HomeMy WebLinkAbout090040_POA for high freeboard_20230213FLAN OF ACTMN (PoA� FOR HGH FREEBOARD AT ANC l[�AL FAULMES Facility Number: q - County: I Facility Name: &D,a firn ILC Certified Operator Name:4'14-cz,11 ~D. t'?S Operator 1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the lowest point on the top of the dam for lagoons without Spillways; and from the current liquid level in the lagoon to the boitom of the spillway for lagoons with spillways. Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 0 Lagoon Name/identifier (ID): Spillway (Yes or No): Level (inches): 2. Check all applicable items Liquid level is within the designed structural freeboard elevations of one or more structures. Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within acceptable ranges. V/Liquid level is within the 25 year 2 elevations for one or m �, q y a 4 hour storm e1e a ore structures. A 30 day Plan of Action is attached. Agronomic balance is within acceptable range. Waste is to be pumped and hauled to off site locations. Volume and PAN content of waste to pumped and hauled is reflected in section Ill tables. Included within this plan is a list of the Proposed sites with related facility number(s), number acres and receiving crop information, Contact and secure approval from the Division of Water Quality prior to fin of waste to a site not covered in the facility's certified animal waste management plan. Operation will be partially or fully depopulated. - attach a complete schedule with corresponding animal units and dates for depopulation - if animals are to be moved to another permitted facility, provide facility number, lagoon freeboard levels and herd population for the receiving facility 3. Earliest possible date to begin land application of waste: ___...,,,.;,_,�,� •�_ ._. I hereby certify that I have reviewed the information listed above and included within the attached Plan of Action, and to the best of tray knowledge and ability, the information is accurate and correct. ld Facility er/Manager (print) Manager (signature) Phone: � d e 2(►3ea3 Cover Page 2121100 II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YRJ24 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY 1. Structure ID: A & H Hog Farm line m = 371.7 lb PAN 2. Structure ID: line m = lb PAN 3. Structure ID: 4. Structure ID: 5. Structure ID: 6. Structure ID: line m = lb PAN line m = lb PAN line m = lb PAN line m = lb PAN In. lines 1 +2+3+4+5+6= 371.7 lb PAN III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN PERIOD_ DO NOT LIST FIELDS TO WHICH PAN CANNOT BE APPLIED DURING THIS 30 DAY PERIOD. o. tract # p. field # q. crop r. acres s. remaining IRR 2 PAN balance (lb/acre) t. TOTAL PAN BALANCE FOR FIELD (Ibs.) column r x s u. application window' 3235 1 overseed 4.64 25.00 116.0 Sept -April 3235 2S overseed 1.11 25.00 27.8 Sept -April 3235 2W overseed 2.38 25.00 59.5 Sept -April 3235 3N overseed 2.83 25.00 70.8 Sept -April 3235 3S overseed 1.62 25.00 40.5 Sept -April 3235 4N overseed 0.78 25.00 19.5 Sept -April 3235 4S overseed 1.07 25.00 26.8 Sept -April 3235 5N overseed 2.83 25.00 70.8 Sept -April 3235 5S overseed 4.76 25.00 119.0 Sept -April 3235 11 overseed 4.64 25.00 116.0 Mar- Sept 32351 2S overseed 1.11 25.00 27.8 Mar- Sept *** guestimate on PAN left***** 'State current crop ending application date or next crop application beginning date for available receiving crops during 30 day draw down period. v. Total PAN available for all fields (sum of column t) = 694.3 Ib. PAN IV. FACILITY'S PoA OVERALL PAN BALANCE w. Total PAN to be land applied (line n from section II) = 371.7 lb. PAN x. Crop's remaining PAN balance (line v from section III) = 694.3 lb. PAN y. Overall PAN balance (w - x) = -323 Ib. PAN Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN based on new information. If new fields are to be included as an option for lowering lagoon level, add these fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the receiving facility. NARRATIVE: Will pump as soon as conditions allow. PoA (30 Day) 2/21 /00 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD 1. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): A & H Hog Farm 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker b. designed 25 yr./24 hr. storm & structural freeboard c. line b - line a (inches in red zone) _ d. top of dike surface area according to design (area at below structural freeboard elevation) e. line c/12 x line d x 7.48 gallons/W 3. Projected volume of waste liquid produced during draw down period 18.0 inches 19.0 inches 1.0 inches 102856 1ft2 64114 gallons f. temporary storage period according to structural design 180 days g. volume of waste produced according to structural design 121058 ft3 h. current herd # 1 3672 certified herd #1 3672 actual waste produced = current herd # x line g = certified herd # i. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h + i + j) x 7.48 x 30 days/line f= 4. Total PAN to be land applied during draw down period I. current waste analysis dated 1 11/11/2 222] m. ((lines e + k)/1000) x line I = REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) 121058 ft' 0 ft3 62270 ft3 228549 gallons 1.27 Ibs/1000 gal. 371.7 lbs. PAN PoA (30 Day) 2/21 /00