Loading...
HomeMy WebLinkAbout20230452 Ver 1_Site Plan_20230328Full Pond/ Normal Water Level Sncrellne 'C 1_.a lie (At Full Pond/ Normal Water Level) LV 0-bove X rJ' L4' Le-�Ow X, 51 c G S �Ao i f-ces (-e.m(Dved or) , 0' mc-k 6ISV')A �c2 bvr�-P-r Please approximately sketch the following information on this plan, lenvh of Shoreline (provide dimensions for each item, such as 10.ft x 100 ft)*: I. All proposed vegetation clearing 2. Location of rip rap or fill to be placed above the Full Pond/ Normal Water Level elevation 3. Location of rip rap or fill to be placed below the Full Pond/ Normal Water Level elevation 4. Location of any proposed structures such as buildings, retaining walls, docks, etc. 5. Location of any excavation or dredging below the Full Pond/ Normal Water Level elevation 6. Location of construction access corridors FORM: SSGP 10-2013 Page 3 of 3