HomeMy WebLinkAboutNCC201435_NOT Closeout Documents_20230322North Carolina Department of Environmental Quality
Land Resources: 943 Washington Square Mall, Washington, NC 27889 (252) 946-6481
County: Pitt Project: Sugg Parkway Substation
Person financially responsible: Greenville Utilities Commision - Anthony C
Cannon, GM/CEO
Address: P.O. Box 1847, Greenville, NC 27835
1. Project Location: Sugg Parkway, Pactolus
Pictures: No
2. Weather and soil conditions: 60 degrees, surety, dry
River basin: Tar -Pamlico
Project #: PITT-2020-010
Initial inspection: No
3. Is site currently under notice of violation? No
4. Is the site in compliance with S.P.C.A. and rules? Yes If no, check violations below:
5. Violations:
6. Is the site in compliance with NPDES Permit NCGO10000 Construction Stormwater requirements? Yes
Describe:
7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply)
Degree of damage:
8. Contact made with (name): No contact was made. Title:
Inspection report: Sent Report Date given/sent: March 14, 2023
9. Corrective action needed:
10. Comments: Permanent ground cover sufficient to restrain erosion has been established. No additional self -
monitoring or self -inspections are required. The project is in compliance and released under the SPCA. The
permittee must request termination of coverage under the NPDES General Stormwater Permit for Construction
Activities (NCGO 1) via a Notice of Termination (NOT). The NOT is available at
https:Hedocs.deq.nc.gov/Forms/NCGOI-Termination. Please note that this correspondence must be uploaded as part
of completing the NOT process.
Reported by: Scott Graboski Others present:
Date of inspection: March 14, 2023 Time arriving on site: 9:00 AM Time leaving site: 9:10 AM