Loading...
HomeMy WebLinkAbout090169_POA for High Freeboard_20230206PLAN OF „ CTI MN (POA) FOR MGH FGRZEEBOARD AT AN if AL FA- U TIES Facility Number: 9 4 ! Facility name: &IUespif- Certified Operator Name: county- . 1-3 ia-zato Operator # 1(,0011010 1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the lowest point on the top of the dam for lagoons without spillways; and from the current liquid level in the lagoon to the bottom of the spillway for lagoons with spillways. Structure 1 Structure 2 Structure 3 Structure 4 Lagoon Name/Identifier (ID): 1 Spillway (Yes or No): Nb Level (inches): 2. Check all applicable items ' u e 5 Structure 6 44 zr� 3 L-7- L�?/QI&I or, Liquid level is within the designed structural freeboard elevations of one or more structures. Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within acceptable ranges. ✓ Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day Plan of Action is attached. Agronomic balance is within acceptable range. Waste is to be pumped and hauled to off site locations. Volume and PAN content of waste to pumped and hauled is reflected in section III tables. Included- within this plan is a list of the proposed sites with related facility number(s), number acres and receiving crop information. Contact and secure approval from the Division of Water Quality prior to transfer of waste to a site not covered in the facility's ceatified animal waste management plan. Operation will be partially or fully depopulated. attach a complete schedule with corresponding animal units and dates for depopulation if animals are to be moved to another permitted facility, provide facility number, lagoon freeboard levels and herd population for the receiving facility 3. Earliest possible date to begin land application of waste: 2/&Ja3 I hereby certify. that I have reviewed the information listed above and included within the attached Plan of Action, and to the best of my knowledge and ability, the information is accurate and correct. �� S rf �I& C 2,C �e e S pc Phone: Facility Owner/Manager (print) 1242�� �,� Dame: `� Facility OwnerlManagert (signature) PoA Cover Page 2121100 II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY 1. Structure ID: Gillespie line m = 395.4 lb PAN 2. Structure ID: line m = lb PAN 3. Structure ID: line m = lb PAN 4. Structure ID: line m = lb PAN 5. Structure ID: line m = lb PAN 6. Structure ID: line m = lb PAN n. lines 1 +2+3+4+5+6= 395.4 lb PAN III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN 01=R1nn nn NnT i icT 1=I1=I nS TO wNlrla PAN roNNOT RF APPI IFD DURING THIS 3n DAY PERIOD. o. tract # p. field # q. crop r. acres s. remaining IRR 2 PAN balance (lb/acre) t. TOTAL PAN BALANCE FOR FIELD (lbs.) column r x s u. application window' 1754 12 overseed 1.60 40.00 64.0 Oct - March 1754 14 overseed 1.60 40.00 64.0 Oct - March 1754 15 overseed 9.20 40.00 368.0 Oct - March 1754 6 overseed 4.00 40.00 160.0 Oct - March 1754 8 overseed 1.60 40.00 64.0 Oct - March ** guestimate on OS PAN left 'State current crop ending application date or next crop application beginning date for available receiving crops during 30 day draw down period. v. Total PAN available for all fields (sum of column t) = 720.0 Ib. PAN IV. FACILITY'S PoA OVERALL PAN BALANCE w. Total PAN to be land applied (line n from section II) = 395.4 Ib. PAN x. Crop's remaining PAN balance (line v from section III) = 720.0 lb. PAN y. Overall PAN balance (w - x) _ -325 lb. PAN NARRATIVE: Will begin pumping as soon as field conditions permit. PoA (30 Day) 2/21 /00 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): JGillespie 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker 17.0 inches b. designed 25 yr./24 hr. storm & structural freeboard 19.0 inches c. line b - line a (inches in red zone) = 2.0 inches d. top of dike surface area according to design (area at below structural freeboard elevation) 78408 ft2 e. line c/12 x line d x 7.48 gallons/ft3 97749 gallons 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design 180 days g. volume of waste produced according to structural design 105497 ft3 h. current herd # 1 2666 certified herd #1 3200 actual waste produced = current herd # x line g = certified herd # i. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h + i + j) x 7.48 x 30 days/line f= 4. Total PAN to be land applied during draw down period I. current waste analysis dated 1 10/20/2022 m. ((lines e + k)/1000) x line I = REPEAT SECTION 1 FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) 87892 ft3 Offs 48020 ft3 169437 gallons 1.48 Ibs/1000 gal. 395.4 lbs. PAN PoA (30 Day) 2/21 /00