.00 ft Stage / Storage Table Stage (ft) Elevation (ft) Contour area (sgft) Incr. Storage (cult) Total storage (cult) 0.00 1041.00 2,488 0 0 1.00 1042.00 3,287 2,887 2,887 2.00 1043.00 4,124 3,705 6,592 3.00 1044.00 4,992 4,558 11,150 4.00 1045.00 5,887 5,439 16,590 5.00 1046.00 6,810 6,349 22,938 Culvert / Orifice Structures Weir Structures [A►] [B] [C] [PrfRsr] [A] [B] [C] [D] Rise (In) = 12.00 4.00 0.00 0.00 Crest Len (ft) = 6.00 0.00 0.00 0.00 Span (in) = 12.00 4.00 0.00 0.00 Crest El. (ft) = 1045.00 0.00 0.00 0.00 No. Barrels = 1 1 0 0 Weir Coeff. - 3.33 3.33 3.33 3.33 Invert El. (ft) = 1041.00 1041.10 0.00 0.00 Weir Type = Ciplti - - - Length (ft) = 44.00 0.50 0.00 0.00 Multistage = No No No No Slope (%) = 1.14 0.00 0.00 n/a N -Value = .013 .013 .013 n/a Orifice Coeff. = 0.60 0.60 0.60 0.60 Exfil.(in/hr) = 0.000 (by Wet area) Multi -Stage = n/a Yes No No TW Elev. (ft) = 0.00 Note: CuKrert/0rifioe outflows are analyzed under inw (ic) and outlet (oc) control. Weir risers checked for orifice condificm (ic) and suWneryence (s). Stage / Storage / Discharge Table Stage Storage Elevation Civ A Clv B Clv C PrfRsr Wr A Wr B Wr C Wr D Exfll User Total ft tuft ft cfs cfs cfs cfs cis Cfs cis cis cfs cis cfs 0.00 0 1041.00 0.00 0.00 - - 0,00 - - - - - 0.000 1.00 2,887 1042.00 0.35 is 0.35 is - - 0.00 - - - - - 0.354 2.00 6,592 1043.00 0.54 is 0.54 is - - 0.00 - - - - - 0.538 3.00 11,150 1044.00 0.69 is 0.68 is - - 0.00 - - - - - 0.676 4.00 16,590 1045.00 0.79 is 0.79 is - - 0.00 - - - - - 0.791 5.00 22,938 1046.00 0.89 is 0.89 is - - 19.98 - - - - - 20.87 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAO® Civil 3D® 2009 by Autodesk, Inc. v6.066 Hyd. No. 4 Hyd. volume Pond 5 - Pre Const Curve number Hydrograph type = SCS Runoff Storm frequency = 2 yrs Time interval = 1 min Drainage area = 3.720 ac Basin Slope = 9.0% Tc method = USER Total precip. = 2.38 in Storm duration = 6.00 hrs Pond 5 - Pre Const Q (c�) Hyd. No. 4 - 2 Year 1.00 0.90 0.80 0.70 0.60 0.50 0.40 0.30 0.20 0.10 0.00 1 L 0.0 1.0 - Hyd No. 4 5 Monday, Mar 30, 2015 Peak discharge = 0.728 cfs Time to peak = 2.53 hrs Hyd. volume = 4,287 cult Curve number = 67 Hydraulic length = 815 ft Time of conc. (Tc) = 5.00 min Distribution = SCS 6 -Hr Shape factor = 484 2.0 3.0 4.0 5.0 6.0 Q (cfs) 1.00 0.90 0.80 0.70 0.60 0.50 0.40 0.30 0.20 0.10 -j- 0.00 7.0 Time (hrs) Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2009 by Autodesk, Inc. v6.o66 Hyd. No. 5 Hyd. volume Pond 5 - Post Const Curve number Hydrograph type = SCS Runoff Storm frequency = 2 yrs Time interval = 1 min Drainage area = 3.720 ac Basin Slope = 9.0% Tc method = USER Total precip. = 2.38 in Storm duration = 6.00 hrs Q (cfs) 2.00 1.00 am WIA Pond 5 - Post Const Hyd. No. 5 — 2 Year Monday, Mar 30, 2015 Peak discharge = 1.077 cfs Time to peak = 2.53 hrs Hyd. volume = 5,560 cuft Curve number = 70 Hydraulic length = 815 ft Time of conc. (Tc) = 5.00 min Distribution = SCS 6 -Hr Shape factor = 484 I.0 1.0 3.0 4.0 5.0 6.0 Hyd No. 5 Q (cfs) 2.00 1.00 -j- 0.00 7.0 Time (hrs) Hydrograph Report Hydraflow Hydrographs Extension for AUtoCAD® Civil 3D® 2009 by Autodesk, Inc. v6.066 Hyd. No. 6 BMP 5 - Routed Hydrograph type = Reservoir Storm frequency = 2 yrs Time interval = 1 min Inflow hyd. No. = 5 - Pond 5 - Post Const Reservoir name = BMP #5 Storage Indication method used. Q (cfs) 2.00 1.00 BMP 5 - Routed Hyd. No. 6 -- 2 Year Peak discharge Time to peak Hyd. volume Max. Elevation Max. Storage ri Monday, Mar 30, 2015 = 0.298 cfs = 5.47 hrs = 5,259 cuft = 1041.77 ft = 2,224 cult 2.0 4.0 6.0 Hyd No. 6 Hyd No. 5 80 10.0 12.0 14.0 16.0 Total storage used = 2,224 cuft Q (Cfs) 2.00 1.00 o.00 18.0 Time (hrs) Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2009 by Autodesk, Inc. v6.066 Hyd. No. 4 Hyd. volume Pond 5 - Pre Const Curve number = Hydrograph type = SCS Runoff Storm frequency = 10 yrs Time interval = 1 min Drainage area = 3.720 ac Basin Slope = 9.0% Tc method = USER Total precip. = 3.45 in Storm duration = 6.00 hrs Pond 5 - Pre Const Q (Cfs) Hyd. No. 4 —10 Year 3.00 2.00 1.00 LO1 8 Monday, Mar 30, 2015 Peak discharge = 2.458 cfs Time to peak = 2.52 hrs Hyd. volume = 11,449 cuft Curve number = 67 Hydraulic length = 815 ft Time of conc. (Tc) = 5.00 min Distribution = SCS 6 -Hr Shape factor = 484 1.0 2.0 3.0 4.0 5.0 6.0 Hyd No. 4 Q (cfs) 3.00 2.00 1.00 1- 0.00 7.0 Time (hrs) Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2009 by Autodesk, Inc. WON Hyd. No. 5 Hyd. volume Pond 5 - Post Const Curve number Hydrograph type = SCS Runoff Storm frequency = 10 yrs Time interval = 1 min Drainage area = 3.720 ac Basin Slope = 9.0% Tc method = USER Total precip. = 3.45 in Storm duration = 6.00 hrs Q (Cfs) 4.00 MIN 2.00 1.00 MEN UIV Pond 5 - Post Const Hyd. No. 5 —10 Year 9 Monday, Mar 30, 2015 Peak discharge = 3.065 cfs Time to peak = 2.45 hrs Hyd. volume = 13,610 cuft Curve number = 70 Hydraulic length = 815 ft Time of conc. (Tc) = 5.00 min Distribution = SCS 6 -Hr Shape factor = 484 1.0 2.0 3.0 4.0 5.0 6.0 Hyd No. 5 Q (Cfs) 4.00 3.00 moil 1.00 -1- 0.00 7.0 Time (hrs) Hydrograph Report Hydraflow Hydrographs Extension for AutoCADW Civil 3D® 2009 by Autodesk, Inc. v6.066 Hyd. No. 6 Hyd. volume BMP 5 - Routed Max. Elevation Hydrograph type = Reservoir Storm frequency = 10 yrs Time interval = 1 min Inflow hyd. No. = 5 - Pond 5 - Post Const Reservoir name = BMP #5 Storage Indication method used Q (cfs) 4.00 We] 2.00 iWoU BMP 5 - Routed Hyd. No. 6 -- 10 Year 10 Monday, Mar 30, 2015 Peak discharge = 0.548 cfs Time to peak = 6.02 hrs Hyd. volume = 13,309 cuft Max. Elevation = 1043.07 ft Max. Storage = 6,900 cuft 11 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 Hyd No. 6 Hyd No. 5 Total storage used = 6,900 cuft Q (cfs) 4.00 C W 2.00 1.00 0.00 18.0 Time (hrs) Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2009 by Autodesk, Inc. v6.066 Hyd. No. 4 Hyd. volume Pond 5 - Pre Const Curve number Hydrograph type = SCS Runoff Storm frequency = 25 yrs Time interval = 1 min Drainage area = 3.720 ac Basin Slope = 9.0% Tc method = USER Total precip. = 4.08 in Storm duration = 6.00 hrs Q(Cfs) 4.00 3.00 2.00 1.00 0.00 ' 1 0.0 1.0 Hyd No. 4 Pond 5 - Pre Const Hyd. No. 4 — 25 Year 11 Monday, Mar 30, 2015 Peak discharge = 3.778 cfs Time to peak = 2.45 hrs Hyd. volume = 16,631 cuft Curve number = 67 Hydraulic length = 815 ft Time of conc. (Tc) = 5.00 min Distribution = SCS 6 -Hr Shape factor = 484 2.0 3.0 4.0 5.0 6.0 Q (cfs) 4.00 3.00 2.00 1.00 -- 0.00 7.0 Time (hrs) Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2009 by Autodesk, Inc. v6.OW Hyd. No. 5 Pond 5 - Post Const Hydrograph type = SCS Runoff Storm frequency = 25 yrs Time interval Drainage area Basin Slope Tc method Total precip. Storm duration Q (Cfs) 5-00- CL1I9 3.00 2.00 1.00 WIM Lfs 1 min 3.720 ac 9.0% USER 4.08 in 6.00 hrs Pond 5 - Post Const Hyd. No. 5 — 25 Year 12 Monday, Mar 30, 2015 Peak discharge = 4.528 cfs Time to peak = 2.43 hrs Hyd. volume = 19,264 cuft Curve number = 70 Hydraulic length = 815 ft Time of conc. (Tc) = 5.00 min Distribution = SCS 6 -Hr Shape factor = 484 1.0 2.0 3.0 4.0 5.0 6.0 Hyd No. 5 Q (cfs) 5.00 4.00 3.00 2.00 1.00 —J- 0.00 7.0 Time (hrs) Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3136 2009 by Autodesk, Inc. v6.066 Hyd. No. 6 Hyd. volume BMP 5 - Routed Max. Elevation Hydrograph type = Reservoir Storm frequency = 25 yrs Time interval = 1 min Inflow hyd. No. = 5 - Pond 5 - Post Const Reservoir name = BMP #5 Storage Indication method used Q (cfs) 5.00 0 Me 3.00 2.00 1.00 BMP 5 - Routed Hyd. No. 6 -- 25 Year 13 Monday. Mar 30, 2015 Peak discharge = 0.670 cfs Time to peak = 6.03 hrs Hyd. volume = 18,963 cuft Max. Elevation = 1043.95 ft Max. Storage = 10,942 cuft 2.0 4.0 6.0 8.0 Hyd No. 6 Hyd No. 5 10.0 12.0 14.0 16.0 18.0 Total storage used = 10,942 cuft Q (cfs) 5.00 4.00 3.00 2.00 1.00 0.00 20.0 Time (hrs) Hydrograph Report 14 Hydraflow Hydrographs Extension for AutoCAD® Civil 300 2009 by Autodesk, Inc. v6.066 Hyd. No. 4 Hyd. volume Pond 5 - Pre Const Curve number Hydrograph type = SCS Runoff Storm frequency = 50 yrs Time interval = 1 min Drainage area = 3.720 ac Basin Slope = 9.0% Tc method = USER Total precip. = 4.58 in Storm duration = 6.00 hrs Q (Cfs) 5.00 4.00 3.00 2.00 1.00 Pond 5 - Pre Const Hyd. No. 4 — 50 Year 0.00 ' 0.0 1.0 2.0 3.0 4.0 — Hyd No. 4 Monday, Mar 30, 2015 Peak discharge = 4.939 cfs Time to peak = 2.43 hrs Hyd. volume = 21,122 cuft Curve number = 67 Hydraulic length = 815 ft Time of conc. (Tc) = 5.00 min Distribution = SCS 6 -Hr Shape factor = 484 5.0 6.0 Q (Cfs) 5.00 4.00 3.00 2.00 1.00 --1- 0.00 7.0 Time (hrs) Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3130 2009 by Autodesk, Inc. v6.066 Hyd. No. 5 Hyd. volume Pond 5 - Post Const Curve number Hydrograph type = SCS Runoff Storm frequency = 50 yrs Time interval = 1 min Drainage area = 3.720 ac Basin Slope = 9.0% Tc method = USER Total precip. = 4.58 in Storm duration = 6.00 hrs Q (Cfs) 6.00 5.00 4.00 3.00 2.00 1.00 0.00 ' 0.0 1.0 Hyd No. 5 Pond 5 - Post Const Hyd. No. 5 — 50 Year 15 Monday, Mar 30, 2015 Peak discharge = 5.783 cfs Time to peak = 2.43 hrs Hyd. volume = 24,100 cuft Curve number = 70 Hydraulic length = 815 ft Time of conc. (Tc) = 5.00 min Distribution = SCS 6 -Hr Shape factor = 484 2.0 3.0 4.0 5.0 6.0 Q (efs) 6.00 5.00 4.00 3.00 2.00 1.00 —i- 0.00 7.0 Time (hrs) Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD(& Civil 3138 2009 by Autodesk, Inc. v6.066 Hyd. No. 6 Hyd. volume BMP 5 - Routed Max. Elevation Hydrograph type = Reservoir Storm frequency = 50 yrs Time interval = 1 min Inflow hyd. No. = 5 - Pond 5 - Post Const Reservoir name = BMP #5 Storage Indication method used Q (cfs) 6.00 5.00 4.00 MIX 2.00 1.00 0.00 0.0 2.0 Hyd No. 6 BMP 5 - Routed Hyd. No. 6 -- 50 Year ill Monday. Mar 30, 2015 Peak discharge = 0.752 cfs Time to peak = 6.03 hrs Hyd. volume = 23,799 cult Max. Elevation = 1044.64 ft Max. Storage = 14,652 cult 4.0 6.0 8.0 Hyd No. 5 Q (cfs) 6.00 5.00 Will K 11, 2.00 1.00 0.00 100 12.0 14.0 16.0 18.0 20.0 Total storage used = 14,652 cult Time (hrs) Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2009 by Autodesk, Inc. v6.066 Hyd. No. 4 Hyd. volume Pond 5 - Pre Const Curve number Hydrograph type = SCS Runoff Storm frequency = 100 yrs Time interval = 1 min Drainage area = 3.720 ac Basin Slope = 9.0% Tc method = USER Total precip. = 5.08 in Storm duration = 6.00 hrs Pond 5 - Pre Const Q (ifs) Hyd. No. 4 —100 Year 7.00 6.00 5.00 4.00 3.00 2.00 1.00 0.00 Vu 1.0 Hyd No. 4 17 Monday, Mar 30, 2015 Peak discharge = 6.177 cfs Time to peak = 2.43 hrs Hyd. volume = 25,887 cuft Curve number = 67 Hydraulic length = 815 ft Time of conc. (Tc) = 5.00 min Distribution = SCS 6 -Hr Shape factor = 484 2.0 3.0 4.0 5.0 6.0 Q (cis) 7.00 U.-NITS, 5.00 4.00 3.00 2.00 W11 -1-- 0.00 7.0 Time (hrs) Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2009 by Autodesk, Inc. v6.066 Hyd. No. 5 Hyd. volume Pond 5 - Post Const Curve number Hydrograph type = SCS Runoff Storm frequency = 100 yrs Time interval = 1 min Drainage area = 3.720 ac Basin Slope = 9.0% Tc method = USER Total precip. = 5.08 in Storm duration = 6.00 hrs Q (cfs) 8.00 . �M 4.00 2.00 0.00 0.0 1.0 Hyd No. 5 Pond 5 - Post Const Hyd. No. 5 —100 Year 18 Monday, Mar 30, 2015 Peak discharge = 7.096 cfs Time to peak = 2.43 hrs Hyd. volume = 29,186 cuft Curve number = 70 Hydraulic length = 815 ft Time of conc. (Tc) = 5.00 min Distribution = SCS 6 -Hr Shape factor = 484 2.0 3.0 4.0 5.0 6.0 Q (cfs) 8.00 ". 11C 4.00 P11P 1 0.00 7.0 Time (hrs) Hydrograph Report Hydraflow Hydrographs Extension for AutoCADQQ Civil 3138 2009 by Autodesk, Inc. v6.066 Hyd. No. 6 BMP 5 - Routed Hydrograph type = Reservoir Peak discharge Storm frequency = 100 yrs Time to peak Time interval = 1 min Hyd. volume Inflow hyd. No. = 5 - Pond 5 - Post Const Max. Elevation Reservoir name = BMP #5 Max. Storage Storage Indication method used Q (cfs) 8.00 . ri 4.00 2.00 0.00 O.0 2.0 -- Hyd No. 6 BMP 5 - Routed Hyd. No. 6 -- 100 Year 19 Monday, Mar 30, 2015 = 0.827 cfs = 6.03 hrs = 28,885 cuft = 1045.34 ft = 18,713 cult 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 20.0 Hyd No. 5 Total storage used = 18,713 cult Q (cfs) 8.00 WE 4.00 2.00 0.00 22.0 Time (hrs) Hydraflow Rainfall Report 20 Hydratlow Hydrographs Extension for AutoCAD® Civil 3D® 2009 by Autodesk, Inc. v6.066 Monday, Mar 30, 2015 Return Period Intensity- Duration - Frequency Equation Coefficients (FHA) (Yr"s) B p E 0.8890 (NIA) 1 57.3018 12.6000 SCS 24 -hour 2 68.6290 13.0000 0.8850 (Ynt) 3 0.0000 0.0000 0.0000 -- 5 67.5316 12.6000 0.8309 50 10 67.3303 12.4000 0.8000 3.58 25 58.6655 11.0000 0.7384 1.85 50 54.7434 10.3000 0.7025 1.27 100 47.2780 9.0000 0.6512 3.11 File name: Winston Salem.IDF Intensity = B / (Tc + D)AE Return Period - Intensity Values (in/hr) 1 -yr 2 -y► 3-yr S-yr 10-yr -yr SCS 24 -hour 2.83 3.42 0.00 4.28 (Ynt) 5 min 10 15 20 25 30 35 40 45 50 55 80 1 4.48 3.58 3.00 2.59 2.28 2.04 1.85 1.69 1.56 1.45 1.35 1.27 2 5.32 4.28 3.60 3.11 2.74 2.46 2.23 2.04 1.89 1.75 1.64 1.54 3 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5 6.23 5.06 4.29 3.73 3.32 2.99 2.73 2.51 2.33 2.17 2.04 1.92 10 6.85 5.60 4.76 4.17 3.71 3.36 3.07 2.84 2.64 2.47 2.32 2.19 25 7.57 6.20 5.29 4.65 4.16 3.78 3.47 3.22 3.00 2.82 2.66 2.52 50 8.06 6.60 5.66 4.99 4.48 4.08 3.76 3.49 3.27 3.07 2.91 2.76 100 8.48 6.95 5.97 5.28 4.76 I 4.35 4.02 3.75 3.52 3.32 3.15 3.00 i c = ome In minutes. Values may exceed 60. - - -f Storm Distribution -'w'a,. nIc name: mnston Salem. Rainfall Precipitation Table (in) 1 -yr 2 -y► 3-yr S-yr 10-yr -yr SCS 24 -hour 2.83 3.42 0.00 4.28 4.96 50 SCS 6-Hr 1.97 2.38 0.00 2.99 3.45 48 76.63 Huff -1st 0.00 0.00 0.00 0.00 0.00 0Huff -2nd 0.00 0.00 0.00 0.00 0.00 0. Huff -3rd 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff -4th 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff -Indy 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Custom 0.00 0.00 0.00 0.00 1 0.00 0.00 0.00 0.00 N LO k a. M2 W N Z O a 0 �o C V O no O a> F°- w 0 0 0 0 0 v 0 a>> W Q 00 ri 0 v @o 0 c .- O N � o � L J Q O > 7 <U 0 O U � C C O — C � O > O vU 0 0 0 0 N r. C O� O O V E O O o � mw J o o d O � j m (D U) c 3 0 Qi Y O ar J r O U) lL Z O. CD M LO r N 0 co m 0 U U a� 0 N T T C T j O N O N r U N a a Ln CD N � O 7 of� M c c � T @ u T L � m 0 L O G C m (D U) c 3 0 Qi Y O ar J r O U) lL Z O. CD M LO r N 0 co m 0 U U a� 0 N N Li C Y Vf 47 O Q T m rn 0 0 N M 5 U Q U O Q _O C 0 N O x W CL L !O Q1 O 3 c° m CL M2 W 1 N O Z O a 0 0 f0 O O v O- O O O. S F 11.1 C 00 CL - O w E o � o � M Ul o Q f7 nj N m T N Vl T C p T T O Vl O a U O a C, c S x U) U U) T I I L O 0 o m j O 1 � T i L I 3 O G al U) C� CO -Tr; 0 N O c' 1 m m a C O 2 Q co LO N cn O m z 0 U U a� �o GUPTON & ASSOCIATES P.A. 2200 Silas Crk. Pkwy. Suite 2 -B Winston - Salem, N.C. 27103 COUNTRY MEADOWS STORMWATER MANAGEMENT ED STRUCTURE SITE CONDITIONS AND INPUT DATA BASIN #5 Site Data Total Site Area: 3.69 Acres Total Disturbed Area: 3.69 Acres Total Drainage Area Into Structure- 3.69 Acres Proposed BUA/Impervious Area: 0.66 Acres Proposed BUA/Impervious Area: 17.9 % Off -Site Drainage Area: 0 Acres Maximum Off -Site BUA/Impervious Area: 0 Total BUA/Impervious Area Into Structure: 0.66 Acres Total BUA/Impervious Area Into Structure: 17.9 % Desiqn Data Pre - Developed Overland Flow Runoff Factor 2 Factor Hydraulic Length: 687 Feet Hydraulic Height: 65 Feet Time of Concentration, Tc (Pre - developed) : 5.92 Min. Post - Developed Overland Flow Runoff Factor 1.72 Factor Hydraulic Length: 687 Feet Hydraulic Height: 65 Feet Time of Concentration, Tc (Post - developed) : 5.09 Min. "Note: Times of concentration are calculated using Kirpich Method. Use minimum 5 minute Tc SCS Weighted Curve Number (Pre - developed): SCS Weighted Curve Number (Post - developed): Precipitation Depth, 1 yr. 24 hr. Storm. Precipitation Depth. 2 yr. 6 hr. Storm: Precipitation Depth, 10 yr. 6 hr. Storm: Precipitation Depth, 25 yr. 6 hr. Storm: 67.00 CN 70.00 CN * *See table 2.83 Inches * *See table 2.38 Inches * *See table 3.45 Inches **See table 4.08 Inches GUPTON & ASSOCIATES P.A. 2200 Silas Crk. Pkwy. Suite 2 -B Winston- Salem, N.C. 27103 COUNTRY MEADOWS STORMWATER MANAGEMENT ED STRUCTURE SITE CONDITIONS AND INPUT DATA BASIN #5 Pre - Developed SCS Runoff Curve Number (CN) Soil Group Description CN Area acres Product of CN x Area B B Brush - Weed -Grass Mixt 67 3.69 268.3 247.23 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0 0 Weighted SCS Curve Number (CN) = Post - Developed SCS Runoff Curve Number (CN) J•oV 147.23 67.00 Soil_-Group Description CN Area (acres) Product of CN x Area B 1/2 Residential 70 3.69 268.3 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0 0 0 Weighted SCS Curve Number (CN) = s.ny 258.30 70.00 *See table 8.03e 'Reference made to "Erosion and Sediment Control Planning and Design Manual' State of N -C. COUNTRY MEADOWS STORMWATER MANAGEMENT ED STRUCTURE TEMPORARY BASIN DESIGN Basin #5 BASIN CONFIGURATION (CULVERT & SKIMMER) Width Length Proposed Basin Dimension: X Basin Side Slopes: 1 Minimum Length/Width Ratio: Maximum Length/Width Ratio: Proposed Length/Width Ratio: Computed Storage Requirements: Soil Storage Volume, S Required Surface Area: (A =435 x 10 -yr. op) Required Storage Volume (1800 C.F. x Disturbed Ac): Temporary Sediment Storage (0.5 Acre - Inches): Storage Estimate Before Cleanout Interval, Vc: Cleanout Interval: Water Quality Release Orifice for Faircloth Skimmer: Design Head (Constant for Skimmer), h: Maximum Release Rate: Minimum Release Rate: Maximum Hole Size: Minimum Hole Size: Faircloth Skimmer Barrel Size: Faircloth Skimmer Orifice Size Used: Orifice Size Release Rates: Required Basin Depth (min. 2'): Crest Height of Riser/Weir: 0.008 S.F. 0.003 S.F. 0.014 S.F 0.0284 CFS Surface Area 4,940.00 S.F. 2:1 6:1 7.3:1 4.29 Inches 4,667.30 S.F. 6,642.00 Cu.Ft. 6,697.35 Cu.Ft. 3,233.89 Cu.Ft. Days 2.0 In. 2 Days 5 Days 1.24 In. Dia. 0.78 In. Dia. 2.0 In. Dia. 1.60 In. Dia. 1.2 Days 1.34 Ft. Ft. Basin Volume as Configured at Top of Riser: 10,078.72 C. F. COUNTRY MEADOWS STORMWATER MANAGEMENT ED STRUCTURE PERMANENT BASIN DESIGN Basin #5 BASIN CONFIGURATION (RISER & ORIFICE Width Length Surface Area In. Approx. Basin Dimension: X 4,940.00 S.F. Basin Side Slopes: l 1.4 In. Minimum Length/Width Ratio: 1.5:1 Days Proposed Length/Width Ratio: 7.3:1 Days Computed Storage Requirements: 0.010 S.F. 1.36 In. Dia. Permanent Pool Average Depth: 0.004 S.F. 0.86 Ft. Percent Impervious Cover: 17.9 % Required SAIDA for 85% TSS Removal: 0.087 S.F. In. Dia. Required SA /DA for 90% TSS Removal: 0.1463 CFS 2.0 % Surface Area / Drainage Area Ratio: 3.07 % Required Surface Area: (85% TSS Removal): 1,430.55 S.F. Required Surface Area: (90% TSS Removal): 2,218.16 S.F. Soil Storage Volume, S : 4.29 Inches Required Permanent Sediment Storage (0.125 Acre - Inches): 1,674.34 Cu.Ft. Required Permanent Sediment Storage Depth (min. 1'): 0.34 Ft. Water Quality Drawdown Orifice: Maximum Head: 4.1 In. Minimum Head: 0.0 In. Design Head (h max/3), h: 1.4 In. Maximum Release Rate: 2 Days Minimum Release Rate: 5 Days Maximum Hole Size: 0.010 S.F. 1.36 In. Dia. Minimum Hole Size: 0.004 S.F. 0.86 In. Dia. Conduit Size Used: In. Dia. Orifice Size Used: 0.087 S.F. In. Dia. Orifice Size Release Rates: 0.1463 CFS 2.0 Days Crest Height of Spillway: Ft. Basin Volume as Configured at Top of Spillway: 11,217.02 C. F. COUNTRY MEADOWS STORMWATER MANAGEMENT ED STRUCTURE COMPUTED DESIGN DATA Basin #5 COMPUTED 1 -YR. WATER QUALITY DATA Volumetric Runoff Coefficient, Rv: 0.211 16,631 Water Quality Volume (1 -Inch Storm), WQv: 2,825.96 Cu.Ft. Water Quality Runoff Volume, Qa: 0.21 Inches Water Quality CN (using Qa): 87 CN Intial Abstraction. la: = 0.312 la /P(1 "} = 0.312 Qu (TR -55)= 920.00 csm /in Time of Concentration, Tc 5.92 Min. Intensity for 1 yr. Storm, I 4.48 In. /hr. Peak Rate of Runoff, Tp 14.25 Min. Water Quality Peak Discharge, Qp: 1.1 cfs Runoff Depth, Q' : 0.62 Inches Water Quality Drawdown Elevation: 1041.10 Peak Discharge Water Quality Volume Provided: /Elev. 1041 to 1045) 16,590.00 Cu.Ft. (Volume between Permanent Pool and Riser Orifice) 1 yr. - 24 hr 0.242 COMPUTED 25 -YR. WATER QUANTITY DATA Pre - developed Runoff Volume: 16,631 Cu.Ft. Post - developed Runoff Volume: 19,264 Cu.Ft. Runoff Volume to be Detained (Post - Pre): 2,633 Cu.Ft. Water Quantity Volume Provided: (Elev. 1041 to 1045) 16,590 Cu.Ft. Discharge Rate @ 48 hrs: 0.670 cfs Approx. Time to Complete Discharge: (max. 120 hrs.) 15 hr. PRE /POST DEVELOPED PEAK DISCHARGES Pre - Developed Post - Developed Routed BMP #4 Peak Discharge Peak Discharge Peak Discharge Design Storm (cfs) (cfs) (cfs) 1 yr. - 24 hr 0.242 0.5 0.191 2 yr. - 6 hr. 0.728 1.077 0.298 10 yr. - 6 hr. 2.458 3.065 0.548 25 yr. - 6 hr. 3.778 4.528 0.670 50 yr. - 6 hr. 4.939 5.783 0.752 100 yr. - 6 hr. 6.177 7.096 0.827 2 f� Depth- Duration - Frequency Table Winston - Salem, NC Winston - Salem, NC Return Period Return Period Duration Duration 1 -yr 2 -yr 5 -yr 10 -yr 25 -yr 50-yr 100 -yr in/hr) (in.) in.) in. in.) in. in. in.) 5 min 0.37 0.44 0.52 0.57 0.63 0.67 0.71 10 min 0.60 0.71 0.83 0.92 1.01 1.07 1.12 15 min 0.74 0.89 1.05 1.16 1.28 1.35 1.42 30 min 1.02 1.23 1.50 1.68 1.89 2.04 2.17 60 min 1.27 1.54 1.92 2.19 2.52 2.76 3.00 2 hr 1.50 1.82 2.28 2.62 3.06 3.40 3.73 3 hr 1.61 1.95 2.45 2.82 3.31 3.68 4.05 6 hr 1.97 0.50 2.99 3.45 4.08 4.58 5.08 12 hr 2.35 2.85 3.58 4.16 4.97 5.61 6.29 24 hr 2.83 3.42 4.28 4.96 5.89 6.63 7.40 Intensity - Duration - Frequency Table Winston - Salem, NC Return Period Duration 1 -yr 2 -yr 5 -yr 10-yr 25-yr 50 -yr 100 -yr in/hr) (in /hr ) (in /hr in /hr) in /hr in /hr in /hr 5 min 4.48 = ...: 6.24 6.86 7.58 8.06 8.48 10 min 3.58 4.25 5.00 5.50 6.05 6.42 6.74 15 min 2.98 3.56 4.22 4.63 5.11 5.42 5.68 30 min 2.04 2.46 2.99 3.36 3.78 4.08 4.35 60 min 1.27 1.54 1.92 2.19 2.52 2.76 3.00 2 hr 0.75 0.91 1.14 1.31 1.53 1.70 1.87 3 hr 0.54 0.65 0.82 0.94 1.10 1.23 1.35 6 hr 0.33 0.40 0.50 0.58 0.68 0.76 0.85 12 hr 0.20 0.24 0.30 0.35 0.41 0.47 0.52 24 hr 0.12 0.14 0.18 0.21 0.25 0.28 0.31 Reference Data a R m� M L65 U Z I� d V. sa A x M11n p C a� -- a 3 F g w �m �3 U i 4 £p R pp� ➢f � 6 6 � Z t ZQ k m C O m U r r 0 Z c 0 U d Y O d m a Z O 2 0 z Ca G 0 Z W 0 W J a ci CD — C O) 3 Q w j o cm M CD C N 'p N L T .... U ijN m m O LP � n L C W O d U C C U U° O) r p L e a y C) N 3 0 14 E vuai ��NE � CD � N CrnE 4) CL C c1Oi� O = c o a co o t E E r' 0i m a> n� E A ^ °- iii„ a�� d m Cl- c�i o m o m T U m ° (u C -0 Z z m m C M N 7 co U o @ E r) aNi y y L a E m m a H T� a� m0 o C Z � Z Uo � o L -cc u3 E u3 .L.. O -E O E m O 7d. Oa ha a LN a° Yl U _O N O Q _ m a,•gW 3 mL 19 E U�w m� mmNov � nL d an Z CL O t 3 :° m w '� o °�° ~�°pp Sc �'mu' -a� i y O °OD< n '> O T 1 N— c L O L 3 3m7 c 7 U 0= m m i5 c m T N c m N C 7 m n Oi O y m n m E l m a S C ° mom Z�.2 (D u E_o U c o' C m p E� G E 3 C y ��oaci N a' mL 7 N (.1 'p m N y o Y (a a W y T -om a0'n O u E h N `-i �ZoaO m N n c a� m y Ul a a`O a _� a� ry O m L m Z U) C L da U v�0i N N O N O L W m� T"O" N >L N Na C— O)y m m m A O�y C d Z _� O o 0 L � C m~ p C m O CO n T 7� N U m m .L C m _W a E' o w O a m O N (!% N U yD U �' E _ W d O 'p O E m 7 C 0 y° U 7 O a0 -� Q m o 0 N ca m C C o n L a 7 CL m E m y m m m N -0 o 47 a�.cm. d m O L y N_ 2 E �� �p nom Eo m E F• w E a N d E p p CO U y `a v Q c� L d H t O 7 co (n O co O m U N L p F- IT O O N N � N 01 N m —(L T a� 2 7 Z� 7 > Cl) ; M o y 0 a O �U c6 O t m u m N 0 C O O � m m m 3 N to O 2 U _i 3 42 Im j LL C U 0 t n W T C C = o O m co o t 0 a. tq > O uiba in o ° a a c ° o 0Ml w 3 ` F m O O a dy „ 6 Qo c _ y c c c m a m o O 7i a o Q C > A 7 m > 19 A 3 ..- a a _ d �• O � N 7 (n T O IL O N V _ t I>0 O y C O W L U m C tl a C > Y N E o G m (n UO) cf0l o m m° C) c) U�' (7 `� @ i a ao: in in U) U) Fn U) c a 'm W ti ° _: "G 5 °• lei -i it a m _ G • C N . , Q U) IT O O N N � N 01 N m —(L T a� 2 7 Z� 7 > Cl) ; M o y 0 a O �U c6 O t m u m N 0 C O O � m m m 3 N to O 2 U _i Soil Map -- Stokes County, North Carolina Map Unit Legend LSDA Natural Resources Web Soil Survey 3" Conservation Service National Cooperative Soil Sur 12/`18=14 vey Page 3 of 3 Stokes County, North Carolina (NC789) Map Unit Symbol Map Unit Name Acres In AOI Percent of AOI CcB Clifford fine sandy loam, 2 to 8 9.0 10.2% percent slopes CeB2 Clifford sandy day loam, 2 to 8 - — -- 18.3 11 20.9% I— percent slopes, moderately eroded — DaA Dan River and Comua soils, 0 tot - 0.2 — - 0.2% 4 �M slopes, I — occasionally flooded — — - FPC2 -- - Fairview- Poplar Forest 21.2 24.1% complex, 8 to 15 percent — — — slopes, moderately eroded FpD2 Fairview- Poplar Forest 39.1 -- — 44.5% complex, 15 to 25 percent — — - - L slopes, moderately eroded — — Totals for Area of Interest _ ! - 87.8 100.0X LSDA Natural Resources Web Soil Survey 3" Conservation Service National Cooperative Soil Sur 12/`18=14 vey Page 3 of 3 CUP IVN& M HO,r A civil engineering - land surveying - site planning P.O. Box 1070 King, N.C. 27021 336 - 985 -6519 COUNTRY MEADOWS PAP�Ro Mountain View Road King, NC 9 .. 2015 BMP #6 - SKIMMER SEDIMENT BASIN 3/24/2015 Developer Mountain View Commercial Properties, LLC 13146 NW Gibson Road Palm City, FL 34990 GUPTON & WEBB, P.A. P.O. BOX 1070 King, N.C. 27021 COUNTRY MEADOWS SKIMMER SEDIMENT BASIN 6.64 SITE CONDITIONS AND INPUT DATA BASIN #6 Total Disturbed Area: 3.74 Acres Total Drainage Area Into Structure: 3.74 Acres Proposed BUA/Impervious Area: 0.75 Acres Proposed BUA/Impervious Area: 20.1 % Design Data *See table 8.03b 70 Hydraulic Length: 643 Feet Hydraulic Height: 49 Feet Volumetric Runoff Coefficient, Rv: 0.231 Inches Overland Flow Runoff Factor Description 1.72 Factor Pre - Developed Runoff Coefficient, " C ": *See table 8.03a 0.30 Factor Post - Developed Runoff Coefficient, " C ": *See table 8.03a 0.50 Factor SCS Weighted Curve Number. *See table 8.03b 70 CN Precipitation Depth , 2 yr. 24 hr Storm: * *See table 3.40 Inches Precipitation Depth , 10 yr. 24 hr. Storm: * *See table 4.93 Inches Precipitation Depth , 25 yr. 24 hr. Storm: **See table 5.86 Inches SCS Runoff Curve Number (CN) 0 Soil Group Description CN Area (acres) Product of CN x Area B Residential - 1/2 Acre 70 3.74 261.8 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 J.14 Lbl .Su Weighted SCS Curve Number (CN) = 70.00 Totals COUNTRY MEADOWS SKIMMER SEDIMENT BASIN 6.64 COMPUTED DESIGN DATA Basin #6 COMPUTED 2 -YR. DATA Time of Concentration, Tc Intensity for 2 yr. Storm, I Peak Rate of Runoff, Tp Pre - Development Peak Flow, Qpre: Post - Development Peak Flow, Qpost : Soil Storage Volume, S Runoff Depth, Q* : COMPUTED 10 -YR. DATA Time of Concentration, Tc Intensity for 10 yr. Storm. I Peak Rate of Runoff, Tp : Pre - Development Peak Flow, Qpre: Post - Development Peak Flow, Qpost : Soil Storage Volume, S Runoff Depth, Q* : COMPUTED STORAGE REQUIREMENTS Required Surface Area: (A =325 x 10 -yr. Qp) Required Storage Volume (1800 C. F. x Disturbed Ac): Temporary Sediment Storage (0.5 Acre - Inches): Permanent Sediment Storage (0.125 Acre - Inches): Storage Estimate Before Cleanout Interval, Vc: Cleanout Interval: 5.26 Min. .j.� ' In. /hr. 15.40 Min. 6.03 cfs 10.04 cfs 4.29 Inches 0.95 Inches 5.26 Min. .j.� ' In. /hr. 25.28 Min. 7.65 cfs 12.75 cfs *Reference made to "Erosion and Sediment Control Planning and Design Manual' State of N.C. "Reference made to NOAA ATLAS 14, Volume 2, Version 2 NOAA Website, National Weather Service, Silver Springs, MD COUNTRY MEADOWS STORMWATER MANAGEMENT ED STRUCTURE BASIN CONFIGURATION AND DESIGN Basin #6 BASIN CONFIGURATION Width Length Proposed Basin Dimensions. X C3 Basin Side Slopes: 1 Water Quality Release Orifice for Faircloth Skimmer: Design Head (Constant for Skimmer), h: 4.29 Inches 1.98 Inches 4,143.75 S. F. 6,732.00 Cu.Ft. 6,788.10 Cu.Ft. 1,697.03 Cu.Ft. 4,906.00 Cu. Ft. Days Surface Area 4,557.00 S. F. 2.0 In. Maximum Release Rate: Minimum Release Rate: Maximum Hole Size: Minimum Hole Size: Faircloth Skimmer Barrel Size: Faircloth Skimmer Orifice Size Used: Orifice Sized Used Release Rates: Water Quality Minimum Depth: Sediment Storage Depth: Min. Basin Depth: Crest Height of Weir. 0.039638 0.013213 0.017 S.F 0.0345 CFS 1 Days 3 Days 2.70 In_ Dia. 1.56 In. Dia. 2.0 In. Dia. 1.75 In. Dia. 2.3 Days 1.08 Ft. 1.49 Ft. 2.57 Ft. 3.00 Ft. Basin Volume as Configured at Spillway Weir. 11,387.94 C.F. GUPTON & WEBB, P.A. P.O. BOX 1070 King, N.C. 27021 COUNTRY MEADOWS STORMWATER RETENTION STAGE - STORAGE COMPUTATIONS CONTOUR CONTOUR INCR. ACCUM. COMP. ELEV. AREA VOL. VOL STAGE In S In Z STAGE ft (sq R ) (cu R ) (cu ft) R ft 1065.0 3077.21 0 0 0 0 0.0000 1066.0 3511.44 3,294 3,294 1 8.0999 0.0000 1.10 1067.0 3965.69 3,739 7,033 2 8.8584 0.6931 2.05 1068.0 4439.96 4,203 11,236 3 9.3269 1.0986 2.99 1069.0 4934.24 4,687 15,923 4 9.6755 1.3863 3.98 1070.0 5448.55 5,191 21,114 5 9.9577 1.6094 5.00 S 1 = 11,236 ft3 Z 1 = Ks= 2,916.34 S2 = 21,114 ft3 Z2 = b= 1.23 STORMWATER RETENTION STAGE - STORAGE COMPUTATIONS BETWEEN CONTOURS CONTOUR CONTOUR INCR. ACCUM. ELEV. AREA VOL. VOL STAGE ft ft cult cult ft 1065.0 3077.21 0 0 0 1065.1 3120.63 310 310 0.1 1065.2 3164.05 314 624 0.2 1065.3 3207.47 319 943 0.3 1065.4 3250.89 323 1,266 0.4 1065.5 3294.31 327 1,593 0.5 1065.6 3337.73 332 1,925 0.6 1065.7 3381.15 336 2,261 0.7 1065.8 3424.57 340 2,601 0.8 1065.9 3467.99 345 2,946 0.9 1066.0 3511.44 349 3,295 1.0 1066.1 3556.87 353 3,648 1.1 1066.2 3602.30 358 4,006 1.2 1066.3 3647.73 363 4,369 1.3 1066.4 3693.16 367 4,736 1.4 1066.5 3738.59 372 5,108 1.5 1066.6 3784.02 376 5,484 1.6 1066.7 3829.45 381 5,865 1.7 1066.8 3874.88 385 6,250 1.8 1066.9 3920.31 390 6,640 1.9 1067.0 3965.69 394 7,034 2.0 1067.1 4013.12 399 7,433 2.1 1067.2 4060.55 404 7,837 2.2 1067.3 4107.98 408 8,245 2.3 1067.4 4155.41 413 8,658 2.4 1067.5 4202.84 418 9,076 2.5 1067.6 4250.27 423 9,499 2.6 1067.7 4297.70 427 9,926 2.7 1067.8 4345.13 432 10,358 2.8 1067.9 4392.56 437 10,795 2.9 1068.0 4439.96 442 11,237 3.0 1068.1 4489.39 446 11,683 3.1 1068.2 4538.82 451 12,134 3.2 1068.3 4588.25 456 12,590 3.3 1068.4 4637.68 461 13,051 3.4 1068.5 4687.11 466 13,517 3.5 1068.6 4736.54 471 13,988 3.6 1068.7 4785.97 476 14,464 3.7 1068.8 4835.40 481 14,945 3.8 1068.9 4884.83 486 15,431 3.9 1069.0 4934.24 491 15,922 4.0 1069.1 4985.67 496 16,418 4.1 1069.2 5037.10 501 16,919 4.2 1069.3 5088.53 506 17,425 4.3 1069.4 5139.96 511 17,936 4.4 1069.5 5191.39 517 18,453 4.5 1069.6 5242.82 522 18,975 4.6 1069.7 5294.25 527 19,502 4.7 1069.8 5345.68 532 20,034 4.8 1069.9 5397.11 537 20,571 4.9 1070.0 5448.55 542 21,113 5.0 1070.1 4903.70 518 21,631 5.1 1070.2 4358.85 463 22,094 5.2 1070.3 3814.00 409 22,503 5.3 1070.4 3269.15 354 22,857 5.4 1070.5 2724.30 300 23,157 5.5 1070.6 2179.45 245 23,402 5.6 1070.7 1634.60 191 23,593 5.7 1070.8 1089.75 136 23,729 5.8 1070.9 544.90 82 23,811 5.9 0.0 0.00 - 291767 - 267,956 - 1065.0 0.1 - 544.86 -27 - 267,983 - 1064.9 0.2 - 1089.72 -82 - 268,065 - 1064.8 0.3 - 1634.58 -136 - 268,201 - 1064.7 0.4 - 2179.44 -191 - 268,392 - 1064.6 0.5 - 2724.30 -245 - 268,637 - 1064.5 0.6 - 3269.16 -300 - 268,937 - 1064.4 0.7 - 3814.02 -354 - 269,291 - 1064.3 0.8 - 4358.88 -409 - 269,700 - 1064.2 0.9 - 4903.74 -463 - 270,163 - 1064.1 0.0 0.00 2207 - 267,956 -1065 GUPTON & ASSOCIATES P.A. 2200 Silas Crk. Pkwy Suite 2 -B Winston- Salem, N.C. 27103 2 -YR STORM CHAINSAW ROUTING Project: COUNTRY MEADOWS "2-YR FREQUENCY STORM: "Peak Runoff (Qp) = 10.04 cfs "Time to Peak (Tp) = 15.40 min. "Time Step (dT) = 1.54 min. "STORAGE EQUATION: "Ks = 291634 "b = 1.23 "Initial Elevation (Zo) = 1065.0 ft. Maximums 10.02 11,6731 3.09 1 1068.09 1.72 TIME (min) INFLOW (CIS) STORAGE (Cu ft) STAGE (ft) ELEVATION (ft) OUTFLOW (cf.) 1.5 0.23 21 0.02 1065.02 0.00 3.0 0.91 42 0.03 1065.03 0.00 4.5 1.97 126 0.08 1065.08 0.01 6.0 3.31 307 0.16 1065.16 0.02 7.5 4.82 611 0.28 1065.28 0.03 9.0 6.34 1054 0.44 1065.44 0.03 10.5 7.73 1637 0.63 1065.63 0.03 12.0 8.88 2348 0.84 1065.84 0.03 13.5 9.67 3166 1.07 1066.07 0.03 15.0 10.02 4057 1.31 1066.31 0.03 16.5 9.91 4980 1.55 1066.55 0.03 18.0 9.35 5893 1.77 1066.77 0.03 19.5 8.38 6754 1.98 1066.98 0.03 21.0 7.40 7526 2.16 1067.16 0.03 22.5 6.52 8207 2.32 1067.32 0.03 24.0 5.75 8807 2.46 1067.46 0.03 25.5 5.06 9336 2.58 1067.58 0.03 27.0 4.46 9801 2.68 1067.68 0.03 28.5 3.93 10210 2.77 1067.77 0.03 30.0 3.46 10570 2.85 1067.85 0.03 31.5 3.05 10887 2.92 1067.92 0.03 33.0 2.69 11166 2.98 1067.98 0.03 34.5 2.37 11412 3.03 1068.03 0.59 36.0 2.09 11576 3.07 1068.07 1.35 37.5 1.84 11644 3.08 1068.08 1.53 39.0 1.62 11673 3.09 1068.09 1.72 40.5 1.43 11664 3.09 1068.09 1.72 42.0 1.26 11637 3.08 1068.08 1.53 43.5 1.11 11612 3.08 1068.08 1.53 45.0 0.98 11573 3.07 1068.07 1.35 46.5 0.86 11539 3.06 1068.06 1.16 48.0 0.76 11511 3.05 1068.05 0.97 49.5 0.67 11492 3.05 1068.05 0.97 51.0 0.59 11464 3.04 1068.04 0.78 52.5 0.52 11446 3.04 1068.04 0.78 54.0 0.46 11422 3.03 1068.03 0.59 55.5 0.40 11410 3.03 1068.03 0.59 57.0 0.35 11392 3.03 1068.03 0.59 58.5 0.31 11370 3.02 1068.02 0.41 60.0 0.28 11361 3.02 1068.02 0.41 61.5 0.24 11349 3.02 1068.02 0.41 63.0 0.21 11333 3.01 1068.01 0.22 64.5 0.19 11332 3.01 1068.01 0.22 66.0 0.17 11329 301 1068.01 0.22 67.5 0.15 11324 3.01 1068.01 0.22 69.0 1 0.13 11318 1 3.01 1 1068.01 0.22 GUPTON & ASSOCIATES P.A. 2200 Silas Crk. Pkwy Suite 2 -B Winston - Salem, N.C. 27103 2 -YR STAGE - DISCHARGE FUNCTION Project: COUNTRY MEADOWS Faircloth shimmer Constant Head 0.167 ft. ELEVATION (ft) STAGE (ft) WATER QUALITY DRAW DOWN: RISER ORIFICE WEIR BARREL (cfs) (cfs) (cfs) PRIMARY OUTFLOW (cfs) # Skimmers = 1.0 Riser Weir Length = 0.0 ft. "Diameter = 0.146 ft. "Crest Elevation = 1068.0 ft. "Area = 0.017 sE "Weir Coefficent = 3.0 "Vertical Spacing = 0.0 ft. "Discharge Coefficient = 0.6 "Invert Elevation = 1065.0 ft. #NUM! 0.03 "Discharge Coefficient = 0.6 "Orifice Diameter= 2.0 in. "EMERGENCY WEIR: 0.03 "Invert Elevation = 1065.0 ft "Weir Coefficient = 3.0 "Discharge Coefficient = 0.60 "Crest Elevation = 1068.0 ft 0.03 0.03 "Weir Length = 14.0 ft Faircloth shimmer Constant Head 0.167 ft. ELEVATION (ft) STAGE (ft) POND SKIMMER (cfs) RISER ORIFICE WEIR BARREL (cfs) (cfs) (cfs) PRIMARY OUTFLOW (cfs) EMERGENCY WEIR (cfs) TOTAL OUTFLOW ON 1065.0 0.0 0.00 #NUM! #NUM! 0.00 0.00 #NUM! 0.00 1065.2 0.2 0.03 #NUM! #NUM! 0.03 0.03 #NUM! 0.03 1065.4 0.4 0.03 #NUM! #NUM! 0.03 0.03 #NUM! 0.03 1065.6 0.6 0.03 #NUM! #NUM! 0.03 0.03 #NUM! 0.03 1065.8 0.8 0.03 #NUM! #NUM! 0.03 0.03 #NUM! 0.03 1066.0 1.0 0.03 #NUM! #NUM! 0.03 0.03 #NUM! 0.03 1066.2 1.21 0.03 #NUM! #NUM! 0.03 0.03 #NUM! 0.03 1066.4 1.41 0.03 #NUM! #NUM! 0.03 0.03 #NUM! 0.03 1066.6 1.61 0.03 #NUM! #NUM! 0.03 0.03 #NUM! 0.03 1066.8 1.8 0.03 #NUM! #NUM! 0.03 0.03 #NUM! 0.03 1067.0 2.0 0.031 #NUM! #NUM! 0.03 0.03 #NUM! 0.03 1067.2 2.2 0.031 #NUM! I #NUM! 0.03 0.03 #NUM! 0.03 1067.4 2.4 0.03 #NUM! #NUM! 0.03 0.03 #NUM! 0.03 1067.6 2.6 0.03 #NUM! #N-UM! 0.03 0.03 #NUM! 0.03 1067.8 2.81 0.03 #NUM! #NUM! 0.03 0.03 #NUM! 0.03 1068.0 3.01 0.03 0.00 0.00 0.18 0.03 0.00 0.03 1068.2 3.21 0.03 0.00 0.00 0.19 0.03 3.76 3.79 1068.4 3.4 0.031 0.00 1 0.00 0.19 0.03 10.63 10.66 1068.6 3.6 0.03 0.00 1 0.00 0.20 0.03 19.521 19.55 1068.8 3.8 0.03 0.00 0.00 0.20 0.03 30.05 30.08 1069.0 4.0 0.03 0.00 0.00 0.21 0.03 42.00 42.03 1069.2 4.2 0.03 0.00 0.00 0.21 0.03 55.21 55.24 1069.4 4.41 0.03 0.00 0.00 0.22 0.03 69.57 69.601 1069.6 4.61 0.031 0.00 0.00 0.22 0.03 85.00 85.03 1069.8 4.8 0.031 0.00 1 0.00 0.23 0.03 101.43 101.46 1070.0 5.0 0.03 0.00 0.00 0.23 0.03 118.79 118.82 1070.2 5.2 0.03 0.00 0.00 0.24 0.03 137.05 137.08 1070.4 5.4 0.03 0.00 0.00 0.24 0.03 156.16 156.19 1070.6 5.6 0.03 0.00 0.00 0.25 0.03 176.08 176.11 1070.8 5.81 0.03 0.00 0.00 0.25 0.03 196.78 196.81 1071.0 6.01 0.031 0.00 1 0.00 0.26 0.03 218.24 218.27 1071.2 6.21 0.03 0.00 0.00 0.26 0.03 240.42 240.45 1071.4 6.41 0.03 0.00 0.00 0.26 0.03 263.31 263.34 1071.6 6.61 0.03 0.00 0.00 0.27 0.03 286.88 286.91 1071.8 6.8 0.03 0.00 0.00 0.27 0.03 311.12 311.15 1072.0 7.0 0.03 0.00 0.00 0.28 0.03 336.00 336.03 1072.2 7.2 0.03 0.00 0.00 0.28 0.03 361.51 361.54 1072.4 7.4 0.03 0.00 0.00 0.28 0.03 387.64 387.67 1072.6 7.6 0.03 0.00 0.00 0.29 0.03 414.37 414.40 1072.8 7.8 0.03 0.00 0.00 0.29 0.03 441.68 441.71 1073.0 8.0 0.03 0.00 0.00 0.30 0.03 469.57 469.60 1073.2 8.2 0.031 0.00 0.00 0.30 0.03 498.03 498.06 1073.4 8.4 . 31 0.00 0.00 0.30 0.03 527.04 527.07 1073.6 8.6 0.031 0.00 1 0.00 0.31 0.03 556.58 556.61 1073.8 8.8 0.031 0.00 1 0.00 0.31 0.03 586.67 586.70 1074.0 9.0 0.03 0.00 0.00 0.31 0.03 617.27 617.30 GUPTON & ASSOCIATES P.A. 2200 Silas Crk. Pkwy Suite 2 -B Winston - Salem, N.C. 27103 10-VR STORM CHAINSAW ROUTING Project: COUNTRY MEADOWS "10411 FREQUENCY STORM: "Peak Runoff (Qp) = 12.75 efs "Time to Peak (Tp) = 25.28 min. "Time Step (dT) = 2.53 min. "STORAGE EQUATION: "Ks = 2916.34 "b= 1.23 "Initial Elevation (Zo) = 1065.0 ft. Maximums 12.75 13,379 3.45 1068.45 1188 TIME (min) INFLOW (CIS) STORAGE (CU ft) STAGE (ft) ELEVATION (ft) OUTFLOW (cfs) 2.5 0.31 47 0.03 1065.03 0.00 5.0 1.19 94 0.06 1065.06 0.01 7.5 2.57 273 0.15 1065.15 0.02 10.0 4.32 660 030 1065.30 0.03 12.5 6.26 1311 0.52 1065.52 0.03 15.0 8.22 2257 0.81 1065.81 0.03 17.5 10.00 3500 1.16 1066.16 0.03 20.0 11.43 5013 1.55 1066.55 0.03 22.5 12.37 6744 1.98 1066.98 0.03 25.0 12.75 8617 2.41 1067.41 0.03 27.5 12.51 10548 2.84 1067.84 0.03 30.0 11_68 12442 3.25 1068.25 5.51 32.5 10.35 13379 3.45 1068.45 12.88 35.0 9.15 12995 3.37 1068.37 9.63 37.5 8.04 12922 3.35 1068.35 8.94 40.0 7.07 12785 3.33 1068.33 8.26 42.5 6.22 12604 3.29 1068.29 6.88 45.0 5.47 12504 3.27 1068.27 6.19 47.5 4.81 12395 3.24 1068.24 5.16 50.0 4.23 12342 3.23 1068.23 4.82 52.5 3.72 12252 3.21 1068.21 4.13 55.0 3.27 12190 3.20 1068.20 3.79 57.5 2.88 12111 3.18 1068.18 3.41 60.0 2.53 12031 3.17 1068.17 3.23 62.5 2.22 11925 3.14 1068.14 2.66 65.0 1.96 11858 3.13 1068.13 2.47 67.5 1.72 11781 3.11 1068.11 2.10 70.0 1.51 11723 3.10 1068.10 1.91 72.5 1.33 11662 3.09 1068.09 1.72 75.0 1.17 11603 3.07 1068.07 1.35 77.5 1.03 11576 3.07 1068.07 1.35 80.0 0.90 11527 3.06 1068.06 1.16 82.5 0.80 11488 3.05 1068.05 0.97 85.0 0.70 11462 3.04 1068.04 0.78 87.5 0.61 11450 3.04 1068.04 0.78 90.0 0.54 11424 3.03 1068.03 0.59 92.5 0.48 11416 3.03 1068.03 0.59 95.0 0.42 11399 3.03 1068.03 0.59 97.5 0.37 11373 3.02 1068.02 0.41 100.0 0.32 11367 3.02 1068.02 0.41 102.5 0.28 11353 3.02 1068.02 0.41 105.0 0.25 11333 3.01 1068.01 0.22 107.5 0.22 11338 3.02 1068.02 0.41 110.0 0.19 11309 3.01 1068.01 0.22 112.5 0.17 11304 3.01 1068.01 0.22 115.0 1 0.15 1 11296 3.01 1 1068.01 0.22 Faircloth skimmer Constant Head 0.167 ft. ELEVATION (ft) GUPTON & ASSOCIATES P.A. POND SKIMMER (cfs) RISER ORIFICE WEIR BARREL (cfs) (cfs) (cfs) 2200 Silas Cris. Pkwy Suite 2-B EMERGENCYJ WEIR (cfs) OTAL OUTFLOW ON Winston -Salem, N.C. 27103 0.0 0.00 10-YR STAGE - DISCHARGE FUNCTION #NUM! Project: COUNTRY MEADOWS 0.00 #NUM! WATER QUALITY DRAW DOWN: 1065.2 # Skimmers = !.0 Riser Weir Length = 0.0 ft. "Diameter = 0.146 ft. "Crest Elevation = 1068.00 ft. "Area = 0.017 A "Weir Coefficent = 3.0 "Vertical Spacing = 0.0 R. "Discharge Coefficient = 0.6 "Invert Elevation = 1065.0 ft. 0.03 "Discharge Coefficient = 0.6 "Orifice Diameter = 2.0 in. "EMERGENCY WEIR- 0.03 "Invert Elevation = 1065.0 ft. "Weir Coefficient = 3.0 "Discharge Coefficient = 0.60 "Crest Elevation = 1068.0 ft. 1065.8 "Weir Length = 14.0 fL Faircloth skimmer Constant Head 0.167 ft. ELEVATION (ft) STAGE (ft) POND SKIMMER (cfs) RISER ORIFICE WEIR BARREL (cfs) (cfs) (cfs) PRIMARY OUTFLOW (cfs) EMERGENCYJ WEIR (cfs) OTAL OUTFLOW ON 1065.0 0.0 0.00 #NUM! #NUM! 0.00 0.00 #NUM! 0.00 1065.2 0.2 0.03 #NUM! #NUM! 0.03 0.03 #NUM! 0.03 1065.4 0.4 0.03 #NUM! #NUM! 0.03 0.03 #NUM! 0.03 1065.6 0.6 0.03 #NUM! #NUM! 0.03 0.03 #NUM! 0.03 1065.8 0.8 0.03 #NUM! #NUM! 0.03 0.03 #NUM! 0.03 1066.0 1.0 0-031 #NUM! #NUM! 0.03 0.03 #NUM! 0.03 1066.2 1.2 0.03 #NUM! #NUM! 0.03 0.03 #NUM! 0.03 1066.4 1.4 0.03 #NUM! #NUM! 0.03 0.03 #NUM! 0.03 1066.6 1.6 0.03 #NUM! #NUM! 0.03 0.03 #NUM! 0.03 1066.8 1.8 0.03 #NUM! #NUM! 0.03 0.03 #NUM! 0.03 1067.0 2.0 0.03 #NUM! #NUM! 0.03 0.03 #NUM! 0.03 1067.2 2.2 0.03 #NUM! #NUM! 0.03 0.03 #NUM! 0.03 1067.4 2.4 0.03 #NUM! #NUM! 0.03 0.03 #NUM! 0.03 1067.6 2.6 0.03 #NUM! #NUM! 0.03 0.03 #NUM! 0.03 1067.8 2.8 0.03 #NUM! #NUM! 0.03 0.03 #NUM! 0.03 1068.0 3.01 0.03 0.00 0.00 0.18 0.03 0.00 0.03 1068.2 3.2 0.031 0.00 0.00 0.19 0.03 3.76 3.79 1068.4 3.4 0.03 0.00 0.00 0.19 0.03 10.63 10.66 1068.6 16 0.03 0.00 0.00 0.20 0.03 19.52 19.55 1068.8 3.8 0.03 0.00 0.00 0.20 0.03 30.05 30.08 1069.0 4.0 0.03 0.00 0.00 0.21 0.03 42.00 42.03 1069.2 4.2 0.03 0.00 0.00 0.21 0.03 55.21 55.24 1069.4 4.4 0.03 0.00 1 0.00 0.22 0.03 69.57 69.60 1069.6 4.6 0.03 0.00 0.00 0.22 0.03 85.00 85.03 1069.8 4.8 0.03 0.00 0.00 0.23 0.03 101.43 101.461 1070.0 5.0 0.03 0.00 0.00 0.23 0.03 118.79 118.82 1070.2 5.2 0.03 0.00 0.00 0.24 0.03 137.05 137.08 1070.4 5.41 0.03 0.00 0.00 0.24 0.03 156.16 156.19 1070.6 5.61 0.00 0.00 0.25 0.03 176.08 176.11 1070.8 5.8 0.03 0.00 0.00 0.25 0.03 1%.81 1071.0 6.0 0.03 0.00 0.00 0.26 0.03 A263.31 218.27 1071.2 6.2 0.03 0.00 0.00 0.26 0.03 240.45 1071.4 6.4 0.03 0.00 0.00 0.26 0.03 263.34 1071.6 6.6 0.03 0.00 0.00 0.27 0.03 1 286.881 286.91 1071.8 6.8 0.03 0.00 0.00 0.27 0.03 1 311.12 311.15 1072.0 7.01 0.03 0.00 0.00 0.28 0.03 336.00 336.03 1072.2 7.2 0.03 0.00 0.00 0.28 0.03 361.51 361.54 1072.4 7.4 0.03 0.00 0.00 0.28 0.03 387.64 387.67 1072.6 7.6 0.03 0.00 0.00 0.29 0.03 414.37 414.40 1072.8 7.8 0.03 0.00 0.00 0.29 0.03 1 441.68 441.71 1073.0 8.0 0.03 0.00 0.00 0.30 0.03 469.571 469.60 1073.2 8.2 0.03 0.00 0.00 0.30 0.03 498.03 498.06 1073.4 8.4 0.03 0.00 0.00 0.30 0.03 527.04 527.07 1073.6 8.6 0.03 0.00 0.00 0.31 0.03 556.58 556.61 1073.8 8.811 0.031 0.00 0.00 0.31 0.03 586.67 586.70 1074.0 9.05 0.03 0.00 0.00 0.31 0.03 617.27 617.30 GUPTON & WEBB, P.A. P.O. BOX 1070 King, N.C. 27021 COUNTRY MEADOWS STORMWATER RETENTION POND SUMMARY REPORT ,CONTOU ONTOUF CONTOUR INCR. ACCUM. ELEV. AREA AREA VOL. VOL STAGE k s ft acres cu ft cu ft 11 1065.0 3,077.211 0.07 0 0 0 1066.0 3,511.44 0.08 3,294 3,294 1 1067.0 3,965.69 0.09 3,739 7,033 2 1068.0 4,439.96 0.10 4,203 11,236 3 1069.0 4,934.24 0.11 4,687 15,923 4 1070.0 5,448.55 0.13 5,191 21,114 5 POND ELEVATIONS: Top of Dam Elevation: 1070.00 Ft. Top of Weir Spillway Elev.: 1070.00 Ft. Weir Spillway Elevation: 1068.00 Ft. Runoff Depth in Spillway Elevatio 1068.45 Ft. Invert of Skimmer Elevation: 1065.00 Ft. Bottom of Pond Elevation: 1016.00 Ft. FAIRCLOTH SKIMMER: PRIMARY SPILLWAY: Barrel Length: 38 Ft. Barrel Size: 2 In. Barrel Slope: 1.05 % EMERGENCY SPILLWAY Bottom Width: 14 Ft. Water Quality Release Orifice for Faircloth Skimmer: Design Head (Constant for Skimmer), h: 2.0 In. Maximum Release Rate: 1 Days Minimum Release Rate: 3 Days Maximum Hole Size: 0.039638 2.70 In. Dia. Minimum Hole Size: 0.013213 1.56 In. Dia. Faircloth Skimmer Orifice Size: 1.75 In. Dia. Faircloth Skimmer Barrel Size: 2.00 In. Dia. MAX STAGE ELEV.: 1068.09 MAX FLOW CFS: 1.72 GUPTON & WEBB, P.A. P.O. BOX 1070 King, N.C. 27021 OUTLET STRUCTURE SCHEMATIC MAX STAGE ELEV.: 1068.45 MAX FLOW CFS: 12.88 Toe of Dam 1066.00 1070.00 1068.00 �— 14.00 ft —►I Top of Dam 1.0' Min.) 1070.00 1.55 ft —7 10 Yr 1068.45 ------------------------ 1 - - Max. 0.5' 2.00 ft- - -- -- - - - - -- f - -- FLOOD 0.45 ft Spillway 2 Yr 1068.09 1068.00 3.00 ft 4.00 ft WATER QUALITY 38.00 ft 1.05% 1065.00 1065.00 2 in. 1064.60 Toe of Dam 1066.00 1070.00 1068.00 �— 14.00 ft —►I MAX STAGE ELEV.: 1068.09 MAX FLOW CFS: 1.72 GUPTON & WEBB, P.A. P.O. BOX 1070 King, N.C. 27021 OUTLET STRUCTURE SCHEMATIC MAX STAGE ELEV.: 1068.45 MAX FLOW CFS: 12.88 Toe of Dam 1066.00 1070.00 1068.00 14.00 ft Top of Dam 1.0' Min.) 1070.00 1.55 ft 10 Yr 1068.45 -------- ----------------- 1 Max. 0.5' 2.00 ft FLOOD -- - - - - -- `--- 0.45 ft Spillway 2 Yr 1068.09 _ — 1068.00 3.00 ft 4.00 ft WATER QUALITY 38.00 ft 1.05% 1065.00 1065.00 2 in. 1064.60 Toe of Dam 1066.00 1070.00 1068.00 14.00 ft