Loading...
HomeMy WebLinkAboutNCC214086_NOT Closeout Documents_20230320BIN - Apex LLC Jon L. Morris 500 East Morehead St, Suite 200 Charlotte, NC 28202 Re: Certificate of Completion Project Name: Cash Corporate Center - Project Delta Project Location; Project Number: Submitted By: Submitted Date: Completion Date 1201 Burma Drive 20-025 Advanced Civil Design, Inc. June 3, 2021 March 16, 2023 WATER RESOURCES March 16, 2023 THIS IS TO CERTIFY that on the above referenced project the grading has been completed, temporary S&E measures have been removed, and permanent ground cover sufficient to restrain erosion has been established as outlined on the approved S&E Plan and in accordance with the Town of Apex S&E ordinance. Permanent ground cover sufficient to restrain erosion has been established. No additional self - monitoring or self -inspections are required. Project is in compliance and released under the SPCA. Termination of coverage under the NPDES General Stormwater Permit for Construction Activities (NCG01) must be requested by the permittee via a Notice of Termination (NOT). The NOT is available at: https:Hedocs.deq.nc.gov/Forms/NCG01-Termination. Please note that this correspondence must be uploaded as part of completing the NOT process. The owner of the site will be responsible for regular erosion control maintenance after this release to the developer. James Misciagno, CES, CPESC Stormwater Field Services Supervisor Town of Apex Stormwater Engineering TOWN OF APEX The Peak of Good Living PO Box 25o Apex, NC 27502 1 (919) 362-8166 1 www.apexnc.org