HomeMy WebLinkAboutNCC230741_ESC Approval Submitted_20230328ROY COOPER
Governor
ELISABETH BISER
Secretary
DOUGLASANSEL
Interim Director
WJH LLC
¢ , StR7�o
NORTH CAROLINA
Environmental Quaitty
December 30, 2022
LETTER OF APPROVAL
Attention: Dave Hodgman, Regional President
3091 Governors Lake Dr, STE 300
Norcross, GA 30071
RE: Project Name: Windcrest Lot EC Plan
Acres Approved: 11
Project ID: RANDO-2023-013
County: Randolph
City: Asheboro
Address: Windcrest Road
River Basin: Cape Fear
Stream Classification: C
Submitted By: Summey Engineering Associates, PLLC
Date Received by LQS: December 20, 2022
Plan Type: Revised
Dear Dave Hodgman:
This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable
with modifications and hereby issue this letter of Approval. This plan approval shall expire three (3) years
following the date of approval, if no land -disturbing activity has been undertaken, as is required by Title 15A
NCAC 4B .0129.
As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of
Intent (eNOI) form requesting a Certificate of Coverage (COC) under the NCG010000 Construction General
Permit. After the form is reviewed and found to be complete, you will receive a link with payment instructions
for the $100 annual permit fee. After the fee is processed, you will receive the COC via email. As the
Financially Responsible Party shown on the FRO form submitted for this project, you MUST obtain the COC
prior to commencement of any land disturbing activity. The eNOI form may be accessed at deq.nc.gov/NCGOI.
Please direct questions about the eNOI form to the Stormwater Program staff in the Raleigh central office. If the
owner/operator of this project changes in the future, the new responsible party must obtain a new COC.
Title 15A NCAC 4B .0118(a) and the NCGO1 permit require that the following documentation be kept on file at
the job site:
North Carolina Department of Environmental Quality I Division of Energy, Mineral, and Land Resources
Winston-Salem Regional Office 1450 Hanes Mill Road, Suite 300 I Winston-Salem, North Carolina 27105
336-776-9800
Letter of Approval
WJH LLC
December 30, 2022
Page 2 of 2
1. The approved E&SC plan as well as any approved deviation.
2. The NCGO1 permit and the COC, once it is received.
3. Records of inspections made during the previous 12 months.
Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to ensure
compliance with the approved plan.
North Carolina's Sedimentation Pollution Control Act is performance -oriented, requiring protection of existing
natural resources and adjoining properties. If, following the commencement of this project, it is determined that
the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation
Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may require
revisions to the plan and implementation of the revisions to ensure compliance with the Act.
Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality
laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land -
disturbing activity. This approval does not supersede any other permit or approval.
Please note that this approval is based in part on the accuracy of the information provided in the Financial
Responsibility Form, which you provided. You are requested to file an amended form if there is any change in
the information included on the form. In addition, it would be helpful if you notify this office of the proposed
starting date for this project.
Your cooperation is appreciated.
Sincerely,
ame�. � PE
Regional Engineer
Land Quality Section
Enclosures: Certificate of Approval
NCGO1 Fact Sheet
Summey Engineering Associates, PLLC
Attention: H. Mack Summey, PE
PO Box 968
Asheboro, NC 27204
Devin Blake [devin@summeyengineering.com]
C
=
r'd
�
A
�
o
�I
R
o
,�
3
W
�
�
�
�
�
�
ice•.
a�
`
y�
�
a�
4.,
'0
oj
„
v
to*-
(U
Qk
i
3 i 't'IU•.da..M Ai� /Y eA+i
�,;
i'
as_ \. _
tl*i%}r
_ Z
s _'
•I E[
, f
77
r