HomeMy WebLinkAboutAttachment B - Impact Figures(REVISED)(red)BENCHMARK
GROUND CONTROL FOR SURVEY PROVIDED BY MERRICK & CO, INC.
CONTACT LIST
OWNER
CITY OF MORGANTON
WATER RESOURCES DEPARTMENT
305 E. UNION STREET, SUITE A100
MORGANTON, NC 28655
EMAIL:BBORIS@CI.MORGANTONNC.GOV
CONTACT: BRAD BORIS
ENGINEER
MERRICK & COMPANY
301 SOUTH MCDOWELL ST. SUITE 300
CHARLOTTE, NC 28204
EMAIL: RHUTCHINSON@MERRICK.COM
PHONE: 704-817-0008
CONTACT: REBECCA HUTCHINSON
CITY ENGINEER
CITY OF MORGANTON
DEVELOPMENT AND DESIGN SERVICES/ENGINEERING DIVISION
305 E. UNION STREET, SUITE A100
MORGANTON, NC 28655
EMAIL: MSCLARANDIS@MORGANTONNC.GOV
PHONE: 828-438-5263
CONTACT: MARIO SCLARANDIS
CITY DEVELOPMENT AND DESIGN SERVICES DIRECTOR
CITY OF MORGANTON
DEVELOPMENT AND DESIGN SERVICES
305 E. UNION STREET, SUITE A100
MORGANTON, NC 28655
EMAIL: WSMITH@MORGANTONNC.GOV
PHONE: 828-438-5270
CONTACT: WENDY SMITH
CITY ELECTRICAL SERVICES DIRECTOR
CITY OF MORGANTON
ELECTRIC SERVICES
305 E. UNION STREET, SUITE A100
MORGANTON, NC 28655
EMAIL: BKIRBY@MORGANTONNC.GOV
PHONE: 828-438-5284
CONTACT: BROOKS KIRBY
CITY OF MORGANTON
BOST RD SEWER
IMPROVEMENTS PROJECT
BURKE COUNTY, NORTH CAROLINA
SHEET INDEX
VICINITY MAP 1" = 1000'
PUMP
STATION
SITE
CA
T
A
W
B
A
R
I
V
E
R
N G
R
E
E
N
S
T
SAN
F
O
R
D
D
R
BO
S
T
R
D
S
T
M
A
R
Y
S
C
H
U
R
C
H
R
D
SR 1
2
6
Q:
\
C
H
A
\
P
r
o
j
e
c
t
s
\
1
0
9
3
-
M
o
r
g
a
n
t
o
n
B
o
s
t
R
d
\
C
A
D
\
C
D
s
\
1
0
9
3
-
C
o
v
e
r
.
d
w
g
3
/
9/
2
0
2
3
6
:
1
9
:
5
3
A
M
Gravity Sewer
Size Quantity
8" PVC 2909 LF
8" DIP 137 LF
48" Manholes 15
Forcemain
Size Quantity
8" PVC 3340 LF
8" HDPE 600 LF (plan)
8" DIP 165 LF
Air Release Valves 4
SUMMARY OF SEWER MAINS & MANHOLES
Sheet Number Sheet Title
G1.1 Cover Sheet
G1.2 General Notes
CD1.1 Pump Station Demolition Plan
C1.1 Pump Station Site Plan
C1.2 Pump Station Paving and Grading Plan
C1.3 Pump Station Piping and Utilities Plan
C2.1 Gravity Sewer Plan & Profile STA 0+00 - 11+00
C2.2 Gravity Sewer Plan & Profile STA 11+00 - 20+50
C2.3 Gravity Sewer Plan & Profile STA 20+50 - 28+89 (END)
C2.4 Force Main Plan & Profile STA 0+00 - 11+00
C2.5 Force Main Plan & Profile STA 11+00 - 23+00
C2.6 Force Main Plan & Profile STA 23+00 - 34+00
C2.7 Force Main Plan & Profile STA 34+00 - 41+28 (END)
CE2.1 Erosion Control Site
CE2.2 Erosion Control Gravity Sewer
CE2.3 Erosion Control Force main
CE2.4 Erosion Control Force main
CE2.5 Erosion Control Lift Station and Access Dr
C3.1 Civil Details
C3.2 Civil Details
CE3.1 Erosion Control Details
CE3.2 Erosion Control Details
CE3.3 Erosion Control Details
CE3.4 Erosion Control Details
CE3.5 Erosion Control Details
M1.1 Lift Station Plan Views
M1.2 Lift Station Section
M1.3 Lift Station Details
M1.4 Lift Station Details
S1.1 Abbreviations, Drawings, Legends & Sheet Index
S1.2 General Notes
S2.1 Foundation Plan
S3.1 Framing Plan
S3.2 Roof Plan
S4.1 Section
S5.1 Typical Details & Schedules
S5.2 Typical Details
S5.3 Typical Details
E1.1 Symbol Legend and Abbreviations
ED2.1 Electrical Demolition Site Plan
E2.1 Electrical Equipment, Lighting Site Plans & Elevations
E4.1 Electrical Riser Diagram and Schedules
I1.1 Instrumentation P&ID Symbols and Abbreviations
I2.1 Instrumentation P&ID Pump Station and Valve Vault
100-YR
FLOODPLAIN
FLOODWAY
FLOODWAY
100-YR
FLOODPLAIN
Q:
\
C
H
A
\
P
r
o
j
e
c
t
s
\
1
0
9
3
-
m
o
r
g
a
n
t
o
n
b
o
s
t
r
d
\
C
A
D
\
C
D
s
\
1
0
9
3
-
C
o
v
e
r
.
d
w
g
3
/
7
/
2
0
2
3
1
0
:
3
5
:
3
2
P
M
GENERAL CONSTRUCTION NOTES
1. ALL CONTRACTORS AND SUBCONTRACTORS SHALL HAVE A SET OF APPROVED CONSTRUCTION DOCUMENTS, THE APPROPRIATE
EDITION OF THE GOVERNING JURISDICTION DESIGN AND CONSTRUCTION STANDARDS, THE STORMWATER MANAGEMENT PLAN, AND
ALL REQUIRED PERMITS ON SITE AT ALL TIMES.
2. ALL CONSTRUCTION SHALL CONFORM TO THE APPROPRIATE EDITION OF THE GOVERNING JURISDICTION STANDARDS AND
SPECIFICATIONS.
3. THE ENGINEER MAKES NO REPRESENTATION OR GUARANTEE REGARDING EARTHWORK QUANTITIES OR THAT THE EARTHWORK FOR
THIS PROJECT WILL BALANCE DUE TO VARIOUS FIELD CONDITIONS, CHANGING SOIL TYPES, ALLOWABLE CONSTRUCTION
TOLERANCES, AND CONSTRUCTION METHODS THAT ARE BEYOND THE CONTROL OF THE ENGINEER.
4. MERRICK & COMPANY IS NOT RESPONSIBLE FOR CONSTRUCTION MEANS, METHODS, TECHNIQUES, SEQUENCES, PROCEDURES,
SAFETY PRECAUTIONS, OR PROGRAMS UTILIZED IN CONNECTION WITH THE WORK. MERRICK WILL NOT BE RESPONSIBLE FOR THE
CONTRACTOR'S FAILURE TO CARRY OUT THE WORK IN ACCORDANCE WITH THE CONTRACT DOCUMENTS.
5. THE CONTRACTOR SHALL CALL THE NATIONWIDE UTILITY CONTACT NUMBER (811) OR LOCAL UTILITY LOCATE SERVICE, TO REQUEST
LOCATES OF ALL UNDERGROUND UTILITIES AT LEAST 48 HOURS PRIOR TO COMMENCEMENT OF ANY LAND DISTURBING ACTIVITY.
6. THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING AND PROTECTING ALL EXISTING UTILITIES. EXISTING UTILITY LOCATIONS
SHOWN ON THE PLANS WERE TAKEN FROM THE BEST AVAILABLE INFORMATION AT THE TIME OF DESIGN. HOWEVER, THEY ARE
APPROXIMATE AND ARE NOT RELIABLE FOR CONSTRUCTION PURPOSES AND MAY NOT INCLUDE ALL THE UTILITIES THAT EXIST ON
THE PROJECT SITE. THEREFORE, THE CONTRACTOR IS ENCOURAGED TO CONDUCT THEIR OWN UTILITY INVESTIGATION AS THEY WILL
BE ASKED TO PARTICIPATE IN RESOLVING CONFLICTS PRIOR TO BEGINNING WORK.
7. THE CONTRACTOR SHALL VERIFY SITE CONDITIONS, EXISTING TOPOGRAPHIC DATA, AND LOCATIONS OF ALL UTILITIES PRIOR TO
INITIATING CONSTRUCTION. THE CONTRACTOR SHALL PROTECT ALL EXISTING UTILITIES ON THE PROJECT SITE. ANY DAMAGE TO
EXISTING UTILITIES, WHETHER SHOWN OR NOT ON THE PROJECT PLANS, SHALL BE REPAIRED OR REPLACED AT THE CONTRACTOR'S
EXPENSE AND NO ADDITIONAL COST TO THE OWNER. NOTIFY ENGINEER AND OWNER OF ANY DISCREPANCIES FOUND PRIOR TO
INITIATING ANY WORK.
8. THE CONTRACTOR SHALL OBTAIN ALL PERMITS NECESSARY TO COMPLETE THE WORK AND SHALL COMPLY WITH ALL LOCAL, STATE,
AND FEDERAL REGULATIONS. A COPY OF ALL PERMITS SHALL BE MAINTAINED ON-SITE AT ALL TIMES.
9. ALL WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE RECOMMENDATIONS OF THE GEOTECHNICAL REPORT.
10. THE CONTRACTOR IS RESPONSIBLE FOR SAFETY OF ALL PERSONNEL AND EQUIPMENT ON THE PROJECT SITE AT ALL TIMES, AND IS
NOT LIMITED TO NORMAL WORKING HOURS. ALL WORK SHALL BE PERFORMED IN ACCORDANCE WITH ALL LOCAL, STATE AND FEDERAL
SAFETY AND HEALTH REGULATIONS.
11. TRAFFIC CONTROL SHALL BE PROVIDED TO THE EXTENT NECESSARY TO COMPLETE THE WORK. IF NECESSARY, CONTRACTOR SHALL
PREPARE, SUBMIT, AND OBTAIN APPROVAL OF A TRAFFIC CONTROL PLAN AND PERMIT FROM THE ENTITY HAVING JURISDICTION OVER
THE ROADS AND PUBLIC RIGHTS-OF-WAY. TRAFFIC CONTROL STANDARDS SHALL COMPLY WITH THE MANUAL ON UNIFORM TRAFFIC
CONTROL DEVICES (MUTCD), LATEST EDITION. TRAFFIC CONTROL AND ASSOCIATED PLAN SUBMITTAL AND PERMITTING COSTS SHALL
BE INCLUDED IN THE COST OF THE PROJECT.
12. ALL WASTE MATERIALS SHALL BE PROPERLY DISPOSED OF IN AN APPROVED LANDFILL PERMITTED TO ACCEPT THAT PARTICULAR
TYPE OF WASTE.
13. DEVIATIONS FROM THESE PLANS AND SPECIFICATIONS WITHOUT PRIOR WRITTEN APPROVAL OF THE OWNER OR HIS DESIGNATED
REPRESENTATIVE MAY CAUSE THE WORK TO BE DEEMED UNACCEPTABLE.
14. TO THE EXTENT NECESSARY FOR THIS PROJECT, CONTRACTOR SHALL INSTALL INITIAL SEDIMENTATION AND EROSION CONTROL
MEASURES PRIOR TO INITIATING ANY WORK ON THE PROJECT SITE. MAINTAIN ALL EROSION CONTROL MEASURES UNTIL FINAL
STABILIZATION AND REVEGETATION IS APPROVED BY THE COUNTY AND/OR CITY.
15. THE PROJECT PLANS AND SPECIFICATIONS ARE INTENDED TO PROVIDE THE COMPLETED PROJECT IN A COMPLETE AND OPERABLE
CONDITION. THE CONTRACTOR SHALL FURNISH AND INSTALL ALL MATERIALS AND PROVIDE ALL LABOR NECESSARY TO COMPLETE
THE PROJECT IN A NEAT AND PROFESSIONAL MANNER, INCLUDING ALL INCIDENTALS NECESSARY TO COMPLETE THE WORK, WITHOUT
ADDITIONAL COST TO THE OWNER.
16. NOTIFY INSPECTORS OF ALL WORK ACTIVITY AT LEAST 48 HOURS IN ADVANCE.
17. ANY INSPECTION BY THE GOVERNING AGENCY OR THE ENGINEER, SHALL NOT, IN ANY WAY, RELIEVE THE CONTRACTOR FROM ANY
OBLIGATION TO PERFORM THE WORK IN STRICT COMPLIANCE WITH THE APPLICABLE CODES AND AGENCY REQUIREMENTS.
18. ANY DISRUPTION IN UTILITIES SHALL BE COORDINATED AT LEAST 24 HOURS IN ADVANCE WITH THE UTILITY OWNER, PROJECT OWNER,
EMERGENCY PROVIDERS, ALL IMPACTED LOCAL RESIDENTS, AND IMPACTED BUSINESS OWNERS. METHOD OF NOTIFICATION SHALL
BE SUBJECT TO APPROVAL OF THE PROJECT OWNER AND AFFECTED UTILITY OWNER.
19. MAINTAIN EMERGENCY VEHICLE ACCESS TO AND THROUGH THE PROJECT SITE AT ALL TIMES.
20. THE CONTRACTOR IS RESPONSIBLE FOR RESTORATION OF EXISTING UTILITIES AND SURFACE CONDITIONS DISTURBED BY
CONSTRUCTION ACTIVITIES TO THE SATISFACTION OF THE OWNER, PROPERTY OWNER, AFFECTED UTILITY, OR LOCAL JURISDICTION.
ALL SURFACE AND UTILITY RESTORATION SHALL BE PROVIDED BY THE CONTRACTOR AT NO ADDITIONAL EXPENSE TO THE OWNER.
ALL SURFACE RESTORATION SHALL BE REPLACED WITH LIKE KIND, SIZE, AND TYPE OF IMPROVEMENT THAT EXISTED PRIOR TO
INITIATING CONSTRUCTION.
21. THE PROJECT PLANS AND SPECIFICATIONS AS SIGNED AND SEALED BY A PROFESSIONAL ENGINEER, FOR AND ON BEHALF OF
MERRICK AND COMPANY, REPRESENT THE FINAL CONSTRUCTION DOCUMENTS FOR THIS PROJECT. THE USE OF ANY ELECTRONIC OR
OTHER MEDIA PURPORTING TO REPRESENT THE FINAL CONSTRUCTION DOCUMENTS FOR THIS PROJECT SHALL NOT BE RELIED UPON
AS FINAL CONSTRUCTION DOCUMENTS. SHOULD THERE BE A CONFLICT BETWEEN SEALED DRAWINGS AND ELECTRONIC OR OTHER
MEDIA FILES, THE SEALED DRAWINGS SHALL GOVERN. EACH USER OF ANY ELECTRONIC OR OTHER MEDIA WAIVES AND RELEASES
MERRICK FROM ALL ACTIONS, CLAIMS, DAMAGES, ACTIONS, OBLIGATIONS, AND LIABILITIES OF ANY KIND OR NATURE WITH RESPECT
TO THE ELECTRONIC OR OTHER MEDIA FILES.
22. NOTHING CONTAINED IN THE CONTRACT DOCUMENTS SHALL CREATE, NOR SHALL BE CONSTRUED TO CREATE, ANY CONTRACTUAL
RELATIONSHIP BETWEEN THE ENGINEER AND THE CONTRACTOR OR ANY SUBCONTRACTOR.
23. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROMPTLY NOTIFYING THE ENGINEER OF ANY PROBLEMS OR POTENTIAL PROBLEMS
IN CONFORMANCE TO THE DESIGN LINE AND GRADE FOR ANY ELEMENT OF THE CONSTRUCTION. PRIOR TO CONSTRUCTION, THE
CONTRACTOR SHALL BE RESPONSIBLE FOR PROMPTLY NOTIFYING THE ENGINEER OF SITE CONDITIONS THAT DIFFER FROM THOSE
SHOWN ON THE APPROVED PLANS.
24. IN THE EVENT THE CONTRACTOR ALLOWS, AUTHORIZES, APPROVES OR CONSTRUCTS ITEMS THAT DIFFER FROM THE APPROVED
PLAN, SPECIFICATIONS, OR OTHER CONTRACT DOCUMENTS, WITHOUT WRITTEN APPROVAL BY THE ENGINEER, THE CONTRACTOR
SHALL BE RESPONSIBLE FOR ANY LIABILITY ARISING FROM SUCH CHANGES.
25. DISTURBANCE SHALL BE LIMITED TO THE TEMPORARY CONSTRUCTION EASEMENT AREAS FOR WHICH ENCROACHMENT AGREEMENTS
HAVE BEEN OBTAINED, AND STAGING AREAS PROCURED BY THE CONTRACTOR. LIMITS OF DISTURBANCE ARE THE PERMANENT RIGHT
OF WAY IF NO TEMPORARY CONSTRUCTION EASEMENT EXISTS. CONTRACTOR SHALL REMOVE ALL TREES WITHIN THE LIMITS OF THE
TEMPORARY CONSTRUCTION EASEMENT, EXCEPT WHERE TREE PROTECTION IS SHOWN ON THE DRAWINGS.
26. THE SEDIMENTATION FENCE SHALL BE LOCATED AN ADEQUATE DISTANCE FROM THE LIMITS OF DISTURBANCE TO ALLOW FOR
INSTALLATION, STORAGE, MAINTENANCE AND DECOMMISSIONING OPERATIONS. ADDITIONALLY, LOCATING THE SEDIMENT FENCE
AWAY FROM THE LIMITS OF DISTURBANCE MAY HELP PREVENT OFFSITE SEDIMENTATION.
27. IF ADDITIONAL AREAS OUTSIDE THE EXISTING LIMITS OF DISTURBANCE ARE REQUIRED BY THE CONTRACTOR, A PLAN SHOWING THE
REVISED LIMITS OF DISTURBANCE MUST BE SUBMITTED TO NC DEQ REGIONAL OFFICE FOR REVIEW AND APPROVAL. CONTRACTOR
SHALL BE RESPONSIBLE FOR REHABILITATING ANY ADDITIONAL AREAS UTILIZED DURING CONSTRUCTION TO EQUAL OR BETTER THAN
EXISTING CONDITION. CONTRACTOR SHALL INSTALL AND MAINTAIN EROSION CONTROL DEVICES IN ALL AREAS UTILIZED BY THE
CONTRACTOR TO CONSTRUCT THE PROJECT INCLUDING STAGING, STORAGE, ONSITE STOCKPILING AND OFFSITE STOCKPILING AND
OFFSITE DISPOSAL AREAS. CONTRACTOR SHALL FOLLOW ALL LOCAL REGULATIONS REGARDING THE WORK, INCLUDING KEEPING MUD
AND DIRT OFF OF PUBLIC ROADS AND PRIVATE ENTRANCES, AND REHABILITATING STAGING, STORAGE, OR STOCKPILING AREAS TO
EQUAL OR BETTER THAN EXISTING CONDITION. CONTRACTOR SHALL TAKE ALL REASONABLE MEASURES TO PREVENT TRACKING
MUD/SOIL ONTO ADJACENT ROADWAYS. ANY MUD/SOIL TRACKED ON ROADWAYS SHALL BE CLEANED DAILY. FOLLOWING COMPLETION
OF CONSTRUCTION, RESTORE ALL CONSTRUCTION SITE ACCESS AREAS TO A CONDITION EQUAL TO OR BETTER THAN ORIGINAL.
28. AS PER NCDEQ CONSTRUCTION GENERAL PERMIT NCG01, PERIMETER DIKES, SWALES, DITCHES AND SLOPES, DISTURBED AREAS
WITHIN HIGH WATER QUALITY (HWQ) ZONES, AND SLOPES STEEPER THAN 3H: 1 V FOLLOWING COMPLETION OF ANY PHASE OF
GRADING, SHALL BE PLANTED OR OTHERWISE PROVIDED WITH TEMPORARY OR PERMANENT GROUND COVER, DEVICES, OR
STRUCTURES SUFFICIENT TO RESTRAIN EROSION WITHIN 7 CALENDAR DAYS. ALL OTHER SLOPES OF 3H:1V OR FLATTER, EXCEPT
THOSE WITH SLOPES GREATER THAN 50 FEET IN LENGTH OR WITHIN HWQ ZONES, FOLLOWING COMPLETION OF ANY PHASE OF
GRADING, SHALL BE PLANTED OR OTHERWISE PROVIDED WITH TEMPORARY OR PERMANENT GROUND COVER, DEVICES, OR
STRUCTURES SUFFICIENT TO RESTRAIN EROSION WITHIN 14 CALENDAR DAYS. CONTRACT DOCUMENTS SUPERCEDE CW DESIGN
STANDARDS.
29. SOIL EXPLORATION WORK (IF APPLICABLE) MAY BE PROVIDED FOR INFORMATION ONLY AND IS SOLELY TO ASSIST BIDDERS IN
ASSESSING THE NATURE AND EXTENT OF TESTING PROCEDURES REQUIRED TO MAKE THEIR OWN DETERMINATION OF ACTUAL
SUBSURFACE CONDITIONS THAT WILL BE ENCOUNTERED DURING THE COURSE OF THE WORK. NO REPRESENTATION IS MADE OR WILL
BE GIVEN BY THE CONTRACTOR CONCERNING ACTUAL CONDITIONS THAT WILL BE ENCOUNTERED. CONTRACTOR SHALL CONDUCT
ALL INVESTIGATIONS AND TESTING THEY DEEM NECESSARY TO ARRIVE AT THEIR OWN CONCLUSIONS REGARDING SUCH CONDITIONS
PRIOR TO CONSTRUCTION. SOIL BORING PROFILE ELEVATIONS ARE APPROXIMATE.
30. ALL AREAS WITH OPEN EXCAVATIONS, OPEN VAULTS OR MANHOLES, OR EQUIPMENT SHALL BE FENCED WITH TEMPORARY SAFETY
FENCING AT LEAST 4 FEET HIGH AT END OF EACH WORK DAY.
31. ANY LAND CORNER, PROPERTY MONUMENTATION, OR BENCHMARK WITHIN THE LIMITS OF CONSTRUCTION SHALL BE PROTECTED. IF A
CORNER MONUMENT IS IN DANGER OF BEING DESTROYED, THE CONTRACTOR SHALL NOTIFY THE OWNER IMMEDIATELY. ANY CORNER
MONUMENT DISTURBED OR DESTROYED SHALL BE RESET BY A PROFESSIONAL LAND SURVEYOR REGISTERED IN THE STATE OF NC AT
THE CONTRACTOR'S EXPENSE. CONTRACTOR TO PROTECT OR REPLACE NCDOT RIGHT-OF-WAY MARKERS OR MONUMENTS PER
NCDOT 806.01.
32. CONTACT PROJECT INSPECTOR IMMEDIATELY REGARDING ANY CONFLICTS THAT ARISE DURING CONSTRUCTION OF WORK SHOWN ON
THE DRAWINGS.
33. FOR ALL TIE-IN PIPING OR CROSSINGS, CONTRACTOR SHALL VERIFY ALL EXISTING PIPELINE ELEVATIONS, LOCATIONS, DIAMETERS,
AND MATERIALS PRIOR TO SHOP DRAWING SUBMITTALS, NOTIFYING THE OWNER AND ENGINEER OF ANY CONFLICTS.
34. ALL DRIVEWAYS, DRAIN PIPES, HEADWALLS, AND OTHER PHYSICAL FEATURES SHALL BE RESTORED TO EQUAL OR BETTER THAN
EXISTING CONDITION, IN BOTH NEW AND EXISTING RIGHTS-OF-WAY AND WITHIN ANY TEMPORARY EASEMENT AREAS. ANY
STRUCTURES OR DRIVEWAYS DISTURBED OUTSIDE THE RIGHT-OF-WAY OR EASEMENT SHALL ALSO BE FULLY RESTORED TO THE
OWNER'S SATISFACTION AT NO ADDITIONAL COST TO THE OWNER.
35. WHEN DEWATERING TRENCHES, TURBID WATER SHALL BE PUMPED THROUGH A FILTER BAG.
36. ADDITIONAL SILT FENCE AND SILT FENCE STONE OUTLETS MAY BE REQUIRED BASED ON FIELD CONDITIONS AS DIRECTED BY
ENGINEER.
37. CONTRACTOR SHALL BE RESPONSIBLE FOR ANY WASTEWATER SPILLS ASSOCIATED WITH THE MAIN ALIGNMENT OR ASSOCIATED
BRANCH ALIGNMENTS THAT OCCUR AS A RESULT OF CONSTRUCTION ACTIVITIES AND ASSOCIATED FINES FROM STATE REGULATORY
AGENCIES.
38. PROTECT ALL DRAIN CULVERTS DURING CONSTRUCTION. MAINTAIN PROTECTION UNTIL DISTURBED AREAS ARE STABILIZED WITH
GROUND COVER SUFFICIENT TO RESTRAIN EROSION.
39. PROVIDE TEMPORARY DITCH LINING FOR DISTURBED DITCH LINES OR OTHER AREAS OF CONCENTRATED FLOW WHERE SLOPE IS
GREATER THAN 2%.
40. CONTRACTOR TO DIG TEST PITS AND DETERMINE ELEVATION OF ALL KNOWN CONFLICTS AT LEAST 1000 FEET AHEAD OF PIPE OR
CASING INSTALLATION.
41. ELEVATIONS AND GRADES SHOWN WITHIN THESE CONTRACT DRAWINGS ARE CRITICAL TO THIS SEWER INSTALLATION.
CONTRACTOR'S REGISTERED LAND SURVEYOR SHALL VERIFY LINES AND GRADES THROUGHOUT THE INSTALLATION PROCESS AND
DOCUMENT ON CONSTRUCTION RECORD DRAWINGS.
42. EXCESS EXCAVATED MATERIAL SHALL BE REMOVED FROM THE SITE AND DISPOSED OF AT AN APPROVED AND PROPERLY PERMITTED
OFFSITE LOCATION. CONTRACTOR SHALL PROVIDE TO ENGINEER PROOF OF PERMIT.
43. REPLACE ALL EXISTING FENCES IMMEDIATELY AFTER CONSTRUCTION HAS CLEARED THE FENCE LINE. TEMPORARY FENCES THAT
PROVIDE EQUAL SECURITY SHALL BE ERECTED UNTIL THE EXISTING FENCE CAN BE RESET.
44. INLET PROTECTION IS REQUIRED FOR ALL INLETS LOCATED IN THE WORKING AREA AND ADJACENT AREAS AND REQUIRED UNTIL THE
SITE IS FULLY STABILIZED.
45. CONTRACTOR TO SUBMIT TRAFFIC CONTROL & SAFETY PLAN FOR APPROVAL PRIOR TO SHUTTING DOWN ANY PORTION OF ANY
ROADWAY. CONTACT AUTHORITY HAVING JURISDICTION TWO WEEKS PRIOR TO ANY CONSTRUCTION. ONE LANE MUST BE OPEN AT
ALL TIMES ON QUAIL PARK DR.
46. THE CONTRACTOR SHALL ADHERE TO ALL CONDITIONS AND REQUIREMENTS OF ALL PERMITS THAT HAVE BEEN OBTAINED AND ALL
AVAILABLE LOCAL, STATE AND FEDERAL REGULATIONS. SEE SPECIAL PROVISIONS.
47. EXCAVATED MATERIALS SHALL NOT BE PLACED ON ROADWAY OR SIDEWALK.
48. CONTRACTOR SHALL BE RESPONSIBLE FOR MAKING SITE AND ADJACENT PROPERTIES ACCESSIBLE FOR EMERGENCY VEHICLES AT
ALL TIMES.
49. CONTRACTOR SHALL AVOID EXISTING SEPTIC TANKS AND WELLS, INCLUDING ANY REQUIRED SETBACKS OR BUFFERS.
50. ALL LANDSCAPE AREAS DISTURBED WITHIN STREET RIGHT-OF-WAY WILL BE REPAIRED PER STANDARD SPECIFICATIONS OF NCDOT
WITH POSITIVE DRAINAGE.
51. CONTRACTOR ENTRY/EXIT TO PROJECT IS LIMITED TO FOUR DIFFERENT ACCESS POINTS. 1) TEMPORARY ACCESS OFF BOST RD
THROUGH AN EXISTING PRIVATE DRIVE ONTO PARCEL 1794328709, 2) PERMANENT ACCESS OFF OF BOST RD AT PROPOSED ACCESS
EASEMENT ONTO PARCEL1794518195, 3) TEMPORARY ACCESS OFF CATAWBA MEADOWS DR. ONTO PARCEL 1794737408 (CATAWBA
MEADOWS PARK), AND 4) TEMPORARY ACCESS FROM AN EXISTING PRIVATE DRIVE ONTO PARCEL 1794218321. PERMISSION MUST BE
OBTAINED FROM ALL IMPACTED PROPERTY OWNERS BY THE CONTRACTOR. CONTRACTOR MAY, AT THEIR OPTION, OBTAIN
ADDITIONAL ACCESS AND WORK AREAS FROM PRIVATE PROPERTY OWNERS AT NO ADDITIONAL COST TO THE OWNER AND WHILE
ADHERING TO ALL CONTRACT REQUIREMENTS. ADDITIONAL AREAS OUTSIDE THE EXISTING ACCESS ROADS MUST BE SUBMITTED TO
NC DEQ REGIONAL OFFICE FOR REVIEW AND APPROVAL.
52. CONTRACTOR SHALL ENSURE THE SITE IS STABILIZED DAILY AND NO MORE THAN 25 LF MAY BE LEFT OPEN.
CITY OF MORGANTON STANDARD NOTES
1. ALL MATERIALS AND WORKMANSHIP SHALL BE SUBJECT TO INSPECTION BY THE CITY OF MORGANTON ENGINEER. THE CITY RESERVES THE RIGHT
TO ACCEPT OR REJECT ANY SUCH MATERIALS AND WORKMANSHIP THAT DOES NOT CONFORM TO ITS STANDARDS AND SPECIFICATIONS.
2. THE CONTRACTOR SHALL NOTIFY THE DEVELOPMENT AND DESIGN SERVICES DEPARTMENT/ENGINEERING DIVISION AT 828-438-5260 AND THE
WATER RESOURCES DEPARTMENT AT 828-438-5276 A MINIMUM OF 48 HOURS PRIOR TO STARTING CONSTRUCTION, AND EACH MORNING BY 9:00
A.M. THE LOCATION AND WORK TO BE PERFORMED. THE CONTRACTOR SHALL NOTIFY THE CITY AT LEAST 48 HOURS PRIOR TO AN INSPECTION.
3. LOCATION OF EXISTING UTILITIES AND SEWER TIE-INS SHALL BE VERIFIED BY THE CONTRACTOR PRIOR TO ACTUAL CONSTRUCTION. FOR
INFORMATION, CONTACT: 811.
4. A PLAN FOR TRAFFIC CONTROL DURING CONSTRUCTION SHALL BE SUBMITTED TO THE CITY OF MORGANTON ENGINEER FOR ACCEPTANCE WITH
THE PERMIT APPLICATION. AN EXCAVATION OR PUBLIC IMPROVEMENTS CONSTRUCTION PERMIT WILL NOT BE ISSUED WITHOUT AN APPROVED
TRAFFIC CONTROL PLAN FOR TRAFFIC CONTROL DURING CONSTRUCTION.
5. THE CONSTRUCTION PLANS SHALL BE CONSIDERED VALID FOR TWO (2) YEARS FROM THE DATE OF ACCEPTANCE/APPROVAL. IF APPLICABLE
CONSTRUCTION PERMITS HAVE NOT BEEN OBTAINED, AND CONSTRUCTION STARTED WITHIN THAT TIME, THESE PLANS SHALL BE VOID AND WILL
BE SUBJECT TO RE-REVIEW AND RE-ACCEPTANCE BY CITY OF MORGANTON.
6. THE CONTRACTOR SHALL RETAIN AN APPROVED SET OF PERMITTED CONSTRUCTION PLANS ON SITE AT ALL TIMES.
7. IN THE EVENT THE CONTRACTOR PROCEEDS WITH CONSTRUCTION PRIOR TO PERMIT ISSUANCE, THE CITY REQUIRES THE WORK TO BE
REINSTALLED AND THE CONTRACTOR SHALL BE FULLY LIABLE FOR ALL ACTIONS AND COSTS, INCLUDING PROSECUTION BY THE CITY OR THE
STATE FOR PROCEEDING WITH INSTALLATION PRIOR TO ISSUANCE OF APPROPRIATE PERMIT(S).
LEGEND
PROPOSED SANITARY SEWER LINE
& MANHOLE
EXISTING WATER LINE & VALVE
EXISTING WATER VALVE
EXISTING SANITARY SEWER LINE
AND MANHOLE
EXISTING OVERHEAD POWER LINE
& POLES
EXISTING FENCE
EXISTING GAS LINE
EXISTING PROPERTY LINE
EXISTING UNDERGROUND
TELEPHONE LINE
SS SS SS
PROPOSED SANITARY FORCE MAIN
& BENDS/DEFLECTIONS
EXISTING SEWER MANHOLE
PROPOSED FENCE
EXISTING VEGETATION/HEDGES
DOUBLE LEAF
ACCESS HATCH
100 YEAR FLOODPLAIN
TOP OF BANK/TOE OF BANK
SSE
SINGLE LEAF
ACCESS HATCH
GRAVEL
EXISTING GUY WIRE
EXISTING ELECTRIC BOX
METAL GRATING
EXISTING
PROPOSED
EXISTING RIGHT OF WAY
EXISTING STORM SEWER, YARD
INLET & CATCH BASIN
CONSTRUCTION ACCESS EASEMENT
PROPOSED ASPHALT PAVEMENT
DEMOLISH EXISTING, AS INDICATED
TEMPORARY CONSTRUCTION
EASEMENTee
CONSTRUCTION SEQUENCE - EROSION & SEDIMENT CONTROL
1. OBTAIN EROSION CONTROL PLAN APPROVAL FROM NCDEQ AND FILE FOR AN NPDES NCG010000 ELECTRONIC NOTICE OF INTENT
(E-NOI) TO OBTAIN A CERTIFICATE OF COVERAGE (COC) UNDER THE GENERAL STORM WATER PERMIT NCG01000.
2. SET UP AN ON-SITE PRE-CONSTRUCTION CONFERENCE WITH EROSION CONTROL INSPECTOR FROM NCDEQ TO DISCUSS EROSION
CONTROL MEASURES. CONTRACTOR SHALL CONTACT THE NCDEQ DIVISION OF LAND QUALITY AT LEAST TWO (2) WEEKS BEFORE
CONSTRUCTION ACTIVITIES BEGIN AT (828) 296-4621.
3. INSTALL PERIMETER SILT FENCE, SILT FENCE OUTLETS, TEMPORARY CONSTRUCTION ENTRANCES, AND TREE PROTECTION FENCE AS
SHOWN ON EROSION CONTROL PLAN.
4. CALL FOR ON-SITE INSPECTION BY INSPECTOR. WHEN APPROVED, CLEARING AND GRUBBING MAY BEGIN. THE SEDIMENTATION FENCE
SHALL BE LOCATED AN ADEQUATE DISTANCE FROM THE LIMITS OF DISTURBANCE TO ALLOW FOR INSTALLATION, STORAGE,
MAINTENANCE AND DECOMMISSIONING OPERATIONS. ADDITIONALLY, LOCATING THE SEDIMENT FENCE AWAY FROM THE LIMITS OF
DISTURBANCE MAY HELP PREVENT OFFSITE SEDIMENTATION.
5. THE CONTRACTOR SHALL DILIGENTLY AND CONTINUOUSLY MAINTAIN ALL EROSION CONTROL DEVICES AND STRUCTURES.
CONTRACTOR SHALL STABILIZE ANY DISTURBED AREAS PER NCDEQ CONSTRUCTION GENERAL PERMIT NCG01. SEE GENERAL NOTE
28 OF 51. (THIS SHEET)
6. COORDINATE WITH EROSION CONTROL INSPECTOR PRIOR TO REMOVAL OF EROSION CONTROL MEASURES.
7. ALL EROSION CONTROL MEASURES SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE N.C. EROSION AND SEDIMENT CONTROL
PLANNING AND DESIGN MANUAL.
8. ALL EROSION CONTROL MEASURES SHALL REMAIN IN PLACE UNTIL CONSTRUCTION IS COMPLETE, PERMANENT VEGETATION IS
ESTABLISHED ON ALL DISTURBED AREAS, AND APPROVAL BY NCDEQ AND THE ENGINEER IS GIVEN FOR REMOVAL.
9. NO MAJOR GRADING ACTIVITIES TO TAKE PLACE DURING WET WEATHER OR PERIODS OF PREDICTED WET WEATHER
10. THE MAXIMUM LINEAR FEET OF UNSTABLE/ OPEN LAND AT ONE TIME IS XXXXXXXXXXXXXXXXXXXXXXXXXXXXX
11. THE SITE MUST BE STORM READY BEFORE ANY EXTENDED BREAKS IN CONSTRUCTION ACTIVITIES INCLUDING WEEKENDS.
12. NOTIFY THE NCDEQ LAND QUALITY SPECIALIST WHEN THE PROJECT IS READY FOR A CLOSE OUT INSPECTION AFTER THE SITE IS
PERMANENTLY STABILIZED AND ALL EROSION AND SEDIMENTATION CONTROLS REMOVED.
13. FILE FOR AN NPDES NCG010000 ELECTRONIC NOTICE OF TERMINATION (E-NOT) AFTER FINAL CLOSE OUT INSPECTION REPORT IS
RECEIVED FROM NCDEQ LAND QUALITY SECTION.
SANITARY SEWER EASEMENT
BORE HOLE
CONTRACTOR LAYDOWN AND
STAGING
AIR RELEASE VALVE
GROUNDWATER
AC AC AC
EXISTING NCDOT DRAINAGE EASEMENT
EMERGENT WETLANDS
PROPOSED WATER LINE & VALVE
UK
U
T
I
L
UK
U
T
I
L
UK
U
T
I
L
UK
U
T
I
L
UK
U
T
I
L
UK
U
T
I
L
UK
U
T
I
L
UK
U
T
I
L
UK
U
T
I
L
UK
U
T
I
L
UK
U
T
I
L
UK
U
T
I
L
UK
U
T
I
L
UK
U
T
I
L
UK
U
T
UK
U
T
I
L
UK
U
T
I
L
UK
U
T
I
L
UK
U
T
I
L
UK
U
T
I
L
UK
U
T
I
L
UK
U
T
I
L
UK
U
T
I
L
UK
U
T
I
L
UK
U
T
I
L
UK
U
T
I
L
B6
0+
0
0
1
+
0
0
Q:
\
C
H
A
\
P
r
o
j
e
c
t
s
\
1
0
9
3
-
m
o
r
g
a
n
t
o
n
b
o
s
t
r
d
\
C
A
D
\
C
D
s
\
1
0
9
3
-
S
i
t
e
P
l
a
n
.
d
wg
3
/
7
/
2
0
2
3
1
0
:
3
6
:
3
6
P
M
FINAL PLANS
NOT FOR CONSTRUCTION
5 10 20 30 400
Scale: 1" = 10'
NOTES
1. EXISTING SEWER AND PUMP STATION TO REMAIN IN SERVICE
UNTIL CHANGE OVER OCCURS.
1.1. TESTING TO BE SUCCESSFULLY COMPLETED BEFORE
CHANGE OVER CAN BEGIN. CHECK SEQUENCING
SCHEDULE.
2. REMOVE EXISTING ASPHALT DRIVE PER NCDOT AND CITY OF
MORGANTON SPECIFICATIONS.
3. CONTRACTOR TO SET UP TRAFFIC SAFETY MEASURES
BEFORE BEGINNING DRIVEWAY WORK.
4. EXISTING POWER POLES AND SERVICE LINES TO BE REMOVED
BY DUKE ENERGY. CONTRACTOR TO SEQUENCE REMOVAL
WITH CHANGE OVER TO THE NEW LIFT STATION.
COORDINATE WITH ELECTRICAL PLANS.
5. EXISTING 2" FORCEMAIN TO BE ABANDONED IN PLACE. FILL
WITH FLOW-FILL (CLSM) AND CAP BOTH ENDS. X LF FROM
PUMP STATION TO N GREEN ST
REMOVE EXISTING CHAIN
LINK FENCE (TYP ALL)
SAWCUT AND REMOVE EXISTING WET WELL AND
VALVE VAULT STRUCTURES TO A DEPTH OF 3 FT
BELOW EXISTING GRADE. FILL THE REMAINING
STRUCTURE WITH FLOW-FILL (CLSM) AND ABANDON IN
PLACE. SEWER CONNECTION TO BE ABANDONED IN
PLACE TO EXTENT SHOWN ON PIPING AND UTILITIES
PLAN. FILL W/CONCRETE
REMOVE EXISTING ASPHALT
DRIVEWAY, PROTECT CONCRETE
APRON AND CURB IN PLACE.
REMOVE EXISTING
ASPHALT PAVEMENT
(~137 SQ YD)
REMOVE EXISTING CHAIN
LINK DOUBLE SWING GATE
REMOVE EXISTING
ELECTRICAL
PANELS.
EXISTING POWER POLE AND
ELECTRIC SERVICE TO BE
REMOVED. SEE NOTE 4
EXISTING POWER POLE AND GUY
WIRE TO BE REMOVED AND
REPLACED. SEE NOTE 4.
UNNAMED
TRIBUTARY
EXISTING
PROPERTY LINE
EXISTING
PROPERTY LINE
EXISTING SEWER TO BE
ABANDONED. SEE DEMO PLAN
1900 LF FROM
SSE
SSE
SSE
SSE
SSE
SSE
SSE
SSE
SSE
SSE
SSE
e
e
e
e
e
e
e
e
e
e
e
e
e
e
e
e
e
ee
e
e
e
e
e
e
e
S
S
E
S
S
E
SSE
SSE
S
S
E
S
S
E
S
S
E
e
e
e
e
e
e
e
e
e
e
e
AC
AC
AC
AC
AC
AC
AC
AC
AC
AC
AC
e
e
B6
N =742231.187
E =1194247.208
N =742149.863
E =1194245.474
N =742138.619
E =1194302.215
N =742182.647
E =1194237.495
N =742216.760
E =1194319.604
10
1
5
10
1
5
10
1
5
1015
10
1
4
10
1
3
10
1
2
10
1
0
10
1
5
N =742164.645
E =1194253.222
N =742161.018
E =1194271.872
N =742175.742
E =1194274.736
N =742179.369
E =1194256.086
Q:
\
C
H
A
\
P
r
o
j
e
c
t
s
\
1
0
9
3
-
m
o
r
g
a
n
t
o
n
b
o
s
t
r
d
\
C
A
D
\
C
D
s
\
1
0
9
3
-
S
i
t
e
P
l
a
n
.
d
wg
3
/
7
/
2
0
2
3
1
0
:
3
6
:
4
0
P
M
5102030400
Scale: 1" = 10'
FINAL PLANS
NOT FOR CONSTRUCTION
CHAINLINK FENCE ENTIRE PERIMETER
SEE DETAIL SHEET C3.2
TOP OF BANK
TOE OF BANK
PROPOSED PRECAST
VALVE VAULT EXISTING
PROPERTY LINE
TEMPORARY CONSTRUCTION
LAYDOWN YARD
EXISTING
PROPERTY LINE
PROPOSED WET WELL
W/METAL PLATFORM. SEE
MECHANICAL SHEETS
EXISTING EMERGENT
WETLAND, SEE EROSION
CONTROL SHEETS
RIGHT-OF-WAY
RIGHT-OF-WAY
UNNAMED
TRIBUTARY
METAL CANOPY
OVER ELECTRICAL
EQUIPMENT. SEE
NOTE 2.
16-FT WIDE DOUBLE SWING
CHAIN LINK GATE SEE
DETAIL SHEET C3.2
PROPOSED
PROPERTY LINE
CONSTRUCTION ENTRANCE
TO REMAIN AT END OF PROJECT
EMERGENCY PUMP CONNECTION
DISCHARGE PROTECTED BY STANDARD
PIPE BOLLARDS. SEE MECHANICAL AND
STRUCTURAL SHEETS.
NOTES
1. ELECTRICAL PANELS TO BE PLACED ON TOP OF METAL
PLATFORM. SEE ELECTRICAL SHEETS FOR PLACEMENT AND
DETAILS.
2. METAL CANOPY TO PROVIDE SHADE AND COVERAGE FOR
THE ELECTRICAL PANELS. SEE THE STRUCTURAL SHEETS
FOR INSTALLATION OF THE CANOPY TO THE METAL
PLATFORM
WET WELL VENT
PROTECTED BY
REMOVABLE BOLLARD.
SEE MECHANICAL
SHEETS.
49
.
5
'
3
3
.
5
'
73.8'
57.9'
PROPOSED
PROPERTY LINE
EXISTING CONTOUR
LINES (TYP)
80
.
1
'
TEMPORARY
CONSTRUCTION LAYDOWN
YARD AND STOCKPILE
LOCATION
e
ee
e
742742=742742164.645742
53.22253.222E =1194253.22253.22253.222
16-FT WIDE DO
CHAIN LINK GATEN LINK
DETAIL SHEET C3.2
C
DETAIL
77=77427
E
DE DOU
GATE
32
9.863
5.45 47454
9
5.45 47454
Herbaceous Wetland AA
W1: 0.01 acre permanent impact (purple)
W2: 0.01 acre temporary impact (blue)
SSE
SSE
SSE
SSE
SSE
SS
SSE
SSE
SSE
SSE
SSE
e
e
e
e
e
e
e
e
e
e
e
e
e
e
e
e
e
ee
e
e
e
e
e
e
e
S
S
E
S
S
E
SSE
SSE
S
S
E
S
S
E
S
S
e
e
e
e
e
e
e
e
e
AC
AC
AC
AC
AC
AC
AC
AC
A
e
e
B6
R=23.45'
15.0
0
'
5.00'
16.00
15.50
16.00
15.75
16.25
15.50
16.05
16.05
16.24
15.75
16.50
16.50
16.50 16.50
16.35
16.50 16.25
16.25
10.00
11.00
12.00
13.00
14.00
10
1
4
10
1
3
10
1
2
10
1
1
10
1
1
10
1
2
10
1
3
10
1
4
1012
1013
1014
1012
1013
1014
5.00'
23
.
7
3
'
33.18'
24.66'
25
.
2
6
'
3
3
.
7
4
'
49
.
5
1
'
39.97'
33.85'
19.64'
29
.
7
9
'
19.64'
R=37.22'
15.00'
5.00'
23
.
7
3
'
25
.
0
0
'
GRADE AND SLOPE
PER GRADING PLAN
SUBGRADE COMPACTED TO 95%
STND PROCTOR. ASTM D698ASPHALT PAVEMENT
ASPHALT SURFACE: 4" I-2
BASE COURSE: 6" COMPACTED
AGGREGATE BASE COURSE (CABC)
SITE PAVEMENT
SCALE: NONE
Q:
\
C
H
A
\
P
r
o
j
e
c
t
s
\
1
0
9
3
-
m
o
r
g
a
n
t
o
n
b
o
s
t
r
d
\
C
A
D
\
C
D
s
\
1
0
9
3
-
S
i
t
e
P
l
a
n
.
d
wg
3
/
7
/
2
0
2
3
1
0
:
3
6
:
4
7
P
M
5102030400
Scale: 1" = 10'
FINAL PLANS
NOT FOR CONSTRUCTION
NOTES
1. CONTRACTOR TO SET UP TRAFFIC SAFETY MEASURES BEFORE
BEGINNING DRIVEWAY WORK.
2. PROPOSED CONSTRUCTION LAYDOWN YARD MAY HAVE GRAVEL
SURFACING INSTALLED DURING CONSTRUCTION AT
CONTRACTOR'S EXPENSE. AFTER CONSTRUCTION, REMOVE
GRAVEL AND RESTORE TO NATURAL GROUND, HYDROSEED PER
SPECIFICATIONS.
PROPOSED DRIVEWAY. TIE
INTO EXISTING CONCRETE
APRON.
ASPHALT PAVEMENT. SEE
DETAIL THIS SHEET.
RIGHT-OF-WAY
RIGHT-OF-WAY
UNNAMED
TRIBUTARY
TOP OF BANK
TOE OF BANK
PROPOSED PRECAST
VALVE VAULT. FLUSH
W/GRADE
EXISTING
PROPERTY LINE
EXISTING
PROPERTY LINE
PROPOSED
PROPERTY LINE
DITCH 1. SEE EROSION
CONTROL SHEETS FOR
MATTING DETAILS.
ROADSIDE DITCH
MAT DITCH WITH NORTH
AMERICAN GREEN C125 OR
APPROVED EQUIVALENT
TEMPORARY CONSTRUCTION
LAYDOWN YARD
CONSTRUCTION ENTRANCE
TO REMAIN AT END OF PROJECT
RESTORE TO NATURAL
GROUND, HYDROSEED
AREAS OUTSIDE OF FENCE
LINE PER SPECIFICATIONS.
RESTORE TO NATURAL
GROUND, HYDROSEED
AREAS OUTSIDE OF FENCE
LINE PER SPECIFICATIONS.
INV IN: 1012.5 FT
INV OUT: 1012.0 FT
24 LF 18" RCP CLASS IV WITH RIP
RAP. SEE DETAIL X, SHEET CX.X
48 LF 48" RCP Class III WITH RIP
RAP. SEE DETAIL X, SHEET CX.X
INV. IN: 1010.2 FT
INV. OUT: 1009.7 FTPROPOSED CONTOUR
LINES (TYP)
EXISTING
CONTOUR LINES
(TYP)
PROPOSED SPOT
ELEVATION (TYP)
PROPOSED SPOT
ELEVATION (TYP)
24 LF 18" RCP CLASS IV W/RIP
RAP. SEE NCDOT STND DETAIL
876.02, SHEET CE3.3
TEMPORARY
CONSTRUCTION LAYDOWN
YARD AND STOCKPILE
LOCATION
48 LF 48" RCP CLASS III W/RIP
RAP. SEE NCDOT STND DETAIL
876.02, SHEET CE3.3
Intermittent Stream B
S3: 16 lf permanent impact (rip rap apron)
SSE
SSE
SSE
SSE
SSE
S
SSE
SSE
SSE
SSE
SSE
e
e
e
e
e
e
e
e
e
e
e
e
e
e
e
e
e
ee
e
e
e
e
e
e
e
S
S
E
S
S
E
SSE
SSE
S
S
E
S
S
E
e
e
e
e
e
e
e
e
e
e
AC
AC
AC
AC
AC
AC
AC
AC
AC
e
e
UK
U
T
I
L
UK
U
T
I
L
UK
U
T
I
L
UK
U
T
I
L
UK
U
T
I
L
UK
U
T
I
L
UK
U
T
I
L
UK
U
T
I
L
UK
U
T
I
L
UK
U
T
I
L
UK
U
T
I
L
UK
U
T
I
L
UK
U
T
I
L
UK
U
T
I
L
U
UK
U
T
I
L
UK
U
T
I
L
UK
U
T
I
L
UK
U
T
I
L
UK
U
T
I
L
UK
U
T
I
L
UK
U
T
I
L
UK
U
T
I
L
UK
U
T
I
L
UK
U
T
I
L
UK
U
T
I
L
B6
0+
0
0
1+00
0+
0
0
1
+
0
0
0+00
0+35
997
1000
1010
1020
997
1000
1010
1020
0+00 0+37
34.85 LF 8" PVC @ 4.05%
EX
M
H
B
ST
A
:
0
+
3
4
.
8
5
RI
M
:
1
0
1
6
.
3
6
IN
V
O
U
T
:
1
0
0
6
.
8
2
(
L
i
f
t
S
t
a
t
i
o
n
)
LI
F
T
S
T
A
T
I
O
N
ST
A
:
0
+
0
0
.
0
0
RI
M
:
1
0
0
8
.
9
3
IN
V
I
N
:
1
0
0
5
.
4
1
(
E
X
M
H
B
)
Q:
\
C
H
A
\
P
r
o
j
e
c
t
s
\
1
0
9
3
-
m
o
r
g
a
n
t
o
n
b
o
s
t
r
d
\
C
A
D
\
C
D
s
\
1
0
9
3
-
S
i
t
e
P
l
a
n
.
d
wg
3
/
7
/
2
0
2
3
1
0
:
3
6
:
5
2
P
M
5102030400
Scale: 1" = 10'
FINAL PLANS
NOT FOR CONSTRUCTION
NOTES
1. CONTRACTOR TO CONFIRM LOCATIONS AND DEPTHS OF ALL
EXISTING UTILITIES IN THE FIELD.
2. EXISTING SEWER AND PUMP STATION TO REMAIN IN SERVICE UNTIL
CHANGE OVER OCCURS.
2.1. TESTING TO BE SUCCESSFULLY COMPLETED BEFORE CHANGE
OVER CAN BEGIN. CHECK SEQUENCING SCHEDULE.
3. EXISTING 8" PVC TO BE ABANDONED IN PLACE BETWEEN NEW MH 2
AND EXISTING MH. PLUG THIS SEGMENT WITH FLOW-FILL (CSLM,
MAKE FLUSH WITH THE INNER WALL OF THE EXISTING MH TO
REMAIN.
4. CORE HOLE AND CONNECT NEW 8" PIPE TO THE EXISTING MH.
RESHAPE THE BENCH AND FLOW CHANNEL TO SLOPE WITH A 0.2 FT
DROP ACROSS THE MH, TOWARDS THE NEW LIFT STATION. ADJUST
THE RIM ELEVATION FLUSH WITH FINISHED GRADE. WATER PROOF
PER MORGANTON SPECIFICATIONS. SEE DETAIL SHEET.
TOP OF BANK
TOE OF BANK
PROPOSED PRECAST
VALVE VAULT
EXISTING
PROPERTY LINE
TEMPORARY
CONSTRUCTION
LAYDOWN YARD
EXISTING
PROPERTY LINE
PROPOSED
WET WELL
RIGHT-OF-WAY
RIGHT-OF-WAY
UNNAMED
TRIBUTARY
8' RCP
1007.9' FROM
SEDIMENT
8' RCP
1008.82' FROM
SEDIMENT
HEADWALL
1012.56'
EXISTING 30" RCP CULVERT TO BE
REMOVED AND REPLACED BY NEW
48" RCP. SEE PAVING AND GRADING
SHEET
CURB
EMERGENCY PUMP
CONNECTION DISCHARGE.
SEE MECHANICAL SHEETS.
EXISTING ELECTRIC POLE
TO REMAIN UNTIL NEW
SERVICE IS INSTALLED.
PROTECT IN PLACE.
EXISTING ELECTRIC POLE AND
GUY WIRE TO REMAIN UNTIL
NEW SERVICE IS INSTALLED.
PROTECT IN PLACE.
EXISTING SEWER AND
FORCEMAIN TO BE
ABANDONED. SEE DEMO PLAN
EXISTING MH TO REMAIN.
SEE NOTE 3 AND 4.
CURB
PROPOSED
PROPERTY LINE
ABANDON EXISTING
WATER SERVICE.
PROPOSED 25LF 2" PVC WL.
CONTRACTOR TO INSTALL WITH 36"
MIN. COVER.
2" TAPPING SLEEVE AND VALVE ON
EXISTING 12" WL. SEE DETAIL X.
CONSTRUCTION ENTRANCE
TO REMAIN AT END OF PROJECT
EXISTING EMERGENT
WETLAND, SEE EROSION
CONTROL SHEETS
TIE EXISTING 8" SEWER
INTO MH 2. SEE NOTE 3
INV IN:
1003.87'
INV. IN
1005.41'
INV. IN
1007.02'
INV. OUT
1006.82'
INV IN:
1007.52'
ADJUST WATER
SERVICE TO NEW
GRADE
SEE PROFILE A,
THIS SHEET
PROFILE A
Proposed
GroundExisting
Ground
SEE STND MORGANTON
DETAIL 119
TEMPORARY
CONSTRUCTION LAYDOWN
YARD AND STOCKPILE
LOCATION
10141016
10
1
4
1
0
1
0
10
1
2
1
0
1
4
1012
1012
1
0
1
4
10
2
0
1
0
2
2
1
0
1
8
1016
1016
10161016
1
0
1
8
MH 4 - BOLT DOWN LID
STA:4+51.39
N:741716.80
E:1194279.12
MH 7
STA:10+06.89
N:741173.18
E:1194177.24
MH 3 - BOLT DOWN LID
STA:1+53.39
N:742014.69
E:1194271.25
MH 2 - OUTSIDE DROP W/BOLT DOWN LID
STA:0+16.13
N:742151.51
E:1194260.27
MH 6 - VENTED
STA:9+52.89
N:741221.71
E:1194200.94
10
2
0
1022
10
2
0
e
e e
e
e
e
e
e
e
e
e
eeeeeee
SSE
SSE
SSE
SSE
SSE
SSESSESSESSESSE
SSE
SSE SSE SSE SSE
SSE
SSE
SSE
SSE
SSE
SSE
SS
E
SS
E
e
e
AC
AC
54.00 LF of
8" PVC
372.00 LF of
8" PVC
16.13 LF of
8" PVC
N7° 50' 26"E
N1° 30' 49"W
N11° 16' 45"E
N12° 14' 00"E
129.50 LF of
8" PVC
UK UTIL
UK UTIL
UK UTIL
UK UTIL
UK UTIL
U
UK UTIL
UK UTIL
N26° 01' 26"E
MH 5 - BOLT DOWN LID
STA:8+23.39
N:741348.27
E:1194228.38
137.26 LF of
8" DIP
N4° 35' 19"W 298.00 LF of
8" PVC
WET WELL
STA:0+00.00
N:742167.33
E:1194263.43
0+00
1+00
2+00 3+00 4+00 5+00
6+00
7+00
8+00
9+00
10+
0
0
11+00
1003
1005
1010
1015
1020
1025
1003
1005
1010
1015
1020
1025
0+00 0+50 1+00 1+50 2+00 2+50 3+00 3+50 4+00 4+50 5+00 5+50 6+00 6+50 7+00 7+50 8+00 8+50 9+00 9+50 10+00 10+50 11+00
16.13 LF 8" PVC @ 0.61%
372.00 LF 8" PVC @ 0.83%
298.00 LF 8" PVC @ 0.84%
MH
7
ST
A
:
1
0
+
0
6
.
8
9
RI
M
:
1
0
2
1
.
4
0
IN
V
I
N
:
1
0
1
3
.
4
0
(
M
H
8
)
IN
V
O
U
T
:
1
0
1
3
.
2
0
(
M
H
6
)
MH
5
-
B
O
L
T
D
O
W
N
L
I
D
ST
A
:
8
+
2
3
.
3
9
RI
M
:
1
0
1
9
.
6
2
IN
V
I
N
:
1
0
1
1
.
5
3
(
M
H
6
)
IN
V
O
U
T
:
1
0
1
1
.
3
3
(
M
H
4
)
MH
4
-
B
O
L
T
D
O
W
N
L
I
D
ST
A
:
4
+
5
1
.
3
9
RI
M
:
1
0
1
7
.
4
3
IN
V
I
N
:
1
0
0
8
.
2
5
(
M
H
5
)
IN
V
O
U
T
:
1
0
0
8
.
0
5
(
M
H
3
)
MH
3
-
B
O
L
T
D
O
W
N
L
I
D
ST
A
:
1
+
5
3
.
3
9
RI
M
:
1
0
1
4
.
3
8
IN
V
I
N
:
1
0
0
5
.
5
5
(
M
H
4
)
IN
V
O
U
T
:
1
0
0
5
.
3
5
(
M
H
2
)
MH
2
-
O
U
T
S
I
D
E
D
R
O
P
W
/
B
O
L
T
D
O
W
N
L
I
D
ST
A
:
0
+
1
6
.
1
3
RI
M
:
1
0
1
4
.
0
6
IN
V
I
N
:
1
0
0
4
.
1
7
(
M
H
3
)
IN
V
I
N
:
1
0
0
7
.
5
0
(
E
X
8
"
S
E
W
E
R
)
IN
V
O
U
T
:
1
0
0
3
.
9
7
(
W
E
T
W
E
L
L
)
B8
ELEV:1008.24
10' BORE TERM.
129.50 LF 8" PVC @ 0.80%
MH
6
-
V
E
N
T
E
D
ST
A
:
9
+
5
2
.
8
9
RI
M
:
1
0
2
0
.
5
1
IN
V
I
N
:
1
0
1
2
.
7
6
(
M
H
7
)
IN
V
O
U
T
:
1
0
1
2
.
5
6
(
M
H
5
)
372.00 LF 8" PVC @ 0.83%
WE
T
W
E
L
L
ST
A
:
0
+
0
0
.
0
0
RI
M
:
1
0
0
7
.
3
9
IN
V
I
N
:
1
0
0
3
.
8
7
(
M
H
2
)
IN
V
I
N
:
1
0
0
5
.
4
1
(
E
X
M
H
)
54.00 LF 8" PVC @ 0.80%
137.26 LF 8" PVC @ 0.86
%
STA 10+20.81
SEWER SERVICE CONNECTION
WITH CLEANOUT PER DETAIL
208, SHEET C3.2
Q:
\
C
H
A
\
P
r
o
j
e
c
t
s
\
1
0
9
3
-
m
o
r
g
a
n
t
o
n
b
o
s
t
r
d
\
C
A
D
\
C
D
s
\
1
0
9
3
-
P
l
a
n
P
r
o
f
i
l
e
-G
r
a
v
i
t
y
S
e
w
e
r
.
d
w
g
3
/
7
/
2
0
2
3
1
0
:
3
7
:
4
5
P
M
20 40 80 120 1600
Scale: 1" = 40'
PERENNIAL STREAM
100-YR FLOODPLAIN
TOE OF BANK
TOP OF BANK
EXISTING EMERGENT WETLANDS
PUMP STATION.
SEE SITE PLAN,
SHEET C1.1
25' PUBLIC SANITARY
SEWER EASEMENT
25
.
0
'
10
.
0
'
B6
B8
B7
PROTECT DOWN GUY. ANCHOR IN
PLACE, BRACE UTILITY POLE
DURING EXCAVATION AS
NECESSARY. COORDINATE WITH
ELECTRICAL UTILITY
NOTES
1. FIELD VERIFY ELEVATION OF EXISTING UTILITIES BY
POTHOLING PRIOR TO CONSTRUCTION. PROTECT IN
PLACE. COORDINATE AND COMPLY WITH CROSSING AND
INSPECTION REQUIREMENTS WITH UTILITY COMPANY
2. UTILITY CROSSINGS SHOWN AT ASSUMED ELEVATIONS
3. EXISTING 2" FORCEMAIN TO BE ABANDONED IN PLACE.
FILL WITH FLOW-FILL (CLSM) AND CAP BOTH ENDS.
MA
T
C
H
L
I
N
E
S
T
A
1
1
+
0
0
,
S
H
E
E
T
C
2
.
2
100-YR FLOOD ELEV= 1019'
3.
0
'
EXISTING GRAVEL
DRIVEWAY. REPAIR AT
COMPLETION OF WORK
PERMANENT DRAINAGE
EASEMENT
PERMANENT
DRAINAGE EASEMENT
EXISTING FORCE
MAIN. SEE NOTES.
EXISTING CHAIN
LINK FENCE
171°
177°
CONSTRUCTION
LAYDOWN YARD.
SEE SHEET C3.8
EXISTING GRAVEL
DRIVEWAY. REPAIR AT
COMPLETION OF WORK
PERMANENT DRAINAGE
EASEMENT
25' TEMPORARY
CONSTRUCTION
EASEMENT
9
0
°
176°
CONNECT EXISTING 8" SEWER TO
NEW MANHOLE VIA OUTSIDE DROP
CONNECTION PER DETAIL 204, SHEET
C3.1
EXISTING GRADE
448.66 LF 8" PVC @ 0.82%
166°
DITCH
DITCH
25
.
0
'
12.5
STREAM
SEE PIPING & UTILITIES
PLAN, SHEET C1.3, FOR
PROFILE
164°
Perennial Stream A
S2: 40 lf temporary impact (open-cut sewer)
1
0
4
8
1
0
4
4
10
MH 11
STA:19+92.44
N:741567.23
E:1193286.61
MH 10 - VENTED
STA:19+36.53
N:741579.58
E:1193341.15
25
.
0
'
50
.
0
'
MH 9
STA:18+81.56
N:741555.54
E:1193390.58
9
0
°
1020
1022
1
0
1
8
1
0
2
2
10
2
0
1022
1024
10
2
6
10
2
8
1
0
3
2
10
3
6
1
0
4
2
1
0
3
4
1
0
3
2
1020
12.5'
e e e e e e e e e e e e e e
e
e
e
e
e
SSE SSE SSE SSE SSE SSE SSE SSE SSE
SSE
S
S
E
SSE SSE SSE SSE SSE SSE SSE SSE SSE SSE
S
S
E
S
S
E
2
5
8
.
7
6
L
F
o
f
8
"
P
V
C
N77° 14' 09"E
55.9
1
L
F
o
f
8" P
V
C
MH 8 - SHALLOW FLAT TOP
STA:14+55.56
N:741369.41
E:1193773.77
N
1
2
°
4
5
'
5
1
"
W
54.97 LF of
8" PVC
448.66 LF of
8" PVC
426.00 LF of
8" PVC
S64° 03' 51"E S64° 05' 31"E25
.
0
'
S64° 04' 03"E
12+00 13+00 14+00 15+00 16+00 17+00 18+00 19+00
2
0
+
0
0
2
1
+
0
0
1010
1015
1020
1025
1030
1035
1040
1045
1010
1015
1020
1025
1030
1035
1040
1045
11+00 11+50 12+00 12+50 13+00 13+50 14+00 14+50 15+00 15+50 16+00 16+50 17+00 17+50 18+00 18+50 19+00 19+50 20+00 20+50
MH
1
1
ST
A
:
1
9
+
9
2
.
4
4
RI
M
:
1
0
3
9
.
2
9
IN
V
I
N
:
1
0
2
5
.
6
4
(
M
H
1
2
)
IN
V
O
U
T
:
1
0
2
5
.
4
4
(
M
H
1
0
)
MH
1
0
-
V
E
N
T
E
D
ST
A
:
1
9
+
3
6
.
5
3
RI
M
:
1
0
3
6
.
4
3
IN
V
I
N
:
1
0
2
4
.
0
9
(
M
H
1
1
)
IN
V
O
U
T
:
1
0
2
3
.
8
9
(
M
H
9
)
MH
9
ST
A
:
1
8
+
8
1
.
5
6
RI
M
:
1
0
2
9
.
7
6
IN
V
I
N
:
1
0
2
2
.
5
6
(
M
H
1
0
)
IN
V
O
U
T
:
1
0
2
2
.
3
6
(
M
H
8
)
MH
8
-
S
H
A
L
L
O
W
F
L
A
T
T
O
P
ST
A
:
1
4
+
5
5
.
5
6
RI
M
:
1
0
2
1
.
7
8
IN
V
I
N
:
1
0
1
7
.
2
8
(
M
H
9
)
IN
V
O
U
T
:
1
0
1
7
.
0
8
(
M
H
7
)
426.00 LF 8" PVC @
1
.
1
9
%
3.
0
'
3.
0
'
54.97 LF 8
"
P
V
C
@
2
.
4
1
%
55.91 LF 8
"
P
V
C
@
2
.
4
1
%
448.66 LF 8" PVC @ 0.82%
Q:
\
C
H
A
\
P
r
o
j
e
c
t
s
\
1
0
9
3
-
m
o
r
g
a
n
t
o
n
b
o
s
t
r
d
\
C
A
D
\
C
D
s
\
1
0
9
3
-
P
l
a
n
P
r
o
f
i
l
e
-G
r
a
v
i
t
y
S
e
w
e
r
.
d
w
g
3
/
7
/
2
0
2
3
1
0
:
3
7
:
5
1
P
M
20 40 80 120 1600
Scale: 1" = 40'
NOTES:
1. FIELD VERIFY ELEVATION OF EXISTING UTILITIES BY
POTHOLING PRIOR TO CONSTRUCTION. PROTECT IN
PLACE. COORDINATE AND COMPLY WITH CROSSING AND
INSPECTION REQUIREMENTS WITH UTILITY COMPANY
2. UTILITY CROSSINGS SHOWN AT ASSUMED ELEVATIONS
MA
T
C
H
L
I
N
E
S
T
A
1
1
+
0
0
,
S
H
E
E
T
C
2
.
1
MAT
C
H
L
I
N
E
S
T
A
2
0
+
5
0
,
S
H
E
E
T
C
2
.
3
25' PUBLIC SANITARY
SEWER EASEMENTEXISTING UNPAVED DRIVEWAY.
REPAIR AT COMPLETION OF WORK
EXISTING FENCE.
PROTECT IN PLACE
180°
EXISTING GRAVEL
DRIVEWAY. REPAIR AT
COMPLETION OF WORK
25' TEMPORARY SANITARY
SEWER EASEMENT
EXISTING DITCH
CENTERLINE
100-YR FLOODPLAIN
EXISTING GRADE DITCH
PROPERTY LINE
APPROXIMATE ROW
180°141°
Intermittent Stream H
S1: 40lf temporary impact (open-cut sewer)
1050
10
4
6
1048
1050
1050
1046
104010421044
1044
1052
1042
1034
1032
1038
1042
1034
1044
MH 13
STA:23+34.20
N:741291.37
E:1193264.18
e
e
e
e
SSE
SSE
S
S
E
SSE
SSE
SSE
SSE
SSE
SS
E
SS
E
SSE
SSE
S
S
E
SSE
SSE
SSE
SSE
SS
E
SS
E
e
e
e
e
e e
e
e
e
e
258.76 LF
o
f
8" PVC
201.32 L
F
o
f
8" PVC
184.38 LF of
8" PVC
18
8
.
5
6
L
F
o
f
8"
P
V
C
N16° 06'
3
4
"
W
N73° 33' 39"E
N6° 41' 30"E
83.00 LF of
8" PVC
MH 12
STA:22+51.20
N:741314.86
E:1193343.78
N12° 45' 51
"
W
MH 16
STA:29+08.46
N:740753.47
E:1193201.00
MH15
STA:27+19.90
N:740914.84
E:1193298.55
MH14
STA:25+35.52
N:741097.96
E:1193320.04
N3
1
°
0
9
'
1
6
"
E
29
+
0
8
21+00
22+00
2
3
+
0
0
24+00
25+00 26+00
27+00
28
+
0
0
29
+
0
0
1023
1025
1030
1035
1040
1045
1050
1055
1023
1025
1030
1035
1040
1045
1050
1055
20+50 21+00 21+50 22+00 22+50 23+00 23+50 24+00 24+50 25+00 25+50 26+00 26+50 27+00 27+50 28+00 28+50 29+00 29+50
MH
1
3
ST
A
:
2
3
+
3
4
.
2
0
RI
M
:
1
0
4
5
.
6
1
IN
V
I
N
:
1
0
3
4
.
2
3
(
M
H
1
4
)
IN
V
O
U
T
:
1
0
3
4
.
0
3
(
M
H
1
2
)
MH
1
2
ST
A
:
2
2
+
5
1
.
2
0
RI
M
:
1
0
4
0
.
1
3
IN
V
I
N
:
1
0
3
2
.
0
6
(
M
H
1
3
)
IN
V
O
U
T
:
1
0
3
1
.
8
6
(
M
H
1
1
)
184.38 LF 8" PVC @ 0.78%
201.32 LF 8"
P
V
C
@
1
.
7
7
%
258.76 LF
8
"
P
V
C
@
2
.
4
1
%
83.00 LF 8" PVC @ 2.37%
MH
1
4
ST
A
:
2
5
+
3
5
.
5
2
RI
M
:
1
0
4
6
.
5
4
IN
V
I
N
:
1
0
3
8
.
0
0
(
M
H
1
5
)
IN
V
O
U
T
:
1
0
3
7
.
8
0
(
M
H
1
3
)
MH
1
5
ST
A
:
2
7
+
1
9
.
9
0
RI
M
:
1
0
4
7
.
7
1
IN
V
I
N
:
1
0
3
9
.
6
3
(
M
H
1
6
)
IN
V
O
U
T
:
1
0
3
9
.
4
2
(
M
H
1
4
)
188.56 LF 8" PVC @ 0.66%
B1
ELEV=1023.88
20' BORE TERM.
MH
1
6
ST
A
:
2
9
+
0
8
.
4
6
RI
M
:
1
0
4
9
.
0
3
IN
V
I
N
(
E
S
T
I
M
A
T
E
)
:
1
0
4
1
.
0
7
(
E
X
U
P
S
T
R
E
A
M
M
H
)
IN
V
O
U
T
:
1
0
4
0
.
8
7
(
M
H
1
5
)
EXISTING SEWER TO REMAIN
IN PLACE AND IN SERVICE
CONNECT EXISTING 8" PVC
SEWER TO MH 16
Q:
\
C
H
A
\
P
r
o
j
e
c
t
s
\
1
0
9
3
-
m
o
r
g
a
n
t
o
n
b
o
s
t
r
d
\
C
A
D
\
C
D
s
\
1
0
9
3
-
P
l
a
n
P
r
o
f
i
l
e
-G
r
a
v
i
t
y
S
e
w
e
r
.
d
w
g
3
/
7
/
2
0
2
3
1
0
:
3
7
:
5
6
P
M
20 40 80 120 1600
Scale: 1" = 40'
CONCRETE PAD
ASPHALT PARKING LOT
25' TEMPORARY
CONSTRUCTION EASEMENT 25' PUBLIC SANITARY
SEWER EASEMENT
CAUTION: UTILITY CROSSING.
SEE NOTES.
NOTES:
1. FIELD VERIFY ELEVATION OF EXISTING UTILITIES BY
POTHOLING PRIOR TO CONSTRUCTION. PROTECT IN
PLACE. COORDINATE AND COMPLY WITH CROSSING AND
INSPECTION REQUIREMENTS WITH UTILITY COMPANY
2. UTILITY CROSSINGS SHOWN AT ASSUMED ELEVATIONS
3. CAUTION: WORK AREA INCLUDES OVERHEAD ELECTRIC
LINES
4. ROADWAY BORE NOTE: CONTRACTOR SHALL PROVIDE
SHORING FOR ALL PITS ALONG ROADWAYS PER
SPECIFICATIONS
PROTECT DOWN GUY ANCHOR IN
PLACE, BRACE UTILITY POLE
DURING EXCAVATION AS
NECESSARY. COORDINATE WITH
ELECTRICAL UTILITY
UNDERGROUND TELEPHONE CROSSINGS
STA = 23+01.93, 23+03.53, 23+04.93, 23+10.70, 23+53.38
5.
2
'
M
A
T
C
H
L
I
N
E
S
T
A
2
0
+
5
0
,
S
H
E
E
T
C
2
.
2
3.
6
'
ST. MARY'S
CHURCH RD
STA = 22+71.21
UNDERGROUND
TELEPHONE CROSSING
STA = 22+75.04
GAS CROSSING
STA = 22+80.12
6" PVC WATER
CROSSING
STA = 27+07.64
STORM CROSSING
6" PVC
60 LF 24" STEEL CASING
D.O.T. - .250"
36'x12'
LAUNCH PIT
(APPROXIMATE)
10'x10' RECEIVING
PIT (APPROXIMATE)
RECEIVING PIT
10'x10'x11'
(APPROXIMATE)
LAUNCH PIT
36'x12'x14'
(APPROXIMATE)
94°
EXISTING SIGN
EXISTING GRAVEL
DRIVEWAY. REPAIR AT
COMPLETION OF WORK
EXISTING 8" PVC SEWER TO REMAIN
IN PLACE AND IN SERVICE
DITCH
EXISTING GRADE
EXISTING MH
DITCH
DITCH
CAUTION: STORM
CROSSING. SEE NOTES.
BRACE UTILITY POLE DURING
EXCAVATION AS NECESSARY.
COORDINATE WITH ELECTRICAL
UTILITY
APPARENT ROW
B1
90°
157°
156°
9
5
°
12.5'
PROTECT DOWN GUY ANCHOR IN
PLACE, BRACE UTILITY POLE
DURING EXCAVATION AS
NECESSARY. COORDINATE WITH
ELECTRICAL UTILITY
12.5'
2
5
.
0
'
50
.
0
'
25.
0
'
EXISTING LINE TO BE
ABANDONED IN PLACE.
GROUT PIPE BETWEEN
EX MH AND MH 16
101010121014
1
0
1
2
10
1
2
101
4
0+
0
0
0+50 1+00
1+50
2+00
2+50
3+00
3+50
4+00
4+50
5+00
5+50
6+00
6+50 7+00 7+50 8+00 8+50 9+00 9+50 10+00 10+50 11+
SSE
SSE
SSE
SSE
SSE
SSE
SSE SSE SSE SSE SSE SS
e
e
e
e
e e e e e e e e
e
SSE
SSE
SSE
SSE
SSE
SSE SSE SSE SSE SSE SSE
e
e
e
e
e
e
S
S
E
S
S
E
AC
AC
AC
AC AC
140.58 LF of
8" PVC
213.63 LF
o
f
8" PVC
378.80 LF of
8" PVC
84.00 LF
o
f
8" PVC
S89° 59' 16"E
57.4'
57.
4
'
3
0
.
0
'
S78° 44' 1
6
"
E
S78° 43' 5
3
"
E
S89° 59' 36"E
29.41 LF of
8" DIP
54.66 LF of
8" PVC
S76° 59' 57"E
ARV-1
STA=2+61.93
ARV-#
STA=9+89.35
ARV-2
STA=9+89.35
135.65 LF
o
f
8" DIP
S78° 44' 16"E
25
.
0
'
S78° 44' 16"E 11.25d HORIZ. BEND
STA = 6+31.41
N = 742077.87
E = 1194882.73
UT
I
L
UK
U
T
I
L
UK
U
985
990
995
1000
1005
1010
1015
1020
1025
985
990
995
1000
1005
1010
1015
1020
1025
0+00 0+50 1+00 1+50 2+00 2+50 3+00 3+50 4+00 4+50 5+00 5+50 6+00 6+50 7+00 7+50 8+00 8+50 9+00 9+50 10+00 10+50 11+00
5.0'
ST
A
=
2
+
7
0
.
0
0
TO
P
=
1
0
0
5
.
1
9
22
.
5
d
V
E
R
T
.
B
E
N
D
ST
A
=
4
+
1
7
.
9
3
TO
P
=
1
0
0
3
.
3
0
22
.
5
d
V
E
R
T
.
B
E
N
D
13.28 LF 8" PVC
@ -41.42%
250.00 LF 8" PVC @ 0.00%
135.65 LF 8" DIP @ 0.00%
6.66 LF 8" PVC
@ 0.00%
ST
A
=
0
+
0
6
.
6
7
TO
P
=
1
0
1
0
.
6
9
22
.
2
5
d
V
E
R
T
.
B
E
N
D
ST
A
=
2
+
7
8
.
4
4
TO
P
=
1
0
0
1
.
7
3
22
.
5
d
V
E
R
T
.
B
E
N
D
ST
A
=
4
+
1
4
.
0
9
TO
P
=
1
0
0
1
.
7
3
22
.
5
d
V
E
R
T
.
B
E
N
D
ST
A
=
9
+
9
7
.
0
4
TO
P
=
1
0
0
3
.
3
1
22
.
5
d
V
E
R
T
.
B
E
N
D
ST
A
=
1
0
+
0
9
.
5
8
TO
P
=
9
9
8
.
1
6
22
.
5
d
V
E
R
T
.
B
E
N
D
ST
A
=
1
0
+
3
9
.
0
0
TO
P
=
9
9
8
.
1
6
22
.
5
d
V
E
R
T
.
B
E
N
D
ST
A
=
1
0
+
5
7
.
1
3
TO
P
=
1
0
0
5
.
5
6
22
.
5
d
V
E
R
T
.
B
E
N
D
8.44 LF 8" PVC @ -41.00%
3.84 LF 8" PVC @ 41.00%
579.11 LF 8" PVC @ 0.00%
12.54 LF 8" PVC @ -41.00%
29.41 LF 8" DIP @ 0.00%
18.05 LF 8" PVC @ 41.00%
40.00 LF 8" PVC
@ 1.31%
ST
A
=
0
+
1
9
.
9
5
TO
P
=
1
0
0
5
.
1
9
22
.
5
d
V
E
R
T
.
B
E
N
D
ST
A
=
6
+
3
1
.
5
7
11
.
2
5
d
H
O
R
I
Z
.
B
E
N
D
TO
P
=
1
0
1
0
.
7
6
ST
A
=
2
+
6
1
.
7
7
AR
V
-
1
B6
ELEV=1000.71
15' BORE TERM.
B9
ELEV=990.64
20' BORE TERM.
TO
P
=
1
0
0
8
.
4
0
ST
A
=
9
+
8
9
.
3
5
AR
V
-
2
B6
Q:
\
C
H
A
\
P
r
o
j
e
c
t
s
\
1
0
9
3
-
m
o
r
g
a
n
t
o
n
b
o
s
t
r
d
\
C
A
D
\
C
D
s
\
1
0
9
3
-
P
l
a
n
P
r
o
f
i
l
e
_F
o
r
c
e
m
a
i
n
-
N
E
W
.
d
w
g
3
/
7
/
2
0
2
3
1
0
:
3
8
:
4
2
P
M
10x10
RECEIVING PIT
25' TEMPORARY
CONSTRUCTION EASEMENT
25' PUBLIC SANITARY
SEWER EASEMENT
30x12 LAUNCH PIT
PUMP STATION.
SEE SITE PLAN
SHEET C1.1
CAUTION: UTILITY CROSSING
CONTRACTOR TO COORDINATE
WITH UTILITY
EXISTING PAVED
PATH (TYP)
EXISTING PAVED
PATH (TYP)
EMERGENT WETLANDS
EMERGENT
WETLANDS
B9
100-YR FLOODWAY
20 40 80 120 1600
Scale: 1" = 40'
25
.
0
'
25
.
0
'
LAUNCH PIT
30' X 12' X 10'
RECEIVING PIT
10' X 10' X 10'
DITCH
140.64 LF
18" STEEL CASING
D.O.T - .250"
VALVE VAULT, SEE
SHEET M1.1
STA = 0+59.67
8" PVC SEWER
CROSSING
BOST RD
100-YR FLOOD ELEV= 1019
STA =
1+12.08
WATER
UTILITY
1794320209
Burke County Fair, Inc.
St. Mary's Church Rd
1794518195
MCW INV LLC
826 N. Green St.
NOTES
1. FIELD VERIFY ELEVATION OF EXISTING UTILITIES BY POTHOLING
PRIOR TO CONSTRUCTION. PROTECT IN PLACE. COORDINATE
AND COMPLY WITH CROSSING AND INSPECTION REQUIREMENTS
WITH UTILITY COMPANY
2. ROADWAY BORE NOTE: CONTRACTOR SHALL PROVIDE SHORING
FOR ALL PITS ALONG ROADWAYS PER SPECIFICATIONS
3. AREA CONTAINS INTERMITTENT VEGETATION NOT SHOWN FOR
CLARITY
10x10
RECEIVING PIT
RECEIVING PIT
10' x 10' x 11'
2.
7
'
3.
0
'
PERMANENT ACCESS.
SEE EROSION
CONTROL SHEETS
FOR CONTINUATION
OF EASEMENT
TWO (2) 45d BENDS OUT
OF VALVE VAULT. SEE
SHEET M1.1
LAUNCH PIT
30' X 12' X 12'
PERENNIAL
STREAM
PERENNIAL
STREAM
MA
T
C
H
L
I
N
E
S
T
A
1
1
+
0
0
,
S
H
E
E
T
C
2
.
5
STREAM CROSSING
STREAM CROSSING
1.
8
'
123.10 LF
18" STEEL CASING
D.O.T - .250"
EXISTING GRADE
63
.
1
5
7
4
'
STREAM CROSSING. SEE
EROSION CONTROL SHEETS
EXISTING TREE (TYP)
PERMANENT
DRAINAGE
EASEMENT
PROPOSED
42" CULVERT
PROPOSED DITCHES
PROPOSED SITE GRADE
Perennial Stream A
-Jack and bore (no impact)
Perennial Stream C
S4: 40 lf temporary impact (open-cut sewer)
+00 11+50 12+00 12+50 13+00 13+50 14+00 14+50 15+00 15+50 16+00 16+50 17+00 17+50 18+00 18+50 19+00 19+50 20+00 20+50 21+00 21+50 22+00 22+50 23+
SE SSE SSE SSE SSE SSE SSE SSE SSE SSE SSE SSE SSE SSE
e e e e e e e e e e e e e e e e e e e e e e
SSE SSE SSE SSE SSE SSE SSE SSE SSE SSE SSE SSE SSE SSE
1258.05 LF of
8" PVC
50
.
0
'
25
.
0
'
25
.
0
'
N89° 58' 55"E
1000
1005
1010
1015
1020
1025
1000
1005
1010
1015
1020
1025
11+00 11+50 12+00 12+50 13+00 13+50 14+00 14+50 15+00 15+50 16+00 16+50 17+00 17+50 18+00 18+50 19+00 19+50 20+00 20+50 21+00 21+50 22+00 22+50 23+00
3.
2
'
3.
2
'
3.
3
'
3.
2
'
B12
ELEV=1003.13
10' BORE TERM.B11
ELEV=1001.80
10' BORE TERM.
ST
A
=
1
3
+
7
7
.
0
4
TO
P
=
1
0
0
9
.
7
6
DE
F
L
E
C
T
J
O
I
N
T
280.00 LF 8" PVC
@
1
.
3
1
%
520.00 LF 8" PVC @ 0.00%
400.00 LF 8" PVC @ 0.80%
ST
A
=
1
8
+
9
7
.
1
3
TO
P
=
1
0
0
9
.
7
6
DE
F
L
E
C
T
J
O
I
N
T
Q:
\
C
H
A
\
P
r
o
j
e
c
t
s
\
1
0
9
3
-
m
o
r
g
a
n
t
o
n
b
o
s
t
r
d
\
C
A
D
\
C
D
s
\
1
0
9
3
-
P
l
a
n
P
r
o
f
i
l
e
_F
o
r
c
e
m
a
i
n
-
N
E
W
.
d
w
g
3
/
7
/
2
0
2
3
1
0
:
3
8
:
4
6
P
M
100-YR FLOODWAY
EXISTING PAVED PATH
B11
20 40 80 120 1600
Scale: 1" = 40'
25' TEMPORARY
CONSTRUCTION EASEMENT
25' PUBLIC SANITARY
SEWER EASEMENT
100-YR FLOOD ELEV=1019'
1794518195
MCW INV LLC
826 N. Green St.
B12
MA
T
C
H
L
I
N
E
S
T
A
2
3
+
0
0
,
S
H
E
E
T
C
2
.
6
MA
T
C
H
L
I
N
E
S
T
A
1
1
+
0
0
,
S
H
E
E
T
C
2
.
4
EXISTING GRADE
NOTES
1. AREA CONTAINS INTERMITTENT VEGETATION NOT SHOWN
FOR CLARITY
EXISTING TREE (TYP)
+50
23+
0
0
23+
5
0
24+
0
0
24+
5
0
25+
0
0
25+
5
0
26+
0
0 26+50 27+00 27+50 28+00 28+50 29+00 29+50 30+00 30+50 31+00 31+50 32+00 32+
5
0
33+
0
0
33+
5
0
34+
0
0
34+
5
0
35+
0
e
e
e
e
e
e
e
SSE
SSE
SSE
SSE
e
e
e
e
e
e
SSE
SSE
SSE
SSE
SSE
SSE
SSE
SSE
SSE
SSE
AC
AC
AC
AC
303.
5
2
L
F
o
f
8" P
V
C
42.73 LF of
8" PVC
25
.
0
'
50
.
0
'
24
.
0
'
S89
°
5
9
'
1
6
"
E
N65° 18' 30"E
22.5d HORIZ. BEND
STA = 32+42.41
N = 742345.47
E = 1197435.07
ARV-3
STA=25+93.24
ARV-4
STA=32+76.89
22.5d HORIZ. BEND
STA = 26+00.80
N = 742077.45
E = 1196852.11
DEFLECT JOINT
PER MANUFACTURER
REQUIREMENTS
TO MATCH ALIGNMENT S89
°
5
9
25
.
0
'
975
980
985
990
995
1000
1005
1010
1015
1020
1025
1030
975
980
985
990
995
1000
1005
1010
1015
1020
1025
1030
23+00 23+50 24+00 24+50 25+00 25+50 26+00 26+50 27+00 27+50 28+00 28+50 29+00 29+50 30+00 30+50 31+00 31+50 32+00 32+50 33+00 33+50 34+00
5.0'
TO
P
=
1
0
2
3
.
7
4
ST
A
=
3
2
+
7
6
.
8
9
AR
V
-
4
[BORE DEPTH NOT TO SCALE]
B13
ACTUAL ELEV=953.80
64' BORE TERM.
[BORE DEPTH NOT TO SCALE]
B14
ACTUAL ELEV=953.80
45' BORE TERM.
TO
P
=
1
0
1
8
.
0
7
ST
A
=
2
5
+
9
3
.
2
4
AR
V
-
3
ST
A
=
2
6
+
0
3
.
9
1
TO
P
=
1
0
0
8
.
9
1
11
.
2
5
d
V
E
R
T
.
B
E
N
D
303.91 LF 8" PVC @ 0.00%
ST
A
=
3
2
+
0
2
.
7
9
TO
P
=
1
0
1
8
.
6
9
11
.
2
5
d
V
E
R
T
.
B
E
N
D
111.75 LF 8" PVC @ 0.00%
ST
A
=
2
8
+
8
3
.
6
7
EL
E
V
=
9
8
7
.
9
0
ST
A
=
3
2
+
4
2
.
5
7
22
.
5
d
H
O
R
I
Z
.
B
E
N
D
2
1
0
.
2
'
93.9'
R29
3
.
9
'
R
1
4
2
.
1
'
5.0'
ST
A
=
2
6
+
0
0
.
9
5
22
.
5
d
H
O
R
I
Z
.
B
E
N
D
6
0
.
4
1
L
F
8
"
P
V
C
@
-
1
9
.
8
9
%
ST
A
=
3
3
+
1
1
.
5
9
11
.
2
5
d
H
O
R
I
Z
.
B
E
N
D
ST
A
=
3
3
+
7
2
.
0
0
11
.
2
5
d
H
O
R
I
Z
.
B
E
N
D
Q:
\
C
H
A
\
P
r
o
j
e
c
t
s
\
1
0
9
3
-
m
o
r
g
a
n
t
o
n
b
o
s
t
r
d
\
C
A
D
\
C
D
s
\
1
0
9
3
-
P
l
a
n
P
r
o
f
i
l
e
_F
o
r
c
e
m
a
i
n
-
N
E
W
.
d
w
g
3
/
7
/
2
0
2
3
1
0
:
3
8
:
5
2
P
M
B13
B14
25' PUBLIC SANITARY
SEWER EASEMENT
25' TEMPORARY
CONSTRUCTION EASEMENT
100-YR FLOODWAY
100-YR FLOODPLAIN
COVERED SHELTER
PAVED GREENWAY TRAIL.
DO NOT OBSTRUCT
CA
T
A
W
B
A
R
I
V
E
R
20 40 80 120 1600
Scale: 1" = 40'
100-YR FLOODPLAIN ELEV= 1019'
HDD PIPELINE
DITCH
1794737408
CITY OF MORGANTON
220 Catawba Meadows Dr.
10' MINIMUM PIPE DEPTH
AT LOWEST POINT OF
STREAM BOTTOM
NOTES
1. FIELD VERIFY ELEVATION OF EXISTING UTILITIES BY
POTHOLING PRIOR TO CONSTRUCTION. PROTECT IN
PLACE. COORDINATE AND COMPLY WITH CROSSING AND
INSPECTION REQUIREMENTS WITH UTILITY COMPANY
2. ODOR CONTROL FOR ARV NEAR SHELTER. COORDINATE
WITH CITY.
3. AREA CONTAINS INTERMITTENT VEGETATION NOT SHOWN
FOR CLARITY.
4. AREA BETWEEN RIVER AND 250 RIPARIAN BUFFER SHALL
NOT BE IMPACTED.
PROTECT CONCRETE
PAD AND BRICK WALL IN PLACE
5.
1
'
10
.
0
'
RIPARIAN BUFFER, 250' FROM CATAWBA
RIVER'S EDGE. SEE CONSERVATION
EASEMENT REQUIREMENTS.
8
"
H
D
P
E
@
-
2
0
.
0
0
%
8"
H
D
P
E
@
2
0
.
0
0
%
1794518195
MCW INV LLC
826 N. Green St.
BE
G
I
N
H
D
D
MA
T
C
H
L
I
N
E
S
T
A
2
3
+
0
0
,
S
H
E
E
T
C
2
.
5
MA
T
C
H
L
I
N
E
S
T
A
3
4
+
0
0
,
S
H
E
E
T
C
2
.
7
NOTE: 598.88 LF 8" HDPE. APPROXIMATE
LENGTH AND DEPTH SHOWN. EXACT DESIGN
TO BE DETERMINED BY HDD CONTRACTOR.
GROUNDWATER
ENCOUNTERED (TYP)
HDD ALIGNMENT,
PIPE NOT NEEDED
TO BE REMOVED.
EN
D
H
D
D
EXISTING GRADE
RIPARIAN BUFFER, 250' FROM
CATAWBA RIVER'S EDGE, PART OF
THE CONSERVATION EASEMENT
50' X 50' TEMPORARY
CONSTRUCTION LAYDOWN
YARD. SEE EROSION
CONTROL SHEETS
30
.
0
'
30' PUBLIC SANITARY
SEWER EASEMENT
ST
R
E
A
M
B
O
T
T
O
M
EXISTING TREE (TYP)
50' RIPARIAN BUFFER
Perennial Stream K (Catawba River)
-Directional drill (no impact)
41+05
33+5
0
34+0
0
34+5
0
35+0
0
35+
5
0
36+0
0
36+5
0
37+00
37+50
38+00
38+50
39+00
39+50
40+00
40+50
41+00
e
e
e
e
e
e
e
e
e
e
e
e
e
SSE
SSE
SSE
SSE
SSE
SSE
SSE
SSE
SSE
SSE
SSE
SSE
SSE
SSE
SSE
SSE
SSE
A
C
A
C
A
C
A
C
A
C
A
C
A
C
A
C
A
C
A
C
A
C
A
C
S78° 44' 16"E
5.00 LF of
8" PVC
45d HORIZ. BEND
STA = 36+93.72
N = 742345.38
E = 1197886.38
45d HORIZ. BEND
STA = 40+99.71
N = 742012.21
E = 1198117.28
321.90 LF 8" PVC @ 0.00%
S89°
5
9
'
3
4
"
E
S33° 4
4
'
1
6
"
E
372.20 LF 8" PVC @ 0.00%
11.25d HORIZ. BEND
STA = 37+29.47
N = 742320.10
E = 1197911.65
35.74 LF of
8" PVC
S44° 59' 16"E
1005
1010
1015
1020
1025
1030
1035
1040
1005
1010
1015
1020
1025
1030
1035
1040
34+00 34+50 35+00 35+50 36+00 36+50 37+00 37+50 38+00 38+50 39+00 39+50 40+00 40+50 41+00 41+50
ST
A
=
3
7
+
2
9
.
6
2
11
.
2
5
d
H
O
R
I
Z
.
B
E
N
D
ST
A
=
3
6
+
9
3
.
8
8
45
d
H
O
R
I
Z
.
B
E
N
D
FM
-
M
H
ST
A
:
4
1
+
0
4
.
7
1
RI
M
:
1
0
3
4
.
6
7
IN
V
I
N
:
1
0
3
3
.
4
8
(
F
M
)
IN
V
I
N
:
1
0
3
1
.
6
1
(
E
X
)
396.51 LF 8" PVC @ 0.00%
ST
A
=
4
0
+
5
0
.
0
0
TO
P
=
1
0
1
8
.
2
4
22
.
5
d
V
E
R
T
.
B
E
N
D
ST
A
=
4
0
+
8
9
.
8
7
TO
P
=
1
0
1
9
.
0
6
22
.
5
d
V
E
R
T
.
B
E
N
D
ST
A
=
3
6
+
4
3
.
8
0
TO
P
=
1
0
0
6
.
6
7
11
.
2
5
d
V
E
R
T
.
B
E
N
D
ST
A
=
3
6
+
8
1
.
5
9
TO
P
=
1
0
1
3
.
9
7
11
.
2
5
d
V
E
R
T
.
B
E
N
D
37.78 LF 8" PVC @ 19.89%
271.80 LF 8" PVC @ 0.00%
11.77 LF 8" PVC @ 41.42%
10.00 LF 8" PVC @ 100.00%
Q:
\
C
H
A
\
P
r
o
j
e
c
t
s
\
1
0
9
3
-
m
o
r
g
a
n
t
o
n
b
o
s
t
r
d
\
C
A
D
\
C
D
s
\
1
0
9
3
-
P
l
a
n
P
r
o
f
i
l
e
_F
o
r
c
e
m
a
i
n
-
N
E
W
.
d
w
g
3
/
7
/
2
0
2
3
1
0
:
3
8
:
5
7
P
M
100-YR FLOODPLAIN
B16
30' PUBLIC SANITARY
SEWER EASEMENT
CONNECT TO EXISTING MH
STA: 41+04.86 PER DETAIL 3,
THIS SHEET
20 40 80 120 1600
Scale: 1" = 40'
CAUTION: UTILITY CROSSING
CONTRACTOR TO COORDINATE WITH
UNDERGROUND ELECTRIC UTILITY
UNDERGROUND ELECTRIC
STA = 40+36.73, 40+49.62
100-YR FLOODPLAIN
ELEV= 1019
PROTECT DOWN GUY
ANCHOR IN PLACE
NOTES
1. FIELD VERIFY ELEVATION OF EXISTING UTILITIES BY
POTHOLING PRIOR TO CONSTRUCTION. PROTECT IN
PLACE. COORDINATE AND COMPLY WITH CROSSING AND
INSPECTION REQUIREMENTS WITH UTILITY COMPANY
2. FIELD VERIFY DEPTH REQUIRED TO CORE HOLE INTO
EXISTING MANHOLE BELOW EXISTING CONE SECTION. DO
NOT CORE THROUGH EXISTING MANHOLE JOINT
3. CAUTION: WORK AREA INCLUDES OVERHEAD ELECTRIC
LINES
4. AREA CONTAINS INTERMITTENT VEGETATION NOT SHOWN
FOR CLARITY
1794737408
CITY OF MORGANTON
220 Catawba Meadows Dr.
PROTECT CONCRETE
PAD AND BRICK WALL
IN PLACE
1794737408
CITY OF MORGANTON
220 Catawba Meadows Dr.
EX MANHOLE
ALL HARDWARE
SHALL BE 316 SS
316 SS SHIELDED
FERNCO COUPLING
STRUCTURAL FRP UNISTRUT SUPPORTS
W/ 316 SS EPOXY ANCHORS, 5' MAX
VERTICAL SPACING
MATCH CROWN ELEVATION
EXISTING GRAVITY
SEWER (OUT)
PVC BLIND FLANGE W/ 2" TAP,
18" LONG X 2" THREADED PVC
VENT PIPE
CORE HOLE WITH LINKSEAL
PER DETAIL SHEET M1.3
8" DIP FORCE MAIN
8" DIP PE X PE SPOOL
MJ RESTRAINED 90°
HORIZ BEND
8" SCH 40 PVC FLG X PE
SPOOL DROP PIPE,
LENGTH AS REQUIRED
SCH 40 PVC FLG X PE 90°
BEND, ORIENT TOWARDS
GRAVITY SEWER OUT
REMOVE AND REPLACE CONCRETE
BENCH TO PROVIDE NEW FLOW
CHANNEL FOR FORCEMAIN OUTLET,
CONCRETE TO PROVIDE GOOD
ANCHORAGE OF 90° BEND FITTING
NOTE: FIELD VERIFY EXISTING CONDITIONS
INSIDE MANHOLE PRIOR TO PROCEEDING
WITH THE WORK. NOTIFY ENGINEER OF
POTENTIAL CONFLICTS AND PROVIDE
RECOMMENDATIONS OF DESIGN
ADJUSTMENTS TO SUIT THE CONDITIONS
FOR REVIEW BY THE ENGINEER
SEE FORCE MAIN CONNECTION
DETAIL 3, THIS SHEET FOR
CONTINUATION
TEMPORARY CONSTRUCTION ACCESS,
SEE EROSION CONTROL SHEETS
EXISTING GRADE
30
.
0
'
8" PVC FLG TEE
M
A
T
C
H
L
I
N
E
S
T
A
3
4
+
0
0
,
S
H
E
E
T
C
2
.
6
50' X 50' TEMPORARY
CONSTRUCTION LAYDOWN
YARD. SEE EROSION
CONTROL SHEETS
DITCH
EXISTING TREE (TYP)
FULLY RESTRAINED MJ 45° VERT. BEND,
ROTATED TO MATCH ALIGNMENT. SEE
PROFILE 1, THIS SHEET FOR CONTINUATION
8" PVC FORCE MAIN
FULLY RESTRAINED MJ 22.55°
VERT. BEND, ROTATED TO
MATCH ALIGNMENT
EXISTING GROUND
Q:
\
C
H
A
\
P
r
o
j
e
c
t
s
\
1
0
9
3
-
m
o
r
g
a
n
t
o
n
b
o
s
t
r
d
\
C
A
D
\
C
D
s
\
1
0
9
3
-
D
e
t
a
i
l
s
.
d
w
g
3/
7
/
2
0
2
3
1
0
:
3
9
:
2
2
P
M
BRACES
WIRE
TIES
STRETCHER
BAR
GATE
POST TRUSS ROD
3 8" DIA. MIN.
CHAIN-LINK
FABRIC
WIRE TIES
LINE
POST
BRACE POST
WIRE TIES
1 5 8" BOTTOM RAIL
BRACE POST
TOP RAIL
BRACES
TRUSS ROD
3 8" DIA. MIN.
CORNER
POST
10'-0"MULTIPLES OF 10'-0"
(MAX)
2'-6"
3"
(TYP)
END BAY 10'-0"MULTIPLES OF 10'-0"
(MAX)
3'-6"
8'-0"
0'-6"
2"3'-7"2"3'-7"2"3 1
2"2"3'-7"2"3'-7"2"1 7
8"1 7
8"
16'
AMERICAN
ULTRA LATCH
DROP ROD
1" ALUM SOLID SQ GUSSETS
3/16"Ø CABLE TRUSSING
2"x2" ALUM SQ TUBE
GATE FRAMING TYP.
3 1/2" DIA TERMINAL POST
(GALVANIZED STEEL PIPE)
CHAIN LINK FABRIC
6"x2" BOLT ON 180° HINGE
Q:
\
C
H
A
\
P
r
o
j
e
c
t
s
\
1
0
9
3
-
m
o
r
g
a
n
t
o
n
b
o
s
t
r
d
\
C
A
D
\
C
D
s
\
1
0
9
3
-
D
e
t
a
i
l
s
.
d
w
g
3/
7
/
2
0
2
3
1
0
:
3
9
:
2
7
P
M
Q:
\
C
H
A
\
P
r
o
j
e
c
t
s
\
1
0
9
3
-
m
o
r
g
a
n
t
o
n
b
o
s
t
r
d
\
C
A
D
\
C
D
s
\
1
0
9
3
-
D
e
t
a
i
l
s
.
d
w
g
3
/
7
/
2
0
2
3
1
0
:
3
9
:
3
1
P
M
ee
SSE SSE SSE SSE SSE
e e e e e e eSSESSESSESSESSE
e
e
SSE
S
S
E
S
S
E
e
e
SS
E
S
S
E
S
S
E
SS
E
SSE
SSE
S
S
E
SS
E
SSE
SSE
S
S
E
e
ACAC
ACAC
AC
AC
30 60 120 180 2400
Scale: 1" = 60'
Q:
\
C
H
A
\
P
r
o
j
e
c
t
s
\
1
0
9
3
-
m
o
r
g
a
n
t
o
n
b
o
s
t
r
d
\
C
A
D
\
C
D
s
\
1
0
9
3
-
E
r
o
s
i
o
n
C
o
n
t
ro
l
.
d
w
g
3
/
7
/
2
0
2
3
1
0
:
4
0
:
0
8
P
M
NOTES:
1. PROJECT IS LOCATED WITHIN THE CATAWBA RIVER BASIN,
WS-IV CLASSIFICATION.
2. LIMITS OF DISTURBANCE ARE OUTLINED BY TEMPORARY,
PERMANENT, AND ACCESS EASEMENT LINE TYPES.
3. THE GRAY HATCHED AREA IN THE PLAN REPRESENT THE
FULL LIMITS OF DISTURBANCE FOR THIS PROJECT
4. IF ADDITIONAL AREAS OUTSIDE THE EXISTING LIMITS OF
DISTURBANCE ARE REQUIRED BY THE CONTRACTOR, A
PLAN SHOWING THE REVISED LIMITS OF DISTURBANCE
MUST BE SUBMITTED TO NC DEQ REGIONAL OFFICE FOR
REVIEW AND APPROVAL.
5. ADDITIONAL AREAS OUTSIDE THE EXISTING ACCESS
ROADS MUST BE SUBMITTED TO NC DEQ REGIONAL OFFICE
FOR REVIEW AND APPROVAL.
6. ALL LAYDOWN YARDS AND AREAS USED FOR STOCKPILE
OR SPOIL STORAGE MUST BE ENCLOSED BY A
TEMPORARY SILT FENCE.
1050
10
4
6
1048
1050
1050
1046
104010421044
1044
1048
1044
1052
18
19
+
0
0
20+00
21+00
22+00
2
3
+
0
0
24+00
25+00 26+00
27+00
28
+
0
0
29
+
0
0
29
+
0
8
e
e
e
e
e
SS
E
S
S
E
SSE S
S
E
SSE
SSE
SSE
SS
E
SS
E
S
S
E
SSE
S
S
E
SSE
SSE
SSE
SS
E
e
e
e
e
e
e
e
SSE
AC
UK UTIL
UK UTIL
UK UTIL
UK UTIL
10
1
4
1
0
1
0
1
0
1
2
1
0
1
4
1012 1012
1
0
1
4
10
2
0
1
0
2
2
1
0
1
8
1016
1016
10161016
1
0
1
8
0+00 1+00 2+00 3+00 4+00 5+00
6+00
7+00
8+00
9+00
10+
0
0
0
0+00
1+
0
0
2+
0
0
X
X
X
X
X
X
X
X
SS
E
SS
E
e
e
e
e
e
e
e
e
eeee
SSE
SSE
SSE
SSESSESSESSE
SSE SSE SSE
SSE
SSE
SSE
SSE
e
e
A
C
A
C
A
C
A
C
AC
AC AC
11+00 12+00 13+00 14+00 15+00 16+00 17+00 18+00
e e e e e e e e
e
SSE SSE SSE SSE SSE SSE
SSE SSE SSE SSE SSE
Notes
1. Polyacrylamides (PAM) shall be used to reduce turbidity and suspended
solids whenver a sediment trap, basin, pit, hole or building foundation is
being pumped out to remove sediment laden water. This activity must be
inspected and approved by the regional erosion control inspector.
2. Use Double Row Silt Fence along creeks and wetlands.
3. Silt fence around bore pits, see detail 3 Sheet CE3.4
4. A ground cover sufficient to restrain accelerated erosion must be provided
within 7-14 calendar days of the date of last land-disturbing activity on any
portion of the project. See seeding details on Sheet CE3.1.
5. All diversion ditches and interior basin slopes must be matted. See detail
30.20 on Sheet CE3.2.
6. Stockpile material for trenches will be placed upslope of the excavation to be
promptly backfilled into trenches. Trenches to be stabilized same day for
linear pipe work. All work in creeks and streams must be completed in the
dry. Please see Detail 30.13 on Sheet CE3.2 and Specification 31 23 19 for
dewatering requirements.
30 60 120 180 2400
Scale: 1" = 60'
Q:
\
C
H
A
\
P
r
o
j
e
c
t
s
\
1
0
9
3
-
M
o
r
g
a
n
t
o
n
B
o
s
t
R
d
\
C
A
D
\
C
D
s
\
1
0
9
3
-
E
r
o
s
i
o
n
C
o
n
t
ro
l
.
d
w
g
3
/
8
/
2
0
2
3
1
0
:
5
1
:
3
4
A
M
PERENNIAL STREAM
TEMPORARY STREAM CROSSING PER DETAIL 3.
STABILIZE STREAM BANKS PER DETAIL 218. RIP RAP
SHALL BE REMOVED AND AREA RESTORED AFTER
CROSSING IS COMPLETE. ALL WORK MUST BE
COMPLETED IN THE DRY, SEE NOTE 6.
SILT FENCE OUTLET (TYP).
SEE DETAIL SHEET CE3.2
100-YR FLOODPLAIN
MA
T
C
H
L
I
N
E
S
T
A
1
0
+
5
0
,
T
H
I
S
S
H
E
E
T
MAT
C
H
L
I
N
E
S
T
A
1
0
+
5
0
,
THIS
S
H
E
E
T
MA
T
C
H
L
I
N
E
S
T
A
1
8
+
0
0
,
T
H
I
S
S
H
E
E
T
MA
T
C
H
L
I
N
E
S
T
A
1
8
+
0
0
,
THI
S
S
H
E
E
T
STONE OUTLET (TYP)
STONE OUTLET (TYP)
EX. STORM DITCH
EX. STORM DITCH
EX. STORM DITCH
EX. STORM DITCH
EX. STORM DITCH
EX. GRAVEL DRIVE
CONSTRUCTION ACCESS
SEE SHEET CE2.5
TEMPORARY CONSTRUCTION
LAYDOWN YARD AND
STOCKPILE LOCATION
PROPOSED
PROPERTY LINE
PROPOSED
FENCE LINE
CONSTRUCTION ACCESS
SEE SHEET CE2.5
TRENCHLESS
CROSSING OF BOST
RD. SEE CIVIL SHEETS
SILT FENCE OUTLET (TYP).
SEE DETAIL SHEET CE3.2
NCDOT DRAINAGE
EASEMENT
NCDOT DRAINAGE
EASEMENT
NCDOT DRAINAGE
EASEMENT
EMERGENT WETLANDS
IN STORM DITCH
BORE
LAUNCH PIT
BORE
RECEIVING PIT
SILT FENCE OUTLET (TYP).
SEE DETAIL SHEET C3.2
DOUBLE ROW
SILT FENCE
TEMPORARY STREAM CROSSING PER DETAIL 3.
STABILIZE STREAM BANKS PER DETAIL 218. RIP RAP
SHALL BE REMOVED AND AREA RESTORED AFTER
CROSSING IS COMPLETE. ALL WORK MUST BE
COMPLETED IN THE DRY, SEE NOTE 6.
SILT SACK INLET
PROTECTION (TYP).
SEE DETAIL 30.15 SHEET CE3.5
CATCH BASIN INLET
PROTECTION (TYP).
SEE DETAIL 30.09 SHEET CE3.5
PIPE
SEDIMENT TRAP
Wattle
UK
U
T
I
L
UK
U
T
I
L
101
4
e16.05
16.05
1+00
2+00
3+00
4+00
5+00
6+00
7+00 8+00 9+00 10+00 11+00 12+00 13+00 14+00 15+00 16+00 17+00 18+
SSE
SSE
SSE
SSE
SSE SSE SSE SSE SSE SSE SSE SSE SSE
e
e
e e e e e e e e e e e e e e e
SSE
SSE
SSE
SSE
SSE SSE SSE SSE SSE SSE SSE SSE SSE
e
e
e
e
e
e
e
e
AC
AC
AC
AC
AC
AC
AC
AC
AC
Notes
1. Polyacrylamides (PAM) shall be used to reduce turbidity and suspended
solids whenver a sediment trap, basin, pit, hole or building foundation is
being pumped out to remove sediment laden water. This activity must be
inspected and approved by the regional erosion control inspector.
2. Use Double Row Silt Fence along creeks and wetlands.
3. Silt fence around bore pits, see detail 3 Sheet CE3.4
4. A ground cover sufficient to restrain accelerated erosion must be provided
within 7-14 calendar days of the date of last land-disturbing activity on any
portion of the project. See seeding details on Sheet CE3.1.
5. All diversion ditches and interior basin slopes must be matted. See detail
30.20 on Sheet CE3.2.
6. Stockpile material for trenches will be placed upslope of the excavation to be
promptly backfilled into trenches. Trenches to be stabilized same day for
linear pipe work. All work in creeks and streams must be completed in the
dry. Please see Detail 30.13 on Sheet CE3.2 and Specification 31 23 19 for
dewatering requirements.
e
SSE
AC
+00 19+00 20+00 21+00 22+00 23+00 24+00 25+00 26+00
27+00
28+00
29+00
30+00
31+00
32+00
33+00
SSE SSE SSE SSE SSE SSE
e e e e e e e e e e
SSE SSE SSE SSE SSE SSE
SSE S
SSE SSE
30 60 120 180 2400
Scale: 1" = 60'
Q:
\
C
H
A
\
P
r
o
j
e
c
t
s
\
1
0
9
3
-
m
o
r
g
a
n
t
o
n
b
o
s
t
r
d
\
C
A
D
\
C
D
s
\
1
0
9
3
-
E
r
o
s
i
o
n
C
o
n
t
ro
l
.
d
w
g
3
/
7
/
2
0
2
3
1
0
:
4
0
:
3
9
P
M
PERENNIAL
STREAM
EMERGENT
WETLANDS
SILT FENCE OUTLET (TYP).
SEE DETAIL SHEET C3.2SILT FENCE. SEE DETAIL
SHEET C3.4 (TYP)
100-YR
FLOODWAY
SILT FENCE (TYP.) SEE
DETAIL SHEET CE3.2
SILT FENCE OUTLET (TYP.)
SEE DETAIL SHEET CE3.2
100-YR
FLOODWAY
EXISTING PAVED
GREENWAY PATH
MA
T
C
H
L
I
N
E
S
T
A
3
3
+
5
0
,
S
H
E
E
T
C
E
2
.
3
250 RIPARIAN BUFFER
AS PART OF THE
CONSERVATION EASEMENT
100-YR
FLOODPLAIN
PERMANENT
ACCESS ROAD
MA
T
C
H
L
I
N
E
S
T
A
1
8
+
0
0
,
T
H
I
S
S
H
E
E
T
MA
T
C
H
L
I
N
E
S
T
A
1
8
+
0
0
,
T
H
I
S
S
H
E
E
T
EXISTING PARK
SHELTER
BORE
RECEIVING PIT
BORE
LAUNCH PIT
BORE RECEIVING PIT.
DOUBLE ROW
SILT FENCE (TYP)
50' CATAWBA BASIN
RIPARIAN BUFFER
TEMPORARY STREAM CROSSING PER DETAIL 3.
STABILIZE STREAM BANKS PER DETAIL 218. RIP RAP
SHALL BE REMOVED AND AREA RESTORED AFTER
CROSSING IS COMPLETE. ALL WORK MUST BE
COMPLETED IN THE DRY, SEE NOTE 6.
DOUBLE ROW SILT
FENCE (TYP). SEE
SHEET CE3.2
DOUBLE ROW
SILT FENCE (TYP)
DOUBLE ROW SILT
FENCE SEE
SHEET CE3.2
HDD PIT. INSTALL
SILT FENCE PER
DETAIL 4 (TYP)
Wattle
34+00 35+00 36+00 3
7
+
0
0
3
8
+
0
0
3
9
+
0
0
4
0
+
0
0
41+0041+05
e
e
e
e
e
e
e
e
e
e
SSE SSE SSE
S
S
E
S
S
E
S
S
E
SSE SSE SSE
S
S
E
S
S
E
S
S
E
AC
AC
AC
AC
AC
AC
AC
AC
AC
AC
Notes
1. Polyacrylamides (PAM) shall be used to reduce turbidity and suspended
solids whenver a sediment trap, basin, pit, hole or building foundation is
being pumped out to remove sediment laden water. This activity must be
inspected and approved by the regional erosion control inspector.
2. Use Double Row Silt Fence along creeks and wetlands.
3. Silt fence around bore pits, see detail 3 Sheet CE3.4
4. A ground cover sufficient to restrain accelerated erosion must be provided
within 7-14 calendar days of the date of last land-disturbing activity on any
portion of the project. See seeding details on Sheet CE3.1.
5. All diversion ditches and interior basin slopes must be matted. See detail
30.20 on Sheet CE3.2.
6. Stockpile material for trenches will be placed upslope of the excavation to be
promptly backfilled into trenches. Trenches to be stabilized same day for
linear pipe work. All work in creeks and streams must be completed in the
dry. Please see Detail 30.13 on Sheet CE3.2 and Specification 31 23 19 for
dewatering requirements.
e
SSE
AC
30 60 120 180 2400
Scale: 1" = 60'
Q:
\
C
H
A
\
P
r
o
j
e
c
t
s
\
1
0
9
3
-
m
o
r
g
a
n
t
o
n
b
o
s
t
r
d
\
C
A
D
\
C
D
s
\
1
0
9
3
-
E
r
o
s
i
o
n
C
o
n
t
ro
l
.
d
w
g
3
/
7
/
2
0
2
3
1
0
:
4
0
:
5
1
P
M
TREE PROTECTION
FENCE (TYP.). SEE
DETAIL SHEET CE3.4
100-YR FLOODPLAIN
DOUBLE ROWSILT FENCE
ALONG CREEK. SEE
DETAIL SHEET CE3.2
MA
T
C
H
L
I
N
E
S
T
A
3
3
+
5
0
,
S
H
E
E
T
C
E
2
.
2
TEMPORARY
CONSTRUCTION ACCESS
TEMPORARY
CONSTRUCTION
LAYDOWN
50
.
0
'
TREE PROTECTION
FENCE (TYP.)
50.0'
SILT FENCE OUTLET (TYP.)
SEE DETAIL SHEET CE3.2
Wattle
UK
U
T
I
L
UK
U
T
I
L
UK
U
T
I
L
UK
U
T
I
L
UK
U
T
I
L
101010121014
1
0
1
2
10
1
2
101
4
0+
0
0
1
+
0
0
2+
0
0
0+
0
0
1+00
2+00
3+00
4+00
20
.
0
'
20
.
0
'
SSE
SSE
SSE
SS
e
SSE
SSE
SSE
e
e
e
e
e
e
e
e
e
e
e
e
e
e
e
e
e
SS
E
S
S
E
S
S
E
SS
E
S
S
E
e
e
e
e
e
e
e
e
e
AC
AC
AC
AC
AC
AC AC
AC
AC
AC
AC AC
AC
AC
AC
AC
AC
AC
AC
AC
AC
AC
AC
101010121014
1
0
1
2
101
4
0+
0
0
16.00
15.50
16.00
15.75
16.25
15.50
16.05
16.05
16.24
15.75
16.50
16.50
16.50 16.50
16.35
16.50 16.25
16.25
10.00
11.00
12.00
13.00
14.00
15
.
0
0
'
15
.
0
0
'
10.00'
10.00'
18"
0+
0
0
1+00
SSE
S
e
e
e
e
e
e
e
e
e
e
e
e
e
e
e
e
S
S
E
SSE
S
S
E
S
S
E
e
e
e
e
e
AC
AC
A
AC
AC
AC
e
Notes
1. Polyacrylamides (PAM) shall be used to reduce turbidity and suspended
solids whenver a sediment trap, basin, pit, hole or building foundation is
being pumped out to remove sediment laden water. This activity must be
inspected and approved by the regional erosion control inspector.
2. Use Double Row Silt Fence along creeks and wetlands.
3. Silt fence around bore pits, see detail 3 Sheet CE3.4
4. A ground cover sufficient to restrain accelerated erosion must be provided
within 7-14 calendar days of the date of last land-disturbing activity on any
portion of the project. See seeding details on Sheet CE3.1.
5. All diversion ditches and interior basin slopes must be matted. See detail
30.20 on Sheet CE3.2.
6. Stockpile material for trenches will be placed upslope of the excavation to be
promptly backfilled into trenches. Trenches to be stabilized same day for
linear pipe work. All work in creeks and streams must be completed in the
dry. Please see Detail 30.13 on Sheet CE3.2 and Specification 31 23 19 for
dewatering requirements.Q:
\
C
H
A
\
P
r
o
j
e
c
t
s
\
1
0
9
3
-
m
o
r
g
a
n
t
o
n
b
o
s
t
r
d
\
C
A
D
\
C
D
s
\
1
0
9
3
-
E
r
o
s
i
o
n
C
o
n
t
ro
l
.
d
w
g
3
/
7
/
2
0
2
3
1
0
:
4
1
:
0
0
P
M
ACCESS DRIVE NOTES:
1. TEMPORARY CONSTRUCTION ACCESS DRIVE TO
REMAIN AT END OF PROJECT AND TRANSFERRED TO
PROPERTY OWNER.
2. PERMANENT ACCESS DRIVE TO BE INSTALLED AND
MAINTAINED BY CITY OF MORGANTON. DRIVEWAY
PERMIT TO BE ACQUIRED.
3. ACCESS LIMITED TO THE CONSTRUCTION ACCESS. IF
CONTRACTOR WISHES TO USE THE EXISTING DRIVE
THEY MUST SUBMIT DETAIL FOR SEDIMENT TRACK AND
OBTAIN PRIOR APPROVAL FROM ENGINEER.
4. DO NOT IMPACT ANY WETLANDS OUTSIDE OF THE
LIMIT OF DISTURBANCE
LIFT STATION SITE PLAN
TEMPORARY CONSTRUCTION
LAYDOWN YARD AND
STOCKPILE LOCATION
PROPOSED
DRIVEWAY. TIE INTO
EXISTING CONCRETE
APRON.
RIGHT-OF-WAY
PROPOSED
PROPERTY LINE
DITCH 1. SEE CE3.2 FOR
MATTING DETAILS.
ROADSIDE DITCH
MAT DITCH WITH NORTH
AMERICAN GREEN C125 OR
APPROVED EQUIVALENT
INV IN: 1012.5 FT
INV OUT: 1012.0 FT
24 LF 18" RCP
CLASS IV
48 LF 48" RCP
Class III
INV. IN: 1010.2 FT
INV. OUT: 1009.7 FT
PROPOSED CONTOUR
LINES (TYP)
EXISTING CONTOUR
LINES (TYP)
DITCH 2. SEE CE3.2 FOR
MATTING DETAILS.
PROPOSED
FENCE LINE
TEMPORARY CONSTRUCTION
LAYDOWN YARD AND
STOCKPILE LOCATION
TEMPORARY CONSTRUCTION
ACCESS DRIVE. SEE NOTE 1
EXISTING
DRIVEWAY APRON
5102030400
Scale: 1" = 10'
20 40 80 120 1600
Scale: 1" = 40'
PERMANENT ACCESS DRIVE.
SEE NOTE 2.
TEMPORARY CONSTRUCTION
LAYDOWN YARD
SPOT ELEVATION
(TYP)
PROPOSED PAVED
DRIVEWAY
BORE
LAUNCH PIT
BORE
RECEIVING PIT BORE
LAUNCH PIT
BORE
LAUNCH PIT
ROCK CHECK DAM (TYP).
SEE DETAIL 30.10C ON
SHEET CE3.2.
ROCK CHECK DAM (TYP).
SEE DETAIL 30.10C ON
SHEET CE3.2.
CLASS I RIP RAP
NCDOT STD. 876.02
DOUBLE ROW SILT FENCE
ADJACENT TO WETLANDS.
SEE DETAIL SHEET CE3.2
TEMPORARY
STREAM CROSSING
PER DETAIL 3.
STABILIZE STREAM
BANKS PER DETAIL
218. RIP RAP SHALL
BE REMOVED AND
AREA RESTORED
AFTER CROSSING IS
COMPLETE. ALL
WORK MUST BE
COMPLETED IN THE
DRY, SEE NOTE 6.WATTLE
WATTLE
Q:
\
C
H
A
\
P
r
o
j
e
c
t
s
\
1
0
9
3
-
m
o
r
g
a
n
t
o
n
b
o
s
t
r
d
\
C
A
D
\
C
D
s
\
1
0
9
3
-
D
e
t
a
i
l
s
.
d
w
g
3
/
7
/
2
0
2
3
1
0
:
4
1
:
4
9
P
M
Alternative native species: Switchgrass (Panicum Virgatum),
Splitbeard Bluestem (Andropogon Ternarius), Beggarlice (Desmodium
spp.), and Partridge Pea (Chamaecrista Fasciculata).
Q:
\
C
H
A
\
P
r
o
j
e
c
t
s
\
1
0
9
3
-
M
o
r
g
a
n
t
o
n
B
o
s
t
R
d
\
C
A
D
\
C
D
s
\
1
0
9
3
-
D
e
t
a
i
l
s
.
d
w
g
3
/
9
/
2
0
2
3
6
:
0
1
:
4
8
A
M
5. SEE SPECIFICATIONS 31 23 19 FOR ADDITIONAL DEWATERING REQUIREMENTS
Q:
\
C
H
A
\
P
r
o
j
e
c
t
s
\
1
0
9
3
-
m
o
r
g
a
n
t
o
n
b
o
s
t
r
d
\
C
A
D
\
C
D
s
\
1
0
9
3
-
D
e
t
a
i
l
s
.
d
w
g
3
/
7
/
2
0
2
3
1
0
:
4
2
:
0
9
P
M
Q:
\
C
H
A
\
P
r
o
j
e
c
t
s
\
1
0
9
3
-
M
o
r
g
a
n
t
o
n
B
o
s
t
R
d
\
C
A
D
\
C
D
s
\
1
0
9
3
-
D
e
t
a
i
l
s
.
d
w
g
3
/
8
/
2
0
2
3
9
:
5
6
:
2
4
A
M
BORE PIT LENGTH
BORE PIT LENGTH
20'
M
I
N
.
ROAD OR STREAM CROSSING
SEE STND MORGANTON BORE
ENCASEMENT DETAIL 211 ON THIS
SHEET FOR MINIMUM PIPE DEPTHS
BORE PITS - SEE CIVIL PLANS
FOR SIZING
INSTALL SILT FENCING AROUND BORE
PIT PERIMETER. SEE FOR SILT FENCE
DETAIL 30.06A ON SHEET CE3.2
INSTALL SILT FENCING AROUND BORE
PIT PERIMETER. SEE SILT FENCE
DETAIL 30.06A ON SHEET CE3.2
NOTES:
1. INSTALL CARRIER PIPE AND CASING PIPE IN THE DRY. SEE STND
DEWATERING DETAIL 30.13 ON SHEET CE3.2 .
2. SPOIL PILES TO BE REMAIN WITHIN THE LIMITS OF DISTURBANCE.
LOCATE PILES A MINIMUM OF EIGHT FEET FROM THE TOP OF THE
BANKAND SLOPE LANDWARD TO PREVENT DIRECT DRAINAGE FROM
THE SPOIL PILE BACK INTO THE WATERWAY.
3. WHERE RUNOFF FROM THE PILE MAY OCCUR, PLACE FILTER FENCE
AT THE BASE OF THE SPOIL PILE (BETWEEN THE PILE AND THE
DITCH BANK) TO HELP RETAIN SOIL UNTIL VEGETATION IS
ESTABLISHED.
20
'
M
I
N
.
Q:
\
C
H
A
\
P
r
o
j
e
c
t
s
\
1
0
9
3
-
M
o
r
g
a
n
t
o
n
B
o
s
t
R
d
\
C
A
D
\
C
D
s
\
1
0
9
3
-
D
e
t
a
i
l
s
.
d
w
g
3
/
8
/
2
0
2
3
9
:
5
3
:
3
1
A
M
1. UNIFORMLY GRADE A SHALLOW
DEPRESSION APPROACHING THE
INLET.
2. DRIVE 5-FOOT STEEL POSTS 2 FEET
INTO THE GROUND SURROUNDING THE
INLET. SPACE POSTS EVENLY AROUND
THE PERIMETER OF THE INLET, A
MAXIMUM OF 4 FEET APART.
3. SURROUND THE POSTS WITH WIRE
MESH HARDWARE CLOTH. SECURE
THE WIRE MESH TO THE STEEL
POSTS AT THE TOP, MIDDLE, AND
BOTTOM. PLACING A 2-FOOT FLAP
OF THE WIRE MESH UNDER THE
GRAVEL FOR ANCHORING IS
RECOMMENDED.
4. PLACE CLEAN GRAVEL (NC DOT #5
OR #57 STONE) ON A 2:1 SLOPE
WITH A HEIGHT OF 16 INCHES
AROUND THE WIRE, AND SMOOTH TO
AN EVEN GRADE.
5. ONCE THE CONTRIBUTING DRAINAGE
AREA HAS BEEN STABILIZED, REMOVE
ACCUMULATED SEDIMENT, AND
ESTABLISH FINAL GRADING
ELEVATIONS.
6. COMPACT THE AREA PROPERLY AND
STABILIZED IT WITH GROUNDCOVER.
PLACE UPLAND AND NOT
DIRECTLY IN THE CREEK
Base Flow + (1-2 ft MIN)
DIKE TYPES
INSET A INSET B INSET C
INSET A INSET B
INSET A-B
SANDBAGS SHEET PILLING STONE
W/POLYPROPYLENE
SHEET PILLING STONE
W/POLYPROPYLENE
ELEVATION VIEW SANDBAGS