Loading...
HomeMy WebLinkAboutNCC230844_ESC Approval Submitted_20230328ROY COOPER Governor ELIZABETH S. BISER Secretary DOUGLAS R. ANSEL NORTH CAROLINA Interim Director Environmental Quality January 27, 2023 LETTER OF APPROVAL WITH MODIFICATIONS Iredell Statesville Schools Attention: Scott Hager, Director of Construction 350 Old Murdock Road Troutman, North Carolina 28166 RE: Project Name: Shepherd Elementary School Project ID: IREDE-2023-009 Acres Approved: 5.87 acres City: Mooresville Location: Charlotte Highway River Basin: Catawba Stream Classification: Other Submitted By: CESI Date Received by LQS: January 13, 2023 Plan Type: New Dear Mr. Hager: This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable with modifications and hereby issue this letter of Approval with Modifications. The Modifications Required for Approval are listed on the attached page. This plan approval shall expire three (3) years following the date of approval, if no land -disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129. As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (eNOI) form requesting a Certificate of Coverage (COC) under the NCGO 10000 Construction General Permit. After the form is reviewed and found to be complete, you will receive a link with payment instructions for the $100 annual permit fee. After the fee is processed, you will receive the COC via email. As the Financially Responsible Party shown on the FRO form submitted for this project, you MUST obtain the COC prior to commencement of any land disturbing activity. The eNOI form may be accessed at deq.nc.,gov/NCGO1. Please direct questions about the eNOI form to the Stormwater Program staff in the Raleigh central office. If the owner/operator of this project changes in the future, the new responsible party must obtain a new COC. Title 15A NCAC 4B .0118(a) and the NCGO1 permit require that the following documentation be kept on file at the job site: 1. The approved E&SC plan as well as any approved deviation. North Carolina Department of Environmental Quality I Division of Energy, Mineral, and Land Resources Mooresville Regional Office 1610 East Center Avenue, Suite 3011 Mooresville, North Carolina 28115 704-663-1699 Letter of Approval with Modifications Iredell Statesville Schools January 27, 2023 Page 2 of 3 2. The NCGO1 permit and the COC, once it is received. 3. Records of inspections made during the previous 30 days. Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to ensure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Act is performance -oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, it is determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute I I3A-51 through 66), this office may require revisions to the plan and implementation of the revisions to ensure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land -disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. You are requested to file an amended form if there is any change in the information included on the form. In addition, it would be helpful if you notify this office of the proposed starting date for this project. Your cooperation is appreciated. Sincerely, AK Jerry W. Eplin, PE Assistant Regional Engineer Land Quality Section JWE Enclosure: Certificate of Approval Modifications Required for Approval NCGO1 Fact Sheet c: CESI Attention: Dawson Reese P.O. Box 54 Statesville, North Carolina 28677 North Carolina Department of Environmental Quality I Division of Energy, Mineral, and Land Resources Mooresville Regional Office 1 610 East Center Avenue, Suite 3011 Mooresville, North Carolina 28115 704-663-1699 Letter of Approval with Modifications Iredell Statesville Schools January 27, 2023 Page 3 of 3 MODIFICATIONS REQUIRED FOR APPROVAL Project Name: Shepherd Elementary School Project ID: IREDE-2023-009 County: Iredell Reviewed by: Jerry W. Eplin, PE 1. It is recommended that a buffer of at least 10 feet be provided for the natural drainage ditch located southwest of basin SSB-3. It is important that the referenced feature not be disturbed. 2. The outlet from basin SB-1 requires immediate permanent stabilization after installation. Rip rap should be provided from the outlet rip rap to the downgradient rock ring. 3. A temporary construction entrance may be needed near A4 when transferring fill from the borrow site to the construction site. If needed, coordinate installation with the inspector. [G.S. 113A-57(3)] 4. Install clean water diversions early in the project, with immediate matting and stabilization. Inspect clean water diversions once per week and after every rainfall during the construction operation. Maintain the vegetation in a vigorous, healthy condition at all times. [G.S. I I3A-57(3), 15A NCAC .0106(a)(4)]] 5. Additional measures may be required - The applicant is responsible for the control of sediment on -site. If the approved erosion and sedimentation control measures prove insufficient, the applicant must take those additional steps necessary to stop sediment from leaving this site. [15A NCAC 4B .0115] North Carolina Department of Environmental Quality I Division of Energy, Mineral, and Land Resources Mooresville Regional Office 1 6I0 East Center Avenue, Suite 3011 Mooresville, North Carolina 28115 704-663-1699 Fact Sheet on the New NCGO1 Permit AE April 2019 The NC Construction General Permit (also known as was renewed on April 1, 2019. The updated permit does not significantly change the measures that are required to be implemented on construction sites.However, there are some organizational and technical updates to the permit as described below. Mostnotably, there isanew process in which construction sites will obtain official coverage under an NCG01 permit through an electronic process. DEkdLRworked with abroad team ofstakeholders tomake all ufthese updates. |fyou have questions, c�nne e A 1� L t contact Lucas or(919)7O7-3639. Organizational Updates The new permit: • Repeats state requirements for E&S[ Plans and organizes them with federal construction activity requirements; • |sclearly organized bytopic; and * Has less text and more tables. Technical Updates The new permit: w Requires that the E&S[Plan meet SVVPPPrequirements (p. l); ° Provides alist nfitems that must be included inthe SVVPPP,such osthe construction sequence, plans, calculations, etc. (p.l-4);'� w Has updated language onbypasses and upsets that istailored toconstruction activities(p. 10); • Puts all hnmframeofor inspections, rexord'keepinBand reporting in "calendar days" for clarity and consistency (p.11'14);z " Changes the inspection frequency (during business hours) toatleast once per 7calendar days and after every storm >1.Oinch (previously O.5 inch);' and * Excludes weekends, state and federal holidays from normal business hours unless construction activities take This list is based on webahe8uidance bythe D[&40Sediment Program. � The number ofcalendar days was selected tobeaoequivalent aa possible with the previous permit. 3 The intent is to provide predictability tuthe inspection schedule. COC: Certificate ofCoverage, proof ufcoverage under anN[GO1permit QEKN0R: N[Division ofEnergy, Mineral, and Land Resources E&SC: Erosion &SedimentationControl e'NO|: Notice of Intent, application form for the N[G01 permit e-NOT: Notice ofTermination, form for closing out the N[6O1permit SWPPP: StormvvaterPollution Prevention Plan, required bythe W[GU1 The NCGO1 Process The new NCG01app8es tmpermits approved m*wrafter April �2019. Pennitteaswill nolonger receive mcopy ofthe N{GO1permit hnthe mail with their E&SCPlan approvals and beconsidered ascovered under the permit. Federal rules require that DEK4LRreceive anN0oneach construction project and issue each construction project its own O3C. Under the new N[GO1process, construction sites will continue to receive approval for E&S[Plans from either DEK4LRorthe delegated local E&3[program just like before. After receiving E&S[Plan approval, permitteeswill officially obtain coverage under the N[GOlby completing ane'NO|(available at )� Thee'N0wiU only take about 2Uminutes tnfill out and submit nn-|ine. initially, there will benocharge associated with applying for anN[GO1 permit but onoraround June l2U19,DEK8LRwill begin charging a$lO0 annual general permit fee as required per §143-215.3D. DEK8LRbworking oncreatngasing|eappJicationfonnthatwiUa|lowan applicant tosimultaneously apply for onE&S[permit and anNOG01 [O[.That effort ispart ofalarger Permit Transformation project at UEMLR. Why do construction sites have to do this extra application step? DEM0isrequired bythe EPA to issue aspecific OOC to every construction site that disturbs one acre o,more. DEK8LRisworking tncreate aform that combines the E&S[plan approval and e'NO|processes, but that will take more time. For now, DEK8LRhas created anefficient e'N0process. ifanE&SC Plan |sapproved before April 1,which permit applies? Projects with already approved E&6CPlans will automatically follow the new N[GO1permit, but will not need tofill out ane-N0orpay aoannual permit fee. However, the perm|tteesshould print the new permit and the two standard detail sheets and have them onsite. Will DEMLRoffer tools to help pernmAtteescomply with the new NCG017 Yes DEK4LRwill provide two sample plan sheets at that can beplaced into the E&SCplan set. The first covers the site stabilization and materials handling portions ofthe permit. The second sheet covers the inspection, record -keeping and reporting portions of the p*rmnit. How will the new e-NOI submittal and COCprocess work? Pennhteeswill apply for E&SCPlan approvals from DEMLRorthe local E&S[program like before. The E&S[approva| letter will instruct the perm|tteetovisit tosubmit ane'NO|form toDEK4LR. The permh1eemay begin the construction activity after receipt ofthe [O[ (within three days*).The permitteemust print and retain acopy ofthe permit and the [OConsite. Initially, the CO[will beissued for free but nn nraround June 1,ZO19,a$10Oannual general permit fee will becharged. Submittal must be byaresponsible corporate officer that owns or operates the activity, such asapresident, secretary, treasurer, urvice president n,amanager that isauthorized inaccordance with |V.8.6ufthe NOG01per/nit. Additional signatory options are set forth in|V.B.6ofthe permit. It ispossible for consultant toprepare the o-NO|,save itasadraft, and email ittothe responsible entity for signature &submittal, What happens tothe COCwhen the construction activity is complete? When aproject iscomplete, the pennbteeowill contact DEK4LRorthe local delegated program toclose out the E&5[Plan. After DEMLRorthe local E8'S[program inform the permUtteeofthe project close out via inspection report, the permhteewill visit to submit an e-NOT. Will there be a grace period for adherence tothe new process? DEK4LRdoes not have the authority uugrant agrace period from a federally mandated permit. Permitteesv*iD beinformed nfthe new process via web site, E&SCPlan approval letters and list sena. if construction activity disturbs one acre ormore (or ispart ofcommon plan ofdevelopment that disturbs one acre urmore) fails Losubmit ane'NO| after approval ofits E&SC Plan, this isaviolation of federal permitting requirements and the permh1ee could besubject to a penalty assessment. How does the new NCG01affect the delegated local E&SCPrograms? Local programs will continue tnreview and approve E&S[plans. However, they will nolonger send copies ofthe NCGO2with E&3[Plan approvals. DEK4LRwill provide sample language tn use inlocal E&SCPlan approvals tn advise permittees that they must submit ane'NO|toDEK4LR. Local programs are not required to check ifpennbtepshave submitted e- NO|stoDEMLR.However, ifthey wish todothis voluntarily, there will bea tool available on DEK4LR'sweb site for them tnview a list ofconstruction projects that have submitted u-N0|s. When local programs doaeuutanE&SC Plan, the close-out letter will advise permitteesthat they must submit ane' NOT DEK4LRwill provide sample language. Local programs may approve E&S[ plans that meet state sediment laws and rules even ifthose plans are not compliant with all ofthe N[GO1 requirements, However, their permhteeswill berequired toadd two plan sheets (which will beprovided by DEMLR)totheir E&6[Plans toensure that they fully comply with the ground stabilization, materials handling, and inspection, record -keeping and reporting portion n/the N[GU2permit, *Or24business hours for uproject opproved under the DEMLR Express reviewprogmm,