Loading...
HomeMy WebLinkAboutSWA000195_Response To Comments_20230323 (3)C UU1 Civil Design Concepts, PA November 22, 2022 Mr. Jim Farkas Division of Energy, Mineral & Land Resources Stormwater Program 512 North Salisbury Street, Office 640E Raleigh, NC 27604 RE: Legacy at Mills River — Phase 1 CDC Project No.: 22160 NCDEQ Permit NO.: TBD Dear Plan Reviewer, On behalf of Blue Ridge Retirement Partners, LLC, we are pleased to submit the requested additional information for your review and approval. The comments identified in the email from Ms. Margie DeBerry, dated October 25, 2022 are summarized below along with the associated responses (in blue). 1. Ix original, signed hard copies of the Application with the following corrections made (A complete application is required per 15A NCAC 02H .1042(3)(a) and per Section F of the Application). One hard copy of the Application was provided, but two original signed hard copies are required. CDC — Two originals are provided. 2. Ix hard copy of a USGS map identifying the project location and GPS coordinates for the project. This is required per 15A NCAC 02H .1043(3)(e) and per Section F of the Application. One hard copy of a USGS map was provided (in the Hydrology and Erosion Control Study), however two hard copies are required. CDC — Two copies of the USGS map are provided. 3. Ix hard copy of the construction sequence discussing how any future development on the project maybe phased. This is required per 15A NCAC 02H .1043(3)(g). One hard copy of the construction sequence was provided (in the Hydrology and Erosion Control Study), however two hard copies are required. CDC — The Construction Sequence provided on C931 has been provided as a separate signed/sealed page. 4. 2x hard copies of documentation from the NC Secretary of State or other official documentation which supports the titles and positions held by the persons listed in Section C.2 of the Application per 15A NCAC 2H. 1043(3)(b). This is required per Section F of the Application. CDC — Two copies of the documentation have been provided. Mailing Address: P.O. Box 5432, Asheville, NC 28813 168 Patton Avenue Asheville, NC 28801 52 Walnut Street — Suite 9, Waynesville, NC 28786 Phone 828-252-5388 Fax 828-252-5365 Phone: 828-452-4410 Fax: 828-456-5455 Legacy at Mills River — Phase 1 November 22, 2022 Page 2 5. Please indicate whether both phases of the project are being permitted with the submitted application, or only Phase 1. The project name stated on the application is "Legacy at Mills River — Ph. V' CDC — This plan set is for Phase 1 only. 6. Section E.5 of the application listed BUA associated with Existing Development. Please note that "Existing development" as defined in 15A NCAC 02H .1002, means those projects that are built or those projects that have established a vested right under North Carolina law as of the effective date of the state stormwater program or applicable local government ordinance to which the project is subject. If the existing BUA indicated on the application was built after the post -construction stormwater rules went into effect (2006), and cumulatively disturbed 1.0 acre or more, a stormwater permit was required, and the proposed project is not eligible to be permitted under the Fast -Track ATC process. Please provide the construction date and total area of the existing pavement, buildings, bridge, and gravel road shown on the submitted plans. CDC — Based on discussions with the current owner, it is our understanding that the site was previously permitted before 2006 by a now defunct developer. Since 2006, the only improvements to the site have been the pavement associated with the temporary sales center. These improvements disturbed less than 1 acre and this impervious area will be removed once the project is complete. Based on this information it is our understanding that Phase 1 can continue as a fast -track review. Please find enclosed the following items for your review and approval: • Two (2) State Stormwater Fast Track Process: "Authorization to Construct" (ATC) Permit Application Forms [ORIGINALS] • Two (2) USGS Maps • Two (2) Construction Sequence excerpt from Sheet C931. • Two (2) North Carolina Secretary of State documentation If you should have any questions or need any additional information during your review, please do not hesitate to call our office. Sincerely, W"' Michael Ca' P.E. Civil Design Concepts, P.A. mcain@cdcgo.com