Loading...
HomeMy WebLinkAboutFW_ C204553 Sediment Losses - Storm Event 3_27_2023From:Gingrich, Sophia E To:Steffens, Thomas A CIV USARMY CESAW (USA); Sprinkle, Hannah H; Lane, Stephen Cc:Giles, Jon W; Westphal, Anneliese Subject:FW: C204553 Sediment Losses - Storm Event 3/27/2023 Date:Monday, March 27, 2023 4:19:29 PM Attachments:18+-00 -Y32 - berm blowout into old js, flowing into new js.JPG 18+-00 -Y32- sediment loss from old js.JPG 19+-25 -Y32RPB1- 225FT RT - water flowing out of woods undermined fence and matting.JPG 28+-00 -Y32- LT - sediment loss, SDO failure.JPG 29+-00 -Y32- LT - water flowing out of woods undermined fence and matting.JPG 725+-00 -L1- temp js crossing loss, inlet.northern.JPG 725+-00 -L1- temp js crossing loss, outlet.southern.JPG Culvert #10 - Ponding water flowing through weephole into riprap and js.1.JPG Culvert #13 Diversion - diversion blowout around dike into old js.JPG Culvert #13 Diversion - downstream.crossing.JPG Tom, Hannah, and Stephen, Please see the forwarded email from Ben this afternoon about the bypass. There are multiple issues that were caused by the rain yesterday and overnight last night. Ben labeled the pictures with station numbers. Jon is planning on going out to the project tomorrow morning to get more information and will provide you with an update after his visit. We wanted to go ahead and give you a heads up in the meantime. Please let us know if you have any questions. Thanks, Sophia Gingrich Environmental Specialist I Division 3 NCDOT – Division of Highways From: Meyer (RK & K Civil Engineering), Benjamin C <ext-bcmeyer1@ncdot.gov> Sent: Monday, March 27, 2023 4:01 PM To: Giles, Jon W <jwgiles1@ncdot.gov> Cc: Gingrich, Sophia E <segingrich@ncdot.gov>; Westphal, Anneliese <awestphal@ncdot.gov>; jhaga@rkk.com; Jackson Provost, PE, PLS <Jackson.Provost@summitde.com>; Brandon Helms <brandon.helms@summitde.com>; Waugh, Daniel G <dgwaugh1@ncdot.gov> Subject: C204553 Sediment Losses - Storm Event 3/27/2023 Jon, Attached are photos highlighting erosion control losses that occurred due to the ~2.38” of rain that the project received from the rain events during the past 24 hours. The contractor is actively working to address these issues. We are available to review onsite with the DEO staff. Please let us know if you need any additional information for the locations on the project. Cheers, Ben Ben Meyer, PE, CCM Assistant Resident Engineer Hampstead Bypass Cell: 910-617-1902 Ext-bcmeyer1@ncdot.gov bmeyer@rkk.com Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties.