HomeMy WebLinkAboutNC0055271_Authorization to Construct_20080825Shields Mobile Home Park
A To C No. 055271AOI
Issued April 28, 2008
Engineer's Certification
T.�
P, G4 , as a duly registered istered Professional Engineer in
g
the State of North Carolina, having been authorized to observe (periodically/weekly/full time)
the construction of the modifications and improvements to the Shields Mobile Home Park
WWTP, located on NC Hwy 87 N in Alamance County for Shields Mobile Home Park, hereby
state that, to the best of my abilities, due care and diligence was used in the observation of the
following construction:
Installation of an inline UV disinfection system in an insulated enclosure, with
audible and visual alarms, spare lamps to be kept on site, the chlorination and
dechlorination systems shall remain as backup disinfection in the event of the UV
disinfection system's failure, in conformity with the project plans, specifications,
and other supporting data subsequently filed and approved by the Department of
Environment and Natural Resources.
I certify that the construction of the above referenced project was observed to be built within
substantial compliance and intent of the approved plans and specifications.
g SignatureRegistration No.
s✓ IZ4�
Date I' 2-S- ,---'6
Send to: Construction Grants & Loans
DENR/DWQ
1633 Mail Service Center
Raleigh, NC 27699-1633
%9 of �
z °o166 19016'
•,'t
w A T�9
O
o �c
April 28, 2008
Mr. James M. Carson
Shields MHP
1356 Saint Regis Drive
Burlington, North Carolina 27217
Dear Mr. Carson:
Michael F. Easley, Governor
William G. Ross Jr., Secretary
North Carolina Department of Environment and Natural Resources
SUBJECT: Authorization to Construct
A to C No. 055271AOI
Shields MHP
Shields MHP WWTP
Alamance County
Coleen H. Sullins, Director
Division of Water Quality
A letter of request for Authorization to Construct was received February 15, 2008, by the
Division, and final plans and specifications for the subject project have been reviewed and found
to be satisfactory. Authorization is hereby granted for the construction of modifications to the
existing 0.006 MGD Wastewater Treatment Plant, with discharge of treated wastewater into
Travis Creek in the Cape Fear River Basin.
This authorization results in no increase in design or permitted capacity and is awarded
for the construction of the following specific modifications:
Installation of an inline UV disinfection system in an insulated enclosure, with
audible and visual alarms, spare lamps to be kept on site, the chlorination and
dechlorination systems shall remain as backup disinfection in the event of the UV
disinfection system's failure, in conformity with the project plans, specifications,
and other supporting data subsequently filed and approved by the Department of
Environment and Natural Resources.
This Authorization to Construct is issued in accordance with Part III, Paragraph A of
NPDES Permit No. NCOO55271 issued March 7, 2007, and shall be subject to revocation unless
the wastewater treatment facilities are constructed in accordance with the conditions and
limitations specified in Permit No. NC0055271.
The sludge generated from these treatment facilities must be disposed of in accordance
with G.S. 143-215.1 and in a manner approved by the North Carolina Division of Water Quality.
In the event that the facilities fail to perform satisfactorily, including the creation of
nuisance conditions, the Permittee shall take immediate corrective action, including those as nNa�tthCarolina
tura!!�
North Carolina Division of Water Quality 1617 Mail Service Center Raleigh, NC 27699-1617 Phone (919) 733-7015 Customer Service
Internet: www.ncwatcrquality.org 512 N. Salisbury St. Raleigh, NC 27604 FAX (919) 733-2496 1-877-623-6748
An Equal Opportunity/Affirmative Action Employer — 50% Recycled/10% Post Consumer Paper
Mr. James M. Carson
April 28, 2008
Page 2
be required by this Division, such as the construction of additional or replacement wastewater
treatment or disposal facilities.
The Winston Salem Regional Office, telephone number (336) 771-5000, shall be notified
at least forty-eight (48) hours in advance of operation of the installed facilities so that an on site
inspection can be made. Such notification to the regional supervisor shall be made during the
normal office hours from 8:00 a.m. until 5:00 p.m. on Monday through Friday, excluding State
Holidays.
Upon completion of construction and prior to operation of this permitted facility, a
certification must be received from a professional engineer certifying that the permitted facility
has been installed in accordance with the NPDES Permit, this Authorization to Construct and the
approved plans and specifications. Mail the Certification to: Construction Grants & Loans,
DWQ/DENR, 1633 Mail Service Center, Raleigh, NC 27699-1633.
Upon classification of the facility by the Certification Commission, the Permittee shall
employ a certified wastewater treatment plant operator to be in responsible charge (ORC) of the
wastewater treatment facilities. The operator must hold a certificate of the type and grade at
least equivalent to or greater than the classification assigned to the wastewater treatment
facilities by the Certification Commission.
The Permittee must also employ a certified back-up operator of the appropriate type and
grade to comply with the conditions of T15A:8G.0202. The ORC of the facility must visit each
Class I facility at least weekly and each Class II, IJI and IV facility at least daily, excluding
weekends and holidays, must properly manage the facility, must document daily operation and
maintenance of the facility, and must comply with all other conditions of T15A:8G.0202.
A copy of the approved plans and specifications shall be maintained on file by the
Permittee for the life of the facility.
During the construction of the proposed additions/modifications, the permittee shall
continue to properly maintain and operate the existing wastewater treatment facilities at all times,
and in such a manner, as necessary to comply with the effluent limits specified in the NPDES
Permit.
You are reminded that it is mandatory for the project to be constructed in accordance
with the North Carolina Sedimentation Pollution Control Act, and when applicable, the North
Carolina Dam Safety Act. In addition, the specifications must clearly state what the contractor's
responsibilities shall be in complying with these Acts.
Prior to entering into any contract(s) for construction, the recipient must have obtained all
applicable permits from the State.
Failure to abide by the requirements contained in this Authorization to Construct may
subject the Permittee to an enforcement action by the Division of Water Quality in accordance
with North Carolina General Statute 143-215.6A to 143-215.6C.
Mr. James M. Carson
April 28, 2008
Page 3
The issuance of this Authorization to Construct does not preclude the Permittee from
complying with any and all statutes, rules, regulations, or ordinances which may be imposed by
other government agencies (local, state, and federal) which have jurisdiction.
One (1) set of approved plans and specifications is being forwarded to you. If you have
any questions or need additional information, please contact Ken Pohlig, P.E. at telephone
number (919) 715-6221.
Sincerely,
/So-� / i - 6'jok���
Coleen H. Sullins
MM:kp
cc: Charles R. Underwood, Inc., Sanford - Russell Underwood, P.E.
Alamance County Health Department
DWQ Winston Salem Regional Office, Surface Water Protection
Technical Assistance and Certification Unit
Point Source Branch, NPDES Program
Daniel Blaisdell, P.E.
Ken Pohlig, P.E.
Michelle McKay, E.I.
ATC File