Loading...
HomeMy WebLinkAbout20230447 Ver 1_Conrad Site Plan_20230323GE NERAL DEVELOPMENT NOTES: 1. OWNER/APPLICANT: CHRIS AND CHRYSTIE CONRAD 4745 LUDWELL BRANCH CT. RAI FIGH, NC 27612 DEED REFERENCE: DB:1700, PG:233, 2. PROPERTY DATA: LOT 16, SECTION 14, WHALEHEAD CLUB PLAT REFERENCE: P.C. 3, SL 77, C.C.R. PIN: 115A-ODD-0016-0014 ADDRESS: 806 LIGHTHOUSE DRIVE, COROLLA, NC 27927 3. FEMA DATA: FLOOD ZONE: F.I.R.M. ZONE X PANEL NUMBER 3720 9935 OOK; EFFECTIVE DATE DECEMBER 21, 2018 (DATA SUBJECT TO CHANGE BY FEMA) 4. LOT COVERAGE DATA: TOTAL LOT AREA: 20,000 SF COVERAGE: PROPOSED DWELLING STRUCTURE UNDER ROOF: 3,264 SF PROPOSED CONCRETE PARKING AND DRIVE NOT UNDER ROOF: 1,953 SF PROPOSED POOL SURFACE: 476 SF PROPOSED CONCRETE POOL DECK NOT UNDER ROOF: 1,347 SF TOTAL PROPOSED LOT COVERAGE: 7,040 SF PERCENT LOT COVERAGE; 35.2% (SEE STORMWATER BELOW) 'OPEN DECKS AND STEPS OVER GROUND ARE NOT INCLUDED IN COVERAGE 5, U-f1UTIE5 DATA - THIS DEVELOPMENT WILL BE SERVED BY ON -SITE WASTEWATER PER THIS PLAN. THIS DEVELOPMENT WILL BE SERVED BY COUNTY WATER. ALL NEW UTIUTIES SHALL BE INSTALLED UNDERGROUND. 6. PARKING DATA: REQUIREMENTS - (2) SPACES FOR BEDROOMS 1-4 (6) SPACES FOR BEDROOMS 5-10 (1) SPACES FOR BMRO S 11-12.. (9) TOTAL PARKING SPACES REQUIRED PROVISIONS - (9) 10'xl8' PARKING SPACES PROVIDED 7. BOUNDARY, EXISTING TOPOGRAPHIC ELEVATIONS AND WETLANDS BASED ON 'SURVEYED FOR CHRIS CONRAD & CHRYSTIE CONRAD, WETLANDS PLAT OF LOT 16, WHALEHEAD CLUB, SECTION 14' PREPARED BY SADLER SURVEYING, PLLC, SEALED BY MICHAEL D. SADLER, PLS L-5029, DATED 3-20-2023. 8 DWELLING DIMENSIONS ARE BASED ON FLOOR PLANS PROVIDED BY FINCH & COMPANY TITLED 'CONRAD ESTIMATING PLANS.PDF' RECEIVED IAA EMAIL ON 12-13-22. POOL, POOL DECKING AND PARKING LAYOUT PER DIRECTION OF FINCH & COMPANY. DEVIATIONS FROM THESE PLANS MAY REQUIRE SITE AND PERMIT MODIFICATIONS. STORMWAIM CALCULATIONS: THE FOLLOWING CALCULATIONS ARE PERFORMED IN ACCORDANCE WITH CHAPTER 2.3 OF THE CURRITUCK COUNTY STORMWATER MANUAL. MEASURES T ]EE& I OWELLING- PORCHES. POOL DECKING, DRIVEWAY, AND WALKS PROPOSED IMPERVIOUS COVERAGE - 6,564 SF (SEE GENERAL NOTE 4, EXCLUDES POOL SURFACE) STORMWATER STORAGE REQUIRED = 6,564 SF " 4 INCH ' (1 FT/12 INCH) = 2,188 CUBIC FEET (CF). VOLUME PROVIDED BY STORMWATER MEASURES = RETENTION AREA TABLE ID TOP ELEV BOTTOM ELEV DEPTH SIDE SLOPE TOP AREA BOTTOM AREA VOLUME A 6.5' 6.0' 0.5' 1 3:1 1 3.895 SFt 1 3,020 SFt 11,729 CFf B 6.5' 6.0' 0.5' 1 3:1 1 946 SFt 1 695 SFt 1 410 CFf QEERA-nON AND MAINTENANCE PLAN NOTES A. DURING CONSTRUCTION, EROSION SHALL BE KEPT TO A MINIMUM AND ANY ERODED AREAS SHALL BE REPAIRED IMMEDIATELY. B. ALL DISTURBED AREAS SHALL BE SEEDED AND STABILIZED PURSUANT TO THE SPECIFICATIONS PROVIDED THIS SHEET. C. THE FOLLOWING OPERATION & MAINTENANCE MEASURES SHALL BE PERFORMED ON ALL STORMWATER i MANAGEMENT MEASURES FOR OPTIMUM EFFICIENCY OF THE STORMWATER MANAGEMENT SYSTEM. THIS INCLUDES THE ROOF GUTTER SYSTEM, PERIMETER SUBSURFACE CONVEYANCE PIPE SYSTEM, • STORMWATER CHAMBER FIELDS AND RETENTION AREA BMP. 1. SYSTEM INSPECTIONS- AT LEAST (1) EVERY 6 MONTHS OR AFTER ANY SIGNIFICANT RAINFALL EVENT- 2. SEDIMENT ACCUMULATION AND TRASH/DEBRIS REMOVAL - AT LEAST (1) EVERY 6 MONTHS OR AFTER ANY SIGNIFICANT RAINFALL 3. IMMEDIATELY REPAIR ANY SYSTEM COMPONENTS THAT ARE DAMAGED OR ARE NOT FUNCTIONING AS INTENDED, 4. IMMEDIATELY REPAIR ANY ERODED AREAS/SIDE SLOPES AND REVEGETATE AS NECESSARY. = PROVIDE ADDITIONAL EROSION PROTECTION SUCH AS REINFORCED TURF MATTING OR RIPRAP AS NEEDED TO PREVENT CONTINUED PROBLEMS. 5. THE VEGETATION IN AND AROUND THE STORMWATER RETENTION AREA SHALL BE MAINTAINED AT A HEIGHT OF APPROXIMATELY SIX INCHES. 6. RECORDS OF OPERATION AND MAINTENANCE SHALL BE KEPT. u r SEED, SPRIG, OR SOD SIDE SLOPES TYPICAL VEGETATIVE SWALE SECTION NOT TO SCALE SECTION VIEW LEGEND SYMBOL DESCRIPTION �u RIGHT OF WAY = PROPERTY BOUNDARY = ADJACENT PROPERTY LINE PROPOSED GRADE CONTOUR mew• _�-- PROPOSED WW DISPOSAL LINE PROPOSED WW FORCE MAIN = PROPOSED WW CONVEYANCE x6 0 = EXISTING GRADE SPOT ELEV. 08,72 = PROPOSED GRADE SPOT ELEV. = PROPOSED CONCRETE C = POTENTIAL EXISTING WETLAND r = PROPOSED PARKING SPACE # NOTE: EXISTING SITE INFORMATION DESCRIBED HEREON IS BELIEVED TO BE ACCURATE, HOWEVER, BPG INC. MAKES NO WARRANTY AS TO THE ACCURACY. IT IS THE CONTRACTORS RESPONSIBILITY TO VERIFY THIS INFORMATION BEFORE RELYING ON IT. THE CONTENT OF THESE DOCUMENTS MAY ALSO INCLUDE TECHNICAL INACCURACIES OR TYPOGRAPHICAL ERRORS. IF SUCH CONDITIONS EXIST, THE CONTRACTOR SHALL CONSULT WITH THE ENGINEER PRIOR TO PROCEEDING WITH THE SCHEDULED WORK AND MAY CONTINUE AFTER AN AUTHORIZATION TO PROCEED HAS BEEN GRANTED. 0 VEGETATED RETENTION AREA-B BOTTOM EL.EV.:6.OV BOTTOM WIDTH: 10.5t SIDE SLOPE: 3 1 � STORAGE DEPTH: 6. (SEE DETAILS THIS SHEET) VEGETATED BERM TOP ELEV.:6.50' TOP WIDTH: 1't SIDE SLOPE: 3:1 (SEE DETAILS THIS SHEET) a a 0 IC4 LOT 17 NI JOHN DONLEAVY la z PROPOSED SEPTIC TANK 3141 GAL PRECAST GARNERS STB-349 (OR APPROVED EQUAL) SEE DETAILS SHEET 2 ( ) PROPOSED EQ TANKS 1,500 GAL PRECAST GARNERS PT-312 I OR APPROVED EQUAL (SEE DETAILS SHEET 2) CONTROL PANEL (APPROX.)- VEGETATED SWALE-C BOTTOM ELEV,-6.00' SIDE SLOPE 3:1- (SEE DETAIS THIS SHEET) LANDSCAPING WALL ALONG PODS - (AS NEEDED) PROPOSED PRE-TREATMENT (2) E-Z TREAT MODEL 1200 PODS (SEE DETAILS SHEET 2) PROPOSED RECIRC/PUMP TANK - 2,581 GAL. PRECAST GARNERS PT-271 (OR APPROVED EQUAL) (SEE DETAILS SHEET 2) 6' PVC CENTER FEED MANIFOLD W/ CLEAN OUTS EACH END (SEE DETAILS THIS SHEET) 2" PVC FORCE MAIN 36' MIN. COVER (SEE DETAILS THIS SHEET) PROPOSED ACTIVE WASTEWATER DISPOSAL AREA TYP. L.P.P. TRENCH DISPOSAL DISPOSAL AREA: 1,080 SF W/ (12) 30 LF LATERALS SPACED 0 3' D.C. FILL DISPOSAL AREA TO MIN. ELEV. OF &0't. (SEE DETAILS THIS SHEET) PROPOSED 10DX REPAIR AREA - AREA: 1080 SF LOT 32 N/F EUGENE & VICTORIA RO FINISHED GRADE ELEV.: VARIES PER PLAN I I % SEED, SPRIG, OR SOD SIDE SLOPES & BOTTOM AS SPECIFIED LIGHTHOUSE DRIVE (601 R/VII) PK NAIL NAAVD�88.01 •Sl Q 'ma`s is. o ° d 4 \ 51' 46'E)21Zc r} - ao 1a.o' d MBE o &25 &43 4 3 ; o L e a ° n � 39.8' &84 &72 -.. -. - ° ° N 4. &7D EN OVER v 17.61' v v 3.39' EN E za. w OVER �, o I I � � { f PROPOSED \ 2-STORY WOOD ` o FRAME DWELLING ON m PILE FOUNDATION I BEDROOMS GROUND DLAB ELEVATION: 9.0'L x ROOF I I a ( I ; " O a O a , Ll c w EN DE m OVER o � I v6.0' w PROPOSED POOL , U.V. FEND HOTPOOL TU9 m� �� CONCRETE DECK - d (APPROK) ad DRAINRELD ELEVATION:8.0'± 0.0' 0 1O TOP OF FlLL , 7 Ft �25' MBL w 5.0' � I J W Y o � M y . - W W r/rrr rr�irrrr,�rrr r,�rrr yrrrrr VEGETATED RETENTION AREA -A N16' 51' 46"W 100.00' VEGETATED BERM BOTTOM ELEV.:6.00' TOP ELEV.:6.50' BOTTOM WIDTH: 23.OY:k TOP WIDTH: 1 SIDE SLOPE: 3:1 SIDE SLOPE: 3:1 STORAGE DEPTH: 6" (SEE DETAILS THIS SHEET) (SEE DETAILS THIS SHEET) LOT 33 N/F JUNE & DOUGLAS THOMAS PROPOSED SITE DEVELOPMENT PLAN SCALE:1"=2V 20 0 10 20 40 PLAN VIEW 1: 20 GRAPHIC SCALE a i ncnac i +r my ri rnn SEE PLAN) J 1 STORAGE DEPTH: 6' BOTTOM ELEV.: &0 BERM TOP WIDTH' V± VEGETATED EARTHEN BERM SEED, SPRIG, OR SOD SIDE SLOPES & TOP AS SPECIFIED a_ NON -SELECT FILL 1 AVG. EX. GRADE ELEV.: 6.0't. \\K/\'IN \\!\\//..,\Ii\\Y/a\.-ll .A\S\\C/. v I A- ]\\T\Y/Y I'N I\\\.,al.%i\\}\\\/\ BOTTOM WIDTH VARIES (SEE PLAN) TYPICAL STORMWATER RETENTION AREA & BERM SECTION NOT TO SCALE SECTION VIEW SEEDING AND SITE STABILIZATION SPFCIFICATIONS PERMANENT VEGETATION SHALL BE ESTABLISHED WITHIN THE LIMITS OF ALL DISTURBED AREAS AS TO THE SPECIFICATIONS DESCRIBED BELOW OR AN APPROVES? EQUAL. A. FERTIUZER: APPLY 3,000 LB/ACRE GROUND AGRICULTURE LIMESTONE AND 500 LB/ACRE 10-10-10 FERTIUZER. TOP DRESS W/ 50 LB/ACRE NITROGEN. B. MULCH: APPLY 4,000 LB/ACRE STRAW. ANCHOR STRAW BY TACKING W/ ASPHALT, NETTING, OR A MULCH ANCHORING TOOL. C. SEEDING/SODDING: 1. TEMPORARY VEGETATION: IF TEMPORARY SEEDING OCCURS DURING WINTER, EARLY SPRING, OR FALL, APPLY 120 LB/ACRE RYE GRAIN. IF TEMPORARY SEEDING OCCURS DURING SUMMER, APPLY 40 LB/ACRE CENTIPEEDGRASS, TEMPORARY VEGETATION CANNOT BE APPLIED WITHIN 15 WORKING DAYS OF LAND DISTURBING ACTIVITY. 2. PERMANENT VEGETATION: APPLY COASTAL MIX CONSISTING OF 50 LB/PENSACOLA BAHIAGRASS, AND 10 LB/ACRE GERMAN MILLET. APPLY PERMANENT SEEDING BETWEEN APRIL 1 AND JULY 15. REFERTIUa THE FOLLOWING APRIL WITH 50 LB/ACRE NITROGEN. 3. SODDING: PERMANENT VEGETATION -SELECT COMPATIBLE SPECIES TO PERMANENT SEEDED TYPE; INSTALL WITH LONGEST DIMENSION PERPENDICULAR TO THE SLOPE AND STAPLE IF NECESSARY; ROLL SOD IMMEDIATELY AND WATER TO 4. PROPOSED POTENTIAL WETLAND IMPACT AREA 614 SF (REQUIRES USACOE LOT 15 APPROVAL) N/F JAMES & JOAN KRILL 0 d a N 9= o n 0 VEGETATED RETENTION AREA -A BOTTOM ELEV.:6.00' BOTTOM WIDTH: 5'f SIDE SLOPE: 3.1 STORAGE DEPTH: 6' (SEE DETAILS THIS SHEET) VEGETATED BERM TOP ELEV.:6.50' TOP WIDTH: V:k SIDE SLOPE: 3- I (SEE DETAILS THIS SHEET) GEOTEXTII FABRIG 4" NITRIM 1 1/4- SCH 40 F 12'- #5OFA! 2" ABON & 6" BELO PROPOSED POTENTIAL WETLAND IMPACT AREA 2,797 SF (REQUIRES USACOE APPROVAL) LOT 34 N/F ROBIN & KATHRYN LASKOWSKI ASTEWATER SYSTEM DESIGN NOTES: PRETREATMENT SYSTEM INSTALLATION AND TESTING PROCEDURES WASTEWATER DESIGN DATA: 1, A PRECONSTRUCTION CONFERENCE SHALL BE HELD AND ATTENDED BY THE SYSTEM DESIGNER, A. DAILY DESIGN FLOW: 1,440 GALLONS PER DAY (GPD) ENGINEER, CERTIFIED SYSTEM INSTALLER, AND LOCAL HEALTH DEPARTMENT (LHO), PRIOR TO BEGINNING BASED ON (12) BEDROOMS WITH (24) PERSON OCCUPANCY CONSTRUCTION OF THE PRETREATMENT SYSTEM AND ASSOCIATED DISPOSAL SYSTEM, B. ACTIVE DISPOSAL SYSTEM: 2. CONTRACTOR SHALL HAVE EXISTING UTIU71ES FLAGGED PRIOR TO GROUND DISTURBING ACTIVITIES. TS-II PRE-TREATMENT W/ LPP BED DISPOSAL SYSTEM CONTACT 1-800-632--4949. (PER A970 (j)(3) BED DISPOSAL > 1000 GPD) 3. ALL PRETREATMENT SYSTEM COMPONENTS SHALL BE LOCATED IN COMPLIANCE WITH THE HORIZONTAL L.T.A.R.: 1.0 GPD /SF + 25% BED REDUCTION MAX W FILL) / ) SETBACK REQUIREMENTS OF RULE .1950, RULE .1970 AND SHALL BE LOCATED TO PREVENT MINIMUM DISPOSAL AREA REQUIRED 1,080 SF SURFACE/SUBSURFACE WATER INFLOW/INFILTRATION. MINIMUM LATERAL LENGTH REQUIRED 360 LF 4. ALL PRETREATMENT SYSTEM COMPONENTS SHALL BE INSTALLED ACCORDING TO THE MANUFACTURE'S LATERAL LENGTH PROVIDED 12 30 LF. LINES 3' O.C. 360 LF ( ) ( ) PROVIDED INSTALLATION MANUAL AND INSTRUCTIONS FOUND ON THESE PLANS. SHOULD THERE BE A C. REPAIR DISPOSAL SYSTEM: (TS-II PRETREATMENT W/ 100% DISPOSAL) CONFLICT BETWEEN THE INSTALLATION MANUAL AND THESE PLANS THE CONTRACTOR SHALL NOTIFY THE ENGINEER FOR RESOLUTION PRIOR TO PROCEEDING WITH INSTALLATION. ALL COMPONENTS USED WITH, REPAIR AREA 1,080 SF. (SEE PLAN) BUT NOT MANUFACTURED BY SYSTEM MANUFACTURER, SHALL BE INSTALLED IN ACCORDANCE WITH ALL SOIL CONDITIONS USED FOR DESIGN BASED ON A SOILS REPORT PREPARED APPUGABLE REGULATIONS AND MANUFACTURER INSTRUCTIONS. BY PROTOCOL SAMPLING SERVICE, INC., JOB No. 22-182, DATED 5- THE OWNER AND SYSTEM INSTALLER SHALL BE IN POSSESSION OF ALL NECESSARY PERMITS AND 12-6-2022 LICENSES BEFORE ATTEMPTING ANY PORTION OF AN INSTALLATION. THE INSTALLER MUST BE LEVEL IV ALL CONSTRUCTION MATERIALS AND METHODS MUST CONFORM TO AND AUTHORIZED IN WRITING BY THE MANUFACTURER. APPLICABLE LOCAL AND STATE SEWAGE HANDLING AND DISPOSAL 6- WATERTIGHTNESS OF ALL SYSTEM TANKAGE SHALL BE DEMONSTRATED BY LEAKAGE TESTS CONDUCTED REGULATIONS. IN ACCORDANCE WITH THE SPEGIFICATIONS. ANY DEVIATION FROM THIS DESIGN MUST BE APPROVED BY THE DESIGN 7. THE SYSTEM INSTALLER SHALE. COMMISSION THE PRETREATMENT SYSTEM MANUFACTURE FOR EACH ENGINEER AND DARE COUNTY DIVISION OF ENVIRONMENTAL HEALTH PRIOR INSTALLATION AND SHALL PROVIDE AN ACCEPTANCE LETTER TO THE LHD PRIOR TO IS SLANGS OF THE TO INSTALLATION. OPERATION PERMIT. ELECTRICALWIRING TO BE INSTALLED UNDER THE DIRECT SUPERVISION OF B. SPECIFIED SITE PREPARATION STEPS AND CONSTRUCTION SPECIFICATIONS FOR THE GROUND ABSORPTION A LICENSED ELECTRICAL CONTRACTOR, ACCORDING TO NEC, STATE AND SYSTEM SHALL 6E STRICTLY ADHERED TO, INCLUDING SPECIFIED DEPTH OF TRENCHES IN RELATION TO LOCAL ELECTRICAL CODES, AS APPLICABLE SITE LIMITING CONDITIONS, COVER MATERIAL SPECIFICATION, TRENCH INSTALLATION, ETC. CONTRACTOR IS TO INSTALL CONCRETE TANKS ON UNIFORMLY FIRM AND 9. THE APPROVED SYSTEM INSTALLER, SYSTEM DESIGNER OR ENGINEER, AND APPROVED ORC SHALL STABLE COMPACTED GROUND. CRUSHED STONE IS REQUIRED IF EARTH BASE CONDUCT AN INSPECTION / START-UP OF THE PRETREATMENT SYSTEM AND ALL ASSOCIATED SYSTEM IS DISTRUBED. COMPONENTS. THE LOCAL HEALTH DEPARTMENT SHALL SHALL ATTEND AND OBSERVE THE CONTRACTOR MUST CONTACT THE APPROPRIATE UTILITY AUTHORITY PRIOR INSPECTION/START--UP. THE FOLLOWING SHALL OCCUR DURING THE INSPECTION/START-UP: a. SYSTEMTESTING. (MAY OCCUR AHEAD OF START-UP, COORD. WITH ENGINEER TO ANY DIGGING ON SITE. AND HD)ATERTIGHTTNESS SEE ADDITIONAL NOTES, DETAILS AND SPECIFICATIONS THIS SHEET AND b. DISPOSAL FIELD INSTALLATION OBSERVATIONS. (MAY OCCUR AHEAD OF START-UP, COORD. WITH SUPPLEMENTAL TECHINICAL SPECIFICATIONS FOR FURTHER DIRECTION. ENGINEER AND LHD) • SEPTIC TANK: (1) GARNERS 3,141 GAL. STB-349 C. RECIRCULATION PUMP CONTROL PANEL OPERATION, TIME DOSE AND ALARM SETTINGS d. RECIRCULATION PUMP MODEL NUMBERS AND ALARM SETTINGS • EQUALIZATION TANK: 1 GARNERS 1,500 GAL. PT-312 ( } e. PRESSURE HEAD ON PRETREATMENT POD DISTRIBUTION SYSTEM • RECIRCULATION/PUMP TANK: (1} GARNERS 2,581 GAL, PT--271 W/ t RETURN FLOW TO SEPTIC TANK SET PER DESIGN AND RECORDED, WHEN APPLICABLE V NIT OPERATION AN ALARMSETTINGS, WHEN AP A g. u u E D LAR PL.lc BLE E-Z TREAT MODIFICATIONS PER PLAN. h. FINAL DOSING PUMP OPERATION, DRAWDOWN TEST, DISPOSAL FIELD HEAD PRESSURE SET • ALL TANKS MUST $E APPROVED BY THE MANUFACTURER FOR USE I- FINAL DOSING PUMP CONTROL PANEL OPERATION, TIME DOSE AND ALARM SETTINGS g. RISER HATCHES HAVE TAMPERPROOF BOLTS OR LOCKS WITH THE SPECIFIED PRETREATMENT SYSTEM h. ALL OTHER SYSTEM APPURTENANCE INSTALLATIONS OBSERVED • ALL TANKS MUST BE STATE APPROVED FOR ON -SITE WASTEWATER SYSTEMS GENERAL STANDARDS AND INSTRUCTIONS • ALL TANKS MUST BE LEAK TESTED AFTER INSTALLATION UTILIZING 1. ALL SYSTEM COMPONENTS ARE LOCATED AT OR GREATER THAN 10 FEET FROM THE NEAREST STATIC WATER TEST METHOD AS OUTLINED IN THE SPECIFICATIONS. N THAN T FROM FOUNDATION AN A PROPERTY 1.1E AT OR GREATER N 5 FEE OM THE BUILDING FOUNDA D TOR • ALL TANKS MUST BE WATER TIGHT INCLUDING ACCESS RISERS. GREATER THAN 20 FEET FROM OTHER NITRIFICATION FIELDS. WATERTIGHT ACCESS HATCHES MAY ALSO BE REQUIRED PER PLANS. 2. ALL MATERIALS, SUPPLIES, PROCEDURES, WORKMANSHIP AND INSTALLATIONS SHALL COMPLY • ALTERNATE TANKAGE FROM THOSE SPECIFIED ON THESE PLANS MAY WITH THE LATEST EDITIONS AND AMENDMENTS OF: NORTH CAROLINA BUILDING CODE, LAWS BE USED BUT MUST FIRST BE APPROVED AND MAY REQUIRE AND RULES FOR SANITARY SEWAGE COLLECTION, TREATMENT, AND DISPOSAL, SECTION .1900 REDESIGN AT THE OWNERS EXPENSE. OF THE NORTH CAROLINA ADMINISTRATIVE CODE, NORTH CAROUNA PLUMBING CODE, LAWS AND REGULATIONS APPLICABLE TO GENERAL CONTRACTING IN THE STATE OF NORTH INSTALL SPECIFIED MODEL OF EFFLUENT FILTER AT OUTLET END OF SEPTIC CAROUNA, RESPECTIVE MANUFACTURERS' INSTRUCTIONS AND ACCEPTED INDUSTRY STANDARDS. TANK. PROVIDE FILTER SERVICE EXTRACTOR HANDLE FOR USE ON REMOVING 3. ALL WORK SHALL BE PERFORMED UNDER THE DIRECT SUPERVISION OF A PERSON PROPERLY FILTER. INSTRUCT PROPERTY OWNER OF PROPER PROCEDURES FOR REGISTERED WITH THE LOCAL HEALTH DEPARTMENT OR THE DESIGN ENGINEER. REMOVAL AND MAINTENANCE OF EFFLUENT FILTER TANK AND DRAINFIELD INVERT ELEVATIONS MAY NEED TO BE FIELD 4. FILL AND BACKFlLL MATERIALS SHALL BE CLEAN AND FREE OF ORGANIC MATERIAL AND TRASH OR DEBRIS THAT MAY BE HARMFUL TO ANY SYSTEM COMPONENTS. ADJUSTED. ALL INVERTS TO BE CHECKED AND APPROVED BY ENGINEER AFTER TANKS ARE INSTALLED. 5. ALL WORK SHALL CEASE AND BE HELD FOR INSPECTION AND APPROVAL AT APPROPRIATE MILESTONES IN ACCORDANCE MATH THE REQUIREMENTS OF THE LOCAL HEALTH DEPARTMENT. THE CONTRACTOR SHALL PROVIDE REASONABLE PRIOR NOTICE (MINIMUM 24 HOURS) TO THE LOCAL HEALTH DEPARTMENT AND THE ENGINEER OF PENDING INSPECTION. 6. THE CONTRACTOR SHALL PERFORM AND CERTIFY ALL TESTS AND SHALL MAINTAIN A RECORD OF ALL TESTS RESULTS. TEST RESULTS SHALL BE PROVIDED TO THE ENGINEER AND THE OWNER UPON REQUEST, AND SHALL BE TRANSMITTED TO THE OWNER WITH THE OPERATIONS AND MAINTENANCE MANUALS. 7. THE CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR THE CONDUCT AND SUPERVISION OF ALL WORK ASSOCIATED WITH THE SPECIFICATIONS DESCRIBED HEREON. 45- BEND 22 1/2- BEND 90- BEND 1 1/4" 90' ELBOW OR TEE •-T I1 1/4" LATERAL ice- AREA AGAINST PIPE UNDISTURBED SOIL 2' 1'-0" x V-0" 4" 1'-0" x V-w E" 1'-3" x 11-3' E' V-6' x 1'-6" 10, 2'-0" x 2'-V 12' 2'-3" x 2'-3" AREA AGAINST PIPE UNDISTURBED SOIL 2" T-0" x 1'-0" 4' T-2" x 1'-2" 6" T-G' x T-6" 8' 1'-9" x 10" Z-2" x 2' -2" 12. 2'-8" x 2'-8" AREA AGAINST PIPE UNDISTURBED SOIL 2" 1'-0" x 1'-0" 4" 1'-U" x 1'-0" 6" 1'-D" x 1'-0" 8" 1'-2" x 1'-2" 10 1'-6" x V-6" 12" 1'-8" x 1'-8" AREA AGAINST PIPE LINDISTURBEDS01L 2" 1'-0" x 1' 0" 4" 1'-d' x 1'-x 6" 1'-3" x V-3" 8" 2'-V x T- 10" 2'-6" x 2',T 12" 3' U" x Y-G" NOTES: 1. CONCRETE THRUST BLOCKING TO BE POURED AGAINST UNDISTURBED EARTH. 2. KEEP CONCRETE CLEAR OF JOINT AND ACCESSORIES. 3. ABOVE BEARING AREAS AND VOLUME'S ARE CALCULATED AT A SOIL BEARING CAPACITY OF 2000 PSF AND A TEST PRESSURE OF 150 PSI. 4. THRUST BLOCKS FOR VERTICAL UPWARD BENDS SHALL BE THE SAME AS FOR HORIZONTAL BENDS. 5. WHEN CALLED FOR ON THE CONSTRUCTION DRAWINGS OR CONTRACT SPECIAL PROVISIONS VALVES SHALL HAVE CONCRETE RESTRAINT BLOCKS AS SPECIFIED ABOVE, UNLESS THE VALVE IS FLANGED TO A TEE, CROSS OR SIMILAR FITTING OR ANOTHER METHOD OF RESTRAINT ACCEPTABLE TO THE ENGINEER IS PROVIDED. CONCRETE THRUST BLOCKING DETAILS NOT TO SCALE 1 1/4" PVC TANK INSTALLATION NOTES A EXCAVATION 1. DIG SUITABLE EXCAVATION, BRACED AND SHEETED AS SOIL CONDITIONS DICTATE. 2. KEEP EXCAVATIONS FREE OF WATER AT ALL TIMES. B. LEAKAGE TEST 1. PRIOR TO BACKFIWNG AND COVERING TANKS, PERFORM 24 HOUR LEAKAGE TEST AS FOLLOWS: a. NOTIFY ENGINEER PRIOR TO BEGINNING TEST. b. FILL TANKS WITH CLEAR WATER. c.OBSERVE LEAKAGE OVER 24 HOUR PERIOD - WITH SOIL DEWATERED, WATER LEVEL IN TANK MUST NOT DROP MORE THAN ONE-HALF (1/2') INCH. e. REPL.ASTER TANK AND REPEAT TEST UNTIL SUCCESSFUL,. C. BACKFlLUNG 1. BACKFlLL WITH MATERIAL FREE OF BOULDERS, LARGE ROOTS, SOD AND OTHER DEBRIS OR ORGANIC MATTER. 2. COMPACT TO AT LEAST 90 PERCENT OF ASTM D1557 DRY DENSITY. 3. PROTECT TANK SITE FROM HEAVY EQUIPMENT. 4. GRADE SITE TO PREVENT PENDING OF WATER ABOVE TANKS. PLUMBING/SUPPLY LINE NOTES 1t, WASTEWATER FROM THE RESIDENCE WILL BE CONVEYED TO THE SEPTIC TANK BY GRAVITY FLOW THROUGH A 4 INCH OR 6 INCH DIAMETER PVC OR DIP GRAVITY SEWER PIPE AS REQUIRED BY NORTH CAROLINA PLUMBING CODE. MINIMUM SLOPE OF THE SEWER SHALL BE j INCH/FOOT OR AS REQUIRED BY PLUMBING CODE 2. SEWERS INSTALLED UNDER PAVEMENT OR AGGREGATE PARKING OR DRIVE AREAS SHALL BE SERVICE WEIGHT DUCTILE IRON PIPE AND FITTINGS. SEWERS INSTALLED IN UNPAVED AREAS AND PROTECTED FROM TRAFFIC OR OTHER SEVERE LOADS SHALL BE SCHEDULE 40 PVC PIPE AND FITTINGS. 3. SUPPLY LINES AND MANIFOLDS SHALL BE SCHEDULE 40 PVC PIPE AND FITTINGS AND SHALL CONFORM TO THE MATERIAL AND INSTALLATION SPECIFICATIONS FOR BUILDING SEWERS. 4. SUPPLY AND MANIFOLD PIPE SHALL BE INSTALLED ON A SMOOTH SLOPE BETWEEN THE INVERT ELEVATIONS OF THE ENDS WITHOUT DIPS OR AIR TRAPS, GENERAL SEEDING AND SITE STABILIZATION SPECIFICATIONS PERMANENT VEGETATION SHALL BE ESTABLISHED WITHIN THE LIMITS OF ALL DISTURBED AREAS AS TO THE SPECIFICATIONS DESCRIBED BELOW OR AN APPROVED EQUAL- 1. FERTILIZER: APPLY 3,000 LB/ACRE GROUND AGRICULTURE UMESTONE AND 500 LB/ACRE 10-10-10 FERTILIZER. TOP DRESS W/ SO LB/ACRE NITROGEN. 2. MULCH: APPLY 4,000 LB/ACRE STRAW. ANCHOR STRAW BY TACKING W/ ASPHALT, NETTING, OR A MULCH ANCHORING TOOL DISPOSAL FIELD CONSTRUCTION NOTES AND SEQUENCING 1. HOLD PRE -CONSTRUCTION CONFERENCE TO DISCUSS PROJECT SCHEDULING & COORDINATION. NOTIFY ENGINEER AND LOCAL HEALTH DEPARTMENT RE PRESENTATIVE PRIOR TO BEGINNING WORK. 2. HAVE EXISTING U TI Ti U ES FLAGGED PRIOR TO GROUND DISTURBING ACTIVITIES. DIAL 811 3. REFER TO ANY ADDITIONAL SITE SPECIFIC PREPARATION NOTES AND CONSTRUCTION INSPECTION PROCEDURES THAT MAY BE NOTED ON PLANS. 4. REMOVE ORGANIC MATTER AND SCARIFY NATURAL GROUND. 5. PLACE CLEAN TYPE I SAND FILL ACROSS DRAINFIELD AREA WHERE SPECIFIED ON THE PLAN. SITE PREPARATION, INCLUDING CUTTING, FILLING AND GRADING SHALL BE PERFORMED IN STRICT ACCORDANCE WITH THE APPROVED DRAWINGS AND SPECIFICATIONS. 6. TRAFFIC SHALL BE PROHIBITED ON FIELDS AND SIDE SLOPES, 7. UPON COMPLETION OF FILL INSTALLATION, SCHEDULE INSPECTION WITH LOCAL HEALTH DEPT. AND/OR ENGINEER PRIOR TO BEGINNING INSTALLATION OF DISPOSAL SYSTEM. 8. INSTALL SUPPLY MANIFOLDS, LATERALS, RISERS AND VALVES: A. MANIFOLDS: a. EXCAVATE TRENCH APPROXIMATELY 12 INCHES WIDE FOR INSTALLATION OF SUPPLY MANIFOLD. b. PLACE SEGMENTS AND GLUE FITTINGS TO MANIFOLD SEGMENTS AS SHOWN ON DRAWINGS. B. LATERALS & RISERS: a. EXCAVATE LATERAL 'TRENCHES, USING TRANSIT TO ENSURE TRENCHES ARE LEVEL. b. ASSEMBLE LATERAL SEGMENTS WITH TEES ON 3' CENTERS FOR RISERS AS SHOWN ON DRAWINGS. c. PLACE LATERAL$ IN TRENCHES AND CONNECT (GLUE) TO MANIFOLDS. d. PLACE AN A IN LATERALS AS SHOWN ON DRAWINGS. LA £ D GLUE RISERS IN TEES INSTALLED RISERS TO BE CUT IN 5' LENGTHS AND SHALL EXTEND 6' ABOVE FINISH GRADE AS SHOWN ON PLANS. e. PROVIDE CLEANOUT AT EACH LATERAL END. C. VALVES: I' PLACE GATE VALVE IN SUPPLY FORCE MAIN IF REQUIRED AND AS SHOWN ON PLANS. 9. GRAVEL FOR NITRIFICATION LINES SHALL BE CLEAN WASHED GRAVEL OR CRUSHED STONE GRADED FROM 3/4 TO 1 INCH. 10. NITRIFICATION LINES SHALL BE INSTALLED LEVEL WITH A MINIMUM INVERT ELEVATION OF 12 INCHES BELOW LOCAL FINISHED GRADE Q& IN ACCORDANCE WITH ELEVATIONS SPECIFIED ON THE PLAN WHEN PROVIDED. 11. EXCAVATED TRENCH BOTTOMS SHALL BE UNDISTURBED NATURAL SOIL OR COMPACTED CLEAN FILL GRAVEL CINDER NITRIRCAT10N LINES SHALL BE RAKED AND TAMPED LEVEL W THE DIRECTION OF THE PIPE RUN AND SHALL REMAIN IN SUCH CONDITION AND CLEAN TO ACCEPT INSTALLATION OF THE PIPE AND SUBSEQUENT GRAVEL FILL GRAVEL SHALL AT ALL TIMES BE MAINTAINED CLEAN AND FREE OF SOIL. THE TOP SURFACE OF THE GRAVEL FILL SHALL BE PROTECTED BY PERMANENTLY INSTALLED. 12. GEOTEXTILE FILTER FABRIC SHALL BE INSTALLED TO PREVENT MIGRATION OF SOIL INTO GRAVEL VOIDS. BACKFlLL OVER NITRIFICATION LINES SHALL BE ONLY LIGHTLY COMPACTED. 13. UPON COMPLETION OF NITRIFICATION LINE INSTALLATION, SCHEDULE INSPECTION WITH LOCAL HEALTH DEPT. AND/OR ENGINEER PRIOR TO COVERING. 14. THE DRALNFIELD AREA SHALL BE FINE GRADED THE MINIMUM AMOUNT NECESSARY TO OBTAIN FINISH GRADES AS SHOWN ON THE DRAWINGS AND TO PROMOTE RUNOFF AWAY FROM DRAINFIELD. 15. FINISH GRADE SLOPES FOR DISTURBED LAND SHALL NOT EXCEED 1.3 (RISE:RUN). 16. COMPLETED DRAINFlELD AREAS SHALL BE IDENTIFIED AND BARRICADED TO PREVENT COMPACTION BY CONSTRUCTION OR OTHER TRAFFIC. ALL DISTURBED AREAS SHALL BE STABILIZED AND VEGETATED WITHIN 21 DAYS AFTER CESSATION OF LAND DISTURBING ACTIVITIES. TEMPORARY COVER, IF NECESSARY, SHALL BE IN ACCORDANCE NTH THE RECOMMENDATIONS OF THE NOTES AS DESCRIBED HEREON. 17. FOR SYSTEMS REQUIRING START-UP, SCHEDULE WITH ENGINEER, LOCAL HEALTH DEPARTMENT AND N VATI NS F PRESSURE HEAD TT-UP x 1 1/4' REDUCING TEE PROPERTY OWNER. AT A MINIMUM, STAR0 1 CLUDE OBSER0 0 SETTING, FLOW VOLUME CONFIRMATION AND PROPER OPERATION OF SYSTEM COMPONENTS. 6' SCH 40 PVC MANIFOLD THREADED PLUG LATERAL CONNECTION DETAIL 6' MIN. ABOVE FINISHED GRADE NOT TO SCALE ALL LATERALS INSTALLED LEVEL 6" THREADED FEMALE CAP J 6" SCH aD PVC PIPE THREADED CAP NATIVE FILL MATERIAL \ MALE ADAPTER 0 0 1 1/4' PVC LATERAL ($DR 160 PSI) -- EARTHEN DAM [ND GRAVEL) Z 4" PERFORATED DRAIN LINE \ M \ I 1.5' � 3' O.C. EXTRUDED SMOOTH WALL TUBING, RANCOR OR OR APPROVED EQUAL \ \ \ FILTER CUM, FILL NOUT WITH GRAVEL �- 18" 5/32' DIA. HOLE AT 3' O.C. ALL PIPE SLEEVE (TYP.) �* USE t- 90' BEND PROVIDE 4` CAP WITH 1 1/4` ORIFICES FACE UPWARD EXCEPT h t:+•-...- i HOLE AT EACH END OF LATERAL FOR DISCHARGE HOLES LOCATED =.-= CAULK AT LATERAL OPENING AND IN THE MIDDLE AND A SECOND WASHED GRAVEL: #5 OF ASTM D-448 WRAP WITH FILTER CLOTH DOV44WARD-FACING HOLE 25% \ ALL LATERALS TO BE INSTALLED LEVEL FROM THE END OF THE LATERAL. LATERAL ORIFICE SPACING DETAIL L.P.P. FIELD CLEANOUT/TURN-UP DETAIL NOT TO SCALE NOTTO .EN -OUT INSTALLATION SHALL BE PROVIDED AT EACH END CLEAN -OUT OF EACH MANIFOLD AND AT THE END OF EACH LATERAL END OF MANIFOLD CLEAN OUT (TYP.) (SEE DETAIL THIS SHEET) SEE NOTE BELOW FOR OF HOLES PER LATERAL HOLES UPWARD -FACING (TYP.) FIRST HOLE M �. - ----------------- END O LATERAL CLEAN OUT 2nd TO LAST HOLE TO BE HOLE 0 LATERAL MIDPOINT TO 3' (TYP') 1.5' (TYP.) SCH 40 PVC SUPPLY MANIFOLD (TYP.) (SEE DETAIL THIS SHEET) DOWNWARD -FACING (TYP.) BE DOWNWARD -FACING (TYP.) (SEE PLAN AND DETAILS FOR SIZE) ALL LATERALS ARE 1 1/4.0 PVC (SDR 160 PSI) SCH 40 PVC FORCE MAIN FROM END OF MANIFOLD CLEAN OUT TO BE SLEEVED IN 4'0 HOPE PERFORATED PIPE DOSING TANK. (TYP.) (SEE DETAIL THIS SHEET) TEE CONNECTION TO MANIFOLD. ALL LATERALS ORIFICES ARE TO BE (SEE PLAN FOR SIZE) DRILLED 5/32"0 AND SPACED 0 V O.C. SEE LATERAL ORIFICE L.P.P DISPOSAL FIELD PLAN VIEW SPACING DETAIL THIS SHEET NOT TO SCALE L.P.P. BED DISPOSAL FIELD SECTION VIEW NOT TO SCALE ALL LATERALS SHALL BE INSTALLED LEVEL (12) 30 LF. LATERALS SPACED 10 HOLES PER LATERAL TRENCH BOTTOM ELEVATION 6.50' MIN. FINISHED FIELD ELEVATION &00'f U Z O O �j Z U4 03 '` c,N ab00 ' [] F" > w z o a 0 W5 O x .1 Q p; Upac w l �a'�FF1 Q 0 P u z v 1 W 0 u �.�``1 'k a �SSIp % E / SEAL JJ na9n'1. .f DATE: LE: 1-25-23 1"=20' DESIGNED: CHECKED: BPG DRAWN: APPROVED: DMK DMK SHEET: 1 OF CAD FILE: 47460OB 2 PROJECT NO: 4746 Irl