Loading...
HomeMy WebLinkAboutNCC200667_NOT Closeout Documents_20230321ROY COOPER W GovernorELIZABETH S. BISERSecretary DOUGLAS R. ANSEL NORTH CAROLINA Interim Director Environmental Quality March 15, 2023 SEDIMENT AND EROSION CONTROL & CONSTRUCTION STORMWATER INSPECTION REPORT Tate Commons Limited Partnership ATTN: Anne Little, Vice President & Assoc. General Counsel 500 South Front Street, 101h Floor Columbus, Ohio 43215 Dear Sir or Madam: Attached is a copy of the inspection report prepared following an onsite inspection of the project referenced on the report. This report is intended to inform you of the project's compliance with the North Carolina Sedimentation Pollution Control Act of 1973 and Construction NPDES Stormwater General Permit. Please review this report carefully as it may contain corrective actions needed and/or comments which will assist you in meeting the required performance standards. If any deficiencies are noted, it is our desire that any and all possible problems be discussed and resolved at the earliest possible time. To facilitate this effort, please contact me at the address/phone number below should you have any questions. Sincerely, Chris Pullinger Environmental Program Consultant (252) 948-3934 Enclosure: Sediment/Construction Stormwater Inspection Report D E Q�� Office North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources Washington Regional Oce 1 943 Washington Square Mall I Washington, North Carolina 27889 NORTH CAROHNA uepaa nt0enmmnmwWawl\ r 252.946.6481 North Carolina Department of Environmental Quality Land Resources: 943 Washington Square Mall, Washington, NC 27889 (252) 946-6481 County: Craven Project: Tate Commons Apartment Complex River basin: Neuse Person financially responsible: Anne Little, Vice President & Assoc. Project #: CRAVE-2019-026 General Counsel Address: 500 South Front Street, IO b Floor, Columbus, Ohio 43215 1. Project Location: Karen Drive, New Bern Pictures: No 2. Weather and soil conditions: Clear, warm, dry Initial inspection: No 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A. and rules? Yes If no, check violations below: 5. Violations: 6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements? Yes Describe: Site covered under NCC200667, and is in compliance 7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply) Degree of damage: 8. Contact made with (name): Nobody Inspection report: E-mailed Report 9. Corrective action needed: Title: n/a Date given/sent: March 15, 2023 10. Comments: Permanent ground cover sufficient to restrain erosion has been established. No additional self -monitoring or self -inspections are required. Project is in compliance and released under the SPCA. Termination of coverage under the NPDES General Stormwater Permit for Construction Activities (NCG01) must be requested by the permittee via a Notice of Termination (NOT). The NOT is available at: https://edocs.deci.nc.-zov/Forms/NCGOI-Termination. Please note that this correspondence must be uploaded as part of completing the NOT process. Reported by: Chris Pullinger Others present: n/a Date of inspection: February 16, 2023 Time arriving on site: 1:45 PM Time leaving site: 2:00 PM cc: