HomeMy WebLinkAbout310392_Compliance Evaluation Inspection_20230328 O'Division of Water Resources
Facility Number 3 I - 3q 0 Division of Soil and Water Conservation
0 Other Agency
Type of Visit: Q Compliance Inspection 0 Operation Review 0 Structure Evaluation Q Technical Assistance
Reason for Visit: ("Routine O Complaint O Follow-up O Referral O Emergency O Other O Denied Access
Date of Visit: 103 /23 Arrival Time:1 10 1%5tAm I Departure Time: County: Region: �t
Farm Name: S�fiyt° sh,,1-, I'grm Owner Email:
Owner Name: 5icyc 3-H4 11-k Phone:
Mailing Address:
Physical Address:
Facility Contact: Title: Phone:
Onsite Representative: Integrator:
Certified Operator: c5�Tf 4M Sn o-k Certification Number: 1 �7 a
Back-up Operator: Certification Number:
Location of Farm: Latitude: Longitude:
Design Current Design Current Design Current
Swine Capacity Pop. Wet Poultry Capacity Pop. Cattle Capacity Pop.
Wean to Finish I 11-ayer Dairy Cow
Wean to Feeder [Non-Layer Dairy Calf
Feeder to Finish al GD t If60 Dairy Heifer
Farrow to Wean Design Current Dry Cow
Farrow to Feeder Dry Poultry Capacity Pop. Non-Dair
Farrow to Finish Layers 113eef Stocker
Gilts Non-Layers Beef Feeder
Boars Pullets I Beef Brood Cow
Turkeys
Other Turkey Poults
Other
Discharges and Stream Impacts
1. Is any discharge observed from any part of the operation? ❑ Yes [✓]No ❑ NA ❑ NE
Discharge originated at: ❑ Structure ❑ Application Field ❑ Other:
a. Was the conveyance man-made? ❑ Yes ❑ No ❑ NA ❑ NE
b. Did the discharge reach waters of the State?(If yes,notify DWR) ❑ Yes ❑ No ❑ NA ❑ NE
c. What is the estimated volume that reached waters of the State(gallons)?
d. Does the discharge bypass the waste management system'?(If yes, notify DWR) ❑ Yes ❑ No ❑ NA ❑ NE
2. Is there evidence of a past discharge from any part of the operation? ❑ Yes r__7rNo ❑ NA ❑ NE
3. Were there any observable adverse impacts or potential adverse impacts to the waters ❑ Yes dNo ❑ NA ❑ NE
of the State other than from a discharge?
Page I of 3 511212020 Continued
Facili Number: - 3`�z Date of Inspection: o g a3
Waste Collection&Treatment
4. Is storage capacity(structural plus storm storage plus heavy rainfall)less than adequate? ❑ Yes [-No ❑ NA ❑ NE
a. If yes,is waste level into the structural freeboard? ❑ Yes ❑ No ❑ NA ❑ NE
Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6
Identifier:
Spillway?:
Designed Freeboard(in):
Observed Freeboard(in): 2
5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes [D No ❑ NA ❑ NE
(i.e.,large trees,severe erosion,seepage,etc.)
6. Are there structures on-site which are not properly addressed and/or managed through a ❑ Yes ❑'No ❑ NA ❑ NE
waste management or closure plan?
If any of questions 4-6 were answered yes,and the situation poses an immediate public health or environmental threat, notify DWR
7. Do any of the structures need maintenance or improvement? [ZI Yes ❑ No ❑ NA ❑ NE
8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes [ No ❑ NA ❑ NE
(not applicable to roofed pits,dry stacks,and/or wet stacks)
9.Does any part of the waste management system other than the waste structures require [:] Yes 2"No ❑ N A ❑ N E
maintenance or improvement?
Waste Application
10.Are there any required buffers,setbacks,or compliance alternatives that need ❑ Yes Eallo ❑ NA ❑ NL
maintenance or improvement?
1 1. Is there evidence of incorrect land application?If yes,check the appropriate box below. ❑ Yes allo ❑ NA ❑ N L
❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals(Cu,Zn,etc.)
❑ PAN ❑ PAN> 10%or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil
❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area
12. Crop Type(s):
13. Soil Type(s):
14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes [Er-No ❑ NA ❑ NE
15. Does the receiving crop and/or land application site need improvement? ❑ Yes [a No ❑ NA ❑ NE
16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes [2rNo ❑ NA ❑ NE
acres determination?
17. Does the facility lack adequate acreage for land application? ❑ Yes EZ No ❑ NA 0 NE
18. Is there a lack of properly operating waste application equipment? ❑ Yes E No ❑ NA ❑ NE
Required Records&Documents
19. Did the facility fail to have the Certificate of Coverage&Permit readily available? ❑ Yes 2'/No ❑ NA ❑ NE
20. Does the facility fail to have all components of the CAWMP readily available?If yes,check ❑ Yes ["No ❑ NA ❑ NE
the appropriate box.
❑WUP ❑Checklists [:]Design ❑Maps ❑ Lease Agreements ❑Other:
21.Does record keeping need improvement?If yes,check the appropriate box below. ❑ Yes E�J/No ❑ NA ❑ NE
❑Waste Application ❑Weekly Freeboard ❑Waste Analysis ❑Soil Analysis ❑Waste Transfers ❑Weather Code
❑Rainfall ❑Stocking ❑Crop Yield ❑120 Minute Inspections ❑Monthly and V Rainfall Inspections ❑Sludge Survey
22. Did the facility fail to install and maintain a rain gauge? ❑ Yes ff No ❑ NA ❑ NE
23. If selected,did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes EKNo ❑ NA ❑ NE
Page 2 of 3 511212020 Continued
Facility Number: jDate of inspection: 03 .Z 2
24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes E�,No ❑ NA ❑ NE
25. Is the facility out of compliance with permit conditions related to sludge? If yes,check ❑ Yes [allo ❑ NA ❑ NE
the appropriate box(es)below.
❑Failure to complete annual sludge survey ❑Failure to develop a POA for sludge levels
❑Non-compliant sludge levels in any lagoon
List structure(s)and date of first survey indicating non-compliance:
26. Did the facility fail to provide documentation of an actively certified operator in charge? ❑ Yes [.7rNo ❑ N A ❑ NE
27. Did the facility fail to secure a phosphorus loss assessments(PLAT)certification? ❑ Yes ❑ No E] N1 A ❑ NE
Other Issues
28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document ❑ Yes []"No ❑ NA ❑ NE
and report mortality rates that were higher than normal?
29.At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes E2"No ❑ NA ❑ NE
If yes,contact a regional Air Quality representative immediately.
30. Did the facility fail to notify the Regional Office of emergency situations as required by the ❑ Yes E�fNo ❑ NA ❑ NE
permit?(i.e.,discharge,freeboard problems,over-application)
31. Do subsurface tile drains exist at the facility?If yes,check the appropriate box below. ❑ Yes �No ❑ NA ❑ NE
❑ Application Field ❑ Lagoon/Storage Pond ❑ Other:
32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes O No ❑ NA ❑ NE
33. Did the Reviewer/Inspector fail to discuss review/inspection with an on-site representative? ❑ Yes E3"'No ❑ NA ❑ NE
34. Does the facility require a follow-up visit by the same agency? ❑ Yes [2/No ❑ NA ❑ NE
Comments(refer to question#): Explain any YES answers and/or any additional recommendations or any other comments.
Use drawings of facility to better explain situations(use additional pages as necessary).
51 s,,YVLCX t z ho/Z z c&-e- c n d' v.e Za L 3
Zo Z�f
�os� ccvt�lys�s 6`z6/zozv cc GILD` ZoZ 3
�agdot%
Reviewer/Inspector Name: Xllc ad �{ 1�Z7� Phone: qld. 3 /2Z�
Reviewer/Inspector Signature: Date: 3l S�23
Page 3 of 3 511212020