HomeMy WebLinkAboutNCC214086_NOT Closeout Documents_20230320BIN - Apex LLC
Jon L. Morris
500 East Morehead St, Suite 200
Charlotte, NC 28202
Re: Certificate of Completion
Project Name: Cash Corporate Center - Project Delta
Project Location;
Project Number:
Submitted By:
Submitted Date:
Completion Date
1201 Burma Drive
20-025
Advanced Civil Design, Inc.
June 3, 2021
March 16, 2023
WATER RESOURCES
March 16, 2023
THIS IS TO CERTIFY that on the above referenced project the grading has been completed,
temporary S&E measures have been removed, and permanent ground cover sufficient to
restrain erosion has been established as outlined on the approved S&E Plan and in accordance
with the Town of Apex S&E ordinance.
Permanent ground cover sufficient to restrain erosion has been established. No additional self -
monitoring or self -inspections are required. Project is in compliance and released under the
SPCA. Termination of coverage under the NPDES General Stormwater Permit for Construction
Activities (NCG01) must be requested by the permittee via a Notice of Termination (NOT). The
NOT is available at: https:Hedocs.deq.nc.gov/Forms/NCG01-Termination. Please note that this
correspondence must be uploaded as part of completing the NOT process.
The owner of the site will be responsible for regular erosion control maintenance after this
release to the developer.
James Misciagno, CES, CPESC
Stormwater Field Services Supervisor
Town of Apex Stormwater Engineering
TOWN OF APEX
The Peak of Good Living
PO Box 25o Apex, NC 27502 1 (919) 362-8166 1 www.apexnc.org