Loading...
HomeMy WebLinkAbout20230452 Ver 1_Site Plan_20230328 (2)PpogectName/address_�io131 IbDyl�nrrY�c�i� ,C�' neli C. County: ,M��i�e �or Owner: jL i. '1�� S':J C OL Print Sigaiture Contractor/agent: Sr 6 e :Print ._ Signature _ The approval is for the purpose and design described in your application. impacts not indicated in the application is a violation of the Buffer Buie. Site specific work should be provided in the application. [15A NCAC 02H .0506 and 15A NCAC 02B .0243(8)] Trees are not allowed to be removed from Zone of the Buffer (within 30 ft of the full pond elevation), unless approved. Exception, those trees that are severely undermined along.the immediate shoreline can be removed. Minimal shaping and sloping along the immediate shoreline is allowed. [1:5A NCAC 02B .0243(6}] Benching; grading in the buffer is not allowed. Excessive disturbance of ground cover. [15A NCAC 02B .0243 (6)] Beaches, impervious patios, impervious walkways, etc. are not allowed in the buffer unless specifically approved by the Division. There are limitation on size for decks. [15A NCAC 028.0M(4) and (6)1 Work to be conducted from land must indicate an access and indicate any trees that are to be removed. The work corridor should be described. The approved access corridor shall be restored, Staging, spoil, construction material must be outside the buffer. [15A NCAC 02H .05€22 and 15A NCAC 02B .0243 (4), (6), (8)] Stormwater cannot be piped or channeled for direct discharge to the lake. All constructed stormwater discharges must be at the natural elevation and discharged prior to entering the buffer directed as diffuse or sheet flow at non -erosive velocities to the lake, [15A NCAC 02B .0243(5), (6)] Acknowledgement of ivotification hereby state that l have been informed of the Catawba Ripariaai Bu efF r Rule. Any work conducted in the buffer, not specifically stated in the application and approved by the Division of Water Resources (DWR), is a violation and subject to enforcement. Due diligence will be taken such that the construction will be built within substantial compliance and intent of the 401 Water Quality Certification and Suffer Rules, the approved plan(s) and specification(s), and other supporting materials. Date: � -Q6 a