HomeMy WebLinkAbout090040_POA for high freeboard_20230213FLAN OF ACTMN (PoA� FOR HGH FREEBOARD AT ANC l[�AL FAULMES
Facility Number: q - County: I
Facility Name: &D,a firn ILC
Certified Operator Name:4'14-cz,11 ~D. t'?S Operator
1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the
lowest point on the top of the dam for lagoons without Spillways; and from the current liquid level
in the lagoon to the boitom of the spillway for lagoons with spillways.
Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 0
Lagoon Name/identifier (ID):
Spillway (Yes or No):
Level (inches):
2. Check all applicable items
Liquid level is within the designed structural freeboard elevations of one or more structures. Five
and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within
acceptable ranges.
V/Liquid level is within the 25 year 2 elevations for one or m �, q y a 4 hour storm e1e a ore structures. A 30 day
Plan of Action is attached. Agronomic balance is within acceptable range.
Waste is to be pumped and hauled to off site locations. Volume and PAN content of waste to
pumped and hauled is reflected in section Ill tables. Included within this plan is a list of the
Proposed sites with related facility number(s), number acres and receiving crop information,
Contact and secure approval from the Division of Water Quality prior to fin of waste
to a site not covered in the facility's certified animal waste management plan.
Operation will be partially or fully depopulated.
- attach a complete schedule with corresponding animal units and dates for depopulation
- if animals are to be moved to another permitted facility, provide facility number, lagoon
freeboard levels and herd population for the receiving facility
3. Earliest possible date to begin land application of waste: ___...,,,.;,_,�,� •�_ ._.
I hereby certify that I have reviewed the information listed above and included within the attached Plan
of Action, and to the best of tray knowledge and ability, the information is accurate and correct.
ld
Facility er/Manager (print)
Manager (signature)
Phone:
� d
e 2(►3ea3
Cover Page 2121100
II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YRJ24
HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY
1. Structure ID: A & H Hog Farm line m = 371.7 lb PAN
2. Structure ID: line m = lb PAN
3. Structure ID:
4. Structure ID:
5. Structure ID:
6. Structure ID:
line m = lb PAN
line m = lb PAN
line m = lb PAN
line m = lb PAN
In. lines 1 +2+3+4+5+6= 371.7 lb PAN
III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN
PERIOD_ DO NOT LIST FIELDS TO WHICH PAN CANNOT BE APPLIED DURING THIS 30 DAY PERIOD.
o. tract #
p. field #
q. crop
r. acres
s. remaining IRR
2 PAN balance
(lb/acre)
t. TOTAL PAN
BALANCE FOR
FIELD (Ibs.)
column r x s
u. application window'
3235
1
overseed
4.64
25.00
116.0
Sept -April
3235
2S
overseed
1.11
25.00
27.8
Sept -April
3235
2W
overseed
2.38
25.00
59.5
Sept -April
3235
3N
overseed
2.83
25.00
70.8
Sept -April
3235
3S
overseed
1.62
25.00
40.5
Sept -April
3235
4N
overseed
0.78
25.00
19.5
Sept -April
3235
4S
overseed
1.07
25.00
26.8
Sept -April
3235
5N
overseed
2.83
25.00
70.8
Sept -April
3235
5S
overseed
4.76
25.00
119.0
Sept -April
3235
11
overseed
4.64
25.00
116.0
Mar- Sept
32351
2S
overseed
1.11
25.00
27.8
Mar- Sept
*** guestimate on PAN left*****
'State current crop ending application date or next crop application beginning date for available
receiving crops during 30 day draw down period.
v. Total PAN available for all fields (sum of column t) = 694.3 Ib. PAN
IV. FACILITY'S PoA OVERALL PAN BALANCE
w. Total PAN to be land applied (line n from section II) = 371.7 lb. PAN
x. Crop's remaining PAN balance (line v from section III) = 694.3 lb. PAN
y. Overall PAN balance (w - x) = -323 Ib. PAN
Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and
haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN
based on new information. If new fields are to be included as an option for lowering lagoon level, add these
fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to
another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the
receiving facility.
NARRATIVE:
Will pump as soon as conditions allow.
PoA (30 Day) 2/21 /00
PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
30 DAY DRAW DOWN PERIOD
1. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE
1. Structure Name/Identifier (ID): A & H Hog Farm
2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard
a. current liquid level according to marker
b. designed 25 yr./24 hr. storm & structural freeboard
c. line b - line a (inches in red zone) _
d. top of dike surface area according to design
(area at below structural freeboard elevation)
e. line c/12 x line d x 7.48 gallons/W
3. Projected volume of waste liquid produced during draw down period
18.0 inches
19.0 inches
1.0 inches
102856 1ft2
64114 gallons
f. temporary storage period according to structural design 180 days
g. volume of waste produced according to structural design 121058 ft3
h. current herd # 1 3672 certified herd #1 3672
actual waste produced = current herd # x line g =
certified herd #
i. volume of wash water according to structural design
j. excess rainfall over evaporation according to design
k. (lines h + i + j) x 7.48 x 30 days/line f=
4. Total PAN to be land applied during draw down period
I. current waste analysis dated 1 11/11/2 222]
m. ((lines e + k)/1000) x line I =
REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE.
(Click on the next Structure tab shown below)
121058 ft'
0 ft3
62270 ft3
228549 gallons
1.27 Ibs/1000 gal.
371.7 lbs. PAN
PoA (30 Day) 2/21 /00