HomeMy WebLinkAboutNCC201351_NOT Supporting Documents (2)_20230327North Carolina Department of Environmental Quality
Land Resources: 450 W. Hanes Mill Road, Suite 300, Winston-Salem, NC 27105
(336) 776-9800
County: Wilkes Project: SECU Wilkesboro Branch
Person financially responsible: State Employees Credit Union - Jamie Applequist,
Executive VP, Branch Operations
Address: 119 Salisbury Street, Raleigh, NC 27603
1. Project Location: Executive Dr, Wilkesboro
Pictures: No
2. Weather and soil conditions: N/A
River basin: Yadkin-PeeDee
Project #: WILKE-2020-008
Initial inspection: No
3. Is site currently under notice of violation? No
4. Is the site in compliance with S.P.C.A. and rules? Yes If no, check violations below:
5. Violations:
6. Is the site in compliance with NPDES Permit NCGO10000 Construction Stormwater requirements?
Describe:
7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply)
Degree of damage:
8. Contact made with (name): Title:
Inspection report: Sent Report Date given/sent: March 27, 2023
9. Corrective action needed:
10. Comments: This site was never developed, and a closeout inspection was requested on March 24, 2023
since there are no plans to develop the site in the foreseeable future. Permanent vegetation
was noted on the last inspection in January 2023. No additional self -monitoring or
self -inspections are required. Project is in compliance and released under the SPCA.
Termination of coverage under the NPDES General Stormwater Permit for Construction
Activities (NCGO1) must be requested by the permittee via a Notice of Termination (NOT).
The NOT is available at: https://edoes.deq.ne.gov/Fonns/NCGOI-Termination. Please note
that this correspondence must be uploaded as part of completing the NOT process. If you
have any questions, please contact me at Robby. DeansAancdenr.gov or by phone at (336)
776-9658.
Reported by: Robby Deans
Date of inspection: March 27, 2023
cc:
Others present:
Time arriving on site: 8:15 AM Time leaving site: 8:20 AM
Yes