Loading...
HomeMy WebLinkAboutB-4439 Brunswick Bridge 100 on SR 1342 Makatoka Rd sediment lossFrom:Westphal, Anneliese To:Steffens, Thomas A CIV USARMY CESAW (USA); Sprinkle, Hannah H Cc:Giles, Jon W; Bullard, Jason M; Gingrich, Sophia E Subject:B-4439 Brunswick Bridge 100 on SR 1342 Makatoka Rd sediment loss Date:Monday, March 27, 2023 4:42:05 PM Attachments:image001.png B-4439_20230327_before removal.JPEG B-4439_20230327_after some removal.JPG Hi Tom and Hannah, The subject bridge project had a sediment loss that was discovered today by the project inspector. It occurred at Sta. 16+26LT -L-. They estimate about 4, 5-gallon buckets. They project received approximately 1.7 inches of rain over the weekend. The material washed through the rock (oddly it was not noticeable over the rock). They worked on it with hand tools today, and they think they will be able to reclaim more after the water level goes down. We will follow-up with additional photos after all has been removed. Please let me know if you have questions or concerns. Thanks, Anneliese Anneliese Westphal Environmental Senior Specialist Division 3 NCDOT- Division of Highways 910 341 2000 office 910 604 1330 mobile 910 675 0143 fax awestphal@ncdot.gov 5501 Barbados Blvd Castle Hayne, NC 28429-5647 Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties.