HomeMy WebLinkAbout20230452 Ver 1_Site Plan_20230328Full Pond/
Normal Water Level
Sncrellne
'C
1_.a lie
(At Full Pond/ Normal Water Level)
LV 0-bove X rJ'
L4' Le-�Ow X, 51
c
G
S
�Ao i f-ces (-e.m(Dved
or) , 0' mc-k 6ISV')A �c2
bvr�-P-r
Please approximately sketch the following information on this plan, lenvh of Shoreline
(provide dimensions for each item, such as 10.ft x 100 ft)*:
I. All proposed vegetation clearing
2. Location of rip rap or fill to be placed above the Full Pond/ Normal Water Level elevation
3. Location of rip rap or fill to be placed below the Full Pond/ Normal Water Level elevation
4. Location of any proposed structures such as buildings, retaining walls, docks, etc.
5. Location of any excavation or dredging below the Full Pond/ Normal Water Level elevation
6. Location of construction access corridors
FORM: SSGP 10-2013 Page 3 of 3