HomeMy WebLinkAbout090169_POA for High Freeboard_20230206PLAN OF „ CTI MN (POA) FOR MGH FGRZEEBOARD AT AN if AL FA- U TIES
Facility Number: 9 4 !
Facility name: &IUespif-
Certified Operator Name:
county-
. 1-3 ia-zato
Operator # 1(,0011010
1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the
lowest point on the top of the dam for lagoons without spillways; and from the current liquid level
in the lagoon to the bottom of the spillway for lagoons with spillways.
Structure 1 Structure 2 Structure 3 Structure 4
Lagoon Name/Identifier (ID): 1
Spillway (Yes or No): Nb
Level (inches):
2. Check all applicable items
' u e 5 Structure 6
44
zr� 3
L-7- L�?/QI&I
or,
Liquid level is within the designed structural freeboard elevations of one or more structures. Five
and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within
acceptable ranges.
✓ Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day
Plan of Action is attached. Agronomic balance is within acceptable range.
Waste is to be pumped and hauled to off site locations. Volume and PAN content of waste to
pumped and hauled is reflected in section III tables. Included- within this plan is a list of the
proposed sites with related facility number(s), number acres and receiving crop information.
Contact and secure approval from the Division of Water Quality prior to transfer of waste
to a site not covered in the facility's ceatified animal waste management plan.
Operation will be partially or fully depopulated.
attach a complete schedule with corresponding animal units and dates for depopulation
if animals are to be moved to another permitted facility, provide facility number, lagoon
freeboard levels and herd population for the receiving facility
3. Earliest possible date to begin land application of waste:
2/&Ja3
I hereby certify. that I have reviewed the information listed above and included within the attached Plan
of Action, and to the best of my knowledge and ability, the information is accurate and correct.
�� S rf �I&
C 2,C �e e S pc Phone:
Facility Owner/Manager (print)
1242�� �,� Dame: `�
Facility OwnerlManagert (signature)
PoA Cover Page 2121100
II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24
HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY
1. Structure ID: Gillespie line m = 395.4 lb PAN
2. Structure ID: line m = lb PAN
3. Structure ID: line m = lb PAN
4. Structure ID: line m = lb PAN
5. Structure ID: line m = lb PAN
6. Structure ID: line m = lb PAN
n. lines 1 +2+3+4+5+6= 395.4 lb PAN
III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN
01=R1nn nn NnT i icT 1=I1=I nS TO wNlrla PAN roNNOT RF APPI IFD DURING THIS 3n DAY PERIOD.
o. tract #
p. field #
q. crop
r. acres
s. remaining IRR
2 PAN balance
(lb/acre)
t. TOTAL PAN
BALANCE FOR
FIELD (lbs.)
column r x s
u. application window'
1754
12
overseed
1.60
40.00
64.0
Oct - March
1754
14
overseed
1.60
40.00
64.0
Oct - March
1754
15
overseed
9.20
40.00
368.0
Oct - March
1754
6
overseed
4.00
40.00
160.0
Oct - March
1754
8
overseed
1.60
40.00
64.0
Oct - March
** guestimate on OS PAN left
'State current crop ending application date or next crop application beginning date for available
receiving crops during 30 day draw down period.
v. Total PAN available for all fields (sum of column t) = 720.0 Ib. PAN
IV. FACILITY'S PoA OVERALL PAN BALANCE
w. Total PAN to be land applied (line n from section II) = 395.4 Ib. PAN
x. Crop's remaining PAN balance (line v from section III) = 720.0 lb. PAN
y. Overall PAN balance (w - x) _ -325 lb. PAN
NARRATIVE:
Will begin pumping as soon as field conditions permit.
PoA (30 Day) 2/21 /00
PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
30 DAY DRAW DOWN PERIOD
I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE
1. Structure Name/Identifier (ID): JGillespie
2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard
a. current liquid level according to marker 17.0 inches
b. designed 25 yr./24 hr. storm & structural freeboard 19.0 inches
c. line b - line a (inches in red zone) = 2.0 inches
d. top of dike surface area according to design
(area at below structural freeboard elevation) 78408 ft2
e. line c/12 x line d x 7.48 gallons/ft3 97749 gallons
3. Projected volume of waste liquid produced during draw down period
f. temporary storage period according to structural design 180 days
g. volume of waste produced according to structural design 105497 ft3
h. current herd # 1 2666 certified herd #1 3200
actual waste produced = current herd # x line g =
certified herd #
i. volume of wash water according to structural design
j. excess rainfall over evaporation according to design
k. (lines h + i + j) x 7.48 x 30 days/line f=
4. Total PAN to be land applied during draw down period
I. current waste analysis dated 1 10/20/2022
m. ((lines e + k)/1000) x line I =
REPEAT SECTION 1 FOR EACH WASTE STRUCTURE ON SITE.
(Click on the next Structure tab shown below)
87892 ft3
Offs
48020 ft3
169437 gallons
1.48 Ibs/1000 gal.
395.4 lbs. PAN
PoA (30 Day) 2/21 /00