HomeMy WebLinkAboutNCC211371_Annual Fee Waived Email_20230317Clark, Paul
From: lase rfiche.ncdenr.gov@mccicloud.io
Sent: Friday, March 17, 2023 9:41 PM
To: Randy.Veltri@duke-energy.com; nuwan.wijesuriya@duke-energy.com
Cc: Clark, Paul; Georgoulias, Bethany; nuwan.wijesuriya@duke-energy.com
Subject: [External] Construction SW General Permit Annual Fee Update - NCC211371
CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to
Report Spam.
Dear Construction General Permit Permittee:
This email is to notify you that the 2023 annual fee for Certificate of Coverage (COC) no. NCC211371 has been applied or
waived. No future fees will be required, as this permit is no longer active.
This COC is for Fayetteville -Fayetteville Dupont SW St. 115 kV Replace STIR 207, STIR 208, SW 211 in Cumberland
County, issued to Duke Energy Progress, LLC. This communication is in reference to Invoice no. NCC211371-2023.
If you have any questions, please contact the Stormwater Program at (919) 707-3649, or visit https://deg.nc.gov/NCG01.
The NC DEMLR Stormwater Program
512 N. Salisbury Street, Archdale Building 6th Floor, 1612 Mail Service Center, Raleigh, NC 27699-1612
This email was automatically generated by Laserfiche. Please do not respond to this email address, as responses are not
monitored.