Loading...
HomeMy WebLinkAbout20150252 Ver 1_More Info Received_20150415Price, Zan (George) From: Clement Riddle <clement @cwenv.com> Sent: Wednesday, April 15, 2015 4:36 PM To: Price, Zan (George) Subject: RE: Additional Information - Rhododendron Lake Park - Phase II - DWR -15 -0252 Attachments: UT WASH REACH 3 DETAILS O41515.pdf Zan, Thank you for your email reagrding the park improvements at Rhododnron Lake Park, Phase 2. 1. The lake willl be dewatered from the top using a mechaical pump and hose. Water will be withdrawn from the pond into the hose and pump and discharged into the outlet pipe. Please note that the stream intake pipe has been sealed off during this project to prevent stream flow into the pond. 2. The attached PDF, Reach 3 Detail, represents the stream bank stabilization at area S 1. 3. The wetland littoral shelf will be seeded with MD Mountain OBL Wetland Mix(ERNMX -704). The stream banks will be planted with NC Mountains Riparian Mix # ERNMX -304. Please do not hesitate to contact me if you have any questions or comments about this project. Clement G-ear\Nater 224 South Grove Street, Suite F Hendersonville, NC 28792 Office: 828 - 698 -9800 Mobile: 828- 606 -5168 clement0cwenv.com From: Price, Zan (George) [mailto: Zan. Price @ ncdenr.gov] Sent: Monday, April 13, 2015 5:01 PM To: Clement Riddle Subject: Additional Information - Rhododendron Lake Park - Phase II - DWR -15 -0252 The Division of Water Resources (DWR) has performed a review of the 401 Water Quality Certification application submitted for the referenced project. Please provide additional information so we can complete our review. Respond to this email by April 20, 2015 to avoid placing this application on hold. Please provide a descriptive narrative on the proposed construction techniques and construction sequence that details the method of dewatering the lake area to prevent downstream sedimentation during sediment removal from the lake and forebay construction. 2. Please provide the proposed streambank slope for the impact S1 bank stabilization area. Please provide the proposed temporary and permanent seed mix list for the bank stabilization areas and littoral shelf area. Contact me if you have any questions or concerns. Zan Price, P.E. NCDENR - Division of Water Resources Water Quality Regional Operations Section Asheville Regional Office 2090 U.S. Hwy. 70 Swannanoa, N.C. 28778 ph.: 828 - 296 -4500 fax: 828 - 299 -7043 email: zan.price @ncdenr.gov website: www.ncwaterguality.org Notice: Per Executive Order No. 150, all emails sent to and from this account are subject to the North Carolina Public Records Law and may be disclosed to third parties.