HomeMy WebLinkAbout820540_Routine Inspection_202303066011S 34161,-�3
iivison.ofWater Resources
Facility Number 0 Division of Soil and Water Conservation
0 Other Agency
type of Visit: -compliance Inspection 0 Operation Review 0 Structure Evaluation 0 Technical Assistance
Reason for Visit: ''Routine 0 Complaint 0 Follow-up 0 Referral 0 Emergency 0 Other 0 Denied Access
Date of Visit: &- Arrival Time: 161, Departure Time: 3" County: �oOWRegion: � Ci
Farm Name: � Owner Email:
AOwner Name: Phone:
Mailing Address:
Physical Address:
Facility Contact: �� Title:
Onsite Representative:
Certified Operator:
Back-up Operator:
Location of Farm:
Latitude:
Discharges and Stream Impacts
1. Is any discharge observed from any part of the operation?
Discharge originated at: ❑ Structure ❑ Application Field ❑ Other:
a. Was the conveyance man-made?
b. Did the discharge reach waters of the State? (If yes, notify DWR)
c. What is the estimated volume that reached waters of the State (gallons)?
Phone:
Integrator: /-,Z'2�
-zz
Certification Number: '9(,%�'7 /
Certification Number:
Longitude:
❑ Yes _bolo ❑ NA ❑ NE
❑ Yes ❑ No ❑ NA ❑ NE
❑ Yes ❑ No ❑ NA ❑ NE
d. Does the discharge bypass the waste management system? (If yes, notify DWR) ❑ Yes ❑ No ❑ NA ❑ NE
2. Is there evidence of a past discharge from any part of the operation? ❑ Yes -EE INo ❑ NA ❑ NE
3. Were there any observable adverse impacts or potential adverse impacts to the waters ❑ Yes —PT"No ❑ NA ❑ NE
of the State other than from a discharge?
Page 1 of 3 511212020 Continued
Facility Number: jDate of Inspection:
Waste Collection & Treatment
4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate?
❑ Yes �No
❑ NA
❑ NE
a. If yes, is waste level into the structural freeboard?
❑ Yes ❑ No
❑ NA
❑ NE
Structure 1 Structure 2 Structure 3 Structure 4
Structure 5 Structure 6
Identifier: f
Spillway?:
C3
Designed Freeboard (in): 17
Observed Freeboard (in):�
5. Are there any immediate threats to the integrity of any of the structures observed?
❑ Yes __2 No
❑ NA
❑ NE
(i.e., large trees, severe erosion, seepage, etc.)
6. Are there structures on -site which are not properly addressed and/or managed through a
❑ Yes e'No
❑ NA
❑ NE
waste management or closure plan?
If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat,
notify DWR
7. Do any of the structures need maintenance or improvement?
❑ Yes- ,_L]� o
❑ NA
❑ NE
8. Do any of the structures lack adequate markers as required by the permit?
[:]Yes f j No
❑ NA
❑ NE
(not applicable to roofed pits, dry stacks, and/or wet stacks)
9. Does any part of the waste management system other than the waste structures require
❑ Yes -fn-No
❑ NA
❑ NE
maintenance or improvement?
Waste Application
10. Are there any required buffers, setbacks, or compliance alternatives that need
❑ Yes_,In—No
❑ NA
❑ NE
maintenance or improvement?
1 l . Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes _[:��o ❑ NA ❑ NE
❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.)
❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil
❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area
12. Crop Type(s): �����C�c�: r.✓/��' O��
13. Soil Type(s):C��2.e!�
14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes -o ❑ NA ❑ NE
15. Does the receiving crop and/or land application site need improvement? ❑ Yes jQ--No ❑ NA ❑ NE
16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes -[D No ❑ NA ❑ NE
acres determination?
17. Does the facility lack adequate acreage for land application?
❑ Yes [2,No
❑ NA
❑ NE
18. Is there a lack of properly operating waste application equipment?
❑ Yes FLNo
❑ NA
❑ NE
Required Records & Documents
19. Did the facility fail to have the Certificate of Coverage & Permit readily available?
❑ Yes _ -5o
❑ NA
❑ NE
20. Does the facility fail to have all components of the CAWMP readily available? If yes, check
❑ Yes F->o
❑ NA
❑ NE
the appropriate box.
❑WUP ❑Checklists ❑ Design ❑ Maps ❑ Lease Agreements
❑Other:
21. Does record keeping need improvement? If yes, check the appropriate box below.
-F. Yes -o
❑ NA
❑ NE
❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis -EfoSooil Analysis
❑ Waste Transfers
❑ Weather
Code
❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and I" Rainfall Inspections
❑ Sludge Survey
22. Did the facility fail to install and maintain a rain gauge?
❑ Yes [7No
❑ NA
❑ NE
23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment?
❑ Yes _Q-flo
❑ NA
❑ NE
Page 2 of 3
511212020 Continued
Facility Number: - Date of Inspection:
24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes ff No ❑ NA ❑ NE
25. Is the facility out of compliance with permit conditions related to sludge? If yes, check ❑ Yes allo ❑ NA ❑ NE
the appropriate box(es) below.
❑ Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels
❑ Non -compliant sludge levels in any lagoon
List structure(s) and date of first survey indicating non-compliance:
26. Did the facility fail to provide documentation of an actively certified operator in charge? ❑ Yes 4allo ❑ NA ❑ NE
27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? []Yes allo ❑ NA ❑ NE
Other Issues
28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document
and report mortality rates that were higher than normal?
29. At the time of the inspection did the facility pose an odor or air quality concern?
If yes, contact a regional Air Quality representative immediately.
30. Did the facility fail to notify the Regional Office of emergency situations as required by the
permit? (i.e., discharge, freeboard problems, over -application)
31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below.
❑ Application Field ❑ Lagoon/Storage Pond ❑ Other:
32. Were any additional problems noted which cause non-compliance of the permit or CAWMP?
33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative?
34. Does the facility require a follow-up visit by the same agency?
[:]Yes 2rNo ❑ NA ❑ NE
❑ Yes il FI-No ❑ NA ❑ NE
[—]Yes ErNo ❑ NA ❑ NE
❑ Yes Jallo ❑ NA ❑ NE
❑ Yes
E:TNo
❑ NA
❑ NE
❑ Yes
allo
❑ NA
❑ NE
❑ Yes
JEJ`No
❑ NA
❑ NE
Reviewer/Inspector Signature:
Page 3 of 3
Date: 3 123
511212020