Loading...
HomeMy WebLinkAbout20150023 Ver 2_Emails_20150415Burdette, Jennifer a From: Burdette, Jennifer a Sent: Wednesday, April 15, 2015 4:40 PM To: 'Jonathan L. McDaniel' Cc: Shaver, Brad E SAW Subject: RE: Marine Chevrolet y *Email correspondence to and from this address may be subject to the North Carolina Public Records Low and may be disclosed to third parties unless the content is exempt by statute or other regulation. * From: Jonathan L. McDaniel rmailto :jmcdanielCa)bizec.rr.coml Sent: Wednesday, April 15, 2015 10:23 AM To: Burdette, Jennifer a Cc: Shaver, Brad E SAW Subject: Marine Chevrolet Jennifer, As discussed, attached is the detail showing the gabion mattress inside the drainage junctions to address the aquatic life movement general condition. Please review and comment. If you are o.k. with this concept, I will proceed to revise the impact maps to include this detail, and also include some construction notes for pumping around if a rain event should occur. Just a reminder that we are not installing a rip rap apron at the outlet because we are addressing the velocity by using flat slopes on the pipes and having the 12" drops inside the junctions. Thanks, 1 Jonathan L. McDaniel, PE Parker & Associates, Inc. Engineers * Surveyors * Planners (910) 455 -2414 Firm License Number - F -0108 www.parkerengineeringandsurveying.com USE AN APPROVED BUTYL RUBBER (MASTIC) SEALANT APPLIED TO TOP OF CONE SECTION 2' THRU 4' ECCENTRIC C( AS REQUIRED 1' THRU 4' RISER SECTIOr AS REQUIRED PRECAST OPENING REQUIRED FOR ALL PIPES. SEE PLANS FOR PIPE SIZES 6" MINIMUM EXTENDED BASE BASE SECTION AS REQUIRED 6" MINIMUM SET MANHOLE ON 12" OF No. 57 STONE. — PLACE COMPACTED No. 57 STONE AROUND ALL PIPES EXTENDED BASE ALL MANHOLES CORROSION RESISTANT MESH—\ 5:1 r .....................� 1/2" DIA. STAINLESS STEEL . "U" BOLT ■ 3/4" RAID. PLACE "U" BOLT 12" FROM TOP ; OF MH . . . . . . . . . . . . . . . . . . . . . i ALL JOINTS TO BE T & G W /PREFORMED BUTYL RUBBER (MASTIC) GASKET MEETING AASHTO M -198, ASTM. C -990, FED SPEC SS -S -00210 (210A) PRECAST MANHOLE TO MEET REQUIREMENTS OF ASTM. C478, AASHTO M -199 • a 5:1 GABION MATTRESS -4" DIA. RIP RAP -3 "x3" MESH OPENINGS -MESH TO BE CORROSION RESISTANT MEETING ASTM 974 -97 F�w GABION MATTRESS WITH 4" DIA. RIP RAP 12" DROP FROM INVERT TO INSIDE BOTTOM MARINE CHEVROLET DRAINAGE JUNCTION DETAIL Not to Scale Parker & Associates, Inc. Consulting Engineers P.O. Boa 976 - 28541 -0976 ors - Land Planners 306 New Bridge Street - 28540 Land Surveyors Jacksonville, North Carolina Phone (910) 455 -2414 - Fax (910) 455 -3441 Firm License Number: F -0108 S.ps4i°g Hor �2p�s